Академический Документы
Профессиональный Документы
Культура Документы
Revision
Document No. RDA/SGI/H/C-04
0
RECORD OF REVISIONS
.
TD
Overall carriageway width ow 6m
Clear carriageway width cw 4.25 m
Cross Camber cr.cam 0.00%
REINFORCING STEEL
Grade of Reinforcement fyk = Fe 500 Mpa
Design yield strength of reinforcement fyd = 0.870 *fyk
= 434.78 Mpa
Modulus of Elasticity Es = 200000 Mpa
3
RCC Density γrcc 2.5 t/m
3
Dry density of earth γearth 2 t/m
ANALYSES ASSUMPTION
Enviromental parameters
Relative humidity = 51 %
Exposure condition = Severe
Relative humidity is taken as 45% for the calculation of stresses to keep differential shrinkage on conservative side.
Otherwise the exposure condition is severe, therefore minimum cover shall be 45mm.
.
Creep for pier cap
TD
Cross-sectional Area Ac = 3.50 m2
Perimeter in contact with atmosphere u = 7.50 m
Notational size ho 2Ac/u = 933.333 mm
Age of concrete at the time of loading to = 90 days
t considered = 25550 days
= 1.61 (Refer Appendix B)
1.78 *(Increased by 10% on the conservative side)
2
Ecm' = 11638.0 N/mm
SEISMIC PARAMETER
Seismic Zone = IV
Type of soil = medium
Zone factor Z = 0.24
Importance factor I = 1.5
Response Reduction Factor, Rlong. = 3
Response Reduction Factor, Rtrans. = 3
Response Reduction Factor, Rvert. = 3
Page 2 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LEVEL DETAILS :
Formation level FRL 4383.297 m
Lowest Bed Level LBL 4375.010 m (Min Bed Level)
Ground Level GL 4375.670 m
Lowest water level LWL 4375.415 m
Highest flood Level HFL 4378.106 m (As per Hydrological Calculation)
MSL Normal Condition MSL.N 4371.000 m
MSL Seismic Condition MSL.S 4371.711
.
TD
Thickness of Pile Cap plc.thk 1.500 m
Pile Cap Bottom Level el.plc.b 4374.000 m
Page 3 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Bearing Top 4382.650
0.3 Cap Top 4382.150
PIER COMPONENT :-
2.00
4.900
3
GL 4375.670
3.25 3.25
Pile Cap Top 4375.500
1.5
5
Pile Cap Bottom 4374.000
Page 4 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
1.294
2.706
.
TD
8
2.706
1.294
2b 2a 2c
0.875 Cap Bottom 4380.400
1.375
1.375 5.25
3b
8
5.25
3a
3.75
3b
.
TD
1 1 2.000 0.875 8.000 14.0 35.0 7.713 0.000 0.000
2a 1 2.000 0.875 5.250 9.2 23.0 6.838 0.000 0.000
2b 1 2.000 0.875 1.375 2.4 6.0 6.983 0.000 -3.083
2c 1 2.000 0.875 1.375 2.4 6.0 6.983 0.000 3.083
Page 6 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Total Earth Fill 9.62 19.25 1.59 0.00 0.00
TD
Total Weight of Earthfill = 19.25 T
Lever arm from cg of pile cap (along X'X' axis) = 0.00 m
Moment MZ'Z' = 0.00 Tm
Water Weight
8 1 1 8 0.000 8 0.00 0.00 1.50 0 0
9 1 -1 1.5 0.000 3.75 0.00 0.00 1.50 0 0
10 0.785 -1 1.5 0.000 1.5 0.00 0.00 1.50 0 0
Page 7 of 139
Total Water
SPAR GEO INFRA PVT. LTD. 0.00 0.00 0.00 0.00 0.00
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Water Weight
8 1 1 8 0.000 8 0.00 0.00 1.50 0 0
9 1 -1 1.5 0.000 3.75 0.00 0.00 1.50 0 0
10 0.785 -1 1.5 0.000 1.5 0.00 0.00 1.50 0 0
.
Total Water 0.00 0.00 0.00 0.00 0.00
TD
II) HFL
i) Maximum Case
Element Area Fact No.s B H L V W eY eL eT
3
m m m m Tonne m m m
Water Weight
8 1 1 8 2.436 8 155.90 155.90 2.72 0 0
9 1 -1 1.5 2.436 3.75 -13.70 -13.70 2.72 0 0
10 0.785 -1 1.5 2.436 1.5 -4.30 -4.30 2.72 0 0
Water Weight
8 1 1 8 2.606 8 166.78 166.78 2.80 0 0
9 1 -1 1.5 2.606 3.75 -14.66 -14.66 2.80 0 0
10 0.785 -1 1.5 2.606 1.5 -4.61 -4.61 2.80 0 0
Calculation of Bouyancy
HFL Condition
Element Area Fact Nos. B H L V W eY eL eT
3
m m m m T m m m
Pier cap
1 1 -1 2.000 0.000 8.000 0.0 0.0 7.275 0.000 0.000
2a 1 -1 2.000 0.000 5.250 0.0 0.0 6.400 0.000 0.000
2b 0.5 -1 2.000 0.000 0.000 0.0 0.0 6.400 0.000 -2.625
2c 0.5 -1 2.000 0.000 0.000 0.0 0.0 6.400 0.000 2.625
Pier Shaft
3a 1 -1 1.5 2.61 3.75 -14.66 -36.6 2.80 0.000 0.000
3b 0.7854 -1 1.5 2.61 1.5 -4.61 -11.5 2.80 0.000 0.000
Pile Cap
Page 8 of 139
SPAR GEO7 INFRA PVT.
1 LTD. -1 8 1.5 8 -96.00 -240.00 0.75 0.000 0.000
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
LWL Condition
Pier Shaft
3a 1 -1 1.5 0.00 3.75 0.00 0.0 2.80 0.000 0.000
3b 0.7854 -1 1.5 0.00 1.5 0.00 0.0 2.80 0.000 0.000
Pile Cap
7 1 -1 8 1.415 8 -90.56 -226.40 0.75 0.000 0.000
Page 9 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
fcm = 45 Mpa
t = 25550 days
to = 90 days
o = RHfcmto
.
TD
RH = 1+ 1 - RH/100 for fcm ≤ 45 Mpa
1/3
0.1 ( ho )
RH = Relative humidity
= 51 %
ho = 1210.6 mm
RH = 1.45976
o = 1.59666
Page 10 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
fcm = 45 Mpa
t = 25550 days
to = 90 days
o = RHfcmto
.
TD
RH = 1+ 1 - RH/100 for fcm ≤ 45 Mpa
1/3
0.1 ( ho )
RH = Relative humidity
= 51 %
ho = 933.333 mm
RH = 1.501
o = 1.642
H = 1479.02
Page 11 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Page 12 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Snow Load
Cg above Deck Top = 0.50 m
.
TD
Page 13 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
43.417 43.417
TD
43.28 43.28
CLASS A
TYPE 1 2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
DIST 1.1 3.2 1.2 4.3 3 3 3
6.8 6.8 6.8 6.8 11.4 11.4 2.7 2.7
3 3 3 4.3 1.2 3.2 1.1
R11 R22 R33 eccn R11 R22 R33 eccn R11 R22 R33 R22 L span R span eccn
Rmax (T) (T) (T) (m) (T) (T) (T) (m) (T) (T) (T) (T) (T-m) (T-m) (m)
.
TD
Class 70RW - 1 4 93 3 -1 0 0 0 9 200 7 200 -118 -126 -1.22
Class 70RT - 1 1 68 1 -1 0 0 0 3 147 2 147 -93 -94 -1.28
Class A - 1 Lane 0 0 0 0 5 49 1 0.075 6 57 1 57 2 2 0.08
Pmax 9 200 7 200 -118 -126 -1.220
Load
70RW Class A
Reaction Trans. Reaction Trans. Reaction MLL Trans.
R11 R22 R33 eccn R11 R22 R33 eccn R11 R22 R33 R22 L span R span eccn
Mmax (T) (T) (T) (m) (T) (T) (T) (m) (T) (T) (T) (T) (T-m) (T-m) (m)
Page 15 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Maximum Reaction case :
Forces @ L-T axis at c/L Pile Cap bottom Left span Right span
Vertical Load (LL Reaction) = 96.3 T 103.3 T
Eccentricity from c/L of pier in longitudinal dir. n = 0.00 m 0.00 m
Moment MTT = 0.0 Tm 0.0 Tm
Eccentricity from c/L of pier in transverse dir. n = -1.22 m -1.22 m
Moment MLL = -117.5 Tm -126.1 Tm
Cg. From pile cap bottom = 10.5 m 10.5 m
Page 16 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
govern
* Fh (breaking force) is considered 20 % of the first train load + 10 % of the load of the succeeding trains or
part thereof.
Reaction due to dead load and Snow load at free end of left & right span
Load description Left span Right span
Tonne Tonne
DL 60.00 60.00
Snow load 22.67 22.67
Surfacing 0.00 0.00
Rg 82.67 82.67
Page 17 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Flogitudnal 8.150 Flogitudnal 19.692
Contraction Case Contraction Case
0.03 0.05 0.03 0.05
Fh/2+R 10.500 Fh/2+R 16.490 -
Fh/2+R 15.111 Fh/2+R 9.252
Flogitudnal 25.612 Flogitudnal 25.742
Page 18 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
C) No Live load condition 13.23 8.65 114.42
Page 19 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
bearings for the earthquake in the longitudinal direction.
TD
Diagram showing location of F and measured deflection:
1 mm deflection
6.65
Shaft Bottom/ Point of fixity
Basic Data:
Modulus of Elasticity E 32308.2 Mpa
Page 20 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Table for calculation of Seismic Coefficient in Longitudinal, Transverse and Vertical direction
.
Length upto load point L m L.L 7.15 L.T 7.47
TD
Horizontal force F T F.L 7.36 F.T 6.91
Page 21 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Forces @ Pile cap bottom & Their Lever arm from pile cap bottom
Left span Right span
Description W ey W ey
Tonne m Tonne m
.
Total Super-Structure DL = 120.0 8.974 120.0 8.974
TD
Total Super-Structure Snow load = 45.3 9.797 45.3 9.797
Total Surfacing weight = 0.0 9.322 0.0 9.322
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.2025
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.203
Page 22 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
SEISMIC VERTICAL :
Reaction due to DL, Snow load & Surfacing @ Pile cap bottom
Left span Right span
Description V MTT MLL V MTT MLL
Tonne Tm Tm Tonne Tm Tm
Total Super-Structure DL = 60.0 0.0 0.0 60.0 0.0 0.0
Total Super-Structure Snow load = 22.7 4.1 0.0 22.7 4.1 0.0
Total Surfacing weight = 0.0 0.0 0.0 0.0 0.0 0.0
.
TD
Horizontal seismic coefficent Av = 0.135
Total weight of sup DL, Snow load & surfacing = 165.3 Tonne
Right span
At Fixed End, Force about V HL HT ey MTT MLL
toe T T T m Tm Tm
Seismic Longitudinal 33.5 8.7 289.6
Page 23 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Longitudinal Horizontal seismic coefficent AhL = 0.203
Transverse Horizontal seismic coefficent AhT = 0.203
Vertical seismic coefficent AV = 0.135
Live load Reaction & Their Lever arm from Pile cap bottom
Max Reaction case Left span Right span
Description W MTT MLL ey W MTT MLL ey
Tonne Tm Tm m Tonne Tm Tm m
Max Reaction case = 96.3 0.0 -117.5 10.5 103.3 0.0 -126.1 10.5
Max Moment case = 0.0 0.0 0.0 10.5 189.4 0.0 -231.1 10.5
SEISMIC LONGITUDINAL :
No Live Load seismic component is considered in longitudinal direction
* 20% of braking force is considered
Fh = 41.79 x 0.2
= 8.36 Tonne
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.203
Page 24 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Max Live Load Reaction Case :
TD
Maximum Live Load reaction = 96.33 Tonne 103.34 Tonne
Seismic Component HT = 3.90 Tonne 4.19 Tonne
Lever arm above base slab = 10.50 m 10.50 m
Moment about LL axis MLL = 40.95 Tm 43.93 Tm
SEISMIC VERTICAL :
Vertical seismic coefficent AhT = 0.135
Page 25 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Max Live Load Reaction Case :
TD
Left span Right span
At Fixed/ Free End V HL HT ey MTT MLL V HL HT ey MTT MLL
T T T m Tm Tm T T T m Tm Tm
Seismic Longitudinal 0.0 0.0 0.0 8.4 8.7 72.3
Page 26 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
govern
* Fh (breaking force) is considered 20 % of the first train load + 10 % of the load of the succeeding trains or
part thereof.
Reaction due to dead load and Snow load at free end of left & right span
Load description Left span Right span
Tonne Tonne
DL 60.00 60.00
Snow load 22.67 22.67
Surfacing 0.00 0.00
Rg 82.67 82.67
Page 27 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Flogitudnal 4.740 Flogitudnal 13.356
TD
Contraction Case Contraction Case
0.03 0.05 0.03 0.05
R -4.960 - R -10.950 -
Fh/2+R 10.679 Fh/2+R 8.727
Flogitudnal 5.719 Flogitudnal -2.224
Page 28 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Total 407.6 2.7 0.00 0.00
W = Weight of super-structure
ey = Cg. above base slab in vertical direction
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.203
Total weight of Sub-structure = 407.6 T
SEISMIC VERTICAL :
Horizontal seismic coefficent Av = 0.135
Total weight of Sub-structure = 407.6 Tonne
Page 29 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Exposed area of Super structure A3 119.0 m2
TD
Drag co efficient for Super structure CD 1.95
Drag co efficient for live load Super structure CD 1.2
Gust Factor G 2
Lift coefficient CL 0.75
2 2
Basic Wind Pressure @ Bridge Location 66 m/s = 4.000
Wind pressure= Ratio Basic wind speed as per TABLE 4 IRC 6-2014 33 m/s
Due to Dead load of Super structure
Horizpntal wind pressure P 80.9 Kg/m2 ( IRC:6 - 2014,Page 31)
Transverse force PZ X A1 x G x CD 75.5 T
Longitudinal force 25% FT 18.9 T
Verticle force PZ X A3 x G x CL 14.5 T
1.5
5.25
Height of pier 6.7 m
Exposed Area of sub structure in T‐Dirn 10.0 m2
Exposed Area of sub structure in L‐Dir n 34.9 m2
Drag co efficient for Sub structure CD 0.9
Transverse force PZ X A1 x G x CD 1.5 T
Page 30 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
V HL HT ey MTT MLL
At Fixed End, Force about toe
T T T m Tm Tm
Super structure 14.5 18.9 75.53 6.7 125.6 502.3
.
TD
Page 31 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Mean velocity of current = 2.5 m/s
Surface water velocity = √2 x 2.5
= 3.54 m/sec
Page 32 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Lever arm above pile cap bottom m 2.901 2.901 2.901
Obstracted area m2 12 12 12
Total Force up to pier shaft bottom T 6.174 2.112 5.802
Lever arm above pile cap bottom m 0.800 0.800 0.800
Page 33 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Lever arm above Pier shaft bottom m 2.901 2.901 2.901
Page 34 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
8 8 8 1.5 75.4 75.4
Pile cap bottom 4374.0
Deepest scour level 4371.0 7.7 7.7 7.7 3.0 139.7 139.7
Total Force F = Ce * h *W
Total force = C3 F
C3 = 0.495
Force up to pile cap bottom = 15.746
Lever arm above scour level = C4H
C4 = 0.6513
Lever arm above scour level = 4.628202 m
Lever arm above pile cap bottom = 1.6 m
Moment at pile cap bottom = 25.63741 tm
Page 35 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Seismic Transvers
h = 0.203
F = 31.821 Tonne
Levera arm above scour level = 3.046 m
.
TD
Total force = C3 F
C3 = 0.495
Force up to pile cap bottom = 15.746
Lever arm above scour level = C4H
C4 = 0.6513
Lever arm above scour level = 4.628202 m
Lever arm above pile cap bottom = 1.6 m
Moment at pile cap bottom = 25.63741 tm
Total force = C3 F
C3 = 0.254
Force up to pier shaft bottom = 8.085
Lever arm above scour level = C4H
C4 = 0.771
Lever arm above scour level = 5.479 m
Lever arm above pier shaft bottom = 0.979 m
Moment at pier shaft bottom = 7.916 tm
Page 36 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
Seismic Transvers
h = 0.203
F = 31.821 Tonne
Levera arm above scour level = 3.046 m
.
TD
Total force = C3 F
C3 = 0.254
Force up to pier shaft bottom = 8.085
Lever arm above scour level = C4H
C4 = 0.7711
Lever arm above scour level = 5.479162 m
Lever arm above pile cap bottom = 1.0 m
Moment at pier shaft bottom = 7.916196 tm
Page 37 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates
TD
S.N. L T S.N. L T S.N. L T S.N. L T S.N. L T
1 -3.00 -3.00 13 -2.00 2.00 25 0.00 0.00 37 2.00 -2.00 49 3.00 3.00
N = 49 Nos. 2 -3.00 -2.00 14 -2.00 3.00 26 0.00 1.00 38 2.00 -1.00
3 -3.00 -1.00 15 -1.00 -3.00 27 0.00 2.00 39 2.00 0.00
4 -3.00 0.00 16 -1.00 -2.00 28 0.00 3.00 40 2.00 1.00
5 -3.00 1.00 17 -1.00 -1.00 29 1.00 -3.00 41 2.00 2.00
1X7 6 -3.00 2.00 18 -1.00 0.00 30 1.00 -2.00 42 2.00 3.00
1 1 7 -3.00 3.00 19 -1.00 1.00 31 1.00 -1.00 43 3.00 -3.00
8 -2.00 -3.00 20 -1.00 2.00 32 1.00 0.00 44 3.00 -2.00
1 9 -2.00 -2.00 21 -1.00 3.00 33 1.00 1.00 45 3.00 -1.00
1 10 -2.00 -1.00 22 0.00 -3.00 34 1.00 2.00 46 3.00 0.00
11 -2.00 0.00 23 0.00 -2.00 35 1.00 3.00 47 3.00 1.00
T 1 12 -2.00 1.00 24 0.00 -1 36 2 -3.00 48 3.00 2.00
r2 193.00 181.00
L 1
1 8 LWL Condition Non-Seismic Seismic Case wind case
Maximum Reaction Over Pile = 19.2 Tonne 21.3 Tonne 19.7
1 Minimum Reaction Over Pile = 3.5 Tonne -6.1 Tonne -9.6
Maximum Horizontal Force/ Pile = 0.5 Tonne 2.7 Tonne 2.4
1
1
Pile capacity = 50 Tonne OK [Seismic]
8
Note :
1.Reaction per pile is less than the vertical capacity of the pile hence safe.
2. Horizontal capacity is governing the design and considering the fixity of the piles the horizontal
capacity can be considered as 1.25*2.5*1.25 = 3.91. Hence safe in horizontal loading
Page 38 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
S.N. Description Forces @ cg. Of pile cap bottom Pile Reaction over Pile No.
V HL HT MTT MLL 1 2 3 4 5 6 7 8 9 10 11 12
Tonne Tonne Tonne Tm Tm Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 NS LWL Span dislodge case 283.07 6.6136 0 61.2882 0.06891 4.8 4.8 4.8 4.8 4.8 4.8 4.8 5.1 5.1 5.1 5.1 5.1
LC-2 NS LWL No Live load 365.74 13.2272 0 122.576 0.06891 5.6 5.6 5.6 5.6 5.6 5.6 5.6 6.2 6.2 6.2 6.2 6.2
LC-3 NS LWL With LL max reaction case 565.411 25.7421 0 230.83 -243.529 12.0 10.6 9.3 8.0 6.6 5.3 3.9 13.2 11.8 10.5 9.1 7.8
LC-4 NS LWL With LL max moment case 535.907 25.6115 0 229.701 -231.016 11.2 9.9 8.6 7.4 6.1 4.8 3.5 12.4 11.1 9.8 8.6 7.3
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (50% 273.143 64.6191 14.8905 317.366 56.5741 -0.3 0.0 0.3 0.6 1.0 1.3 1.6 1.3 1.7 2.0 2.3 2.6
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (50% 273.143 24.0152 49.6352 138.054 188.423 0.3 1.3 2.4 3.4 4.5 5.5 6.6 1.0 2.1 3.1 4.1 5.2
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50% 292.997 64.6191 14.8905 317.532 56.5769 0.1 0.4 0.7 1.0 1.4 1.7 2.0 1.8 2.1 2.4 2.7 3.0
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50% 292.997 24.0152 49.6352 138.219 188.426 0.7 1.7 2.8 3.8 4.9 5.9 7.0 1.4 2.5 3.5 4.5 5.6
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 342.538 129.238 34.8033 634.568 159.28 -5.5 -4.6 -3.8 -2.9 -2.0 -1.1 -0.2 -2.2 -1.3 -0.5 0.4 1.3
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 342.538 48.0305 116.011 275.942 530.78 -6.1 -3.2 -0.2 2.7 5.6 8.6 11.5 -4.7 -1.7 1.2 4.1 7.1
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 388.943 129.238 34.8033 635.229 159.286 -4.6 -3.7 -2.8 -1.9 -1.1 -0.2 0.7 -1.3 -0.4 0.5 1.4 2.2
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 388.943 48.0305 116.011 276.604 530.785 -5.2 -2.2 0.7 3.6 6.6 9.5 12.4 -3.7 -0.8 2.1 5.1 8.0
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 380.855 129.367 35.2885 635.681 117.627 -4.1 -3.4 -2.8 -2.1 -1.5 -0.8 -0.2 -0.8 -0.1 0.5 1.2 1.8
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 380.855 48.1593 117.628 277.056 501.011 -4.8 -2.1 0.7 3.5 6.2 9.0 11.8 -3.4 -0.6 2.1 4.9 7.7
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 430.494 129.367 35.2885 636.342 113.686 -3.0 -2.4 -1.7 -1.1 -0.5 0.2 0.8 0.3 0.9 1.6 2.2 2.8
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 430.494 48.1593 117.628 277.717 497.07 -3.8 -1.0 1.7 4.5 7.2 10.0 12.7 -2.3 0.4 3.2 5.9 8.7
LC-17 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 359.64 121.73 35.2636 569.623 119.767 -3.5 -2.8 -2.2 -1.5 -0.9 -0.2 0.5 -0.5 0.1 0.8 1.4 2.1
LC-18 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 359.64 40.5224 117.545 210.998 502.54 -4.3 -1.5 1.3 4.1 6.8 9.6 12.4 -3.2 -0.4 2.4 5.2 7.9
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 409.113 121.73 35.2636 570.284 116.029 -2.4 -1.8 -1.2 -0.5 0.1 0.8 1.4 0.5 1.2 1.8 2.4 3.1
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 409.113 40.5224 117.545 211.659 498.802 -3.2 -0.5 2.3 5.1 7.8 10.6 13.3 -2.1 0.6 3.4 6.2 8.9
LC-21 NS HFL Span dislodge case 359.207 10.3647 7.08887 67.7326 8.44312 6.1 6.2 6.2 6.3 6.3 6.4 6.4 6.5 6.5 6.6 6.6 6.7
LC-22 NS HFL No Live load 441.877 16.9783 7.08887 129.021 8.44312 6.9 6.9 7.0 7.0 7.1 7.1 7.2 7.5 7.6 7.6 7.7 7.7
LC-23 NS HFL With LL max reaction case 641.547 29.4932 7.08887 237.275 -235.154 13.3 12.0 10.7 9.4 8.1 6.8 5.5 14.5 13.2 11.9 10.6 9.3
LC-24 NS HFL With LL max moment case 621.668 29.3626 7.08887 236.145 -222.642 12.7 11.5 10.2 9.0 7.8 6.6 5.3 13.9 12.7 11.5 10.2 9.0
Page 39 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-25 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (50 349.28 76.2431 24.3413 336.63 68.794 0.8 1.1 1.5 1.9 2.3 2.7 3.0 2.5 2.9 3.3 3.6 4.0
LC-26 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (50 349.28 30.1282 64.597 148.344 209.616 1.3 2.5 3.7 4.8 6.0 7.1 8.3 2.1 3.3 4.4 5.6 6.7
.
