Академический Документы
Профессиональный Документы
Культура Документы
Rick Pollman
Managing forecasts
Quick review of last year’s enhancements
Waterfall – Material Shortages
Managing multiple resources within a work center
Individual Operation Overlap
Shipping Buffer by Item
Planned Order Time Fence
Operation Delay Time – Group Mode
Forecast split
Split monthly number into weekly numbers
Extract
VPi
Configuration Cancel
DbUtility Settings
VPi Planning
Engine
Load data and
Map Data and split forecast
perform forecast
Write Schedule Pass consumption
VPi Database
Microsoft Access / SQL Server database
Extract
VPi
Configuration Cancel
DbUtility Settings
VPi Planning
Engine
Load data and
Map Data and split forecast
perform forecast
Write Schedule Pass consumption
VPi Database
Microsoft Access / SQL Server database
Extract
VPi
Configuration Cancel
DbUtility Settings
VPi Planning
Engine
Load data and
Map Data and split forecast
perform forecast
Write Schedule Pass consumption
VPi Database
Microsoft Access / SQL Server database
Component Level
CMPOC10 BOM Where Used
Planning Bill
PBCOLOR Planning Bill
Product Family
PFCOLOR Product Family
Option to print
Option to export to Excel spreadsheet
MACHINE
WORKCENTER_ID START_DATE END_DATE UNITS
LTH1NC 5/10/2010 5/10/2010 1 Override WKCTR fixed
LTH1NC 5/12/2010 5/13/2010 6 Units utilizing the
LTH1NC 5/14/2010 5/17/2010 1
MACHINE table
WKCTR
WORKCENTER_ID UNITS UTILIZATION CALENDAR_ID
LTH1NC 3 1 18_HOUR
MACHINE
WORKCENTER_ID START_DATE END_DATE UNITS
LTH1NC 5/10/2010 5/10/2010 1 Standard Capacity
LTH1NC 5/12/2010 5/13/2010 6 3(units) * 18(hours) = 54
LTH1NC 5/14/2010 5/17/2010 1
hours
WKCTR
WORKCENTER_ID UNITS UTILIZATION CALENDAR_ID
LTH1NC 3 1 18_HOUR Manage the
capacity by
MACHINE changing the
WORKCENTER_ID START_DATE END_DATE UNITS number of units
LTH1NC 5/10/2010 5/10/2010 1
LTH1NC 5/12/2010 5/13/2010 6 available for
LTH1NC 5/14/2010 5/17/2010 1 specific time
frames.
WKCTR
WORKCENTER_ID UNITS UTILIZATION CALENDAR_ID
LTH1NC 3 1 18_HOUR
MACHINE
WORKCENTER_ID START_DATE END_DATE UNITS 1(unit) * 18(hours) = 18 Hours
LTH1NC 5/10/2010 5/10/2010 1
LTH1NC 5/12/2010 5/13/2010 6
LTH1NC 5/14/2010 5/17/2010 1
WKCTR
WORKCENTER_ID UNITS UTILIZATION CALENDAR_ID
LTH1NC 3 1 18_HOUR
MACHINE
WORKCENTER_ID START_DATE END_DATE UNITS 6(units) * 18(hours) = 108 Hours
LTH1NC 5/10/2010 5/10/2010 1
LTH1NC 5/12/2010 5/13/2010 6
LTH1NC 5/14/2010 5/17/2010 1
WKCTR
WORKCENTER_ID UNITS UTILIZATION CALENDAR_ID
LTH1NC 3 1 18_HOUR
MACHINE
WORKCENTER_ID START_DATE END_DATE UNITS 1(unit)
1(unit)**18(hours)
18(hours)==18
18Hours
Hours
LTH1NC 5/10/2010 5/10/2010 1
LTH1NC 5/12/2010 5/13/2010 6
LTH1NC 5/14/2010 5/17/2010 1
Original Design
Required you to know the work center capacity (i.e.: 8, 16, 24 hrs)
and multiply by 3,600 seconds times the number of days
Operation Delay Time cont.
By Work Center
Weekly or Monthly
buckets