Вы находитесь на странице: 1из 13

SPECIFICATION

ELECTRICAL

L1-CHE-SPE-033

ELECTRICAL EARTHING &


BONDING
IN THE
MELBOURNE UNDERGROUND
RAIL LOOP
Version: 1

Issued: 12 May 2016

Owner: Engineering

Authored by:

Andrew Russack

Head of Engineering - Electrical

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

Approval

Amendment Record

Approval Date Version Description


12/05/2016 1 Initial Issue

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

Table of Contents

1 Purpose .............................................................................................................................. 4

2 Scope ................................................................................................................................. 4

3 Acronyms and Abbreviations ........................................................................................... 4

4 Definitions .......................................................................................................................... 4

5 Reference Documents ....................................................................................................... 5

6 Responsibilities ................................................................................................................. 5

7 Requirements..................................................................................................................... 6
7.1 MURL Earthing & Bonding Principles..................................................................................... 6
7.2 Earthing System - Tunnel and Station Structures .................................................................. 6
7.3 Track Insulation ...................................................................................................................... 7
7.4 Connections to the Running Rails .......................................................................................... 8
7.5 Cross-bonding of Tracks in the Tunnels................................................................................. 9
7.6 Melbourne Central Tie Station ..............................................................................................10
7.7 Insulation of Underground Station Platforms near the Trains ..............................................10
7.8 Insulation of Melbourne Central and Flagstaff Station Roof Structures from Tram Tracks .10

8 Appendices ...................................................................................................................... 11
MURL Schematic Earthing and Bonding Diagram ..............................................................................11
Cross-bonding of Running Tracks at Underground Stations ...............................................................11

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

1 Purpose
To set out the electrical earthing and bonding requirements within the underground portion
of the Melbourne Underground Rail Loop.
This document is based on and supersedes the document entitled “Protection of Structures
and Personnel from Leakage Currents from Train and Tram DC Traction Systems”,
developed as part of the MURL project. (Refer Section 5. ‘Referenced Documents’ for
further details)

2 Scope
This specification sets out the electrical earthing and bonding requirements within the
Melbourne Underground Rail Loop. It applies only within the underground sections,
including the tunnel ramps and underground station areas.
This specification does not cover the earthing and bonding requirements for the above
ground section of the MURL, also known as the Overpass or Through Suburban Lines
between Flinders Street and Southern Cross Stations.

3 Acronyms and Abbreviations


MURL Melbourne Underground Rail Loop
OCL overhead contact line system
RODES Remote Overhead De-energisation and Earthing System

4 Definitions
Bonding The electrical connection of conductive materials to form a
(electrical) continuous electrical conductor. Bonding is generally applied to
1. maintain electrically conductive materials at the same
potential; and/or
2. Manage the return path of fault currents; and/or
3. Manage the path of traction power return currents.
Earth The general mass of earth; or
The electrical connection between an electrically conductive
piece of infrastructure to the general mass of earth.
Earthing The action of making an electrical connection between
electrically conductive infrastructure and the general mass of
earth.
MURL Melbourne Underground Rail Loop is defined as the tunnels,
stations and the overpass completing the loop between Flinders
and Southern Cross Stations carrying the Through Suburban
Lines.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

MURL Overpass Bridge and viaduct structures carrying the Through Suburban
Lines between Flinders Street and Southern Cross stations. Also
known as the ‘new viaduct’.
RODES System for the remote de-energisation of the OCL system in the
MURL, primarily to expedite emergency recovery activities in a
safe manner.

Shall Is used as the descriptive word to express a requirement that is


mandatory to achieve conformance.

Tunnel Any section of the MURL that is below ground level, including
the whole of the ramps leading into the tunnel proper from
normal ground level.
Should Is used as the descriptive word to express a requirement that is
recommended in order to achieve compliance. The term ‘should’
can also be used if a requirement is a design goal but not a
mandatory requirement.

5 Reference Documents
Electricity Safety Act 1998
Electricity Safety (Installations) Regulations 2009
AS3000: 2007 Electrical Installations
EN50122-1:2011 Railway Applications – Fixed Installations – Electrical Safety, Earthing
and the Return Circuit – Part 1: Protective provisions against electric shock
EN50122-2:2010 Railway Applications – Fixed Installations – Electrical Safety, Earthing
and the Return Circuit – Part 1: Protective provisions against the effects of stray currents
caused by d.c. traction systems
L1-CHE-STD-015 MEST 000002-06 Electrical Networks Principles and Performance
L1-CHE-STD-010 MEST 000002-03 MTM Railway Bridges - Electrical Protection and
Bonding Standard
L1-CHE-STD-016 MEST 000002-05 Track Bonding For Signalling and Traction Return
Current
Melbourne Transit Authority - Melbourne Underground Rail Loop Administration: “Protection
of Structures and Personnel from Leakage Currents from Train and Tram DC Traction
Systems”, John Connell-Mott, Hay and Andersen, Hatch, Jacobs. Ref: 0268J. October,
1985

