CONTENTS
TITLE PAGE 1
CONTENTS 2
I. PURPOSE 3
II. SCOPE 3
III. REFERENCE DOCUMENTS 3
A. Project Job Specifications 3
B. Applicable Standards 4
IV. DEFINITIONS 4
V. GENERAL 6
VI. FUNCTIONAL IDENTIFICATION 11
VII. LOOP IDENTIFICATION 16
VIII. SYMBOLS 16
ATTACHMENT A. ALLOWABLE FIRST LETTERS 18
ATTACHMENT B. INSTRMENT MEASUREMENT NOTAION TABLE 21
ATTACHMENT C. LEGEND AND SYMBOLS DRAWINGS 22
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 3 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
I. PURPOSE
This Job Specification provides criteria for the uniform and consistent
presentation of Instrument and Control Symbology and Identification on P&ID’s for
the ECOPETROL Barrancabermeja Refinery Modernization Project (PMRB) -
Barracabermeja, Colombia.
II. SCOPE
This Specification covers the generation of new P&IDs. It also applies to P&ID’s
provided by packaged equipment suppliers and to tagging conventions used in the
instrument database.
This document provides design guidelines for the P&ID symbol and identification
conventions associated with Instrumented Control Systems including the tagging
used for identifying hard & soft tags.
This document also provides several typical P&ID representations of the symbols
as linked to field sensing devices, motor and valve controls. The intention of
this document is to clarify how to represent Instrumentation symbols on P&IDs,
not to provide all details how to implement the control systems.
B. Applicable Standards
IV. DEFINITIONS
V. GENERAL
B. Each instrument, device or component in the project shall have a unique alpha-
numeric tag number using the following style:
XXXXX - UU NNN Z Z
| | | | |
| | | | Tag Number Suffix (1 letter)
| | | |
| | | Loop Number Suffix (1 letter)
| | |
| | Consecutive Number, 3 digits
| |
| Unit Identifier, 2 digits
|
Functional Identification (max 5 letter left justified)
D. The Loop Number Suffix may be added to a Loop Number to identify identical
loops on identical equipment in the same processing unit when the service or
equipment is assigned the same equipment identification number with a suffix,
such as reactors, heat exchangers, and pumps. The Loop Suffix shall be one
letter and shall be located after the numeric component of the tag number.
E. The Tag Number Suffix shall be one letter and shall be located after the loop
number suffix if it is used or after the numeric component of the tag number
if the loop number suffix is not used. The tag number suffix may be added to
Instrument Tag Numbers in the loop to designate two or more similar devices or
functions:
2. Case 2 – in the same service, such as control valves that direct flow to
the same place or auxiliary devices, such as those that perform the same
function.
F. For the new Units, the Unit identifier will be a two digit number as shown in
the table V.2 and the consecutive number will be a three-digit number between
001 and 999.
G. For existing Units, the unit number will be a two-digit number. For process
areas with similar Unit Number (i.e. U-200 and U-2000), a leading zero shall
be included as part of the unit identifier. The consecutive number will be a
three-digit number limited by the numerical sequence of the similar unit
number: i.e. for process areas U-200 and U-250, the consecutive number will be
between 000 and 499 for unit U-200 and will be between 500 and 999 for unit U-
250. In this case, the numeric component of the tag number (UU NNN) shall be
provided by the Owner. See examples below:
Tag Components
New Units
H. The Unit Identifier shall follow the proposed Unit Numbers in the project as
per Table V.2 below. This table shall be consulted together :
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 8 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
Unit Unit
Unit Name Remarks
Number Identifier
Coking Naphtha
U-8300 83 New
Hydrodesulphurization Unit (CNHU)
Unit Unit
Unit Name Remarks
Number Identifier
69
U-6900 Liquid Sulfur Gantry New
U-7000 Spare 70
Replacement and
U-7200 Storage Tanks 72
Relocation
Unit Unit
Unit Name Remarks
Number Identifier
K. Control Valves shall be identified with letters (FV, PV, LV, TV, etc). New
positioners for existing valves shall be added to the instrument database
under the same valve tag with a comment “ Existing Valve – New Positioner”
TI TI TI
82001 82002 82004
TT TE TT
82003 82001 82004
TE
TE 82004
82002
O. The numeric component of Tag Numbers may be duplicated within the same unit
area (e.g. FT -63001 and LT -63001 have a different first letter but have
the same numeric component, 63001).
C. The modifiers [R]=Run / [S]=Stop and [C]=Close / [O]=Open for the succeeding
letters shall be used for the Run/Stop and Close/Open signals rather than
suffixes (e.g. the Run/Stop push button shall be tagged as HSR -82001 and HSS
-82001 instead of HS -82001A and HS -82001B).
E. Auxiliary devices like solenoid valves shall be tagged based upon their
initiating loop and not upon their output loop.
F. All Control Functions shall include the modifier [I] (e.g. FIC -82001 instead
of FC -82001).
G. Safety valve, pressure relief valve, safety relief valve, vacuum relief valve
and thermal relief valve shall use the functional identification [PSV]. An
Identification / Tag Number Suffix could be added to Identification / Tag
Numbers of these valves in case of a multiple relief valve system scenario.
H. The Deviation Alarm is an alarm generated when the difference between two
analog values exceeds a limit (e.g., deviation between primary and redundant
instruments or a deviation between process variable and setpoint). The general
deviation alarm between redundant transmitters shall use the functional
identification [*AD*], i.e. the high deviation alarm for the transmitters PT
-82501A, PT -82501B and PT -82501C shall be PADH -82501.
