Вы находитесь на странице: 1из 6

Company: Project: Engineering Contractor:

OFFSITES ENGINEERING WORKS


FOR THE ERBIL REFINERY
40,000 B/D EXPANSION PROJECT

Contract no.: 10J01762-01


Company doc. no.: Job no.: 10J01762 Engineering doc. no.:
N/A Sheet 1 of 6 10J01762-ELE-LS-000-001

OFFSITES ENGINEERING WORKS FOR THE


ERBIL REFINERY 40,000 B/D EXPANSION PROJECT

ELECTRICAL LOAD SUMMARY

D0 26/09/2011 Approved for Design C.Caldarigi S.Caputi F.Cilia


C0 15/04/2011 Issued for Company Approval J.Strazynski S.Caputi F.Cilia
REV. DATE REVISION TITLE PREPARED CHECKED APPROVED

10J01762-ELE-LS-000-001-D0.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
ELECTRICAL LOAD SUMMARY
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 2 of 6 10J01762-ELE-LS-000-001

REVISION HISTORY

SHEET rev. rev. rev. rev. rev. rev. rev. rev. rev. rev.
1 C0 D0
2 C0 D0
3 C0 D0
4 C0 D0
5 C0 D0
6 C0 D0

10J01762-ELE-LS-000-001-D0.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
ELECTRICAL LOAD SUMMARY
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 3 of 6 10J01762-ELE-LS-000-001

1 "POS" : Load position in the list

2 : Identification Tag Number of the Equipment


"EQUIPMENT TAG No."

3 "DESCRIPTION" : Short description of the Equipment

4 "CLASSIFICATION OF: LOADS"


Usual consumers, Preferentials, Essentials.

5 "EQUIPMENT TYPE" Specific type of load e.g. M = induction motor , I = instrument load, P = package unit or

power/light socket, L = lighting , H = heater , D = distribution board


6 "DUTY" Duty operating condition for directly connected users e.g. C = continuous (100%) ,
I = intermittent (30%) and S = stand-by/Spare (10%) .
7 "ABSORBED LOAD" Mechanical power requirement (kW) - including safety factor as- per API Standard 610

8 "USER RATING" Rated Power of equipment - connected load ( kW ) -

9 "LOAD FACTOR" Absorbed load / User rating

10 "EFFICIENCY" Efficiency "h"of the equipment at load factor

11 "POWER FACTOR AT LF" Power Factor "cos fi" of the equipment at load factor

12 "CONTINUOUS" Continuous demand load kW/kVA

13 "INTERMITTENT" Intermittent demand load kW/kVA

14 "STAND BY" Stand-by demand load kW/kVA

15 "NOTES" General remarks

10J01762-ELE-LS-000-001-D0.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
ELECTRICAL LOAD SUMMARY
Company doc. no.: Rev C0 D0 Engineering doc. no.:
N/A Sheet 4 of 6 10J01762-ELE-LS-000-001
EQUIPMENT POWER CONSUMED LOAD
EFFICIENCY
LOAD FACTOR

EQUIPMENT TYPE
ABSORBED MOTOR D

PREFERENTIALS
FACTOR E

USUAL CONSUMERS
Voltage Frequency LOAD RATING AT LOAD INTERMITTENT & STAND - BY &

RESTARTING
C AT LOAD CONTINUOUS NOTES

ESSENTIALS

DUTY TYPE
A B FACTOR DISCONTINUOUS SPARE
Pos. Equipment No. Description (A/B) FACTOR F G
C H
C

V Hz kW kW In decimal In decimal cos fi kW kVAR kW kVAR kW kVAR

0.4kV_ MCC - 001 (BUS A)


