DAILY WATERLINE REPORT

DESCO PGPC-TIWI
Operator
DESCO INC.
Contractor
REPORT NO.

WATERLINE Well Site: NAG 64 Report Date: Jan. 9, 2019


PROJECTS
Mob Start: TBA Spud Date:
01
Project Mgr: Ronnie Laviña PGPC Rep: Project Head Ruben Millar
Mobile Phone: 09989729850 Mobile Phone: Mobile Phone: 09989688647
SAFETY MONITORING
Safety Topic: TSR # 01. Days Activity.
Without LTA since first day (Last Nov 02, 2017)

LTA: 0 MTI: 0 FAC: 0 RWC: 0 NM: 0

TIME SUMMARY
Start End Duration Waterline Crew Activities Pump Activities
Pump Operating Standby Shutdown
No. Hours Hours Hours

Toolbox meeting 12 0 0

GM Engine
1. Cleaning of engine parts and accessories by using Diesel as cleaning agent.
2. Sanding of the engine camshaft and engine block.
3. Resetting of the crankshaft.

Caterpillar Engine 343


1. Draining of the engine oil.
2. Pulling out of the crank case.
0600 1800 12 hours
Cummins Engine BigCamm 855 5TUT pump
1. Pulling out of the radiator, cylinder head, intake manifold, turbo, and raker
arm.
**Subject for troubleshooting - Lack of oil distribute in cylinder head

Vacuum truck
1. Rewiring of electrical functions

Skid
1. Continuous fabrication work for the skid of Caterpillar Engine 343

Weather Condition: Sunny

PERSONNEL & EQUIPMENT


No. Name of Personnel No. Equipment
1 PROJECT HEAD: RUBEN P. MILLAR 11 INSTALLER/HELPER: DAVID FELITE 1 Service Pick-Up
2 PROJECT ENGINEER: RK C. AGUIRRE 12 WELDER: ARIEL CASTAÑADE
3 SAFETY OFFICER: EUGENE QUIDLAT 13 PIPE FITTER: ALEX OREO
4 CHIEF MECHANIC: REYNOLD MONTECILLO 14 PIPE FITTER: DENNIS MONTAÑO
5 MECHANIC: REY PALMA 15 PIPE FITTER: PETER AURE
6 MECHANIC ASST.: JAMES MALLIO 16 SERVICE DRIVER: NAVARES, ROMAN
7 ELECTRICIAN: RODERICK BUENDIA 17
8 ELECTRICIAN: CRESENCIO DUCUSIN 18
9 INSTALLER/HELPER: JEFFREY MALAGNO 19
10 INSTALLER/HELPER: MANOLITO MALOLES 20
No. of Pipes Layed

66