Вы находитесь на странице: 1из 31

ECOPETROL BARRANCABERMEJA FWUSAC

SPECIFICATION No: 123939-60A3


BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 2 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

CONTENTS

TITLE PAGE 1

CONTENTS 2

I. PURPOSE 3
II. SCOPE 3
III. REFERENCE DOCUMENTS 3
A. Project Job Specifications 3
B. Applicable Standards 4
IV. DEFINITIONS 4
V. GENERAL 6
VI. FUNCTIONAL IDENTIFICATION 11
VII. LOOP IDENTIFICATION 16
VIII. SYMBOLS 16
ATTACHMENT A. ALLOWABLE FIRST LETTERS 18
ATTACHMENT B. INSTRMENT MEASUREMENT NOTAION TABLE 21
ATTACHMENT C. LEGEND AND SYMBOLS DRAWINGS 22
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 3 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

I. PURPOSE

This Job Specification provides criteria for the uniform and consistent
presentation of Instrument and Control Symbology and Identification on P&ID’s for
the ECOPETROL Barrancabermeja Refinery Modernization Project (PMRB) -
Barracabermeja, Colombia.

II. SCOPE

Instrumentation Symbols and Identification shall be in accordance with the


Standard ANSI/ISA-5.1-2009 and the additional definitions, statements,
requirements and exceptions described in the following sections of this Job
Specification. These additional definitions, statements and requirements detail
and describe the selected numbering scheme, graphic symbol, and other choices
required by ANSI/ISA-5.1-2009.

This Specification covers the generation of new P&IDs. It also applies to P&ID’s
provided by packaged equipment suppliers and to tagging conventions used in the
instrument database.

This document provides design guidelines for the P&ID symbol and identification
conventions associated with Instrumented Control Systems including the tagging
used for identifying hard & soft tags.

This document also provides several typical P&ID representations of the symbols
as linked to field sensing devices, motor and valve controls. The intention of
this document is to clarify how to represent Instrumentation symbols on P&IDs,
not to provide all details how to implement the control systems.

III. REFERENCE DOCUMENTS

A. Project Job Specifications

123939-00A1 Basic Engineering Data

123939-60A1 Instrument Basis of Design

123939-60A16 SPI Automation Practice

123939-60A18 Control Systems-Electrical Interface


ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 4 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

B. Applicable Standards

ANSI/ISA-5.1-2009 Instrumentation Symbols and Identification.

IV. DEFINITIONS

“must” or “shall” A mandatory requirement for which exceptions will


not normally be granted.

“should” A preferred course of action for which exceptions


will be granted for a superior course of action.

“may” An acceptable course of action for which exceptions


will be granted for equal or better course of
action.

Instrumentation Process measurement, monitoring, controlling, and


interlocking devices and equipment.

Instrument System A collection of instrumentation that is specifically


designed and configured to perform a unique
function, such as, distributed control, safety
instrumented systems, process stream analysis, etc.

Owner ECOPETROL or its designated representative (EPC


Contractor, Contractor, in the sense of prime
contractor)

EPC CONTRACTOR Engineering, Procurement and Construction


Contractor. FPJV or its designated representative.

Fail Closed (FC) The characteristic of an automated valve that


results in the valve closing as a result of specific
malfunctions, including loss of signal or motive
power (Reference ISA S5.1.).

Fail Indeterminate (FI) The characteristic of an automated valve that


results in the valve moving to an unknown position
as a result of specific malfunctions, including loss
of signal or motive power. Some automated valves
will not stay at the last position upon failure and
will instead move with the process differential
pressure. Additional equipment may be needed to meet
the definition of FC, FO or FL. (Reference ISA
S5.1.).

Fail Locked (FL) Last Position: The characteristic of an automated


valve that results in the valve remaining in the
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 5 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

last (locked) position as a result of specific


malfunctions, including loss of signal or motive
power. Automated valves may fail indeterminate
without additional equipment. (Reference ISA S5.1.).

Fail Open (FO) The characteristic of an automated valve that


results in the valve opening as a result of specific
malfunctions, including loss of signal or motive
power (Reference ISA S5.1.).

Hand Switch (HS) Any operator manipulated discrete control device,


including hardwired panel switches and software
points.

Interlock A system that, in response to a predetermined


condition, initiates a predefined action. Typically
comprised of binary (on - off) signals and logic
used for process control, sequencing or protective
interruption of normal process control functions.
Protective interlocks are typically further defined
as being either safety related or commercial (asset
or production protection) related.

Logic solver The control equipment that performs the logic


function. It can be either hardwired (e.g., relays)
or Programmable Electronic Systems (e.g., DCS or PLC
based, including dual or triple redundant
microprocessors).

Loop Number A number that identifies a related collection, or


group, of instrument devices and control functions.

Piping & Instrumentation A detailed graphical representation of a process


Diagram (P&ID) including the hardware and software (e.g. piping,
equipment, instrumentation) necessary to design,
construct and operate the facility. Common synonyms
for P&ID's include EFD's (Engineering Flow
Diagrams), UFD's (Utility Flow Diagrams) and MFD's
(Mechanical Flow Diagrams).

Tag Number Unique identification number for an individual


instrument device or control function
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 6 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

V. GENERAL

A. Instruments shall be identified (tagged) by a system of letters and numbers


generally in accordance with the ANSI/ISA-5.1-2009 and the additional
definitions, statements, requirements and exceptions described in the
following paragraphs.

B. Each instrument, device or component in the project shall have a unique alpha-
numeric tag number using the following style:

XXXXX - UU NNN Z Z
| | | | |
| | | | Tag Number Suffix (1 letter)
| | | |
| | | Loop Number Suffix (1 letter)
| | |
| | Consecutive Number, 3 digits
| |
| Unit Identifier, 2 digits
|
Functional Identification (max 5 letter left justified)

C. The Functional Identification will use a system of letters to classify the


instrument, device or component functionality and will use up to five (5)
letters left justified (see section VI). The Unit Identifier defines the unit
with which the instrument/ device/ component/ loop or system is associated.
The consecutive number will establish a loop identity for the instrument, in
general, will be common to other instruments, devices or components of the
loop of which is a part. The Loop and Instrument number suffixes are sometimes
added to complete the instrument identification (Based on ANSI/ISA-5.1-2009
Annex A).

D. The Loop Number Suffix may be added to a Loop Number to identify identical
loops on identical equipment in the same processing unit when the service or
equipment is assigned the same equipment identification number with a suffix,
such as reactors, heat exchangers, and pumps. The Loop Suffix shall be one
letter and shall be located after the numeric component of the tag number.

E. The Tag Number Suffix shall be one letter and shall be located after the loop
number suffix if it is used or after the numeric component of the tag number
if the loop number suffix is not used. The tag number suffix may be added to
Instrument Tag Numbers in the loop to designate two or more similar devices or
functions:

1. Case 1 – in different services, such as control valves that direct flow to


different places or auxiliary devices, such as those that perform different
functions.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 7 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

2. Case 2 – in the same service, such as control valves that direct flow to
the same place or auxiliary devices, such as those that perform the same
function.

F. For the new Units, the Unit identifier will be a two digit number as shown in
the table V.2 and the consecutive number will be a three-digit number between
001 and 999.

G. For existing Units, the unit number will be a two-digit number. For process
areas with similar Unit Number (i.e. U-200 and U-2000), a leading zero shall
be included as part of the unit identifier. The consecutive number will be a
three-digit number limited by the numerical sequence of the similar unit
number: i.e. for process areas U-200 and U-250, the consecutive number will be
between 000 and 499 for unit U-200 and will be between 500 and 999 for unit U-
250. In this case, the numeric component of the tag number (UU NNN) shall be
provided by the Owner. See examples below:

Tag Components

Instrument Tag Function Unit Consecutive Loop Instrument


Suffix Suffix
Existing Units

PT -02080 PT 200 080

FT -02199AB FT 200 199 A B

LT -20545 LT 2000 545

FT -02617B FT 250 617 B

PG -38271 PG 3800 271

New Units

FT -82155A FT 8200 155 A

PADHH-69502 PADHH 6900 502

Table V.1. Tagnames Examples

H. The Unit Identifier shall follow the proposed Unit Numbers in the project as
per Table V.2 below. This table shall be consulted together :
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 8 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Table V.2. Unit Identifiers

Unit Unit
Unit Name Remarks
Number Identifier

MAJOR ISBL PROCESS UNITS

Review and Integrate


Existing Unit with New
U-200 Crude Distillation Unit 02
Units (Consecutives
000-499)
Dismantling Existing
U-250 Crude Distillation Unit 02 ADU Section
(Consecutives 500-999)
Modification Vacuum
U-2000 Crude Distillation Unit 20 Section to Deep
Flash Technology
Demolish. Dismantling
U-2100 Crude Distillation Unit 21 Existing ADU and
Vacuum Section
Crude Atmospheric Distillation Unit will not be
U-8000 80
Unit installed

Unit will not be


U-8100 Crude Vacuum Distillation Unit 81
installed

U-8200 Delayed Coker Unit (DCU) 82 New

Coking Naphtha
U-8300 83 New
Hydrodesulphurization Unit (CNHU)

