8. HISTORY OF SUBSTATION
Shornur substation was commissioned as 66KV substation in 1969 and
subsequently upgraded to 110KV in 1971 as per records available with us. The
substation compound is spread over 15.72 Acres of land in Eruppayil desom of
shornur-1 village. The area comes under Shornur municipality in Palakkad
district. Situated on north side of Palakkad- ponnani state highway nearly half
kilometer from unlawfully towards Palakkad. The land where Electrical
division, TMR division and electrical section are situated as under the custody
of 220KV substation sub division Shornur. The layout of total area is exhibited
in control room.
This substation was upgraded to 220KV in 2003 with two 220KV feeders
from 400KV substation Madakkathara and 220KV substation Areacode (both
feeder can use for import/ export), 2 nos. 100MVA 3phase 220/110KV
transformers normally connected in parallel provides 110KV supply to 110KV
'A' bus and 'B' bus. Normally both A and B bus are in coupled condition.
Two direct 110KV feeders from 400KV substation Madakkathara and
220KV substation Malaparamb can either used for import or export. All 110KV
feeders except 1SHTR can fed from either A or B bus. 1SHTR (Traction) feeder
connected to A bus only.
220kV double bus arrangement with bus bar protection commissioned on 2017.
8
220kV SUBSTATION SHORNUR OPERATING MANUAL
9
220kV SUBSTATION SHORNUR OPERATING MANUAL
10
220kV SUBSTATION SHORNUR OPERATING MANUAL
protections. It should be noted that when the capacitor bank is switched off,
then it can be reclosed only after a set time delay of 7 minutes and hence trials
should not be made before this 7 minutes as it may lead to mal operations and
confusions.
9.6 UNDER FREQUENCY RELAYS
Under frequency relay has been provided in 1SHKO,1SHEP,1SHKP and
1SHPP feeders. These relays are set to operate when the frequency goes below
48.8Hz. If this relay operates, the operator should contact LD immediately and
inform the matter and action according to their instructions.
9.7 SYNCHRONIZING TROLLEY
We have a synchronizing trolley suitable for 220KV feeder control panels
and can be used as and when required. (Presently this trolley has been given to
220KV substation Palakkad as they were in need of same when lines from
400KV Elappully PGCIL substation are taken into service.
9.8 FIRST AID
A first aid kit with artificial resuscitation kit is provided near the main
entrance of control room.
9.9 COMMUNICATION SYSTEM
1 Wave trap
Ensures that the Radio frequency carrier signals-either fed from
carrier equipments to HT line or that coming from the opposite station do not
enter power station equipments (Transformers, isolators, CBs etc.)The WT
consists of essentially a coil and being connected to main current circuit in HV
line, they are constructed to withstand short circuit currents.
2 Coupling capacitor
Serves as interlink element between high voltage line and low
voltage RF carrier equipments. It essentially offers very high impedance of
power frequency and allows RF carrier signals to pass through it to the LMU .If
CVT is provided instead of PT, it serves the purpose of coupling capacitor.
3 Line matching unit
The LMU consists essentially of an impedance transformer, the primary
and secondary winding of which are insulated from each other to withstand a
voltage of 10kV .It serves to match characteristic impedance of coaxial
cable(125 ohm ) to that of HV line(600 ohm)
11
220kV SUBSTATION SHORNUR OPERATING MANUAL
4 Drainage coil
Serves to ground 50Hz leakage current through CC to earth ,
thus preventing accumulation of charge on the LV side of capacitor, which
would result in setting of LA .The coil offers high impedance to the RF
signals . The protective devices serves to protect PLCC equipments &
personnel from danger through leakage of HV ie, short circuits or flash over
occurring on the coupling capacitor .Earth switch is kept open for normal
operating conditions and closed if any work to be done on the
communication equipment. It is to be ensured that the drainage coil is
properly earthed.
5 Coaxial Cable
Serves as an interconnecting cable between the LMU & PLCC set.
9.10 EARTHING
The terminology, grounding or earth means connecting the non-current
carrying parts of an equipment to the general mass of the earth to ensure that in
the event of fault, the parts in question cannot have higher potential than the
grounding grid.
The objective of connecting the non-electrical materials to earth can be
summarized as:-
To provide safety for operating personnel working in or near the station
by reducing step and touch potential occurring under normal or fault conditions
within safe limits.
To provide a low impedance to the ground of such capability so as to
handle the fault current as permitted by the over current protection system for
the duration of fault current without getting fire and without creating explosive
hazard to building or contents within the building. To aid circuit relaying for
clearing ground fault.
