Вы находитесь на странице: 1из 10

JOB: Bosasso District 2KM TARMAC ROAD

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY
($) (USD)

ELEMENT NO. 1: PRELIMINARY/SUPPORT SERVICE

1.01 Allow for contractor overheads for mobilization / LS 3,000.00 1 3,000.00


demobilization of labour, plant and equipment.

1.02 Allow for survey works for setting out horizontal/ LM 2000.00 0.3 600.00
verical alignment and width of road.

Total of Bill carried forward to summary 3,600.00

ELEMENT NO. 2 : ROAD CLEARANCE

2.01 Remove top soil and or accumulated silt to a depth m² 14,000 2 28000
as directed by the Engineer and stockpile for reuse or
cart to spoil as required.

Total of Bill carried forward to summary 28,000.00

ELEMENT NO. 3: EARTHWORKS

No separate payment shall be made for the overhaul


material and the cost of such haulage shall be
included in the rates and/ or prices.

3.01 m³ 1,400 12 16800


Excavate specified portions (from chainage 1+200 to
2+000), and provide & arrage appropriately hand
packed stones at specified portions with challenging
drainage. Upto 800m maximum.

3.02
Compaction of 250mm below formation level in fill to
95 - 98% MDD m³ 3,500 2 7000

Total of Bill carried forward to summary 23,800.00


RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY
($) (USD)

ELEMENT NO. 4: DRAINAGE WORKS

4.01 Excavation for side drains on both extremes to


specifications, approximately 0.5 m deep and 0.5m
wide with side slope at 2:1 m³ 1000 2 2000

4.02 Provide and place course aggregate base, few fines m³ 500 10 5000
to constitute 250mm base layer to concrete drainage
channells appropriately.

4.03 Provide 100mm thick class 15 concrete for side


drains. Set elevations to slope appropriately. m³ 220 110 24200

4.04 Provide adequately reinforced class 25 concrete in


100mm thickness as drifts to allow for water passage unit 6 250 1500
at cross-roads.

Total of Bill carried forward to summary 32,700.00

ELEMENT NO. 5: NATURAL MATERIAL SUBBASE AND BASE

No overhaul will be paid for separately under this


item and the cost of hauling will be deemed to have
been included in the rates.

5.01 Provide,place,water process and compact to 95% m³ 2,100 10 21000


MDD (AASHTO T180) course aggregate base, few
fines to constitute 150mm base layer

Total of Bill carried forward to summary 21,000.00


RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY
($) (USD)

ELEMENT NO. 6: BITUMINOUS SURFACE TREATMENT & SURFACE DRESSING

No overhaul will be paid for separately under this


item and the cost of hauling will be deemed to have
been included in the rates.

6.01 Spray MC 30 cut-back bitumen as prime coat to m2 14,000 2 28000


carriageway, shoulders and junctions at 1.0-1.2
lts/m2
Prepare surface of carriageway, shoulders and
6.02 junctions, provide, heat and spray 80/100 bitumen m2 14,000 2 28000
binder (cutback by kerosene) as first and second seal
at a rate of 1.0-1.41/m2

6.03 Provide, transport, lay, and roll 14/20mm class 1 m³ 1,400 20 28000.00
chippings for 100mm thick 1st seal to carriageway,
shoulders and junctions at a rate of 60-90 m2/m3

6.04 Provide, transport, lay, and roll 6/10mm class 1 m³ 560 20 11200.00
chippings for 40mm thick 2nd seal to carriageway at
a rate of 100-130m2/m3

Total of Bill carried forward to summary 95,200.00

ELEMENT NO. 7: ROAD FURNITURE

7.01 Provide and erect where necessary and/or where No. 6 30 180
instructed new galvanized steel plate road signs of
high intensity grade reflective sheeting on standard
single hot dip galvanized steel pipe with internal
diameter of 75mm used for the sign post.

