Академический Документы
Профессиональный Документы
Культура Документы
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Job Information
Engineer Checked Approved
Name: Yodsan
Date: 27-12-61
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 2 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes
Node X Y Z
(m) (m) (m)
1 0.000 0.000 0.000
2 0.000 2.000 0.000
3 0.000 4.000 0.000
4 0.000 5.850 0.000
5 0.000 7.100 0.000
6 0.000 9.500 0.000
7 0.923 2.000 0.000
8 1.846 4.000 0.000
9 2.025 7.100 0.000
10 2.025 9.500 0.000
11 2.700 5.850 0.000
12 2.700 7.100 0.000
13 4.050 7.100 0.000
14 4.050 9.500 0.000
15 5.400 5.850 0.000
16 5.400 7.100 0.000
17 6.075 7.100 0.000
18 6.075 9.500 0.000
19 8.100 5.850 0.000
20 8.100 7.100 0.000
21 8.100 9.500 0.000
22 10.125 7.100 0.000
23 10.125 9.500 0.000
24 10.800 5.850 0.000
25 10.800 7.100 0.000
26 12.150 7.100 0.000
27 12.150 9.500 0.000
28 13.500 5.850 0.000
29 13.500 7.100 0.000
30 14.175 7.100 0.000
31 14.175 9.500 0.000
32 14.354 4.000 0.000
33 15.277 2.000 0.000
34 16.200 0.000 0.000
35 16.200 2.000 0.000
36 16.200 4.000 0.000
37 16.200 5.850 0.000
38 16.200 7.100 0.000
39 16.200 9.500 0.000
40 0.000 0.000 -6.000
41 0.000 2.000 -6.000
42 0.000 4.000 -6.000
43 0.000 5.850 -6.000
44 0.000 7.100 -6.000
46 0.923 2.000 -6.000
47 1.846 4.000 -6.000
48 2.025 7.100 -6.000
50 2.700 5.850 -6.000
51 2.700 7.100 -6.000
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 3 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
52 4.050 7.100 -6.000
54 5.400 5.850 -6.000
55 5.400 7.100 -6.000
56 6.075 7.100 -6.000
58 8.100 5.850 -6.000
59 8.100 7.100 -6.000
61 10.125 7.100 -6.000
63 10.800 5.850 -6.000
64 10.800 7.100 -6.000
65 12.150 7.100 -6.000
67 13.500 5.850 -6.000
68 13.500 7.100 -6.000
69 14.175 7.100 -6.000
71 14.354 4.000 -6.000
72 15.277 2.000 -6.000
73 16.200 0.000 -6.000
74 16.200 2.000 -6.000
75 16.200 4.000 -6.000
76 16.200 5.850 -6.000
77 16.200 7.100 -6.000
79 0.000 10.250 0.000
80 2.025 10.250 0.000
81 4.050 10.250 0.000
82 6.075 10.250 0.000
83 8.100 10.250 0.000
84 10.125 10.250 0.000
85 12.150 10.250 0.000
86 14.175 10.250 0.000
87 16.200 10.250 0.000
88 1.007 2.182 0.000
89 1.007 2.182 -6.000
90 1.930 4.182 -6.000
91 1.930 4.182 0.000
92 14.270 4.182 -6.000
93 14.270 4.182 0.000
94 15.193 2.182 0.000
95 15.193 2.182 -6.000
96 0.000 7.100 -2.250
97 0.000 9.500 -2.250
98 2.025 7.100 -2.250
99 2.025 9.500 -2.250
100 4.050 7.100 -2.250
101 4.050 9.500 -2.250
102 6.075 7.100 -2.250
103 6.075 9.500 -2.250
104 8.100 7.100 -2.250
105 8.100 9.500 -2.250
106 10.125 7.100 -2.250
107 10.125 9.500 -2.250
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 4 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
108 12.150 7.100 -2.250
109 12.150 9.500 -2.250
110 14.175 7.100 -2.250
111 14.175 9.500 -2.250
112 16.200 7.100 -2.250
113 16.200 9.500 -2.250
122 0.000 7.434 0.000
123 0.000 7.434 -0.900
124 0.000 7.684 0.000
125 0.000 7.684 -0.900
126 0.000 7.934 0.000
127 0.000 7.934 -0.900
128 0.000 8.184 0.000
129 0.000 8.184 -0.900
130 0.000 8.434 0.000
131 0.000 8.434 -0.900
132 0.000 8.684 0.000
133 0.000 8.684 -0.900
134 0.000 8.934 0.000
135 0.000 8.934 -0.900
136 0.000 9.184 0.000
137 0.000 9.184 -0.900
138 0.000 9.787 0.000
139 0.000 9.787 -0.900
140 0.000 10.037 0.000
141 0.000 10.037 -0.900
142 2.025 7.434 0.000
143 2.025 7.434 -0.900
144 2.025 7.684 0.000
145 2.025 7.684 -0.900
146 2.025 7.934 0.000
147 2.025 7.934 -0.900
148 2.025 8.184 0.000
149 2.025 8.184 -0.900
150 2.025 8.434 0.000
151 2.025 8.434 -0.900
152 2.025 8.684 0.000
153 2.025 8.684 -0.900
154 2.025 8.934 0.000
155 2.025 8.934 -0.900
156 2.025 9.184 0.000
158 2.025 9.787 0.000
159 2.025 9.787 -0.900
160 2.025 10.037 0.000
161 2.025 10.037 -0.900
162 4.050 7.434 0.000
163 4.050 7.434 -0.900
164 4.050 7.684 0.000
165 4.050 7.684 -0.900
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 5 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
166 4.050 7.934 0.000
167 4.050 7.934 -0.900
168 4.050 8.184 0.000
169 4.050 8.184 -0.900
170 4.050 8.434 0.000
171 4.050 8.434 -0.900
172 4.050 8.684 0.000
173 4.050 8.684 -0.900
174 4.050 8.934 0.000
175 4.050 8.934 -0.900
176 4.050 9.184 0.000
177 4.050 9.184 -0.900
178 4.050 9.787 0.000
179 4.050 9.787 -0.900
180 4.050 10.037 0.000
181 4.050 10.037 -0.900
182 6.075 7.434 0.000
183 6.075 7.434 -0.900
184 6.075 7.684 0.000
185 6.075 7.684 -0.900
186 6.075 7.934 0.000
187 6.075 7.934 -0.900
188 6.075 8.184 0.000
189 6.075 8.184 -0.900
190 6.075 8.434 0.000
191 6.075 8.434 -0.900
192 6.075 8.684 0.000
193 6.075 8.684 -0.900
194 6.075 8.934 0.000
195 6.075 8.934 -0.900
196 6.075 9.184 0.000
197 6.075 9.184 -0.900
198 6.075 9.787 0.000
199 6.075 9.787 -0.900
200 6.075 10.037 0.000
201 6.075 10.037 -0.900
202 8.100 7.434 0.000
203 8.100 7.434 -0.900
204 8.100 7.684 0.000
205 8.100 7.684 -0.900
206 8.100 7.934 0.000
207 8.100 7.934 -0.900
208 8.100 8.184 0.000
209 8.100 8.184 -0.900
210 8.100 8.434 0.000
211 8.100 8.434 -0.900
212 8.100 8.684 0.000
213 8.100 8.684 -0.900
214 8.100 8.934 0.000
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 6 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
215 8.100 8.934 -0.900
216 8.100 9.184 0.000
217 8.100 9.184 -0.900
218 8.100 9.787 0.000
219 8.100 9.787 -0.900
220 8.100 10.037 0.000
221 8.100 10.037 -0.900
222 10.125 7.434 0.000
223 10.125 7.434 -0.900
224 10.125 7.684 0.000
225 10.125 7.684 -0.900
226 10.125 7.934 0.000
227 10.125 7.934 -0.900
228 10.125 8.184 0.000
229 10.125 8.184 -0.900
230 10.125 8.434 0.000
231 10.125 8.434 -0.900
232 10.125 8.684 0.000
233 10.125 8.684 -0.900
234 10.125 8.934 0.000
235 10.125 8.934 -0.900
236 10.125 9.184 0.000
237 10.125 9.184 -0.900
238 10.125 9.787 0.000
239 10.125 9.787 -0.900
240 10.125 10.037 0.000
241 10.125 10.037 -0.900
242 12.150 7.434 0.000
243 12.150 7.434 -0.900
244 12.150 7.684 0.000
245 12.150 7.684 -0.900