U-8400 Hydrocracker Unit (HCU) 84 New

U-8500 Hydrogen Generation Unit 85 New

U-8600 Sour Water Stripper(SWS)– Train 1 86


U–8700 Sour Water Stripper – Train 2 87 New

U-8900 Amine Regeneration (ARU) - Train 1 89


New
U-9000 Amine Regeneration Unit - Train 2 90

U-9100 Sulfur Recovery Unit - Train 1 91


New SRU
U–9200 Sulfur Recovery Unit - Train 2 92

U-9400 Tail Gas Treating Unit - Train 1 94


New TGTU
U-9500 Tail Gas Treating unit - Train 2 95
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 9 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Unit Unit
Unit Name Remarks
Number Identifier

MAJOR OSBL UNITS

U-3000 Raw Material Storage Tanks 30 Revamp

Raw Material Storage Tanks - Pump


U-3200 32 Revamp
House #2 Area
Raw Material Storage Tanks - Pump
U-3300 33 Revamp
House #7 Area

Raw Material Storage Tanks - Pump


U-3500 35 Revamp
House #5 Area

Raw Material Storage Tanks - Pump


U-3800 38 Revamp
House B & C Are

Raw Material Storage Tanks - Pump


U-3900 39 Revamp
House #9 Area

U-6000 Fire Water Distribution System 60 New

Boiler Feedwater System Package &


U-6100 61 New
Steam and Power Generation

U-6200 Cooling Water System 62 New

Wastewater Treatment and Recovery


U-6300 63 New
System

Plant and Instrument Air System -


U-6400 64 New
Train 1

U-6600 Hydrocarbon Flare System 66 New

U-6700 Acid Gas Flare System 67 New

New, Includes Coke


U-6800 Coke Storage & Handling System 68
Barge Loading

69
U-6900 Liquid Sulfur Gantry New

U-7000 Spare 70

U-7100 Raw Material Storage Tanks 71 New

Replacement and
U-7200 Storage Tanks 72
Relocation

U-7300 Nitrogen Supply System 73 New


ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 10 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Unit Unit
Unit Name Remarks
Number Identifier

U-7400 Caustic Supply System 74 New

U-9700 Electrical Substation 97 New

Interconnecting Piping (Including


U-9800 98 New
Underground)

I. Where ANSI/ISA-5.1-2009 offers alternate methods of presentation, the project


practice is to use the method requiring the fewest symbols. Symbols will not
be shown for the following:

1. Valve positioners. Valve positioners will not be part of the Instrument


Index. They shall be identified and included in the instrument database and
P&ID’s only if they are provided as standalone instruments or if they need
to be installed distantly from the related final element.

2. Balloons identifying flow primary elements. Flow primary elements will be


part of the Instrument Index.

3. Local process variable indicators on transmitter outputs, unless it is


intended to designate a special location for the indicator, as shown by a
note next to the tagging balloon.

4. Square root extraction signal conditioning. Unless noted otherwise on the


P&IDs, square root extraction of head meter type flow instrumentation is
assumed to be performed in the transmitter.

J. Transmitters with integral indicators shall be identified with letters (FT,


PT, LT, TT, AT).

K. Control Valves shall be identified with letters (FV, PV, LV, TV, etc). New
positioners for existing valves shall be added to the instrument database
under the same valve tag with a comment “ Existing Valve – New Positioner”

L. I/P Converters and Electro-pneumatic positioners shall be identified with


letters FY, PY, LY, TY, and AY and shall be included in the instrument
database and P&ID’s only if they are provided as standalone instruments or if
they need to be installed distantly from the related final element.

M. If it is required to use multiplexers or wireless transmitters, they shall be


identified on P&ID and included in the instrument database. See examples 1 and
2 below:
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 11 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Figure V.1. Example 1

TI TI TI
82001 82002 82004

TT TE TT
82003 82001 82004

TE
TE 82004
82002

Figure V.1. Example 2

N. Functional identification of an instrument shall be made according to its


function and shall not be based on its construction. Thus a differential
pressure transmitter used for flow measurement shall be tagged as “FT” or a
pressure transmitter on an atmospheric tank to measure its level shall be
tagged as “LT” and so on.

O. The numeric component of Tag Numbers may be duplicated within the same unit
area (e.g. FT -63001 and LT -63001 have a different first letter but have
the same numeric component, 63001).

VI. FUNCTIONAL IDENTIFICATION

A. The functional identification of an Instrument shall be a system of letters


generally in accordance with the ANSI/ISA-5.1-2009, extracts from which
follow. Minor modifications have been made.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 12 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

B. The functional identification of an instrument will consist of letters from


Table VI.1, and will include one first-letter, covering the measured or
initiating variable ([L]=Level, [F]=Flow, [P]=Pressure, etc.) and the
succeeding letter covering the functions of the individual instrument
([T]=Transmitter, [C]=Controller, [I]=Indicator, etc.). Additional letters can
be included as modifiers of the first of succeeding letter previously
mentioned. Modifiers shall be consistently used wherever applicable. Use
maximum five (5) letters as functional identification.

C. The modifiers [R]=Run / [S]=Stop and [C]=Close / [O]=Open for the succeeding
letters shall be used for the Run/Stop and Close/Open signals rather than
suffixes (e.g. the Run/Stop push button shall be tagged as HSR -82001 and HSS
-82001 instead of HS -82001A and HS -82001B).

D. Control Signal to auxiliary electrical devices like motors interposing relays,


shall use [Y] rather than [M] or [X] as first-letter (e.g. YY -82001 instead
of XY -82001).

E. Auxiliary devices like solenoid valves shall be tagged based upon their
initiating loop and not upon their output loop.

F. All Control Functions shall include the modifier [I] (e.g. FIC -82001 instead
of FC -82001).

G. Safety valve, pressure relief valve, safety relief valve, vacuum relief valve
and thermal relief valve shall use the functional identification [PSV]. An
Identification / Tag Number Suffix could be added to Identification / Tag
Numbers of these valves in case of a multiple relief valve system scenario.

H. The Deviation Alarm is an alarm generated when the difference between two
analog values exceeds a limit (e.g., deviation between primary and redundant
instruments or a deviation between process variable and setpoint). The general
deviation alarm between redundant transmitters shall use the functional
identification [*AD*], i.e. the high deviation alarm for the transmitters PT
-82501A, PT -82501B and PT -82501C shall be PADH -82501.

I. The Motor Operated Valves for the Offsite Area (U-7100) and the existing units
could be identified [MOV] to keep consistency with the existing tag naming
convention in the ECOPETROL Barrancabermeja Refinery.

J. The Tank Gauging System and Motor Operated Valve host stations could use the
functional identification [UK].

K. The Level Transmitter part of a Tank Gauging System shall use the functional
identification [UT] instead of [LT]. This level transmitter usually gets
multiple process variables (level, pressure and temperature) for the tank
gauging system.

L. The water level transmitter part of the existing Tank Gauging System could use
the functional identification [NT] or [LT] in accordance with tag naming
convection existing unit.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 13 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

M. The Variable Modifier [Z] shall be used to identify components of the Safety
Instrumented Systems.

N. Readout/Passive Function indicate [I] applies to the analog or digital readout


of an actual measurement or input signal to a discrete instrument or a
distributed control system's video display unit. It should apply to field
signal indicators (4-20 mA, 0-100%, engineering units with low accuracy) and
remote display indicators (engineering units with high accuracy).

O. The attachment A includes a table with the allowable first letters for single
and multi-input components.

P. The Measurable Variable [Y] should be used for sequence controlled logic which
is associated with batch control (i.e. Coke Drum Valving sequence).

Q. Refer to the Job Specification 123939-60A18, Control Systems-Electrical


Interface for Motor Control Tagging convention. Typical tagging for motor
control is shown in the legend sheets, Attachment C.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 14 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

TABLE VI.1

FIRST LETTER SUCCEEDING LETTERS


MEASURING OR READOUT OR PASSIVE OUTPUT FUNCTION
INITIATING MODIFIER FUNCTION MODIFIER
VARIABLE
A ANALYSIS (3) ALARM
B BURNER FLAME USER’S CHOICE (1) USER’S CHOICE (1) USER’S CHOICE (1)
C USER’S CHOICE (1) CONTROL CLOSE
COMPUTER/AUTO/MAN
(5)
D USER’S CHOICE (1) DIFFERENTIAL OR DEVIATION
DEVIATION
E VOLTAGE (EMF) PRIMARY ELEMENT
F FLOW RATE RATIO (FRACTION)
G GAS DETECTION GLASS / GAUGE
H HAND (MANUALLY HIGH (OPEN)
INITIATED)
I CURRENT INDICATE
(ELECTRICAL)
J POWER SCAN MULTIPLEX OR TREND
K TIME OR TIME TIME RATE OF CONTROL STATION (5)
SCHEDULE CHANGE COMPUTER/MAN
L LEVEL LIGHT LOW (CLOSE)
M USER’S CHOICE (1) MOMENTARY MIDDLE OR
INTERMEDIATE
N USER’S CHOICE (1) USER’S CHOICE USER’S CHOICE (1) USER’S CHOICE (1)
O USER’S CHOICE (1) ORIFICE (RESTRICTION) OPEN
P PRESSURE OR VACUUM POINT (TEST)
CONNECTION
Q QUANTITY INTEGRATE OR
TOTALIZE
R RADIOACTIVITY RECORD RUN
S SPEED OR FREQUENCY SAFETY SWITCH STOP
T TEMPERATURE TRANSMIT
U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION
V VIBRATION, VALVE, DAMPER, OR
MECHANICAL ANALYSIS LOUVER
W WEIGHT OR FORCE WELL, PROBE
X UNCLASSIFIED (2) X AXIS UNCLASSIFIED (2) UNCLASSIFIED (2) UNCLASSIFIED (2)
Y EVENT, STATE, Y AXIS RELAY, COMPUTE OR
PRESENCE CONVERTER
Z POSITION Z AXIS DRIVER, ACTUATOR OR
UNCLASSIFIED FINAL
CONTROL ELEMENT

See Notes for Table VI.1 -- Meanings of Identification Letters – in the next
page.
(Reference ANSI/ISA-5.1-2009 Section 4)
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 15 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Notes for Table VI.1 -- Meanings of Identification Letters


(Reference ANSI/ISA-5.1-2009 Section 4)

1. A user's choice letter is intended to cover unlisted meanings that will be


used repetitively in a particular project. If used, the letter may have one
meaning as a first-letter and another meaning as a succeeding-letter. The
meanings need be defined only once in a legend, or otherwise, for that
project.