I. The Motor Operated Valves for the Offsite Area (U-7100) and the existing units
could be identified [MOV] to keep consistency with the existing tag naming
convention in the ECOPETROL Barrancabermeja Refinery.
J. The Tank Gauging System and Motor Operated Valve host stations could use the
functional identification [UK].
K. The Level Transmitter part of a Tank Gauging System shall use the functional
identification [UT] instead of [LT]. This level transmitter usually gets
multiple process variables (level, pressure and temperature) for the tank
gauging system.
L. The water level transmitter part of the existing Tank Gauging System could use
the functional identification [NT] or [LT] in accordance with tag naming
convection existing unit.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 13 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
M. The Variable Modifier [Z] shall be used to identify components of the Safety
Instrumented Systems.
O. The attachment A includes a table with the allowable first letters for single
and multi-input components.
P. The Measurable Variable [Y] should be used for sequence controlled logic which
is associated with batch control (i.e. Coke Drum Valving sequence).
TABLE VI.1
See Notes for Table VI.1 -- Meanings of Identification Letters – in the next
page.
(Reference ANSI/ISA-5.1-2009 Section 4)
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 15 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
2. The unclassified letter [X] is intended to cover unlisted meanings that will
be used only once or to a limited extent. If used, the letter may have any
number of meanings as a first-letter and may have any number of meanings as a
succeeding-letter. Except for its use with distinctive symbols, it is
expected that the meanings will be defined outside a tagging balloon on a
P&ID. For example, XR -00002 may be a stress recorder, XR -00003 may be a
vibration recorder, and XX -00004 may be a stress oscilloscope.
3. First-letter [A] for analysis covers all analyses that are not listed in Table
2 and are not covered by a user's choice letter. It is expected that the type
of analysis in each instance will be defined outside a tagging balloon on a
P&ID.
X - UU NNN Z
| | | |
| | | |
| | | |
| | | Loop Number Suffix (1 letter)
| | |
| | Consecutive Number, 3 digits
| |
| Unit Identifier, 2 digits
|
First Letter - Functional Identification (max 2 letter left justified)
C. A Loop Number Suffix may be added to a Loop Number to identify identical loops
on identical equipment in the same processing unit when the service or
equipment is assigned the same equipment identification number with a suffix,
such as reactors, heat exchangers, and pumps. The Loop Suffix shall be one
letter and shall be located after the numeric component of the Loop
Identification Number.
VIII. SYMBOLS
See Legend Sheets in attachment C. These letters shall be placed at the lower
right of an instrument balloon as follow: (V) and (LP).
D. The actuator action (FO, FL, FC) in the event of actuating medium failure
shall be shown on the P&ID’s, close to the control valves. (Based on
ANSI/ISA-5.1-2009 Table 5.4.4 Method A).
E. Most of instruments balloons used for tagging shall be solid line on P&ID's.
These instruments may be repeated on auxiliary flow diagrams (AFD's), in
phantom to provide a clear functional understanding. If it is required to show
the same balloon in two different P&ID’s, just one of them shall be shown with
solid line and the other ones shall be shown with dash lines.
F. An arrow head shall be used when required to clarify the direction of the
signal for all line types. It shall be shown at the end of the line where it
enters a device.
G. All alarm/trip values (i.e. temperature, flow, pressure, etc.) shall NOT be
shown on P&IDs but shall be provided as part of the instrument database.
H. The circle within a square shall represent the Primary shared-display, shared-
control system devices or functions. If the system is other than the
primary DCS device or function, it can be identified as notation outside of
the bubble; such as PLC-1.
I. The rotated square within a square shall represent the Safety Instrumented
System devices or system. If the system is other than the primary SIS device
or function, it can be identified as notation outside of the bubble, such as
BMS-1.
J. The type of elements for temperature primary elements and level transmitter
shall be identified on the EFD according to the instrument measurement
notation table in the attachment B on this Job Specification.