246 12.150 7.934 0.000
247 12.150 7.934 -0.900
248 12.150 8.184 0.000
249 12.150 8.184 -0.900
250 12.150 8.434 0.000
251 12.150 8.434 -0.900
252 12.150 8.684 0.000
253 12.150 8.684 -0.900
254 12.150 8.934 0.000
255 12.150 8.934 -0.900
256 12.150 9.184 0.000
257 12.150 9.184 -0.900
258 12.150 9.787 0.000
259 12.150 9.787 -0.900
260 12.150 10.037 0.000
261 12.150 10.037 -0.900
262 14.175 7.434 0.000
263 14.175 7.434 -0.900
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 7 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
264 14.175 7.684 0.000
265 14.175 7.684 -0.900
266 14.175 7.934 0.000
267 14.175 7.934 -0.900
268 14.175 8.184 0.000
269 14.175 8.184 -0.900
270 14.175 8.434 0.000
271 14.175 8.434 -0.900
272 14.175 8.684 0.000
273 14.175 8.684 -0.900
274 14.175 8.934 0.000
275 14.175 8.934 -0.900
276 14.175 9.184 0.000
277 14.175 9.184 -0.900
278 14.175 9.787 0.000
279 14.175 9.787 -0.900
280 14.175 10.037 0.000
281 14.175 10.037 -0.900
282 16.200 7.434 0.000
283 16.200 7.434 -0.900
284 16.200 7.684 0.000
285 16.200 7.684 -0.900
286 16.200 7.934 0.000
287 16.200 7.934 -0.900
288 16.200 8.184 0.000
289 16.200 8.184 -0.900
290 16.200 8.434 0.000
291 16.200 8.434 -0.900
292 16.200 8.684 0.000
293 16.200 8.684 -0.900
294 16.200 8.934 0.000
295 16.200 8.934 -0.900
296 16.200 9.184 0.000
297 16.200 9.184 -0.900
298 16.200 9.787 0.000
299 16.200 9.787 -0.900
300 16.200 10.037 0.000
301 16.200 10.037 -0.900
302 0.000 7.434 -2.250
303 0.000 7.434 -1.500
304 0.000 7.684 -2.250
305 0.000 7.684 -1.500
306 0.000 7.934 -2.250
307 0.000 7.934 -1.500
308 0.000 9.184 -2.250
309 0.000 9.184 -1.500
310 0.000 8.934 -2.250
311 0.000 8.934 -1.500
312 0.000 8.684 -2.250
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 7 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 8 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
313 0.000 8.684 -1.500
314 2.025 7.434 -2.250
315 2.025 7.434 -1.500
316 2.025 7.684 -2.250
317 2.025 7.684 -1.500
318 2.025 7.934 -2.250
319 2.025 7.934 -1.500
320 2.025 9.184 -2.250
321 2.025 9.184 -1.500
322 2.025 8.934 -2.250
323 2.025 8.934 -1.500
324 2.025 8.684 -2.250
325 2.025 8.684 -1.500
326 4.050 7.434 -2.250
327 4.050 7.434 -1.500
328 4.050 7.684 -2.250
329 4.050 7.684 -1.500
330 4.050 7.934 -2.250
331 4.050 7.934 -1.500
332 4.050 9.184 -2.250
333 4.050 9.184 -1.500
334 4.050 8.934 -2.250
335 4.050 8.934 -1.500
336 4.050 8.684 -2.250
337 4.050 8.684 -1.500
338 6.075 7.434 -2.250
339 6.075 7.434 -1.500
340 6.075 7.684 -2.250
341 6.075 7.684 -1.500
342 6.075 7.934 -2.250
343 6.075 7.934 -1.500
344 6.075 9.184 -2.250
345 6.075 9.184 -1.500
346 6.075 8.934 -2.250
347 6.075 8.934 -1.500
348 6.075 8.684 -2.250
349 6.075 8.684 -1.500
350 8.100 7.434 -2.250
351 8.100 7.434 -1.500
352 8.100 7.684 -2.250
353 8.100 7.684 -1.500
354 8.100 7.934 -2.250
355 8.100 7.934 -1.500
356 8.100 9.184 -2.250
357 8.100 9.184 -1.500
358 8.100 8.934 -2.250
359 8.100 8.934 -1.500
360 8.100 8.684 -2.250
361 8.100 8.684 -1.500
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 8 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 9 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
362 10.125 7.434 -2.250
363 10.125 7.434 -1.500
364 10.125 7.684 -2.250
365 10.125 7.684 -1.500
366 10.125 7.934 -2.250
367 10.125 7.934 -1.500
368 10.125 9.184 -2.250
369 10.125 9.184 -1.500
370 10.125 8.934 -2.250
371 10.125 8.934 -1.500
372 10.125 8.684 -2.250
373 10.125 8.684 -1.500
374 12.150 7.434 -2.250
375 12.150 7.434 -1.500
376 12.150 7.684 -2.250
377 12.150 7.684 -1.500
378 12.150 7.934 -2.250
379 12.150 7.934 -1.500
380 12.150 9.184 -2.250
381 12.150 9.184 -1.500
382 12.150 8.934 -2.250
383 12.150 8.934 -1.500
384 12.150 8.684 -2.250
385 12.150 8.684 -1.500
386 14.175 7.434 -2.250
387 14.175 7.434 -1.500
388 14.175 7.684 -2.250
389 14.175 7.684 -1.500
390 14.175 7.934 -2.250
391 14.175 7.934 -1.500
392 14.175 9.184 -2.250
393 14.175 9.184 -1.500
394 14.175 8.934 -2.250
395 14.175 8.934 -1.500
396 14.175 8.684 -2.250
397 14.175 8.684 -1.500
398 16.200 7.434 -2.250
399 16.200 7.434 -1.500
400 16.200 7.684 -2.250
401 16.200 7.684 -1.500
402 16.200 7.934 -2.250
403 16.200 7.934 -1.500
404 16.200 9.184 -2.250
405 16.200 9.184 -1.500
406 16.200 8.934 -2.250
407 16.200 8.934 -1.500
408 16.200 8.684 -2.250
409 16.200 8.684 -1.500
410 0.200 7.434 -6.000
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 9 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 10 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
411 0.200 7.434 -5.100
412 0.200 7.684 -6.000
413 0.200 7.684 -5.100
414 0.200 7.934 -6.000
415 0.200 7.934 -5.100
416 0.200 8.184 -6.000
417 0.200 8.184 -5.100
418 0.200 8.434 -6.000
419 0.200 8.434 -5.100
420 2.025 7.434 -6.000
421 2.025 7.434 -5.100
422 2.025 7.684 -6.000
423 2.025 7.684 -5.100
424 2.025 7.934 -6.000
425 2.025 7.934 -5.100
426 2.025 8.184 -6.000
427 2.025 8.184 -5.100
428 2.025 8.434 -6.000
429 2.025 8.434 -5.100
430 4.050 7.434 -6.000
431 4.050 7.434 -5.100
432 4.050 7.684 -6.000
433 4.050 7.684 -5.100
434 4.050 7.934 -6.000
435 4.050 7.934 -5.100
436 4.050 8.184 -6.000
437 4.050 8.184 -5.100
438 4.050 8.434 -6.000
439 4.050 8.434 -5.100
440 6.075 7.434 -6.000
441 6.075 7.434 -5.100
442 6.075 7.684 -6.000
443 6.075 7.684 -5.100
444 6.075 7.934 -6.000
445 6.075 7.934 -5.100
446 6.075 8.184 -6.000
447 6.075 8.184 -5.100
448 6.075 8.434 -6.000
449 6.075 8.434 -5.100
450 8.100 7.434 -6.000
451 8.100 7.434 -5.100
452 8.100 7.684 -6.000
453 8.100 7.684 -5.100
454 8.100 7.934 -6.000
455 8.100 7.934 -5.100
456 8.100 8.184 -6.000
457 8.100 8.184 -5.100
458 8.100 8.434 -6.000
459 8.100 8.434 -5.100
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 10 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 11 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
460 10.125 7.434 -6.000
461 10.125 7.434 -5.100
462 10.125 7.684 -6.000