LC-27 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50% 369.134 76.2431 24.3413 336.795 68.7968 1.2 1.5 1.9 2.3 2.7 3.1 3.4 2.9 3.3 3.7 4.0 4.4
TD
LC-28 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50% 369.134 30.1282 64.597 148.509 209.619 1.8 2.9 4.1 5.2 6.4 7.5 8.7 2.5 3.7 4.8 6.0 7.2
LC-29 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 418.675 148.735 46.6159 666.649 175.346 -4.7 -3.8 -2.8 -1.8 -0.8 0.1 1.1 -1.3 -0.3 0.7 1.6 2.6
LC-30 LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3 418.675 56.5053 138.846 290.078 564.791 -5.3 -2.2 0.9 4.0 7.2 10.3 13.4 -3.8 -0.7 2.4 5.5 8.7
LC-31 LC-22 + Seismic Sx=1,Sz=0.3,Sy=0.3 465.08 148.735 46.6159 667.31 175.351 -3.8 -2.8 -1.9 -0.9 0.1 1.1 2.0 -0.3 0.6 1.6 2.6 3.5
LC-32 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 465.08 56.5053 138.846 290.739 564.797 -4.4 -1.3 1.9 5.0 8.1 11.2 14.3 -2.9 0.2 3.4 6.5 9.6
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 456.992 148.864 47.1011 667.763 133.692 -3.3 -2.5 -1.8 -1.1 -0.3 0.4 1.2 0.2 0.9 1.7 2.4 3.1
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 456.992 56.6341 140.463 291.192 535.022 -4.1 -1.1 1.8 4.8 7.8 10.7 13.7 -2.6 0.4 3.4 6.3 9.3
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 506.631 148.864 47.1011 668.424 129.752 -2.2 -1.5 -0.8 -0.1 0.7 1.4 2.1 1.3 2.0 2.7 3.4 4.1
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 506.631 56.6341 140.463 291.853 531.081 -3.0 -0.1 2.9 5.8 8.7 11.7 14.6 -1.5 1.4 4.4 7.3 10.2
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 455.024 141.227 42.3524 601.704 128.141 -2.2 -1.5 -0.8 -0.1 0.6 1.3 2.1 0.9 1.6 2.3 3.1 3.8
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 455.024 48.9973 124.634 225.133 510.914 -2.7 0.1 3.0 5.8 8.6 11.4 14.3 -1.5 1.3 4.1 7.0 9.8
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 504.497 141.227 42.3524 602.366 124.403 -1.1 -0.4 0.2 0.9 1.6 2.3 3.0 2.0 2.7 3.4 4.1 4.7
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 504.497 48.9973 124.634 225.794 507.176 -1.6 1.2 4.0 6.8 9.6 12.4 15.2 -0.5 2.4 5.2 8.0 10.8
LC-41 NS LWL Span dislodge case+wind load 216.514 24.8066 100.308 150.544 17.3548 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.6 2.7 2.8 2.9 3.0
LC-42 NS LWL No Live load+wind load 299.184 24.8066 100.308 154.625 17.3548 3.4 3.5 3.6 3.7 3.8 3.9 4.0 4.2 4.3 4.4 4.5 4.6
LC-43 NS LWL With LL max reaction case+wind 245.815 85.4733 57.4703 700.447 -226.243 -2.1 -3.4 -4.6 -5.9 -7.1 -8.4 -9.6 1.5 0.3 -1.0 -2.2 -3.5
LC-44 NS LWL With LL max reaction succeding 299.265 60.4038 100.308 462.541 -104.444 0.6 0.1 -0.5 -1.1 -1.7 -2.2 -2.8 3.0 2.5 1.9 1.3 0.7
LC-45 NS HFL Span dislodge case+wind load 216.514 24.8066 100.308 150.544 17.3548 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.6 2.7 2.8 2.9 3.0
LC-46 NS HFL No Live load+wind load 299.184 24.8066 100.308 154.625 17.3548 3.4 3.5 3.6 3.7 3.8 3.9 4.0 4.2 4.3 4.4 4.5 4.6
LC-47 NS HFL With LL max reaction case+wind 245.815 85.4733 57.4703 700.447 -226.243 -2.1 -3.4 -4.6 -5.9 -7.1 -8.4 -9.6 1.5 0.3 -1.0 -2.2 -3.5
LC-48 NS HFL With LL max reaction succeding+ 278.081 60.4038 100.308 462.541 -104.444 0.2 -0.4 -0.9 -1.5 -2.1 -2.7 -3.2 2.6 2.0 1.5 0.9 0.3
Page 40 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
5.1 5.1 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.8 5.8 5.8 5.8 5.8 5.8 5.8 6.1 6.1 6.1 6.1 6.1 6.1
6.2 6.2 6.8 6.8 6.8 6.8 6.8 6.8 6.8 7.5 7.5 7.5 7.5 7.5 7.5 7.5 8.1 8.1 8.1 8.1 8.1 8.1
6.5 5.1 14.4 13.0 11.7 10.3 9.0 7.7 6.3 15.6 14.2 12.9 11.5 10.2 8.8 7.5 16.8 15.4 14.1 12.7 11.4 10.0
6.0 4.7 13.6 12.3 11.0 9.7 8.5 7.2 5.9 14.8 13.5 12.2 10.9 9.7 8.4 7.1 16.0 14.7 13.4 12.1 10.9 9.6
2.9 3.2 3.0 3.3 3.6 3.9 4.2 4.6 4.9 4.6 4.9 5.3 5.6 5.9 6.2 6.5 6.3 6.6 6.9 7.2 7.5 7.8
6.2 7.3 1.7 2.8 3.8 4.9 5.9 6.9 8.0 2.5 3.5 4.5 5.6 6.6 7.7 8.7 3.2 4.2 5.2 6.3 7.3 8.4
3.3 3.6 3.4 3.7 4.0 4.3 4.6 5.0 5.3 5.0 5.4 5.7 6.0 6.3 6.6 6.9 6.7 7.0 7.3 7.6 7.9 8.2
6.6 7.7 2.1 3.2 4.2 5.3 6.3 7.3 8.4 2.9 3.9 4.9 6.0 7.0 8.1 9.1 3.6 4.6 5.7 6.7 7.7 8.8
2.2 3.1 1.1 1.9 2.8 3.7 4.6 5.5 6.3 4.4 5.2 6.1 7.0 7.9 8.8 9.6 7.6 8.5 9.4 10.3 11.2 12.0
10.0 12.9 -3.2 -0.3 2.6 5.6 8.5 11.4 14.4 -1.8 1.1 4.1 7.0 9.9 12.9 15.8 -0.4 2.6 5.5 8.4 11.4 14.3
3.1 4.0 2.0 2.9 3.8 4.6 5.5 6.4 7.3 5.3 6.2 7.1 7.9 8.8 9.7 10.6 8.6 9.5 10.3 11.2 12.1 13.0
10.9 13.9 -2.3 0.6 3.6 6.5 9.4 12.4 15.3 -0.9 2.1 5.0 7.9 10.9 13.8 16.7 0.6 3.5 6.4 9.4 12.3 15.2
2.5 3.1 2.5 3.2 3.8 4.5 5.1 5.8 6.4 5.8 6.5 7.1 7.8 8.4 9.1 9.7 9.1 9.8 10.4 11.1 11.7 12.4
10.4 13.2 -2.0 0.8 3.6 6.3 9.1 11.9 14.6 -0.5 2.2 5.0 7.8 10.5 13.3 16.1 0.9 3.7 6.4 9.2 12.0 14.7
3.4 4.1 3.6 4.2 4.9 5.5 6.1 6.7 7.4 6.9 7.5 8.2 8.8 9.4 10.0 10.7 10.2 10.8 11.5 12.1 12.7 13.3
11.4 14.1 -0.9 1.9 4.6 7.3 10.1 12.8 15.6 0.5 3.3 6.0 8.8 11.5 14.3 17.0 2.0 4.7 7.5 10.2 13.0 15.7
2.8 3.4 2.4 3.1 3.7 4.4 5.0 5.7 6.4 5.4 6.0 6.7 7.3 8.0 8.7 9.3 8.3 9.0 9.6 10.3 11.0 11.6
10.7 13.5 -2.1 0.7 3.5 6.2 9.0 11.8 14.6 -1.0 1.8 4.6 7.3 10.1 12.9 15.7 0.1 2.9 5.7 8.4 11.2 14.0
3.7 4.4 3.5 4.1 4.8 5.4 6.0 6.7 7.3 6.4 7.1 7.7 8.3 9.0 9.6 10.3 9.4 10.0 10.7 11.3 11.9 12.6
11.7 14.4 -1.0 1.7 4.5 7.3 10.0 12.8 15.5 0.1 2.8 5.6 8.3 11.1 13.9 16.6 1.2 3.9 6.7 9.4 12.2 15.0
6.7 6.8 6.8 6.9 6.9 7.0 7.0 7.1 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.5 7.5 7.6 7.6 7.7 7.7 7.8
7.8 7.8 8.2 8.3 8.3 8.3 8.4 8.4 8.5 8.9 8.9 9.0 9.0 9.1 9.1 9.2 9.5 9.6 9.6 9.7 9.7 9.8
8.0 6.7 15.8 14.5 13.2 11.9 10.6 9.3 8.0 17.0 15.7 14.4 13.1 11.8 10.5 9.2 18.2 16.9 15.6 14.3 13.0 11.7
7.8 6.5 15.2 13.9 12.7 11.5 10.2 9.0 7.8 16.4 15.1 13.9 12.7 11.5 10.2 9.0 17.6 16.4 15.1 13.9 12.7 11.5
Page 41 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
4.4 4.8 4.2 4.6 5.0 5.4 5.8 6.1 6.5 6.0 6.4 6.7 7.1 7.5 7.9 8.3 7.7 8.1 8.5 8.9 9.3 9.6
7.9 9.1 2.9 4.0 5.2 6.4 7.5 8.7 9.8 3.7 4.8 6.0 7.1 8.3 9.4 10.6 4.4 5.6 6.7 7.9 9.1 10.2
.
4.8 5.2 4.6 5.0 5.4 5.8 6.2 6.5 6.9 6.4 6.8 7.2 7.5 7.9 8.3 8.7 8.1 8.5 8.9 9.3 9.7 10.0
TD
8.3 9.5 3.3 4.4 5.6 6.8 7.9 9.1 10.2 4.1 5.2 6.4 7.5 8.7 9.8 11.0 4.8 6.0 7.1 8.3 9.5 10.6
3.6 4.5 2.2 3.2 4.1 5.1 6.1 7.0 8.0 5.6 6.6 7.6 8.5 9.5 10.5 11.5 9.1 10.1 11.0 12.0 13.0 13.9
11.8 14.9 -2.3 0.8 3.9 7.0 10.2 13.3 16.4 -0.8 2.3 5.4 8.5 11.7 14.8 17.9 0.7 3.8 6.9 10.0 13.2 16.3
4.5 5.5 3.1 4.1 5.1 6.0 7.0 8.0 8.9 6.6 7.6 8.5 9.5 10.5 11.4 12.4 10.0 11.0 12.0 12.9 13.9 14.9
12.7 15.8 -1.4 1.7 4.9 8.0 11.1 14.2 17.3 0.1 3.3 6.4 9.5 12.6 15.7 18.9 1.6 4.8 7.9 11.0 14.1 17.2
3.9 4.6 3.7 4.4 5.1 5.9 6.6 7.3 8.1 7.1 7.8 8.6 9.3 10.1 10.8 11.5 10.6 11.3 12.0 12.8 13.5 14.3
12.2 15.2 -1.1 1.9 4.9 7.8 10.8 13.7 16.7 0.5 3.4 6.4 9.3 12.3 15.2 18.2 2.0 4.9 7.9 10.8 13.8 16.7
4.8 5.6 4.7 5.4 6.2 6.9 7.6 8.3 9.0 8.2 8.9 9.6 10.3 11.1 11.8 12.5 11.7 12.4 13.1 13.8 14.5 15.2
13.2 16.1 0.0 3.0 5.9 8.8 11.8 14.7 17.6 1.5 4.5 7.4 10.3 13.3 16.2 19.1 3.0 6.0 8.9 11.9 14.8 17.7
4.5 5.2 4.0 4.8 5.5 6.2 6.9 7.6 8.3 7.2 7.9 8.6 9.3 10.0 10.7 11.4 10.3 11.0 11.7 12.4 13.1 13.8
12.6 15.4 -0.3 2.5 5.3 8.1 10.9 13.8 16.6 0.8 3.6 6.5 9.3 12.1 14.9 17.8 2.0 4.8 7.6 10.5 13.3 16.1
5.4 6.1 5.1 5.8 6.5 7.2 7.9 8.5 9.2 8.2 8.9 9.6 10.3 11.0 11.7 12.4 11.4 12.0 12.7 13.4 14.1 14.8
13.6 16.4 0.7 3.5 6.3 9.1 11.9 14.7 17.5 1.9 4.7 7.5 10.3 13.1 15.9 18.7 3.1 5.9 8.7 11.5 14.3 17.1
3.1 3.1 3.4 3.4 3.5 3.6 3.7 3.8 3.9 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.9 5.0 5.1 5.2 5.3 5.4
4.7 4.8 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.6 6.7 6.8 6.9 7.0 7.1
-4.7 -6.0 5.1 3.9 2.6 1.4 0.1 -1.1 -2.4 8.8 7.5 6.3 5.0 3.8 2.5 1.3 12.4 11.1 9.9 8.6 7.4 6.1
0.2 -0.4 5.4 4.9 4.3 3.7 3.1 2.6 2.0 7.8 7.3 6.7 6.1 5.5 5.0 4.4 10.2 9.7 9.1 8.5 7.9 7.3
3.1 3.1 3.4 3.4 3.5 3.6 3.7 3.8 3.9 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.9 5.0 5.1 5.2 5.3 5.4
4.7 4.8 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.6 6.7 6.8 6.9 7.0 7.1
-4.7 -6.0 5.1 3.9 2.6 1.4 0.1 -1.1 -2.4 8.8 7.5 6.3 5.0 3.8 2.5 1.3 12.4 11.1 9.9 8.6 7.4 6.1
-0.3 -0.8 5.0 4.4 3.9 3.3 2.7 2.1 1.5 7.4 6.8 6.3 5.7 5.1 4.5 3.9 9.8 9.2 8.6 8.1 7.5 6.9
Page 42 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Resultant
horizontal
force
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
6.1 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.7 6.7 6.7 6.7 6.7 6.7 6.7 0.1
8.1 8.7 8.7 8.7 8.7 8.7 8.7 8.7 9.4 9.4 9.4 9.4 9.4 9.4 9.4 0.3
8.7 18.0 16.6 15.3 13.9 12.6 11.2 9.9 19.2 17.8 16.5 15.1 13.8 12.4 11.1 0.5
8.3 17.1 15.9 14.6 13.3 12.0 10.8 9.5 18.3 17.1 15.8 14.5 13.2 12.0 10.7 0.5
8.2 7.9 8.2 8.6 8.9 9.2 9.5 9.8 9.6 9.9 10.2 10.5 10.8 11.1 11.4 1.4
9.4 3.9 4.9 6.0 7.0 8.0 9.1 10.1 4.6 5.6 6.7 7.7 8.8 9.8 10.8 1.1
8.6 8.3 8.6 9.0 9.3 9.6 9.9 10.2 10.0 10.3 10.6 10.9 11.2 11.5 11.9 1.4
9.8 4.3 5.3 6.4 7.4 8.5 9.5 10.5 5.0 6.0 7.1 8.1 9.2 10.2 11.3 1.1
0.0
12.9 10.9 11.8 12.7 13.6 14.4 15.3 16.2 14.2 15.1 16.0 16.9 17.7 18.6 19.5 2.7
17.2 1.1 4.0 6.9 9.9 12.8 15.7 18.6 2.5 5.4 8.3 11.3 14.2 17.1 20.1 2.6
13.9 11.9 12.8 13.6 14.5 15.4 16.3 17.2 15.2 16.1 16.9 17.8 18.7 19.6 20.5 2.7
18.2 2.0 4.9 7.9 10.8 13.7 16.7 19.6 3.4 6.4 9.3 12.2 15.2 18.1 21.0 2.6
13.0 12.4 13.1 13.7 14.4 15.0 15.7 16.3 15.7 16.4 17.0 17.7 18.3 19.0 19.6 2.7
17.5 2.3 5.1 7.9 10.6 13.4 16.2 18.9 3.8 6.5 9.3 12.1 14.8 17.6 20.4 2.6
14.0 13.5 14.1 14.8 15.4 16.0 16.6 17.3 16.8 17.4 18.0 18.7 19.3 19.9 20.6 2.7
18.5 3.4 6.2 8.9 11.7 14.4 17.2 19.9 4.9 7.6 10.4 13.1 15.8 18.6 21.3 2.6
12.3 11.3 11.9 12.6 13.2 13.9 14.6 15.2 14.2 14.9 15.5 16.2 16.9 17.5 18.2 2.6
16.8 1.2 4.0 6.7 9.5 12.3 15.1 17.9 2.3 5.1 7.8 10.6 13.4 16.2 18.9 2.5
13.2 12.3 13.0 13.6 14.3 14.9 15.5 16.2 15.3 15.9 16.6 17.2 17.9 18.5 19.1 2.6
17.7 2.3 5.0 7.8 10.5 13.3 16.1 18.8 3.4 6.1 8.9 11.6 14.4 17.2 19.9 2.5
7.8 7.9 7.9 8.0 8.0 8.1 8.1 8.2 8.2 8.3 8.3 8.4 8.4 8.5 8.5 0.3
9.8 10.2 10.3 10.3 10.4 10.4 10.4 10.5 10.9 10.9 11.0 11.0 11.1 11.1 11.2 0.4
10.4 19.4 18.1 16.9 15.6 14.3 13.0 11.7 20.7 19.4 18.1 16.8 15.5 14.2 12.9 0.6
10.2 18.8 17.6 16.4 15.1 13.9 12.7 11.4 20.0 18.8 17.6 16.4 15.1 13.9 12.7 0.6
Page 43 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
10.0 9.5 9.9 10.2 10.6 11.0 11.4 11.8 11.2 11.6 12.0 12.4 12.7 13.1 13.5 1.6
11.4 5.2 6.3 7.5 8.7 9.8 11.0 12.1 6.0 7.1 8.3 9.4 10.6 11.8 12.9 1.5
.
10.4 9.9 10.3 10.6 11.0 11.4 11.8 12.2 11.6 12.0 12.4 12.8 13.1 13.5 13.9 1.6
TD
11.8 5.6 6.8 7.9 9.1 10.2 11.4 12.5 6.4 7.5 8.7 9.8 11.0 12.2 13.3 1.5
14.9 12.5 13.5 14.5 15.5 16.4 17.4 18.4 16.0 17.0 17.9 18.9 19.9 20.8 21.8 3.2
19.4 2.2 5.3 8.4 11.6 14.7 17.8 20.9 3.7 6.8 9.9 13.1 16.2 19.3 22.4 3.1
15.9 13.5 14.5 15.4 16.4 17.4 18.3 19.3 17.0 17.9 18.9 19.9 20.8 21.8 22.8 3.2
20.4 3.1 6.3 9.4 12.5 15.6 18.7 21.9 4.6 7.8 10.9 14.0 17.1 20.3 23.4 3.1
15.0 14.0 14.8 15.5 16.2 17.0 17.7 18.5 17.5 18.2 19.0 19.7 20.4 21.2 21.9 3.2
19.7 3.5 6.4 9.4 12.3 15.3 18.3 21.2 5.0 7.9 10.9 13.9 16.8 19.8 22.7 3.1
16.0 15.1 15.8 16.5 17.3 18.0 18.7 19.4 18.6 19.3 20.0 20.7 21.4 22.2 22.9 3.2
20.7 4.6 7.5 10.4 13.4 16.3 19.2 22.2 6.1 9.0 11.9 14.9 17.8 20.7 23.7 3.1
14.5 13.4 14.1 14.8 15.5 16.2 16.9 17.6 16.5 17.2 17.9 18.6 19.3 20.1 20.8 3.0
18.9 3.2 6.0 8.8 11.6 14.4 17.3 20.1 4.3 7.1 10.0 12.8 15.6 18.4 21.3 2.7
15.5 14.5 15.2 15.9 16.5 17.2 17.9 18.6 17.6 18.3 19.0 19.7 20.3 21.0 21.7 3.0
19.9 4.2 7.0 9.8 12.6 15.4 18.2 21.0 5.4 8.2 11.0 13.8 16.6 19.4 22.2 2.7
5.5 5.7 5.8 5.9 6.0 6.1 6.2 6.3 6.5 6.6 6.7 6.8 6.9 7.0 7.0 2.1
7.2 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.2 8.3 8.4 8.5 8.6 8.7 8.8 2.1
4.9 16.0 14.8 13.5 12.3 11.0 9.8 8.5 19.7 18.4 17.2 15.9 14.7 13.4 12.2 2.1
6.8 12.6 12.1 11.5 10.9 10.3 9.7 9.2 15.0 14.5 13.9 13.3 12.7 12.1 11.6 2.4
5.5 5.7 5.8 5.9 6.0 6.1 6.2 6.3 6.5 6.6 6.7 6.8 6.9 7.0 7.0 2.1
7.2 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.2 8.3 8.4 8.5 8.6 8.7 8.8 2.1
4.9 16.0 14.8 13.5 12.3 11.0 9.8 8.5 19.7 18.4 17.2 15.9 14.7 13.4 12.2 2.1
6.3 12.2 11.6 11.0 10.5 9.9 9.3 8.7 14.6 14.0 13.4 12.9 12.3 11.7 11.1 2.4
Page 44 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
No of vertical piles = 25 nos
Angle of inclination of Raker piles = 10 Degree
SUMMERY OF FORCES :
S.N. Description
1 2 3 4 5 6 7 8 9 10 11
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 NS LWL Span dislodge case 4.7 4.8 4.8 4.8 4.8 4.8 4.8 5.1 5.2 5.2 5.2
LC-2 NS LWL No Live load 5.5 5.5 5.5 5.5 5.5 5.5 5.5 6.1 6.3 6.3 6.3
LC-3 NS LWL With LL max reaction case 11.8 10.5 9.2 7.8 6.5 5.2 3.9 13.0 12.0 10.7 9.3
LC-4 NS LWL With LL max moment case 11.0 9.8 8.5 7.3 6.0 4.7 3.5 12.2 11.3 10.0 8.7
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (50% seis -0.3 0.0 0.3 0.6 0.9 1.2 1.6 1.3 1.7 2.0 2.3
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (50% seis 0.3 1.3 2.4 3.4 4.4 5.4 6.5 1.0 2.1 3.2 4.2
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50% seism 0.1 0.4 0.7 1.0 1.3 1.6 2.0 1.7 2.1 2.4 2.7
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50% seism 0.7 1.7 2.7 3.8 4.8 5.8 6.8 1.4 2.5 3.6 4.6
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -5.4 -4.6 -3.7 -2.8 -2.0 -1.1 -0.2 -2.2 -1.4 -0.5 0.4
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -6.0 -3.1 -0.2 2.7 5.5 8.4 11.3 -4.6 -1.8 1.2 4.2
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 -4.5 -3.6 -2.8 -1.9 -1.0 -0.2 0.7 -1.3 -0.4 0.5 1.4
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 -5.1 -2.2 0.7 3.6 6.5 9.4 12.2 -3.7 -0.8 2.2 5.1
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -4.0 -3.4 -2.7 -2.1 -1.4 -0.8 -0.2 -0.8 -0.1 0.5 1.2
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -4.8 -2.0 0.7 3.4 6.1 8.9 11.6 -3.4 -0.6 2.2 5.0
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 -2.9 -2.3 -1.7 -1.1 -0.5 0.1 0.8 0.3 0.9 1.6 2.2
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 -3.7 -1.0 1.7 4.4 7.1 9.8 12.5 -2.3 0.4 3.2 6.0
LC-17 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -3.4 -2.8 -2.1 -1.5 -0.8 -0.2 0.5 -0.5 0.1 0.8 1.5
LC-18 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -4.2 -1.5 1.3 4.0 6.7 9.5 12.2 -3.1 -0.4 2.4 5.2
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 -2.4 -1.8 -1.1 -0.5 0.1 0.8 1.4 0.5 1.2 1.8 2.5
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 -3.2 -0.4 2.3 5.0 7.7 10.4 13.1 -2.1 0.7 3.5 6.3
LC-21 NS HFL Span dislodge case 6.0 6.1 6.1 6.2 6.2 6.3 6.3 6.4 6.6 6.7 6.7
LC-22 NS HFL No Live load 6.8 6.8 6.9 6.9 7.0 7.0 7.0 7.4 7.7 7.8 7.8
LC-23 NS HFL With LL max reaction case 13.1 11.8 10.5 9.3 8.0 6.7 5.4 14.3 13.4 12.1 10.8
LC-24 NS HFL With LL max moment case 12.5 11.3 10.1 8.9 7.7 6.5 5.2 13.7 12.9 11.6 10.4
LC-25 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (50% se 0.7 1.1 1.5 1.9 2.2 2.6 3.0 2.5 2.9 3.3 3.7
Page 45 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-26 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (50% se 1.3 2.5 3.6 4.7 5.9 7.0 8.2 2.1 3.3 4.5 5.7
LC-27 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50% sei 1.1 1.5 1.9 2.3 2.6 3.0 3.4 2.9 3.3 3.7 4.1
.
TD
LC-28 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50% sei 1.7 2.9 4.0 5.1 6.3 7.4 8.6 2.5 3.7 4.9 6.1
LC-29 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -4.7 -3.7 -2.7 -1.8 -0.8 0.1 1.1 -1.3 -0.3 0.7 1.7
LC-30 LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -5.2 -2.2 0.9 4.0 7.0 10.1 13.2 -3.8 -0.7 2.5 5.6
LC-31 LC-22 + Seismic Sx=1,Sz=0.3,Sy=0.3 -3.7 -2.8 -1.8 -0.9 0.1 1.0 2.0 -0.3 0.6 1.6 2.6
LC-32 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 -4.3 -1.2 1.8 4.9 8.0 11.0 14.1 -2.8 0.2 3.4 6.6
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -3.2 -2.5 -1.8 -1.0 -0.3 0.4 1.1 0.2 0.9 1.7 2.4
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -4.0 -1.1 1.8 4.7 7.6 10.5 13.5 -2.5 0.4 3.4 6.4
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 -2.2 -1.5 -0.8 0.0 0.7 1.4 2.1 1.2 2.0 2.7 3.5
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 -3.0 -0.1 2.8 5.7 8.6 11.5 14.4 -1.5 1.5 4.4 7.4
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 -2.2 -1.5 -0.8 -0.1 0.6 1.3 2.0 0.9 1.7 2.4 3.1
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 -2.6 0.1 2.9 5.7 8.5 11.3 14.0 -1.5 1.3 4.2 7.1
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 -1.1 -0.4 0.2 0.9 1.6 2.3 2.9 2.0 2.7 3.4 4.1
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 -1.6 1.2 3.9 6.7 9.4 12.2 15.0 -0.4 2.4 5.2 8.1
LC-41 NS LWL Span dislodge case+wind load 1.8 1.9 2.0 2.0 2.1 2.2 2.3 2.5 2.7 2.8 2.9
LC-42 NS LWL No Live load+wind load 3.4 3.5 3.6 3.6 3.7 3.8 3.9 4.2 4.4 4.5 4.6
LC-43 NS LWL With LL max reaction case+wind load -2.1 -3.3 -4.6 -5.8 -7.0 -8.2 -9.5 1.5 0.3 -1.0 -2.3
LC-44 NS LWL With LL max reaction succeding+win 0.6 0.1 -0.5 -1.1 -1.6 -2.2 -2.8 3.0 2.5 1.9 1.3
LC-45 NS HFL Span dislodge case+wind load 1.8 1.9 2.0 2.0 2.1 2.2 2.3 2.5 2.7 2.8 2.9
LC-46 NS HFL No Live load+wind load 3.4 3.5 3.6 3.6 3.7 3.8 3.9 4.2 4.4 4.5 4.6
LC-47 NS HFL With LL max reaction case+wind load -2.1 -3.3 -4.6 -5.8 -7.0 -8.2 -9.5 1.5 0.3 -1.0 -2.3
LC-48 NS HFL With LL max reaction succeding+win 0.2 -0.4 -0.9 -1.5 -2.1 -2.6 -3.2 2.6 2.1 1.5 0.9
Page 46 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Pile Reaction
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
5.2 5.2 5.1 5.4 5.5 5.5 5.5 5.5 5.5 5.4 5.7 5.9 5.9 5.9 5.9 5.9 5.7
6.3 6.3 6.1 6.7 6.9 6.9 6.9 6.9 6.9 6.7 7.3 7.6 7.6 7.6 7.6 7.6 7.4
7.9 6.6 5.0 14.2 13.2 11.9 10.5 9.1 7.8 6.2 15.3 14.4 13.1 11.7 10.4 9.0 7.4
7.4 6.1 4.7 13.4 12.5 11.2 9.9 8.6 7.3 5.8 14.5 13.7 12.4 11.1 9.8 8.5 7.0
2.6 3.0 3.2 2.9 3.4 3.7 4.0 4.3 4.6 4.8 4.6 5.0 5.3 5.7 6.0 6.3 6.4
5.3 6.3 7.2 1.7 2.8 3.9 4.9 6.0 7.0 7.9 2.4 3.5 4.6 5.7 6.7 7.8 8.6
3.0 3.4 3.6 3.3 3.8 4.1 4.4 4.7 5.0 5.2 5.0 5.4 5.8 6.1 6.4 6.7 6.8
5.7 6.7 7.6 2.1 3.2 4.3 5.3 6.4 7.5 8.3 2.8 4.0 5.0 6.1 7.1 8.2 9.0
1.3 2.2 3.0 1.0 2.0 2.9 3.8 4.7 5.5 6.2 4.3 5.3 6.2 7.1 8.0 8.9 9.5
7.2 10.2 12.7 -3.2 -0.3 2.7 5.6 8.6 11.6 14.1 -1.8 1.1 4.1 7.1 10.1 13.1 15.5
2.3 3.2 3.9 2.0 2.9 3.8 4.7 5.6 6.5 7.2 5.2 6.3 7.2 8.1 9.0 9.8 10.4
8.1 11.1 13.7 -2.3 0.6 3.6 6.6 9.6 12.6 15.1 -0.8 2.1 5.1 8.1 11.0 14.0 16.5
1.9 2.5 3.1 2.5 3.2 3.9 4.5 5.2 5.9 6.3 5.7 6.6 7.2 7.9 8.6 9.2 9.6
7.8 10.6 13.0 -1.9 0.8 3.6 6.4 9.2 12.1 14.4 -0.5 2.3 5.1 7.9 10.7 13.5 15.8
2.9 3.5 4.0 3.5 4.3 4.9 5.6 6.2 6.8 7.3 6.8 7.6 8.3 8.9 9.6 10.2 10.5
8.8 11.6 13.9 -0.9 1.9 4.7 7.5 10.2 13.0 15.3 0.5 3.3 6.1 8.9 11.7 14.5 16.8
2.1 2.8 3.4 2.4 3.1 3.8 4.5 5.1 5.8 6.3 5.3 6.1 6.8 7.5 8.1 8.8 9.2
8.1 10.9 13.3 -2.1 0.7 3.5 6.3 9.2 12.0 14.4 -1.0 1.8 4.6 7.5 10.3 13.1 15.4
3.1 3.8 4.3 3.4 4.2 4.8 5.5 6.1 6.8 7.2 6.3 7.2 7.8 8.5 9.1 9.8 10.1
9.0 11.8 14.2 -1.0 1.8 4.6 7.4 10.2 13.0 15.3 0.1 2.9 5.7 8.5 11.3 14.1 16.4
6.8 6.8 6.7 6.7 7.0 7.0 7.1 7.1 7.2 7.0 7.1 7.3 7.4 7.4 7.5 7.5 7.4
7.8 7.9 7.7 8.1 8.4 8.4 8.5 8.5 8.6 8.4 8.7 9.1 9.1 9.2 9.2 9.3 9.0
9.5 8.2 6.6 15.5 14.7 13.4 12.0 10.7 9.4 7.8 16.7 15.9 14.6 13.3 12.0 10.7 9.1
9.1 7.9 6.5 14.9 14.1 12.9 11.6 10.4 9.1 7.7 16.1 15.4 14.1 12.9 11.6 10.4 8.9
4.1 4.5 4.7 4.2 4.7 5.1 5.5 5.9 6.2 6.4 5.9 6.5 6.9 7.2 7.6 8.0 8.1
Page 47 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
6.9 8.0 8.9 2.8 4.1 5.3 6.5 7.6 8.8 9.7 3.6 4.9 6.1 7.2 8.4 9.6 10.4
4.5 4.9 5.1 4.6 5.1 5.5 5.9 6.3 6.6 6.8 6.3 6.9 7.3 7.6 8.0 8.4 8.5
.
