DETAILED ESTIMATE OF BUILDING

Sl:No Items of work No L B H Qty


1 Earth work excavation for foundation in all classes
of soil with lead up to 50m: and lift up to1.50m.
For Column P1 7 2.20 1.70 1.70 44.51
For Column P2 11 2.00 2.00 1.70 74.80
For Column P3 9 1.80 1.80 1.70 49.57
For Retaining wall (1) 1 9.00 1.40 1.05 13.23
For Retaining wall (2) 1 11.00 1.10 0.75 9.08
For Plinth Beam 1 48.22 0.23 0.40 4.43
1 11.05 0.23 0.50 1.27
6 6.68 0.23 0.50 4.61
1 10.50 0.23 0.50 1.20
Total 202.70

Say 210m3

2 Plain cement concrete 1:4:8 using 40mm: metal for


foundation leveling course.
For Column P1 7 2.20 1.70 0.20 5.24
For Column P2 11 2.00 2.00 0.20 8.80
For Column P3 9 1.80 1.80 0.20 5.83
For Retaining wall (1) 1 9.00 1.40 0.15 1.89
. For Retaining wall (2) 1 11.00 1.10 0.15 1.81
Total 23.57

Say 25m3

3 R.C.C 1:2:4 using 20mm broken stone including


centering, shuttering and curing but excluding steel
reinforcement for column footing, retaining wall 12.60
footing. 16.04
For Column P1 7 2.00 2.00 0.45 9.22
For Column P2 11 1.80 1.80 0.45 3.78
For Column P3 9 1.60 1.60 0.40 3.30
For Retaining wall (1) 1 9.00 1.20 0.35 44.97
For Retaining wall (2) 1 11.00 1.00 0.30
Grand Total Say 45m3

4A R.C.C 1:1½:3 using 20mm broken stone for


columns pedestrian including all centering,
shuttering and curing but excluding cost and 4.49
conveyance of steel in cellar floor. 10.24
Column Pedestal 27 0.80 0.52 0.40 14.73
Columns C1, C2, C3 27 0.50 0.22 3.45
Total Say 15m3

4B R.C.C 1:1½:3 using 20mm broken stone for


columns including all centering, shuttering and
curing but excluding cost and conveyance of steel 8.91
in ground floor. 8.91
Columns C1, C2, C3 27 0.50 0.22 3.00
Total Say 9m3

1.32
4C R.C.C 1:1½:3 using 20mm broken stone for 1.32
columns including all centering, shuttering and
curing but excluding cost and conveyance of steel Say 2m3
in Tower floor. 1.57
Columns C1, C2, C3 4 0.50 0.22 3.00 1.13
Total 2.55
4.42
1.16
5 R.C.C 1:2:4 using 20mm nominal size broken stone 0.19
including centering, shuttering and curing but 0.05
excluding steel reinforcement for grade beam and 11.07
plinth beam. Say 12m3
Left Side (20.80 - 0.50) 17.80 0.22 0.40 6.91
Back 1 10.32 0.22 0.50 5.54
Right Side (27.66 - 4.50) 1 23.16 0.22 0.50 12.45
Inside 6 6.70 0.22 0.50 Say 13m3
1 10.52 0.22 0.50 7.69
1 3.26 0.15 0.40 1.49
1 1.80 0.15 0.20 0.98
Total 1.51
8.97
0.08
6 R.C.C 1:1½:3 using 20mm broken stone for 20.72
retaining wall including cost and conveyance of Say 21m3
material, labour charges but excluding cost of steel 6.69
reinforcement. 1.99
Retaining wall (1) 1 9.00 0.29(av) 2.65 2.99
Retaining wall (2) 1 11.00 0.24(av) 2.10 11.94
Total 0.19
0.12
0.61
7A R.C.C. 1:2:4 using 20mm nominal size broken 24.53
stone including centering, shuttering and curing but
excluding steel reinforcement for beam etc in cellar Say 25m3
Floor. 1.26
Outer Left Side, Right Side and centre 3 27.86 0.23 0.40 0.55
Back Side 1 10.82 0.23 0.60 0.81
Front Side 1 7.14 0.23 0.60
1 10.96 0.23 0.60 Say 1m3
6 10.83 0.23 0.60
Lintel 1 7.14 010 0.10
Total

37.47
7B R.C.C. 1:2:4 using 20mm nominal size broken 0.43
stone including centering, shuttering and curing but 37.04
excluding steel reinforcement for beam etc in
ground Floor. Say 37m3
Outer Left Side, Right Side and centre 3 24.25 0.23 0.40
Outer Left Side, Right Side and centre 3 4.81 0.23 0.60 39.39
Back and Front 2 10.82 0.23 0.60
Centre 8 10.82 0.23 0.60 Say 40m3
Lintel 1 17.50 0.11 0.10 1.90
D 2 1.80 0.22 0.15
D 1 6.90 0.22 0.40 Say 2m3
Total