1 P-2315 A Fuel Oil Transfer Pump Motor (note 2) M i 400 50 58.00 75.00 0.77 0.94 0.86 61.70 36.61 1 - Motors rating shall be verified by Supplier after checking data sheets
2 P-2315 C Fuel Oil Transfer Pump Motor (note 2) M s 400 50 58.00 75.00 0.77 0.94 0.86 61.70 36.61 of driven machines.
3 P-2314 B Diesel Fuel Transfer Pump Motor (note 2) M s 400 50 28.00 37.00 0.76 0.91 0.86 30.77 18.26 2 - The efficiency and power factor are preliminary only ( 100% full power)
4 P-2313 B Kerosene/Jet Fuel Transfer Pump Motor (note 2) M s 400 50 19.40 25.00 0.78 0.90 0.85 21.56 13.36 It will be verified after receiving Vendor data sheets.
5 P-2312 B Gasoline Transfer Pump Motor (note 2) M s 400 50 24.50 30.00 0.82 0.91 0.85 26.92 16.69
6 P-2212 B Naphtha Transfer Pump Motor (note 2) M s 400 50 19.00 25.00 0.76 0.90 0.85 21.11 13.08
7 P-2213 B HDT Naphtha Transfer Pump Motor (note 2) M s 400 50 20.00 25.00 0.80 0.90 0.85 22.22 13.77
8 P-2613 B Slop Transfer Pump Motor (note 2) M s 400 50 27.50 37.00 0.74 0.91 0.85 30.22 18.73
9 LCP-2512 B LCP for Firewater Jockey Pump (note 2) M s 400 50 22.00 22.00 1.00 1.00 0.90 22.00 10.66
10 P-1105 B Sour Water Transfer Pump Motor (note 2) M s 400 50 8.40 11.00 0.76 0.88 0.83 9.55 6.41
11 B-P-2401 B Utility Water Pump Motor (note 2) M s 400 50 37.00 55.00 0.67 0.93 0.86 40.00 23.73
12 HVAC-SB HVAC for Substation Building P c 400 500 30.00 30.00 1.00 1.00 1.00 30.00 0.00
13 HVAC-CB HVAC for Control Building P c 400 500 30.00 30.00 1.00 1.00 1.00 30.00 0.00
12 P-2617-C Waste Water Pump Motor (note 2) M i 400 50 1.90 3.00 0.63 0.80 0.82 2.38 1.66
14 LS-DB-001 Lighting and Socket Distribution Panel - External P c 400 50 100.00 100.00 1.00 1.00 0.90 100.00 48.43

Maximum of normal running plant load = x(%)F + y(%)G x=100% y=30% Peak Load = x(%)F + y(%)G + z(%)H x=100% y=30% z=10%
Global Power factor 0.95
Total Absorbed Load Total Reactive Power Total Apparent Power Total Absorbed Load Total Reactive Power Total Apparent Power TOTAL 160.00 48.43 64.08 38.27 286.05 171.30 ( cos j ) :
kW kVAR kVA kW kVAR kVA
179.22 59.91 188.97 207.83 77.04 221.65 X= 1
kVA = SQRT (kW2 + kVAR2) 167.17 74.64 333.42 The following coincidence factors are assumed Y= 0.3
to the maximum and peack load calculation: Z= 0.1

NOTES:
a) Load classification / restarting: b) Absorbed Load: c ) Consumed Loads:
F - "Continuous"; all loads that may continuously be required for normal operation
Critical Load - complete duplication of the energy source with Diesel Generator - for pumps , shaft load on duty point including lighting and workshop.
- for instrumentation , conputers comunication, air conditioning the required load G - "Intermittent ; the load required for intermediate pumping, storage,
Essential Load - complete duplication of the energy source is reguired, during full operation of plant loading, etc. and all electrical spare of electrically driven units.
of the lines of supply or of the equipment - for lighting during dark hours; H - "Stand-by"; loads required in emergencies only, such as fire-water pumps or
-for workshops, the average total load in normal full operation those of normally not running elettrically driven units stand by for normally
Non Essential Load - service load running steam-driven ones (e.g. charge pumps, boiler feed pumps

10J01762-ELE-LS-000-001-D0.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
ELECTRICAL LOAD SUMMARY
Company doc. no.: Rev C0 D0 Engineering doc. no.:
N/A Sheet 5 of 6 10J01762-ELE-LS-000-001
EQUIPMENT POWER CONSUMED LOAD
EFFICIENCY
LOAD FACTOR

EQUIPMENT TYPE
ABSORBED MOTOR D

PREFERENTIALS
FACTOR E

USUAL CONSUMERS
Voltage Frequency LOAD RATING AT LOAD INTERMITTENT & STAND - BY &

RESTARTING
C AT LOAD CONTINUOUS NOTES

ESSENTIALS

DUTY TYPE
A B FACTOR DISCONTINUOUS SPARE
Pos. Equipment No. Description (A/B) FACTOR F G
C H
C

V Hz kW kW In decimal In decimal cos fi kW kVAR kW kVAR kW kVAR

0.4kV_ MCC - 001 (BUS B)


