HARYANA VIDYUT PRASARAN NIGAM LIMITED

TECHNICAL SPECIFICATION NO.92-3 (R-1) (220kV)/


DGM-1441

FOR

DIGITAL TIMER FOR MEASUREMENT OF


BREAKER TIMINGS
(Suitable for use upto 220kV S/Stns.)

(M&P WING)

CHIEF ENGINEER, MM,


HVPNL, PANCHKULA

MAY-2016
GENERAL REQUIREMENTS

1.0 SCOPE:

1.1 This specification covers the design, engineering, manufacture, inspection & testing at
manufacturer’s work before dispatch, packing, forwarding and delivery at the discretion of
Purchaser of various testing equipment listed in the schedule of requirements at Annexure-A.
1.2 Unless specifically excluded from the offer, all fittings and accessories, not specifically
stated in this specification but which are necessary for satisfactory operation of the scheme or
to complete the work in a good workman like manner shall be deemed to have been included
in the scope of supply of the Bidder.

1.3 The Demonstration of the equipment in live EHV switchyard upto 220kV S/Stn. and
satisfactory performance as per GTP requirement i.e. the consistency and repeatability of test
results shall be the criteria of acceptability of successful bidder thereafter part-II (price bid) of
the tender shall be opened.

2.0 SERVICE CONDITIONS:

Equipment to be supplied against this specification shall be suitable for satisfactory


continuous operation under the following tropical conditions:-

i. Location IN THE STATE OF HARYANA


0
ii. Max. ambient air temp ( C) 50
iii. Min. ambient air temp (0C) -2.5
iv. Max. relative humidity (%) 100
v. Min. relative humidity (%) 26
vi. Average annual rainfall (mm). 900
vii. Max. Wind pressure (kg/sq.m) 195
viii. Max.Altitude above mean sea level (meters) 1000
ix. Isoceraunic level (days/year) 50
x. Seismic level (horizontal acceleration) 0.3g

Note: Moderately hot and humid tropical climate conducive to rust and fungus growth. The
climatic conditions are also prone to wide variations in ambient conditions.

3.0 MATERIAL AND WORKMANSHIP:

All the materials used in the construction of the equipment shall be of the best quality
obtainable of their respective kinds and whole of the work shall be of the highest class, well
finished and of approved design and make. Castings shall be free from blow-holes, flaws,
cracks or other defects and shall be smooth grained and of true dimensions and forms.
4.0 DEPARTURE FROM THE SPECIFICATIONS:

Should the tenderer wish to depart from provision of this specification either on account
of a manufacturing practice or for any other reasons, he will draw specific attention to the
proposed points of departure on the prescribed performa (enclosed) at Annexure-B in his
tender and submit such full information, drawings & specifications as will enable the merit the
merit of his proposal to be appreciated.

In the event of contractor drawings, specification and table etc. disagreeing with this
specification during the execution of the contract, this specification shall be held binding unless
the departures have been fully recorded as required above.

5.0 SITE DEMONSTRATION:-

The successful bidder(s) will be required to demonstrate the performance of their


offered equipment(s) at four locations in Haryana so as to familiarize the purchaser’s
Engineers/technicians for use of a given testing equipment. These demonstrations will be free
of charge & will be planned soon after the supplies are made so as to make use of the testing
equipments. Apart from the detailed demonstration at site, the supplier shall also have to
arrange necessary training to HVPNL engineers.
6.0 NAME PLATE:

An easily accessible engraved or painted name plate shall be provided on each


equipment. It must include purchase order No., supplier’s reference No. & item number as per
purchase order.

7.0 INSPECTION AT MANUFACTURERS WORKS:

7.1 All equipment shall be subject to routine tests according to the relevant standards and to
such other tests as may be required to ensure that all equipment is satisfactory and in
accordance with this specification. The Purchaser reserves the right to witness all the tests,
unless dispensed with in writing by the purchaser.

7.2 The supplier shall give sufficient advance intimation at least 15 days notice to the
purchaser to enable him to depute his representative for witnessing the tests to prove the test
equipment.