463 10.125 7.684 -5.100
464 10.125 7.934 -6.000
465 10.125 7.934 -5.100
466 10.125 8.184 -6.000
467 10.125 8.184 -5.100
468 10.125 8.434 -6.000
469 10.125 8.434 -5.100
470 12.150 7.434 -6.000
471 12.150 7.434 -5.100
472 12.150 7.684 -6.000
473 12.150 7.684 -5.100
474 12.150 7.934 -6.000
475 12.150 7.934 -5.100
476 12.150 8.184 -6.000
477 12.150 8.184 -5.100
478 12.150 8.434 -6.000
479 12.150 8.434 -5.100
480 14.175 7.434 -6.000
481 14.175 7.434 -5.100
482 14.175 7.684 -6.000
483 14.175 7.684 -5.100
484 14.175 7.934 -6.000
485 14.175 7.934 -5.100
486 14.175 8.184 -6.000
487 14.175 8.184 -5.100
488 14.175 8.434 -6.000
489 14.175 8.434 -5.100
490 16.000 7.434 -6.000
491 16.000 7.434 -5.100
492 16.000 7.684 -6.000
493 16.000 7.684 -5.100
494 16.000 7.934 -6.000
495 16.000 7.934 -5.100
496 16.000 8.184 -6.000
497 16.000 8.184 -5.100
498 16.000 8.434 -6.000
499 16.000 8.434 -5.100
500 0.000 7.100 -3.750
501 0.000 7.750 -3.750
502 0.000 7.434 -3.750
503 0.000 7.684 -3.750
504 0.000 7.434 -4.500
505 0.000 7.684 -4.500
506 2.025 7.100 -3.750
507 2.025 7.750 -3.750
508 2.025 7.434 -3.750
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 11 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 12 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
509 2.025 7.684 -3.750
510 2.025 7.434 -4.500
511 2.025 7.684 -4.500
512 4.050 7.100 -3.750
513 4.050 7.750 -3.750
514 4.050 7.434 -3.750
515 4.050 7.684 -3.750
516 4.050 7.434 -4.500
517 4.050 7.684 -4.500
518 6.075 7.100 -3.750
519 6.075 7.750 -3.750
520 6.075 7.434 -3.750
521 6.075 7.684 -3.750
522 6.075 7.434 -4.500
523 6.075 7.684 -4.500
524 8.100 7.100 -3.750
525 8.100 7.750 -3.750
526 8.100 7.434 -3.750
527 8.100 7.684 -3.750
528 8.100 7.434 -4.500
529 8.100 7.684 -4.500
530 10.125 7.100 -3.750
531 10.125 7.750 -3.750
532 10.125 7.434 -3.750
533 10.125 7.684 -3.750
534 10.125 7.434 -4.500
535 10.125 7.684 -4.500
536 12.150 7.100 -3.750
537 12.150 7.750 -3.750
538 12.150 7.434 -3.750
539 12.150 7.684 -3.750
540 12.150 7.434 -4.500
541 12.150 7.684 -4.500
542 14.175 7.100 -3.750
543 14.175 7.750 -3.750
544 14.175 7.434 -3.750
545 14.175 7.684 -3.750
546 14.175 7.434 -4.500
547 14.175 7.684 -4.500
548 16.200 7.100 -3.750
549 16.200 7.750 -3.750
550 16.200 7.434 -3.750
551 16.200 7.684 -3.750
552 16.200 7.434 -4.500
553 16.200 7.684 -4.500
732 16.200 9.153 0.000
734 16.200 8.403 0.000
743 16.000 8.403 -6.000
744 2.700 5.850 -3.000
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 12 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 13 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
745 8.100 5.850 -3.000
746 13.500 5.850 -3.000
747 2.025 7.100 -3.000
748 6.075 7.100 -3.000
749 10.125 7.100 -3.000
750 14.175 7.100 -3.000
751 0.200 8.684 -6.000
752 0.200 8.684 -5.100
753 2.025 8.684 -6.000
754 2.025 8.684 -5.100
755 4.050 8.684 -6.000
756 4.050 8.684 -5.100
757 6.075 8.684 -6.000
758 6.075 8.684 -5.100
759 8.100 8.684 -6.000
760 8.100 8.684 -5.100
761 10.125 8.684 -6.000
762 10.125 8.684 -5.100
763 12.150 8.684 -6.000
764 12.150 8.684 -5.100
765 14.175 8.684 -6.000
766 14.175 8.684 -5.100
767 16.000 8.684 -6.000
768 16.000 8.684 -5.100
769 0.200 8.934 -6.000
770 0.200 8.934 -5.100
771 2.025 8.934 -6.000
772 2.025 8.934 -5.100
773 4.050 8.934 -6.000
774 4.050 8.934 -5.100
775 6.075 8.934 -6.000
776 6.075 8.934 -5.100
777 8.100 8.934 -6.000
778 8.100 8.934 -5.100
779 10.125 8.934 -6.000
780 10.125 8.934 -5.100
781 12.150 8.934 -6.000
782 12.150 8.934 -5.100
783 14.175 8.934 -6.000
784 14.175 8.934 -5.100
785 16.000 8.934 -6.000
786 16.000 8.934 -5.100
787 0.000 7.100 -0.900
788 0.000 7.100 -1.500
789 2.025 7.100 -0.900
790 2.025 7.100 -1.500
791 4.050 7.100 -0.900
792 4.050 7.100 -1.500
793 6.075 7.100 -0.900
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 13 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 14 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Nodes Cont...
Node X Y Z
(m) (m) (m)
794 6.075 7.100 -1.500
795 8.100 7.100 -0.900
796 8.100 7.100 -1.500
797 10.125 7.100 -0.900
798 10.125 7.100 -1.500
799 12.150 7.100 -0.900
800 12.150 7.100 -1.500
801 14.175 7.100 -0.900
802 14.175 7.100 -1.500
803 16.200 7.100 -0.900
804 16.200 7.100 -1.500
805 0.000 7.100 -4.500
806 0.000 7.100 -5.100
807 2.025 7.100 -4.500
808 2.025 7.100 -5.100
809 4.050 7.100 -4.500
810 4.050 7.100 -5.100
811 6.075 7.100 -4.500
812 6.075 7.100 -5.100
813 8.100 7.100 -4.500
814 8.100 7.100 -5.100
815 10.125 7.100 -4.500
816 10.125 7.100 -5.100
817 12.150 7.100 -4.500
818 12.150 7.100 -5.100
819 14.175 7.100 -4.500
820 14.175 7.100 -5.100
821 16.200 7.100 -4.500
822 16.200 7.100 -5.100
823 0.000 3.000 -6.000
824 0.000 3.000 0.000
826 16.200 3.000 -6.000
827 16.200 3.000 0.000
829 0.000 3.000 -3.000
830 16.200 3.000 -3.000
831 0.200 7.100 -6.000
832 16.000 7.100 -6.000
835 0.200 7.100 -5.100
836 16.000 7.100 -5.100
837 2.025 9.184 -0.900
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 14 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 15 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams
Beam Node A Node B Length Property
(m) (degrees)
1 2 1 2.000 1 90
2 3 824 1.000 1 90
3 4 3 1.850 1 90
4 5 4 1.250 1 90
5 6 136 0.316 1 90
6 1 7 2.203 3 0
7 2 7 0.923 3 0
8 3 8 1.846 3 0
9 5 9 2.025 2 0
10 6 10 2.025 10 90
11 11 4 2.700 2 0
12 11 5 2.975 4 0
13 7 88 0.200 3 0
14 9 142 0.334 12 90
15 8 91 0.200 3 0
16 9 12 0.675 2 0
17 12 11 1.250 4 0
18 10 14 2.025 10 90
19 12 13 1.350 2 0
20 11 15 2.700 16 0
21 15 12 2.975 4 0
22 13 162 0.334 12 90
23 13 16 1.350 2 0
24 14 18 2.025 10 90
25 16 15 1.250 4 0
26 16 17 0.675 2 0
27 17 182 0.334 12 90
28 15 19 2.700 16 0
29 19 16 2.975 4 0
30 17 20 2.025 2 0
31 18 21 2.025 10 90
32 20 19 1.250 4 0
33 20 202 0.334 12 90
34 20 22 2.025 2 0
35 21 23 2.025 10 90
36 19 24 2.700 16 0
37 19 25 2.975 4 0
38 22 222 0.334 12 90
39 22 25 0.675 2 0
40 25 24 1.250 4 0