K. The Tank Gauging System and Motor Operated Valve host stations shall use the
Computer System and Software Symbol shown in the ANSI/ISA-5.1-2009, Table
5.1.1 Symbol No 3 Column C.
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 18 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Analysis A U First Letter for the
loop which normally
Analysis(SIS) AZ UZ
actuates the
Burner, Combustion B U instrument:
Burner, BZ UZ
Combustion(SIS)
User’s Choice C U
User’s Choice D U
Voltage E U
Voltage(SIS) EZ UZ
Flow, Flow Rate F U
Flow Ratio FF
Flow Total FQ UQ
Flow Safety FS
Flow(SIS) FZ UZ
User’s Choice G U
Hand H U
Hand(SIS) HZ UZ
Current I U
Current(SIS) IZ UZ
Power J
Power Totalize JQ
Power(SIS) JZ
Time, Schedule K U
Time Totalize KQ UQ
Level L U
Level(SIS) LZ UZ
User’s Choice M U
User’s Choice N U
User’s Choice O U
Pressure P U
Pressure Difference PD
Pressure PD UD
Differential
Pressure Ratio PF
Pressure Scan PJ PJ
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 19 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Pressure Rate of PK UK First Letter for the
Change loop which normally
Pressure Safety PS actuates the
instrument:
Pressure(SIS) PZ UV
Quantity Q U
Quantity Totalize QQ UQ
Radiation R U
Radiation Totalize RQ UQ
Radiation(SIS) RZ UZ
Speed, Frequency S U
Speed(SIS) SZ UZ
Temperature T U
Temperature TD
Difference
Temperature TD UD
Differential
Temperature Ratio TF
Temperature Scan TJ
Temperature Rate of TK UK
Change
Temperature Safety TS
Temperature(SIS) TZ UZ
Multivariable U
Multivariable Scan UJ
Multivariable(SIS) UZ
Vibration, V U
Machinery Analysis
Vibration(SIS) VZ UZ
Vibration X-Axis VX UX
Vibration Y-Axis VY UY
Vibration Z-Axis VZ UZ
Vibration X- VZX UZX First Letter for the
Axis(SIS) loop which normally
Vibration Y- VZY UZY actuates the
Axis(SIS) instrument:
Vibration Z- VZZ UZZ
Axis(SIS)
Weight, Force W U
Force(SIS) WZ UZ
Weight Difference WD
Weight Differential WD UD
Weight Ratio WF
Weight Loss (Gain) WK UK
Weight Total WQ UQ
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 20 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
First Letters
Measured/Initiating Measured/Initiating Variables (w/ and w/o Modifiers)
Variables
Multi-Input Component
Name Single Input Common to Common to Two Loops
Component Single Loop
Force X Axis WX UX
Force Y Axis WY UY
Force Z Axis WZ UZ
Force X Axis(SIS) WZX UZX
First Letter for the
Force Y Axis(SIS) WZY UZY
loop which normally
Force Z Axis(SIS) WZZ UZZ actuates the
Unclassified X U instrument:
Event, State, Y Y
Presence
Event, State(SIS) YZ YZ
Position, Dimension Z U
Position(SIS) ZZ UZ
Position X Axis ZX UX
Position Y Axis ZY UY
Position Z Axis ZZ UZ
Position X ZZX UZX
Axis(SIS)
Position Y ZZY UZY
Axis(SIS)
Position Z ZZZ UZZ
Axis(SIS)
Position Difference ZD UD
Position Difference ZDX UDX
X Axis
Position Difference ZDY UDY
Y Axis
Position Difference ZDZ UDZ
Z Axis
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 21 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
Analysis
AIR = Excess air H2O =
Water O2 = Oxygen UV = Ultra-violet
CO = Carbon monoxide H2S =
Hydrogen OP = Opacity VIS = Visible light
CO2 = Carbon dioxide HUM =
Humidity ORP = Oxidation VISC = Viscosity
COL = Color IR =
Infrared pH = Hydrogen ion =
COMB = Combustibles LC =
Liquid REF = Refractometer =
COND = Elec. MOIS =
Moisture RI = Refractive =
DEN = Density MS =
Mass TC = Thermal =
GC = Gas NIR =
Near infrared TDL = Tunable Diode =
Flow
CFR = Constant flow OP = Orifice plate PT = Pitot tube VENT = Venturi tube
CONE = Cone OP- = Corner taps PV = Pitot venturi VOR = Vortex Shedding
COR = Coriollis OP- = Circle quadrant SNR = Sonar WDG = Wedge
DOP = Doppler OP-E = Eccentric SON Sonic =
DSON = Doppler sonic OP- = Flange taps TAR = Target
FLN = Flow nozzle OP- = Multi-hole THER = Thermal =
FLT = Flow tube OP-P = Pipe taps TTS = Transit time =
LAM = Laminar OP- = Vena contracta TUR = Turbine =
MAG = Magnetic PD = Positive US = Ultrasonic =
Level
CAP = Capacitance GWR = Guided wave NUC = Nuclear US = Ultrasonic
d/p = Differential LSR = Laser RAD = Radar DISP = Displacer
DI = Dielectric MAG = Magnetic RES = Resistance REFL = Reflex
DP = Differential MS = Magnetostrictive SON = Sonic N-REF = Non-Reflex
Pressure
ABS = Absolute MAN = Manometer VAC = Vacuum
AVG = Average P-V = Pressure-vacuum =
DRF = Draft SG = Strain gage = =
Temperature
BM = Bi-metallic RTD = Resistance temp TCK = Thermocouple TRAN = Transistor
IR = Infrared TC = Thermocouple TCT = Thermocouple =
RAD = Radiation TCE = Thermocouple THRM = Thermistor =
RP = Radiation TCJ = Thermocouple TMP = Thermopyle =
Miscellaneous
Burner, Combustion Position Quantity Radiation
FR = Flame rod CAP = Capacitance PE = Photoelectric α = Alpha radiation
IR = Infrared EC = Eddy current TOG = Toggle β = Beta radiation
TV = Television IND = Inductive = γ = Gamma radiation
UV = Ultraviolet LAS = Laser = n = Neutron
= MAG = Magnetic = =
= MECH = Mechanical = =
= OPT = Optical = =
= RAD = Radar = =
= = = =
Speed Weight, Force
ACC = • Acceleration LC = Load cell = =
EC = • Eddy current SG = Strain gauge = =
PROX = • Proximity WS = Weigh scale = =
VEL = • Velocity = = =
= = = =
ECOPETROL BARRANCABERMEJA FWUSAC
SPECIFICATION No: 123939-60A3
BARRANCABERMEJA REFINERY MODERNIZATION PROJECT (PMRB) Page 22 of 22
BARRANCABERMEJA, COLOMBIA REV No: 1
Note: The attached drawings are the latest revision available in the project when this
Job Specification was issued. These drawings are included here just for reference. The
drawings with the latest revision in the project documentation shall be used for the
EFD/P&ID development.
Attachment C to Job Specification
123939-60A3. The attached drawings are
the latest revision available in the project
when this Job Specification was issued.