TD
7.3 8.4 9.3 3.2 4.5 5.7 6.9 8.0 9.2 10.1 4.0 5.3 6.5 7.6 8.8 10.0 10.8
2.6 3.6 4.5 2.2 3.2 4.2 5.2 6.2 7.1 7.9 5.6 6.7 7.7 8.7 9.7 10.6 11.3
8.8 12.0 14.7 -2.3 0.8 4.0 7.2 10.3 13.5 16.2 -0.8 2.3 5.5 8.7 11.8 15.0 17.6
3.6 4.6 5.4 3.1 4.2 5.1 6.1 7.1 8.1 8.8 6.5 7.7 8.7 9.6 10.6 11.6 12.2
9.7 12.9 15.6 -1.4 1.8 4.9 8.1 11.3 14.4 17.1 0.1 3.3 6.5 9.6 12.8 16.0 18.6
3.2 3.9 4.6 3.6 4.5 5.2 6.0 6.7 7.5 8.0 7.0 8.0 8.7 9.5 10.2 11.0 11.4
9.4 12.4 14.9 -1.0 1.9 4.9 7.9 10.9 13.9 16.4 0.5 3.5 6.5 9.5 12.5 15.5 17.9
4.2 4.9 5.5 4.7 5.5 6.3 7.0 7.7 8.4 8.9 8.1 9.0 9.8 10.5 11.2 12.0 12.3
10.4 13.4 15.9 0.0 3.0 6.0 9.0 11.9 14.9 17.4 1.5 4.5 7.5 10.5 13.5 16.5 18.9
3.8 4.5 5.1 4.0 4.8 5.5 6.3 7.0 7.7 8.2 7.1 8.0 8.7 9.4 10.1 10.9 11.2
9.9 12.8 15.2 -0.3 2.5 5.4 8.2 11.1 14.0 16.3 0.8 3.7 6.6 9.4 12.3 15.2 17.5
4.8 5.5 6.0 5.0 5.9 6.6 7.3 8.0 8.7 9.1 8.1 9.1 9.8 10.5 11.2 11.9 12.2
10.9 13.8 16.1 0.7 3.6 6.4 9.3 12.1 15.0 17.3 1.9 4.8 7.6 10.5 13.3 16.1 18.4
3.0 3.1 3.1 3.3 3.5 3.6 3.7 3.8 3.9 3.9 4.1 4.3 4.4 4.5 4.6 4.7 4.6
4.7 4.8 4.7 4.9 5.2 5.3 5.4 5.5 5.6 5.5 5.7 6.0 6.1 6.2 6.3 6.4 6.3
-3.5 -4.8 -5.9 5.1 3.9 2.7 1.4 0.1 -1.1 -2.3 8.6 7.6 6.4 5.1 3.8 2.6 1.2
0.7 0.2 -0.4 5.4 4.9 4.4 3.8 3.2 2.6 1.9 7.7 7.4 6.8 6.2 5.6 5.0 4.3
3.0 3.1 3.1 3.3 3.5 3.6 3.7 3.8 3.9 3.9 4.1 4.3 4.4 4.5 4.6 4.7 4.6
4.7 4.8 4.7 4.9 5.2 5.3 5.4 5.5 5.6 5.5 5.7 6.0 6.1 6.2 6.3 6.4 6.3
-3.5 -4.8 -5.9 5.1 3.9 2.7 1.4 0.1 -1.1 -2.3 8.6 7.6 6.4 5.1 3.8 2.6 1.2
0.3 -0.3 -0.8 4.9 4.5 3.9 3.3 2.7 2.2 1.5 7.3 6.9 6.3 5.8 5.2 4.6 3.9
Page 48 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
over Pile No.
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
6.0 6.2 6.2 6.2 6.2 6.2 6.0 6.3 6.5 6.5 6.5 6.5 6.5 6.3 6.6 6.8 6.8 6.8
8.0 8.2 8.2 8.2 8.2 8.2 8.0 8.6 8.9 8.9 8.9 8.9 8.9 8.6 9.2 9.5 9.5 9.5
16.5 15.7 14.3 12.9 11.6 10.2 8.6 17.7 16.9 15.5 14.1 12.8 11.4 9.7 18.9 18.1 16.7 15.4
15.7 14.9 13.6 12.3 11.0 9.7 8.2 16.9 16.1 14.8 13.5 12.2 10.9 9.3 18.1 17.3 16.0 14.7
6.2 6.7 7.0 7.3 7.6 8.0 8.0 7.8 8.4 8.7 9.0 9.3 9.6 9.7 9.4 10.0 10.4 10.7
3.1 4.3 5.3 6.4 7.4 8.5 9.3 3.8 5.0 6.1 7.1 8.2 9.2 10.0 4.5 5.7 6.8 7.8
6.6 7.1 7.4 7.7 8.1 8.4 8.4 8.2 8.8 9.1 9.4 9.7 10.0 10.1 9.8 10.4 10.8 11.1
3.5 4.7 5.7 6.8 7.9 8.9 9.7 4.2 5.4 6.5 7.5 8.6 9.6 10.4 4.9 6.1 7.2 8.3
7.5 8.6 9.5 10.4 11.3 12.2 12.7 10.8 12.0 12.9 13.8 14.7 15.6 16.0 14.0 15.3 16.2 17.1
-0.4 2.6 5.6 8.6 11.5 14.5 17.0 1.0 4.0 7.0 10.0 13.0 16.0 18.4 2.4 5.5 8.5 11.5
8.5 9.6 10.5 11.4 12.3 13.2 13.7 11.7 13.0 13.9 14.7 15.6 16.5 16.9 14.9 16.3 17.2 18.1
0.6 3.6 6.5 9.5 12.5 15.5 17.9 2.0 5.0 8.0 11.0 13.9 16.9 19.3 3.4 6.5 9.4 12.4
9.0 9.9 10.6 11.2 11.9 12.6 12.8 12.2 13.3 13.9 14.6 15.2 15.9 16.1 15.5 16.6 17.3 17.9
0.9 3.7 6.5 9.4 12.2 15.0 17.2 2.3 5.2 8.0 10.8 13.6 16.4 18.7 3.7 6.6 9.5 12.3
10.0 11.0 11.6 12.3 12.9 13.5 13.8 13.3 14.3 15.0 15.6 16.3 16.9 17.0 16.5 17.7 18.3 19.0
2.0 4.8 7.6 10.4 13.2 16.0 18.2 3.4 6.3 9.1 11.8 14.6 17.4 19.6 4.8 7.7 10.5 13.3
8.2 9.1 9.8 10.4 11.1 11.8 12.1 11.1 12.1 12.8 13.4 14.1 14.8 15.0 14.0 15.1 15.8 16.4
0.1 2.9 5.7 8.6 11.4 14.2 16.5 1.2 4.0 6.9 9.7 12.5 15.3 17.6 2.3 5.1 8.0 10.8
9.2 10.2 10.8 11.5 12.1 12.8 13.0 12.1 13.2 13.8 14.5 15.1 15.8 15.9 15.1 16.2 16.8 17.5
1.2 4.0 6.8 9.6 12.4 15.2 17.4 2.2 5.1 7.9 10.7 13.5 16.3 18.5 3.3 6.2 9.0 11.8
7.4 7.7 7.8 7.8 7.8 7.9 7.7 7.8 8.1 8.1 8.2 8.2 8.3 8.0 8.1 8.4 8.5 8.5
9.4 9.7 9.8 9.8 9.9 9.9 9.7 10.1 10.4 10.5 10.5 10.6 10.6 10.3 10.7 11.1 11.1 11.2
17.9 17.2 15.9 14.5 13.2 11.9 10.3 19.2 18.4 17.1 15.8 14.5 13.2 11.5 20.4 19.7 18.4 17.0
17.3 16.6 15.4 14.1 12.9 11.6 10.1 18.5 17.9 16.6 15.4 14.1 12.9 11.3 19.7 19.1 17.9 16.6
7.6 8.2 8.6 9.0 9.4 9.8 9.9 9.3 10.0 10.4 10.8 11.2 11.6 11.6 11.1 11.8 12.2 12.6
Page 49 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
4.4 5.7 6.8 8.0 9.2 10.4 11.2 5.1 6.4 7.6 8.8 10.0 11.2 12.0 5.9 7.2 8.4 9.6
8.0 8.6 9.0 9.4 9.8 10.2 10.3 9.7 10.4 10.8 11.2 11.6 12.0 12.0 11.5 12.2 12.6 13.0
.
TD
4.8 6.1 7.3 8.4 9.6 10.8 11.6 5.5 6.9 8.0 9.2 10.4 11.6 12.4 6.3 7.6 8.8 10.0
9.0 10.2 11.2 12.2 13.2 14.2 14.7 12.4 13.7 14.7 15.7 16.7 17.7 18.1 15.8 17.2 18.2 19.2
0.7 3.9 7.0 10.2 13.4 16.5 19.1 2.2 5.4 8.6 11.7 14.9 18.1 20.6 3.6 6.9 10.1 13.3
9.9 11.2 12.2 13.1 14.1 15.1 15.6 13.3 14.7 15.7 16.7 17.6 18.6 19.0 16.7 18.2 19.2 20.2
1.6 4.8 8.0 11.2 14.3 17.5 20.0 3.1 6.4 9.5 12.7 15.9 19.0 21.5 4.6 7.9 11.1 14.2
10.4 11.5 12.2 13.0 13.7 14.5 14.8 13.8 15.0 15.7 16.5 17.2 18.0 18.2 17.2 18.5 19.3 20.0
1.9 5.0 8.0 11.0 14.0 17.0 19.4 3.4 6.5 9.5 12.5 15.5 18.5 20.9 4.9 8.1 11.1 14.1
11.5 12.6 13.3 14.0 14.7 15.5 15.7 14.9 16.1 16.8 17.5 18.3 19.0 19.1 18.3 19.6 20.3 21.0
3.0 6.1 9.1 12.0 15.0 18.0 20.3 4.5 7.6 10.6 13.6 16.5 19.5 21.8 6.0 9.1 12.1 15.1
10.1 11.2 11.9 12.6 13.3 14.0 14.3 13.2 14.3 15.0 15.8 16.5 17.2 17.4 16.3 17.5 18.2 18.9
2.0 4.9 7.7 10.6 13.5 16.3 18.6 3.1 6.1 8.9 11.8 14.7 17.5 19.8 4.3 7.3 10.1 13.0
11.2 12.2 12.9 13.6 14.3 15.0 15.2 14.3 15.4 16.1 16.8 17.5 18.2 18.3 17.3 18.6 19.3 20.0
3.0 6.0 8.8 11.6 14.5 17.3 19.6 4.2 7.1 10.0 12.8 15.7 18.5 20.7 5.3 8.3 11.2 14.0
4.8 5.1 5.2 5.3 5.4 5.5 5.4 5.6 5.9 6.0 6.1 6.2 6.3 6.2 6.4 6.7 6.8 6.9
6.5 6.8 6.9 7.0 7.1 7.2 7.1 7.3 7.6 7.7 7.8 7.9 8.0 7.9 8.1 8.4 8.5 8.6
12.2 11.3 10.0 8.8 7.5 6.2 4.8 15.8 15.0 13.7 12.5 11.2 9.9 8.4 19.4 18.7 17.4 16.1
10.1 9.8 9.2 8.6 8.0 7.5 6.7 12.4 12.2 11.7 11.1 10.5 9.9 9.0 14.8 14.7 14.1 13.5
4.8 5.1 5.2 5.3 5.4 5.5 5.4 5.6 5.9 6.0 6.1 6.2 6.3 6.2 6.4 6.7 6.8 6.9
6.5 6.8 6.9 7.0 7.1 7.2 7.1 7.3 7.6 7.7 7.8 7.9 8.0 7.9 8.1 8.4 8.5 8.6
12.2 11.3 10.0 8.8 7.5 6.2 4.8 15.8 15.0 13.7 12.5 11.2 9.9 8.4 19.4 18.7 17.4 16.1
9.7 9.4 8.8 8.2 7.6 7.0 6.2 12.0 11.8 11.2 10.6 10.0 9.5 8.6 14.4 14.2 13.6 13.1
Page 50 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LWL Condi
.
TD
Maximum R
Minimum R
Self weight
Max Reactio
Min Reactio
Pile capacity
HFL Condi
Maximum R
Minimum R
Self weight
Max Reactio
Min Reactio
Pile capacity
Page 51 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
47 48 49 50 51 52 53 54 55 56
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
6.8 6.8 6.6
9.5 9.5 9.2
14.0 12.6 10.9
13.4 12.1 10.5
Page 52 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
11.2 12.3 13.1
Page 53 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
ition
Non-Seismic Seismic Case wind case
.
TD
Reaction Over Pile = 18.9 Tonne 21.0 Tonne 19.4 Tonne
Reaction Over Pile = 3.5 Tonne -6.0 Tonne -9.5 Tonne
of pile = 1.7 Tonne 1.7 Tonne 1.7 Tonne
on Over Pile+with SW of pile = 20.6 Tonne 22.8 Tonne 21.1 Tonne
on Over+with SW of pile = 5.2 Tonne -4.3 Tonne -7.7 Tonne
y = 50 Tonne OK [Seismic]
ition
Non-Seismic Seismic Case wind case
Reaction Over Pile = 20.4 Tonne 23.3 Tonne 19.4 Tonne
Reaction Over Pile = 5.2 Tonne -5.2 Tonne -9.5 Tonne
of pile = 1.7 Tonne 1.7 Tonne 1.7 Tonne
on Over Pile+with SW of pile = 22.1 Tonne 25.1 Tonne 21.1 Tonne
on Over+with SW of pile = 7.0 Tonne -3.5 Tonne -7.7 Tonne
y = 50 Tonne OK [Seismic]
Page 54 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates
N = 49 Nos. S.N. L T S.N. L T S.N. L T S.N. L T S.N. L T
1 -3 -3.0 13 -2 2 25 0 0 37 2 -2 49 3 3
2 -3 -2.0 14 -2 3 26 0 1 38 2 -1
1 1 3 -3 -1.0 15 -1 -3 27 0 2 39 2 0
4 -3 0.0 16 -1 -2 28 0 3 40 2 1
1 5 -3 1.0 17 -1 -1 29 1 -3 41 2 2
6 -3 2.0 18 -1 0 30 1 -2 42 2 3
1 7 -3 3.0 19 -1 1 31 1 -1 43 3 -3
1 8 -2 -3.0 20 -1 2 32 1 0 44 3 -2
9 -2 -2.0 21 -1 3 33 1 1 45 3 -1
1 10 -2 -1.0 22 0 -3 34 1 2 46 3 0
1 8 11 -2 0.0 23 0 -2 35 1 3 47 3 1
12 -2 1.0 24 0 -1 36 2 -3 48 3 2
1 r2 193.00 181.00
1
1
ULS, Maximum & Minimum Reactions over Pile LWL
8 Non-Seismic Seismic Case wind load
Maximum Reaction Over Pile 33.2 Tonne 36.4 Tonne 36.7 Tonne
Minimum Reaction Over Pile 6.4 Tonne -4.4 Tonne 0.9 Tonne
Maximum Horizontal Force/ Pile 0.8 Tonne 3.3 Tonne 2.7 Tonne
Page 55 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
S.N. Description Forces @ Pile cap Bootom
V HL HT MTT MLL 1 2 3 4 5 6 7 8 9 10 11 12
Tonne Tonne Tonne Tm Tm Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 NS LWL Span dislodge case Comb-1 662.893 9.9204 0 92.9525 0.09302 12.1 12.1 12.1 12.1 12.1 12.1 12.1 12.6 12.6 12.6 12.6 12.6
LC-2 NS LWL No Live load Comb-1 765.43 19.8408 0 182.641 0.09302 12.8 12.8 12.8 12.8 12.8 12.8 12.8 13.7 13.7 13.7 13.7 13.7
LC-3 NS LWL With LL max reaction case Co 1064.93 38.6131 0 345.021 -365.303 22.4 20.4 18.4 16.4 14.4 12.3 10.3 24.2 22.2 20.2 18.2 16.1
LC-4 NS LWL With LL max moment case Co 1023.57 38.4173 0 343.327 -346.534 21.3 19.4 17.5 15.6 13.6 11.7 9.8 23.1 21.2 19.2 17.3 15.4
LC-5 NS LWL Span dislodge case Comb-2 475.51 6.87814 0 78.4505 0.06891 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.9 8.9 8.9 8.9 8.9
LC-6 NS LWL No Live load Comb-2 558.18 13.7563 0 156.901 0.06891 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.8 9.8 9.8 9.8 9.8
LC-7 NS LWL With LL max reaction case Co 817.752 26.7718 0 297.631 -316.608 17.3 15.6 13.8 12.1 10.3 8.6 6.8 18.9 17.1 15.4 13.6 11.9
LC-8 NS LWL With LL max moment case Co 785.172 26.636 0 296.163 -300.341 16.4 14.7 13.1 11.4 9.8 8.1 6.4 17.9 16.3 14.6 13.0 11.3
LC-9 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (50 638.935 73.5748 22.3358 432.532 84.8509 4.9 5.4 5.8 6.3 6.8 7.3 7.7 7.2 7.6 8.1 8.6 9.0
LC-10 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (50 638.935 24.8501 59.5622 163.563 282.624 5.8 7.4 8.9 10.5 12.1 13.6 15.2 6.7 8.2 9.8 11.3 12.9
LC-11 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50 668.716 73.5748 22.3358 432.78 84.8551 5.5 6.0 6.5 6.9 7.4 7.9 8.3 7.8 8.2 8.7 9.2 9.6
LC-12 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50 668.716 31.0627 59.5622 163.811 282.628 6.4 8.0 9.5 11.1 12.7 14.2 15.8 7.3 8.8 10.4 11.9 13.5
LC-13 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 730.626 153.499 52.2049 933.465 238.91 -3.6 -2.2 -0.9 0.4 1.7 3.0 4.4 1.3 2.6 3.9 5.2 6.6
LC-14 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 730.626 70.0617 139.213 395.527 796.159 -4.4 0.0 4.4 8.8 13.2 17.6 22.0 -2.4 2.0 6.4 10.8 15.2
LC-15 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 800.233 153.499 52.2049 934.457 238.918 -2.2 -0.8 0.5 1.8 3.1 4.4 5.8 2.7 4.0 5.3 6.6 8.0
LC-16 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 800.233 70.0617 139.213 396.519 796.168 -3.0 1.4 5.8 10.2 14.6 19.0 23.4 -1.0 3.4 7.8 12.2 16.6
LC-17 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 768.134 155.24 52.9327 952.298 200.79 -2.5 -1.3 -0.2 0.9 2.0 3.1 4.2 2.5 3.6 4.7 5.8 6.9
LC-18 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 768.134 72.2389 141.154 414.36 775.865 -3.6 0.7 4.9 9.2 13.5 17.8 22.1 -1.5 2.8 7.1 11.4 15.7
LC-19 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 842.593 155.24 52.9327 953.289 194.879 -0.9 0.2 1.3 2.4 3.5 4.5 5.6 4.1 5.2 6.2 7.3 8.4
LC-20 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 842.593 72.2389 141.154 415.352 769.954 -2.0 2.2 6.5 10.7 15.0 19.2 23.5 0.1 4.4 8.6 12.9 17.1
LC-21 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 740.225 146.076 52.8954 853.21 202.748 -1.5 -0.4 0.7 1.8 3.0 4.1 5.2 2.9 4.0 5.1 6.3 7.4
LC-22 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 740.225 60.7836 141.054 315.272 776.908 -2.7 1.6 5.9 10.2 14.5 18.8 23.1 -1.0 3.3 7.5 11.8 16.1
LC-23 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 814.434 146.076 52.8954 854.201 197.141 0.1 1.2 2.3 3.3 4.4 5.5 6.6 4.5 5.6 6.7 7.8 8.9
Page 56 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-24 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 814.434 60.7836 141.054 316.264 771.301 -1.1 3.2 7.4 11.7 16.0 20.2 24.5 0.6 4.8 9.1 13.3 17.6
LC-25 NS HFL Span dislodge case Comb-1 830.722 10.9372 7.08887 97.7646 8.46723 15.3 15.3 15.4 15.4 15.5 15.5 15.6 15.8 15.8 15.9 15.9 16.0
.
TD
LC-26 NS HFL No Live load Comb-1 942.326 18.8735 7.08887 189.085 8.46723 16.2 16.2 16.2 16.3 16.3 16.4 16.4 17.1 17.2 17.2 17.3 17.3
LC-27 NS HFL With LL max reaction case Com 1241.83 33.8914 7.08887 351.466 -356.929 25.8 23.8 21.9 19.9 17.9 15.9 14.0 27.6 25.6 23.7 21.7 19.7
LC-28 NS HFL With LL max moment case Com1213.46 33.7347 7.08887 349.771 -338.16 24.9 23.1 21.2 19.3 17.5 15.6 13.7 26.7 24.9 23.0 21.1 19.3
LC-29 NS HFL Span dislodge case Comb-2 604.143 9.87902 7.08887 84.8949 8.44312 10.9 10.9 11.0 11.0 11.1 11.1 11.1 11.3 11.4 11.4 11.4 11.5
LC-30 NS HFL No Live load Comb-2 686.813 13.4057 7.08887 163.345 8.44312 11.3 11.4 11.4 11.5 11.5 11.6 11.6 12.2 12.2 12.3 12.3 12.4
LC-31 NS HFL With LL max reaction case Com 946.384 29.7727 7.08887 304.075 -308.234 19.7 18.0 16.3 14.6 12.9 11.2 9.5 21.3 19.6 17.9 16.2 14.5
LC-32 NS HFL With LL max moment case Com923.428 29.6369 7.08887 302.607 -291.967 19.0 17.4 15.8 14.1 12.5 10.9 9.3 20.5 18.9 17.3 15.7 14.1
LC-33 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 ( 815.831 86.8421 32.9675 494.701 98.9935 7.3 7.9 8.4 9.0 9.5 10.1 10.6 9.9 10.4 11.0 11.5 12.1
LC-34 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 ( 815.831 42.1358 74.6808 216.759 310.226 8.1 9.9 11.6 13.3 15.0 16.7 18.4 9.3 11.0 12.7 14.4 16.1
LC-35 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (5 845.612 86.8421 32.9675 494.949 98.9977 7.9 8.5 9.0 9.6 10.1 10.7 11.2 10.5 11.0 11.6 12.1 12.7
LC-36 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (5 845.612 42.1358 74.6808 217.007 310.231 8.7 10.5 12.2 13.9 15.6 17.3 19.0 9.9 11.6 13.3 15.0 16.7
LC-37 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 907.523 170.683 64.0176 982.709 254.975 -1.0 0.4 1.8 3.2 4.7 6.1 7.5 4.1 5.5 6.9 8.3 9.7
LC-38 LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3 907.523 80.5206 157.481 426.825 830.171 -1.9 2.7 7.3 11.9 16.5 21.1 25.6 0.3 4.9 9.5 14.1 18.7
LC-39 LC-22 + Seismic Sx=1,Sz=0.3,Sy=0.3 977.13 170.683 64.0176 983.701 254.984 0.4 1.8 3.2 4.7 6.1 7.5 8.9 5.5 6.9 8.3 9.7 11.2
LC-40 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 977.13 80.5206 157.481 427.817 830.179 -0.5 4.1 8.7 13.3 17.9 22.5 27.1 1.7 6.3 10.9 15.5 20.1
LC-41 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 945.031 170.838 64.7454 984.38 216.855 0.4 1.6 2.8 4.0 5.2 6.4 7.6 5.5 6.7 7.9 9.1 10.3
LC-42 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 945.031 80.7137 159.422 428.496 809.877 -0.8 3.7 8.2 12.6 17.1 21.6 26.0 1.4 5.9 10.4 14.8 19.3
LC-43 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 1019.49 170.838 64.7454 985.371 210.944 2.0 3.2 4.3 5.5 6.7 7.8 9.0 7.1 8.3 9.4 10.6 11.8
LC-44 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 1019.49 80.7137 159.422 429.487 803.966 0.8 5.2 9.7 14.1 18.6 23.0 27.5 3.0 7.5 11.9 16.4 20.8
LC-45 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 930.113 161.674 64.708 885.292 218.813 1.6 2.8 4.0 5.2 6.4 7.6 8.8 6.2 7.4 8.6 9.8 11.0
LC-46 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 930.113 69.2585 159.322 329.408 810.919 0.4 4.9 9.4 13.9 18.3 22.8 27.3 2.1 6.6 11.1 15.6 20.0
LC-47 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 1004.32 161.674 64.708 886.283 213.206 3.2 4.4 5.5 6.7 7.9 9.1 10.3 7.8 9.0 10.1 11.3 12.5
LC-48 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 1004.32 69.2585 159.322 330.399 805.312 2.0 6.5 10.9 15.4 19.8 24.3 28.7 3.7 8.2 12.6 17.1 21.5
LC-49 NS LWL Span dislodge case+wind load 595.93 13.6715 11.7062 96.3364 17.3789 10.4 10.5 10.6 10.7 10.8 10.9 11.0 10.9 11.0 11.1 11.2 11.3
LC-50 NS LWL No Live load+wind load 712.606 42.5419 73.3924 312.246 530.145 0.9 3.8 6.8 9.7 12.6 15.5 18.5 2.5 5.4 8.4 11.3 14.2
LC-51 NS LWL With LL max reaction case+wi 996.726 61.1183 73.3924 472.932 183.518 9.9 11.0 12.0 13.0 14.0 15.0 16.0 12.4 13.4 14.4 15.4 16.5
LC-52 NS LWL With LL max reaction succedin 939.102 64.7876 114.516 479.405 606.242 1.7 5.0 8.4 11.7 15.1 18.4 21.8 4.1 7.5 10.8 14.2 17.5
LC-53 NS HFL Span dislodge case+wind load 733.827 13.6715 11.7062 96.3364 17.3789 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.7 13.8 13.9 14.0 14.1
LC-54 NS HFL No Live load+wind load 850.502 42.5419 73.3924 312.246 530.145 3.7 6.6 9.6 12.5 15.4 18.4 21.3 5.3 8.3 11.2 14.1 17.1
LC-55 NS HFL With LL max reaction case+wi 1134.62 61.1183 73.3924 472.932 183.518 12.8 13.8 14.8 15.8 16.8 17.8 18.8 15.2 16.2 17.2 18.3 19.3
LC-56 NS HFL With LL max reaction succedin 1077 64.7876 114.516 479.405 606.242 4.5 7.8 11.2 14.5 17.9 21.2 24.6 7.0 10.3 13.7 17.0 20.4
Page 57 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Pile Reaction over Pile No.