41 23 27 2.025 10 90
42 25 26 1.350 2 0
43 24 28 2.700 16 0
44 24 29 2.975 4 0
45 26 242 0.334 12 90
46 26 29 1.350 2 0
47 27 31 2.025 10 90
48 29 28 1.250 4 0
49 29 30 0.675 2 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 15 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 16 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
50 32 93 0.200 3 0
51 30 262 0.334 12 90
52 33 94 0.200 3 0
53 28 37 2.700 2 0
54 28 38 2.975 4 0
55 30 38 2.025 2 0
56 31 39 2.025 10 90
57 32 36 1.846 3 0
58 34 33 2.203 3 0
59 33 35 0.923 3 0
60 35 34 2.000 1 90
61 36 827 1.000 1 90
64 39 296 0.316 1 90
65 41 40 2.000 1 90
66 42 823 1.000 1 90
67 43 42 1.850 1 90
68 44 43 1.250 1 90
70 40 46 2.203 3 0
71 41 46 0.923 3 0
72 42 47 1.846 3 0
73 44 831 0.200 2 0
75 50 43 2.700 2 0
76 50 44 2.975 4 0
77 46 89 0.200 3 0
79 47 90 0.200 3 0
80 48 51 0.675 2 0
81 51 50 1.250 4 0
83 51 52 1.350 2 0
84 50 54 2.700 16 0
85 54 51 2.975 4 0
87 52 55 1.350 2 0
89 55 54 1.250 4 0
90 55 56 0.675 2 0
92 54 58 2.700 16 0
93 58 55 2.975 4 0
94 56 59 2.025 2 0
96 59 58 1.250 4 0
98 59 61 2.025 2 0
100 58 63 2.700 16 0
101 58 64 2.975 4 0
103 61 64 0.675 2 0
104 64 63 1.250 4 0
106 64 65 1.350 2 0
107 63 67 2.700 16 0
108 63 68 2.975 4 0
110 65 68 1.350 2 0
112 68 67 1.250 4 0
113 68 69 0.675 2 0
114 71 92 0.200 3 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 16 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 17 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
116 72 95 0.200 3 0
117 67 76 2.700 2 0
118 67 77 2.975 4 0
119 69 832 1.825 2 0
121 71 75 1.846 3 0
122 73 72 2.203 3 0
123 72 74 0.923 3 0
124 74 73 2.000 1 90
125 75 826 1.000 1 90
129 6 138 0.287 12 90
130 10 158 0.287 12 90
131 14 178 0.287 12 90
132 18 198 0.287 12 90
133 21 218 0.287 12 90
134 23 238 0.287 12 90
135 27 258 0.287 12 90
136 31 278 0.287 12 90
137 39 298 0.287 12 90
138 88 8 2.003 3 0
139 89 47 2.003 3 0
140 89 88 6.000 5 0
141 90 50 1.838 3 0
142 91 11 1.838 3 0
143 90 91 6.000 5 0
144 92 67 1.838 3 0
145 93 28 1.838 3 0
146 92 93 6.000 5 0
147 94 32 2.003 3 0
148 95 71 2.003 3 0
149 95 94 6.000 5 0
152 43 4 6.000 7 0
153 44 806 0.900 7 0
156 76 37 6.000 7 0
157 77 822 0.900 7 0
158 50 744 3.000 8 0
159 54 15 6.000 8 0
160 58 745 3.000 8 0
161 63 24 6.000 8 0
162 67 746 3.000 8 0
163 43 744 4.036 9 0
164 4 744 4.036 9 0
165 54 745 4.036 9 0
166 24 746 4.036 9 0
167 37 746 4.036 9 0
168 63 745 4.036 9 0
169 48 808 0.900 8 0
170 52 810 0.900 8 0
171 56 812 0.900 8 0
172 59 814 0.900 8 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 17 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 18 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
173 61 816 0.900 8 0
174 65 818 0.900 8 0
175 69 820 0.900 8 0
176 44 747 3.619 9 0
177 52 747 3.619 9 0
178 52 748 3.619 9 0
179 13 748 3.619 9 0
180 59 749 3.619 9 0
181 20 749 3.619 9 0
182 65 750 3.619 9 0
183 26 750 3.619 9 0
184 96 788 0.750 7 0
185 97 308 0.316 12 90
186 98 790 0.750 8 0
187 100 792 0.750 8 0
188 102 794 0.750 8 0
189 104 796 0.750 8 0
190 106 798 0.750 8 0
191 108 800 0.750 8 0
192 110 802 0.750 8 0
193 112 804 0.750 7 0
194 98 314 0.334 12 90
195 100 326 0.334 12 90
196 102 338 0.334 12 90
197 104 350 0.334 12 90
198 106 362 0.334 12 90
199 108 374 0.334 12 90
200 110 386 0.334 12 90
201 113 404 0.316 12 90
203 6 97 2.250 10 0
204 14 101 2.250 10 0
205 21 105 2.250 10 0
206 27 109 2.250 10 0
207 39 113 2.250 10 0
208 113 111 2.025 10 90
209 111 109 2.025 10 90
210 109 107 2.025 10 90
211 107 105 2.025 10 90
212 105 103 2.025 10 90
213 103 101 2.025 10 90
214 101 99 2.025 10 90
215 99 97 2.025 10 90
216 97 14 4.633 11 0
217 6 101 4.633 11 0
218 101 21 4.633 11 0
219 21 109 4.633 11 0
220 109 39 4.633 11 0
221 113 27 4.633 11 0
222 27 105 4.633 11 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 18 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 19 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
223 105 14 4.633 11 0
232 122 5 0.334 1 90
233 122 123 0.900 13 45
234 124 122 0.250 1 90
235 124 125 0.900 13 45
236 126 124 0.250 1 90
237 126 127 0.900 13 45
238 128 126 0.250 1 90
239 128 129 0.900 13 45
240 130 128 0.250 1 90
241 130 131 0.900 13 45
242 132 130 0.250 1 90
243 132 133 0.900 13 45
244 134 132 0.250 1 90
245 134 135 0.900 13 45
246 136 134 0.250 1 90
247 136 137 0.900 13 45
248 138 140 0.250 12 90
249 138 139 0.900 13 45
250 140 79 0.213 12 90
251 140 141 0.900 13 45
252 142 144 0.250 12 90
253 144 146 0.250 12 90
254 146 148 0.250 12 90
255 148 150 0.250 12 90
256 150 152 0.250 12 90
257 152 154 0.250 12 90
258 154 156 0.250 12 90
259 156 10 0.316 12 90
260 158 160 0.250 12 90
261 160 80 0.213 12 90
262 142 143 0.900 13 45
263 144 145 0.900 13 45
264 146 147 0.900 13 45
265 148 149 0.900 13 45
266 150 151 0.900 13 45
267 152 153 0.900 13 45
268 154 155 0.900 13 45
270 158 159 0.900 13 45
271 160 161 0.900 13 45
272 162 164 0.250 12 90
273 164 166 0.250 12 90
274 166 168 0.250 12 90
275 168 170 0.250 12 90
276 170 172 0.250 12 90
277 172 174 0.250 12 90
278 174 176 0.250 12 90
279 176 14 0.316 12 90
280 178 180 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 19 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 20 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
281 180 81 0.213 12 90
282 162 163 0.900 13 45
283 164 165 0.900 13 45
284 166 167 0.900 13 45
285 168 169 0.900 13 45
286 170 171 0.900 13 45
287 172 173 0.900 13 45
288 174 175 0.900 13 45
289 176 177 0.900 13 45
290 178 179 0.900 13 45
291 180 181 0.900 13 45
292 182 184 0.250 12 90
293 184 186 0.250 12 90
294 186 188 0.250 12 90
295 188 190 0.250 12 90
296 190 192 0.250 12 90
297 192 194 0.250 12 90
298 194 196 0.250 12 90
299 196 18 0.316 12 90
300 198 200 0.250 12 90
301 200 82 0.213 12 90
302 182 183 0.900 13 45
303 184 185 0.900 13 45
304 186 187 0.900 13 45
305 188 189 0.900 13 45
306 190 191 0.900 13 45
307 192 193 0.900 13 45