These drawings are included here just for
reference. The drawings with the latest
revision in the project documentation shall
be used for the EFD/P&ID development.
123939-0000-A1-50-005 GENERAL NOTES:
74 74
NOTE 5 NOTE 5 NOTE 5 NOTE 5 2. INTERLOCK DESIGNATION IS SHOWN IN THE MAIN EFD. "Z" INTERLOCK
68
POS IND AIR SUPPLY POS IND AIR SUPPLY DESIGNATION IS SHOWN IN THE DETAIL FOR REFERENCE ONLY. 68
HAC HAC HAC ZLC ZLO ZI PI HAC HAC HAC ZLC ZLO ZI PI 3. ESD PUSH BUTTONS ARE SHOWN IN THE MAIN EFD'S AS REQUIRED.
66
UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN L UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN L NOTE 5 NOTE 5 DETAIL ENGINEERING CONTRACTOR SHALL VERIFY THE REQUIREMENT 66
L L
POS IND AIR SUPPLY FOR INDIVIDUAL PUSH BUTTONS PER VALVE IN THE CONTROL ROOMS
(LOCAL CONTROL ROOM AND REMOTE CONTROL ROOM) TO AVOID
64 ZLC ZLO ZI PI DUPLICATED FUNCTION. 64
ECC CCL LOCAL ECC CCL LOCAL ECC CCL LOCAL ECC CCL LOCAL
UUNNN UUNNN UUNNN UUNNN L
HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC HSC LOCKUP RELAY L 4. DETAIL ENGINEERING CONTRACTOR SHALL UPDATE THESE DETAILS
62
UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C UUNNN A UUNNN B UUNNN C BASED ON THE SELECTED VALVE VENDOR. THE FINAL DETAIL SHALL 62
INCLUDE ALL THE INSTRUMENTATION AND SIGNALS REQUIRED FOR
THE PARTIAL STROKE TEST IN ACCORDANCE WITH THE SAFETY
60 60
IA REQUIREMENTS.
5. POSITION INDICATION AND AIR SUPPLY PRESSURE AVAILABLE IN THE
58 Z Z Z Z Z Z 58
VALVE ELECTRO-PNEUMATIC POSITIONER VIA HART PROTOCOL.
RESERVOIR
NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 3, 4 NOTES 2, 4 NOTES 2, 3, 4 6. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS
56 56
SHALL CARRY THE SAME CONECUTIVE NUMBER (PPNNN) OF THE VALVE
ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO TAG SHOWN ON THE P&ID.
54 UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN R 54
7. FIREPROOFING REQUIREMENTS FOR POWER AND SIGNAL WIRING
EP EP EP EP EP EP SHALL BE SPECIFIED IN THE MAIN EFD.
IA IA IA
52 52
8. INTEGRAL OPEN / CLOSE / STOP PUSH BUTTONS SHALL BE PROVIDED
FOR EACH MOTOR OPERATED VALVE.
UV
+
UV
+
UV
+
UV
+
UV
+
UV
+
50 50
UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN 9. DETAILED ENGINEERING CONTRACTOR SHALL INCLUDED ALL THE
EV-1 EV-2 EV-3 COMMUNICATION REQUIREMENTS FOR THE MOTOR OPERATED
48 SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL VALVES. 48
NOTE 6 NOTE 6 NOTE 6
10. VALVE BODY TYPE IS SHOWN ON MAIN EFD.
46 46
CONDITIONAL
CONDITIONAL
30
IA NOTE 2, 4 NOTE 2, 3, 4 30
Z Z
Z Z
ESD
ESD
28 28
RESERVOIR
NOTES 2, 4 NOTES 2, 4
26 UY UY ZT UY UY UY ZT UY 26
ZSC ZSO ZSC ZSO ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C
UUNNN UUNNN R UUNNN UUNNN R UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN D 9/30/2010 ISSUED FOR FEED MHA MB EK
M M M M
24 NOTE 8, 9 NOTE 8, 9 C NOT ISSUED
24
EP EP NOTE 8 NOTE 8
B NOT ISSUED
22 22
UU UU A NOT ISSUED
MCS MCS
UV UV UV UV DRW. CHK. APP.
+ +
+ +
UV UV REV. DATE DESCRIPTION
20 UUNNN UUNNN UUNNN UUNNN +
+ BY BY BY 20
EV-5 UUNNN UUNNN
EV-4 EV-6 REVISIONS
18
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL 18
NOTE 6 NOTE 6, 7 NOTE 6, 7 ECOPETROL S.A.
16
BARRANCABERMEJA 16
14 REFINERY 14
BARRANCABERMEJA COLOMBIA
4 4
THIS DRAWING IS THE PROPERTY OF THE
UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN 2. INTERLOCK DESIGNATION IS SHOWN IN THE MAIN EFD. "Z" INTERLOCK
68 DESIGNATION IS SHOWN IN THE DETAIL FOR REFERENCE ONLY. 68
ZLC ZLO ZI UA ZLC ZLO ZI UA 3. ESD PUSH BUTTONS ARE SHOWN IN THE MAIN EFD'S AS REQUIRED.