Mat earthing is used in 220Kv substation Shornur. The substation grounding
system comprises of a grid (earth mat) formed by a horizontal conductors. In
addition to such a grid below ground level, earthing spikes (electrodes) are
driven into the ground and are connected electrically to the earth grid,
equipment bodies, structures, neutrals etc. are connected to the station earthing
system by earthing strips
10. PROCEDURE FOR TAKING ALTERNATE AC SUPPLY
When LT supply from station auxiliary transformer is not available due to
any reason LT supply can be availed from
1. LT LINE PASSING NEAR THE COLONY
Procedure is:
1. Switch off 11KV station auxiliary feeder.
12
220kV SUBSTATION SHORNUR OPERATING MANUAL
13
220kV SUBSTATION SHORNUR OPERATING MANUAL
14
220kV SUBSTATION SHORNUR OPERATING MANUAL
12.OPERATING INSTRUCTIONS
15
220kV SUBSTATION SHORNUR OPERATING MANUAL
16
220kV SUBSTATION SHORNUR OPERATING MANUAL
15. Whenever the feeder is charged, check the voltage and currents in all .
phase.
16. In case of doubt in any operation, request for instructions from the Station
Engineer/Asst.Executive Engineer.
17. Operators will be responsible for the tools kept in the control room as
well as the wiring drawings and instruction books
18. Operators will be responsible for maintaining station water supply,
arranging switching of switch yard and station lights .
19. They should be familiar with the emergency hand operations of circuit
breakers tapchangers etc., procedure to be adapted in case of fire
accidents, first aid, artificial respiration, safety procedures.
20. The operator should have a detailed knowledge of 110kV feeding
arrangement and alternate sources of supply in case of normal feeding .
are failed.
17
220kV SUBSTATION SHORNUR OPERATING MANUAL
18
220kV SUBSTATION SHORNUR OPERATING MANUAL
However the operating staff should judge the severity of the fault by
voltage dip, relay indications both on faulty feeder as well as other
equipments before deciding to charge the feeder. If the fault seems to be
very severe, a detailed inspection of terminal equipment and terminal
19
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. TRIPPING OF TRANSFORMERS:
1. When a Transformer trips
1. Cancel the audible alarms.
2. Take down all relay and window indications.
3. Reset the relays and window indications.
4. If the transformer trips only on O/C or E/F, charge the transformer and
load it. If the transformer trips again, the transformer need be charged .
only after detailed inspection, intimate station engineer and AEE.
5.If the transformer has originally tripped on Differential, REF or
transformer troubles like Buchholz/Oil surge relay, winding temp etc. the
. transformer should be charged only after detailed inspection. The matter
. may be immediately reported to the maintenance staff and Station
ON BUCHHOLZ TRIPS:
Isolate the affected transformer & inform the Station Engineer. Maintain
the supply through the other transformer & reduce load by load shedding if
necessary for 11KV transformer. Check whether any gas collection in OLTC or
20
220kV SUBSTATION SHORNUR OPERATING MANUAL
ON WINDING TEMPERATURE:
Isolate the affected transformer & inform the station Engineer and LD.
Maintain the supply through the other transformer & reduce load by load
shedding if necessary for 11KV transformer. Verify the cooling fans are
working, if not switch on the fans manually & inform the matter to the station
Engineer.
ON PRV TRIPS:
The pressure relief valve is a protective device for oil filled transformer.
It is designed to relieve the excessive pressure which may build up by a fault or
an arcing inside the transformer tank. When the pressure inside valve exceed a
preset limit, the PRV vents out the excess pressure and operates a micro switch.
It also gives a visual indication of the valve operation by raising a flag.
Accept the alarms, note down the relay indications and time of tripping
then reset the relays. Inform station engineer and LDC.
21
220kV SUBSTATION SHORNUR OPERATING MANUAL
Reset the alarms and note down the indications and time of tripping. If
the incomer trips in REF protection, 110 KV breaker of the corresponding
transformer also should have tripped and in that case the transformer should not
be test charged. Inform the matter to the station engineer. In other cases (E/F &
O/C) follow the instructions below:
Check whether any feeder has also tripped simultaneously. If so, isolate this
feeder & test charge the incomer. The isolated feeder can be declared faulty.
If no 11KV feeder has been tripped simultaneously with the incomer, switch off
all 11KV feeders except station services feeder & test charge the incomer. If
OK, the 11KV feeders can be test charged one by one. If the incomer trips when
any of the 11KV feeders are being test charged, it can be assumed that the
breaker/relay of this feeder failed to clear a fault. Isolate this feeder and test
charge the incomer again.
NOTE: In any case of incomer tripping if both incomers are coupled, it is better
to open the coupler before test charging in order to avoid the simultaneous
tripping of both incomers.