6.79
7C R.C.C. 1:2:4 using 20mm nominal size broken Say 7m3
stone including centering, shuttering and curing but 1.35
excluding steel reinforcement for beam etc in
Tower Floor. Say 1.50m3
2 4.58 0.23 0.60 6300
2 3.00 0.23 0.40 3744
Total 1328
1743
6448
7049
8A R.C.C. 1:2:4 using 20mm nominal size broken 135
stone including centering, shuttering and curing but 26747
excluding steel reinforcement for slab in cellar
Floor. Say 27000kg
Beams 1 27.64 11.30 0.12
1 6.86 0.52 0.12
Total less deduction 35.60
2.17
0.35
8B R.C.C. 1:2:4 using 20mm nominal size broken 37.42
stone including centering, shuttering and curing but
excluding steel reinforcement for slab in ground 1 29.05 11.30 0.12 Say 38m3
Floor.

8C R.C.C. 1:2:4 using 20mm nominal size broken 40.36


stone including centering, shuttering and curing but 2.05
excluding steel reinforcement for slab in Tower 4.30
Floor. 1 4.58 3.46 0.12 4.68
7.62

0.59
9 R.C.C 1:1½:3 using 20mm broken stone for strong 59.60
room including centering, shuttering and
conveyance of material, labour charges but 1 15.10 0.15 3.00 1.16
excluding cost and conveyance of steel in ground 0.42
floor. 0.69
4.56
10 R.C.C 1:1½:3 using 20mm broken stone for folding 3.45
step, thin slab etc including centering, shuttering 0.69
and conveyance of material, labour charges but 20 1.50 0.45 0.10 10.97
excluding cost and conveyance of steel. 48.63

Say 49m3
11 Steel Reinforcement for R.C.C work bend tied and
placed in suitable position and including cost of
binding wire and all other labour charge etc. 7.87
Column Footing 1 45M3 140kg/m3 0.43
Column -1 14.73 10.23 24.96 150 0.34
Plinth Beam 11.07 120kg/m3 7.10
Retaining Wall 12.45 140kg/m3
Lintel, Beam 20.72 46.06 140kg/m3 Say 7.50m3
Slab 37.04 41.29 78.33 90
Stair Case 1.35 100
Total

5.04
12A Brick masonry in cm 1:6 for superstructure using 5.67
country burnt bricks with scaffolding curing etc 6.30
complete in cellar Floor. 17.01
Outer(73-8.50) 1 64.50 0.23 2.40
(73-8.50) 1 7.05 0.11 2.80 Say 17m2
Deduction 2 0.75 0.11 2.10 15.00
Total less deduction 3.00
18.00m2
Say 18m2
12B Brick masonry in cm 1:6 for superstructure using 13.55
country burnt bricks with scaffolding curing etc 6.30
complete in ground Floor. 19.85
Outer (76.98-19x0.50) 1 67.50 0.23 2.60 Say 20m2
inside 1 3.42 0.23 2.60 300.54
2 3.60 0.23 2.60 17.80
1 14.20 0.11 3.00 318.34
Parapet 1 76.98 0.11 0.90
Say 320m2
26 0.23 0.11 0.90 408.80
Total 39.48
3.15
Deduction 2 1.10 0.23 2.10 445.13
2 0.90 0.11 2.10
4 0.75 0.11 2.10 Say 450m2
Al 1 9.45 0.23 2.10
Window 5 2.00 0.23 1.50 461.88
2 1.00 0.23 1.50 20.52
Total 43.20
Total Less Deduction 85.20
153.96
764.76
12C Brick masonry in cm 1:6 for superstructure using
country burnt bricks with scaffolding curing etc 5.04
complete in Tower Floor. 3.78
1 13.16 0.23 2.60 6.30
deduction 1 0.90 0.23 2.10 19.84
Window 1 1.00 0.23 1.50 15.00
Total less deduction 3.00
52.96
711.80
13 Providing and fixing wooden doors with country
wood 100x60mm outer frame, 100x35mm. Shutter Say 715m2
frame and 20mm thick laminated panel board with
all fixtures such as tower bolts, butt hinges, etc.
complete. 82.92
2 1.20 2.10 7.89
3 0.90 2.10 1.50
4 0.75 2.10 79.53
Total
Say 80m2

14 Providing and fixing steel window with standard 308.66


steel sections and glass shutters with all fixtures 14.40
such as butt hinges, hook and eye, stay etc. 65.10
complete. 5 2.00 1.50 25.92
2 1.00 1.50 414.00
Total
Say 415m2

15 Providing and fixing Aluminum glazing with 5.5 328.25


cm thick plane glass fixed to powder coated 79.50
aluminum section and all fixtures etc. complete. 1 6.45 2.10 17.28
1 3.00 2.10 90.60
Total 13.50
14.40
543.53
16 Flooring with plain cement concrete 1:4:8 using
. 40mm metal 10cm thick including cost of materials Say 545m2
labour charges, watering curing etc. 1 27.70 10.85
1 4.45 4.00
Total 15.83