66 ECC CCL LOCAL DETAIL ENGINEERING CONTRACTOR SHALL VERIFY THE REQUIREMENT 66
UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN UUNNN
HSC HSC HSC FOR INDIVIDUAL PUSH BUTTONS PER VALVE IN THE CONTROL ROOMS
ECC CCL LOCAL (LOCAL CONTROL ROOM AND REMOTE CONTROL ROOM) TO AVOID
UUNNN A UUNNN B UUNNN C
64 DUPLICATED FUNCTION. 64
HSC HSC HSC
NOTE 2, 3, 4
UUNNN A UUNNN B UUNNN C 4. DETAIL ENGINEERING CONTRACTOR SHALL UPDATE THESE DETAILS
NOTE 2, 4 NOTE 2, 4
62 BASED ON THE SELECTED VALVE VENDOR. THE FINAL DETAIL SHALL 62
CONDITIONAL
CONDITIONAL
CONDITIONAL
60 NOTE 2, 4 NOTE 2, 3, 4 NOTE 2, 4 REQUIREMENTS. 60
ESD
ESD
ESD
58 58
VALVE ELECTRO-PNEUMATIC POSITIONER VIA HART PROTOCOL.
6. ALL INSTRUMENT TAG NUMBERS SHOWN ON THE IMPLIED DETAILS
56 YY YY ZT UY YY YY ZT UY HY HY ZT UY SHALL CARRY THE SAME CONECUTIVE NUMBER (PPNNN) OF THE VALVE 56
ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN C ZSC ZSO ZSC ZSO UUNNN A UUNNN B UUNNN UUNNN TAG SHOWN ON THE P&ID.
UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M UUNNN UUNNN M
54 NOTE 8, 9 NOTE 8, 9 NOTE 8, 9 7. FIREPROOFING REQUIREMENTS FOR POWER AND SIGNAL WIRING 54
44 DETAIL EV-10 44
MOTOR OPERATED VALVE WITH ESD PUSH BUTTONS
Attachment C to Job Specification
42
123939-60A3. The attached drawings are 42
UUNNN A UUNNN B UUNNN C UUNNN UUNNN UUNNN UUNNN These drawings are included here just for
38 reference. The drawings with the latest 38
30 NOTE 2, 3, 4 30
Z
ESD
28 28
26 HY HY ZT UY 26
NOTE 8
B NOT ISSUED
22 22
UU A NOT ISSUED
MCS
HV +
HV + DRW. CHK. APP.
UUNNN UUNNN REV. DATE DESCRIPTION BY BY BY
20 20
EV-10
REVISIONS
18
SHOWN ON P&ID IMPLIED DETAIL 18
NOTE 6, 7 ECOPETROL S.A.
16
BARRANCABERMEJA 16
14 REFINERY 14
BARRANCABERMEJA COLOMBIA
4 4
THIS DRAWING IS THE PROPERTY OF THE
MOTORS UP TO 125 HP AND FROM 125 HP TO 250 HP @ 1800 RPM. MOTORS UP TO 125 HP AND FROM 125 HP TO 250 HP @ 1800 RPM NO START FROM DCS. MOTORS FROM 125 HP TO 250 HP @ 3600 RPM AND FROM 250 HP TO 500 HP 3. LOCAL CONTROL STATIONS SHALL BE PROVIDED AND SHALL CARRY
66 THE MOTOR TAG NUMBER. 66
II H
II H
II H UUNNN MOTOR CURRENT
52
MOTOR CURRENT UUNNN MOTOR CURRENT 52
UUNNN
TI H
50 50
UUNNN A HIGHEST
WINDING TEMP.
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL
48 (NOTE 4) (NOTE 4) (NOTE 4) H
48
TI
UUNNN B HIGHEST
46
BEARING TEMP. 46
44 44
34 34
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30
28 28
26 26
H H H
ENGINEERING FLOW DIAGRAM
II II II
10 10
UUNNN MOTOR CURRENT UUNNN MOTOR CURRENT UUNNN MOTOR CURRENT GENERAL LEGEND AND SYMBOLS
8 8
TI H TI H TI H PUMP AND MIXERS MOTOR CONTROL DETAILS
SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST SHOWN ON P&ID IMPLIED DETAIL UUNNN A HIGHEST
WINDING TEMP. WINDING TEMP. WINDING TEMP.
6 (NOTE 4) (NOTE 4) (NOTE 4) 6
H H H BARRANCABERMEJA COLOMBIA
TI TI TI
4 UUNNN B HIGHEST UUNNN B HIGHEST UUNNN B HIGHEST THIS DRAWING IS THE PROPERTY OF THE
4
BEARING TEMP. BEARING TEMP. BEARING TEMP.
FOSTER WHEELER USA CORP. HOUSTON, TEXAS
2 VI H VI H AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT 2
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
UUNNN HIGHEST UUNNN HIGHEST INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
VIBRATION VIBRATION SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.
AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS SHALL CARRY THE SAME CONSECUTIVE NUMBER
66
(UUNNN AND UUZZZ) OF THE DCS INSTRUMENT TAG NUMBER 66
(HC-UUNNN AND HC-UUZZZ) SHOWN ON THE MAIN EFD.
64 64
62 62
VAHH VAHH
UUNNN A UUNNN
ZZZ A
60 60
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A
58 I I 58
M M M M
56 VI H VT VE VE VT VI H 56
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
FAULT OR TRIP
FAULT OR TRIP
VAHH VAHH
RUN STATUS
RUN STATUS
54 54
UUNNN B MOTOR II H II H ZZZ B
UUNNN
CURRENT UUNNN UUZZZ MOTOR
START
START
STOP
STOP
52 HC HC CURRENT 52
UUNNN UUZZZ
50
AC-01 HYR YYR HYR YYR 50
HC HC
44
UUNNN UUZZZ
Attachment C to Job Specification 44
START/STOP START/STOP
123939-60A3. The attached drawings are
42 RUN STATUS RUN STATUS the latest revision available in the project 42
FAULT OR TRIP FAULT OR TRIP when this Job Specification was issued.