22
220kV SUBSTATION SHORNUR OPERATING MANUAL
11 kV feeder trips:
IDMT Relay- Note fault indications, whether phase fault or E/F or both and
test charge as per test charge instruction. If fault persists declare the line ‘faulty’
and inform the concerned Ele. Section Office.
11 kV SYSTEM
2 No. of 110/11 kV, 12.5MVA Transformers are in service. One set 11kV
panel board with 2 Nos. Incomers, one bus coupler, 8 Nos. outgoing feeders and
1Nos auxiliary Transformers of 11kV/440 v, 500kVA ratings are in service. The
out going feeders are: -
1) Services (Station Auxilary)
2) Kulappully
3) Chalavara
4) Cheruthuruthy
5) Vadanamkurussy
6) Aryankavu
7) Shornur
8) Vaniyamkulam
9) Industrial
12.7 PROTECTION SIGNALLING OVER COMMUNICATION
This system is for transmitting an instantaneous trip signal from one
station to another station without time delay, thereby the successful reclosing of
the feeder is ensured.
Usual settings of the distance relay implies that the 1 st zone
instantaneous tripping is set for the 80% of the line from one end and for the 2 nd
zone, the tripping is set for the remaining 20% of the line plus 40% of the next
line with a time delay of 300-450 mSec. The 3 rd zone is set beyond that with
more time delay. The same thing applies for the distance relay in the other end
also. There fore the 1st zone instantaneous tripping is applicable for the middle
60% of the line from two ends. Usually reclosing facility is provided for 1 st
zone instantaneous tripping. For the 1st 20% of the line and 80-100% of the line
from one end, the tripping sequence is different at two ends, and then the
reclosing of the line will not be successful for a 1 st zone tripping and the line
may go into a lockout condition. A fault in the 1 st part of the line will be cleared
instantaneously by the distance relay in the 1 st station, where as the same fault
will be cleared by the distance relay in the 2nd station only after 300-
23
220kV SUBSTATION SHORNUR OPERATING MANUAL
450mSec.There fore the fault current will be feeding for this much time from
the other end.
This difficulty is overcome by transmitting protection signal through
the PLCC system (Protection coupler/ (PC)) with proper interconnection with
the distance relay at both ends of the feeder.
The protection coupler senses the fault and analyses the condition
of starter relay and finally sent a valid trip to other end instantaneously, the
output of the PC will be an audio frequency signal. At the receiving end, the
protection coupler receives this AF signal through the communication network,
analyse the fault and monitor the condition of the starter relay and then give a
valid trip signal to the distance relay/master trip relay. All these signal
transmission process takes only 20-25msec of time. Tripping take place at the
both ends simultaneously. The reclosing of the feeder for the condition will be
successful.
LT Distribution system
For availing LT supply to the substation, 1nos.11kV/415V 250kVA
aux. transformers are installed near the control room. This transformer is
charged from station auxiliary feeders of the control room using 3core,
300sq.mm, Al, 11kV, XLPE cable.
12.8 2SHAR & 2SHMD CHECK SYNCHRONISING PROCEDURE
1. Check synchronisation in 2SHAR & 2SHMD feeders are put in service
through main II distance relays SEL 311C2 of the above feeders.
2. Now onwards the CLOSING shall be done only after selecting
either SYNC CHECK or BYEPASS option in the above relays.
3. If the feeder is to be check synchronised, push button PB3_SYN CHK is
to be pushed. Then LED 3 "SYN CHK ACTIVATED" will start flashing
for 5 minutes. During this 5 minutes period, if LED 4 "READY TO
SYNC" lights, the operator can close the TNC and the feeder will CLOSE
& SYNCHRONISED. An indication lamp "SYNC READY" is wired in
the control panel which is equivalent to LED 4. If LED 4 does not light,
the close pulse will not be sent to the breaker.
4. If the feeder is to be charged without sync check, push button
PB5_BYPASS is to be pushed. Then LED 5 BYPASS ACTIVATED will
start flashing for 5 minutes. During this 5 minute period, the operator can
close the CB without any check.
24
220kV SUBSTATION SHORNUR OPERATING MANUAL
25
220kV SUBSTATION SHORNUR OPERATING MANUAL
Fire
Combustion material involved Fire extinguishing Medium
Class
Fire involving ordinary solid materials Water or solution with high water
such as wood, coal, Plastic, cloth, paper, content. Cooling and melting of
Class A and packing materials Rubber etc. material help in quenching the fire.
