Introducing the new

MineSight Schedule Optimizer


Outline
• Integrated planning and workflow
• Equipment scheduling
• Stockpile handling
• Underground planning
• Schedule analysis tools
• More constraints
• Speed up
• Reporting and charting
• Multi-period scheduling – looking ahead
Integrated Planning Tool
• STP, MTP and LTP
• Open pit and Underground
• 3DBM and stratigraphic/GSM
• Cuts (blocks, regular cuts, bench reserves)
• Partial (percentage) cuts mining
• 64-bit
• CPLEX optimization engine
• Gantt (in dev.)
Integrated Planning Spiral
• Integrate MSSO with
– MSHaulage
– MSIP-MM
– MSEP
– MSSP
– MSAtlas
• Save schedule to
– MSPD
– Block model
Interoperability
• MineSight 3D viewer integration
– Visualization
– Animation
– Manual/interactive scheduling
Streamlined Workflow
• Canvas integration
– Drag and drop
– Material flow
• Property dialog
– Capacity
– Period availability
– Filled tonnage
• New GUI
– Dockable panels
Equipment Scheduling
• Equipment scheduling options
– Schedule without equipment
– Schedule then assign equipment
– Schedule with equipment
• Cycle time data
– Default cycle time (phase/bench/destination)
– Import from MineSight Haulage (cut/destination)
• Truck/Shovel hour constraints, and reports
Stockpile Handling
• Reclaim methods
– FIFO
– LIFO
– Average
– Any
• Opening balances
– Materials
– Tonnage
– Volume
– Grades
Underground Planning
• Solids
• Stopes
• MS3D viewer
• Gantt
Schedule Analysis Tools
• ARC
• Visualization
• Animation
• Gantt
More Constraints (1/2)
• Multi-phase dependency
• Phase lead/lag
• Number of partial (open) benches
• Volume constraints
• Destination tonnage & volume capacity
• Destination availability
• Truck & shovel hour
• Haulage route availability
• Stockpile closing balance
More Constraints (2/2)
• Partial (Percentage) cut mining
– Splitting tonnage tolerance
– Minimum leftover tonnage
– Maximum partial cuts each period
– Must complete partial cuts from pervious periods
– Must fully mine preceding cuts on upper level
Speed Up
• Loading cuts
• Updating MSPD
• Optimization
– CPLEX optimization engine
– Multithread
– Multi-core ability
– 64-bit
Reporting and Charting
• ARC library integration
• Standard and project templates
• Analysis report
• Publish report
• Cash flow report (in dev.)
• Real-time reports & charts (in dev.)
Multi-Period Scheduling
• Scheduling period window
• Non-fallible/Infallible scheduling (in progress)
Major Enhancements
01) Haulage integration 12) 64-bit

02) Equipment planning 13) Canvas implementation

03) Solid scheduling 14) CPLEX engine support

04) Stockpile reclaim (average, FIFO, LIFO) 15) Lindo 7 support

05) Stockpile opening balance 16) ARC enhancements

06) Phase lead/lag constraints 17) Advanced material mapping

07) Volume report and constraints 18) Viewer/animation

08) Destination capacity constraints 19) Partial (percentage) cut mining

09) Number of partial bench constraints 20) Multi-period scheduling (in dev)

10) Multiple phase dependency 21) Gantt scheduler (in dev)

11) GUI-revamp 22) Cash flow report (in dev)