40
These drawings are included here just for 40
IMPLIED DETAIL
(NOTE 3) reference. The drawings with the latest
38
revision in the project documentation shall 38
be used for the EFD/P&ID development.
36 36
34 DETAIL AC-02 34
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
AIR COOLER MOTOR CONTROL - UP TO 125 HP MOTORS WITH AUTO / MANUAL STATUS WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30
28 28
VAHH VAHH
UUNNN A UUNNN
ZZZ A
26 26
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 I I C NOT ISSUED
24
M M M M B NOT ISSUED
VI H VT VE VE VT VI H
AUTO
22 22
A NOT ISSUED
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
DRW. CHK. APP.
FAULT OR TRIP
FAULT OR TRIP
VAHH UY VAHH REV. DATE DESCRIPTION BY BY BY
RUN STATUS
RUN STATUS
20 20
UUNNN B MOTOR II H UUNNN B II H UUNNN
ZZZ B
CURRENT UUNNN MOTOR REVISIONS
UUZZZ
START
START
STOP
STOP
HC HC CURRENT
AUTO
18 18
HC HC
ENGINEERING FLOW DIAGRAM
10 10
UUNNN UUZZZ
GENERAL LEGEND AND SYMBOLS
START/STOP/AUTO START/STOP/AUTO
8 RUN STATUS RUN STATUS 8
FAULT OR TRIP FAULT OR TRIP
AIR COOLER
6
IMPLIED DETAIL MOTOR CONTROL DETAILS 6
4 4
THIS DRAWING IS THE PROPERTY OF THE
M M M M
56 VI H VT VE VE VT VI H 56
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
FAULT OR TRIP
FAULT OR TRIP
VAHH VAHH
RUN STATUS
RUN STATUS
54 54
TY TIC UUNNN B MOTOR II H II H UUZZZ B
UU UU CURRENT UUNNN UUZZZ MOTOR
START
START
STOP
STOP
52 HC HC CURRENT 52
UUNNN UUZZZ SI H
50
AC-03 HYR YYR HYR YYR SIC UUZZZ MOTOR 50
SPEED
UUNNN UUNNN UUZZZ UUZZZ UUZZZ
SHOWN ON P&ID UA
48 48
HYS UY HYS UY UUZZZ COMMON
ALARM
UUNNN UUNNN UUZZZ UUZZZ TY TIC
46 46
UU NOTE 5 UU
HC HC
44 44
UUNNN UUZZZ
START/STOP START/STOP
42 RUN STATUS RUN STATUS Attachment C to Job Specification 42
FAULT OR TRIP FAULT OR TRIP
123939-60A3. The attached drawings are
40
IMPLIED DETAIL
the latest revision available in the project 40
28 28
VAHH VAHH
UUNNN A UUNNN
ZZZ A
26 26
VI H VT VE VE VT VI H
UUNNN A UUNNN A UUNNN A UUZZZ A UUZZZ A UUZZZ A D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 I I C NOT ISSUED
24
M M M M B NOT ISSUED
22 VI H VT VE VE VT VI H 22
A NOT ISSUED
UUNNN B UUNNN B UUNNN B UUZZZ B UUZZZ B UUZZZ B
DRW. CHK. APP.
FAULT OR TRIP
FAULT OR TRIP
VAHH VAHH REV. DATE DESCRIPTION BY BY BY
RUN STATUS
RUN STATUS
20 20
UUNNN B MOTOR II H II H UUNNN
ZZZ B
CURRENT UUNNN MOTOR REVISIONS
UUZZZ
START
START
STOP
STOP
18 TY HC HC CURRENT 18
TY
UU UUNNN UUZZZ UU MOTOR SI H SI H ECOPETROL S.A.
AC-04 SPEED UUZZZ MOTOR
16 UUNNN SIC HYR YYR HYR YYR SIC
SPEED BARRANCABERMEJA 16
4 4
THIS DRAWING IS THE PROPERTY OF THE
INSTR.
68
VESSEL VESSEL
LT LT LT LT UUNNN UUNNN AVG = Average OP-P = Pipe taps 68
UUNNNA UUNNNB UUNNNC UUNNNA DISP. DISP.
BM = Bi-metallic
3. NOTATION TO IDENTIFY TYPE OF ELEMENT. ACCORDING TO THE TABLE 1
VESSEL DISP. LT VESSEL
LT LT
2" OR 2" OR OPT = Optical
DISP. GWR GWR
2" GWR GWR P&ID 123939-0000-A1-50-010. REFER TO JOB SPEC 123939-60A3.
PIPING
2" 2" 2" 2" UUNNNB NOTE 5 UUNNNA UUNNNB CAP = Capacitance
NOTE 3 LT NOTE 3 NOTE 2 OP-VC = Vena contracta taps
GWR
LT INSTRUMENTATION SYMBOLS AND IDENTIFICATION.
INSTR.
DISP. 2" GWR
66 3"
3" 2"
2" UUNNNC 2"
2"
UUNNNC 2"RF CFR = Constant flow regulator ORP = Oxidation reduction 66
GWR (TYP.)