308 194 195 0.900 13 45
309 196 197 0.900 13 45
310 198 199 0.900 13 45
311 200 201 0.900 13 45
312 202 204 0.250 12 90
313 204 206 0.250 12 90
314 206 208 0.250 12 90
315 208 210 0.250 12 90
316 210 212 0.250 12 90
317 212 214 0.250 12 90
318 214 216 0.250 12 90
319 216 21 0.316 12 90
320 218 220 0.250 12 90
321 220 83 0.213 12 90
322 202 203 0.900 13 45
323 204 205 0.900 13 45
324 206 207 0.900 13 45
325 208 209 0.900 13 45
326 210 211 0.900 13 45
327 212 213 0.900 13 45
328 214 215 0.900 13 45
329 216 217 0.900 13 45
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 20 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 21 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
330 218 219 0.900 13 45
331 220 221 0.900 13 45
332 222 224 0.250 12 90
333 224 226 0.250 12 90
334 226 228 0.250 12 90
335 228 230 0.250 12 90
336 230 232 0.250 12 90
337 232 234 0.250 12 90
338 234 236 0.250 12 90
339 236 23 0.316 12 90
340 238 240 0.250 12 90
341 240 84 0.213 12 90
342 222 223 0.900 13 45
343 224 225 0.900 13 45
344 226 227 0.900 13 45
345 228 229 0.900 13 45
346 230 231 0.900 13 45
347 232 233 0.900 13 45
348 234 235 0.900 13 45
349 236 237 0.900 13 45
350 238 239 0.900 13 45
351 240 241 0.900 13 45
352 242 244 0.250 12 90
353 244 246 0.250 12 90
354 246 248 0.250 12 90
355 248 250 0.250 12 90
356 250 252 0.250 12 90
357 252 254 0.250 12 90
358 254 256 0.250 12 90
359 256 27 0.316 12 90
360 258 260 0.250 12 90
361 260 85 0.213 12 90
362 242 243 0.900 13 45
363 244 245 0.900 13 45
364 246 247 0.900 13 45
365 248 249 0.900 13 45
366 250 251 0.900 13 45
367 252 253 0.900 13 45
368 254 255 0.900 13 45
369 256 257 0.900 13 45
370 258 259 0.900 13 45
371 260 261 0.900 13 45
372 262 264 0.250 12 90
373 264 266 0.250 12 90
374 266 268 0.250 12 90
375 268 270 0.250 12 90
376 270 272 0.250 12 90
377 272 274 0.250 12 90
378 274 276 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 21 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 22 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
379 276 31 0.316 12 90
380 278 280 0.250 12 90
381 280 86 0.213 12 90
382 262 263 0.900 13 45
383 264 265 0.900 13 45
384 266 267 0.900 13 45
385 268 269 0.900 13 45
386 270 271 0.900 13 45
387 272 273 0.900 13 45
388 274 275 0.900 13 45
389 276 277 0.900 13 45
390 278 279 0.900 13 45
391 280 281 0.900 13 45
392 282 38 0.334 1 90
393 284 282 0.250 1 90
394 286 284 0.250 1 90
395 288 286 0.250 1 90
396 290 734 0.031 1 90
397 292 290 0.250 1 90
398 294 292 0.250 1 90
399 296 732 0.031 1 90
400 298 300 0.250 12 90
401 300 87 0.213 12 90
402 282 283 0.900 13 45
403 284 285 0.900 13 45
404 286 287 0.900 13 45
405 288 289 0.900 13 45
406 290 291 0.900 13 45
407 292 293 0.900 13 45
408 294 295 0.900 13 45
409 296 297 0.900 13 45
410 298 299 0.900 13 45
411 300 301 0.900 13 45
412 302 96 0.334 12 90
413 302 303 0.750 13 45
414 304 302 0.250 12 90
415 304 305 0.750 13 45
416 306 304 0.250 12 90
417 306 307 0.750 13 45
418 308 310 0.250 12 90
419 308 309 0.750 13 45
420 310 312 0.250 12 90
421 310 311 0.750 13 45
422 312 306 0.750 12 90
423 312 313 0.750 13 45
424 314 316 0.250 12 90
425 316 318 0.250 12 90
426 318 324 0.750 12 90
427 320 99 0.316 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 22 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 23 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
428 322 320 0.250 12 90
429 324 322 0.250 12 90
430 314 315 0.750 13 45
431 316 317 0.750 13 45
432 318 319 0.750 13 45
433 320 321 0.750 13 45
434 322 323 0.750 13 45
435 324 325 0.750 13 45
436 326 328 0.250 12 90
437 328 330 0.250 12 90
438 330 336 0.750 12 90
439 332 101 0.316 12 90
440 334 332 0.250 12 90
441 336 334 0.250 12 90
442 326 327 0.750 13 45
443 328 329 0.750 13 45
444 330 331 0.750 13 45
445 332 333 0.750 13 45
446 334 335 0.750 13 45
447 336 337 0.750 13 45
448 338 340 0.250 12 90
449 340 342 0.250 12 90
450 342 348 0.750 12 90
451 344 103 0.316 12 90
452 346 344 0.250 12 90
453 348 346 0.250 12 90
454 338 339 0.750 13 45
455 340 341 0.750 13 45
456 342 343 0.750 13 45
457 344 345 0.750 13 45
458 346 347 0.750 13 45
459 348 349 0.750 13 45
460 350 352 0.250 12 90
461 352 354 0.250 12 90
462 354 360 0.750 12 90
463 356 105 0.316 12 90
464 358 356 0.250 12 90
465 360 358 0.250 12 90
466 350 351 0.750 13 45
467 352 353 0.750 13 45
468 354 355 0.750 13 45
469 356 357 0.750 13 45
470 358 359 0.750 13 45
471 360 361 0.750 13 45
472 362 364 0.250 12 90
473 364 366 0.250 12 90
474 366 372 0.750 12 90
475 368 107 0.316 12 90
476 370 368 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 23 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 24 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
477 372 370 0.250 12 90
478 362 363 0.750 13 45
479 364 365 0.750 13 45
480 366 367 0.750 13 45
481 368 369 0.750 13 45
482 370 371 0.750 13 45
483 372 373 0.750 13 45
484 374 376 0.250 12 90
485 376 378 0.250 12 90
486 378 384 0.750 12 90
487 380 109 0.316 12 90
488 382 380 0.250 12 90
489 384 382 0.250 12 90
490 374 375 0.750 13 45
491 376 377 0.750 13 45
492 378 379 0.750 13 45
493 380 381 0.750 13 45
494 382 383 0.750 13 45
495 384 385 0.750 13 45
496 386 388 0.250 12 90
497 388 390 0.250 12 90
498 390 396 0.750 12 90
499 392 111 0.316 12 90
500 394 392 0.250 12 90
501 396 394 0.250 12 90
502 386 387 0.750 13 45
503 388 389 0.750 13 45
504 390 391 0.750 13 45
505 392 393 0.750 13 45
506 394 395 0.750 13 45
507 396 397 0.750 13 45
508 398 112 0.334 12 90
509 400 398 0.250 12 90
510 402 400 0.250 12 90
511 404 406 0.250 12 90
512 406 408 0.250 12 90
513 408 402 0.750 12 90
514 398 399 0.750 13 45
515 400 401 0.750 13 45
516 402 403 0.750 13 45
517 404 405 0.750 13 45
518 406 407 0.750 13 45
519 408 409 0.750 13 45
520 410 831 0.334 12 90
521 410 411 0.900 13 45
522 412 410 0.250 12 90
523 412 413 0.900 13 45
524 414 412 0.250 12 90
525 414 415 0.900 13 45