7.02 Provide and apply 10cm thick thermo plastic road


marking paint in yellow colour as required by the LS 1 2000 2000
highway authority
Total of Bill carried forward to summary 2180

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY
($) (USD)

SUMMARY

1 PRELIMINARY/SUPPORT SERVICE 3,600.00

2 ROAD CLEARANCE 28000

3 EARTHWORKS 23,800.00

4 DRAINAGE WORKS 32,700.00

5 NATURAL MATERIAL SUBBASE AND BASE 21000

6 BITUMINOUS SURFACE TREATMENT & SURFACE DRESSING 95,200.00

7 ROAD FURNITURE 2180

Grand Total Carried ###


ELEMENT NO. 9: RIGID PAVEMENT

No overhaul will be paid for separately under this


item and the cost of hauling will be deemed to have
been included in the rates.
concrete
Formwork for formed surface finishes

Supply, erect and dismantle all formwork moulds


made of steel as directed. This include striaght,
curved, plain or tapered sections.

AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE ($)
(USD)

250mm high to sides of the pavement slab panel of


9.01 LS 1,000 1,000.00
(3.5m x 6m)

Blinding concrete
Supply vibrated plain concrete class 15/20 with crushed
aggregates as described:

9KM + 600M to 9KM + 700M

9.02 Provide Class 15 concrete (1:4:8) as blinding m³ 40.00 35 1,400.00

10KM + 300M to 11KM + 500M

9.03 Provide Class 15 concrete (1:4:8) as blinding m³ 459.00 35 16,065.00


Reinforcement
High Yield steel reinforcement bars,
characteristic strength not less than 425N/mm2,
to BS 4466:1969, cut, bent, and fixed including
all necessary binding wire and spacer bars:

9KM + 600M to 9KM + 700M

Dowels 20mm Diameter bars 400mm


9.04 long@300mm spacing Kg 681.06 1.75 1,191.86

Ties 12mm Diameter bars , 750mm long @


9.05 spacing of 600mm Kg 366.3 1.75 641.025
12mm main reforcement bars to slab @ 250mm
9.06 both directions
Kg 5,683.20 1.75 9,945.60

10KM + 300M to 11KM + 500M

Dowels 20mm Diameter bars 400mm


9.07 long@300mm spacing
Kg 8,650.92 1.75 15,139.11

Ties 12mm Diameter bars , 750mm long @


9.08 spacing of 600mm
Kg 4,395.60 1.75 7,692.30

12mm main reforcement bars to slab @ 250mm


9.09 both directions
Kg 62,657 1.75 109,649.75

Reinforced Structural Concrete

Cast in-situ vibrated reinforced concrete mix


1:2:4 Crushed aggregate as described:

Total of Bill carried forward to next page 162,724.64


AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE ($)
(USD)

Total of Bill brought forward from previous page 162,724.64

9KM + 500M to 9KM + 700M

In panels of 3.5m x 6m and thickness of 250mm


9.10 and laid to falls of 2.5%
m³ 160 75 12,000.00

10KM + 300M to 11KM + 500M


In panels of 3.5m x 6m and thickness of 250mm
9.11 and laid to falls of 2.5%
m³ 1,764.00 75 132,300.00

Total of Bill carried forward to summary 307,024.64

BILL NO.10: ROAD FURNITURE

10.01 Provide and erect priority type signs 1000mm size Nr 4 100 400.00
10.02 Provide and erect warning type signs 1000mm size Nr 4 100 400.00

10.03 Paint 0.1 m wide yellow centerline on the road m² 1 1,900.00 1,900.00

Paint 0.1 m wide white lines on the road edge


10.04 m² 1 1,900.00 1,900.00
marking as shown

Total of Bill carried forward to summary 4,600.00

BILL NO.11: MISCELLANEOUS

Provision of 10 speeds bumbs at 5 designated


11.01 Nr 10 100 1,000.00
pedestrian crossing points

Allow for unblocking of culverts on the exisitng rigid


11.02 LS 1 1,000.00 1,000.00
pavement and for minor repairs

Total of Bill carried forward to summary 2,000.00

AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE ($)
(USD)

SUMMARY

PRELIMINARY/SUPPORT SERVICE #REF!

ROAD CLEARANCE #REF!

1.2KM SIDE DRAIN #REF!

3 NO 500M LONG DRAIN #REF!

CULVERT #REF!

EARTHWORKS #REF!
NATURAL MATERIAL SUBBASE #REF!

PASSAGE OF TRAFFIC #REF!

RIGID PAVEMENT 307,024.64

ROAD FURNITURE 4600.00

MISCELLANEOUS 2,000.00

Grand Total Carried #REF!