3"
2" 2" GWR CO = Carbon monoxide PD = Positive displacement
2" NOTE 3 3" 2" VESSEL VESSEL 4. PRIMARY ROOT/BLOCK VALVES FOR INSTRUMENT ISOLATION SHALL
PIPING
CO2 = Carbon dioxide PE = Photoelectric
64 2"
2" 2"
NOT BE SHOWN ON P&ID'S. 64
2" 2" 2" COL = Color pH = Hydrogen ion
LT LT LT NOTE 2
UUNNNA UUNNNB UUNNNC 2" 2" 2" COMB = Combustibles PROX = Proximity 5. NUMBER OF PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT
NOTE 2 NOTE 2 NOTE 2
DISP. GWR GWR 2" COND = Elec. conductivity PT = Pitot tube ISOLATION SHALL BE IN ACCORDANCE WITH THE MAINTENANCE
62 62
3" 3" 2" CONE = Cone PV = Pitot venturi ISOLATION PHILOSOPHY DESCRIBED ON THE DOCUMENT
NOTE 3 2"
2"
COR = Coriollis P-V = Pressure-vacuum 123939-EN-12, PROCESS AND MAINTENANCE ISOLATION.
INSTR.
3/4"
60
3"
3" 2" 2" 2" D/P = Differential pressure RAD = Radar 60
3/4" DEN = Density RAD = Radiation 6. FOR FINAL DESTINATION OF VENT AND DRAIN CONNECTIONS REFER
INSTR.
2"
3/4"
DISP = Displacer
PIPING
3/4" NOTE 5 REF = Refractometer TO THE MAIN EFD. THESE CONNECTIONS SHALL BE FINALIZED DURING
58 NOTE 5 3/4" 3/4" 3/4" DI = Dielectric constant RES = Resistance THE DETAIL DESIGN BY DEC. IN SOME SERVICES, INSTRUMENT VENTS 58
PIPING
PIPING
DOP = Doppler RI = Refractive index AND DRAINS MAY BE CONNECTED TO A SAFE LOCATION
DP = Differential pressure RP = Radiation pyrometer (I.E. FLARE OR CLOSE DRAIN).
56 DRF = Draft 56
RTD = Resistance temp detector
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL DSON = Doppler sonic SG = Strain gage
EC = Eddy current SNR = Sonar
54 54
FLN = Flow nozzle
SON Sonic
FLT = Flow tube
TAR = Target
FR = Flame rod
52
LEVEL TRANSMITTER DISPLACER OR GWR / STANDPIPE BY INSTRUMENTS TC = Thermal conductivity 52
LEVEL GLASS GAUGE VESSEL LEVEL TRANSMITTER CAPILLARY VESSEL GC = Gas chromatograph
TC = Thermocouple
GWR = Guided wave radar TCE = Thermocouple type E
50 H2O = Water TCJ = Thermocouple type J 50
3/4" H2S = Hydrogen sulfide TCK = Thermocouple type K
PIPING
2" V1 HUM = Humidity TCT = Thermocouple type T
PIPING.
LT 2" IND = Inductive
INSTR.
48 VESSELL 2" 48
UUNNN TDL = Tunable Diode Laser
INSTR.
DISP.
2" IR = Infrared
OR
GWR 2" THER = Therma
NOTE 2 2" 2" LAM = Laminar THRM = Thermistor
46 46
PIPING INSTR.
2"RF LAS = Laser TMP = Thermopyle
(TYP.)
LC = Liquid chromatograph TOG = Toggle
VESSEL VESSEL LG 1/2"
2"
UUNNN
LC = Load cel TRAN = Transistor
44 2" LG 44
VESSEL LT
REFLEX OR
NON-REFLEX
UUNNN
UUNNN LT
LSR = Laser TTS = Transit time sonic
2" VESSELL REFLEX OR VESSEL
MAG = Magnetic
Attachment C to Job Specification
NOTE 2 NON-REFLEX UUNNN
D/P TUR = Turbine
42 D/P MAN = Manometer TV = Television 42
123939-60A3. The attached drawings are
LT NOTE 3
UUNNN MECH = Mechanical
2" US = Ultrasonic
2"
the latest revision available in the project
INSTR.
DISP.
2" 2" MOIST = Moisture
INSTR.
2"
OR NOTE 3 2" 2" UV = Ultraviolet
MS = Mass spectrometer
when this Job Specification was issued.
40 GWR 40
2"
VAC = Vacuum
MS = Magnetostrictive
PIPING
These drawings are included here just for
3/4"
VEL = Velocity
PIPING
NOTE 5 NOTE 5
3/4"
NOTE 5 1/2" NIR = Near infrared
VENT = Venturi tube
38 NUC = Nuclear
VIS = Visible light reference. The drawings with the latest 38
O2 = Oxygen
OP = Opacity
VISC = Viscosity revision in the project documentation shall
36
OP = Orifice plate
VOR = Vortex Shedding
be used for the EFD/P&ID development. 36
WDG = Wedge
OP-CQ = Circle quadrant
WS = Weigh scale
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL OP-CT = Corner taps
34 \U+03B1 = Alpha radiation 34
OP-E = Eccentric THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
\U+03B2 = Beta radiation
OP-FT = Flange taps WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
\U+0393 = Gamma radiation
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
LEVEL TRANSMITTER WITH LEVEL MAG METER LEVEL GAUGE MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
D/P LEVEL TRANSMITTER
30 30
PIPING INSTR. LT
28 2"RF UUNNN 28
GWR
3/4"NPT V1
2" 2"
2" (TYP.) 3/4"
VESSEL VESSEL 2" 2" 2"
2" 2"
26 2" 26
2"
2" D 9/30/2010 ISSUED FOR FEED MHA MB EK
24 24
LT
C NOT ISSUED
LT LG PIPING INSTR.
