JOB SAFETY ANALYSIS Date of Issue JSANo. ‘Work Group Preparing JSA Piping Prepared by Job Description Pipe Support Fabrication & Installation Approved by Sequence of Task Potential Hazards Recommendations / Control Measures Worksite Housekeeping Slips Trips Falls Access egress and emergency routes are not to be obstructed >All waste to be removed sorted and placed in Authorized storage Jsort bins > Wires and cables to be secured to avoid tripping hazard, andlor provide walkway clearance storage /sort bins. >All electrical system connections to be secured off ground and protected from rainfall > Structure and scaffold projections to be signposted and masked when possible > Holes and ground/floor openings to be barricade and signposted > Fluid spills to be cleared as they occur > Hoses and cables crossing roadways/paths to be protected with suitable covers > Tools to be returned to store after use > Materials to be stored in correct locations > Flammable material are not to be left unattended at worksite