Fire involving Flammable liquids,
vapours, solvents, Transformer Oil, Water or solution with high water
Class B Diesel oil, liquid chemicals, lubricating Content. Cooling and melting of
oils , paints Varnishes, thinner, grease material help in quenching the fire.
etc.
26
220kV SUBSTATION SHORNUR OPERATING MANUAL
27
220kV SUBSTATION SHORNUR OPERATING MANUAL
28
220kV SUBSTATION SHORNUR OPERATING MANUAL
29
220kV SUBSTATION SHORNUR OPERATING MANUAL
2SHAR FEEDER
1.LA, PT
This P/W requires S/OFF of 2SHAR feeder and necessary sanction and
load arrangement required.
1. S/OFF Line CB of 2SHAR feeder.
2. S/OFF line CB of 2SHAR FEEDER at Areacode end.
3. Opened line isolator of 2SHAR feeder.
4. Received NBC and earthed certificate from Areacode substation.
5. Closed the earth switch of 2SHAR feeder.
6. Warning board exhibited at yard and control room panel.
7. P/W Issued No.
30
220kV SUBSTATION SHORNUR OPERATING MANUAL
This P/W requires S/OFF 2SHAR feeder and necessary sanction and load
arrangement required
This P/W requires S/OFF of 2SHAR feeder &necessary sanction and load
arrangement required
This P/W requires S/OFF of 2SHAR feeder and 100MVA, Tr-II so necessary
sanction and load arrangement required
32
220kV SUBSTATION SHORNUR OPERATING MANUAL
This P/W requires S/OFF of 100MVA Tr-1 so necessary sanction and load
arrangements required
1. S/OFF 100MVA Tr-1 secondary side CB.
2. S/OFF 100MVA Tr-1 primary side CB.
3. Open 100MVA Tr-1 primary side isolator.
4. Open 100MVA Tr-1 secondary side isolator.
5. Local earth provided at both sides of the Tr-1.
6. Warning board exhibited at yard and control room panel.
7. P/W Issed No.
100MVA Tr-1 SECONDARY SIDE ISOLATOR
This P/W requires S/OFF of 100MVA Tr-1 so necessary sanction load arrangement
and 110KV bus coupling required
33
220kV SUBSTATION SHORNUR OPERATING MANUAL
This P/W requires complete shut down of 220KV supply. So necessary sanction,
feeding arrangement requires
34
220kV SUBSTATION SHORNUR OPERATING MANUAL
6. Provide local earth at upper bus jumper start point from A & B isolator
connecting joint.
7. Warning board exhibited at yard and control room.
8. P/W issue no.
This P/W requires supply interruption of 1SHOT feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV 1SHOT feeder breaker.
2. Open the line isolator of 1SHOT feeder.
3. Receive NBC and earth certificates from Ottappalam substation.
4. Closed the earth switch
5. Provide local earth on LA jumpers.
6. Warning board exhibited at yard and control room.
7. P/W issued No.
35
220kV SUBSTATION SHORNUR OPERATING MANUAL
3.CT, CB
36
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. CT, CB
This P/W requires supply interruption of 1MDSH feeder. So necessary sanction
and load arrangement requires.
1. S/OFF 110KV MDSH feeder breaker.
2. Open the line isolator and B bus isolator of 1MDSH feeder (confirm A bus
isolator is in opened condition.
3. Provide local earth at both sides of CB or CT.
4. Warning board exhibit at yard and control room panel.
5. P/W Issue No.
110KV WADAKKANCHERY (1WDSH) FEEDER
1. LA AND CONNECTING JUMPERS
This P/W requires supply interruption of 1WDSH feeder. So necessary sanction
and load arrangements requires
1. S/OFF 110KV 1WDSH feeder breaker.
2. Open the line isolator of 1WDSH feeder.
3. Receive NBC and earth certificate from Wadakkanchery substation.
4. Closed the earth switch.
5. Provide local earth on LA jumpers.
6. Warning board exhibited at yard and control room.
7. P/W Issue No.
2. LINE ISOLATOR AND EARTH SWITCH
This P/W requires supply interruption of 1WDSH feeder. So necessary sanction
and load arrangement requires
1. S/OFF 110KV WDSH feeder breaker.
2. Open the line isolator and 'B' bus isolator (confirm the 'A' bus isolator is in
opened condition).
3. Receive NBC and earth certificate from Wadakkanchery substation.
4. Close the earth switch.
5. Provide local earth at incoming side of line isolator.
6. Warning board exhibit at yard and control room.
7. P/W Issue No.
37
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. CT, CB
This P/W requires supply interruption of 1WDSH feeder. So necessary sanction
and load arrangement requires
1. S/OFF 110KV WDSH feeder breaker.
2. Open the line isolator and 'B' bus isolator of 1WDSH feeder (confirm A bus
isolator is in opened condition).