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
12.6 12.6 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.5 13.5 13.5 13.5 13.5 13.5 13.5 14.0 14.0 14.0 14.0 14.0 14.0
13.7 13.7 14.7 14.7 14.7 14.7 14.7 14.7 14.7 15.6 15.6 15.6 15.6 15.6 15.6 15.6 16.6 16.6 16.6 16.6 16.6 16.6
14.1 12.1 26.0 24.0 22.0 19.9 17.9 15.9 13.9 27.8 25.8 23.8 21.7 19.7 17.7 15.7 29.6 27.6 25.5 23.5 21.5 19.5
13.5 11.6 24.9 22.9 21.0 19.1 17.2 15.3 13.4 26.6 24.7 22.8 20.9 19.0 17.1 15.1 28.4 26.5 24.6 22.7 20.8 18.8
8.9 8.9 9.3 9.3 9.3 9.3 9.3 9.3 9.3 9.7 9.7 9.7 9.7 9.7 9.7 9.7 10.1 10.1 10.1 10.1 10.1 10.1
9.8 9.8 10.6 10.6 10.6 10.6 10.6 10.6 10.6 11.4 11.4 11.4 11.4 11.4 11.4 11.4 12.2 12.2 12.2 12.2 12.2 12.2
10.1 8.4 20.4 18.6 16.9 15.1 13.4 11.6 9.9 21.9 20.2 18.4 16.7 14.9 13.2 11.4 23.5 21.7 20.0 18.2 16.5 14.7
9.6 8.0 19.5 17.8 16.1 14.5 12.8 11.2 9.5 21.0 19.3 17.7 16.0 14.4 12.7 11.0 22.5 20.9 19.2 17.6 15.9 14.2
9.5 10.0 9.4 9.9 10.3 10.8 11.3 11.7 12.2 11.6 12.1 12.6 13.0 13.5 14.0 14.4 13.9 14.3 14.8 15.3 15.7 16.2
14.5 16.0 7.5 9.1 10.6 12.2 13.8 15.3 16.9 8.4 9.9 11.5 13.0 14.6 16.2 17.7 9.2 10.8 12.3 13.9 15.4 17.0
10.1 10.6 10.0 10.5 10.9 11.4 11.9 12.3 12.8 12.2 12.7 13.2 13.6 14.1 14.6 15.1 14.5 15.0 15.4 15.9 16.4 16.8
15.1 16.6 8.1 9.7 11.2 12.8 14.4 15.9 17.5 9.0 10.5 12.1 13.6 15.2 16.8 18.3 9.8 11.4 12.9 14.5 16.1 17.6
7.9 9.2 6.1 7.4 8.8 10.1 11.4 12.7 14.0 11.0 12.3 13.6 14.9 16.2 17.6 18.9 15.8 17.1 18.4 19.7 21.1 22.4
19.6 24.0 -0.3 4.1 8.5 12.9 17.3 21.7 26.1 1.7 6.1 10.5 14.9 19.3 23.7 28.1 3.8 8.2 12.6 17.0 21.4 25.8
9.3 10.6 7.5 8.8 10.2 11.5 12.8 14.1 15.4 12.4 13.7 15.0 16.3 17.7 19.0 20.3 17.2 18.5 19.9 21.2 22.5 23.8
21.0 25.4 1.1 5.5 9.9 14.3 18.7 23.1 27.5 3.1 7.5 11.9 16.3 20.7 25.1 29.5 5.2 9.6 14.0 18.4 22.8 27.2
8.0 9.1 7.4 8.5 9.6 10.7 11.9 13.0 14.1 12.3 13.5 14.6 15.7 16.8 17.9 19.0 17.3 18.4 19.5 20.6 21.7 22.8
20.0 24.2 0.7 5.0 9.2 13.5 17.8 22.1 26.4 2.8 7.1 11.4 15.7 20.0 24.2 28.5 5.0 9.3 13.5 17.8 22.1 26.4
9.5 10.5 9.0 10.1 11.2 12.3 13.3 14.4 15.5 14.0 15.0 16.1 17.2 18.3 19.3 20.4 18.9 20.0 21.1 22.1 23.2 24.3
21.4 25.7 2.3 6.5 10.8 15.0 19.3 23.6 27.8 4.4 8.7 12.9 17.2 21.4 25.7 30.0 6.6 10.8 15.1 19.3 23.6 27.9
8.5 9.6 7.3 8.4 9.6 10.7 11.8 12.9 14.0 11.7 12.9 14.0 15.1 16.2 17.3 18.5 16.2 17.3 18.4 19.5 20.6 21.8
20.4 24.7 0.6 4.9 9.2 13.5 17.8 22.1 26.4 2.2 6.5 10.8 15.1 19.4 23.7 28.0 3.9 8.2 12.4 16.7 21.0 25.3
9.9 11.0 8.9 10.0 11.1 12.2 13.3 14.4 15.5 13.4 14.4 15.5 16.6 17.7 18.8 19.9 17.8 18.9 20.0 21.0 22.1 23.2
Page 58 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
21.9 26.1 2.2 6.5 10.7 15.0 19.2 23.5 27.8 3.8 8.1 12.4 16.6 20.9 25.1 29.4 5.5 9.7 14.0 18.3 22.5 26.8
16.0 16.1 16.3 16.4 16.4 16.4 16.5 16.5 16.6 16.8 16.9 16.9 17.0 17.0 17.0 17.1 17.3 17.4 17.4 17.5 17.5 17.6
.
TD
17.4 17.4 18.1 18.2 18.2 18.3 18.3 18.3 18.4 19.1 19.1 19.2 19.2 19.3 19.3 19.4 20.1 20.1 20.2 20.2 20.3 20.3
17.8 15.8 29.4 27.5 25.5 23.5 21.6 19.6 17.6 31.3 29.3 27.3 25.3 23.4 21.4 19.4 33.1 31.1 29.1 27.2 25.2 23.2
17.4 15.5 28.6 26.7 24.8 23.0 21.1 19.2 17.3 30.4 28.5 26.6 24.8 22.9 21.0 19.2 32.2 30.3 28.4 26.6 24.7 22.8
11.5 11.6 11.7 11.8 11.8 11.9 11.9 12.0 12.0 12.2 12.2 12.3 12.3 12.4 12.4 12.5 12.6 12.7 12.7 12.8 12.8 12.9
12.4 12.5 13.0 13.1 13.1 13.2 13.2 13.3 13.3 13.9 13.9 14.0 14.0 14.1 14.1 14.2 14.7 14.8 14.8 14.9 14.9 15.0
12.8 11.1 22.8 21.1 19.4 17.7 16.0 14.3 12.6 24.4 22.7 21.0 19.3 17.6 15.9 14.2 26.0 24.3 22.6 20.9 19.2 17.5
12.5 10.9 22.1 20.5 18.9 17.3 15.7 14.1 12.4 23.7 22.1 20.5 18.8 17.2 15.6 14.0 25.3 23.6 22.0 20.4 18.8 17.2
12.6 13.2 12.4 13.0 13.5 14.1 14.6 15.2 15.7 15.0 15.6 16.1 16.6 17.2 17.7 18.3 17.6 18.1 18.7 19.2 19.8 20.3
17.8 19.5 10.4 12.1 13.8 15.5 17.2 19.0 20.7 11.5 13.2 14.9 16.6 18.4 20.1 21.8 12.6 14.3 16.1 17.8 19.5 21.2
13.2 13.8 13.1 13.6 14.1 14.7 15.2 15.8 16.3 15.6 16.2 16.7 17.3 17.8 18.4 18.9 18.2 18.7 19.3 19.8 20.4 20.9
18.4 20.2 11.0 12.7 14.4 16.1 17.8 19.6 21.3 12.1 13.8 15.5 17.3 19.0 20.7 22.4 13.2 15.0 16.7 18.4 20.1 21.8
11.2 12.6 9.2 10.6 12.0 13.4 14.8 16.2 17.7 14.3 15.7 17.1 18.5 19.9 21.3 22.7 19.4 20.8 22.2 23.6 25.0 26.4
23.3 27.9 2.5 7.1 11.7 16.3 20.9 25.5 30.1 4.8 9.3 13.9 18.5 23.1 27.7 32.3 7.0 11.6 16.1 20.7 25.3 29.9
12.6 14.0 10.6 12.0 13.4 14.8 16.3 17.7 19.1 15.7 17.1 18.5 19.9 21.4 22.8 24.2 20.8 22.2 23.6 25.0 26.4 27.9
24.7 29.3 4.0 8.6 13.1 17.7 22.3 26.9 31.5 6.2 10.8 15.4 19.9 24.5 29.1 33.7 8.4 13.0 17.6 22.2 26.7 31.3
11.5 12.7 10.6 11.8 13.0 14.2 15.4 16.6 17.8 15.7 16.9 18.1 19.3 20.5 21.7 22.9 20.8 22.0 23.2 24.4 25.6 26.8
23.8 28.3 3.6 8.1 12.6 17.1 21.5 26.0 30.5 5.9 10.3 14.8 19.3 23.8 28.2 32.7 8.1 12.6 17.0 21.5 26.0 30.5
12.9 14.1 12.2 13.4 14.5 15.7 16.9 18.0 19.2 17.3 18.5 19.6 20.8 22.0 23.1 24.3 22.4 23.6 24.7 25.9 27.1 28.2
25.2 29.7 5.3 9.7 14.1 18.6 23.0 27.5 31.9 7.5 11.9 16.4 20.8 25.2 29.7 34.1 9.7 14.1 18.6 23.0 27.5 31.9
12.2 13.4 10.8 12.0 13.2 14.4 15.6 16.8 18.0 15.4 16.6 17.8 19.0 20.2 21.4 22.6 19.9 21.2 22.4 23.6 24.8 26.0
24.5 29.0 3.8 8.3 12.8 17.3 21.8 26.2 30.7 5.5 10.0 14.5 19.0 23.5 27.9 32.4 7.2 11.7 16.2 20.7 25.2 29.6
13.7 14.8 12.4 13.5 14.7 15.9 17.1 18.3 19.4 17.0 18.1 19.3 20.5 21.7 22.9 24.0 21.6 22.7 23.9 25.1 26.3 27.4
26.0 30.4 5.4 9.9 14.3 18.8 23.2 27.7 32.1 7.1 11.6 16.0 20.5 24.9 29.4 33.8 8.9 13.3 17.8 22.2 26.7 31.1
11.4 11.5 11.4 11.5 11.6 11.7 11.8 11.9 12.0 11.9 12.0 12.1 12.2 12.3 12.4 12.4 12.4 12.5 12.6 12.7 12.8 12.9
17.2 20.1 4.1 7.1 10.0 12.9 15.9 18.8 21.7 5.8 8.7 11.6 14.5 17.5 20.4 23.3 7.4 10.3 13.2 16.2 19.1 22.0
17.5 18.5 14.8 15.9 16.9 17.9 18.9 19.9 20.9 17.3 18.3 19.3 20.3 21.4 22.4 23.4 19.8 20.8 21.8 22.8 23.8 24.8
20.9 24.2 6.6 10.0 13.3 16.7 20.0 23.4 26.7 9.1 12.5 15.8 19.2 22.5 25.9 29.2 11.6 15.0 18.3 21.6 25.0 28.3
14.2 14.3 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.7 14.8 14.9 15.0 15.1 15.2 15.3 15.2 15.3 15.4 15.5 15.6 15.7
20.0 22.9 7.0 9.9 12.8 15.7 18.7 21.6 24.5 8.6 11.5 14.4 17.4 20.3 23.2 26.1 10.2 13.1 16.0 19.0 21.9 24.8
20.3 21.3 17.7 18.7 19.7 20.7 21.7 22.7 23.7 20.1 21.1 22.1 23.2 24.2 25.2 26.2 22.6 23.6 24.6 25.6 26.6 27.6
23.7 27.1 9.4 12.8 16.1 19.5 22.8 26.2 29.5 11.9 15.3 18.6 22.0 25.3 28.7 32.0 14.4 17.8 21.1 24.5 27.8 31.2
Page 59 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
14.0 14.5 14.5 14.5 14.5 14.5 14.5 14.5 15.0 15.0 15.0 15.0 15.0 15.0 15.0
16.6 17.5 17.5 17.5 17.5 17.5 17.5 17.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5
17.5 31.4 29.3 27.3 25.3 23.3 21.3 19.3 33.2 31.1 29.1 27.1 25.1 23.1 21.0
16.9 30.2 28.3 26.4 24.4 22.5 20.6 18.7 32.0 30.1 28.1 26.2 24.3 22.4 20.5
10.1 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.9 10.9 10.9 10.9 10.9 10.9 10.9
12.2 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.8 13.8 13.8 13.8 13.8 13.8 13.8
13.0 25.0 23.3 21.5 19.8 18.0 16.3 14.5 26.6 24.8 23.1 21.3 19.6 17.8 16.1
12.6 24.1 22.4 20.8 19.1 17.4 15.8 14.1 25.6 23.9 22.3 20.6 19.0 17.3 15.6
16.7 16.1 16.6 17.1 17.5 18.0 18.5 18.9 18.4 18.8 19.3 19.8 20.2 20.7 21.2
18.6 10.1 11.6 13.2 14.7 16.3 17.9 19.4 10.9 12.5 14.0 15.6 17.1 18.7 20.3
17.3 16.7 17.2 17.7 18.1 18.6 19.1 19.5 19.0 19.4 19.9 20.4 20.8 21.3 21.8
19.2 10.7 12.2 13.8 15.3 16.9 18.5 20.0 11.5 13.1 14.6 16.2 17.8 19.3 20.9
23.7 20.6 21.9 23.3 24.6 25.9 27.2 28.5 25.5 26.8 28.1 29.4 30.7 32.1 33.4
30.2 5.8 10.2 14.6 19.0 23.4 27.8 32.2 7.9 12.3 16.7 21.1 25.5 29.9 34.3
25.1 22.1 23.4 24.7 26.0 27.3 28.7 30.0 26.9 28.2 29.5 30.9 32.2 33.5 34.8
31.6 7.2 11.6 16.0 20.4 24.8 29.2 33.6 9.3 13.7 18.1 22.5 26.9 31.3 35.7
23.9 22.2 23.3 24.4 25.5 26.7 27.8 28.9 27.2 28.3 29.4 30.5 31.6 32.7 33.8
30.7 7.1 11.4 15.7 20.0 24.3 28.5 32.8 9.3 13.5 17.8 22.1 26.4 30.7 35.0
25.4 23.8 24.9 26.0 27.1 28.2 29.2 30.3 28.8 29.9 30.9 32.0 33.1 34.2 35.2
32.1 8.7 13.0 17.2 21.5 25.8 30.0 34.3 10.9 15.1 19.4 23.7 27.9 32.2 36.4
22.9 20.6 21.7 22.8 23.9 25.1 26.2 27.3 25.0 26.1 27.2 28.4 29.5 30.6 31.7
29.6 5.5 9.8 14.1 18.4 22.7 27.0 31.3 7.1 11.4 15.7 20.0 24.3 28.6 32.9
24.3 22.2 23.3 24.4 25.5 26.6 27.7 28.7 26.6 27.7 28.8 29.9 31.0 32.1 33.2
Page 60 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
31.0 7.1 11.4 15.6 19.9 24.2 28.4 32.7 8.8 13.0 17.3 21.5 25.8 30.1 34.3
17.6 17.8 17.9 17.9 18.0 18.0 18.1 18.1 18.3 18.4 18.4 18.5 18.5 18.6 18.6
.
TD
20.4 21.1 21.1 21.1 21.2 21.2 21.3 21.3 22.0 22.1 22.1 22.2 22.2 22.3 22.3
21.2 34.9 32.9 31.0 29.0 27.0 25.0 23.1 36.7 34.8 32.8 30.8 28.8 26.9 24.9
21.0 34.0 32.1 30.3 28.4 26.5 24.7 22.8 35.8 33.9 32.1 30.2 28.3 26.5 24.6
12.9 13.1 13.1 13.2 13.2 13.3 13.3 13.3 13.5 13.6 13.6 13.6 13.7 13.7 13.8
15.0 15.6 15.6 15.7 15.7 15.8 15.8 15.8 16.4 16.5 16.5 16.6 16.6 16.6 16.7
15.8 27.6 25.9 24.2 22.5 20.8 19.1 17.4 29.1 27.4 25.7 24.0 22.3 20.6 18.9
15.6 26.8 25.2 23.6 22.0 20.4 18.8 17.1 28.4 26.8 25.2 23.5 21.9 20.3 18.7
20.9 20.1 20.7 21.2 21.8 22.3 22.9 23.4 22.7 23.2 23.8 24.3 24.9 25.4 26.0
22.9 13.8 15.5 17.2 18.9 20.6 22.3 24.0 14.9 16.6 18.3 20.0 21.7 23.4 25.2
21.5 20.7 21.3 21.8 22.4 22.9 23.5 24.0 23.3 23.9 24.4 25.0 25.5 26.0 26.6
23.5 14.4 16.1 17.8 19.5 21.2 22.9 24.6 15.5 17.2 18.9 20.6 22.3 24.1 25.8
27.8 24.5 25.9 27.3 28.7 30.1 31.5 32.9 29.6 31.0 32.4 33.8 35.2 36.6 38.0
34.5 9.2 13.8 18.4 22.9 27.5 32.1 36.7 11.4 16.0 20.6 25.2 29.7 34.3 38.9
29.3 25.9 27.3 28.7 30.1 31.5 33.0 34.4 31.0 32.4 33.8 35.2 36.6 38.0 39.5
35.9 10.6 15.2 19.8 24.4 29.0 33.5 38.1 12.8 17.4 22.0 26.6 31.2 35.8 40.4
28.0 25.9 27.1 28.3 29.5 30.7 31.9 33.1 31.0 32.2 33.4 34.6 35.8 37.0 38.2
34.9 10.3 14.8 19.3 23.7 28.2 32.7 37.2 12.5 17.0 21.5 25.9 30.4 34.9 39.4
29.4 27.5 28.7 29.9 31.0 32.2 33.3 34.5 32.6 33.8 35.0 36.1 37.3 38.5 39.6
36.4 11.9 16.4 20.8 25.3 29.7 34.1 38.6 14.2 18.6 23.0 27.5 31.9 36.4 40.8
27.2 24.5 25.7 26.9 28.2 29.4 30.6 31.8 29.1 30.3 31.5 32.7 34.0 35.2 36.4
34.1 9.0 13.4 17.9 22.4 26.9 31.4 35.8 10.7 15.1 19.6 24.1 28.6 33.1 37.5
28.6 26.1 27.3 28.5 29.7 30.9 32.0 33.2 30.7 31.9 33.1 34.3 35.5 36.6 37.8
35.6 10.6 15.0 19.5 23.9 28.4 32.8 37.3 12.3 16.7 21.2 25.6 30.1 34.5 39.0
12.9 12.9 13.0 13.1 13.2 13.3 13.4 13.4 13.4 13.5 13.6 13.7 13.8 13.9 13.9
24.9 9.0 11.9 14.8 17.8 20.7 23.6 26.6 10.6 13.5 16.5 19.4 22.3 25.3 28.2
25.8 22.2 23.2 24.2 25.2 26.3 27.3 28.3 24.7 25.7 26.7 27.7 28.7 29.7 30.7
31.7 14.1 17.4 20.8 24.1 27.5 30.8 34.2 16.6 19.9 23.3 26.6 30.0 33.3 36.7
15.8 15.7 15.8 15.9 16.0 16.1 16.2 16.3 16.2 16.3 16.4 16.5 16.6 16.7 16.8
27.8 11.8 14.7 17.7 20.6 23.5 26.5 29.4 13.4 16.4 19.3 22.2 25.1 28.1 31.0
28.6 25.0 26.0 27.0 28.1 29.1 30.1 31.1 27.5 28.5 29.5 30.5 31.5 32.5 33.5
34.5 16.9 20.2 23.6 26.9 30.3 33.6 37.0 19.4 22.7 26.1 29.4 32.8 36.1 39.5
Page 61 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Resultant
horizontal
force
Tonne
0.2
0.4
0.8
0.8
0.1
0.3
0.5
0.5
1.6
1.3
1.6
1.4
3.3
3.2
3.3
3.2
3.3
3.2
3.3
3.2
3.2
3.1
3.2
Page 62 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
3.1
0.3
.
TD
0.4
0.7
0.7
0.2
0.3
0.6
0.6
1.9
1.7
1.9
1.7
3.7
3.6
3.7
3.6
3.7
3.6
3.7
3.6
3.6
3.5
3.6
3.5
0.4
1.7
1.9
2.7
0.4
1.7
1.9
2.7
Page 63 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
n n
S.N. LONGI +VE dIRECTION LONGI -VE dIRECTION Resultant
horizontal
Longitudinal Dir Transverse Dir Vertical Load Horizon
1 TO 7 8 TO 14 15 TO21 29 TO 35 36 TO 42 43 TO 49 force . +VE . -VE . +VE . -VE Max Min tal
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 84.6 88.0 91.3 98.1 101.4 104.8 0.2 263.9 304.3 94.7 94.7 14.5 12.1 0.2
LC-2 89.5 96.1 102.7 116.0 122.6 129.2 0.4 288.3 367.8 109.4 109.3 17.5 12.8 0.4
LC-3 114.6 127.1 139.6 164.6 177.2 189.7 0.8 381.3 531.5 109.8 194.5 31.4 10.3 0.8
LC-4 108.9 121.3 133.8 158.7 171.1 183.6 0.8 364.0 513.4 106.0 186.4 30.2 9.8 0.8
LC-5 59.4 62.2 65.1 70.8 73.6 76.5 0.1 186.7 220.9 67.9 67.9 10.5 8.5 0.1
LC-6 62.7 68.4 74.0 85.4 91.1 96.8 0.3 205.1 273.4 79.7 79.7 13.0 9.0 0.3
LC-7 84.4 95.2 106.0 127.6 138.4 149.2 0.5 285.7 415.2 80.1 153.6 25.0 6.8 0.5
LC-8 79.9 90.7 101.4 122.9 133.7 144.4 0.5 272.1 401.0 77.3 147.0 24.1 6.4 0.5
LC-9 44.2 59.9 75.6 107.0 122.7 138.3 1.6 179.7 368.0 101.1 81.4 18.9 4.9 1.6
LC-10 73.5 79.4 85.3 97.2 103.1 109.1 1.3 238.2 309.4 124.1 58.5 19.4 5.8 1.3
LC-11 48.4 64.1 79.8 111.2 126.9 142.6 1.6 192.4 380.8 105.4 85.7 19.5 5.5 1.6
LC-12 77.7 83.6 89.6 101.5 107.4 113.4 1.4 250.9 322.2 128.3 62.7 20.0 6.4 1.4
LC-13 2.8 36.7 70.5 138.2 172.1 205.9 3.3 110.0 516.3 132.1 76.7 28.5 -3.6 3.3
LC-14 61.3 75.7 90.0 118.7 133.1 147.4 3.2 227.1 399.2 196.7 12.0 32.2 -4.4 3.2
LC-15 12.6 46.5 80.4 148.2 182.1 216.0 3.3 139.6 546.3 142.0 86.6 30.0 -2.2 3.3
LC-16 71.2 85.6 99.9 128.7 143.1 157.5 3.2 256.7 429.2 206.7 21.9 33.6 -3.0 3.2
LC-17 6.1 40.7 75.2 144.3 178.8 213.4 3.3 122.0 536.4 133.0 86.4 28.9 -2.5 3.3
LC-18 64.6 79.7 94.7 124.8 139.8 154.8 3.2 239.0 419.4 199.8 19.7 32.8 -3.6 3.2
LC-19 16.6 51.2 85.8 154.9 189.5 224.1 3.3 153.7 568.6 143.0 97.8 30.3 -0.9 3.3
LC-20 75.2 90.2 105.3 135.4 150.5 165.6 3.2 270.7 451.5 209.7 31.0 34.3 -2.0 3.2
LC-21 12.9 43.9 74.8 136.7 167.6 198.6 3.2 131.6 502.9 129.3 82.2 27.3 -1.5 3.2
LC-22 71.4 82.9 94.3 117.2 128.6 140.1 3.1 248.6 385.8 195.9 15.6 31.3 -2.7 3.1
LC-23 23.4 54.4 85.4 147.3 178.3 209.3 3.2 163.2 534.9 139.2 93.5 28.7 0.1 3.2
LC-24 81.9 93.4 104.9 127.8 139.3 150.8 3.1 280.2 417.9 205.8 26.9 32.7 -1.1 3.1
LC-25 108.0 111.6 115.1 122.2 125.8 129.3 0.3 334.7 377.3 119.7 117.7 18.1 15.3 0.3
LC-26 114.0 120.9 127.8 141.5 148.3 155.2 0.4 362.7 445.0 135.6 133.6 21.3 16.2 0.4
LC-27 139.2 151.9 164.7 190.2 202.9 215.6 0.7 455.7 608.7 136.0 218.8 34.9 14.0 0.7
LC-28 135.3 148.0 160.7 186.0 198.7 211.4 0.7 443.9 596.2 134.1 212.6 34.0 13.7 0.7
LC-29 77.1 80.1 83.2 89.4 92.5 95.5 0.2 240.4 277.4 87.3 85.3 13.3 10.9 0.2
LC-30 80.3 86.3 92.2 104.0 110.0 115.9 0.3 258.8 329.9 99.1 97.1 15.8 11.3 0.3
Page 64 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-31 102.1 113.1 124.2 146.2 157.3 168.3 0.6 339.4 471.8 99.4 171.0 27.6 9.5 0.6
LC-32 99.0 110.0 120.9 142.9 153.9 164.8 0.6 329.9 461.6 98.0 165.8 26.8 9.3 0.6
LC-33 62.7 80.7 98.6 134.5 152.4 170.4 1.9 242.0 457.3 128.0 105.1 23.4 7.3 1.9
.