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 24 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 25 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
526 416 414 0.250 12 90
527 416 417 0.900 13 45
528 418 416 0.250 12 90
529 418 419 0.900 13 45
530 420 48 0.334 12 90
531 422 420 0.250 12 90
532 424 422 0.250 12 90
533 426 424 0.250 12 90
534 428 426 0.250 12 90
535 420 421 0.900 13 45
536 422 423 0.900 13 45
537 424 425 0.900 13 45
538 426 427 0.900 13 45
539 428 429 0.900 13 45
540 430 52 0.334 12 90
541 432 430 0.250 12 90
542 434 432 0.250 12 90
543 436 434 0.250 12 90
544 438 436 0.250 12 90
545 430 431 0.900 13 45
546 432 433 0.900 13 45
547 434 435 0.900 13 45
548 436 437 0.900 13 45
549 438 439 0.900 13 45
550 440 56 0.334 12 90
551 442 440 0.250 12 90
552 444 442 0.250 12 90
553 446 444 0.250 12 90
554 448 446 0.250 12 90
555 440 441 0.900 13 45
556 442 443 0.900 13 45
557 444 445 0.900 13 45
558 446 447 0.900 13 45
559 448 449 0.900 13 45
560 450 59 0.334 12 90
561 452 450 0.250 12 90
562 454 452 0.250 12 90
563 456 454 0.250 12 90
564 458 456 0.250 12 90
565 450 451 0.900 13 45
566 452 453 0.900 13 45
567 454 455 0.900 13 45
568 456 457 0.900 13 45
569 458 459 0.900 13 45
570 460 61 0.334 12 90
571 462 460 0.250 12 90
572 464 462 0.250 12 90
573 466 464 0.250 12 90
574 468 466 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 25 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 26 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
575 460 461 0.900 13 45
576 462 463 0.900 13 45
577 464 465 0.900 13 45
578 466 467 0.900 13 45
579 468 469 0.900 13 45
580 470 65 0.334 12 90
581 472 470 0.250 12 90
582 474 472 0.250 12 90
583 476 474 0.250 12 90
584 478 476 0.250 12 90
585 470 471 0.900 13 45
586 472 473 0.900 13 45
587 474 475 0.900 13 45
588 476 477 0.900 13 45
589 478 479 0.900 13 45
590 480 69 0.334 12 90
591 482 480 0.250 12 90
592 484 482 0.250 12 90
593 486 484 0.250 12 90
594 488 486 0.250 12 90
595 480 481 0.900 13 45
596 482 483 0.900 13 45
597 484 485 0.900 13 45
598 486 487 0.900 13 45
599 488 489 0.900 13 45
600 490 832 0.334 12 90
601 492 490 0.250 12 90
602 494 492 0.250 12 90
603 496 494 0.250 12 90
604 498 743 0.031 12 90
605 490 491 0.900 13 45
606 492 493 0.900 13 45
607 494 495 0.900 13 45
608 496 497 0.900 13 45
609 498 499 0.900 13 45
610 500 96 1.500 7 0
611 500 502 0.334 12 90
612 502 503 0.250 12 90
613 503 501 0.066 12 90
614 504 502 0.750 13 45
615 505 503 0.750 13 45
616 506 747 0.750 8 0
617 506 508 0.334 12 90
618 508 509 0.250 12 90
619 509 507 0.066 12 90
620 510 508 0.750 13 45
621 511 509 0.750 13 45
622 512 100 1.500 8 0
623 512 514 0.334 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 26 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 27 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
624 514 515 0.250 12 90
625 515 513 0.066 12 90
626 516 514 0.750 13 45
627 517 515 0.750 13 45
628 518 748 0.750 8 0
629 518 520 0.334 12 90
630 520 521 0.250 12 90
631 521 519 0.066 12 90
632 522 520 0.750 13 45
633 523 521 0.750 13 45
634 524 104 1.500 8 0
635 524 526 0.334 12 90
636 526 527 0.250 12 90
637 527 525 0.066 12 90
638 528 526 0.750 13 45
639 529 527 0.750 13 45
640 530 749 0.750 8 0
641 530 532 0.334 12 90
642 532 533 0.250 12 90
643 533 531 0.066 12 90
644 534 532 0.750 13 45
645 535 533 0.750 13 45
646 536 108 1.500 8 0
647 536 538 0.334 12 90
648 538 539 0.250 12 90
649 539 537 0.066 12 90
650 540 538 0.750 13 45
651 541 539 0.750 13 45
652 542 750 0.750 8 0
653 542 544 0.334 12 90
654 544 545 0.250 12 90
655 545 543 0.066 12 90
656 546 544 0.750 13 45
657 547 545 0.750 13 45
658 548 112 1.500 7 0
659 548 550 0.334 12 90
660 550 551 0.250 12 90
661 551 549 0.066 12 90
662 552 550 0.750 13 45
663 553 551 0.750 13 45
854 732 294 0.219 1 90
857 734 288 0.219 1 90
865 743 496 0.219 12 90
879 38 37 1.250 1 90
880 37 36 1.850 1 90
881 76 75 1.850 1 90
882 77 76 1.250 1 90
883 744 15 4.036 9 0
884 744 54 4.036 9 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 27 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 28 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
885 745 15 4.036 9 0
886 745 24 4.036 9 0
887 746 76 4.036 9 0
888 746 63 4.036 9 0
889 747 13 3.619 9 0
890 747 5 3.619 9 0
891 748 20 3.619 9 0
892 748 59 3.619 9 0
893 749 26 3.619 9 0
894 749 65 3.619 9 0
895 750 38 3.619 9 0
896 750 77 3.619 9 0
897 751 418 0.250 12 90
898 753 428 0.250 12 90
899 755 438 0.250 12 90
900 757 448 0.250 12 90
901 759 458 0.250 12 90
902 761 468 0.250 12 90
903 763 478 0.250 12 90
904 765 488 0.250 12 90
905 767 498 0.250 12 90
906 751 752 0.900 13 45
907 753 754 0.900 13 45
908 755 756 0.900 13 45
909 757 758 0.900 13 45
910 759 760 0.900 13 45
911 761 762 0.900 13 45
912 763 764 0.900 13 45
913 765 766 0.900 13 45
914 767 768 0.900 13 45
915 785 767 0.250 12 90
916 769 770 0.900 13 45
917 771 772 0.900 13 45
918 773 774 0.900 13 45
919 775 776 0.900 13 45
920 777 778 0.900 13 45
921 779 780 0.900 13 45
922 781 782 0.900 13 45
923 783 784 0.900 13 45
924 785 786 0.900 13 45
925 765 783 0.250 12 90
926 763 781 0.250 12 90
927 761 779 0.250 12 90
928 759 777 0.250 12 90
929 757 775 0.250 12 90
930 755 773 0.250 12 90
931 753 771 0.250 12 90
932 751 769 0.250 12 90
933 787 5 0.900 7 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 28 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 29 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
934 788 787 0.600 7 0
935 789 9 0.900 8 0
936 790 789 0.600 8 0
937 791 13 0.900 8 0
938 792 791 0.600 8 0
939 793 17 0.900 8 0
940 794 793 0.600 8 0
941 795 20 0.900 8 0
942 796 795 0.600 8 0
943 797 22 0.900 8 0
944 798 797 0.600 8 0
945 799 26 0.900 8 0
946 800 799 0.600 8 0
947 801 30 0.900 8 0
948 802 801 0.600 8 0
949 788 790 2.025 14 0
950 790 792 2.025 14 0
951 792 794 2.025 14 0
952 794 796 2.025 14 0
953 796 798 2.025 14 0