3. Provide local earth at both sides of CB or CT.
4. Warning board exhibited at yard and control room.
5. P/W Issue No.
38
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. CT, CB
This P/W requires supply interruption of 1MRSH feeder. So necessary sanction
and load arrangement requires
1. S/OFF 110KV MRSH feeder breaker.
2. Open the line isolator and B bus isolator of 1MRSH feeder( confirm A bus
isolator is in opened condition).
3. Provide local earth at both sides of CB or CT.
4. Warning board exhibited at yard and control room.
5. P/W Issue No.
110KV KOOTTANAD (1SHKO)FEEDER
1. LA AND CONNECTING JUMPERS
This P/W requires supply interruption of 1SHKO feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV feeder breaker.
2. Open the line isolator of 1SHKOfeeder.
3. Receive NBC and earth certificate from Koottanad substation.
4. Close the earth switch.
5. Provide local earth on LA jumpers.
6. Warning board exhibited at yard and control room.
7. P/W Issue No.
2.LINE ISOLATOR AND EARTH SWITCH
This P/W requires supply interruption of 1SHKO feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV SHKO feeder breaker.
2. Open the line isolator and B bus isolator( confirm the A bus isolator is in
opened condition).
3. Receive NBC and earth certificate from Koottanad substation.
4. Closed the earth switch.
5. Provide local earth at incoming side of line isolator.
6. Warning board exhibited at yard and control room.
7. P/W Issue No.
39
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. CT, CB
This P/W requires supply interruption of 1SHKO feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV SHKO feeder breaker.
2. Open the line isolator and B bus isolator of 1SHKO feeder( confirm A bus
isolator is in opened condition).
3. Provide local earth at both sides of CB or CT.
4. Warning board exhibited at yard and control room.
5. P/W Issue No.
110KV KOPPAM (1SHKP) FEEDER
1.LA AND CONNECTING JUMPERS
This P/W requires supply interruption of 1SHKP feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV feeder breaker.
2. Open the line isolator of 1SHKP feeder.
3. Receive NBC and earth certificate from Koppam substation.
4. Close the earth switch.
5. Provide local earth on LA jumpers.
6. Warning board exhibited at yard and control room.
7. P/W Issue No.
2.LINE ISOLATOR AND EARTH SWITCH
This P/W requires supply interruption of 1SHKP feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV SHKP feeder breaker.
2. Open the line isolator and B bus isolator( confirm the A bus isolator is in
opened condition).
3. Receive NBC and earth certificate from Koppam substation.
4. Closed the earth switch.
5. Provide local earth at incoming side of line isolator.
6. Warning board exhibited at yard and control room.
7. P/W Issue No.
40
220kV SUBSTATION SHORNUR OPERATING MANUAL
3. CT, CB
This P/W requires supply interruption of 1SHKP feeder. So necessary sanction and
load arrangement requires
1. S/OFF 110KV SHKP feeder breaker.
2. Open the line isolator and B bus isolator of 1SHKP feeder( confirm A bus
isolator is in opened condition).
3. Provide local earth at both sides of CB or CT.
4. Warning board exhibited at yard and control room.
5. P/W Issue No.
110KV EDAPPAL (1SHEP) FEEDER
1.LA,LINE ISOLATOR,EARTH SWITCH AND CONNECTING JUMPERS
This P/W requires supply interruption of 1SHEP feeder. So necessary sanction and
load arrangement requires
1. Instruct O/D 110KV substation Arangottukara to backfeed their 11kv
feeders.
2. S/OFF 1SHEP feeder at Shornur end.
3. Open the line isolaor of 1SHEP feeder.
4. Instruct O/D 110KV substation Edappal to open their line isolator of 1SHEP
feeder.
5. Receive confirmation message from Edappal.
6. Request NBC on 1SHEP feeder from Arangottukara.
7. Receive earthed NBC message from Arangottukara.
8. Request NBC on 1SHEP feeder from Edappal.
9. Receive earthed NBC message from Edappal.
10. Close earth switch of 1SHEP feeder at Shornur.
11. Exhibit warning board at yard and control room.
12. P/W issue No.
2.CT, CB
This P/W requires supply interruption of 1SHEP feeder. So necessary sanction and
load arrangement requires.
1. S/OFF 110KV SHEP feeder breaker.
2. Open the line isolator and B bus isolator of 1SHEP feeder (confirm A bus
isolator is in opened condition.