2. The unclassified letter [X] is intended to cover unlisted meanings that will
be used only once or to a limited extent. If used, the letter may have any
number of meanings as a first-letter and may have any number of meanings as a
succeeding-letter. Except for its use with distinctive symbols, it is
expected that the meanings will be defined outside a tagging balloon on a
P&ID. For example, XR -00002 may be a stress recorder, XR -00003 may be a
vibration recorder, and XX -00004 may be a stress oscilloscope.

3. First-letter [A] for analysis covers all analyses that are not listed in Table
2 and are not covered by a user's choice letter. It is expected that the type
of analysis in each instance will be defined outside a tagging balloon on a
P&ID.

4. A pilot light that is part of an instrument loop shall be designated by a


first-letter followed by succeeding-letter [L]. For example, a pilot light
that indicates an expired time period may be tagged [KL]. However, if it is
desired to tag a pilot light that is not part of a formal instrument loop, the
pilot light may be designated in the same way. Except motor status lights
which shall be not tagged [XL], regardless of the contact source. See note 2
above. Status lights for valves shall be tagged [ZLO] for the open position
and followed by [ZLC] for the closed position.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 16 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

VII. LOOP IDENTIFICATION

A. The loop identification of an instrument shall have a unique alpha-numeric


loop number using the following style:

X - UU NNN Z
| | | |
| | | |
| | | |
| | | Loop Number Suffix (1 letter)
| | |
| | Consecutive Number, 3 digits
| |
| Unit Identifier, 2 digits
|
First Letter - Functional Identification (max 2 letter left justified)

B. Refer to section V.General on this document for the completed description of


each part on the Loop Identification.

C. A Loop Number Suffix may be added to a Loop Number to identify identical loops
on identical equipment in the same processing unit when the service or
equipment is assigned the same equipment identification number with a suffix,
such as reactors, heat exchangers, and pumps. The Loop Suffix shall be one
letter and shall be located after the numeric component of the Loop
Identification Number.

D. Because of the critical nature of the safety relief devices, [PS] is


considered as Measured/ Initiating Variables in the Loop Identification
Number.

VIII. SYMBOLS

A. It is not the intention of this standard to list all symbols or combinations.


ANSI/ISA-5.1-2009 lists many more. Symbols not specifically depicted in the
Job Specification 123939-60A3 shall be based on ANSI/ISA-5.1-2009.
Instrumentation Symbology and details are also shown on the attached Legends
and Symbols drawings in Attachment C.

B. Control valve positioners and control valve electric-to-air converters will be


shown. (Reference ANSI/ISA-5.1-2009 Table 5.4.3 drawings 2 and 5). These
devices may be identified on P&ID’s just in the cases specified in the
paragraph V.I.1 in this document.

C. In addition, various notations may be used on individual symbols. For


example, the letter "V" just outside the circle can indicate an item supplied
by a package vendor, or the letters "LP" can indicate a local panel mounting.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 17 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

See Legend Sheets in attachment C. These letters shall be placed at the lower
right of an instrument balloon as follow: (V) and (LP).

D. The actuator action (FO, FL, FC) in the event of actuating medium failure
shall be shown on the P&ID’s, close to the control valves. (Based on
ANSI/ISA-5.1-2009 Table 5.4.4 Method A).

E. Most of instruments balloons used for tagging shall be solid line on P&ID's.
These instruments may be repeated on auxiliary flow diagrams (AFD's), in
phantom to provide a clear functional understanding. If it is required to show
the same balloon in two different P&ID’s, just one of them shall be shown with
solid line and the other ones shall be shown with dash lines.

F. An arrow head shall be used when required to clarify the direction of the
signal for all line types. It shall be shown at the end of the line where it
enters a device.

G. All alarm/trip values (i.e. temperature, flow, pressure, etc.) shall NOT be
shown on P&IDs but shall be provided as part of the instrument database.

H. The circle within a square shall represent the Primary shared-display, shared-
control system devices or functions. If the system is other than the
primary DCS device or function, it can be identified as notation outside of
the bubble; such as PLC-1.

I. The rotated square within a square shall represent the Safety Instrumented
System devices or system. If the system is other than the primary SIS device
or function, it can be identified as notation outside of the bubble, such as
BMS-1.

J. The type of elements for temperature primary elements and level transmitter
shall be identified on the EFD according to the instrument measurement
notation table in the attachment B on this Job Specification.

K. The Tank Gauging System and Motor Operated Valve host stations shall use the
Computer System and Software Symbol shown in the ANSI/ISA-5.1-2009, Table
5.1.1 Symbol No 3 Column C.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 18 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

ATTACHMENT A. ALLOWABLE FIRST LETTERS

First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Analysis A U First Letter for the
loop which normally
Analysis(SIS) AZ UZ
actuates the
Burner, Combustion B U instrument:
Burner, BZ UZ
Combustion(SIS)
User’s Choice C U
User’s Choice D U
Voltage E U
Voltage(SIS) EZ UZ
Flow, Flow Rate F U
Flow Ratio FF
Flow Total FQ UQ
Flow Safety FS
Flow(SIS) FZ UZ
User’s Choice G U
Hand H U
Hand(SIS) HZ UZ
Current I U
Current(SIS) IZ UZ
Power J
Power Totalize JQ
Power(SIS) JZ
Time, Schedule K U
Time Totalize KQ UQ
Level L U
Level(SIS) LZ UZ
User’s Choice M U
User’s Choice N U
User’s Choice O U
Pressure P U
Pressure Difference PD
Pressure PD UD
Differential
Pressure Ratio PF
Pressure Scan PJ PJ
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 19 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Pressure Rate of PK UK First Letter for the
Change loop which normally
Pressure Safety PS actuates the
instrument:
Pressure(SIS) PZ UV
Quantity Q U
Quantity Totalize QQ UQ
Radiation R U
Radiation Totalize RQ UQ
Radiation(SIS) RZ UZ
Speed, Frequency S U
Speed(SIS) SZ UZ
Temperature T U
Temperature TD
Difference
Temperature TD UD
Differential
Temperature Ratio TF
Temperature Scan TJ
Temperature Rate of TK UK
Change
Temperature Safety TS
Temperature(SIS) TZ UZ
Multivariable U
Multivariable Scan UJ
Multivariable(SIS) UZ
Vibration, V U
Machinery Analysis
Vibration(SIS) VZ UZ
Vibration X-Axis VX UX
Vibration Y-Axis VY UY
Vibration Z-Axis VZ UZ
Vibration X- VZX UZX First Letter for the
Axis(SIS) loop which normally
Vibration Y- VZY UZY actuates the
Axis(SIS) instrument:
Vibration Z- VZZ UZZ
Axis(SIS)
Weight, Force W U
Force(SIS) WZ UZ
Weight Difference WD
Weight Differential WD UD
Weight Ratio WF
Weight Loss (Gain) WK UK
Weight Total WQ UQ
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 20 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Force X Axis WX UX
Force Y Axis WY UY
Force Z Axis WZ UZ
Force X Axis(SIS) WZX UZX
First Letter for the
Force Y Axis(SIS) WZY UZY
loop which normally
Force Z Axis(SIS) WZZ UZZ actuates the
Unclassified X U instrument:

Event, State, Y Y
Presence
Event, State(SIS) YZ YZ
Position, Dimension Z U
Position(SIS) ZZ UZ
Position X Axis ZX UX
Position Y Axis ZY UY
Position Z Axis ZZ UZ
Position X ZZX UZX
Axis(SIS)
Position Y ZZY UZY
Axis(SIS)
Position Z ZZZ UZZ
Axis(SIS)
Position Difference ZD UD
Position Difference ZDX UDX
X Axis
Position Difference ZDY UDY
Y Axis
Position Difference ZDZ UDZ
Z Axis
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 21 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