Say 20m2
17A Plastering in cm: 1:4,12cm: thick trowelled smooth
inside and outside walls with scaffolding curing etc 328.25
complete in cellar Floor. 2 73.00 2.80 14.40
2 7.05 2.80 342.65
Deduction 2 0.75 2.10
Total less deduction Say 350m2

Say 20m2
17B Plastering in cm: 1:4,12cm: thick trowelled smooth
inside and outside walls with scaffolding curing etc 183.69
complete in ground Floor. 2 76.98 3.00 68.73
2 3.42 3.00 10.80
4 3.60 3.00 26.32
2 14.20 3.00 289.34
Parapet 1 76.98 2.00
Total Say 290m2

Deduction 2 1.20 2.10 13.25


2 0.90 2.10 6.22
4 0.75 2.10 19.47
1 4.45 2.10
5 2.00 1.50 Say 20m2
2 1.00 1.50
Total 10.80
Total less deduction 5.76
1.65
18.21
17C Plastering in cm: 1:4,12cm: thick trowelled smooth
inside and outside walls with scaffolding curing etc Say 20m2
complete in Tower Floor.
2 13.82 3.00 34.50
Deduction 1 0.90 2.10 7.80
1 1.00 1.50 42.30
Total less deduction
Say 45m2

18A Plastering in 1:3, 9cm: thick under side of slab with


scaffolding curing etc complete in cellar Floor.
Quantity refer item no: 8A 1 37.04 0.12 295.60
Beam side 2 24.00 0.30
Plinth Beam 12 10.85 0.50 Say 300m2
6 1.44 3.00
Total

Say 5m
18B Plastering in 1:3, 9cm: thick under side of slab with
scaffolding curing etc complete in ground Floor.
Quantity refer item no: 8B
Beam side Say 415m2
Plinth Beam 4 1.44 3.00
Strong Room 2 15.10 3.00
Stair Case 20 1.50 0.45
Sunshade 1 24.00 0.60 Say 545m2
Total

18C Plastering in 1:3, 9cm: thick under side of slab with Say 20m2
scaffolding curing etc complete in Tower Floor.
Quantity refer item no: 8C
1.90
0.12 Say 245m2

19A Plastering in cm 1:4, 12cm thick with second coat


of neat cement finishing in Ground Floor.
Roof Top Quantity refer item no: 18B Say 485m2
Sunshade 24.00 0.60

Say 40m2
19B Plastering in cm 1:4, 12cm thick with second coat
of neat cement finishing in Tower Floor.
Qty refer item No.18C.
20 Floor finishing with vitrified tiles over the cm: 1:4, Say 205m2
12mm: thick with neat joint finishing in Ground
Floor. 1 16.93 10.85
1 10.29 6.68 Say 230m2
1 3.60 3.00
Skirting
Total
Say 40m2

21 Floor finishing with ceramic tiles over the cm: 1:4,


12cm: thick with neat joint finishing.
Ground floor and Tower Floor 1 3.20 4.14 38.25
Cellar Floor 1 3.46 1.80 27.00
Total 65.25

Say 70m2
22 Floor finishing with marble slab over the cm: 1:4,
12cm: thick with neat joint finishing.
For Step 20 1.50 0.45
Landing 4 1.20 1.20
Skirting
Total
23 Dadoing with glazed tiles over the cm: 1:4, 12mm
thick with neat joint finishing.
Toilet 1 23.00 1.50
1 5.20 1.50
Total

24 Floor finishing with Ironite flooring with cement


mortar 1:4: 12mm thick necessary skirting border
etc complete.
Cellar 1 10.85 27.25
Total

25 Providing and fixing Stainless steel hand rail with


50mm top rail 20mm verticals and 50mm
horizontal with neat finishing.
For Stair case

26A Painting plastered surface with cement based water


proof paint two coat over a priming coat in cellar
Floor.
Quantity refer item no: 18A

26B Painting plastered surface with cement based water


proof paint two coat over a priming coat in ground
Floor.
Quantity refer item no: 18B

26C Painting plastered surface with cement based water


proof paint two coat over a priming coat in Tower
Floor.
Quantity refer item no: 18C

27A Painting inside walls with washable distember paint


two cotes over a priming coat in cellar Floor.

Quantity refer item no: 17A 450-(73 2.80)

27B Painting inside walls with washable distember paint


two cotes over a priming coat in ground Floor.
Quantity refer item no: 17B 715 -460
2

27C Painting inside walls with washable distember paint


two cotes over a priming coat in Tower Floor.
Quantity refer item no: 17C 80-40

28A Painting outside walls with Apex paint two coats


over a priming coat in cellar Floor.

Quantity refer item no: 17A

28B Painting outside walls with Apex paint two coats


over a priming coat in ground Floor.

Quantity refer item no: 17B

28C Painting outside walls with Apex paint two coats


over a priming coat in Tower Floor.

Quantity refer item no: 17C

29 Painting approved quantity synthetic enamel paint


two coats over a priming coat.

Quantity refer item no: 13 17 2.25


Quantity refer item no: 14 18 1.50

Вам также может понравиться