41
220kV SUBSTATION SHORNUR OPERATING MANUAL
42
220kV SUBSTATION SHORNUR OPERATING MANUAL
43
220kV SUBSTATION SHORNUR OPERATING MANUAL
15 RELAY
2SHAR,MAIN-1
RELAY
RELAY NAME MAKE FLAG RESET
NO.
EASUN
95ABC-R1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-B1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-Y1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
95ABC-R2 Trip circuit supervision relay ALSTOM Mechanical Upward sliding reset button
EASUN
95ABC-B2 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-Y2 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
80AB DC supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
62 Pole discrepancy relay Mechanical Upward sliding reset button
REYROLLE
EASUN
43A 1-Phase.A/R relay Mechanical Upward sliding reset button
REYROLLE
EASUN
50LBB Local breaker backup protection Mechanical Upward sliding reset button
REYROLLE
EASUN
86 Master tripping Mechanical Upward sliding reset button
REYROLLE
EASUN
50LBB/2T Timer for 50LBB Mechanical Upward sliding reset button
REYROLLE
EASUN
Carrier healthy Mechanical Upward sliding reset button
REYROLLE
EASUN
43B 3-phase A/R relay Mechanical Upward sliding reset button
REYROLLE
EASUN
21XR Contact milti.relay for 21,21XB Mechanical Upward sliding reset button
REYROLLE
EASUN
67R S/P IDMTL over current relay Mechanical Upward sliding reset button
REYROLLE
EASUN
67N S/P IDMTL earth fault relay Mechanical Upward sliding reset button
REYROLLE
EASUN
67B S/P IDMTL over current relay Mechanical Upward sliding reset button
REYROLLE
27 EASUN
Dead line charging Mechanical Upward sliding reset button
B/BX/271 REYROLLE
EASUN
Isolator interlock Mechanical Upward sliding reset button
REYROLLE
44
220kV SUBSTATION SHORNUR OPERATING MANUAL
2MDSH,MAIN 1
RELAY
RELAY NAME MAKE FLAG RESET
NO.
EASUN
95ABC-R1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-B1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-Y1 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
95ABC-R2 Trip circuit supervision relay ALSTOM Mechanical Upward sliding reset button
EASUN
95ABC-B2 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
95ABC-Y2 Trip circuit supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
80AB DC supervision relay Mechanical Upward sliding reset button
REYROLLE
EASUN
62 Pole discrepancy relay Mechanical Upward sliding reset button
REYROLLE
EASUN
43A 1-Phase.A/R relay Mechanical Upward sliding reset button
REYROLLE
EASUN
50LBB Local breaker backup protection Mechanical Upward sliding reset button
REYROLLE
EASUN
86 Master tripping Mechanical Upward sliding reset button
REYROLLE
EASUN
50LBB/2T Timer for 50LBB Mechanical Upward sliding reset button
REYROLLE
EASUN
Carrier healthy Mechanical Upward sliding reset button
REYROLLE
EASUN
43B 3-phase A/R relay Mechanical Upward sliding reset button
REYROLLE
EASUN
21XR Contact milti.relay for 21,21XB Mechanical Upward sliding reset button
REYROLLE
EASUN
67R S/P IDMTL over current relay Mechanical Upward sliding reset button
REYROLLE
EASUN
67N S/P IDMTL earth fault relay Mechanical Upward sliding reset button
REYROLLE
EASUN
67B S/P IDMTL over current relay Mechanical Upward sliding reset button
REYROLLE
27 EASUN
Dead line charging Mechanical Upward sliding reset button
B/BX/271 REYROLLE
EASUN
Isolator interlock Mechanical Upward sliding reset button
REYROLLE
45
220kV SUBSTATION SHORNUR OPERATING MANUAL
220/110KV,100MVA,TFR1,220KV SIDE
46
220kV SUBSTATION SHORNUR OPERATING MANUAL
220/110KV,100MVA,TFR2,220KV SIDE
RELAY
RELAY NAME MAKE FLAG RESET
NO.
220/110KV,100MVA,TFR1,110KV SIDE
RELAY
RELAY NAME MAKE FLAG RESET
NO.
Upward sliding reset
86 Trip relay ALSTOM Mechanical
button
Upward sliding reset
64R Rest.E/F protection relay ALSTOM Mechanical
button
47
220kV SUBSTATION SHORNUR OPERATING MANUAL
220/110KV,100MVA,TFR2,110KV SIDE
RELAY
RELAY NAME MAKE FLAG RESET
NO.