ATTACHMENT B. INSTRUMENT MEASUREMENT NOTATION TABLE

Analysis
AIR = Excess air H2O =
Water O2 = Oxygen UV = Ultra-violet
CO = Carbon monoxide H2S =
Hydrogen OP = Opacity VIS = Visible light
CO2 = Carbon dioxide HUM =
Humidity ORP = Oxidation VISC = Viscosity
COL = Color IR =
Infrared pH = Hydrogen ion =
COMB = Combustibles LC =
Liquid REF = Refractometer =
COND = Elec. MOIS =
Moisture RI = Refractive =
DEN = Density MS =
Mass TC = Thermal =
GC = Gas NIR =
Near infrared TDL = Tunable Diode =
Flow
CFR = Constant flow OP = Orifice plate PT = Pitot tube VENT = Venturi tube
CONE = Cone OP- = Corner taps PV = Pitot venturi VOR = Vortex Shedding
COR = Coriollis OP- = Circle quadrant SNR = Sonar WDG = Wedge
DOP = Doppler OP-E = Eccentric SON Sonic =
DSON = Doppler sonic OP- = Flange taps TAR = Target
FLN = Flow nozzle OP- = Multi-hole THER = Thermal =
FLT = Flow tube OP-P = Pipe taps TTS = Transit time =
LAM = Laminar OP- = Vena contracta TUR = Turbine =
MAG = Magnetic PD = Positive US = Ultrasonic =
Level
CAP = Capacitance GWR = Guided wave NUC = Nuclear US = Ultrasonic
d/p = Differential LSR = Laser RAD = Radar DISP = Displacer
DI = Dielectric MAG = Magnetic RES = Resistance REFL = Reflex
DP = Differential MS = Magnetostrictive SON = Sonic N-REF = Non-Reflex
Pressure
ABS = Absolute MAN = Manometer VAC = Vacuum
AVG = Average P-V = Pressure-vacuum =
DRF = Draft SG = Strain gage = =
Temperature
BM = Bi-metallic RTD = Resistance temp TCK = Thermocouple TRAN = Transistor
IR = Infrared TC = Thermocouple TCT = Thermocouple =
RAD = Radiation TCE = Thermocouple THRM = Thermistor =
RP = Radiation TCJ = Thermocouple TMP = Thermopyle =
Miscellaneous
Burner, Combustion Position Quantity Radiation
FR = Flame rod CAP = Capacitance PE = Photoelectric α = Alpha radiation
IR = Infrared EC = Eddy current TOG = Toggle β = Beta radiation
TV = Television IND = Inductive = γ = Gamma radiation
UV = Ultraviolet LAS = Laser = n = Neutron
= MAG = Magnetic = =
= MECH = Mechanical = =
= OPT = Optical = =
= RAD = Radar = =
= = = =
Speed Weight, Force
ACC = • Acceleration LC = Load cell = =
EC = • Eddy current SG = Strain gauge = =
PROX = • Proximity WS = Weigh scale = =
VEL = • Velocity = = =
= = = =
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 22 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1

INSTRUMENTATION SYMBOLS AND IDENTIFICATION

ATTACHMENT C. LEGEND AND SYMBOLS DRAWINGS

Refer to Project Drawings 123939-0000-A1-50-003, and 123939-0000-A1-50-005 thru 012

Note: The attached drawings are the latest revision available in the project when this
Job Specification was issued. These drawings are included here just for reference. The
drawings with the latest revision in the project documentation shall be used for the
EFD/P&ID development.
Attachment C to Job Specification
123939-60A3. The attached drawings are
the latest revision available in the project
when this Job Specification was issued.
These drawings are included here just for
reference. The drawings with the latest
revision in the project documentation shall
be used for the EFD/P&ID development.
123939-0000-A1-50-005 GENERAL NOTES:
74 74

1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.


DETAIL EV-1 DETAIL EV-2 DETAIL EV-3
REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 SINGLE ACTING ON / OFF VALVE ESD PUSH BUTTON SINGLE ACTING ON / OFF WITH AIR RESERVOIR AND ESD PUSH BUTTONS SINGLE ACTING ON / OFF VALVE 72
AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER
(UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
70 COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS. 70

NOTE 5 NOTE 5 NOTE 5 NOTE 5 2. INTERLOCK DESIGNATION IS SHOWN IN THE MAIN EFD. "Z" INTERLOCK
68
POS IND AIR SUPPLY POS IND AIR SUPPLY DESIGNATION IS SHOWN IN THE DETAIL FOR REFERENCE ONLY. 68

HAC HAC HAC ZLC ZLO ZI PI HAC HAC HAC ZLC ZLO ZI PI 3. ESD PUSH BUTTONS ARE SHOWN IN THE MAIN EFD'S AS REQUIRED.
66
UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN L UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN L NOTE 5 NOTE 5 DETAIL ENGINEERING CONTRACTOR SHALL VERIFY THE REQUIREMENT 66
L L
POS IND AIR SUPPLY FOR INDIVIDUAL PUSH BUTTONS PER VALVE IN THE CONTROL ROOMS
(LOCAL CONTROL ROOM AND REMOTE CONTROL ROOM) TO AVOID
64 ZLC ZLO ZI PI DUPLICATED FUNCTION. 64
ECC CCL LOCAL ECC CCL LOCAL ECC CCL LOCAL ECC CCL LOCAL
UUNNN UUNNN UUNNN UUNNN L
HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC LOCKUP RELAY L 4. DETAIL ENGINEERING CONTRACTOR SHALL UPDATE THESE DETAILS
62
UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C BASED ON THE SELECTED VALVE VENDOR. THE FINAL DETAIL SHALL 62
INCLUDE ALL THE INSTRUMENTATION AND SIGNALS REQUIRED FOR
THE PARTIAL STROKE TEST IN ACCORDANCE WITH THE SAFETY
60 60
IA REQUIREMENTS.
5. POSITION INDICATION AND AIR SUPPLY PRESSURE AVAILABLE IN THE
58 Z Z Z Z Z Z 58
VALVE ELECTRO-PNEUMATIC POSITIONER VIA HART PROTOCOL.
RESERVOIR
NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 4 NOTES 2, 3, 4 6. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS
56 56
SHALL CARRY THE SAME CONECUTIVE NUMBER (PPNNN) OF THE VALVE
ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO TAG SHOWN ON THE P&ID.
54 UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R 54
7. FIREPROOFING REQUIREMENTS FOR POWER AND SIGNAL WIRING
EP EP EP EP EP EP SHALL BE SPECIFIED IN THE MAIN EFD.
IA IA IA
52 52
8. INTEGRAL OPEN / CLOSE / STOP PUSH BUTTONS SHALL BE PROVIDED
FOR EACH MOTOR OPERATED VALVE.
UV
+
UV
+
UV
+
UV
+
UV
+
UV
+
50 50
UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN 9. DETAILED ENGINEERING CONTRACTOR SHALL INCLUDED ALL THE
EV-1 EV-2 EV-3 COMMUNICATION REQUIREMENTS FOR THE MOTOR OPERATED
48 SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL VALVES. 48
NOTE 6 NOTE 6 NOTE 6
10. VALVE BODY TYPE IS SHOWN ON MAIN EFD.
46 46

44 DETAIL EV-4 DETAIL EV-5 DETAIL EV-6 44


SINGLE ACTING ON / OFF WITH AIR RESERVOIR MOTOR OPERATED VALVE MOTOR OPERATED VALVE WITH ESD PUSH BUTTONS

42 Attachment C to Job Specification 42

123939-60A3. The attached drawings are


40 HAC HAC HAC ZLC ZLO ZI UA the latest revision available in the project 40
NOTE 5 NOTE 5 UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN when this Job Specification was issued.
38
POS IND AIR SUPPLY
These drawings are included here just for 38
ZLC ZLO ZI PI reference. The drawings with the latest
ZLC ZLO ZI UA
UUNNN UUNNN UUNNN UUNNN L ECC CCL LOCAL revision in the project documentation shall
36 L UUNNN UUNNN UUNNN UUNNN 36

HSC HSC HSC be used for the EFD/P&ID development.


ECC CCL LOCAL UUNNN A UUNNN B UUNNN C
34 34
HSC HSC HSC THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
NOTE 2, 3, 4 WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
LOCKUP RELAY UUNNN A UUNNN B UUNNN C
32
NOTE 2, 4 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
Z Z MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.

CONDITIONAL

CONDITIONAL
30
IA NOTE 2, 4 NOTE 2, 3, 4 30

Z Z
Z Z

ESD

ESD
28 28

RESERVOIR
NOTES 2, 4 NOTES 2, 4
26 UY UY ZT UY UY UY ZT UY 26

ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C
UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN D 9/30/2010 ISSUED FOR FEED MHA MB EK
M M M M
24 NOTE 8, 9 NOTE 8, 9 C NOT ISSUED
24

EP EP NOTE 8 NOTE 8
B NOT ISSUED
22 22
UU UU A NOT ISSUED
MCS MCS
UV UV UV UV DRW. CHK. APP.
+ +
+ +
UV UV REV. DATE DESCRIPTION
20 UUNNN UUNNN UUNNN UUNNN +
+ BY BY BY 20
EV-5 UUNNN UUNNN
EV-4 EV-6 REVISIONS
18
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL 18
NOTE 6 NOTE 6, 7 NOTE 6, 7 ECOPETROL S.A.
16
BARRANCABERMEJA 16

14 REFINERY 14

PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA


12 12

ENGINEERING FLOW DIAGRAM


10 10
GENERAL LEGEND AND SYMBOLS
8 8
VALVE DETAILS
6 6

BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 2
AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-005 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-005.pid


123939-0000-A1-50-006 GENERAL NOTES:
74 DETAIL EV-7 DETAIL EV-8 DETAIL EV-9 74
MOTOR OPERATED VALVE MOTOR OPERATED VALVE WITH ESD PUSH BUTTONS MOTOR OPERATED VALVE 1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.
REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 72
AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER
(UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
70 HAC HAC HAC ZLC ZLO ZI UA COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS. 70

UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN 2. INTERLOCK DESIGNATION IS SHOWN IN THE MAIN EFD. "Z" INTERLOCK
68 DESIGNATION IS SHOWN IN THE DETAIL FOR REFERENCE ONLY. 68