954 798 800 2.025 14 0
955 800 802 2.025 14 0
956 787 789 2.025 14 0
957 789 791 2.025 14 0
958 791 793 2.025 14 0
959 793 795 2.025 14 0
960 795 797 2.025 14 0
961 797 799 2.025 14 0
962 799 801 2.025 14 0
963 803 38 0.900 7 0
964 804 803 0.600 7 0
965 802 804 2.025 14 0
966 801 803 2.025 14 0
967 805 500 0.750 7 0
968 806 805 0.600 7 0
969 807 506 0.750 8 0
970 808 807 0.600 8 0
971 809 512 0.750 8 0
972 810 809 0.600 8 0
973 811 518 0.750 8 0
974 812 811 0.600 8 0
975 813 524 0.750 8 0
976 814 813 0.600 8 0
977 815 530 0.750 8 0
978 816 815 0.600 8 0
979 817 536 0.750 8 0
980 818 817 0.600 8 0
981 819 542 0.750 8 0
982 820 819 0.600 8 0
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 29 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 30 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
983 821 548 0.750 7 0
984 822 821 0.600 7 0
985 806 835 0.200 10 0
986 808 810 2.025 14 0
987 810 812 2.025 14 0
988 812 814 2.025 14 0
989 814 816 2.025 14 0
990 816 818 2.025 14 0
991 818 820 2.025 14 0
992 805 807 2.025 14 0
993 807 809 2.025 14 0
994 809 811 2.025 14 0
995 811 813 2.025 14 0
996 813 815 2.025 14 0
997 815 817 2.025 14 0
998 817 819 2.025 14 0
999 820 836 1.825 10 0
1000 819 821 2.025 14 0
1001 823 41 1.000 1 90
1002 824 2 1.000 1 90
1003 823 829 3.000 15 0
1006 826 74 1.000 1 90
1007 827 35 1.000 1 90
1008 826 830 3.000 15 0
1011 747 98 0.750 8 0
1012 748 102 0.750 8 0
1013 749 106 0.750 8 0
1014 750 110 0.750 8 0
1015 829 824 3.000 15 0
1016 829 40 4.243 6 0
1017 829 1 4.243 6 0
1018 829 43 4.138 6 0
1019 829 4 4.138 6 0
1020 830 827 3.000 15 0
1021 830 73 4.243 6 0
1022 830 34 4.243 6 0
1023 830 76 4.138 6 0
1024 830 37 4.138 6 0
1025 744 11 3.000 8 0
1026 745 19 3.000 8 0
1027 746 28 3.000 8 0
1028 831 48 1.825 2 0
1029 832 77 0.200 2 0
1031 835 808 1.825 10 0
1032 411 835 0.334 12 90
1033 413 411 0.250 12 90
1034 415 413 0.250 12 90
1035 417 415 0.250 12 90
1036 419 417 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 30 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 31 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
1037 752 419 0.250 12 90
1038 752 770 0.250 12 90
1040 421 808 0.334 12 90
1041 423 421 0.250 12 90
1042 425 423 0.250 12 90
1043 427 425 0.250 12 90
1044 429 427 0.250 12 90
1045 754 429 0.250 12 90
1046 754 772 0.250 12 90
1062 431 810 0.334 12 90
1063 433 431 0.250 12 90
1064 435 433 0.250 12 90
1065 437 435 0.250 12 90
1066 439 437 0.250 12 90
1067 756 439 0.250 12 90
1068 756 774 0.250 12 90
1069 441 812 0.334 12 90
1070 443 441 0.250 12 90
1071 445 443 0.250 12 90
1072 447 445 0.250 12 90
1073 449 447 0.250 12 90
1074 758 449 0.250 12 90
1075 758 776 0.250 12 90
1076 451 814 0.334 12 90
1077 453 451 0.250 12 90
1078 455 453 0.250 12 90
1079 457 455 0.250 12 90
1080 459 457 0.250 12 90
1081 760 459 0.250 12 90
1082 760 778 0.250 12 90
1083 461 816 0.334 12 90
1084 463 461 0.250 12 90
1085 465 463 0.250 12 90
1086 467 465 0.250 12 90
1087 469 467 0.250 12 90
1088 762 469 0.250 12 90
1089 762 780 0.250 12 90
1090 471 818 0.334 12 90
1091 473 471 0.250 12 90
1092 475 473 0.250 12 90
1093 477 475 0.250 12 90
1094 479 477 0.250 12 90
1095 764 479 0.250 12 90
1096 764 782 0.250 12 90
1097 481 820 0.334 12 90
1098 483 481 0.250 12 90
1099 485 483 0.250 12 90
1100 487 485 0.250 12 90
1101 489 487 0.250 12 90
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 31 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 32 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
1102 766 489 0.250 12 90
1103 766 784 0.250 12 90
1104 836 822 0.200 10 0
1105 491 836 0.334 12 90
1106 493 491 0.250 12 90
1107 495 493 0.250 12 90
1108 497 495 0.250 12 90
1109 499 497 0.250 12 90
1110 768 499 0.250 12 90
1111 768 786 0.250 12 90
1112 769 771 1.825 10 0
1113 771 773 2.025 10 0
1114 773 775 2.025 10 0
1115 775 777 2.025 10 0
1116 777 779 2.025 10 0
1117 779 781 2.025 10 0
1118 781 783 2.025 10 0
1119 783 785 1.825 10 0
1120 770 772 1.825 10 0
1121 772 774 2.025 10 0
1122 774 776 2.025 10 0
1123 776 778 2.025 10 0
1124 778 780 2.025 10 0
1125 780 782 2.025 10 0
1126 782 784 2.025 10 0
1127 784 786 1.825 10 0
1128 156 837 0.900 13 45
1129 99 10 2.250 10 0
1130 103 18 2.250 10 0
1131 107 23 2.250 10 0
1132 111 31 2.250 10 0
Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
1 H294X200X8X12 71.050 1.6E+3 11.1E+3 27.853 STEEL
2 H300X150X6.5X9 46.780 508.000 7.21E+3 9.954 STEEL
3 C150X75X6.5 D 47.420 534.141 1.72E+3 12.563 STEEL
4 L90X90X7 LD 24.440 343.483 189.636 3.956 STEEL
5 H150X150X7X10 39.650 563.000 1.62E+3 11.601 STEEL
6 L75X75X6 LD 17.454 170.509 93.765 2.074 STEEL
7 H244X175X7X11 55.490 984.000 6.04E+3 18.192 STEEL
8 H250X125X6X9 36.970 294.000 3.96E+3 7.810 STEEL
9 L65X65X6 LD 15.054 111.293 59.972 1.786 STEEL
10 C150X75X6.5 23.710 117.000 861.000 6.282 STEEL
11 RD16 0.000 0.000 0.000 0.643 STEEL
12 H100X100X6X8 21.590 134.000 378.000 4.076 STEEL
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 32 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 33 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Materials
Mat Name E Density
(kN/mm2) (kg/m3) (/ÄC)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 CONCRETE 21.718 0.170 2.4E+3 10E -6
Supports
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
1 Fixed Fixed Fixed - - -
34 Fixed Fixed Fixed - - -
40 Fixed Fixed Fixed - - -
73 Fixed Fixed Fixed - - -
Releases
Beam ends not shown in this table are fixed in all directions.
Beam Node x y z rx ry rz
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 33 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 34 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Releases Cont...
Beam Node x y z rx ry rz
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 34 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 35 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Releases Cont...