64R Rest.E/F protection relay ALSTOM Mechanical Upward sliding reset button
Aux.Buch/Wndg temp.trip
30AB ALSTOM Mechanical Upward sliding reset button
relay
30CD Aux.oil temp.trip/spare relay ALSTOM Mechanical Upward sliding reset button
50/51A o/c protection A phase ALSTOM Mechanical Upward sliding reset button
50/51C o/c protection B phase ALSTOM Mechanical Upward sliding reset button
50/51N E/F protection A phase ALSTOM Mechanical Upward sliding reset button
48
220kV SUBSTATION SHORNUR OPERATING MANUAL
1MDSH
Distance
21 SEL LED Push button
relay(Numerical)
Distance and
EASUN Upward sliding reset
67R backup o/c REYROLLE
Mechanical
button
relay(IDMTL)
Distance and
EASUN Upward sliding reset
67N backup Mechanical
REYROLLE button
E/Frelay(IDMTL)
Distance and
EASUN Upward sliding reset
67B backup o/c Mechanical
REYROLLE button
relay(IDMTL)
EASUN Upward sliding reset
75A PT selection relay REYROLLE Mechanical button
49
220kV SUBSTATION SHORNUR OPERATING MANUAL
1WDSH
RELAY
RELAY TYPE MAKE FLAG RESET
NO.
21 Distance relay(Numerical) SEL LED Push button
75A PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
75B PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
80AB DC source 1&2 supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
96 LBB trip relay EASUN REYROLLE Mechanical Upward sliding reset button
86 Master trip relay EASUN REYROLLE Mechanical Upward sliding reset button
52X Contact multi.relay for CB EASUN REYROLLE Mechanical Upward sliding reset button
86-95/86 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
86-95/96 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
1MRSH
RELAY
RELAY TYPE MAKE FLAG RESET
NO.
21 Distance relay(Numerical) SEL LED Push button
75A PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
75B PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
80AB DC source 1&2 supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
96 LBB trip relay EASUN REYROLLE Mechanical Upward sliding reset button
86 Master trip relay EASUN REYROLLE Mechanical Upward sliding reset button
52X Contact multi.relay for CB EASUN REYROLLE Mechanical Upward sliding reset button
86-95/86 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
86-95/96 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
50
220kV SUBSTATION SHORNUR OPERATING MANUAL
1SHKP
RELAY
RELAY TYPE MAKE FLAG RESET
NO.
EASUN
75A PT selection relay Mechanical Upward sliding reset button
REYROLLE
EASUN
75B PT selection relay Mechanical Upward sliding reset button
REYROLLE
EASUN
96 LBB trip relay Mechanical Upward sliding reset button
REYROLLE
EASUN
86 Master trip relay Mechanical Upward sliding reset button
REYROLLE
EASUN
52X Contact multi.relay for CB Mechanical Upward sliding reset button
REYROLLE
86- EASUN
Trip circuit supervision relay Mechanical Upward sliding reset button
95/86 REYROLLE
86- EASUN
Trip circuit supervision relay Mechanical Upward sliding reset button
95/96 REYROLLE
EASUN
Carrier healthy relay-COX Mechanical Upward sliding reset button
REYROLLE
EASUN
30ABC Auxiliary relay Mechanical Upward sliding reset button
REYROLLE
1SHOT
RELAY
RELAY TYPE MAKE FLAG RESET
NO.
21 Distance relay(Numerical) SEL LED Push button
67R Distance and backup o/c EASUN REYROLLE Mechanical Upward sliding reset button
51
220kV SUBSTATION SHORNUR OPERATING MANUAL
relay(IDMTL)
75A PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
75B PT selection relay EASUN REYROLLE Mechanical Upward sliding reset button
80AB DC source 1&2 supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
96 LBB trip relay EASUN REYROLLE Mechanical Upward sliding reset button
86 Master trip relay EASUN REYROLLE Mechanical Upward sliding reset button
52X Contact multi.relay for CB EASUN REYROLLE Mechanical Upward sliding reset button
86-95/86 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