ZLC ZLO ZI UA ZLC ZLO ZI UA 3. ESD PUSH BUTTONS ARE SHOWN IN THE MAIN EFD'S AS REQUIRED.
66 ECC CCL LOCAL DETAIL ENGINEERING CONTRACTOR SHALL VERIFY THE REQUIREMENT 66
UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN
HSC HSC HSC FOR INDIVIDUAL PUSH BUTTONS PER VALVE IN THE CONTROL ROOMS
ECC CCL LOCAL (LOCAL CONTROL ROOM AND REMOTE CONTROL ROOM) TO AVOID
UUNNN A UUNNN B UUNNN C
64 DUPLICATED FUNCTION. 64
HSC HSC HSC
NOTE 2, 3, 4
UUNNN A UUNNN B UUNNN C 4. DETAIL ENGINEERING CONTRACTOR SHALL UPDATE THESE DETAILS
NOTE 2, 4 NOTE 2, 4
62 BASED ON THE SELECTED VALVE VENDOR. THE FINAL DETAIL SHALL 62

Z Z Z INCLUDE ALL THE INSTRUMENTATION AND SIGNALS REQUIRED FOR


THE PARTIAL STROKE TEST IN ACCORDANCE WITH THE SAFETY

CONDITIONAL

CONDITIONAL

CONDITIONAL
60 NOTE 2, 4 NOTE 2, 3, 4 NOTE 2, 4 REQUIREMENTS. 60

Z Z Z 5. POSITION INDICATION AND AIR SUPPLY PRESSURE AVAILABLE IN THE

ESD

ESD

ESD
58 58
VALVE ELECTRO-PNEUMATIC POSITIONER VIA HART PROTOCOL.
6. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS
56 YY YY ZT UY YY YY ZT UY HY HY ZT UY SHALL CARRY THE SAME CONECUTIVE NUMBER (PPNNN) OF THE VALVE 56

ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN TAG SHOWN ON THE P&ID.
UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M
54 NOTE 8, 9 NOTE 8, 9 NOTE 8, 9 7. FIREPROOFING REQUIREMENTS FOR POWER AND SIGNAL WIRING 54

NOTE 8 NOTE 8 NOTE 8 SHALL BE SPECIFIED IN THE MAIN EFD.


52 52
UU UU UU 8. INTEGRAL OPEN / CLOSE / STOP PUSH BUTTONS SHALL BE PROVIDED
MCS MCS MCS
YV +
YV +
YV
+
YV
+
HV +
HV
+
FOR EACH MOTOR OPERATED VALVE.
50 UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN 50
EV-7 EV-8 EV-9 9. DETAILED ENGINEERING CONTRACTOR SHALL INCLUDED ALL THE
COMMUNICATION REQUIREMENTS FOR THE MOTOR OPERATED
48
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL VALVES. 48
NOTE 6, 7 NOTE 6, 7 NOTE 6, 7
10. VALVE BODY TYPE IS SHOWN ON MAIN EFD.
46 46

44 DETAIL EV-10 44
MOTOR OPERATED VALVE WITH ESD PUSH BUTTONS
Attachment C to Job Specification
42
123939-60A3. The attached drawings are 42

the latest revision available in the project


40 HAC HAC HAC ZLC ZLO ZI UA when this Job Specification was issued. 40

UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN These drawings are included here just for
38 reference. The drawings with the latest 38

revision in the project documentation shall


36 ECC CCL LOCAL be used for the EFD/P&ID development. 36

HSC HSC HSC


ECC CCL LOCAL UUNNN A UUNNN B UUNNN C
34 34
HSC HSC HSC THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
NOTE 2, 3, 4 WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
UUNNN A UUNNN B UUNNN C
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
Z MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
CONDITIONAL

30 NOTE 2, 3, 4 30

Z
ESD

28 28

26 HY HY ZT UY 26

ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C


UUNNN UUNNN UUNNN UUNNN D 9/30/2010 ISSUED FOR FEED MHA MB EK
M M
24 NOTE 8, 9 C NOT ISSUED
24

NOTE 8
B NOT ISSUED
22 22
UU A NOT ISSUED
MCS
HV +
HV + DRW. CHK. APP.
UUNNN UUNNN REV. DATE DESCRIPTION BY BY BY
20 20
EV-10
REVISIONS
18
SHOWN ON P&ID IMPLIED DETAIL 18
NOTE 6, 7 ECOPETROL S.A.
16
BARRANCABERMEJA 16

14 REFINERY 14

PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA


12 12

ENGINEERING FLOW DIAGRAM


10 10
GENERAL LEGEND AND SYMBOLS
8 8
VALVE DETAILS
6 6

BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 2
AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-006 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-006.pid


123939-0000-A1-50-007 GENERAL NOTES:
74 74

1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.


REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 72
AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER
(UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
70 COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS. 70

2. MOTOR PROTECTION RELAY (MPR) TO BE INSTALLED AT MCC AND


68 DETAIL MC-1 DETAIL MC-2 DETAIL MC-3 INTERCONNECTED TO DCS VIA FIBER OPTIC CABLE. 68

MOTORS UP TO 125 HP AND FROM 125 HP TO 250 HP @ 1800 RPM. MOTORS UP TO 125 HP AND FROM 125 HP TO 250 HP @ 1800 RPM NO START FROM DCS. MOTORS FROM 125 HP TO 250 HP @ 3600 RPM AND FROM 250 HP TO 500 HP 3. LOCAL CONTROL STATIONS SHALL BE PROVIDED AND SHALL CARRY
66 THE MOTOR TAG NUMBER. 66

4. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS


HYR SHALL CARRY THE SAME CONSECUTIVE NUMBER (PPNNN) OF THE DCS
64 64
HYR UUNNN INSTRUMENT TAG (HC-PPNNN) SHOWN ON THE MAIN EFD.
UUNNN
62 HYS 5. ESD PUSH BUTTONS ARE SHOWN IN THE MAIN EFD'S AS REQUIRED. 62
HYS DETAIL ENGINEERING CONTRACTOR SHALL VERIFY THE REQUIREMENT
HYS UUNNN
UUNNN START FOR INDIVIDUAL PUSH BUTTONS PER VALVE IN THE CONTROL ROOMS
UUNNN START HC HC STOP
60
HC HC STOP M M NOTES 2, 3 (LOCAL CONTROL ROOM AND REMOTE CONTROL ROOM) TO AVOID 60
HC HC STOP M M NOTES 2, 3, 5 RUN STATUS UUNNN UUNNN RUN STATUS
DUPLICATED FUNCTION.
M UUNNN
M NOTES 2, 3
UUNNN RUN STATUS
UUNNN UUNNN FAULT OR TRIP
YYR
FAULT OR TRIP
MC-3
58 FAULT OR TRIP MC-2 YYR 6. MOTOR CONTROL DETAILS FOR MOTOR ABOVE 1000HP SHALL BE 58
MC-1 YYR UUNNN
UUNNN REVIEWED BY ELECTRICAL. ROTATING EQUIPMENT AND CONTROL
UUNNN SYSTEMS DISCIPLINES CASE BY CASE BASIS.
56 UY 56
UY
UY UUNNN
UUNNN
54
UUNNN 54

II H
II H
II H UUNNN MOTOR CURRENT
52
MOTOR CURRENT UUNNN MOTOR CURRENT 52
UUNNN
TI H
50 50
UUNNN A HIGHEST
WINDING TEMP.
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL
48 (NOTE 4) (NOTE 4) (NOTE 4) H
48
TI
UUNNN B HIGHEST
46
BEARING TEMP. 46

44 44

42 Attachment C to Job Specification 42


123939-60A3. The attached drawings are
40
the latest revision available in the project 40
when this Job Specification was issued.
38
These drawings are included here just for 38
reference. The drawings with the latest
revision in the project documentation shall
be used for the EFD/P&ID development.
36 36

34 34
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30

28 28

26 26

DETAIL MC-4 DETAIL MC-5 DETAIL MC-6


D 9/30/2010 ISSUED FOR FEED MHA MB EK
24
MOTORS FROM 125 HP TO 250 HP @ 3600 RPM AND FROM 250 HP TO 500 HP NO START FROM DCS. MOTORS FROM 500 HP TO 1000 HP MOTORS FROM 500 HP TO 1000 HP. NO START FROM DCS. 24
C NOT ISSUED
B NOT ISSUED
22 22
HYR A NOT ISSUED
UUNNN REV. DATE DESCRIPTION DRW. CHK. APP.
20 BY BY BY 20
HYS HYS HYS REVISIONS
18
UUNNN UUNNN START UUNNN 18
STOP STOP
M
HC
M NOTES 2, 3
HC
RUN STATUS M
HC
M NOTES 2, 3
HC STOP
RUN STATUS M
HC
M NOTES 2, 3 HC RUN STATUS ECOPETROL S.A.
UUNNN UUNNN FAULT OR TRIP UUNNN UUNNN FAULT OR TRIP UUNNN UUNNN FAULT OR TRIP
16
MC-4 YYR MC-5 YYR MC-6 YYR BARRANCABERMEJA 16

UUNNN UUNNN UUNNN


14 REFINERY 14
UY UY UY
PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA
12
UUNNN UUNNN UUNNN 12

H H H
ENGINEERING FLOW DIAGRAM
II II II
10 10
UUNNN MOTOR CURRENT UUNNN MOTOR CURRENT UUNNN MOTOR CURRENT GENERAL LEGEND AND SYMBOLS
8 8
TI H TI H TI H PUMP AND MIXERS MOTOR CONTROL DETAILS
SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST
WINDING TEMP. WINDING TEMP. WINDING TEMP.
6 (NOTE 4) (NOTE 4) (NOTE 4) 6