TD
LC-34 93.0 100.8 108.7 124.4 132.3 140.1 1.7 302.5 396.8 152.5 80.6 24.0 8.1 1.7
LC-35 66.9 84.9 102.9 138.8 156.7 174.7 1.9 254.7 470.1 132.3 109.3 24.0 7.9 1.9
LC-36 97.2 105.1 112.9 128.7 136.5 144.4 1.7 315.2 409.6 156.8 84.8 24.6 8.7 1.7
LC-37 22.7 58.4 94.0 165.3 200.9 236.6 3.7 175.1 602.8 159.2 100.1 32.9 -1.0 3.7
LC-38 83.2 98.7 114.2 145.1 160.6 176.1 3.6 296.1 481.8 226.0 33.3 36.7 -1.9 3.6
LC-39 32.6 68.2 103.9 175.3 210.9 246.6 3.7 204.7 632.8 169.2 110.0 34.4 0.4 3.7
LC-40 93.0 108.6 124.1 155.1 170.6 186.1 3.6 325.7 511.9 235.9 43.3 38.1 -0.5 3.6
LC-41 27.9 63.6 99.3 170.7 206.4 242.1 3.7 190.8 619.2 160.2 109.8 33.1 0.4 3.7
LC-42 88.4 103.9 119.5 150.5 166.1 181.6 3.6 311.8 498.3 229.0 41.0 37.2 -0.8 3.6
LC-43 38.4 74.2 109.9 181.4 217.1 252.9 3.7 222.5 651.4 170.1 121.2 34.5 2.0 3.7
LC-44 98.9 114.5 130.1 161.2 176.8 192.4 3.6 343.5 530.4 238.9 52.4 38.6 0.8 3.6
LC-45 36.5 68.7 100.8 165.0 197.1 229.2 3.6 206.0 591.3 158.3 107.5 31.8 1.6 3.6
LC-46 97.0 109.0 120.9 144.8 156.8 168.7 3.5 326.9 470.3 227.0 38.8 35.8 0.4 3.5
LC-47 47.0 79.2 111.3 175.6 207.8 239.9 3.6 237.6 623.3 168.2 118.7 33.2 3.2 3.6
LC-48 107.5 119.5 131.5 155.5 167.4 179.4 3.5 358.5 502.3 236.9 50.0 37.3 2.0 3.5
LC-49 74.7 78.1 81.6 88.6 92.1 95.6 0.4 234.4 276.4 87.1 83.1 13.4 10.4 0.4
LC-50 67.8 79.2 90.5 113.1 124.5 135.8 1.7 237.5 373.4 163.3 40.3 26.6 0.9 1.7
LC-51 90.9 108.1 125.2 159.5 176.7 193.8 1.9 324.3 530.1 163.7 121.1 28.3 9.9 1.9
LC-52 82.0 99.4 116.8 151.5 168.9 186.3 2.7 298.1 506.8 204.5 63.8 34.2 1.7 2.7
LC-53 94.4 97.8 101.3 108.3 111.8 115.3 0.4 293.5 335.5 106.8 102.8 16.3 13.2 0.4
LC-54 87.5 98.9 110.2 132.8 144.2 155.5 1.7 296.6 432.5 183.0 60.0 29.4 3.7 1.7
LC-55 110.6 127.8 144.9 179.2 196.4 213.5 1.9 383.3 589.2 183.4 140.8 31.1 12.8 1.9
LC-56 101.7 119.1 136.5 171.2 188.6 206.0 2.7 357.2 565.9 224.2 83.5 37.0 4.5 2.7
1 1 LWL HFL
Non-Seismic Seismic Case Non-Seismic Seismic Case
1 Maximum Reaction Over Pile = 31.4 Tonne 34.3 Tonne 34.9 Tonne 38.6 Tonne
2.14384 Minimum Reaction Over Pile = 6.4 Tonne -4.4 Tonne 9.3 Tonne -1.9 Tonne
Maximum Horizontal Force/ Pile = 0.8 Tonne 3.3 Tonne 0.7 Tonne 3.7 Tonne
1.413
1.4125
3.47 3.47
Page 65 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
TD
Maximum Reaction = 381.3 T 568.6 T 209.7 T 194.5 T 455.7 T 651.4 T 238.9 T 218.8 T
Distance from c/Lpile to face of Pier shaft = 2.470 m 2.470 m 1.144 m 1.144 m 2.470 m 2.470 m 1.144 m 1.144 m
Dia of Pile = 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m
Effective portion of Pile = 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m
Effective force from Pile = 381.32 T 568.6 T 209.70 T 194.52 T 455.73 T 651.4 T 238.92 T 218.82 T
Effective force from Pile / m = 47.7 tm/m 71.1 tm/m 26.2 tm/m 24.3 tm/m 57.0 tm/m 81.4 tm/m 29.9 tm/m 27.4 tm/m
Lever arm from face of Pier shaft = 2.46967 m 2.46967 m 1.14384 m 1.14384 m 2.46967 m 2.46967 m 1.14384 m 1.14384 m
Moment at the face of Pier shaft/m = 117.7 tm/m 175.5 tm/m 30.0 tm/m 27.8 tm/m 140.7 tm/m 201.1 tm/m 34.2 tm/m 31.3 tm/m
Downward Force = 17.57 T/m 17.57 T/m 10.85 T/m 10.85 T/m 17.57 T/m 17.57 T/m 10.85 T/m 10.85 T/m
Lever arm from face of pier shaft = 1.734835 m 1.734835 m 1.07192 m 1.07192 m 1.734835 m 1.73483 m 1.07192 m 1.07192 m
Dowanward moment = 30.47 Tm/m 30.47 Tm/m 11.63 Tm/m 11.63 Tm/m 30.47 Tm/m 30.47 Tm/m 11.63 Tm/m 11.63 Tm/m
2 2 2 2 2 2 2 2
Weight of soil over pile cap = 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m
Load Factor = 1.35
Factored weight of pile cap = 0.459 T/m2 0.459 T/m2 0.459 T/m2 0.459 T/m2 0.459 T/m2 0.459 T/m2 0.459 T/m2 0.459 T/m2
Downward Force = 1.59 T/m 1.59 T/m 0.98 T/m 0.98 T/m 1.59 T/m 1.59 T/m 0.98 T/m 0.98 T/m
Lever arm from face of pier shaft = 1.73 m 1.73 m 1.07 m 1.07 m 1.73 m 1.73 m 1.07 m 1.07 m
Dowanward moment = 2.76 Tm/m 2.76 Tm/m 1.05 Tm/m 1.05 Tm/m 2.76 Tm/m 2.76 Tm/m 1.05 Tm/m 1.05 Tm/m
Total factored downward Shear Force = 19.16 T/m 19.16 T/m 11.84 T/m 11.84 T/m 19.16 T/m 19.16 T/m 11.84 T/m 11.84 T/m
Total factored downward BM = 33.24 Tm/m 33.24 Tm/m 12.69 Tm/m 12.69 Tm/m 33.24 Tm/m 33.24 Tm/m 12.69 Tm/m 12.69 Tm/m
Net Factored Design SF = 28.51 T/m 51.91 T/m 14.38 T/m 12.48 T/m 37.81 T/m 62.26 T/m 18.03 T/m 15.51 T/m
Net Factored Design BM = 84.5 Tm/m 142.28 Tm/m 17.29 Tm/m 15.12 Tm/m 107.45 Tm/m 167.84 Tm/m 21.47 Tm/m 18.60 Tm/m
Maximum Reaction = 381.3 T 568.6 T 209.7 T 194.5 T 455.7 T 651.4 T 238.9 T 218.8 T
Distance from c/L pile to deff section = 1.05717 m 1.05717 m -0.2687 m -0.2687 m 1.05717 m 1.05717 m -0.2687 m -0.2687 m
Dia of Pile = 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m 0.273 m
Effective portion of Pile = 0.273 m 0.273 m -0.1322 m -0.1322 m 0.273 m 0.273 m -0.1322 m -0.1322 m
Effective force from Pile = 381.3 T 568.56 T -101.5 T -94.2 T 455.7 T 651.36 T -115.7 T -105.9 T
Effective SF force from Pile / m = 47.7 T/m 71.07 T/m -12.7 T/m -11.8 T/m 57.0 T/m 81.42 T/m -14.5 T/m -13.2 T/m
Page 66 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
.
Downward Shear Force = 10.41 T/m 10.41 T/m 3.70 T/m 3.70 T/m 0.00 T/m 10.41 T/m 3.70 T/m 3.70 T/m
TD
2 2 2 2 2 2 2 2
Factored weight of pile cap = 0.459 T/m 0.459 T/m 0.459 T/m 0.459 T/m 0.459 T/m 0.459 T/m 0.459 T/m 0.459 T/m
Downward Shear Force = 0.94 T/m 0.94 T/m 0.34 T/m 0.34 T/m 0.94 T/m 0.94 T/m 0.34 T/m 0.34 T/m
Total factored downward SF = 11.36 tm/m 11.36 tm/m 4.04 tm/m 4.04 tm/m 0.94 tm/m 11.36 tm/m 4.04 tm/m 4.04 tm/m
Net Factored Design SF = 36.31 tm/m 59.71 tm/m 0.00 tm/m 0.00 tm/m 56.02 tm/m 70.06 tm/m 0.00 tm/m 0.00 tm/m
Page 67 of 139
SPAR GEO INFRA PVT. LTD.
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
NONE
D = 1.5 m */ overall depth at face of support
d = 1.413 m */ deff at face of support
1.5
Clear Cover = 75 mm
.
= 0.348 %
TD
fyk = 500 Mpa
Grade of Concrete fck = 35 Mpa uk = 0.0045
Grade of steel fyk = 500 Mpa ud = 0.0041
fck = 35 Mpa
xu = 0.87 fyk Ast / 0.362 fck b cu2 = 0.0035
= 168.532 mm xumax/d = 0.464
2
= 2874.34 mm /m
(SLS) CHECK FOR STRESSES (RARE & QUASI PERMANENT LOAD COMBINATIONS)
2
Reinf. modulus of elasticity Es = 200000 N/mm
.
D
LT
Modular ratio for QP Combination = Es / Ecm' = 12.3807
T.
Ec,eq = Ecm*(MQP+MST) = 19164.8 MPa
PV
MST +(1+)* MQP
S
EM
Formula used for calculation of stress
dc (depth of neutral axis) = -m*As + ( m2 * As2 + 2* m*As*b* d )
INA (Transformed) =
b ST
b *dc3/3 + m* As *(d-dc)2
SY
=
IN
R
Description Stress Check For Rare Combination Stress Check For QP Combination
EE
2 2
Ast, provided = 4908.74 mm /m = 4908.74 mm /m
EN
2 2
Compressive stress in concrete c = 5.02 N/mm = 3.22 N/mm
C
2 2
Permissible Compressive stress = 16.8 N/mm OK = 12.6 N/mm OK
A
2 2
Tensile stress in steel s = 169.98 N/mm = 117.34 N/mm
D
2 2
Permissible tensile stress = 300 N/mm OK = 400 N/mm OK
R
h = 1.5 m , b = 1m
k = 0.65
fcteff = fctm
= 2.77 Mpa
.
Act =
TD
Area of concrete within tensile zone just before the first crack form, section behaves
elastically until the tensile fiber stress reaches fctm. hence Neutral axis depth will be
considered for gross section
Act = b * h/2
2
= 0.75 m
2 2
Asmin = 1080.79 mm /m < 4908.74 mm /m OK
Clear cover c = 75 mm
Bar dia eq = 25.00 mm
5 (c +eq/2) = 437.5 mm
width b = 1m
2
Ac,eff = hc,eff *b = 0.21875 m
Es = 200000 Mpa
Ecm' = 16154.1 Mpa */ (for Long term loading)
e = Es/Ecm
e = 12.3807
SPAR GEO INFRA PVT. LTD. Page 70 of 139
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
= 0.00035
.
TD
(ULS) CHECK FOR SHEAR FORCE (Section At deff from face of Support)
Factored Shear Force VED = 70.06 T/m
cp = 0 Mpa
0.33
VRdc = Max ( 0.12 k (80 1 fck ) + 0.15 cp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(min +0.15cp ) bw d
.
= 3141.59 mm /m
D
= 0.222 %
LT
Grade of Concrete fck = 35 Mpa fyk = 500 Mpa
T.
Grade of steel fyk = 500 Mpa uk = 0.0045
PV
ud = 0.0041
xu = 0.87 fyk Ast / 0.362 fck b fck = 35 Mpa
= 107.861 mm cu2 = 0.0035
S
xumax/d = 0.464
EM
xumax = 0.464 d'
= 655.96 mm UNDER REINFORCED
2
= 2122.5 mm /m
R
2 2
= 2122.5 mm /m < 3141.59 mm /m OK
IN
In either direction,
pt = 0.06
d = 1415 mm
IL
= 849 mm2/m
Provide 12 @ 100
C
mm dia mm c/c
Ast provided = 1130.973355 mm2/m
A
Hence Ok
D
R
Provide 12 @ 125
mm dia mm c/c
As per fig 6.11, section A-A of SP 34
(SLS) CHECK FOR STRESSES (RARE & QUASI PERMANENT LOAD COMBINATIONS)
.
2
Reinf. modulus of elasticity Es = 200000 N/mm
D
LT
Modular ratio for QP Combination = Es / Ecm' = 12.3807
T.
Equavelent Modulus of Elasticity for Rare Combination :
Ec,eq = Ecm*(MQP+MST) = 23629.8 MPa
PV
MST +(1+)* MQP
S
Modular ratio for Rare Combination = Es/ Ec,eq = 8.46
EM
Formula used for calculation of stress
-m*As + ( m2 * As2 + 2* m*As*b* d )
dc (depth of neutral axis) =
b ST
INA (Transformed) = b *dc3/3 + m* As *(d-dc) 2
SY
width b = 1m = 1m
2 2
EN
2 2
Compressive stress in concrete c = 0.76 N/mm = 0.24 N/mm
C
2 2
Permissible Compressive stress = 16.8 N/mm OK = 12.6 N/mm OK
A
D
2 2
Tensile stress in steel s = 30.13 N/mm = 11.20 N/mm
R
2 2
Permissible tensile stress = 300 N/mm OK = 300 N/mm OK
h = 1.5 m , b = 1m
k = 0.65
fcteff = fctm
= 2.77 Mpa
.
TD
Act = Area of concrete within tensile zone just before the first crack form, section behaves
elastically until the tensile fiber stress reaches fctm. hence Neutral axis depth will be
considered for gross section
Act = b * h/2
2
= 0.75 m
2 2
Asmin = 1080.79 mm /m < 3141.59 mm /m OK
Clear cover c = 75 mm
Bar dia eq = 20.00 mm
5 (c +eq/2) = 425 mm
width b = 1m
2
Ac,eff = hc,eff *b = 0.2125 m
Es = 200000 Mpa
Ecm' = 16154.1 Mpa */ (for Long term loading)
e = Es/Ecm
e = 12.3807
= 3.4E-05
.
TD
wk = srmax ( sm - cm )
= 0.016 mm < 0.2 mm OK
(ULS) CHECK FOR SHEAR FORCE (Section At deff from face of Support)
Factored Shear Force VED = 0.00 T/m
cp = 0 Mpa
VRdc = Max ( 0.12 k (80 1 fck )0.33 + 0.15 cp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(min +0.15cp ) bw d
.
TD
= 42.699 Tonne > 0.00 Tonne NO SHEAR REINFORCEMENT REQUIRED
.
VEd = 40.81 Tonne
TD
3.8785
Down ward weight of pile cap
= 49.20 Tonne Unfactored
Load factor = 1.35
vEd.red = VEd.red / ud
u = Length of perimeter
= 6.41 m
2
vEd.red = -0.027 N/mm
K = 1+ 200/d ≤ 2
= 1.365
a = 3m
ly = 0.3475 %
lz = 0.222 %
l = ly *lz
= 0.278 %
= 1.507 Mpa
Check
vEd.red < vRdc
-0.027 Mpa < 1.51 Mpa OK
.
TD
B) Check at face of pile
VEd.red = VEd - VED
VEd = 40.8073 Tonne
vEd = VEd.red / uo d
uo = 0.807 m
Check
vEd < vRd.max
0.337 Mpa < 4.16 Mpa OK
Clear cover = 50 mm
0.257 Dia of bar = 32 mm
Nos. of Bars = 4 Nos
Effective cover = 82 mm
Reinf Circular dia = 93.0 mm
Spacing = 73.0 mm 1 layer
2
.
Area of steel provided = 3217.0 mm
TD
Material Properties:
fck = 40 N/mm2 % steel provided = 6.2 %
fyk = 500 N/mm2
2
Es = 200000 N/mm Minimum % steel = 0.4 % OK
250
100
0.2 -128.7 1.0 0.2
0.4 -26.5 4.1 0.4 50
0.6 79.3 3.8 0.6
0.8 142.6 2.9 0.8 0
0 1 2 3 4 5
1 181.5 1.7 1
‐50
1.2 194.3 1.0 1.2
1.4 201.3 0.6 1.4 ‐100
1.6 205.6 0.4 1.6
1.8 208.0 0.2 1.8 ‐150
.
ULS, CHECK FOR PILE MOMENT CAPACITY :
TD
Design Shear Resitance ( IRC 112 / clause 10.3.2 (2) )
k = Min 1 + √ 200/d d is depth in mm
2
k = 1.882
.
TD
250
150 Max_Vertical_load
Pu ( T )
100 Min_vertical_load
50
0
0 1 2 3 4 5
‐50
‐100
‐150
‐200
Mu (Tm)
.
ULS Forces at Pile Top Level : ( SHEAR CAPACITY
TD
LC Pile Reaction Moment MED Moment MRD (LONGITUDINAL DIR )
n
.
TD
LC-25 18.11 15.29 0.27 0.11 3.9 3.9 OK 3.49 3.58 OK
LC-26 21.33 16.15 0.41 0.17 3.9 3.9 OK 4.11 3.90 OK
LC-27 34.90 13.96 0.71 0.30 3.9 3.9 OK 6.73 5.27 OK
LC-28 33.99 13.72 0.70 0.30 3.9 3.9 OK 6.55 5.18 OK
.
TD
LC-49 13.45 10.38 0.37 0.16 3.9 4.0 OK 2.59 3.11 OK
LC-50 26.57 0.90 1.73 0.73 3.9 4.0 OK 5.12 4.43 OK
LC-51 28.28 9.95 1.95 0.83 3.9 4.0 OK 5.45 4.60 OK
LC-52 34.18 1.67 2.69 1.14 3.9 4.0 OK 6.59 5.19 OK
LC-53 16.26 13.19 0.37 0.16 3.9 3.9 OK 3.13 3.39 OK
LC-54 29.38 3.72 1.73 0.73 3.9 4.0 OK 5.66 4.71 OK
LC-55 31.10 12.76 1.95 0.83 3.9 3.9 OK 5.99 4.88 OK
LC-56 37.00 4.48 2.69 1.14 3.9 4.0 OK 7.13 5.48 OK
.
TD
Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates Pile Coordinates
Sr.No L T Sr.No L T Sr.No L T Sr.No L T Sr.No L T
N = 49 Nos. 1 -3 -3 13 -2 2 25 0 0 37 2 -2 49 3 3
2 -3 -2 14 -2 3 26 0 1 38 2 -1 0 0 0
3 -3 -1 15 -1 -3 27 0 2 39 2 0 0 0 0
1 1 4 -3 0 16 -1 -2 28 0 3 40 2 1 0 0 0
5 -3 1 17 -1 -1 29 1 -3 41 2 2 0 0 0
1 6 -3 2 18 -1 0 30 1 -2 42 2 3 0 0 0
7 -3 3 19 -1 1 31 1 -1 43 3 -3 0 0 0
1 8 -2 -3 20 -1 2 32 1 0 44 3 -2 0 0 0
1 9 -2 -2 21 -1 3 33 1 1 45 3 -1
10 -2 -1 22 0 -3 34 1 2 46 3 0
1 11 -2 0 23 0 -2 35 1 3 47 3 1
8 12 -2 1 24 0 -1 36 2 -3 48 3 2
1 193.00 181.00
1
1
1
8
SLS , SUMMERY OF FORCES AT PILE CAP BOTTOM
SUMMERY OF FORCES :
LC-3 LWL RARE, NS LWL DL, Snow load, 757.851 25.7421 0 230.83 -243.529 15.9 14.6 13.2 11.9 10.5 9.2 7.8 17.1 15.8 14.4 13.1 11.7
LC-4 LWL RARE, NS LWL DL, Snow load, 747.594 25.6115 0 229.701 -231.016 15.5 14.2 13.0 11.7 10.4 9.1 7.9 16.7 15.4 14.2 12.9 11.6
LC-5 HFL RARE, NS LWL DL, Snow load, L 886.483 29.4932 7.08887 237.275 -235.154 18.3 17.0 15.7 14.4 13.1 11.8 10.5 19.5 18.2 16.9 15.6 14.3
LC-6 HFL RARE, NS LWL DL, Snow load, L 876.227 29.3626 7.08887 236.145 -222.642 17.9 16.7 15.4 14.2 13.0 11.8 10.5 19.1 17.9 16.7 15.4 14.2
.
TD
Pile Reaction over Pile No.
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
10.1 10.1 10.8 10.8 10.8 10.8 10.8 10.8 10.8 11.4 11.4 11.4 11.4 11.4 11.4 11.4 12.0 12.0 12.0 12.0 12.0 12.0
12.7 12.7 13.4 13.4 13.4 13.4 13.4 13.4 13.4 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.7 14.7 14.7 14.7 14.7 14.7
10.4 9.0 18.3 17.0 15.6 14.3 12.9 11.6 10.2 19.5 18.2 16.8 15.5 14.1 12.8 11.4 20.7 19.4 18.0 16.7 15.3 14.0
10.3 9.0 17.9 16.6 15.3 14.1 12.8 11.5 10.2 19.1 17.8 16.5 15.3 14.0 12.7 11.4 20.3 19.0 17.7 16.4 15.2 13.9
13.0 11.7 20.8 19.5 18.2 16.9 15.6 14.3 13.0 22.0 20.7 19.4 18.1 16.8 15.5 14.2 23.2 21.9 20.6 19.3 18.0 16.7
13.0 11.7 20.3 19.1 17.9 16.7 15.4 14.2 13.0 21.6 20.3 19.1 17.9 16.7 15.4 14.2 22.8 21.6 20.3 19.1 17.9 16.6
.
TD
Resultant
horizontal
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 force
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
12.0 12.7 12.7 12.7 12.7 12.7 12.7 12.7 13.3 13.3 13.3 13.3 13.3 13.3 13.3 0.3
14.7 15.3 15.3 15.3 15.3 15.3 15.3 15.3 15.9 15.9 15.9 15.9 15.9 15.9 15.9 0.3
12.6 21.9 20.5 19.2 17.9 16.5 15.2 13.8 23.1 21.7 20.4 19.1 17.7 16.4 15.0 0.5
12.6 21.5 20.2 18.9 17.6 16.4 15.1 13.8 22.7 21.4 20.1 18.8 17.6 16.3 15.0 0.5
15.4 24.4 23.1 21.8 20.6 19.3 18.0 16.7 25.7 24.4 23.1 21.8 20.5 19.2 17.9 0.6
15.4 24.0 22.8 21.6 20.3 19.1 17.9 16.6 25.2 24.0 22.8 21.6 20.3 19.1 17.9 0.6
.
D
S.N. LONGI +VE dIRECTION LONGI -VE dIRECTION horizontal Vertical Load Horizon
1 TO 7 8 TO 14 15 TO21 29 TO 35 36 TO 42 43 TO 49 . +VE . -VE . +VE . -VE Max Min tal
LT
Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne Tonne
LC-1 66.4 70.8 75.3 84.2 88.6 93.1 0.3 212.5 265.9 79.7 79.7 12.7 9.5 0.3
T.
LC-2 84.8 89.2 93.7 102.6 107.0 111.5 0.3 267.7 321.0 98.1 98.1 15.3 12.1 0.3
PV
LC-3 83.1 91.5 99.9 116.6 125.0 133.4 0.5 274.6 375.0 80.0 136.5 21.9 7.8 0.5
LC-4 81.8 90.1 98.5 115.1 123.5 131.8 0.5 270.4 370.4 80.0 133.6 21.5 7.9 0.5
LC-5 100.8 109.4 118.0 135.2 143.9 152.5 0.6 328.3 431.6 99.4 153.9 24.4 10.5 0.6
S
LC-6 99.5 108.0 116.6 133.7 142.3 150.9 0.6 324.1 426.9 99.3 151.0 24.0 10.5 0.6
EM
ST
SY
1
Pile Dia = 0.257 m
1 Depth of pile cap = 1.5 m
G
3
Density of RCC = 2.5 t/m
2.14384 Earth fill over pile cap = 0.17 m
IN
3
Density of soil = 2 t/m
R
1.06 Pile cap deff = 1.35 m
EE
3.71
8
IN
G
EN
I L
3.47 3.47
IV
8
C
A
D
R
CALCULATING DESIGN BM & SF AT THE FACE OF PIER SHAFT : (Quasi Permanent Load Case)
Longitudinal Direction Transverse Direction
.
D
Pile Nos. . +VE . -VE . +VE . -VE
Maximum Reaction = 267.7 T 321.0 T 98.1 T 98.1 T
LT
Distance from c/Lpile to face of Pier shaft = 2.470 m 2.470 m 1.144 m 1.144 m
Dia of Pile = 0.273 m 0.273 m 0.273 m 0.273 m
T.
Effective portion of Pile = 0.273 m 0.273 m 0.273 m 0.273 m
Effective force from Pile = 267.674 T 321.0 T 98.1242 T 98.1 T
PV
Effective force from Pile / m = 33.5 tm/m 40.1 tm/m 12.3 tm/m 12.3 tm/m
Lever arm from face of Pier shaft = 2.46967 m 2.46967 m 1.14384 m 1.14384 m
Moment at the face of Pier shaft/m = 82.6 tm/m 99.1 tm/m 14.0 tm/m 14.0 tm/m
S
EM
Dowanward moment due to selfweight of pile cap & earth fill
2 2 2 2
Weight of pile cap = 3.75 T/m 3.75 T/m 3.75 T/m 3.75 T/m
Load Factor = 1
ST
Factored weight of pile cap = 3.75 T/m2 3.75 T/m2 3.75 T/m2 3.75 T/m2
Downward Force = 13.01 T/m 13.01 T/m 8.04 T/m 8.04 T/m
SY
Lever arm from face of pier shaft = 1.73483 m 1.73483 m 1.07192 m 1.07192 m
Dowanward moment = 22.57 Tm/m 22.57 Tm/m 8.62 Tm/m 8.62 Tm/m
G
2 2 2 2
Weight of soil over pile cap = 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m
IN
Load Factor = 1
Factored weight of pile cap = 0.34 T/m2 0.34 T/m2 0.34 T/m2 0.34 T/m2
R
Downward Force = 1.18 T/m 1.18 T/m 0.73 T/m 0.73 T/m
EE
Lever arm from face of pier shaft = 1.73 m 1.73 m 1.07 m 1.07 m
Dowanward moment = 2.05 Tm/m 2.05 Tm/m 0.78 Tm/m 0.78 Tm/m
IN
Total factored downward Shear Force = 14.19 T/m 14.19 T/m 8.77 T/m 8.77 T/m
Total factored downward BM = 24.62 Tm/m 24.62 Tm/m 9.40 Tm/m 9.40 Tm/m
G
EN
Net Factored Design SF = 19.27 T/m 25.94 T/m 3.50 T/m 3.50 T/m
Net Factored Design BM = 58.01 Tm/m 74.48 Tm/m 4.63 Tm/m 4.63 Tm/m
L
.
D
Pile Nos. . +VE . -VE . +VE . -VE
Maximum Reaction = 328.3 T 431.6 T 99.4 T 153.9 T
LT
Distance from c/Lpile to face of Pier shaft = 2.470 m 2.470 m 1.144 m 1.144 m
Dia of Pile = 0.273 m 0.273 m 0.273 m 0.273 m
T.
Effective portion of Pile = 0.273 m 0.273 m 0.273 m 0.273 m
Effective force from Pile = 328.3 T 431.6 T 99.3574 T 153.9 T
PV
Effective force from Pile / m = 41.0 tm/m 53.9 tm/m 12.4 tm/m 19.2 tm/m
Lever arm from face of Pier shaft = 2.46967 m 2.46967 m 1.14384 m 1.14384 m
Moment at the face of Pier shaft/m = 101.3 tm/m 133.2 tm/m 14.2 tm/m 22.0 tm/m
S
EM
Dowanward moment due to selfweight of pile cap & earth fill
2 2 2 2
Weight of pile cap = 3.75 T/m 3.75 T/m 3.75 T/m 3.75 T/m
ST
Load Factor = 1
Factored weight of pile cap = 3.75 T/m2 3.75 T/m2 3.75 T/m2 3.75 T/m2
SY
Downward Force = 13.01 T/m 13.01 T/m 8.04 T/m 8.04 T/m
Lever arm from face of pier shaft = 1.73483 m 1.73483 m 1.07192 m 1.07192 m
Dowanward moment = 22.57 Tm/m 22.57 Tm/m 8.62 Tm/m 8.62 Tm/m
G
IN
2 2 2 2
Weight of soil over pile cap = 0.34 T/m 0.34 T/m 0.34 T/m 0.34 T/m
Load Factor = 1
R
Factored weight of pile cap = 0.34 T/m2 0.34 T/m2 0.34 T/m2 0.34 T/m2
EE
Downward Force = 1.18 T/m 1.18 T/m 0.73 T/m 0.73 T/m
Lever arm from face of pier shaft = 1.73 m 1.73 m 1.07 m 1.07 m
Dowanward moment = 2.05 Tm/m 2.05 Tm/m 0.78 Tm/m 0.78 Tm/m
IN
Total factored downward Shear Force = 14.19 T/m 14.19 T/m 8.77 T/m 8.77 T/m
G
Total factored downward BM = 24.62 Tm/m 24.62 Tm/m 9.40 Tm/m 9.40 Tm/m
EN
Net Factored Design SF = 26.84 T/m 39.75 T/m 3.65 T/m 10.47 T/m
Net Factored Design BM = 76.73 Tm/m 108.61 Tm/m 4.81 Tm/m 12.61 Tm/m
I L
.