1 P-2315 B Fuel Oil Transfer Pump Motor (note 2) M i 400 50 58.00 75.00 0.77 0.94 0.86 61.70 36.61 2 - The efficiency and power factor are preliminary only ( 100% full power)
2 P-2314 A Diesel Fuel Transfer Pump Motor (note 2) M i 400 50 28.00 37.00 0.76 0.91 0.86 30.77 18.26
3 P-2313 A Kerosene/Jet Fuel Transfer Pump Motor (note 2) M i 400 50 19.33 25.00 0.77 0.90 0.85 21.48 13.31
4 P-2313 C Kerosene/Jet Fuel Transfer Pump motor (note 2) M i 400 50 19.40 25.00 0.78 0.90 0.85 21.56 13.36
5 P-2312 A Gasoline Transfer Pump motor (note 2) M i 400 50 24.50 30.00 0.82 0.91 0.85 26.92 16.69
6 P-2212 A Naphtha Transfer Pump Motor (note 2) M i 400 50 19.00 25.00 0.76 0.90 0.85 21.11 13.08
7 P-2213 A HDT Naphtha Transfer Pump Motor (note 2) M i 400 50 20.00 25.00 0.80 0.90 0.85 22.22 13.77
8 P-2613 A Slop Transfer Pump Motor (note 2) M i 400 50 27.50 37.00 0.74 0.90 0.85 30.56 18.94
9 LCP-2512 A LCP for Firewater Jockey Pump (note 2) M c 400 50 22.00 22.00 1.00 1.00 0.90 22.00 10.66
10 P-1105 A Sour Water Transfer Pump Motor (note 2) M i 400 50 8.35 11.00 0.76 0.88 0.83 9.49 6.38
11 P-2513 Diesel Filling Pump Motor (note 2) M i 400 50 1.00 1.50 0.67 0.77 0.79 1.30 1.01
12 B-P-2401 A Utility Water Pump Motor (note 2) M i 400 50 37.00 55.00 0.67 0.93 0.86 40.00 23.73
12 P-2617-A Waste Water Pump Motor (note 2) M i 400 50 1.90 3.00 0.63 0.80 0.82 2.38 1.66
12 P-2617-B Waste Water Pump Motor (note 2) M i 400 50 1.90 3.00 0.63 0.80 0.82 2.38 1.66
13 LS-DB-002 Lighting and Socket Distribution Panel - Sustation Building P c 400 50 30.00 30.00 1.00 1.00 0.90 30.00 14.53
14 LS-DB-003 Lighting and Socket Distribution Panel - Control Building P c 400 50 60.00 60.00 1.00 1.00 0.90 60.00 29.06

Maximum of normal running plant load = x(%)F + y(%)G x=100% y=30% Peak Load = x(%)F + y(%)G + z(%)H x=100% y=30% z=10%
Global Power factor 0.88
Total Absorbed Load Total Reactive Power Total Apparent Power Total Absorbed Load Total Reactive Power Total Apparent Power TOTAL 112.00 54.24 291.85 178.45 0.00 0.00 ( cos j ) :
kW kVAR kVA kW kVAR kVA
199.56 107.78 226.80 199.56 107.78 226.80 X= 1
kVA = SQRT (kW2 + kVAR2) 124.44 342.09 0.00 The following coincidence factors are assumed Y= 0.3
to the maximum and peack load calculation: Z= 0.1

NOTES:
a) Load classification / restarting: b) Absorbed Load: c ) Consumed Loads:
F - "Continuous"; all loads that may continuously be required for normal operation
Critical Load - complete duplication of the energy source with Diesel Generator - for pumps , shaft load on duty point including lighting and workshop.
- for instrumentation , conputers comunication, air conditioning the required load G - "Intermittent ; the load required for intermediate pumping, storage,
Essential Load - complete duplication of the energy source is reguired, during full operation of plant loading, etc. and all electrical spare of electrically driven units.
of the lines of supply or of the equipment - for lighting during dark hours; H - "Stand-by"; loads required in emergencies only, such as fire-water pumps or
-for workshops, the average total load in normal full operation those of normally not running elettrically driven units stand by for normally
Non Essential Load - service load running steam-driven ones (e.g. charge pumps, boiler feed pumps

10J01762-ELE-LS-000-001-D0.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
ELECTRICAL LOAD SUMMARY
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
Sheet 6 of 6 10J01762-ELE-LS-000-001

TRANSFORMER SELECTION
BUS A BUS B Total

TOTALY LOAD 0,4kV LEVEL (kW) 207.83 kW 199.56 kW 407.38 kW

TOTALY LOAD 0,4kV LEVEL (kVar) 77.04 kVar 107.78 kVar 184.82 kVar

TOTALY LOAD 0,4kV LEVEL (kVA) 221.65 kVA 226.80 kVA 448.45 kVA

Selected capacity for Trasformers


2 x 630 kVA (one trasfomer shall cover all power demand)
6.6/0.4kV (with 20% spare)

10J01762-ELE-LS-000-001-D0.xls