86-95/96 Trip circuit supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
Carrier healthy relay-COX EASUN REYROLLE Mechanical Upward sliding reset button
30ABC Auxiliary relay EASUN REYROLLE Mechanical Upward sliding reset button
30D Auxiliary relay EASUN REYROLLE Mechanical Upward sliding reset button
89EX Contact multi.relay for ES EASUN REYROLLE Mechanical Upward sliding reset button
89
Contact multi.for isolator EASUN REYROLLE Mechanical Upward sliding reset button
AX/BX/LX
1SHPP
96 LBB Trip relay EASUN REYROLLE Mechanical Upward sliding reset button
25 Check synchronizing relay EASUN REYROLLE Mechanical Upward sliding reset button
89AX/BX Isolator auxiliary EASUN REYROLLE Mechanical Upward sliding reset button
89AX/BX Isolator auxiliary EASUN REYROLLE Mechanical Upward sliding reset button
80A Control DC supervision relay EASUN REYROLLE Mechanical Upward sliding reset button
27B/BX/27L Dead line charging EASUN REYROLLE Mechanical Upward sliding reset button
195 ABC Trip circuit supervision TC-1 EASUN REYROLLE Mechanical Upward sliding reset button
295 ABC Trip circuit supervision TC-2 EASUN REYROLLE Mechanical Upward sliding reset button
52
220kV SUBSTATION SHORNUR OPERATING MANUAL
1SHKO
53
220kV SUBSTATION SHORNUR OPERATING MANUAL
SEL RELAY
54
220kV SUBSTATION SHORNUR OPERATING MANUAL
55
220kV SUBSTATION SHORNUR OPERATING MANUAL
56
220kV SUBSTATION SHORNUR OPERATING MANUAL
57
220kV SUBSTATION SHORNUR OPERATING MANUAL
58
220kV SUBSTATION SHORNUR OPERATING MANUAL
59
220kV SUBSTATION SHORNUR OPERATING MANUAL
60
220kV SUBSTATION SHORNUR OPERATING MANUAL
61
220kV SUBSTATION SHORNUR OPERATING MANUAL
62
220kV SUBSTATION SHORNUR OPERATING MANUAL
63
220kV SUBSTATION SHORNUR OPERATING MANUAL
64
220kV SUBSTATION SHORNUR OPERATING MANUAL
65
220kV SUBSTATION SHORNUR OPERATING MANUAL
66
220kV SUBSTATION SHORNUR OPERATING MANUAL
67
220kV SUBSTATION SHORNUR OPERATING MANUAL
68
220kV SUBSTATION SHORNUR OPERATING MANUAL
69
220kV SUBSTATION SHORNUR OPERATING MANUAL
70
220kV SUBSTATION SHORNUR OPERATING MANUAL
71
220kV SUBSTATION SHORNUR OPERATING MANUAL
72
220kV SUBSTATION SHORNUR OPERATING MANUAL
73
220kV SUBSTATION SHORNUR OPERATING MANUAL
74
220kV SUBSTATION SHORNUR OPERATING MANUAL
75
220kV SUBSTATION SHORNUR OPERATING MANUAL
76
220kV SUBSTATION SHORNUR OPERATING MANUAL
77
220kV SUBSTATION SHORNUR OPERATING MANUAL
78
220kV SUBSTATION SHORNUR OPERATING MANUAL
79
220kV SUBSTATION SHORNUR OPERATING MANUAL
80
220kV SUBSTATION SHORNUR OPERATING MANUAL
81
220kV SUBSTATION SHORNUR OPERATING MANUAL
82
220kV SUBSTATION SHORNUR OPERATING MANUAL
83
220kV SUBSTATION SHORNUR OPERATING MANUAL
84
220kV SUBSTATION SHORNUR OPERATING MANUAL
85
220kV SUBSTATION SHORNUR OPERATING MANUAL
86
220kV SUBSTATION SHORNUR OPERATING MANUAL
87
220kV SUBSTATION SHORNUR OPERATING MANUAL
88
220kV SUBSTATION SHORNUR OPERATING MANUAL
89
220kV SUBSTATION SHORNUR OPERATING MANUAL
90
220kV SUBSTATION SHORNUR OPERATING MANUAL
91
220kV SUBSTATION SHORNUR OPERATING MANUAL
92
220kV SUBSTATION SHORNUR OPERATING MANUAL
93
220kV SUBSTATION SHORNUR OPERATING MANUAL
94
220kV SUBSTATION SHORNUR OPERATING MANUAL
95
220kV SUBSTATION SHORNUR OPERATING MANUAL
96
220kV SUBSTATION SHORNUR OPERATING MANUAL
97
220kV SUBSTATION SHORNUR OPERATING MANUAL
98
220kV SUBSTATION SHORNUR OPERATING MANUAL
99
220kV SUBSTATION SHORNUR OPERATING MANUAL
100
220kV SUBSTATION SHORNUR OPERATING MANUAL
101
220kV SUBSTATION SHORNUR OPERATING MANUAL
102
220kV SUBSTATION SHORNUR OPERATING MANUAL
103
220kV SUBSTATION SHORNUR OPERATING MANUAL
104
220kV SUBSTATION SHORNUR OPERATING MANUAL
105
220kV SUBSTATION SHORNUR OPERATING MANUAL
106
220kV SUBSTATION SHORNUR OPERATING MANUAL
107
220kV SUBSTATION SHORNUR OPERATING MANUAL
108
220kV SUBSTATION SHORNUR OPERATING MANUAL
109