SLS, STRESS CHECK FOR PILE :
D
Pile Dia D = 257 mm L1 + L f LWL = 1.035 m
LT
Clear cover = 50 mm L1 + Lf HFL = 1.035 m
Dia of bar = 32 mm Moment reduction factor m = 0.82
T.
0.257 Nos. of Bars = 4 Nos
PV
Effective cover = 66 mm
Reinf Circular dia = 125.00 mm
Spacing = 98.2 mm
S
Area of steel provided = 3217.0 mm2
EM
Modulus of Elasticity for Concrete
ST
Design Bending Moment MRARE = 0.22 Tm
MQP = 0.11Tm
SY
MST = MRARE - MQP (Bending Moment due to short term loading)
= 0.11 Tm
G
Modulus of Elasticity for Concrete
For short term loading Ecm = 32308.2 Mpa
IN
Creep coefficent = 1
R
For long term loading Ecm' = 16154.1 Mpa
EE
2
Reinf. modulus of elasticity Es = 200000 N/mm
IN
.
Permissible Stresses Rare Combination Quasi Permanent
D
Permissible conc. Stresses 16.8 12.6
LT
Permissible steel stresses -300 -300
T.
SLS, FORCES AT PILE TOP
PV
Forces at Pile Top Stresses in Concrete & Steel
S.N. M = Q (L1 + Modular Max Reaction Crack/u Min Reaction Crack/u
Description NED max NED min Hresultant
S
Lf)/2*m ratio c st Check ncrack c st Check ncrack
EM
Tonne Tonne Tonne Tonne N/mm2 N/mm2 N/mm2 N/mm2
LC-1 LWL QP, NS LWL 12.7 9.5 0.3 0.1 12.38 2.6 17.0 OK Uncracke 2.2 12.4 OK Uncracked
LC-2 HFL QP, NS LWL 15.3 12.1 0.3 0.1 12.38 2.9 21.4 OK Uncracke 2.6 16.8 OK Uncracked
ST
LC-3 LWL RARE, NS LW 21.9 7.8 0.5 0.2 9.37 3.7 15.6 OK Uncracke 2.9 7.2 OK Uncracked
SY
LC-4 LWL RARE, NS LW 21.5 7.9 0.5 0.2 9.37 3.9 14.7 OK Uncracke 3.0 5.6 OK Craked
LC-5 HFL RARE, NS LW 24.4 10.5 0.6 0.3 9.37 4.4 17.4 OK Uncracke 3.6 9.3 OK Uncracked
G
LC-6 HFL RARE, NS LW 24.0 10.5 0.6 0.3 9.37 4.6 16.5 OK Uncracke 3.7 7.8 OK Craked
IN
R
EE
IN
G
EN
IL
IV
C
A
D
R
.
D
No of bars = 4 No.s
LT
Readjusted Spacing = 98.1748 mm
Area of Steel per m Ast/m = 8192 mm^2/m
T.
Distance of neutral axis from bottom fiber of concrete d1
PV
d1 = -0.0992 m
S
Outer Dia
EM
a = Cos-1(d1/r) = 2.45238 Radians
= 140.511 deg
ST
2
Aeff = = 0.0486 m
SY
cgy = = 0.00749 m
G
Ix = = 0.00017 m^4
IN
R
EE
Transformed propertise
Properties of Reinforcement About Prioncipal axis About Prioncipal axis
Reinforcement in compression Layer 1 Layer 1
IN
2 2
Asc = 2*r*a*Ast/m = 0.00322 m 0.04416 m
EN
2 2
Ast = As-Asc = 0m 0m
IV
ex = M/P = 0.03094 m
P = 113067 N
M = 3498.54 N*m
.
D
recalculation of position of neutral axis.
LT
T.
d1 = -0.0992 Craked
PV
Check
Stress at neutral axis must be zero
S
Stres at point y = -0.0992 m
EM
ST
= -2E-16 N/mm^2 OK SY
Results
% steel provided = 6.20146 %
Maximum compressive stress
G
y = 0.1285 m
IN
s = 2.69196 N/m^2
Maximum tensile stress
R
y = -0.0625 m
EE
s = 4.25685 N/mm^2
IN
G
EN
IL
IV
C
A
D
R
.
D
LWL condition HFL Condition
For sub-structure For foundation For sub-structure For foundation
LT
Longitudinal Horizontal seismic coefficent AhL = 0.150 0.203 0.150 0.203
Transverse Horizontal seismic coefficent AhT = 0.150 0.203 0.150 0.203
T.
Vertical seismic coefficent AV = 0.100 0.135 0.100 0.135
PV
S
EM
3.25 1.5 3.25
ST
1.5
SY
G
IN
Calculating Forces @ Shaft Bottom ( Non-Seismic Component)
R
Forces & Eccentricity @ Pile cap bottom Forces & Eccentricity @ Pier Shaft Bottom
EE
S.N. Component V HL HT eY eL eT V HL HT eY eL eT MTT MLL
Tonne Tonne Tonne m m m Tonne Tonne Tonne m m m Tm Tm
IN
1 Sub-structure 67.02 5.49 0.00 0.00 67.02 3.99 0.00 0.00 0.0 0.0
G
EN
5) Surfacing Left span 0.00 9.32 0.00 0.00 0.00 7.82 0.00 0.00 0.0 0.0
I
3) Super-structure DL right span 60.00 8.97 0.00 0.00 60.00 7.47 0.00 0.00 0.0 0.0
C
4) Snow load 22.67 9.80 0.18 0.00 22.67 8.30 0.18 0.00 4.1 0.0
5) Surfacing right span 0.00 9.32 0.00 0.00 0.00 7.82 0.00 0.00 0.0 0.0
A
D
R
.
D
6.1) Max React. LL left span 96.3 10.50 0.00 -1.22 96.33 9.00 0.00 -1.22 0.0 -117.5
6.2) Max Reaction LL right span 103.3 10.50 0.00 -1.22 103.34 9.00 0.00 -1.22 0.0 -126.1
LT
6) Maximum long moment case
T.
6.1) Max long moment LL left span 0 10.50 0.00 -1.22 0.00 9.00 0.00 -1.22 0.0 0.0
6.2) Max long. Moment LL right sp 189.41 10.50 0.00 -1.22 189.41 9.00 0.00 -1.22 0.0 -231.1
PV
7) Live load longitudinal forces
7.1) LL longitudinal force Maximum Reaction 25.74 8.65 25.74 7.15 184.1 0.0
S
7.2) LL longitudinal force Maximum moment 25.61 8.65 25.61 7.15 183.1 0.0
EM
7.3) Longitudinal force No Live load condition 13.23 8.65 13.23 7.15 94.6 0.0
7.4) Fongitudinal force Left span dislodge con 6.61 8.65 6.61 7.15 47.3 0.0
ST
8.1) Bouyancy (HFL) -288.16 1.09 0.00 0.00 -48.16 1.303 0 0 0.0 0.0
8.2) Bouyancy (LWL) -226.40 0.75 0.00 0.00 0.00 0 0 0 0.0 0.0
SY
9) Water current forces
9.1) WC 100 % in transverse direction 1.37 2.90 1.37 1.40 0.0 1.9
9.2) WC at 20% variation 1.64 1.29 2.90 1.64 1.29 1.40 2.3 1.8
G
IN
9.3 wind load Dead load 14.45 18.88 75.53 7.47 0.00 0.00 125.6 502.3
9.4 wind load live load 0.00 2.17 8.69 7.15 14.5 57.8
R
9.5 wind load sub structure 0.00 0.00 1.45 3.99 0.00 0.00 0.0 9.7
9.3) Live Load longitudinal Left span (Mmax) 0 0.00 0.00 -1.50 0.0 0.0
I
9.4) Live Load Longitudinal Right span (Mma 5.72 8.65 5.72 7.15 40.9 0.0
IV
C
8.1) Permanent Loads Left span 0.0 0.0 0.00 -1.50 0.0 0.0
8.2) Permanent Loads Right span 33.5 8.7 24.80 7.15 177.3 0.0
.
D
*/From super-structure Live loads longitudinal (20%)
LT
9.1) Live Load longitudinal Left span (Pmax) 0 0.00 0.00 -1.50 0.0 0.0
9.2) Live Load Longitudinal Right span (Pmax 13.36 8.65 13.36 7.15 95.5 0.0
T.
9.3) Live Load longitudinal Left span (Mmax) 0 0.00 0.00 -1.50 0.0 0.0
9.4) Live Load Longitudinal Right span (Mma 5.72 8.65 5.72 7.15 40.9 0.0
PV
11) Sub-structure Component 82.53 2.70 61.13 1.20 73.3 0.0
S
EM
12) Hydrodynamic Longitudinal 5.989 0.979 5.9 0.0
ST
*/From super-structure permanent loads
12.1) Permanent Loads Left span 16.74 9.20 12.40 7.70 0.0 95.5
SY
12.2) Permanent Loads Right span 16.74 9.20 12.40 7.70 0.0 95.5
G
*/ Max reaction case
IN
13.1) Live Load comp. Left span 3.90138 10.50 2.89 9.00 0.0 26.0
13.2) Live Load comp. Right span 4.18526 10.50 3.10 9.00 0.0 27.9
R
*/ Max Long moment case
EE
13.1) Live Load comp. Left span 0 10.50 0.00 9.00 0.0 0.0
13.2) Live Load comp. Right span 7.67 10.50 5.68 9.00 0.0 51.1
IN
14) Sub-structure Component 82.53 2.70 61.13 1.20 0.0 73.3
G
13.1) Live Load comp. Left span 3.90138 10.50 2.89 9.00 0.0 26.0
13.2) Live Load comp. Right span 4.18526 10.50 3.10 9.00 0.0 27.9
A
13.1) Live Load comp. Left span 0 10.50 0.00 9.00 0.0 0.0
R
13.2) Live Load comp. Right span 7.67 10.50 5.68 9.00 0.0 51.1
.
D
14) Sub-structure Component 82.53 2.70 61.13 1.20 0.0 73.3
LT
15) Hydrodynamic Transverse 5.99 0.98 0.0 5.9
T.
Seismic Vertical Downward LWL
PV
*/From super-structure permanent loads
15.1) Permanent Loads Left span 11.16 0.05 0.00 8.27 0.05 0.00 0.4 0.0
15.2) Permanent Loads Right span 11.16 0.05 0.00 8.27 0.05 0.00 0.4 0.0
S
EM
*/From super-structure Live loads comp
*/ Max reaction case
16.1) Live Load comp. Left span 13.00 0.00 -1.22 9.63 0.00 -1.22 0.0 -11.8
ST
16.2) Live Load comp. Right span 13.95 0.00 -1.22 10.33 0.00 -1.22 0.0 -12.6
*/ Max Long moment case
SY
16.1) Live Load comp. Left span 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0
16.2) Live Load comp. Right span 25.57 0.00 -1.22 18.94 0.00 -1.22 0.0 -23.1
G
17) Sub-structure Component 55.02 0.00 0.00 40.76 0.00 0.00 0.0 0.0
IN
Seismic Vertical Downward HFL
R
*/From super-structure permanent loads
EE
15.1) Permanent Loads Left span 11.16 0.05 0.00 8.27 0.05 0.00 0.4 0.0
15.2) Permanent Loads Right span 11.16 0.05 0.00 8.27 0.05 0.00 0.4 0.0
IN
*/From super-structure Live loads comp
*/ Max reaction case
G
16.1) Live Load comp. Left span 13.00 0.00 -1.22 9.63 0.00 -1.22 0.0 -11.8
EN
16.2) Live Load comp. Right span 13.95 0.00 -1.22 10.33 0.00 -1.22 0.0 -12.6
*/ Max Long moment case
16.1) Live Load comp. Left span 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0
L
16.2) Live Load comp. Right span 25.57 0.00 -1.22 18.94 0.00 -1.22 0.0 -23.1
I
IV
17) Sub-structure Component 55.02 0.00 0.00 40.76 0.00 0.00 0.0 0.0
C
A
D
R
.
D
S.N. Description FORCES @ SHAFT BOTTOM
N HL HT MTT MLL
LT
Tonne Tonne Tonne Tm Tm
LC-1 NS LWL Span dislodge case 202.084 9.9204 0 76.4397 0.03721
LC-2 NS LWL No Live load 313.688 19.8408 0 147.371 0.03721
T.
LC-3 NS LWL With LL max reaction case 613.193 38.6131 0 281.593 -365.36
LC-4 NS LWL With LL max moment case 597.809 38.4173 0 280.192 -346.59
PV
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (5 191.054 69.4108 16.5451 228.83 38.0032
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (5 191.054 24.2954 55.1502 97.2666 126.594
S
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50 213.114 69.4108 16.5451 229.013 38.0063
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50 213.114 24.2954 55.1502 97.4502 126.597
EM
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 287.908 146.758 38.6703 508.712 118.933
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 287.908 56.5271 128.901 245.585 396.364
ST
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 339.468 146.758 38.6703 509.446 118.939
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 339.468 56.5271 128.901 246.32 396.371
SY
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 326.045 148.935 39.2094 524.279 77.2564
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 326.045 58.7043 130.698 261.153 366.005
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 381.199 148.935 39.2094 525.013 72.8779
G
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 381.199 58.7043 130.698 261.887 361.627
IN
LC-17 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 324.086 137.48 39.1817 442.374 79.3972
LC-18 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 324.086 47.249 130.606 179.247 367.565
R
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 379.056 137.48 39.1817 443.108 75.2439
EE
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 379.056 47.249 130.606 179.982 363.411
LC-21 NS HFL Span dislodge case 194.86 11.5597 1.28687 78.7356 1.83951
IN
LC-22 NS HFL No Live load 306.464 21.4801 1.28687 149.666 1.83951
LC-23 NS HFL With LL max reaction case 605.969 40.2525 1.28687 283.889 -363.56
G
LC-24 NS HFL With LL max moment case 590.585 40.0566 1.28687 282.488 -344.79
EN
.
D
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 318.821 156.563 42.2929 532.439 80.8179
LT
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 318.821 62.1402 137.974 265.208 373.671
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 373.975 156.563 42.2929 533.173 76.4393
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 373.975 62.1402 137.974 265.942 369.293
T.
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 316.862 145.108 42.2652 450.534 82.9587
PV
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 316.862 50.6849 137.881 183.303 375.231
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 371.832 145.108 42.2652 451.268 78.8054
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 371.832 50.6849 137.881 184.037 371.077
S
LC-41 NS LWL Span dislodge case+wind load 212.709 17.1414 44.2071 119.337 286.825
EM
LC-42 NS LWL No Live load+wind load 310.824 16.9937 70.652 117.088 462.684
LC-43 NS LWL With LL max reaction case+w 515.645 32.7137 16.5913 236.354 -162.57
LC-44 NS LWL With LL max reaction succedin 594.945 57.3672 78.4772 404.781 168.095
ST
LC-45 NS HFL Span dislodge case+wind load 206.93 16.0545 39.8598 112.11 257.916
LC-46 NS HFL No Live load+wind load 305.045 18.95 78.4772 130.098 514.722
LC-47 NS HFL With LL max reaction case+wi 509.866 32.7137 16.5913 236.354 -162.57
SY
LC-48 NS HFL With LL max reaction succedin 589.166 57.3672 78.4772 404.781 168.095
G
IN
R
EE
IN
G
EN
I L
IV
C
A
D
R
.
D
As1 NRD = Ac fcd+As fyd
LT
= 15891.3 Tonne
T=
T.
T
5250 MEDT MEDL
PV
+ ≤ 1
As4 MEDT MRDL
L
S
As3
EM
fck = 35 Mpa
As2 fcd = 15.6 Mpa
ST
fyd = 434.8 Mpa
Ac = 7875000 mm2
SY
2
L= 1500 As = 82340.4 mm
G
IN
ULS CHECK FOR ABUTMENT SHAFT :
R
CHECK FOR MOMENT CAPACITY
Forces at bottom of abutment shaft
S.N. NED/ (MEDT /MRDT)
EE
Description MRTT MRLL
NED HL HT METT MELL NRD +(MEDL /MRDL)
Tonne Tonne Tonne Tm Tm Tm Tm Check
IN
LC-1 NS LWL Span dislodge case 202.1 9.9 0.0 76.4 0.0 0.0 1.0 537.2 2284.9 0.1 OK
G
LC-2 NS LWL No Live load 313.7 19.8 0.0 147.4 0.0 0.0 1.0 608.3 2531.5 0.2 OK
LC-3 NS LWL With LL max reaction case 613.2 38.6 0.0 281.6 -365.4 0.0 1.0 799.3 3193.1 0.2 OK
EN
LC-4 NS LWL With LL max moment case 597.8 38.4 0.0 280.2 -346.6 0.0 1.0 789.5 3159.1 0.2 OK
L
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (5 191.1 69.4 16.5 228.8 38.0 0.0 1.0 530.2 2260.5 0.4 OK
I
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (5 191.1 24.3 55.2 97.3 126.6 0.0 1.0 530.2 2260.5 0.2 OK
IV
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50 213.1 69.4 16.5 229.0 38.0 0.0 1.0 544.2 2309.3 0.4 OK
C
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50 213.1 24.3 55.2 97.5 126.6 0.0 1.0 544.2 2309.3 0.2 OK
A
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 287.9 146.8 38.7 508.7 118.9 0.0 1.0 591.9 2474.5 0.9 OK
D
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 287.9 56.5 128.9 245.6 396.4 0.0 1.0 591.9 2474.5 0.6 OK
R
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 339.5 146.8 38.7 509.4 118.9 0.0 1.0 624.8 2588.4 0.9 OK
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 339.5 56.5 128.9 246.3 396.4 0.0 1.0 624.8 2588.4 0.5 OK
.
D
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 326.0 148.9 39.2 524.3 77.3 0.0 1.0 616.2 2558.7 0.9 OK
LT
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 326.0 58.7 130.7 261.2 366.0 0.0 1.0 616.2 2558.7 0.6 OK
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 381.2 148.9 39.2 525.0 72.9 0.0 1.0 651.4 2680.6 0.8 OK
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 381.2 58.7 130.7 261.9 361.6 0.0 1.0 651.4 2680.6 0.5 OK
T.
PV
LC-17 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 324.1 137.5 39.2 442.4 79.4 0.0 1.0 615.0 2554.4 0.8 OK
LC-18 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 324.1 47.2 130.6 179.2 367.6 0.0 1.0 615.0 2554.4 0.4 OK
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 379.1 137.5 39.2 443.1 75.2 0.0 1.0 650.0 2675.8 0.7 OK
S
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 379.1 47.2 130.6 180.0 363.4 0.0 1.0 650.0 2675.8 0.4 OK
EM
LC-21 NS HFL Span dislodge case 194.9 11.6 1.3 78.7 1.8 0.0 1.0 532.6 2269.0 0.1 OK
LC-22 NS HFL No Live load 306.5 21.5 1.3 149.7 1.8 0.0 1.0 603.7 2515.5 0.2 OK
ST
LC-23 NS HFL With LL max reaction case 606.0 40.3 1.3 283.9 -363.6 0.0 1.0 794.7 3177.1 0.2 OK
LC-24 NS HFL With LL max moment case 590.6 40.1 1.3 282.5 -344.8 0.0 1.0 784.9 3143.1 0.3 OK
SY
LC-25 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 ( 183.8 79.0 19.2 269.5 41.1 0.0 1.0 525.6 2244.6 0.5 OK
G
LC-26 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 ( 183.8 31.8 60.9 135.9 132.8 0.0 1.0 525.6 2244.6 0.3 OK
LC-27 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (5 205.9 79.0 19.2 269.7 41.1 0.0 1.0 539.6 2293.3 0.5 OK
IN
LC-28 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (5 205.9 31.8 60.9 136.1 132.8 0.0 1.0 539.6 2293.3 0.3 OK
R
LC-29 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 280.7 156.4 41.8 482.8 122.5 0.0 1.0 587.3 2458.5 0.9 OK
LC-30
LC-31
LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3
LC-22 + Seismic Sx=1,Sz=0.3,Sy=0.3
280.7
332.2
61.9
156.4 EE
136.2
41.8
263.8
531.8
404.0
122.5
0.0
0.0
1.0
1.0
587.3
620.2
2458.5
2572.4
0.6
0.9
OK
OK
IN
LC-32 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 332.2 61.9 136.2 264.6 404.0 0.0 1.0 620.2 2572.4 0.6 OK
G
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 318.8 156.6 42.3 532.4 80.8 0.0 1.0 611.6 2542.8 0.9 OK
EN
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 318.8 62.1 138.0 265.2 373.7 0.0 1.0 611.6 2542.8 0.6 OK
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 374.0 156.6 42.3 533.2 76.4 0.0 1.0 646.8 2664.6 0.9 OK
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 374.0 62.1 138.0 265.9 369.3 0.0 1.0 646.8 2664.6 0.5 OK
I L
IV
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 316.9 145.1 42.3 450.5 83.0 0.0 1.0 610.4 2538.5 0.8 OK
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 316.9 50.7 137.9 183.3 375.2 0.0 1.0 610.4 2538.5 0.4 OK
C
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 371.8 145.1 42.3 451.3 78.8 0.0 1.0 645.4 2659.9 0.7 OK
A
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 371.8 50.7 137.9 184.0 371.1 0.0 1.0 645.4 2659.9 0.4 OK
D
R
LC-41 NS LWL Span dislodge case+wind load 212.7 17.1 44.2 119.3 286.8 0.0 1.0 544.0 2308.4 0.3 OK
LC-42 NS LWL No Live load+wind load 310.8 17.0 70.7 117.1 462.7 0.0 1.0 606.5 2525.1 0.4 OK
.
D
LC-43 NS LWL With LL max reaction case+w 515.6 32.7 16.6 236.4 -162.6 0.0 1.0 737.1 2977.6 0.3 OK
LT
LC-44 NS LWL With LL max reaction succedi 594.9 57.4 78.5 404.8 168.1 0.0 1.0 787.7 3152.7 0.6 OK
LC-45 NS HFL Span dislodge case+wind load 206.9 16.1 39.9 112.1 257.9 0.0 1.0 540.3 2295.6 0.3 OK
LC-46 NS HFL No Live load+wind load 305.0 18.9 78.5 130.1 514.7 0.0 1.0 602.8 2512.4 0.4 OK
T.
LC-47 NS HFL With LL max reaction case+wi 509.9 32.7 16.6 236.4 -162.6 0.0 1.0 733.4 2964.8 0.3 OK
PV
LC-48 NS HFL With LL max reaction succedin 589.2 57.4 78.5 404.8 168.1 0.0 1.0 784.0 3140.0 0.6 OK
S
EM
ST
SY
G
IN
R
EE
IN
G
EN
I L
IV
C
A
D
R
.
Section Dimensions: Material Properties:
D
D = 1500 mm fck = 35 N/mm2
LT
As1 B = 5250 mm fyk = 500 N/mm2
Es = 200000 N/mm2
T.
Reinforcement Details :
PV
Dia Spacing Cover From To Y_Cg
Reinf. Nos. Spacing Remark
As3 mm mm mm m m m
As4 3695 REINFORCEMENT ACROSSAXIS OF BENDING:
S
T
As1 20 200 45 285 1245 2570 5 240.0
EM
T = 5250 As2 20 200 45 285 1245 -2570 5 240.0
L REINFORCEMENT ALONG AXIS OF BENDING:
ST
As3 20 200 75 55 3695 -665 19 202.222
0 200 0 0 0 0 0 0 NONE
SY
As4 20 200 45 55 3695 695 19 202.222
As2
As tension face (Length) = 5969.03 mm 2
G
1245 As Compression face (Length) = 5969.03 mm 2
IN
L= 1500 14000 As tension face (wiidth) = 1570.8 mm 2
R
INTERACTION DIAGRAM (Pu : MuTT) As Compression face (width) = 1570.8 mm 2
2
11938.1 mm
EE
NA xu 12000
Total As =
= 0.15 %
IN
Pu Mu 10000
xu/D
T Tm Balance Failure
G
EN
4000
IV
1 10342.5 1429.77
1.2 11461.2 825.11
C
0
2 12526.7 245.878 0 500 1000 1500 2000 2500 3000
R
Mu (Tm)
.
D
LT
Cc = 0.361*fck*xu*b xu ≤ D
0.447*fck*(1 - 4*g/21)*b *D xu > D
T.
g = 16 / ( 7xu / D - 3 )2
PV
Cs = ( fsi -fci) Asi
S
EM
fci = 0 si ≤ 0
0.447fck si ≥ 0.002
0.447fck [ 2 * (si / 0.002) -(si / 0.002)2 ] otherwise
ST
fsi = -0.87 fy si ≤ -0.00217
SY
esi* Es si > -0.00217 si ≤ 0.00217
0.87 fy si > 0.00217
G
IN
Mc = Cc * ( 0.5D - x )
R
Ms = Csi * yi
x = 0.416 xu EE
xu ≤ D
IN
(0.5 - 8*g /49)*{D/ (1-4*g/21)} xu > D
G
0.0035 * xu - D/ 2 + yi xu ≤ D
xu
I L
si =
IV
xu -3D/7
A
D
R
.
D
Reinf. /m length = 2273.91 mm2/m
LT
Reinforcement in transvesre direction = 0.25 times vertical reinf
= 568.479 mm2/m ( total on both face)
T.
Cross -sectional area Ac per meter length/ heigth = 1500000 mm2 /m
PV
Minimum reinf. = 0.001 Ac
= 1500 mm2/m
S
Reinforcement required = 1500 mm2/m (total on both face)
EM
Provide 12 @ 100 c/c on each face
ST
= 1130.97 mm2/m on each face
@ 2261.95 mm2/m (total on both faces ) OK
SY
G
IN
R
EE
IN
G
EN
I L
IV
C
A
D
R
.
Section Dimensions: Material Properties:
D
As1 D = 5250 mm fck = 35 N/mm22
LT
xu B = 1500 mm fyk = 500 N/mm
Es = 200000 N/mm2
T.
NA Reinforcement Details :
PV
As3 Dia Spacing Cover From To Y_Cg Remark
Reinf. Nos. Spacing
As4 3695 mm mm mm m m m
S
T REINFORCEMENT ACROSSAXIS OF BENDING:
EM
T = 5250 As3 20 200 75 55 3695 -665 19 202.222
L 0 200 0 0 0 0 0 0 NONE
As4 20 200 45 55 3695 695 19 202.222
ST
REINFORCEMENT ALONG AXIS OF BENDING:
SY
As1 20 200 45 285 1245 2570 5 240
As2 As2 20 200 45 285 1245 -2570 5 240
G
1245 Balance Failure
IN
L= 1500 14000 d1 5195
R
INTRACTION DIAGRAM (Pu : MuLL) xu 3206.79 mm
xu/D 0.610817
EE
12000
Pu Mu Pu 6026.004 T
xu/D
IN
T Tm 10000 Mu 8540.339 Tm
1E-09 -655.96 389.479
G
1 10319.7 4536.77
IV
4000
1.2 11440.7 2434.22
C
0
2 12508.7 427.211
R
2
Confined area of concrete = 7120800 mm
.
D
Ac = 7875000 mm2
LT
fck = 35 Mpa
fcd = 15.63 Mpa
T.
fyd = 434.8 Mpa
PV
Normalized axial force
k = Max NED/Ac fck
S
k = 0.022 < 0.08
EM
< 0.3
Extent of confinment =
=
ST
Depth of section within the plane of bending
1.5 m
SY
= As/Acc
2
Area of steel provided As = 11938.1 mm
IL
2
L = 0.0016765 mm
IV
w,req = 0.0091034
C
A
=
= 0.12
R
.
= 0.2 x 1380 = 276 mm
D
LT
= 270 mm
T.
Asw = 1607.69 mm2
PV
Provide 12 dia 19 Nos. @ 270 mm c/c
2
2148.8494 mm
S
Area of reinforcement provided at one section = OK
EM
Transverse distance b/w hoops legs or suplementry cross ties :
ST = Min
ST
1/3 * smalllest dimension of confined core
SY
200 mm
200 mm
IN
= 200.00 mm
R
EE
IN
G
EN
IL
IV
C
A
D
R
.