H H H BARRANCABERMEJA COLOMBIA
TI TI TI
4 UUNNN B HIGHEST UUNNN B HIGHEST UUNNN B HIGHEST THIS DRAWING IS THE PROPERTY OF THE
4
BEARING TEMP. BEARING TEMP. BEARING TEMP.
FOSTER WHEELER USA CORP. HOUSTON, TEXAS
2 VI H VI H AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT 2
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
UUNNN HIGHEST UUNNN HIGHEST INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
VIBRATION VIBRATION SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-007 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-007.pid


123939-0000-A1-50-008 GENERAL NOTES:
74 74

1. MOTOR PROTECTION RELAY (MPR) TO BE INSTALLED AT MCC AND


INTERCONNECTED TO DCS VIA FIBER OPTIC CABLE.
72 72

2. TWO LOCAL CONTROLS SHALL BE PROVIDED FOR EACH MOTOR. ONE


AT GRADE AND ONE AT PLATFORM. LOCAL CONTROL STATIONS WILL
70 70
CARRY THE MOTOR TAG NUMBER. LOCAL CONTROL STATIONS ARE
NOT SHOWN ON THESE DETAILS.
68 DETAIL AC-01 3. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS 68

AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS SHALL CARRY THE SAME CONSECUTIVE NUMBER
66
(UUNNN AND UUZZZ) OF THE DCS INSTRUMENT TAG NUMBER 66
(HC-UUNNN AND HC-UUZZZ) SHOWN ON THE MAIN EFD.

64 64

62 62
VAHH VAHH
UUNNN A UUNNN
ZZZ A
60 60
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A
58 I I 58

M M M M
56 VI H VT VE VE VT VI H 56
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B

FAULT OR TRIP

FAULT OR TRIP
VAHH VAHH

RUN STATUS

RUN STATUS
54 54
UUNNN B MOTOR II H II H ZZZ B
UUNNN
CURRENT UUNNN UUZZZ MOTOR

START

START
STOP

STOP
52 HC HC CURRENT 52

UUNNN UUZZZ
50
AC-01 HYR YYR HYR YYR 50

UUNNN UUNNN UUZZZ UUZZZ


SHOWN ON P&ID
48 48
HYS UY HYS UY
UUNNN UUNNN UUZZZ UUZZZ
46 46

HC HC
44
UUNNN UUZZZ
Attachment C to Job Specification 44

START/STOP START/STOP
123939-60A3. The attached drawings are
42 RUN STATUS RUN STATUS the latest revision available in the project 42
FAULT OR TRIP FAULT OR TRIP when this Job Specification was issued.
40
These drawings are included here just for 40
IMPLIED DETAIL
(NOTE 3) reference. The drawings with the latest
38
revision in the project documentation shall 38
be used for the EFD/P&ID development.
36 36

34 DETAIL AC-02 34
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS WITH AUTO / MANUAL STATUS WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30

28 28
VAHH VAHH
UUNNN A UUNNN
ZZZ A
26 26
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 I I C NOT ISSUED
24

M M M M B NOT ISSUED
VI H VT VE VE VT VI H

AUTO
22 22
A NOT ISSUED
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
DRW. CHK. APP.

FAULT OR TRIP

FAULT OR TRIP
VAHH UY VAHH REV. DATE DESCRIPTION BY BY BY

RUN STATUS

RUN STATUS
20 20
UUNNN B MOTOR II H UUNNN B II H UUNNN
ZZZ B
CURRENT UUNNN MOTOR REVISIONS
UUZZZ

START

START
STOP

STOP
HC HC CURRENT

AUTO
18 18

UUNNN UUZZZ ECOPETROL S.A.


AC-02
16 HYR YYR HYR YYR UY
BARRANCABERMEJA 16

UUNNN UUNNN UUZZZ UUZZZ UUZZZ B


SHOWN ON P&ID
14 REFINERY 14
HYS UY HYS UY
UUNNN UUNNN A UUZZZ UUZZZ A PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA
12 12

HC HC
ENGINEERING FLOW DIAGRAM
10 10
UUNNN UUZZZ
GENERAL LEGEND AND SYMBOLS
START/STOP/AUTO START/STOP/AUTO
8 RUN STATUS RUN STATUS 8
FAULT OR TRIP FAULT OR TRIP
AIR COOLER
6
IMPLIED DETAIL MOTOR CONTROL DETAILS 6

(NOTE 3) BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT 2
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-008 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-008.pid


123939-0000-A1-50-009 GENERAL NOTES:
74 74

1. MOTOR PROTECTION RELAY (MPR) TO BE INSTALLED AT MCC AND


INTERCONNECTED TO DCS VIA FIBER OPTIC CABLE.
72 72

2. VARIABLE SPEED MOTOR REQUIREMENTS SHALL BE SHOWN IN THE


MAIN EFD. ADJUSTABLE FREQUENCY DRIVER (AFD) CONTROL IN MCC
70 70
TO HANDLE SPEED CONTROL FUNCTION AND INCLUDE SPEED
MEASUREMENT.
68 DETAIL AC-03 68
3. TWO LOCAL CONTROLS SHALL BE PROVIDED FOR EACH MOTOR. ONE
AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS FIXED SPEED PRIMARY MOTOR - VARIABLE SPEED SECONDARY MOTOR AT GRADE AND ONE AT PLATFORM. LOCAL CONTROL STATIONS WILL
66 CARRY THE MOTOR TAG NUMBER. LOCAL CONTROL STATIONS ARE 66
NOT SHOWN ON THESE DETAILS.

64 4. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS 64


SHALL CARRY THE SAME UNIT ID AND CONSECUTIVE NUMBER
(UUNNN AND UUZZZ) OF THE DCS INSTRUMENT TAG NUMBER
62 (HC-UUNNN AND HC-UUZZZ) SHOWN ON THE MAIN EFD. 62
VAHH VAHH
UUNNN A UUZZZ A 5. DCS TEMPERATURE CONTROLLER (TIC) AND ANALOG OUTPUT
60 BLOCK ARE SHOWN ON MAIN EFD. 60
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A
58 I I 58

M M M M
56 VI H VT VE VE VT VI H 56
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B

FAULT OR TRIP

FAULT OR TRIP
VAHH VAHH

RUN STATUS

RUN STATUS
54 54
TY TIC UUNNN B MOTOR II H II H UUZZZ B
UU UU CURRENT UUNNN UUZZZ MOTOR

START

START
STOP

STOP
52 HC HC CURRENT 52

UUNNN UUZZZ SI H
50
AC-03 HYR YYR HYR YYR SIC UUZZZ MOTOR 50
SPEED
UUNNN UUNNN UUZZZ UUZZZ UUZZZ
SHOWN ON P&ID UA
48 48
HYS UY HYS UY UUZZZ COMMON
ALARM
UUNNN UUNNN UUZZZ UUZZZ TY TIC
46 46
UU NOTE 5 UU
HC HC
44 44
UUNNN UUZZZ
START/STOP START/STOP
42 RUN STATUS RUN STATUS Attachment C to Job Specification 42
FAULT OR TRIP FAULT OR TRIP
123939-60A3. The attached drawings are
40
IMPLIED DETAIL
the latest revision available in the project 40

(NOTE 4) when this Job Specification was issued.


38
These drawings are included here just for 38
reference. The drawings with the latest
36
revision in the project documentation shall 36
be used for the EFD/P&ID development.
34 DETAIL AC-04 34
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS WITH VARIABLE SPEED PRIMARY - SECONDARY MOTORS ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA
32 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30

28 28
VAHH VAHH
UUNNN A UUNNN
ZZZ A
26 26
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 I I C NOT ISSUED
24

M M M M B NOT ISSUED
22 VI H VT VE VE VT VI H 22
A NOT ISSUED
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
DRW. CHK. APP.

FAULT OR TRIP

FAULT OR TRIP
VAHH VAHH REV. DATE DESCRIPTION BY BY BY

RUN STATUS

RUN STATUS
20 20
UUNNN B MOTOR II H II H UUNNN
ZZZ B
CURRENT UUNNN MOTOR REVISIONS
UUZZZ

START

START
STOP

STOP
18 TY HC HC CURRENT 18
TY
UU UUNNN UUZZZ UU MOTOR SI H SI H ECOPETROL S.A.
AC-04 SPEED UUZZZ MOTOR
16 UUNNN SIC HYR YYR HYR YYR SIC
SPEED BARRANCABERMEJA 16

UUNNN UUNNN UUNNN UUZZZ UUZZZ UUZZZ


SHOWN ON P&ID UA UA
14
TIC TIC
COMMON
ALARM UUNNN UUZZZ COMMON
REFINERY 14
HYS UY HYS UY ALARM
UU UU UUNNN UUNNN UUZZZ UUZZZ A PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA
12 TIC TY TY TIC 12
UU NOTE 5 UU
HC HC
UU NOTE 5 UU ENGINEERING FLOW DIAGRAM
10 10
UUNNN UUZZZ
GENERAL LEGEND AND SYMBOLS
START/STOP START/STOP
8 RUN STATUS RUN STATUS 8
FAULT OR TRIP FAULT OR TRIP
AIR COOLER
6
IMPLIED DETAIL MOTOR CONTROL DETAILS 6

(NOTE 4) BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT 2
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-009 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-009.pid


123939-0000-A1-50-010 GENERAL NOTES:
74 74

1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.


REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 DRUM LEVEL 2oo3 VOTING / STANDPIPE BY INSTRUMENTS 72
DRUM LEVEL 2oo3 VOTING / STAND PIPE BY PIPING LEVEL TRANSMITTER DISPLACER OR GWR / STANDPIPE BY PIPING AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER
INSTRUMENT MEASUREMENT NOTATION - TABLE 1
(UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
70
ABS = Absolute OP-E = Eccentric COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS. 70
PIPING INSTR. ACC = Acceleration OP-FT = Flange taps
AIR = Excess air OP-MH = Multi-hole 2. MINIMUM 2" DIAMETER.
LT LT

INSTR.
68
VESSEL VESSEL
LT LT LT LT UUNNN UUNNN AVG = Average OP-P = Pipe taps 68
UUNNNA UUNNNB UUNNNC UUNNNA DISP. DISP.
BM = Bi-metallic
3. NOTATION TO IDENTIFY TYPE OF ELEMENT. ACCORDING TO THE TABLE 1
VESSEL DISP. LT VESSEL
LT LT
2" OR 2" OR OPT = Optical
DISP. GWR GWR
2" GWR GWR P&ID 123939-0000-A1-50-010. REFER TO JOB SPEC 123939-60A3.

PIPING
2" 2" 2" 2" UUNNNB NOTE 5 UUNNNA UUNNNB CAP = Capacitance
NOTE 3 LT NOTE 3 NOTE 2 OP-VC = Vena contracta taps
GWR
LT INSTRUMENTATION SYMBOLS AND IDENTIFICATION.

INSTR.
DISP. 2" GWR
66 3"
3" 2"
2" UUNNNC 2"
2"
UUNNNC 2"RF CFR = Constant flow regulator ORP = Oxidation reduction 66
GWR (TYP.)
3"
2" 2" GWR CO = Carbon monoxide PD = Positive displacement
2" NOTE 3 3" 2" VESSEL VESSEL 4. PRIMARY ROOT/BLOCK VALVES FOR INSTRUMENT ISOLATION SHALL

PIPING
CO2 = Carbon dioxide PE = Photoelectric
64 2"
2" 2"
NOT BE SHOWN ON P&ID'S. 64
2" 2" 2" COL = Color pH = Hydrogen ion
LT LT LT NOTE 2
UUNNNA UUNNNB UUNNNC 2" 2" 2" COMB = Combustibles PROX = Proximity 5. NUMBER OF PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT
NOTE 2 NOTE 2 NOTE 2
DISP. GWR GWR 2" COND = Elec. conductivity PT = Pitot tube ISOLATION SHALL BE IN ACCORDANCE WITH THE MAINTENANCE
62 62
3" 3" 2" CONE = Cone PV = Pitot venturi ISOLATION PHILOSOPHY DESCRIBED ON THE DOCUMENT
NOTE 3 2"
2"
COR = Coriollis P-V = Pressure-vacuum 123939-EN-12, PROCESS AND MAINTENANCE ISOLATION.

INSTR.
3/4"
60
3"
3" 2" 2" 2" D/P = Differential pressure RAD = Radar 60
3/4" DEN = Density RAD = Radiation 6. FOR FINAL DESTINATION OF VENT AND DRAIN CONNECTIONS REFER

INSTR.
2"
3/4"
DISP = Displacer

PIPING
3/4" NOTE 5 REF = Refractometer TO THE MAIN EFD. THESE CONNECTIONS SHALL BE FINALIZED DURING
58 NOTE 5 3/4" 3/4" 3/4" DI = Dielectric constant RES = Resistance THE DETAIL DESIGN BY DEC. IN SOME SERVICES, INSTRUMENT VENTS 58

PIPING
PIPING
DOP = Doppler RI = Refractive index AND DRAINS MAY BE CONNECTED TO A SAFE LOCATION
DP = Differential pressure RP = Radiation pyrometer (I.E. FLARE OR CLOSE DRAIN).
56 DRF = Draft 56
RTD = Resistance temp detector
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL DSON = Doppler sonic SG = Strain gage
EC = Eddy current SNR = Sonar
54 54
FLN = Flow nozzle
SON Sonic
FLT = Flow tube
TAR = Target
FR = Flame rod
52
LEVEL TRANSMITTER DISPLACER OR GWR / STANDPIPE BY INSTRUMENTS TC = Thermal conductivity 52
LEVEL GLASS GAUGE VESSEL LEVEL TRANSMITTER CAPILLARY VESSEL GC = Gas chromatograph
TC = Thermocouple
GWR = Guided wave radar TCE = Thermocouple type E
50 H2O = Water TCJ = Thermocouple type J 50
3/4" H2S = Hydrogen sulfide TCK = Thermocouple type K

PIPING
2" V1 HUM = Humidity TCT = Thermocouple type T

PIPING.
LT 2" IND = Inductive

INSTR.
48 VESSELL 2" 48
UUNNN TDL = Tunable Diode Laser

INSTR.
DISP.
2" IR = Infrared
OR
GWR 2" THER = Therma
NOTE 2 2" 2" LAM = Laminar THRM = Thermistor
46 46
PIPING INSTR.
2"RF LAS = Laser TMP = Thermopyle
(TYP.)
LC = Liquid chromatograph TOG = Toggle
VESSEL VESSEL LG 1/2"
2"
UUNNN
LC = Load cel TRAN = Transistor
44 2" LG 44
VESSEL LT
REFLEX OR
NON-REFLEX
UUNNN
UUNNN LT
LSR = Laser TTS = Transit time sonic
2" VESSELL REFLEX OR VESSEL
MAG = Magnetic
Attachment C to Job Specification
NOTE 2 NON-REFLEX UUNNN
D/P TUR = Turbine
42 D/P MAN = Manometer TV = Television 42
123939-60A3. The attached drawings are
LT NOTE 3
UUNNN MECH = Mechanical
2" US = Ultrasonic
2"
the latest revision available in the project

INSTR.
DISP.
2" 2" MOIST = Moisture
INSTR.

2"
OR NOTE 3 2" 2" UV = Ultraviolet
MS = Mass spectrometer
when this Job Specification was issued.
40 GWR 40
2"
VAC = Vacuum
MS = Magnetostrictive

PIPING
These drawings are included here just for
3/4"
VEL = Velocity
PIPING

NOTE 5 NOTE 5
3/4"
NOTE 5 1/2" NIR = Near infrared
VENT = Venturi tube
38 NUC = Nuclear
VIS = Visible light reference. The drawings with the latest 38

O2 = Oxygen
OP = Opacity
VISC = Viscosity revision in the project documentation shall
36
OP = Orifice plate
VOR = Vortex Shedding
be used for the EFD/P&ID development. 36
WDG = Wedge
OP-CQ = Circle quadrant
WS = Weigh scale
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL OP-CT = Corner taps
34 \U+03B1 = Alpha radiation 34
OP-E = Eccentric THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
\U+03B2 = Beta radiation
OP-FT = Flange taps WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
\U+0393 = Gamma radiation
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
LEVEL TRANSMITTER WITH LEVEL MAG METER LEVEL GAUGE MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
D/P LEVEL TRANSMITTER
30 30

PIPING INSTR. LT
28 2"RF UUNNN 28
GWR
3/4"NPT V1
2" 2"
2" (TYP.) 3/4"
VESSEL VESSEL 2" 2" 2"
2" 2"
26 2" 26

2"
2" D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 24
LT
C NOT ISSUED
LT LG PIPING INSTR.
UUNNN
D/P
UUNNN
GWR
UUNNN
MAG
LG B NOT ISSUED
UUNNN
22 OR MAG 22
NOTE 3 DISP. NOTE 3 A NOT ISSUED
NOTE 5

REV. DATE DESCRIPTION DRW. CHK. APP.


2"
20
2" 2" 2" BY BY BY 20

INSTR.
2"
2" 2" LT
2" 2"
REVISIONS
UUNNN 3/4"

PIPING
18 18
NOTE 5
D/P

PIPING INSTR.
3/4" 3/4"
ECOPETROL S.A.
16
BARRANCABERMEJA 16

14 SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL


REFINERY 14

PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA


12 12

ENGINEERING FLOW DIAGRAM


10 10
LEVEL TRANSMITTER WITH LEVEL MAG METER LEVEL GAUGE
GENERAL LEGEND AND SYMBOLS
8 8
LEVEL INSTRUMENT DETAILS
PIPING INSTR.
6 V1 6
2" 3/4"
NOTE 5
VESSEL VESSEL 2" 2" BARRANCABERMEJA COLOMBIA
2"
4 4
2"
THIS DRAWING IS THE PROPERTY OF THE

2"X3/4"
FOSTER WHEELER USA CORP. HOUSTON, TEXAS
2 2
LT LG NPT AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
UUNNN UUNNN LG THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
D/P MAG INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
UUNNN SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
NOTE 3 2"X3/4" MAG COVERED BY PATENTS.
NPT
LT
2" 2" UUNNN D/P DESIGNED BY: DATE: CHECKED BY: DATE:
INSTR.

2" 2"
2"

2"
3/4" DRAWN BY: DATE: APPROVED BY: DATE:
PIPING

3/4"

PIPING INSTR.