6 Responsibilities
Head of Engineering – Electrical is responsible for the content of this document.
Any changes to the configuration or disconnection of the earthing and bonding system in
the MURL shall not be made until approved by the Head of Engineering – Electrical.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

7 Requirements

7.1 MURL Earthing & Bonding Principles


An electrified railway system shall consider the potential effects of step and touch voltages
under all operating and fault conditions. The earthing and bonding is put in place to mitigate
the effects of step and touch voltages and to ensure that fault conditions are detected and
supply can be disconnected to minimise damage to plant and equipment.
An additional issue to be considered with an electrified railway supplied via direct current is
the effect of driven electrolysis due to the ‘leakage’ of some of the return current from the
running rails. There always exists a finite impedance (resistance is the major component in
the steady state) between the running rails and the general mass of earth. This resistance
allows current to return to the substation negative bus via the earth. This fact is not in itself
a problem.
However, where electric current leaves a metallic structure in the presence of an
electrolyte, electrolytic corrosion (electrolysis) will occur. For iron/steel the effect will be the
loss of material through oxidation at a rate of 9.2kg of material per annum for each ampere
of electric current flowing. With the 1 500VDC traction power system supplying many
thousands of amperes, a significant amount of material can be lost in a very short time.
Most at risk are the running rails themselves in sections of the track distant from traction
power substations, particularly if the ballast is in poor condition and moist, and buried
metallic infrastructure, particularly if running parallel with the rail corridor.
The MURL tunnel system predominantly sits in a very electrically conductive mix of soils
and rock strata. If stray current were allowed to enter the tunnel steel structures and
reinforcing and exit into the surrounding body of earth, a significant amount of damage
could occur to the tunnel structure in a very short time.
The principle adopted in the underground sections of the MURL is to connect together all
concrete reinforcing, exposed steel and other exposed conductive materials except the
running rails and the OCL system. The running rails are insulated from the tunnel floor.

7.2 Earthing System - Tunnel and Station Structures


All tunnel wall reinforcement, station structural steel and soldier piling is connected together
electrically by welding where necessary. The quantity of steel involved in the three
underground stations and its area of contact with 'mother' earth, which has zero resistance,
is enormous. This matrix of steel therefore provides an excellent 'earth' for electrical
purposes.
In parallel with the tunnel reinforcement and bonded to it electrically at approximately 60
metre intervals, two bare stranded copper cables, each having a cross-sectional area of
150 square millimetres, run the full length of each tunnel and assist in connecting the
structural steel reinforcement of the three underground stations together electrically. These
are mounted clear of the tunnel walls to prevent corrosion and in addition to the foregoing
are used for the connection into the earthing system of all exposed metal and other items to
be protected. The earth cables are cross-bonded at regular intervals and at the stations, to
those in the other tunnels.
The items connected into the earthing system via these cables (earth bars) are;
1. All exposed metal in the tunnels with the exception of the running rails, train stops and
OCL system and items of equipment connected to these;

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

2. Box-tunnel reinforcement.
The box tunnel sections are each fitted with exposed steel plates near each end which
are connected electrically by welding to the steel reinforcement therein for stray current
measurement purposes. These 'monitoring points' are positioned so that adjacent box
section plates and hence their internal steel reinforcing, can be easily connected
together by short rods to provide electrical continuity of the reinforcement throughout all
Box sections. In practice, this was achieved by the parallel earthing cables, connecting
one monitoring point of each Box section direct to one of these cables.
3. All 1500 volt DC traction power Insulator pins.
4. All steady arm brackets and supports and anchor brackets.
5. All transformer and generator 'star' points and alternator neutrals.
6. All earths required for the 1500V DC, 400/230 volt AC and other power supplies.
7. All metallic air lines, water pipes and the metallic jackets or sheaths of all
incoming/outgoing services to/from the stations and tunnels having exposed metallic
jackets or sheaths. All such services however have been and shall continue to be
provided with insulated joints in their jackets or sheaths at their points of entry or exit to
the Tunnel system, whether at the stations, Tunnel portals, emergency exits, draught
relief or ventilation shafts, etc.
As a prevention against corrosion and electrolytic action, no copper earth plates or rods
shall be used.
Where copper/copper-alloy to steel/iron connections are proposed to be installed,
consideration must be made for management of the interface between the two metals of
different electronegativity.
All steel racks, brackets and the like shall be hot-dipped galvanized.
All metal-sheathed, bare copper cables and bars, cable racks and brackets shall be
mounted so that there is an air space of at least 20mm between all such bare cables
and bar, cable racks and brackets and the tunnel walls.