D
2
LT
k = 1.365
T T=
T.
5250 1 = Min Asl /bw d
As4 0.02
PV
L 2
Asl = 5969.03 mm */ Reinforcement on tension face
As3 1 = 0.00076
S
EM
cp = Axial stress
As2
ST
min = 0.031 k3/2 fck1/2
= 0.293
SY
L= 1500
VRdc = Max ( 0.12 k (80 1 fck )0.33 + 0.15 cp ) bw d
G
fck = 35 Mpa (min +0.15cp ) bw d
IN
fcd = 15.63 Mpa
R
fyk = 500 Mpa
EE
Max Shear Capacity
2
Ac = 7875000 mm = 0.6 * ( 1- fck /310) */ fck in Mpa
IN
2
As = 5969.03 mm = 0.532
G
.
cp =
VRdc
D
Description
NED HL HL NED/AC
LT
HL < VRdc
Tonne Tonne Tonne N/mm2 Tonne
LC-1 NS LWL Span dislodge case 202.084 9.9204 4.9602 0.26 260.68 PROVIDE MINIMUM SHEAR LINKS
T.
LC-2 NS LWL No Live load 313.688 19.8408 9.9204 0.40 277.42 PROVIDE MINIMUM SHEAR LINKS
PV
LC-3 NS LWL With LL max reaction case 613.193 38.6131 19.3066 0.78 322.34 PROVIDE MINIMUM SHEAR LINKS
LC-4 NS LWL With LL max moment case 597.809 38.4173 19.2086 0.76 320.04 PROVIDE MINIMUM SHEAR LINKS
S
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (5 191.054 69.4108 34.7054 0.24 259.02 PROVIDE MINIMUM SHEAR LINKS
EM
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (5 191.054 24.2954 12.1477 0.24 259.02 PROVIDE MINIMUM SHEAR LINKS
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50 213.114 69.4108 34.7054 0.27 262.33 PROVIDE MINIMUM SHEAR LINKS
ST
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50 213.114 24.2954 12.1477 0.27 262.33 PROVIDE MINIMUM SHEAR LINKS
SY
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 287.908 146.758 73.3789 0.37 273.55 PROVIDE MINIMUM SHEAR LINKS
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 287.908 56.5271 28.2635 0.37 273.55 PROVIDE MINIMUM SHEAR LINKS
G
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 339.468 146.758 73.3789 0.43 281.29 PROVIDE MINIMUM SHEAR LINKS
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 339.468 56.5271 28.2635 0.43 281.29 PROVIDE MINIMUM SHEAR LINKS
IN
R
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 326.045 148.935 74.4675 0.41 279.27 PROVIDE MINIMUM SHEAR LINKS
EE
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 326.045 58.7043 29.3521 0.41 279.27 PROVIDE MINIMUM SHEAR LINKS
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 381.199 148.935 74.4675 0.48 287.54 PROVIDE MINIMUM SHEAR LINKS
IN
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 381.199 58.7043 29.3521 0.48 287.54 PROVIDE MINIMUM SHEAR LINKS
G
LC-17 LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3 324.086 137.48 68.7399 0.41 278.98 PROVIDE MINIMUM SHEAR LINKS
EN
LC-18 LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3 324.086 47.249 23.6245 0.41 278.98 PROVIDE MINIMUM SHEAR LINKS
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 379.056 137.48 68.7399 0.48 287.22 PROVIDE MINIMUM SHEAR LINKS
L
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 379.056 47.249 23.6245 0.48 287.22 PROVIDE MINIMUM SHEAR LINKS
I
IV
LC-21 NS HFL Span dislodge case 194.86 11.5597 5.77987 0.25 259.59 PROVIDE MINIMUM SHEAR LINKS
C
LC-22 NS HFL No Live load 306.464 21.4801 10.7401 0.39 276.33 PROVIDE MINIMUM SHEAR LINKS
LC-23 NS HFL With LL max reaction case 605.969 40.2525 20.1262 0.77 321.26 PROVIDE MINIMUM SHEAR LINKS
A
LC-24 NS HFL With LL max moment case 590.585 40.0566 20.0283 0.75 318.95 PROVIDE MINIMUM SHEAR LINKS
D
R
LC-25 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 ( 183.83 79.0046 39.5023 0.23 257.94 PROVIDE MINIMUM SHEAR LINKS
SPAR GEO INFRA PVT. LTD. Page 111 of 139
RDA CIVIL ENGINEERING SYSTEMS PVT. LTD.
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-26 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 ( 183.83 31.7932 15.8966 0.23 257.94 PROVIDE MINIMUM SHEAR LINKS
LC-27 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (5 205.89 79.0046 39.5023 0.26 261.25 PROVIDE MINIMUM SHEAR LINKS
LC-28 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (5 205.89 31.7932 15.8966 0.26 261.25 PROVIDE MINIMUM SHEAR LINKS
.
D
LT
LC-29 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 280.684 156.37 78.1849 0.36 272.47 PROVIDE MINIMUM SHEAR LINKS
LC-30 LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3 280.684 61.9471 30.9735 0.36 272.47 PROVIDE MINIMUM SHEAR LINKS
T.
LC-31 LC-22 + Seismic Sx=1,Sz=0.3,Sy=0.3 332.244 156.37 78.1849 0.42 280.20 PROVIDE MINIMUM SHEAR LINKS
LC-32 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 332.244 61.9471 30.9735 0.42 280.20 PROVIDE MINIMUM SHEAR LINKS
PV
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 318.821 156.563 78.2815 0.40 278.19 PROVIDE MINIMUM SHEAR LINKS
S
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 318.821 62.1402 31.0701 0.40 278.19 PROVIDE MINIMUM SHEAR LINKS
EM
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 373.975 156.563 78.2815 0.47 286.46 PROVIDE MINIMUM SHEAR LINKS
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 373.975 62.1402 31.0701 0.47 286.46 PROVIDE MINIMUM SHEAR LINKS
ST
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 316.862 145.108 72.5539 0.40 277.89 PROVIDE MINIMUM SHEAR LINKS
SY
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 316.862 50.6849 25.3425 0.40 277.89 PROVIDE MINIMUM SHEAR LINKS
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 371.832 145.108 72.5539 0.47 286.14 PROVIDE MINIMUM SHEAR LINKS
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 371.832 50.6849 25.3425 0.47 286.14 PROVIDE MINIMUM SHEAR LINKS
G
IN
LC-41 NS LWL Span dislodge case+wind load 212.709 17.1414 8.57068 0.27 262.27 PROVIDE MINIMUM SHEAR LINKS
R
LC-42 NS LWL No Live load+wind load 310.824 16.9937 8.49683 0.39 276.99 PROVIDE MINIMUM SHEAR LINKS
LC-43 NS LWL With LL max reaction case+w 515.645 32.7137 16.3569 0.65 307.71 PROVIDE MINIMUM SHEAR LINKS
LC-44
LC-45
NS LWL With LL max reaction succedi
NS HFL Span dislodge case+wind load
594.945
206.93
57.3672
16.0545 EE
28.6836
8.02726
0.76
0.26
319.61
261.40
PROVIDE MINIMUM SHEAR LINKS
PROVIDE MINIMUM SHEAR LINKS
IN
LC-46 NS HFL No Live load+wind load 305.045 18.95 9.47498 0.39 276.12 PROVIDE MINIMUM SHEAR LINKS
G
LC-47 NS HFL With LL max reaction case+w 509.866 32.7137 16.3569 0.65 306.84 PROVIDE MINIMUM SHEAR LINKS
EN
LC-48 NS HFL With LL max reaction succedin 589.166 57.3672 28.6836 0.75 318.74 PROVIDE MINIMUM SHEAR LINKS
I L
IV
C
A
D
R
.
D
Effective Cover at section = 105 mm
LT
Effective depth of section = 1395 mm
T.
Minimum shear reinforcement ratio (min) 0.072√fck = 0.00085
PV
fyk
Shear reinforcement ratio (w) ASW
S
(Refer clause 16.5.2 (5) of IRC :112-2011) s. bw .sin
EM
Therefore,
2
4472.56 mm /m
ST
ASW (min) /s =
SY
Provide 10 links @ 200 c/c in trans dirn & 300 c/c vertically
2
Asw/s provided 6872.23 mm /m OK
I L
IV
C
A
D
R
Ac = 7875000 mm2
.
D
2
As1 As = 5969.03 mm
LT
fcd = 15.6 Mpa
fyd = 434.8 Mpa
T.
T= Selenderness crateria
T
mm4
PV
As4 5250 Moment of Inertia about TT axis ITT = 1.47656E+12
Moment of Inertia about LL axis ILL = 1.80879E+13 mm4
As3 L
S
Radius of gyration along LL axis iL = ITT /A
EM
= 433.013 mm
ST
Radius of gyration along TT axis iT = ILL /A
As2 = 1515.54 mm
SY
L= 1500
G
IN
Clear Height of compression member lo = 6.65 m
Effective Length of column along LL -axis leL = 1.4 *lo
R
= 9.31 m
= 15.30 m
= 10.09
I
IV
.
eL = eT = (eL/L) / (eT/T) /
D
NED HL HT METT MELL eL /L eT /T CHECK
MTT/NED MLL/NED (eT/T) (eL/L)
LT
Tonne Tonne Tonne Tm Tm
LC-1 NS LWL Span dislodge case 202.1 9.9 0.0 76.4 0.0 0.4 0.0 0.3 0.0 7190.1 0.0 Check for limiting slenderness ratio
LC-2 NS LWL No Live load 313.7 19.8 0.0 147.4 0.0 0.5 0.0 0.3 0.0 13862.0 0.0 Check for limiting slenderness ratio
T.
LC-3 NS LWL With LL max reaction case 613.2 38.6 0.0 281.6 -365.4 0.5 -0.6 0.3 -0.1 -2.7 -0.4 Ignore second order effect
PV
LC-4 NS LWL With LL max moment case 597.8 38.4 0.0 280.2 -346.6 0.5 -0.6 0.3 -0.1 -2.8 -0.4 Ignore second order effect
LC-5 LC-1 + Seismic Sx=1,Sz=0.3,Sy=-0.3 (5 191.1 69.4 16.5 228.8 38.0 1.2 0.2 0.8 0.0 21.1 0.0 Check for limiting slenderness ratio
S
LC-6 LC-1 + Seismic Sx=0.3,Sz=1,Sy=-0.3 (5 191.1 24.3 55.2 97.3 126.6 0.5 0.7 0.3 0.1 2.7 0.4 Check for limiting slenderness ratio
EM
LC-7 LC-1 + Seismic Sx=1,Sz=0.3,Sy=0.3 (50 213.1 69.4 16.5 229.0 38.0 1.1 0.2 0.7 0.0 21.1 0.0 Check for limiting slenderness ratio
LC-8 LC-1 + Seismic Sx=0.3,Sz=1,Sy=0.3 (50 213.1 24.3 55.2 97.5 126.6 0.5 0.6 0.3 0.1 2.7 0.4 Check for limiting slenderness ratio
ST
LC-9 LC-2 + Seismic Sx=1,Sz=0.3,Sy=-0.3 287.9 146.8 38.7 508.7 118.9 1.8 0.4 1.2 0.1 15.0 0.1 Check for limiting slenderness ratio
LC-10 LC-2 + Seismic Sx=0.3,Sz=1,Sy=-0.3 287.9 56.5 128.9 245.6 396.4 0.9 1.4 0.6 0.3 2.2 0.5 Check for limiting slenderness ratio
SY
LC-11 LC-2 + Seismic Sx=1,Sz=0.3,Sy=0.3 339.5 146.8 38.7 509.4 118.9 1.5 0.4 1.0 0.1 15.0 0.1 Check for limiting slenderness ratio
LC-12 LC-2 + Seismic Sx=0.3,Sz=1,Sy=0.3 339.5 56.5 128.9 246.3 396.4 0.7 1.2 0.5 0.2 2.2 0.5 Check for limiting slenderness ratio
G
LC-13 LC-3 + Seismic Sx=1,Sz=0.3,Sy=-0.3 326.0 148.9 39.2 524.3 77.3 1.6 0.2 1.1 0.0 23.8 0.0 Check for limiting slenderness ratio
IN
LC-14 LC-3 + Seismic Sx=0.3,Sz=1,Sy=-0.3 326.0 58.7 130.7 261.2 366.0 0.8 1.1 0.5 0.2 2.5 0.4 Check for limiting slenderness ratio
LC-15 LC-3 + Seismic Sx=1,Sz=0.3,Sy=0.3 381.2 148.9 39.2 525.0 72.9 1.4 0.2 0.9 0.0 25.2 0.0 Check for limiting slenderness ratio
R
LC-16 LC-3 + Seismic Sx=0.3,Sz=1,Sy=0.3 381.2 58.7 130.7 261.9 361.6 0.7 0.9 0.5 0.2 2.5 0.4 Check for limiting slenderness ratio
LC-17
LC-18
LC-4 + Seismic Sx=1,Sz=0.3,Sy=-0.3
LC-4 + Seismic Sx=0.3,Sz=1,Sy=-0.3
324.1
324.1
137.5
47.2
39.2
130.6 EE
442.4
179.2
79.4
367.6
1.4
0.6
0.2
1.1
0.9
0.4
0.0
0.2
19.5
1.7
0.1
0.6
Check for limiting slenderness ratio
Check for limiting slenderness ratio
IN
LC-19 LC-4 + Seismic Sx=1,Sz=0.3,Sy=0.3 379.1 137.5 39.2 443.1 75.2 1.2 0.2 0.8 0.0 20.6 0.0 Check for limiting slenderness ratio
G
LC-20 LC-4 + Seismic Sx=0.3,Sz=1,Sy=0.3 379.1 47.2 130.6 180.0 363.4 0.5 1.0 0.3 0.2 1.7 0.6 Check for limiting slenderness ratio
EN
LC-21 NS HFL Span dislodge case 194.9 11.6 1.3 78.7 1.8 0.4 0.0 0.3 0.0 149.8 0.0 Check for limiting slenderness ratio
LC-22 NS HFL No Live load 306.5 21.5 1.3 149.7 1.8 0.5 0.0 0.3 0.0 284.8 0.0 Check for limiting slenderness ratio
L
LC-23 NS HFL With LL max reaction case 606.0 40.3 1.3 283.9 -363.6 0.5 -0.6 0.3 -0.1 -2.7 -0.4 Ignore second order effect
I
LC-24 NS HFL With LL max moment case 590.6 40.1 1.3 282.5 -344.8 0.5 -0.6 0.3 -0.1 -2.9 -0.3 Ignore second order effect
IV
LC-25 LC-21 + Seismic Sx=1,Sz=0.3,Sy=-0.3 ( 183.8 79.0 19.2 269.5 41.1 1.5 0.2 1.0 0.0 22.9 0.0 Check for limiting slenderness ratio
C
LC-26 LC-21 + Seismic Sx=0.3,Sz=1,Sy=-0.3 ( 183.8 31.8 60.9 135.9 132.8 0.7 0.7 0.5 0.1 3.6 0.3 Check for limiting slenderness ratio
A
LC-27 LC-21 + Seismic Sx=1,Sz=0.3,Sy=0.3 (5 205.9 79.0 19.2 269.7 41.1 1.3 0.2 0.9 0.0 23.0 0.0 Check for limiting slenderness ratio
D
LC-28 LC-21 + Seismic Sx=0.3,Sz=1,Sy=0.3 (5 205.9 31.8 60.9 136.1 132.8 0.7 0.6 0.4 0.1 3.6 0.3 Check for limiting slenderness ratio
R
LC-29 LC-22 + Seismic Sx=1,Sz=0.3,Sy=-0.3 280.7 156.4 41.8 531.1 122.5 1.9 0.4 1.3 0.1 15.2 0.1 Check for limiting slenderness ratio
LC-30 LC-22 + Seismic Sx=0.3,Sz=1,Sy=-0.3 280.7 61.9 136.2 263.8 404.0 0.9 1.4 0.6 0.3 2.3 0.4 Check forPage
limiting
115 slenderness
of 139 ratio
SPAR GEO INFRA PVT. LTD.
LC-31 RDA
LC-22 + Seismic
CIVIL Sx=1,Sz=0.3,Sy=0.3
ENGINEERING 332.2
SYSTEMS PVT. LTD. 156.4 41.8 531.8 122.5 1.6 0.4 1.1 0.1 15.2 0.1 Check for limiting slenderness ratio
LC-32 LC-22 + Seismic Sx=0.3,Sz=1,Sy=0.3 332.2 61.9 136.2 264.6 404.0 0.8 1.2 0.5 0.2 2.3 0.4 Check for limiting slenderness ratio
SUBSTRUCTURE FOR BAILEY BRIDGE AT HIMANK IN J&K STATE: CA No. CE(P) HMK-11/2015-16
DESIGN OF PIER CONSISTING OF MICRO PILE FOUNDATION
LC-33 LC-23 + Seismic Sx=1,Sz=0.3,Sy=-0.3 318.8 156.6 42.3 532.4 80.8 1.7 0.3 1.1 0.0 23.1 0.0 Check for limiting slenderness ratio
LC-34 LC-23 + Seismic Sx=0.3,Sz=1,Sy=-0.3 318.8 62.1 138.0 265.2 373.7 0.8 1.2 0.6 0.2 2.5 0.4 Check for limiting slenderness ratio
.
D
LC-35 LC-23 + Seismic Sx=1,Sz=0.3,Sy=0.3 374.0 156.6 42.3 533.2 76.4 1.4 0.2 1.0 0.0 24.4 0.0 Check for limiting slenderness ratio
LC-36 LC-23 + Seismic Sx=0.3,Sz=1,Sy=0.3 374.0 62.1 138.0 265.9 369.3 0.7 1.0 0.5 0.2 2.5 0.4 Check for limiting slenderness ratio
LT
LC-37 LC-24 + Seismic Sx=1,Sz=0.3,Sy=-0.3 316.9 145.1 42.3 450.5 83.0 1.4 0.3 0.9 0.0 19.0 0.1 Check for limiting slenderness ratio
T.
LC-38 LC-24 + Seismic Sx=0.3,Sz=1,Sy=-0.3 316.9 50.7 137.9 183.3 375.2 0.6 1.2 0.4 0.2 1.7 0.6 Check for limiting slenderness ratio
LC-39 LC-24 + Seismic Sx=1,Sz=0.3,Sy=0.3 371.8 145.1 42.3 451.3 78.8 1.2 0.2 0.8 0.0 20.0 0.0 Check for limiting slenderness ratio
PV
LC-40 LC-24 + Seismic Sx=0.3,Sz=1,Sy=0.3 371.8 50.7 137.9 184.0 371.1 0.5 1.0 0.3 0.2 1.7 0.6 Check for limiting slenderness ratio
S
LC-41 NS LWL Span dislodge case+wind load 212.7 17.1 44.2 119.3 286.8 0.6 1.3 0.4 0.3 1.5 0.7 Check for limiting slenderness ratio
LC-42 NS LWL No Live load+wind load 310.8 17.0 70.7 117.1 462.7 0.4 1.5 0.3 0.3 0.9 1.1 Check for limiting slenderness ratio
EM
LC-43 NS LWL With LL max reaction case+w 515.6 32.7 16.6 236.4 -162.6 0.5 -0.3 0.3 -0.1 -5.1 -0.2 Ignore second order effect
LC-44 NS LWL With LL max reaction succedi 594.9 57.4 78.5 404.8 168.1 0.7 0.3 0.5 0.1 8.4 0.1 Check for limiting slenderness ratio
ST
LC-45 NS HFL Span dislodge case+wind load 206.9 16.1 39.9 112.1 257.9 0.5 1.2 0.4 0.2 1.5 0.7 Check for limiting slenderness ratio
LC-46 NS HFL No Live load+wind load 305.0 18.9 78.5 130.1 514.7 0.4 1.7 0.3 0.3 0.9 1.1 Check for limiting slenderness ratio
SY
LC-47 NS HFL With LL max reaction case+wi 509.9 32.7 16.6 236.4 -162.6 0.5 -0.3 0.3 -0.1 -5.1 -0.2 Ignore second order effect
LC-48 NS HFL With LL max reaction succedin 589.2 57.4 78.5 404.8 168.1 0.7 0.3 0.5 0.1 8.4 0.1 Check for limiting slenderness ratio
G
IN
R
EE
IN
G
EN
L
I
IV
C
A
D
R
CHECK FOR PIER SECOND ORDER FORCES: ( IRC 112 / clause 11.2.1)
Ac = 7875000 mm2
2
As1 As = 5969.03 mm
fcd = 15.6 Mpa
fyd = 434.8 Mpa
Selenderness crateria
T
As4 Moment of Inertia about TT axis ITT = 1.47656E+12 mm4
T= Moment of Inertia about LL axis ILL = 1.80879E+13 mm4
As3 L 5250
Radius of gyration along LL axis iL = ITT /A
= 433.013 mm
.
D
Radius of gyration along TT axis iT = ILL /A
LT
As2 = 1515.54 mm
T.
L= 1500
PV
Clear Height of compression member lo = 6.65 m
Effective length of column along L-L leL = 1.4 *lo
S
= 9.31 m
EM
Selenderness ratio along L-L axis L = leL/ iL
=
ST
21.50
B = ( 1 + 2 )
= 1.021
C
= 0
D
C = 1.7 - rm
R
= 1.7
SUMMERY OF FORCES AT BOTTOM OF SHAFT: CHECK FOR SECOND ORDER EFFECT ( along LL Axis)
S.N. ULS FORCES SLS (QP LC) Second Order Effect
MoEqp
NED METT MELL METT MELL ef A n lim ( <lim) : Ignore
/MoEd
Tonne Tm Tm Tm Tm ( >lim) : Consider
LC-1 202.1 76.4 0.0 98.7 0.0 1.29 2.31 0.68 0.02 185.30 Ignore second order effect
LC-2 313.7 147.4 0.0 98.7 0.0 0.67 1.20 0.81 0.03 175.41 Ignore second order effect
LC-3 613.2 281.6 -365.4 98.7 0.0 0.35 0.63 0.89 0.05 138.19 Ignore second order effect
LC-4 597.8 280.2 -346.6 98.7 0.0 0.35 0.63 0.89 0.05 139.88 Ignore second order effect
LC-5 191.1 228.8 38.0 0.0 0.0 0.00 0.00 1.00 0.02 278.62 Ignore second order effect
LC-6 191.1 97.3 126.6 0.0 0.0 0.00 0.00 1.00 0.02 278.62 Ignore second order effect
LC-7 213.1 229.0 38.0 0.0 0.0 0.00 0.00 1.00 0.02 263.81 Ignore second order effect
LC-8 213.1 97.5 126.6 0.0 0.0 0.00 0.00 1.00 0.02 263.81 Ignore second order effect
.
D
LC-9 287.9 508.7 118.9 0.0 0.0 0.00 0.00 1.00 0.02 226.97 Ignore second order effect
LT
LC-10 287.9 245.6 396.4 0.0 0.0 0.00 0.00 1.00 0.02 226.97 Ignore second order effect
LC-11 339.5 509.4 118.9 0.0 0.0 0.00 0.00 1.00 0.03 209.02 Ignore second order effect
LC-12 339.5 246.3 396.4 0.0 0.0 0.00 0.00 1.00 0.03 209.02 Ignore second order effect
T.
LC-13 326.0 524.3 77.3 0.0 0.0 0.00 0.00 1.00 0.03 213.28 Ignore second order effect
PV
LC-14 326.0 261.2 366.0 0.0 0.0 0.00 0.00 1.00 0.03 213.28 Ignore second order effect
LC-15 381.2 525.0 72.9 0.0 0.0 0.00 0.00 1.00 0.03 197.25 Ignore second order effect
LC-16 381.2 261.9 361.6 0.0 0.0 0.00 0.00 1.00
S
0.03 197.25 Ignore second order effect
EM
LC-17 324.1 442.4 79.4 0.0 0.0 0.00 0.00 1.00 0.03 213.93 Ignore second order effect
LC-18 324.1 179.2 367.6 0.0 0.0 0.00 0.00 1.00 0.03 213.93 Ignore second order effect
LC-19
LC-20
379.1
379.1
443.1
180.0
75.2
363.4
0.0
0.0
0.0
0.0 ST
0.00
0.00
0.00
0.00
1.00
1.00
0.03
0.03
197.81
197.81
Ignore second order effect
Ignore second order effect
SY
LC-21 194.9 78.7 1.8 0.0 0.0 0.00 0.00 1.00 0.02 275.89 Ignore second order effect
LC-22 306.5 149.7 1.8 0.0 0.0 0.00 0.00 1.00 0.02 219.99 Ignore second order effect
LC-23 606.0 283.9 -363.6 0.0 0.0 0.00 0.00 1.00 0.05 156.45 Ignore second order effect
G
LC-24 590.6 282.5 -344.8 0.0 0.0 0.00 0.00 1.00 0.05 158.47 Ignore second order effect
IN
LC-25 183.8 269.5 41.1 0.0 0.0 0.00 0.00 1.00 0.01 284.05 Ignore second order effect
R
LC-26 183.8 135.9 132.8 0.0 0.0 0.00 0.00 1.00 0.01 284.05 Ignore second order effect
EE
LC-27 205.9 269.7 41.1 0.0 0.0 0.00 0.00 1.00 0.02 268.40 Ignore second order effect
LC-28 205.9 136.1 132.8 0.0 0.0 0.00 0.00 1.00 0.02 268.40 Ignore second order effect
IN
LC-29 280.7 482.8 122.5 0.0 0.0 0.00 0.00 1.00 0.02 229.87 Ignore second order effect
LC-30 280.7 263.8 404.0 0.0 0.0 0.00 0.00 1.00 0.02 229.87 Ignore second order effect
G
LC-31 332.2 531.8 122.5 0.0 0.0 0.00 0.00 1.00 0.03 211.28 Ignore second order effect
EN
LC-32 332.2 264.6 404.0 0.0 0.0 0.00 0.00 1.00 0.03 211.28 Ignore second order effect
LC-33 318.8 532.4 80.8 0.0 0.0 0.00 0.00 1.00 0.03 215.69 Ignore second order effect
IL
LC-34 318.8 265.2 373.7 0.0 0.0 0.00 0.00 1.00 0.03 215.69 Ignore second order effect
LC-35 374.0 533.2 76.4 0.0 0.0 0.00 0.00 1.00 0.03 199.15 Ignore second order effect
IV
LC-36 374.0 265.9 369.3 0.0 0.0 0.00 0.00 1.00 0.03 199.15 Ignore second order effect
C
LC-37 316.9 450.5 83.0 0.0 0.0 0.00 0.00 1.00 0.03 216.35 Ignore second order effect
A
LC-38 316.9 183.3 375.2 0.0 0.0 0.00 0.00 1.00 0.03 216.35 Ignore second order effect
LC-39 371.8 451.3 78.8 0.0 0.0 0.00 0.00 1.00 0.03 199.72 Ignore second order effect
D
LC-40 371.8 184.0 371.1 0.0 0.0 0.00 0.00 1.00 0.03 199.72 Ignore second order effect
R
LC-41 212.7 119.3 286.8 0.0 0.0 0.00 0.00 1.00 0.02 264.06 Ignore second order effect
LC-42 310.8 117.1 462.7 0.0 0.0 0.00 0.00 1.00 0.03 218.44 Ignore second order effect
LC-43 515.6 236.4 -162.6 0.0 0.0 0.00 0.00 1.00 0.04 169.60 Ignore second order effect
LC-44 594.9 404.8 168.1 0.0 0.0 0.00 0.00 1.00 0.05 157.89 Ignore second order effect
LC-45 206.9 112.1 257.9 0.0 0.0 0.00 0.00 1.00 0.02 267.72 Ignore second order effect
LC-46 305.0 130.1 514.7 0.0 0.0 0.00 0.00 1.00 0.02 220.50 Ignore second order effect
LC-47 509.9 236.4 -162.6 0.0 0.0 0.00 0.00 1.00 0.04 170.56 Ignore second order effect
LC-48 589.2 404.8 168.1 0.0 0.0 0.00 0.00 1.00 0.05 158.66 Ignore second order effect
LC-5 0.00 0.00 1.00 0.02 278.62 Ignore second order effect
LC-6 0.00 0.00 1.00 0.02 278.62 Ignore second order effect
LC-7 0.00 0.00 1.00 0.02 263.81 Ignore second order effect
LC-8 0.00 0.00 1.00 0.02 263.81 Ignore second order effect
.
