Вы находитесь на странице: 1из 8

-- -

I W
Tony Gee

TonyGee and Partners (Middle East) LLC-By A01


Stage by Stage Vertical Deflection
Interchange 52A - Ramp D2 - Bridge 2
Unit 2

MIDAS
Location Node NO.
Start of Deck 1
CL_BRG Pier 03 2
D2 U2-4-11End 3
CIP End 4
D2-U2-4-2_End 5
D2 U2-4-3_End 6
D2-U2-4-4_End 7
D2-U2-4-5_End 8
D2-U2-4-6 End 9
D2 U2-4-7-_End 10
D2 U2-4-8_End 11
D2-U2-4-9 End 12
D2-U2-4-15r End 13
D2 U2 4 11_End 14
D2 U2 4-12_End 15
D2-U2-4-13_End 16
D2 U2 4-14 End 17
CIP End 18
CL -BRG Pier 04 19
D2-5-1 ErTd 20
CIP End 21
D2 552--2_End 22
D2-U2-5-3_End 23
D2-U2-5-4_End 24
D2 U2-5-5_End 25
D2 U2 5 6 End 26
D2-U2-5-7-_End 27
D2 U2 5-8 End 28
D2 U2-5-9 End 29
D2 U2-5-15( End 30
D2-U2-5-11_End 31
D2 U2 5-12_End 32
D2 U2 5-13_End 33
D2-U2-5-14_End 34
CIP End 35
CL_BRG _Pier 05 - II 6
D2-3-1 ErTd 37
CIP End 38
D2-U2-6-2_End 39
D2 U2 6 3_End 40
D2 U2-6-4_End 41
D2-U2-6-5_End 42
D2 U2 6-6 End 43
D2 U2-6-7_End 44
D2-U2-6-8_End 45
D2-U2-6-9 End 46
D2 U2 6-15r End 47
D2 U2 6-11_End 48
D2-U2-6-12_End 49
D2-U2-6-13_End 50
D2 U2 6-14_End 51
CIP End 52
CL -BRG Pier 06 53
End of Deck 54

General Notes

1- At deflection values hown in the table ars in millimeters

2- All Chainage values hown in the lades are in meters and measured from CL ol bearing at Pier -03.
3- All Chainage values hown in the tables are along the ce Mdine of bddge.

4- Downward deflection is negative.

5- Summation of the vertical deflection values are not includi grits construction Ws loads.