Beam Node x y z rx ry rz
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 35 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 36 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
100 0.84BL+0.84DL+0.8PE+0.474WL(+X)+0.8SC+0.8LL
1 BODY LOAD (BL) 0.84
2 DEAD LOAD (DL) 0.84
4 PIPE LOAD EMPTY+6000 (PE) 0.80
8 WIND LOAD (WL +X) 0.47
10 SCAFFOLDING&HOIST LOAD +6000 (SC) 0.80
5 LIVE LOAD +7250 (LL) 0.80
101 0.84BL+0.84DL+0.8PE+0.474WL(+Z)+0.8SC+0.8LL
1 BODY LOAD (BL) 0.84
2 DEAD LOAD (DL) 0.84
4 PIPE LOAD EMPTY+6000 (PE) 0.80
9 WIND LOAD (WL+Z) 0.47
10 SCAFFOLDING&HOIST LOAD +6000 (SC) 0.80
5 LIVE LOAD +7250 (LL) 0.80
104 1.05BL+1.05DL+1.0 OPE+1.0LL+1.0AF 1 BODY LOAD (BL) 1.05
2 DEAD LOAD (DL) 1.05
3 PIPE LOAD OPERATION +6000/+7250 (OPE) 1.00
5 LIVE LOAD +7250 (LL) 1.00
7 ANCHOR FORCE +6000(AF)+X 1.00
105 1.05BL+1.05DL+1.0 OPE +1.00 LL+1.00 FF 1 BODY LOAD (BL) 1.05
2 DEAD LOAD (DL) 1.05
3 PIPE LOAD OPERATION +6000/+7250 (OPE) 1.00
5 LIVE LOAD +7250 (LL) 1.00
6 PIPE FRICTION FORCE +6000 LP(T+X) 1.00
106 0.84BL+0,84DL+0.80OPE+0.80LL+0.8WL(+X) 1 BODY LOAD (BL) 0.84
2 DEAD LOAD (DL) 0.84
3 PIPE LOAD OPERATION +6000/+7250 (OPE) 0.80
5 LIVE LOAD +7250 (LL) 0.80
8 WIND LOAD (WL +X) 0.80
107 0.84BL+0,84DL+0.80OPE+0.80LL+0.8WL(+Z) 1 BODY LOAD (BL) 0.84
2 DEAD LOAD (DL) 0.84
3 PIPE LOAD OPERATION +6000/+7250 (OPE) 0.80
5 LIVE LOAD +7250 (LL) 0.80
9 WIND LOAD (WL+Z) 0.80
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 36 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 37 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Y -1.000 ALL
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 37 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 38 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 38 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 39 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 39 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 40 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 40 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 41 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 41 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 42 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 42 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 43 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 43 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 44 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 44 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 45 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
X 1 1.000
Z 1 1.000
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 45 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 46 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 46 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 47 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kg) (kg) (kg) (kNm) (kNm) (kNm)
Max FX 1 105:1.05BL+1.05DL+1.0
9053
OPE +1.00
25834
LL+1.00 FF-244 0.0 0.0 0.0
Min FX 34 104:1.05BL+1.05DL+1.0
-10003
OPE+1.0LL+1.0AF
26555 -160 0.0 0.0 0.0
Max FY 34 105:1.05BL+1.05DL+1.0
-9966
OPE +1.00
26576
LL+1.00 FF-183 0.0 0.0 0.0
Min FY 73 9:WIND LOAD (WL+Z) 48 -1938 -877 0.0 0.0 0.0
Max FZ 40 105:1.05BL+1.05DL+1.0
7034
OPE +1.00
21385
LL+1.00 FF 282 0.0 0.0 0.0
Min FZ 73 9:WIND LOAD (WL+Z) 48 -1938 -877 0.0 0.0 0.0
Max MX 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Min MX 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Max MY 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Min MY 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Max MZ 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Min MZ 1 1:BODY LOAD (BL) 1532 4685 -100 0.0 0.0 0.0
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
1 H294X200X8X12
H294X200X8X12
0.089 1.000 0.089 AISC- H1-3 104 71.050 11.1E+3 1.6E+3 27.900
2 H294X200X8X12
H294X200X8X12
0.129 1.000 0.129 AISC- H1-3 104 71.050 11.1E+3 1.6E+3 27.900
3 H294X200X8X12
H294X200X8X12
0.168 1.000 0.168 AISC- H1-3 105 71.050 11.1E+3 1.6E+3 27.900
4 H294X200X8X12
H294X200X8X12
0.372 1.000 0.372 AISC- H1-3 104 71.050 11.1E+3 1.6E+3 27.900
5 H294X200X8X12
H294X200X8X12
0.033 1.000 0.033 AISC- H1-3 104 71.050 11.1E+3 1.6E+3 27.900
6 C150X75X6.5 D
C150X75X6.5 DD
0.574 1.000 0.574 AISC- H1-1 105 47.420 1.72E+3 480.508 12.400
7 C150X75X6.5 D
C150X75X6.5 DD
0.003 1.000 0.003 AISC- H2-1 104 47.420 1.72E+3 480.508 12.400
8 C150X75X6.5 D
C150X75X6.5 DD
0.008 1.000 0.008 AISC- H1-3 104 47.420 1.72E+3 480.508 12.400
9 H300X150X6.5X9
H300X150X6.5X9
0.123 1.000 0.123 DEFLECTION 104 46.780 7.21E+3 508.000 9.950
10 C150X75X6.5 C150X75X6.5 0.057 1.000 0.057 AISC- H1-3 104 23.710 861.000 117.000 6.200
11 H300X150X6.5X9
H300X150X6.5X9
0.230 1.000 0.230 AISC- H1-3 104 46.780 7.21E+3 508.000 9.950
12 L90X90X7 LD L90X90X7 LDLD
0.099 1.000 0.099 AISC- H1-3 101 24.440 189.648 340.738 3.992
13 C150X75X6.5 D
C150X75X6.5 DD
0.573 1.000 0.573 AISC- H1-1 105 47.420 1.72E+3 480.508 12.400
14 H100X100X6X8H100X100X6X80.246 1.000 0.246 AISC- H1-3 104 21.590 378.000 134.000 4.080
15 C150X75X6.5 D
C150X75X6.5 DD
0.600 1.000 0.600 AISC- H1-1 105 47.420 1.72E+3 480.508 12.400
16 H300X150X6.5X9
H300X150X6.5X9
0.398 1.000 0.398 AISC- H2-1 105 46.780 7.21E+3 508.000 9.950
17 L90X90X7 LD L90X90X7 LDLD
0.555 1.000 0.555 AISC- H1-1 105 24.440 189.648 340.738 3.992
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 47 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 48 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 48 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 49 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 49 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 50 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 50 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 51 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 51 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 52 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 52 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 53 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 53 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 54 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 54 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 55 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 55 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 56 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 56 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 57 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 57 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 58 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 58 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 59 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 59 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 60 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 60 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 61 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 61 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 62 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 62 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 63 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 63 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 64 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 64 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 65 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Failed Members
There is no data of this type.
MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 65 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 66 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 66 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 67 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
20 ST BH300X150 (UPT)
PASS AISC- H1-1 0.390 101
10804.33 C 169.13 195183.94 0.00
28 ST BH300X150 (UPT)
PASS AISC- H2-1 0.280 104
7049.09 T -107.65 -152410.00 225.00
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 67 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 68 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
36 ST BH300X150 (UPT)
PASS AISC- H2-1 0.264 105
5585.94 T -121.90 -152270.55 22.50
43 ST BH300X150 (UPT)
PASS AISC- H1-1 0.458 105
12986.72 C 265.54 224084.22 270.00
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 68 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 69 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 69 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 70 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 70 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 71 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
84 ST BH300X150 (UPT)
PASS AISC- H1-3 0.346 101
8690.14 C 786.92 156388.89 0.00
92 ST BH300X150 (UPT)
PASS AISC- H2-1 0.214 104
5408.75 T -40.65 -116435.66 202.50
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 71 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 72 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 72 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 73 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 73 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 74 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 74 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 75 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 75 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 76 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 76 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 77 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 77 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 78 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 78 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 79 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 79 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 80 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 80 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 81 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 81 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 82 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 82 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 83 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 83 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 84 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 84 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 85 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 85 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 86 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 86 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 87 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 87 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 88 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 88 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 89 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 89 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 90 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 90 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 91 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 91 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 92 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 92 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 93 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 93 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 94 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 94 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 95 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 95 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 96 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 96 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 97 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 97 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 98 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 98 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 99 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 99 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 100 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 100 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 101 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 101 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 102 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 102 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 103 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 103 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 104 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 104 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 105 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 105 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 106 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 106 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 107 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 107 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 108 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 108 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 109 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 109 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 110 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 110 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 111 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 111 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 112 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 112 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 113 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 113 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 114 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 114 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 115 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 115 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 116 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 116 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 117 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 117 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 118 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 118 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 119 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 119 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 120 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 120 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 121 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 121 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 122 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 122 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 123 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 123 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 124 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 124 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 125 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 125 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 126 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 126 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 127 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 127 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 128 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 128 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 129 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 129 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 130 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 130 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 131 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 131 of 132
Job No Sheet No Rev
CCK Engineering and construction /co.,Ltd.
(Steel Structure Calculation Sheet) CCK-VNT-CAL-021/61 132 02
Client Viny Thai Publc Company Limited File Date/Time 27-Dec-2018 21:05
S4_CASE_MODIFY_ADD_PIPE01_ADD_PL.std
Print Time/Date: 27/12/2018 21:24 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 132 of 132