7.3 Track Insulation


The following items are bonded together electrically and in some cases also mechanically
and shall be insulated and remain effectively insulated from earth, or earthed structures, at
all times:
1. running rails;
2. track switches/points;
3. point machines;
4. track circuits, including pin-point detectors;
5. Impedance and cross-bonds.
The primary insulation consists of the insulation of the running rails from the double
sleepers and rigid invert by large rubber pads 12mm thick between the steel Pandrol rail
mounting plates and the sleepers, or rigid invert, as applicable. These pads are larger than
the Pandrol mounting plates by 22mm approximately on all sides to minimise current
leakage and although the Pandrol plate holding down bolts pass through these pads, they
are insulated from the plates by special nylon bushes.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

The double sleepers are further insulated from the invert by four or more rubber discs
350mm diameter by 15mm thick beneath each and a side pad at each end 300mm long,
150mm wide and 50mm thick. In addition, each double sleeper is insulated from its
neighbouring sleepers by two spacer pads 300mm long x 150mm wide x 65-83mm thick (as
required) along each side.
The RS-STEDEF sleepers are insulated from the rigid invert by two rubber boots, each of
which encompasses the lower half of one of the two concrete blocks forming each sleeper.
Any train stops, pin-point detectors and other equipment connected to the rails shall also be
satisfactorily insulated from the sleepers and/or the rigid invert. Particular attention shall
also be paid to the elimination of metallic paths to such devices per medium of wire-
reinforced air connections and electrical conduits, etc.
For the safety of buried structures it is important that the weekly inspections by patrolmen
during routine track patrols and the yearly and two-yearly tests outlined in the schedule
appended, be undertaken to ensure that the desired standard of rail insulation is maintained
and above all, that the rails are not accidentally, or otherwise, 'earthed' by pipes, crow-bars,
maintenance tools, drink cans, brake dust, ground water or other conducting liquids or
materials.
The minimum resistance to earth of each pair of running rails in parallel with all signalling,
communications and safety equipment connected to them, should be maintained above
5 000 ohms per lineal metre at all times. To facilitate testing, insulated joints are provided in
the eight running rails at each end of the tunnels near the top of each ramp.
The 'bridges' across the insulated joints, which are essential during train operations for the
traction power return currents to return to the substation negatives, shall only be removed
collectively when the relevant overhead sections are de-energised. These ‘bridges’ must be
replaced before the overhead sections are re-energised.

7.4 Connections to the Running Rails


These have been and shall continue to be, limited to items of signalling, communications,
cross-bonding and train control systems, etc. that are effectively insulated from earth. Items
such as train stops, which are contacted by the trains and pin-point detectors and point
machines which are connected to one rail, shall he effectively insulated from earth and
except for the Train Stops, be electrically bonded to a running rail.
The train stops have been repositioned on the curb. In this position they shall be insulated
from earth and their cases left 'floating', i.e. neither connected to earth nor a running rail.
This is considered to be a safe practice in this instance since they are operated from a 110
volt AC unearthed supply. This instruction also applies to the train stops mounted on the
rigid invert on the ramps, through the box tunnel sections and adjacent to the STEDEF
sleepers in the Burnley tunnel, south of Parliament Station.
Particular attention shall be paid to the avoidance of metallic paths via pneumatic (control
air) connections and electrical conduits between the running rails and the Invert, or earthed
structures. To ensure that the cases of these train stops are not inadvertently earthed by
the use of conductor (wire)-reinforced pneumatic connections and electrical conduits, it is
required that their exterior surfaces be painted in a distinctive colour and a plate be
attached stating that the case of this apparatus is insulated from both the running rails and
Earth and that its resistance to either shall be maintained above 10 000 ohms at all times.
Any diodes or clamping devices installed must be remotely indicated to Electrol to ensure a
failure can be identified and rectified quickly.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

Spark gaps shall not be installed between the rail and any structure as the breakdown of a
spark gap could remain undetected and permit heavy currents to flow from the rails into the
steel structures and onto the general mass of earth, causing accelerated electrolytic
corrosion.
RODES control panels and short circuit switch cubicles are bonded to traction return.