8-SIDL Deflection is ind ding deflecton from barriers, wean g surface and utilities loads shown in the contract drawings.
7- f -) indicates that th bridge deck element is not activated at this construction stage.
e Vertical Deflection Stage 5: Long Term Vertical Deflection
2A - Ramp D2 - Bridge 2
Correction Creep & Correction Creep & Correction
Dead Load Dead Load Prestress
due to Per Shrinkage due to Pier Shrinkage due to Pier
From Model Corrected From Model
Activated Deflecton From Model Deflection Corrected Deflection
Stage Chainage
Stage 1 -1.45 4.62 0.24 4.87 -7.13 4.01 -3.12 -8.28 0.72
Stage 1 0.00 -0.26 0.26 0.00 -3.99 3.99 0.00 -0.68 0.68
Stage 1 1.30 -4.80 0.27 -4.53 -1.20 3.97 2.77 6.28 0.65
Stage 1 1.50 -5.48 0.28 -5.21 -0.78 3.97 3.19 7.36 0.64
Stage 1 419 -15.61 0.31 -15.30 5.70 3.92 9.62 23.48 0.56
Stage 1 7.50 -24.87 0.34 -24.53 11.48 3.88 15.35 38.29 0.49
Stage 1 10.50 -32.80 0.37 -32.42 15.56 3.83 19.39 50.31 0.41
Stage 1 13.50 -39.02 0.41 -38.61 17.66 3.79 21.45 58.96 0.33
Stage 1 16.50 -43.29 0.44 -42.85 18.42 3.74 22.16 64.65 0.25
Stage 1 19.50 -45.45 0.47 -44.98 18.33 3.69 22.03 67.42 0.17
Stage 1 22.50 -45.45 0.50 -44.95 17.71 3.65 21.36 67.34 0.09
Stage 1 25.50 -43.33 0.54 -42.79 16.65 3.60 20.26 64.51 0.01
Stage 1 28.50 -39.22 0.57 -38.65 15.08 3.56 18.64 59.00 -0.07
Stage 1 31.50 -33.37 0.60 -32.77 12.70 3.51 16.21 50.94 -0.15
Stage 1 34.50 -26.11 0.63 -25.47 9.08 3.47 12.55 40.04 -0.23
Stage 1 37.50 -17.86 0.67 -17.20 4.72 3.42 8.14 27.11 -0.31
Stage 1 40.50 -9.22 0.70 -8.52 0.28 3.38 3.66 13.37 -0.39
Stage 1 40.70 -8.64 0.70 -7.94 0.01 3.37 3.38 12.46 -0.40
Stage 1 43.50 -0.73 0.73 0.00 -3.33 3.33 0.00 0.47 -0.47
Stage 1 46.30 5.70 0.73 6.43 -7.35 3.38 -3.97 -10.38 -0.45
Stage 2 46.50 -5.69 0.73 -4.96 -3.81 3.38 -0.43 7.65 -0.45
Stage 2 49.50 -11.84 0.73 -11.11 -5.30 3.43 -1.87 15.41 -0.44
Stage 2 52.50 -17.88 0.72 -17.16 -7.75 3.47 -4.28 22.20 -0.42
Stage 2 55.50 -23.29 0.72 -22.57 -10.39 3.52 -6.87 27.79 -0.40
Stage 2 58.51 -27.69 0.72 -26.97 -13.02 3.56 -9.46 31.78 -0.39
Stage 2 61.51 -30.78 0.72 -30.07 -15.14 3.61 -11.53 34.33 -0.37
Stage 2 64.52 -32.38 0.71 -31.67 -16.39 3.66 -12.73 35.44 -0.35
Stage 2 67.52 -32.39 0.71 -31.68 -16.60 3.70 -12.89 35.11 -0.33
Stage 2 70.52 -30.82 0.71 -30.11 -15.83 3.75 -12.08 33.36 -0.32
Stage 2 73.53 -27.76 0.71 -27.05 -14.32 3.80 -10.52 30.21 -0.30
Stage 2 76.53 -23.42 0.70 -22.72 -12.53 3.84 -8.68 25.70 -0.28
Stage 2 79.54 -18.09 0.70 -17.39 -11.03 3.89 -7.14 19.48 -0.27
Stage 2 82.54 -12.17 0.70 -11.48 -9.49 3.94 -5.55 12.31 -0.25
Stage 2 85.54 -6.19 0.70 -5.50 -7.41 3.98 -3.42 5.31 -0.23
Stage 2 85.74 -5.80 0.70 -5.11 -7.23 3.99 -3.24 4.88 -0.23
Stage 2 -0.69 0.69 0.00 -4.03 4.03 0.00 0.22 -0.22
Stage 2 91.34 2.69 0.69 3.38 -1.36 4.07 2.71 -2.64 -0.20
Stage 3 91.54 -6.61 0.70 -5.90 0.51 4.09 4.60 9.98 -0.19
Stage 3 94.54 -13.78 0.71 -13.06 3.96 4.15 8.11 20.54 -0.16
Stage 3 97.54 -20.93 0.72 -20.21 6.32 4.21 10.53 30.44 -0.13
Stage 3 100.54 -27.47 0.73 -26.74 8.14 4.27 12.41 39.22 -0.10
Stage 3 103.54 -32.94 0.74 -32.20 9.43 4.33 13.77 46.27 -0.07
Stage 3 106.53 -36.98 0.75 -36.22 10.54 4.40 14.94 51.55 -0.04
Stage 3 109.53 -39.30 0.76 -38.54 11.63 4.46 16.09 54.83 -0.01
Stage 3 112.53 -39.74 0.77 -38.97 12.68 4.52 17.20 55.90 0.02
Stage 3 115.52 -38.23 0.78 -37.44 13.45 4.58 18.03 54.54 0.05
Stage 3 118.52 -34.77 0.79 -33.98 13.51 4.64 18.15 50.58 0.08
Stage 3 121.52 -29.51 0.80 -28.70 12.25 4.70 16.95 43.84 0.11
Stage 3 124.51 -22.63 0.81 -21.82 8.93 4.76 13.70 33.81 0.14
Stage 3 127.51 -14.49 0.82 -13.67 3.83 4.82 8.65 20.98 0.16
Stage 3 130.51 -5.51 0.83 -4.68 -2.03 4.89 2.85 6.82 0.19
Stage 3 130.71 -4.89 0.83 -4.06 -2.43 4.89 2.46 5.86 0.20
Stage 3 132.01 -0.84 0.84 0.00 -4.92 4.92 0.00 -0.21 0.21
Stage 3 133.46 3.51 0.84 4.35 -7.70 4.95 -2.75 -6.82 0.22
U118009
Project No,
Project Name Kuwait 10-44
c d,: Interchange 520- Ramp 22- Bridge 2- Unit 2
Stage by Stags Vertical Deflection - Stage 05