D
LC-9 0.00 0.00 1.00 0.02 226.97 Ignore second order effect
LC-10 0.00 0.00 1.00 0.02 226.97 Ignore second order effect
LT
LC-11 0.00 0.00 1.00 0.03 209.02 Ignore second order effect
LC-12 0.00 0.00 1.00 0.03 209.02 Ignore second order effect
T.
LC-13 0.00 0.00 1.00 0.03 213.28 Ignore second order effect
PV
LC-14 0.00 0.00 1.00 0.03 213.28 Ignore second order effect
LC-15 0.00 0.00 1.00 0.03 197.25 Ignore second order effect
LC-16 0.00 0.00 1.00 0.03 197.25 Ignore second order effect
S
EM
LC-17 0.00 0.00 1.00 0.03 213.93 Ignore second order effect
LC-18 0.00 0.00 1.00 0.03 213.93 Ignore second order effect
LC-19 0.00 0.00 1.00 0.03 197.81 Ignore second order effect
LC-20 0.00 0.00 1.00 0.03 197.81 ST
Ignore second order effect
SY
LC-21 0.00 0.00 1.00 0.02 275.89 Ignore second order effect
LC-22 0.00 0.00 1.00 0.02 219.99 Ignore second order effect
LC-23 0.00 0.00 1.00 0.05 156.45 Ignore second order effect
G
LC-24 0.00 0.00 1.00 0.05 158.47 Ignore second order effect
IN
LC-25 0.00 0.00 1.00 0.01 284.05 Ignore second order effect
R
LC-26 0.00 0.00 1.00 0.01 284.05 Ignore second order effect
LC-27 0.00 0.00 1.00 0.02 268.40 Ignore second order effect
EE
LC-28 0.00 0.00 1.00 0.02 268.40 Ignore second order effect
IN
LC-29 0.00 0.00 1.00 0.02 229.87 Ignore second order effect
LC-30 0.00 0.00 1.00 0.02 229.87 Ignore second order effect
G
LC-31 0.00 0.00 1.00 0.03 211.28 Ignore second order effect
LC-32 0.00 0.00
EN
LC-33 0.00 0.00 1.00 0.03 215.69 Ignore second order effect
LC-34 0.00 0.00 1.00 0.03 215.69 Ignore second order effect
IL
LC-35 0.00 0.00 1.00 0.03 199.15 Ignore second order effect
IV
LC-36 0.00 0.00 1.00 0.03 199.15 Ignore second order effect
C
LC-37 0.00 0.00 1.00 0.03 216.35 Ignore second order effect
LC-38 0.00 0.00 1.00 0.03 216.35 Ignore second order effect
A
LC-39 0.00 0.00 1.00 0.03 199.72 Ignore second order effect
D
LC-40 0.00 0.00 1.00 0.03 199.72 Ignore second order effect
R
LC-41 0.00 0.00 1.00 0.02 264.06 Ignore second order effect
LC-42 0.00 0.00 1.00 0.03 218.44 Ignore second order effect
LC-43 0.00 0.00 1.00 0.04 169.60 Ignore second order effect
LC-44 0.00 0.00 1.00 0.05 157.89 Ignore second order effect
LC-45 0.00 0.00 1.00 0.02 267.72 Ignore second order effect
LC-46 0.00 0.00 1.00 0.02 220.50 Ignore second order effect
LC-47 0.00 0.00 1.00 0.04 170.56 Ignore second order effect
LC-48 0.00 0.00 1.00 0.05 158.66 Ignore second order effect
.
Modulus of Elasticity for Concrete
D
Design Bending Moment MRARE = 307.77 Tm
LT
MQP = 98.66 Tm
MST = MRARE - MQP (Bending Moment due to short term loading)
T.
= 209.11 Tm
PV
Modulus of Elasticity for Concrete
For short term loading Ecm = 32308.2 Mpa
S
Creep coefficent = 1.73
EM
For long term loading Ecm' = 11848.3 Mpa
2
Es 200000 N/mm
ST
Reinf. modulus of elasticity =
SY
Modular ratio for QP Combination = Es / Ecm = 16.880
Equivalent Modulus of Elasticity for Rare Combination :
Ec,eq = Ecm*(MQP+MST) = 20796.6 MPa
G
MST +(1+)* MQP
IN
Modular ratio for Rare Combination = Es/ Ec,eq = 9.62
R
Permissible Stresses
Permissible conc. Stresses
Rare Combination
16.8 EE
Quasi Permanent
12.6
IN
Permissible steel stresses -300 -300
G
EN
I L
IV
C
A
D
R
.
D
S.N. Description FORCES @ SHAFT BOTTOM Modular
LT
N HL HT MTT MLL NED MED VED ratio
Tonne Tonne Tonne Tm Tm Tonne Tm Tonne
T.
LC-1 LWL QP, NS LWL DL, Snow load 232.362 13.2272 0 98.6551 0.02756 232.4 98.7 13.2 16.88
LC-2 HFL QP, NS LWL DL, Snow load 225.138 13.2272 0 98.6551 0.02756 225.1 98.7 13.2 16.88
PV
LC-3 LWL RARE, NS LWL DL, Snow load, 432.032 25.7421 0 188.137 -243.57 432.0 307.8 25.7 9.62
S
LC-4 LWL RARE, NS LWL DL, Snow load, 421.775 25.6115 0 187.203 -231.06 421.8 297.4 25.6 9.62
LC-5 HFL RARE, NS LWL DL, Snow load, L 424.808 27.3814 1.28687 190.433 -241.77 424.8 307.8 27.4 9.62
EM
LC-6 HFL RARE, NS LWL DL, Snow load, L 414.551 27.2509 1.28687 189.499 -229.25 414.6 297.4 27.3 9.62
ST
SY
G
IN
R
EE
IN
G
EN
I L
IV
C
A
D
R
.
D
LT
As1
T.
PV
T T=
5250
S
As4
L
EM
As3
ST
SY
As2
G
L= 1500
IN
R
SLS CHECK FOR ABUTMENT PIER :
EE
IN
Forces at bottom of abutment shaft
S.N. Forces @ axis
G
Description
NED HL HT METT MELL V HL HT METT MELL
EN
LC-2 HFL QP, NS LWL DL, Snow load 225.1 13.2 0.0 98.7 0.0 225.1 13.2 0.0 98.7 0.0
I
IV
LC-3 LWL RARE, NS LWL DL, Snow load, L 432.0 25.7 0.0 188.1 -243.6 432.0 25.7 0.0 188.1 -243.6
C
LC-4 LWL RARE, NS LWL DL, Snow load, L 421.8 25.6 0.0 187.2 -231.1 421.8 25.6 0.0 187.2 -231.1
LC-5 HFL RARE, NS LWL DL, Snow load, L 424.8 27.4 1.3 190.4 -241.8 424.8 27.4 1.3 190.4 -241.8
A
LC-6 HFL RARE, NS LWL DL, Snow load, L 414.6 27.3 1.3 189.5 -229.3 414.6 27.3 1.3 189.5 -229.3
D
R
Section Dimensions:
2 3 D = 1500 mm
As1 B = 5250 mm
Material Properties:
2
fck = 15.6333333 N/mm
2
As3 fyk = 434.782609 N/mm
2
As4 5195 Es = 200000 N/mm
T = 5250
.
D
LT
T.
T
As2
PV
1 4
1322 L
dy L= 1500
S
EM
NA xu
ST
SY
NA
G
Reinforcement Details :
IN
L T L T
Closed
IL
SECTION COORDINATE
IV
4 4
5 0 0 ILL = 7E+13 mm 2E+13 mm
4 4
Closed ITT = 6.E+12 mm 1.E+12 mm
4 4
ILT = 2.E+13 mm 0.E+00 mm
2
Reinf. modulus of elasticity Es = 200000 N/mm
.
D
LT
Modular ratio for Rare Combination = Es/ Ec,eq = 9.45
T.
Forces Finding Position of Neutral Axs
PV
P MTT MLL Modular First Trail Valuse Adopted Value suggested by program
LC T Tm Tm ratio dy dy dy NA_stress
S
radian mm radian mm radian mm Mpa
EM
LC-1 232.4 98.7 0.1 12.38 4.7 -7E+06 4.7 -4E+07 4.7 -2E+06 2.74
LC-2 225.1 98.7 0.1 12.38 4.7 -7E+06 4.7 -4E+07 4.7 -3E+06 2.63
LC-3
LC-4
432.0
421.8
188.1
187.2
243.6
231.1
9.45
9.45
4.60709
4.61197
-4E+03
-5E+03
ST 4.7
4.7
-8E+04
-8E+04
4.58308
4.59067
-5E+02
-8E+02
12.01
11.35
SY
LC-5 424.8 190.4 241.8 9.45 4.60912 -5E+03 4.7 -8E+04 4.5881 -8E+02 11.88
LC-6 414.6 189.5 229.3 9.45 4.61395 -5E+03 4.7 -8E+04 4.59541 -1E+03 11.22
G
IN
x y x y Dist.
1500 0 0 5250
R
from
Max. Concrete Permissible conc. Max. Tensile Stress Permissible steel N.A
EE
LOAD COMBIANTIONS Stress (Mpa) stresses(Mpa) (Mpa) stresses (Mpa) (mm) (4)
LC-1 QUASI PERMANENT 0.666 16.8 OK -2.1 -400 OK -1195.55
IN
RARE COMBINATION
LC-5 1.795 12.6 OK -9.1 -300 OK -1390.66
LC-6 1.764 12.6 OK -9.2 -300 OK -1356
IL
IV
First Trail NA
tan ()=
C
h = 1.5 m , b = 1m
k = 0.65
fcteff = fctm
= 2.77 Mpa
.
D
Act =
LT
Area of concrete within tensile zone just before the first crack form, section behaves
elastically until the tensile fiber stress reaches fctm. hence Neutral axis depth will be
considered for gross section
T.
Act = b * h/2
PV
2
= 0.75 m
S
= fyk
EM
= 434.783 Mpa
Asmin =
2
1242.91 mm /m <
<
ST 2
4861.99 mm /m on tension face
2
4862.0 mm /m on compression face
OK
OK
SY
= 0.2 mm
IN
Clear cover c = 75 mm
R
5 (c +eq/2) = 437.5 mm
IN
= 3.4c + 0.17Peff
= 704.083 mm
IL
( h - x/3 ) d = 1.2945 m
C
width b = 1m
R
2
Ac,eff = hc,eff *b = 0.51375 m
Es = 200000 Mpa
Ecm' = 16154.1 Mpa */ (for Long term loading)
e = Es/Ecm
e = 12.3807
.
D
= 6.7E-06
LT
wk = srmax ( sm - cm )
T.
= 0.005 mm < 0.2 mm OK
PV
S
EM
ST
SY
G
IN
R
EE
IN
G
EN
IL
IV
C
A
D
R
.
D
1.06
LT
1.294
T.
PV
2.706
S
3.71
EM
2.706
ST
SY
1.294
G
0.00 0.00
IN
2.00
R
EE
Section at deff
1.575
1.294 0.85 0.00 0.00
IN
G
0.875 0.875
EN
1.38 0 2.00
C
A
D
R
.
D
Clear cover to main bar = 50 mm
Effective depth d = 1575 mm
LT
width b = 2000 mm
a/d = 0.5 < 1
T.
PV
Cross-setion properties At face of column At deff Location At Bearing Location
Width b = 2.00 m 2.00 m 2.00 m
Overall depth d = 1.75 m 1.75 m 1.75 m
S
2 2 2
Cross-section Area at bearing location A = 3.50 m 3.50 m 3.50 m
EM
Outer perimeter u = 7.5 m 7.5 m 7.5 m
Effective wall thickness teff,i = 0.47 m 0.47 m 0.47 m
2 2 2
ST
Area enclosed by c/L of wall, Ak = 1.97 m 1.97 m 1.97 m
Perimeter of the area Ak = 7.50 m 7.50 m 7.50 m
SY
Forces Due to Selfweight of pier Cap :
3
Density of concrete = 2.5 t/m
G
Description At Facs of shaft At deff Below bearing
IN
Weight of Straight Portion T = 9.38 2.49 5.66
Lever arm from section m = 1.07 0.28 0.65
R
Torsional Eccentricity m = 0.00 0.00 0.00
.
D
Forces due to Super-structure DL, SIDL & Live Load :
Component
LT
B1 B2
Reaction Reaction
T.
Tonne Tonne
PV
SUP DL = 60.0 0.0 60.0 0.0
Snow load = 22.68 0 22.68 0
Surfacing = 0.00 0.00 0.00 0.00
S
EM
LL Maximum Reaction case
LL (without impact) = 96 0 103 0
LL (with impact) = 110.78 0.00 118.84 0.00
ST
Impact factor 0.15
SY
LL Maximum Moment case
LL (without impact) = 44 0 48 0
LL (with impact) = 50.60 0.00 55.20 0.00
G
Impact factor 0.15
IN
Total Load (Tonne)
R
EE
IN
G
EN
I L
IV
C
A
D
R
.
D
Component Shear Lever Lever Shear Lever Lever Bending Torsional Load Factor
Force arm eT arm eL Force arm eT arm eL Moment Moment ULS Factor
LT
Tonne m m Tonne m m Tm Tm Rare QP
Selfweight of pier cap = 22.51 1.07 0.00 24.13 0.00 1.35 1 1
T.
SUP DL = 60.00 0.85 0.00 60.0 0.85 0.00 101.98 0.00 1.35 1 1
PV
snow load = 22.68 0.85 0.00 22.7 0.85 0.00 38.55 0.00 1.35 1 1
Surfacing = 0.00 0.85 0.00 0.0 0.85 0.00 0.00 0.00 1.75 1 1
S
*/ LL Max reaction case
EM
LL (with impact) = 110.78 0.85 0.00 119 0.85 0.00 195.14 0.00 1.5 1 0
ST
LL (with impact) = 50.60 0.85 0.00 55 0.85 0.00 89.91 0.00 1.5 1 0
SY
*/LL Max reaction case
Design Forces
G
ULS 598.1 515.0 0.0
IN
SLS Rare 417.5 359.8 0.0
SLS Quasi permanent 187.9 164.7 0.0
R
EE
*/LL Longitudinal moment case
Design Forces
ULS 412.3 357.2 0.0
IN
SLS Rare 293.7 254.6 0.0
SLS Quasi permanent 187.9 164.7 0.0
G
EN
*/Governing case
Design Forces
L
359.8 0.0
SLS Quasi permanent 187.9 164.7 0.0
C
A
D
R
.
D
B1 B2
Component Shear Lever Lever Shear Lever Lever Bending Torsional Load Factor
LT
Force arm eT arm eL Force arm eT arm eL Moment Moment Factor
Tonne m m Tonne m m Tm Tm ULS Rare QP
T.
Selfweight of pier cap = 5.97 0.28 0.00 1.70 0.00 1.35 1 1
PV
SUP DL = 60.00 0.73 0.00 60.00 0.73 0.00 87.02 0.00 1.35 1 1
snow load = 22.68 0.73 0 22.68 0.73 0 32.89 0.00 1.35 1 1
Surfacing = 0.00 0.73 0 0.00 0.73 0 0.00 0.00 1.75 1 1
S
EM
*/ LL Max reaction case
LL (with impact) = 110.78 0.73 0 118.84 0.73 0 166.511 0.00 1.5 1 0
ST
*/ LL Longitudinal moment case
LL (with impact) = 50.60 0.73 0 55.20 0.73 0 76.72 0.00 1.5 1 0
SY
*/LL Max reaction case
G
Design Forces
IN
ULS 575.7 413.9 0.0
SLS Rare 401.0 288.1 0.0
R
SLS Quasi permanent 171.3 121.6 0.0
*/Governing case
L
Design Forces
I
.
D
Forces below bearing (L1+ R1)
B1 B2
LT
Component Shear Lever Lever Shear Lever Lever Bending Torsional Load Factor
Force arm eT arm eL Force arm eT arm eL Moment Moment Factor
T.
Tonne m m Tonne m m Tm Tm ULS Rare QP
Selfweight of pier cap = 13.59 0.65 0.00 8.79 0.00 1.35 1 1
PV
SUP DL = 60.00 0 0.00 60.00 0 0.00 0.00 0.00 1.35 1 1
snow load = 22.68 0 0 22.68 0 0 0.00 0.00 1.35 1 1
S
Surfacing = 0.00 0 0 0.00 0 0 0.00 0.00 1.75 1 1
EM
*/ LL Max reaction case
LL (with impact) = 110.78 0 0 118.84 0 0 0.00 0.00 1.5 1 0
ST
*/ LL Longitudinal moment case
SY
LL (with impact) = 50.60 0 0 55.20 0 0 0.00 0.00 1.5 1 0
G
*/LL Max reaction case
IN
Design Forces
ULS 586.0 11.9 0.0
R
SLS Rare 408.6 8.8 0.0
EE
SLS Quasi permanent 178.9 8.8 0.0
*/Governing case
I
Design Forces
IV
.
fywd = 0.8 fyk = 400 MPa Load Combi Permissble Stress
TD
Clear cover = 45 mm SLS Rare 0.48 fck = 16.8 Mpa
Modulus of Elasticity steel Es = 200000 Mpa SLS QP 0.36 fck = 12.6 Mpa
.L
For short Term loading Ecm = 32308.2 Mpa
For long Term loading Ecm' = 11638 Mpa
T
Mean tensile strength = fctm = 2.77 Mpa 2) Permissble Tensile stress in steel= 0.8 fy fctm
0.26 bt d
PV
fcd = 15.63 Mpa = 400 Mpa fyk
Creep factor = 1.78 Rare combination = 300 Mpa As.min = Max of
uk = 0.0045 3) Permissible crack width w k 0.0013 bt d
ud = 0.0041 SLS QP Load combination = 0.3 mm
cu2 = 0.0035
xumax/d = 0.4636
fyk (d'-0.416
Ast (d-0.416
Ast / 0.362
MED/z +FD
Ast,additional
Area of steel provided
Required
Toatl Ast
Ast Calc.<Ast
Ast, z = d- MED/z
(Torsion)
Overall
MRD/z >
fck b
G xu)
xu)
MED b depth D d Dia Nos Spacing Provided xmax Check Ast min Fd 0.416 xu +FD MRD/z
Provided
min
2
Load comb. Tm mm mm mm mm nos mm mm mm mm mm2 mm2 mm2 mm2 T m T Tm Tm/m
IN
Section at face of columne
ER
ULS BM 515.00 2000 1750 1632.0 25 18 109.0 17671.5 756.56 303.358 UR, OK 7862.35 0.0 7862.4 OK 4703.62 OK 299.03 1505.8 641.04 1157.5 768.708 OK
25 18
0 18
Section at deff from face of columne
ULS BM 413.94 2000 1750.0 1632.0 25 18 109.0 17671.5 756.56 303.358 UR, OK 6319.46 0.0 6319.5 OK 4703.62 OK 287.87 1505.8 562.762 1157.5 768.708 OK
IN
25 18
0 18
Section just below bearing
G
ULS BM 11.87 2000 1750.0 1632.0 25 18 109.0 17671.5 756.56 303.358 UR, OK 181.18 0.0 181.2 OK 4703.62 OK 293.00 1505.8 300.886 1157.5 768.708 OK
EN
25 18
0 18
I L
IV
C
A
D
R
.
TD
3 2
MST = MRARE -MQP = 195.14 Tm INA (Transformed) = b *dc /3 + m* As *(d-dc)
m = Es/ Ec,eq = 11.22 MPa
Compressive stress in concrete c = MRARE* dc / INA
.L
Quasi Permanent Load Combination Tensile stress in steel s = m* MRARE* (d - dc ) / I NA
m = Es / Ecm' = 17.19 MPa
VT
Stress Check for SLS Load Combinations
M N.A.
Ast, modular depth Comp Tensile Max T Stress
Max C. Check Check
Load comb. b d Provided
ratio (dc) INA stress Stress stress
2
(tm/m) mm mm mm mm mm4 Mpa Mpa Mpa Mpa
SLS (QP Comb.) 164.66 2000.00 1632.00 17671.5 17.19 737.205 5E+11 2.38 12.6 OK 49.62 300 OK
SLS (QP Comb.) 121.61 2000.00 1632.00 17671.5 17.19 737.20 5E+11 1.76 12.6 OK 36.65 300 OK
SLS (QP Comb.) 8.79 2000.00 1632.00 17671.5 17.19 737.20 5E+11 0.13 12.6 OK 2.65 300 OK
I L
IV
C
A
D
R
.
= 2.9 Mpa
TD
b h d Act =bh/2 s = fyk As,min =kc k fct,eff
Load mm mm mm mm2 Mpa Act / s As,provided
comb. mm mm mm mm2 Mpa k kc mm2 mm2 check
Section at face of columne
SLS QP 2000 1750 1562 1750000 500.00 0.65 0.4 2639 17671.5 OK h k
0 1
Section at deff from face of columne 0.3 1
SLS QP 2000 1750.0 1562.0 1750000 500.00 0.65 0.4 2639 17671.5 OK 0.8 0.65
S
3 0.65
EM
Section just below bearing
SLS QP 2000 1750.0 1562.0 1750000 500.00 0.65 0.4 2639 17671.5 OK
ST
2) CHECK FOR MAXIMUM SPACING b/w bars.
SY
Spacing b/w bars
Load comb. Bar dia cover Provided Calculated
eq c mm mm check
G
Section at face of columne
SLS QP 25 45 109.00 287.50 OK
IN
Section at deff from face of columne
R
SLS QP 25 45 109.00 287.50 OK
EE
Section just below bearing
SLS QP 25 45 109.00 287.50 OK
IN
G
EN
I L
IV
C
A
D
R
smax =3.4c +
0.17Peff
hc,eff =Min [ 2.5 ( h peff = sm - cm =Max sc - kt
.
TD
- d ) , ( h - x/3 ) , Aceff = As/Ac,eff x =neutral
e = fct,eff ( 1+ e P,eff ) / P,eff ]
Load comb. h/2] hc,eff *b Asprovided sc axis depth kt Es/Ecm' /Es , 0.6sc/Es ] wk check
mm mm2 mm2 mm Mpa mm
.L
Section at face of columne
SLS QP 470 940000 17671.5 0.019 379.071 49.62 737.20 0.5 17.19 0.000149 0.056 OK
VT
Section at deff from face of columne
SLS QP 470 940000 17671.5 0.019 379.071 36.65 737.20 0.5 17.19 0.000110 0.042 OK
3/2
0.15 cp ) bw d ,
(min +0.15cp )
min = 0.031 k
k= Min [ 1 +
200/d , 2 ]
Check
d , 0.02 ]
bw d ]
fck1/2
VED VED cp
G
Load comb. d bw Asl
T T mm mm mm2 Mpa Tonne
Section at face of columne
ULS 598.06 1 598.06 1632 2000 1.35 17671.5 0.0054 0.288 0 129.692 Provide shear reinf.
I
R
Section at deff from face of columne
EE
ULS 575.73 1 575.73 1632.00 2000 1.35 17671.5 0.0054 0.288 0 129.692 Provide shear reinf.
.
Check for Maximum Shear Capacity :
D
2*VNS / (cw *
= 0.5 sin [
Vrdmax = cw
bw * z * v1 *
-1
1 * fcd /2
* bw * z *
LT
adopted
Load comb. VED bw d z =0.9d cw 1 Check
fcd) ]
T mm mm mm Tonne deg deg
T.
Section at face of columne
ULS 598.06 2000 1632 1468.8 1 0.6 1377.73 OK 12.86 45
PV
Section at deff from face of columne
ULS 575.73 2000 1632 1468.8 1 0.6 1377.73 OK 12.35 45
S
Section just below bearing
M
ULS 586.01 2000 1632 1468.8 1 0.6 1377.73 OK 12.59 45
TE
YS
EQUIVALENT SHEAR CALCULATION DUE TO TORSION :
t,i VED,i
Load comb. TED Ak tef,i =TED/(2 zi =h =t,i
Ak tef,i) *tef,i*zi
Tm m2 m Mpa m T
Section at face of columne
ULS 0.00 1.97 0.47 0.000 1.75 0.00
Asw/s = VED /
w,min*s *bw
√ fck ) / fyk
VED1 Provide Asw
provide
Asw/s
Load comb. (Torsion =VED1+V bw z design
Asw,min =
.
(Flexure)
)
D
ED2
cot
Legs dia spacing
LT
T T T m m deg mm2/m mm2/m nos mm mm mm2/m Check T
Section at face of columne
ULS 598.06 0.00 598.06 2000 1468.8 45 10179.3 0.00085 170.4 10 12 100 11309.7 OK 299.03
T.
Section at deff from face of columne
ULS 575.73 0.00 575.73 2000 1468.8 45 9799.33 0.00085 170.4 10 12 100 11309.7 OK 287.87
PV
Section just below bearing
ULS 586.01 0.00 586.01 2000 1468.8 45 9974.29 0.00085 170.4 10 12 100 11309.7 OK 293.00
S
Fd = Additional Tensile force, to be accounted in longitudinal reinforcement
E
Calculation of horizontal stirrups for pier cap :
ST
Horizontal stirrups shall be provided in addition to the vertical stirrups.
SY
Minimum shear reinforcement in a section,
G
Asv for 10 legged 12 mm dia @ 125 mm stirrups = 1130.973355 mm2
IN
1130.973355 > or = 0.4
2000 x Sv 0.8 x 500
Sv < or = 565.4866776 mm
EE
Reqd spacing = 565.4866776 mm
Provided spacing = 125 mm
Provided 10 legged 12 mm dia @ 125 mm stirrups
Asv reqd < Asv provided
IN
G
EN
w,min =( 0.072
(2 Ak fyd cot
w,min*s *bw
√ fck ) / fyk
Provide Asw
provide
Asw/s
Asw,min =
Check
Legs dia spacing
L
TRDmax = Check
.
D
= 2 cw
VEd /VRd.max ≤
TEd/TRdmax +
Load comb. TED VED VRDmax 0.6*[1- cw Ak tef.i fcd Ak tef.i
LT
fck/310] Sin Cos
1
Tm m2 T m2 m deg Tm
T.
Section at face of columne
ULS 0.00 598.06 1377.73 0.53 1 1.97 0.47 45 764.1 0.434 OK
PV
Section at deff from face of columne
ULS 0.00 575.73 1377.73 0.53 1 1.97 0.47 45 764.1 0.418 OK
S
Section just below bearing
ULS 0.00 586.01 1377.73 0.53 1 1.97 0.47 45 764.1 0.425 OK
EM
ST
Requirement of Longitudinal area of Reinf
TEd/tan/2/Ak
Asl /uk =
SY
Load comb. TED uk Ak Ast, flexure reinf.
/fyd
Dia Spacing Provided Top
Ast
mm
2
mm mm /m Check width
Tm m m2 deg mm2 /m m mm2
Section at face of columne
IN
ULS 0.00 7.50 1.97 45 0.00 16 150 1340.41 OK 2.00 0.0
R
Section at deff from face of columne
ULS 0.00 7.50 1.97 45 0.00 16 150 1340.41 OK 2.00 0.0
EE
Section just below bearing
ULS 0.00 7.50 1.97 45 0.00 16 150 1340.41 OK 2.00 0.0
IN
G
EN
I L
IV
C
A
D
R
Special Notes
One of the popular methods of scour protection is to provide geo mattress using stone
filled gabions. It is recommended to obtain the details of scour protection arrangement
from an hydraulic expert.