S1/02 The tenderer shall provide a schedule of all builder's work Note
in connection with in detail of the same as necessary
along with the tender.
S1/03 The tenderer shall provide all dimensions, and technical Note
information of all builders work to the Engineer in
advance in relation to the programme of work.
S1/04 All connection cables, sleeves, trench joints etc. to and Note
out of the building shall be flexible allowing a provision
for any settlement or movements.
S1/05 The extent of the work as provided for in this bill of Note
quantities shall consist of all the items covered under the
Specifications.
S1/07 Rates shall include for point wiring include supply & Note
installation of all cables, wiring, Conduting, clips, earth
cables, draw wires, brackets, ceiling roses, wiring,
wooden blocks, junction boxes, switch boxes, 3 core
flexible cord, bulb holders, accessories, switches, socket
outlet bases/switches, all hardware fixings and insulating
materials, junction boxes, fan hooks, fan hangers,
connectors, cutting holes and chases and making good in
all trades.
S1/08 All switches and socket outlets shall be approved type and Note
all samples of switches and socket outlets shall be
submitted with necessary technical specifications to the
Engineer's approval prior to installation.
S1/09 The tenderer shall submit the following information on Note
the items/equipment quoted for together with the tender.
a. make
b. model No.
c. technical data
d. country of manufacture
e. delivery period
f. lead time for manufacturing.
g. port of shipping
h. CIF value of each item in foreign currency.
j. Optional items and their additional cost. (additional
cost to be submitted separately)
k. Schedule of items to be carried out by others
connected to installation of
generators/transformers/Electrical panels such as some
builders work and electrical connection.
l. Details of all special features
m. schedule attached to specification.
S1/10 The tenderer shall submit the technical information and Note
manuals etc., in triplicate.
S1/12 Rates for all electrical panels shall include for supply and Note
installation of all necessary MCCB's, MCB's, EFR's,
ELCB's auxiliary contacts, Volt meters, ammeters, kWh
meters, indicator lamps, selector switches, inter
connecting copper bus bars, inter locks aligning and
grounding the panel, intern connectors, internal wiring
instrument wiring loops, connecting to switch gears, cable
gland lugs, steel channels and necessary hardware fixing
and insulating materials with fully enclosed metal clad
panels and distribution boards where ever necessary and
complete as shown in drawing and comply with the
specifications, and as per relevant latest B.S. standards
and I.E.E. regulations and all complete to working order
to the approval of the local authorities an the Engineer.
S1/16 All the wiring work done under this contract shall Note
conform to BS 7671 :1992 - IEE Wiring regulation-17th
Edition and any other regulations stipulated by the CEB
S1/17 Rate point wiring shall include for all the conduits, Note
conduit fittings, casings, fixing material, for power points.
S1/19 All cables for equipments and units designated to function Note
under fire condition to be in fire rated cables and steel
conduits as indicated and rates shall include accordingly.
S1/20 The panel boards supplied and installed under this Note
contract shall be complete with all the requires
accessories such as neutral bars, earth bars, fixing
material…etc.
S1/22 Rates for the earthing system shall include for all the Note
wiring from individual DBs to earth bar in the ROOM
MAIN DB from there to the earth pit including
construction of the pit, concrete cover …etc.
Ground floor
First floor
Second floor
Common area
Ground floor
First floor
Second floor
Ground floor
Common area
Ground floor
First floor
Second floor
First floor
Second floor
BOH BUILDING
Ground floor
First floor
ALL KITCHEN
Banquet kitchen
Beach kitchen
LINK
Ground floor
First floor
ALL KITCHEN
Banquet kitchen
Beach kitchen
Staff kitchen
0.00
Powder coated metal Isolators 0.00
0.00
Supply and installation of powder coated metal Isolators 0.00
comply to IEC 60947-3 , BS-EN 60947-3 with all the
accessories.
0.00
WEST ROOM BLOCK 0.00
0.00
Ground floor
S1/622 3P isolator nr 1.00 0.00
BOH BUILDING
Ground floor
First floor
ALL KITCHEN
Banquet kitchen
Beach kitchen
Staff kitchen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL FOR ELECTRICAL SYSTEM CARRIED Rs. 0.00
TO ELECTRICAL INSTALLATION SUMMARY