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


SHOWN ON P&ID IMPLIED DETAIL DRAWING No. REV. No.
123939-0000-A1-50-010 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-010.pid


123939-0000-A1-50-011 GENERAL NOTES:
74 74
1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.
REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER 72
(UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
FLOW TRANSMITTER RESTRICTION ORIFICE FLOW TRANSMITTER WEDGE TYPE COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS.
70
FLOW TRANSMITTER PITOT TUBE FLOW TRANSMITTER RESTRICTION ORIFICE 2oo3 70
FT
UUNNNA
2. MINIMUM 2" DIAMETER.
68 3. NOTATION TO IDENTIFY TYPE OF ELEMENT. ACCORDING TO THE TABLE 1 68
P&ID 123939-0000-A1-50-010. REFER TO JOB SPEC 123939-60A3.
INSTRUMENTATION SYMBOLS AND IDENTIFICATION.
66 FT 66
UUNNNA FT 1/2"
UUNNNA 1/2"
4. PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT ISOLATION SHALL
FT INSTR.
UUNNN INSTR.
FT
UUNNNA PIPING. 2" 2"
NOT BE SHOWN ON P&ID'S.
64 FT PIPING. 1/2" 1/2" NOTE 5 NOTE 5 64
FT UUNNN H.P. L.P.
UUNNN FT
(TYP.)
H.P. L.P.
5. NUMBER OF PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT
NOTE 5 2oo3 VOTING
UUNNN 1/2" 1/2" ISOLATION SHALL BE IN ACCORDANCE WITH THE MAINTENANCE
INSTR.
62
PIPING. 1/2" 1/2"
ISOLATION PHILOSOPHY DESCRIBED ON THE DOCUMENT 62
NOTE 5 H.P. L.P. H.P. L.P. 123939-EN-12, PROCESS AND MAINTENANCE ISOLATION.
H.P. L.P. 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" PIPING.
INSTR. INSTR. 2" 2"
60 FT
UUNNNB
FT
UUNNNC
FT
UUNNND
FT FT FT PIPING. 1/2" 6. FOR FINAL DESTINATION OF VENT AND DRAIN CONNECTIONS REFER 60
UUNNNB UUNNNC UUNNND
1/2" TO THE MAIN EFD. THESE CONNECTIONS SHALL BE FINALIZED DURING
THE DETAIL DESIGN BY DEC. IN SOME SERVICES, INSTRUMENT VENTS
58 58
AND DRAINS MAY BE CONNECTED TO A SAFE LOCATION
(I.E. FLARE OR CLOSE DRAIN).
FT
56 UUNNNB FT 56
UUNNNB

SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID
54 IMPLIED DETAIL 54

52 52

50 FLOW TRANSMITTER RESTRICTION ORIFICE FLOW TRANSMITTER VENTURI TYPE VENTURY TYPE FLOW TRANSMITTER WITH CAPILLARY 50

48 48

46 46

FT
UUNNN
44 FT FT FT 44
FT UUNNN
UUNNNA UUNNNA UUNNN
INSTR.
PIPING. 1/2" 1/2" NOTE 5 INSTR. H.P. L.P.
NOTE 5
42
PIPING. 3/4" 3/4" FT
UUNNN
1/2" 1/2"
Attachment C to Job Specification 42

PIPING. 2" INSTR. 123939-60A3. The attached drawings are


40 1/2" 1/2" INSTR. PIPING. 2"
H.P. L.P.
2" NOTE 5
the latest revision available in the project 40
FT
UUNNNB FT
UUNNNB 300# when this Job Specification was issued.
38 These drawings are included here just for 38

reference. The drawings with the latest


36 revision in the project documentation shall 36

be used for the EFD/P&ID development.


34 SHOWN ON P&ID SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL 34
IMPLIED DETAIL THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30

28 28

26 26

D 9/30/2010 ISSUED FOR FEED MHA MB EK


24 24
C NOT ISSUED
B NOT ISSUED
22 22
A NOT ISSUED
REV. DATE DESCRIPTION DRW. CHK. APP.
20 BY BY BY 20

REVISIONS
18 18
ECOPETROL S.A.
16
BARRANCABERMEJA 16

14 REFINERY 14

PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA


12 12

ENGINEERING FLOW DIAGRAM


10 10
GENERAL LEGEND AND SYMBOLS
8 8
FLOW INSTRUMENT DETAILS
6 6

BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 2
AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-011 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-011.pid


123939-0000-A1-50-012 GENERAL NOTES:
74 74
1. ALL INSTRUMENT TAG NUMBERS SHALL INCLUDE THE UNIT IDENTIFIER.
REFER TO JOB SPECIFICATION 123939-60A3, INSTRUMENT SYMBOLS
72 AND IDENTIFICATION. THE NUMERIC COMPONANT OF THE TAG NUMBER 72

PRESSURE DIFFERENTIAL IN VESSEL (UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
PRESSURE DIFFERENTIAL IN LINE - CAPILLARY PRESSURE DIFFERENTIAL IN LINE
COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS.
70 70
PIPING. INSTR. 2. MINIMUM 2" DIAMETER.
68 3/4"NPT
3. NOTATION TO IDENTIFY TYPE OF ELEMENT. ACCORDING TO THE TABLE 1 68
NOTE 5 (TYP.) P&ID 123939-0000-A1-50-010. REFER TO JOB SPEC 123939-60A3.
INSTRUMENTATION SYMBOLS AND IDENTIFICATION.

PIPING.

PIPING.
INSTR.

INSTR.
66 3/4" 66
4. PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT ISOLATION SHALL
PDT NOT BE SHOWN ON P&ID'S.
PDT PDT UUNNN 3/4"NPT
64 UUNNN 3/4"NPT UUNNN 64
(TYP.)
5. NUMBER OF PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT

INSTR.
2" 2"RF
2"
(TYP.)
PDT ISOLATION SHALL BE IN ACCORDANCE WITH THE MAINTENANCE
UUNNN 3/4" 3/4"
62 300# 2"
1/2" 1/2" ISOLATION PHILOSOPHY DESCRIBED ON THE DOCUMENT 62
PDT
PDT
2" 2" UUNNN 123939-EN-12, PROCESS AND MAINTENANCE ISOLATION.
UUNNN NOTE 5 NOTE 5

PIPING.
2" 2"
NOTE 5

PIPING.
60 6. FOR FINAL DESTINATION OF VENT AND DRAIN CONNECTIONS REFER 60

INSTR.
TO THE MAIN EFD. THESE CONNECTIONS SHALL BE FINALIZED DURING
THE DETAIL DESIGN BY DEC. IN SOME SERVICES, INSTRUMENT VENTS
58 58
AND DRAINS MAY BE CONNECTED TO A SAFE LOCATION
(I.E. FLARE OR CLOSE DRAIN).
56 56

SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL
54 54

52 52

50 50

LOCAL PRESSURE GAUGE


48 48
LOCAL PRESSURE GAUGE WITH SEAL REMOTE PRESSURE GAUGE WITH CAPILLARY
PRESSURE TRANSMITTER IN LINE

46 46

44 44

Attachment C to Job Specification


42 PG 123939-60A3. The attached drawings are 42

the latest revision available in the project


PG UUNNN
PG PG
UUNNN UUNNN UUNNN PG
UUNNN
40 INSTR.
3/4"NPT PG
UUNNN 1/2"
2"RF
when this Job Specification was issued. 40
These drawings are included here just for
PIPING. NOTE 5 3/4"NPT 1/2" PT PT
3/4" INSTR. UUNNN UUNNN
INSTR.
PIPING.
reference. The drawings with the latest
2" NOTE 5 PIPING. 2" NOTE 5 3/4"NPT
2." INSTR.
38 38
revision in the project documentation shall
PIPING. 3/4" NOTE 5

36
be used for the EFD/P&ID development. 36

34 34
SHOWN ON P&ID SHOWN ON P&ID SHOWN ON P&ID THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
IMPLIED DETAIL IMPLIED DETAIL IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30

28 PRESSURE TRANSMITTER WITH GAUGE VESSEL 28


REMOTE PRESSURE TRANSMITTER WITH CAPILLARY REMOTE PRESSURE TRANSMITTER WITH CAPILLARY PRESSURE TRANSMITTER IN VESSEL
ON PIPING IN VESSEL
26 26

D 9/30/2010 ISSUED FOR FEED MHA MB EK


24 24
PG C NOT ISSUED
PG
NOTE 5 2"RF UUNNN
UUNNN
B NOT ISSUED
VESSEL

22 NOTE 5 22
VESSEL

2" 2" 2"


PT 2" 2" PT
A NOT ISSUED
PT 2" PT
UUNNN UUNNN 2" 2" UUNNN
PT 2" PT PT
UUNNN
UUNNN
REV. DATE DESCRIPTION DRW. CHK. APP.
UUNNN UUNNN
20
PT 1/2" BY BY BY 20
UUNNN 2"RF
2"RF 2"RF 3/4"NPT REVISIONS
PIPING.
INSTR.

3/4"NPT

PIPING.
INSTR.
1/2"

PIPING.
18 18

INSTR.
2."
INSTR.
PIPING. 2" NOTE 5 ECOPETROL S.A.
NOTE 5
16
BARRANCABERMEJA 16

14 REFINERY 14

SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID
12 IMPLIED DETAIL 12

ENGINEERING FLOW DIAGRAM


10 10
GENERAL LEGEND AND SYMBOLS
8 8
PRESSURE INSTRUMENT DETAILS
6 6

BARRANCABERMEJA COLOMBIA

4 4
THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER USA CORP. HOUSTON, TEXAS


2 2
AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-123939-04 NONE

CAD REV. DATE:


DRAWING No. REV. No.
123939-0000-A1-50-012 D

CAD DRAWING FILE : \\ushsncad03\SPPID\Ecopetrol\plants\Barrancabermeja\Refinery\U-0000 Legend Sheets\123939-0000-A1-50-012.pid

Вам также может понравиться