8.0 GENERAL TECHNICAL REQUIREMENT:

(i) Supply Voltage : Single Phase AC, 230 Volt +10%


(ii) Frequency : 50 Hz + 3%

(iii) The testing set shall be capable of working in hostile condition of electrostatic field
prevailing in charged HV/EHV Substations up to 220 kV of high voltage and of high
interference environment.
9.0 DOCUMENTATION:

The supplier shall furnish nicely printed and bound volumes of the instruction manuals in
English language, prior to the dispatch of the equipment. The instruction manual shall
contain step by step instructions for all operational & maintenance requirements for all
the testing equipments. If should also include the GA & detailed schematic drawings
including internal wiring diagram of the various equipments to facilitate its repair at site
incase of any defect.

The number of sets of instruction manuals to be supplied shall be as under: -

i) Two sets for CE/MM, HVPNL, Panchkula


ii) Five sets separately bound for each item for SE/M&P-Cum-Carrier Circle,
HVPNL, Delhi & five sets for SE/M&P-Cum-Carrier Circle, HVPNL, Ambala.

III PORTABLE CIRCUIT BREAKER TRIPPING & CLOSING TIME RECORDER

The portable instrument suitable for measuring the tripping and close time
of Circuit Breakers (up to 220 kV level) shall conform to following:-

Power : 230V AC+ 10%, 50Hz + 3%

Output : LCD Display

Paper : -
Ranger : 0 to 999 milliseconds or better, within + 0.1
millisecond (min.)
Accuracy : + 0.5%
Measurement : 6 (upto 2 main, 3 Pole simultaneously i.e. 6 main
simultaneously).
Mode : Close, open & close-open
Clock accuracy : 0.002%
Least count : 1 milli-second
Burden : 30VA (Max.)

Instrument shall be hand held/portable and shall be battery operated having PC


interface with minimum 100 record memory.

Accessories : i) Properly insulated leads of red, yellow & blue


colours each measuring 15 meter with proper connectors for
its connections with the circuit breaker & testing instruments.
ii) Properly insulated leads for making other
connections of tripping, closing, dc & earthing etc. The length
shall be sufficient to make connections and these shall be of
suitable colours along with the necessary connectors with
the equipment under test and testing equipment.
iii) The instrument shall be housed in a robust
moulded carrying case and shall be specifically insulated
against the inductive & electrostatic field present in the live HV
Grid S/Stn. yard.
Calibration Box Calibration Box may be provided to check the accuracy of the
testing set.

Environment The test kit shall be compatible for EMC/EMI/safety environment


requirement as per IEC.

Dual Ground The testing kit shall be able to perform tests with dual ground on
Operation both side of the breaker.
Coil current The testing kit shall be able to measure currents taken by closing
measurement and tripping coils and thus resistances of coils. The kit shall have
sufficient number of channels with Hall-Effect sensor with current
Range ±20A DC to 5 kHz AC or more.
With Accuracy ± (0.5 % reading ± 0.1 % FS). And shall be able
to generate Graphic presentation of currents waveform which
shall be displayed with a resolution of 0.1 ms.
Should measure and plot the graph of individual Coil Current and
voltages of all (3 Close + 3 Trip) Coils simultaneously with
Timing Measurement. Automatic measurement of the timing of
the Auxiliary Contact Pair (NO and NC) in series to Coil.
GUARANTEED TECHNICAL PARTICULARS OF DIGITAL TIMER FOR
MEASUREMENT OF BREAKER TIMINGS
(SUITABLE FOR USE AT SUB STATIONS OF VOLTAGE LEVEL UP TO 220 KV)
SR. DESCRIPTION AS PER PARTICULARS
NO. TECHNICAL PARAMETERS

1 NAME OF THE MANUFACTURER

2 POWER

3 OUTPUT

4 PAPER

5 RANGER

6 ACCURACY

7 MEASUREMENT

8 MODE

9 CLOCK ACCURACY

10 LEAST COUNT

11 BURDEN

12 PHYSICAL SPECIFICATION

13 ACCESSORIES

14 CALIBRATION BOX

15 ENVIRONMENT

16 DUAL GROUND OPERATION

17 COIL CURRENT MEASUREMENT

18 ANY DEVIATION FROM TECHNICAL


SPECIFICATION, IF ANY