UUNNN
D/P
UUNNN
GWR
UUNNN
MAG
LG B NOT ISSUED
UUNNN
22 OR MAG 22
NOTE 3 DISP. NOTE 3 A NOT ISSUED
NOTE 5
INSTR.
2"
2" 2" LT
2" 2"
REVISIONS
UUNNN 3/4"
PIPING
18 18
NOTE 5
D/P
PIPING INSTR.
3/4" 3/4"
ECOPETROL S.A.
16
BARRANCABERMEJA 16
2"X3/4"
FOSTER WHEELER USA CORP. HOUSTON, TEXAS
2 2
LT LG NPT AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
UUNNN UUNNN LG THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR DISPOSED OF DIRECTLY OR
D/P MAG INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
UUNNN SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
NOTE 3 2"X3/4" MAG COVERED BY PATENTS.
NPT
LT
2" 2" UUNNN D/P DESIGNED BY: DATE: CHECKED BY: DATE:
INSTR.
2" 2"
2"
2"
3/4" DRAWN BY: DATE: APPROVED BY: DATE:
PIPING
3/4"
PIPING INSTR.
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID
54 IMPLIED DETAIL 54
52 52
50 FLOW TRANSMITTER RESTRICTION ORIFICE FLOW TRANSMITTER VENTURI TYPE VENTURY TYPE FLOW TRANSMITTER WITH CAPILLARY 50
48 48
46 46
FT
UUNNN
44 FT FT FT 44
FT UUNNN
UUNNNA UUNNNA UUNNN
INSTR.
PIPING. 1/2" 1/2" NOTE 5 INSTR. H.P. L.P.
NOTE 5
42
PIPING. 3/4" 3/4" FT
UUNNN
1/2" 1/2"
Attachment C to Job Specification 42
28 28
26 26
REVISIONS
18 18
ECOPETROL S.A.
16
BARRANCABERMEJA 16
14 REFINERY 14
BARRANCABERMEJA COLOMBIA
4 4
THIS DRAWING IS THE PROPERTY OF THE
PRESSURE DIFFERENTIAL IN VESSEL (UUNNN) SHALL NOT EXCEED FIVE (5) DIGITS. THIS NUMERIC
PRESSURE DIFFERENTIAL IN LINE - CAPILLARY PRESSURE DIFFERENTIAL IN LINE
COMPONANT SHALL BE DIFFERENT (UUNNN) FOR EXISTING UNITS.
70 70
PIPING. INSTR. 2. MINIMUM 2" DIAMETER.
68 3/4"NPT
3. NOTATION TO IDENTIFY TYPE OF ELEMENT. ACCORDING TO THE TABLE 1 68
NOTE 5 (TYP.) P&ID 123939-0000-A1-50-010. REFER TO JOB SPEC 123939-60A3.
INSTRUMENTATION SYMBOLS AND IDENTIFICATION.
PIPING.
PIPING.
INSTR.
INSTR.
66 3/4" 66
4. PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT ISOLATION SHALL
PDT NOT BE SHOWN ON P&ID'S.
PDT PDT UUNNN 3/4"NPT
64 UUNNN 3/4"NPT UUNNN 64
(TYP.)
5. NUMBER OF PRIMARY ROOT / BLOCK VALVES FOR INSTRUMENT
INSTR.
2" 2"RF
2"
(TYP.)
PDT ISOLATION SHALL BE IN ACCORDANCE WITH THE MAINTENANCE
UUNNN 3/4" 3/4"
62 300# 2"
1/2" 1/2" ISOLATION PHILOSOPHY DESCRIBED ON THE DOCUMENT 62
PDT
PDT
2" 2" UUNNN 123939-EN-12, PROCESS AND MAINTENANCE ISOLATION.
UUNNN NOTE 5 NOTE 5
PIPING.
2" 2"
NOTE 5
PIPING.
60 6. FOR FINAL DESTINATION OF VENT AND DRAIN CONNECTIONS REFER 60
INSTR.
TO THE MAIN EFD. THESE CONNECTIONS SHALL BE FINALIZED DURING
THE DETAIL DESIGN BY DEC. IN SOME SERVICES, INSTRUMENT VENTS
58 58
AND DRAINS MAY BE CONNECTED TO A SAFE LOCATION
(I.E. FLARE OR CLOSE DRAIN).
56 56
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL
54 54
52 52
50 50
46 46
44 44
36
be used for the EFD/P&ID development. 36
34 34
SHOWN ON P&ID SHOWN ON P&ID SHOWN ON P&ID THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER
IMPLIED DETAIL IMPLIED DETAIL IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL WHEELER USA CORPORATION AND IS TO BE USED, AND REPRODUCED, ONLY IN
32 ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA 32
CORPORATION, FOR THE ECOPETROL BARRANCABERMEJA REFINERY
MODERNIZATION PROJECT, FOR ECOPETROL S.A., BARRANCABERMEJA,COLOMBIA.
30 30
22 NOTE 5 22
VESSEL
3/4"NPT
PIPING.
INSTR.
1/2"
PIPING.
18 18
INSTR.
2."
INSTR.
PIPING. 2" NOTE 5 ECOPETROL S.A.
NOTE 5
16
BARRANCABERMEJA 16
14 REFINERY 14
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID IMPLIED DETAIL PROYECTO MODERNIZACION REFINERIA DE BARRANCABERMEJA
SHOWN ON P&ID IMPLIED DETAIL SHOWN ON P&ID
12 IMPLIED DETAIL 12
BARRANCABERMEJA COLOMBIA
4 4
THIS DRAWING IS THE PROPERTY OF THE