Term Vertical Deflection

Correction
Prestress DW SIDL
due to Pier
Corrected From Model Corrected
Deflection

-7.56 0.87 0.08 0.95


0.00 -0.08 0.08 0.00
6.93 -0.98 0.09 -0.89
8.00 -1.11 0.09 -1.02
24.05 -3.09 0.09 -3.00
38.77 -4.86 0.09 -4.77
50.71 -6.33 0.10 -6.23
59.29 -7.42 0.10 -7.32
64.89 -8.09 0.11 -7.98
67.58 -8.31 0.11 -8.20
67.43 -8.10 0.12 -7.98
64.51 -7.47 0.12 -7.35
1 58.93 -6.49 0.13 -6.36
50.79 -5.24 0.13 -5.11
39.81 -3.84 0.14 -3.70
26.80 -2.41 0.14 -2.27
12.98 -1.12 0.15 -0.97
12.06 -1.04 0.15 -0.90
0.00 -0.15 0.15 0.00
-10.83 0.08 0.15 0.23
7.19 0.08 0.15 0.23
14.97 -0.05 0.15 0.10
21.78 -0.41 0.15 -0.26
27.39 -0.85 0.15 -0.71
31.39 -1.28 0.15 -1.14
33.96 -1.61 0.14 -1.47
35.09 -1.80 0.14 -1.65
34.78 -1.80 0.14 -1.66
33.04 -1.63 0.14 -1.49
29.91 -1.31 0.14 -1.17
25.41 -0.89 0.14 -0.75
19.21 -0.45 0.14 -0.31
12.06 -0.08 0.14 0.06
5.08 0.07 0.14 0.21
4.65 0.07 0.14 0.21
0.00 M r3 0.13 0.00
-2.84 -1.01 0.13 -0.88
9.79 -1.09 0.14 -0.95
20.38 -2.39 0.15 -2.24
30.31 -3.85 0.15 -3.70
39.12 -5.29 0.16 -5.13
46.20 -6.58 0.16 -6.42
51.51 -7.60 0.17 -7.44
54.82 -8.27 0.17 -8.10
55.91 -8.52 0.18 -8.34
54.59 -8.32 0.18 -8.14
50.66 -7.67 0.19 -7.48
43.95 -6.57 0.20 -6.38
33.94 -5.09 0.20 -4.89
21.14 -3.28 0.21 -3.08
7.02 -1.27 0.21 -1.06
6.05 -1.13 0.21 -0.92
0.00 -0.22 0.22 0.00
-6.60 0.76 0.22 0.98
Sheet No.:

Date: 22/09/2018
Bridge 2- Unit 2 Design by: A01
ction - Stage 05 Check by MEE
Rev, A

Correction
2 Surn E Sum
due to Pier
From Model Corrected
Deflection

-9.93 5.06 -4.87


-5.02 5.02 0.00
-0.70 4.98 4.28
-0.01 4.97 4.96
1019 4.89 15.38
20.03 4.80 24.83
26.74 4.71 31.45
30.18 4.62 34.80
31.68 4.53 36.22
31.98 4.45 36.43
31.50 4.36 35.86
30.36 4.27 34.63
28.37 4.18 32.55
25.02 4.09 29.11
19.18 4.01 23.19
11.55 3.92 15.47
3.31 3.83 7.14
2.78 3.83 6.60
-3.74 3.74 0.00
-11.94 3.80 -8.14
-1.77 3.80 2.04
-1.78 3.86 2.08
-3.84 3.92 0.08
-6.74 3.98 -2.76
-10.22 4.04 -6.17
-13.21 4.10 -9.11
-15.12 4.16 -10.96
-15.68 4.22 -11.46
-14.92 4.28 -10.64
-13.18 4.34 -8.84
-11.14 4.40 -6.74
-10.08 4.46 -5.62
-9.43 4.52 -4.91
-8.21 4.58 -3.63
-8.08 4.59 -3.49
-4.64 4.64 0.00
-2.33 4.70 2.37
2.79 4.75 7.54
8.33 4.85 13.18
11.97 4.96 16.93
14.59 5.06 19.65
16.18 5.17 21.35
17.51 5.28 22.78
18.89 5.38 24.27
20.31 5.49 25.79
21.44 5.59 27.03
21.65 5.70 27.35
20.02 5.81 25.82
15.02 5.91 20.93
7.04 6.02 13.05
-1.99 6.12 4.14
-2.59 6.13 3.54
-6.18 6.18 0.00