7.5 Cross-bonding of Tracks in the Tunnels


The tracks in the four MURL tunnels are crossbonded - parallel connected electrically - at
Flagstaff, Melbourne Central and Parliament Stations to reduce the resistance of the return
current path from the loads (trains or faults) to the Substation negatives via the rails and
hence:
 Provide an increased margin of safety in respect to the tripping of the traction power
circuit breakers by over-current during overhead-to-rail (or train) faults.
 Reduce the current in each rail by distributing it over several rails.
 Provide additional and alternative paths via the rails for return currents.
 Reduce the rail-to-earth potentials for increased safety to passengers and staff during
heavy overhead- to-rail for train) faults and minimising at all times, leakage currents
returning to the Substation negatives via the earth and corroding steel pipes and
structures.
The cross-bonding of the four tunnel tracks at each of the three underground stations is
made to each of the four pairs of rails via centre-point tappings to the inductive loops of
parallel-tuned circuits each of which is tuned to the audio frequency of the track circuit
employed at the point of connection to the track concerned. This is essential to prevent
interference between the vital safety signalling tracks circuits employed on adjacent tunnel
tracks.
It is also essential, for the same reason that the tuned-circuit tuning capacitor of each cross-
bond connection be directly connected between the two running rails of each track a short
distance (about 200 to 300mm) ahead of the connections of its associated inductor loop so
that the capacitor will short-circuit the track circuit frequency, cause the Track Circuit to
operate in a 'fail safe' manner and prevent spillover detrimentally into another track, should
a cable or connection on the associated inductor he accidentally or otherwise broken away
from a rail.
At Melbourne Central Station, the cross-bond is also used to connect to the rails, the
negative of a 1500 volt DC supply for the operation, holding and tripping of the Circuit
Breakers in the Tie Station there. As the disconnection of this lead from the rails while the
Traction Power is 'ON' will raise its potential to the highly dangerous level of 1500 volts,
under no circumstances should it be disconnected from the cross-bonding cable, or the
Cross-bonding cable be disconnected from all four rail tracks, while the traction power is
'ON'.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

7.6 Melbourne Central Tie Station


The 1500 volt traction power negative of the Melbourne Central Tie Station is connected to
the four sets of running tracks via the track cross-bonding cables. The following items are
connected to the 1500 volt DC negative and consequently, while the negative is connected
to the rail, are at rail potential in respect to earth.
 All DC Circuit Breaker cubicle frames
 The bus-tie screens
 The 1 500V DC fuse bases
On the other hand, the following items are connected to earth and consequently are at
earth potential -
 All line isolator bases
 All line cable screens
 Cable trays
 Positive terminal of the 50 volt DC battery
 SCADA cabinet
Any connection between items from both groups therefore 'earths' the running rails and
permits heavy traction power currents to flow back to the substation negatives via the earth.
Diodes are installed between the rail and earth (steel structure) at Melbourne Central
Isolator Room to ensure any leakage current returns directly to the running rails and not via
the general mass of earth.

7.7 Insulation of Underground Station Platforms near the Trains


As the metal trains will be at the same potential as the running rails, which under normal
operating conditions may typically reach 60 volts above earth and higher during fault
conditions, a strip of each platform at each underground station between 450 millimetre
(minimum) to one metre wide from the platform edge, depending upon paving tile sizes and
their arrangement, has been insulated with an epoxy or equivalent type resin to prevent
passengers, who may be boarding or leaving a train at the instant a major electrical fault
occurs in the vicinity on the DC traction power system, from receiving a mild but discernible
electric shock.

7.8 Insulation of Melbourne Central and Flagstaff Station Roof Structures from Tram
Tracks
As the tram tracks in La Trobe Street are virtually laid on the roof structures of Melbourne
Central and Flagstaff Stations, stray currents from the tram rails into these structures are
being controlled in each case by the installation of a high resistance Fortecon membrane
between the tram tracks and the roof structure. This membrane, which is in addition to two
layers of Hyload 50 pitch-polymer sheeting for water-proofing/insulation purposes, covers
the entire roof structure and extends down the wall structures for about 150 millimetres.
The control of the stray currents from the tram tracks is also assisted by the use of an
elementary form of overhead multiple balanced negative feeders. Refer Yarra Trams for
further information.

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

8 Appendices
MURL Schematic Earthing and Bonding Diagram
Cross-bonding of Running Tracks at Underground Stations

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

Appendix 1: MURL Schematic Earthing and Bonding Diagram

[under development]

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 13
ELECTRICAL SPECIFICATION ELECTRICAL
EARTHING & BONDING IN THE MURL

L1-CHE-SPE-033 Version: 1 Effective from: 12th May 2016

Appendix 2: Cross-bonding of Running Tracks at Underground Stations

Approving Manager: Head of Engineering - Electrical Approval Date: 12/05/2016 Next Review Date: 12/05/2019
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 13

Вам также может понравиться