Вы находитесь на странице: 1из 17
DOCUMENT: (STATION: [Substation Essien vote PT sec. Voltage: UI PPT se. Votiage- U2 i ystem Frequenc ay Details SETTINGS PUT Rao Phase Angie Sip Few K yuch Toner i Angle: Epi Timer Bysem Angie stem Sip FS ysem Timer IVA Live [Yt Dea ForuerVorage Dil. Vota LEN dine) LN dius) RELAY SETTING CALCULATION |AL-GHASSANIVAH 115/13.8kV SUBSTATION. SYNCHRO CHECK RELAY - KAVSI00 FOR LISKV_ [AL-GHASSANIVAN I1SISALV SUBSTATION SKY Limes oy] Lism3) 6.4 leon, TkAVSiO0 OT LITEM Tam 0.00 de 1300 17 L000. rma. 000 10.00 ay fooonnz f.00 Sov bov is pov =a \™ clynSll Jai FINAL SETTING TEST REPORT |... National Grid sa | Contractor's name: AL-MASHARIQ | Client: SEC-EOA SEC—EOA Contract No. Name of substation: AL-GHASSANIYAH 115/13.8kV S/S 31131093/00 SYNCHROCHECK RELAY(KAVS100) Page 1 of 3 Panel/Bay No: Equip. No. jsDwe. Ret. Record N ‘A. GENERAL INF TION AND DATA: Panel No: [SYNCHRO TROLLEY] Designation 5 Make | AREVA (f [Frequency Ol ‘Serial No: | S1897400/09/11 | ‘Aux: Vollage 125 VDC Model No | KAVSI0001TISIEN | Application SYNCH CHECK B. PHYSICAL INSPECTION MECH, CONDITION: MOUNTING & WIRING LED's DISPLAY AUX. SUP. FAIL ALARM ©. SECONDARY INJECTION TEST: ‘Synch. Check Function Test: Voltage Difference { AU) CI Un = 66.4 = re nM BUS-1 (High )(V) __BUS-1 (Low) (V) PIU DO PA BO 65v 64 7251 71.97 60.09 60.72 AU setting RW) ‘BUS-2 (High) (V) ‘BUS.2 (Low) (V) PIU DO PI DIO ev | 664 72.52 72.06 60.08 60.53 LINE (High) (V) LINE (Low )(V) AU setting UNE sae Fe PRU DIO PIU 010 [ev 66.4 7278 7221 6026 6091 Phase Difference (A ® ) Check y8T 2 me BUSy1 High BUS-1 Low PAU DO, PU DIO 20° 2 | (288.7 2875 2244 222.1 DATE 01/09:2014 “TESTING ENGINEER -JAL, (CSD- Engineer Stpraner: _ fee eee eS Name: MeLovan kumar Name _:_Mr-Hisai = elyaSh fai FP MALSETTING TESTREPORT National Grid sa | Contractor’s name: AL-MASHARIQ_| Client: SEC-EOA 5 ‘SEC=EOA Contrast No? Name of substation: AL-GHASSANIYAH 115/13.8kV S/S 31131093100 SYNCHROCHECK RELAY(KAYS100) Page 2 of 3 Panel/Bay No: Equip. Nos Dog. Ref Record No aoeale uz BUS-2 High BUS2 Low Fue} PDO 20" 2sa1e | 2576 | 2209 | 2221 | TNs | eas ae ee UNE High UNE Le PU 00 P| 00 20° 2 258.9 2578 | 212 | 223 Frequency Ui oe ‘AF Check (Marval) ] ut BUS-1 High (Hz) BUS-1 Low (Hz) F sett seme Ge) PIU Pe} PIU 10 200 mlz 0 60.20 6019 | 69.0 | s9e1 [pec Uz BUS-2High (Hz) | _ BUS-2 Low (Hz) ee ce) PIU DIS PI DIO 200 mHz o 6020 6019 | 5980 | 5981 + 7] TINE LINE -High (Hz) LINE-Low(Hz) OF set ne Se eae a dB) 200 mHz a | 6020 co19 | seao | seer Conditions for Synch check: ScNo Description —Piskip _ Drop ott 1 V Live Line 35.16 S485 3 Ve Dead Bus-I 199 207 [4 V> Live Bus-1 SSH maa [Sareea janes Ve Dead Bus-2 199 207 [aac V5 Live Bus-2 pqees3acea | eas54 DATE 01/09/2014 TESTING ENGINEER -JAL CSD- Engineer Sigravure fot 4 Signature: Name: MeLavan kumar Name _: _MrHilssil

Вам также может понравиться