Вы находитесь на странице: 1из 768

DF001

This drawing and design is the property of AREVA and must not be copied or lent without prior permission in writing

Name OTS Name AG Name


1 DISTANCE RELAY ZONE 3 & BROKEN CONDUCTOR SETTINGS CHANGED
Date 14.11.11 Date 14.11.11 Date

Name OTS Name AG Name


0 First Issue
Date 10.10.11 Date 10.10.11 Date
SIGN.

SIGN.

SIGN.
REV. DESCRIPTION DRAWN CHECKED APPROVED

Customer / Owner

DELHI TRANSCO LIMITED


(A Govt. of NCT of Delhi undertaking)

OFF SHORE, SUPPLY & SERVICE:

AREVA T&D INDIA LTD, NOIDA


Project

220 kV / 33 kV GIS SUBSTATION AT TRAUMA CENTRE (AIIMS), NEW DELHI

LOA No.:
Supply: F.DTL/2011/0pr Proj-I/DGM(P-1B)/2009/F-6/183
Service: F.DTL/2011/0pr Proj-I/DGM(P-1B)/2009/F-6/184
CS2421-1-PEN-001.XLS

Offshore: F.DTL/2011/0pr Proj-I/DGM(P-1B)/2009/F-6/182


TITLE:

Short Circuit Calculations & Relay Coordination

DRAWING NO.
5 2 5 7 P N 0 9 5 - H C M - E - S Y D - C A L - 0 6 0 1 R 1
Sheet 0 1 of 7 6 7 Sheets
CONFIDENTIAL

The information contained in


this document is not to be
communicated either directly
or indirectly to any person
not authorised to receive it

Relay Co-ordination
For
220 kV / 33 kV GIS SUBSTATION AT HC MATHUR (ELECTRIC) LANE,
NEW DELHI

Client: M/s. Delhi Transco Limited, New Delhi

Contractor: AREVA T & D India Limited, Noida

Doc No: 5257PN095-HCM-E-SYD-CAL-0601

Rev: 01, Date: 14.11.2011

Pages: 767, Size: A4


INDEX

Sr. No. Title Pages Page no

1. Revision History 01 04

2. Introduction 01 05

3. System Description 01 06

4. Mode of Operation 01 07

5. Protection 02 08 – 10

6. Short circuit Analysis & Case Studies 01 11

7. Short Circuit Study Result Summary 02 12 – 13

8. Relay co-ordination study methodology 02 14 – 15

9. Relay co-ordination Basis & Assumptions 01 16

10. References 01 17

11. Relay Co-ordination Example 09 18 – 26

12. Relay Setting Quick Reference Chart 95 27 – 121

13. Appendix – A 3L, LLG & LG Short circuit 08


current quick reference chart for various buses

14. Appendix – B Summarized 3L, LLG & LG Short 32


circuit current quick reference for various buses

15. Appendix – C Short circuit calculations 599


in detail for All Case studies

16. Appendix – D Sample co-ordination curves 06

17. Appendix – E Single Line Diagram Modeled 01


in ETAP (Page size A2)

3
Revision History:

Revision Date Details

Base 28.09.11 First Issue

R1 14.11.11 Zone 3 tripping time changed to 0.8 sec / Zone 3


criteria changed from 120% to 100% of protected line
/ Broken conductor protection switched OFF in P442

4
Introduction:

The role of M/s. Delhi Transco Limited (DTL) is confined to arrange and provide transmission
network of 400 KV and 220 KV source from Northern Grid.

To strengthen its power distribution network, DTL is upgrading its distribution network with
underground cables and GIS. The 220 kV/ 33 kV GIS substation at HC Mathur lane (Electric
Lane) is part of its strengthening program. Electric lane SS will receive power from 400 kV /
220 kV PGCIL SS at Maharani bagh.

The 400/220 kV GIS Maharani bagh PGCIL SS has 2 x 315 MVA 400/220 kV Transformers and
2 x 500 MVA transformers are planned making total transforming capacity of 1630 MVA.

DTL Distribution Network

5
System Description:

Electric lane substation distribution network consist of 220/33 kV receiving substation has
220kV GIS, 2 x 100 MVA main three winding power transformers of 220 kV / 33 kV/11 kV.
11 kV tertiary winding is utilized for station auxiliary power requirement and 2 x 400 kVA
step down transformer along with DG backup has been provided to cater substation
auxiliary load.

220 kV / 33 kV (Y / Y) systems are effectively grounded (solidly grounded) system. 33 kV is


used for distributing power to various load centers. Incoming source to substation is 220 kV
double circuit underground cables from Maharani bagh SS and loop out to Park street SS
with the help of double bus GIS.

Power is distributed from SS at 33 kV level. SS has double bus 33 kV switchgear having


incoming from 100 MVA transformers on each bus.

All the 220 kV feeders and transformers have 100% standby capacity for Redundancy.

6
Mode of Operation:

Normal source of supply will be Maharani bagh SS and loop out to park street SS. Both 100
MVA transformers running in isolation mode or synchronized momentarily at 33 kV for load
transfer to other transformer for planned outage for maintenance or for normal supply
restoration. In case of failure of both source from Maharani bagh, Park street SS becomes
Incoming source to HC Mathur Lane SS with 220 kV source from Naraina SS-Bamnauli SS.

In normal mode of supply, both lines from Maharani bagh SS runs in isolated mode and
looped out to Park street SS. Bus coupler remains open. In case of failure or shutdown, bus
coupler is closed and load is transferred to another line.

7
Protection:

Following protections are provided;


1. 220 kV Incomer Feeder:
Composite Numeric relay (P442) with following main functions enabled:
i. Distance protection (6 zone protection available in relay) (21)
ii. Directional / Non directional OC protection & earth fault protection (51/67)
iii. Channel aided directional earth fault protection (67N)
iv. Out of step tripping / power swing blocking (68)
v. Switch on to fault (SOTF) tripping (50/27)
vi. Two stage over voltage protection (59)
vii. Distance to fault locator

Composite Numeric relay (P543) with following main functions enabled:


i. Differential Protection (87)

Microcontroller based INST over current relay (MCTI40) with time delay relay for
Local breaker backup protection:

Composite Numeric relay (C264) for Bay Control for measurement and control:

2. 220 kV OG to 100 MVA Transformer Feeder:


Composite Numeric relay (P633) with following main functions enabled:
i. Differential Protection (87)
ii. Over Fluxing Protection (99)
iii. Three phase Over current Protection (50)
iv. Thermal overload Protection (50T)

Composite Numeric relay (P141) with following main functions enabled:


i. Directional Over Current Protection (67)
ii. Directional earth fault Protection (67N)

Composite Numeric relay (P141) with following main functions enabled:


i. Restricted Earth Fault Protection (64R – HV)

Composite Numeric relay (P141) with following main functions enabled:


i. Restricted Earth Fault Protection (64R – LV)

Microcontroller based INST over current relay (MCTI40) with time delay relay for
Local breaker backup protection:
Composite Numeric relay (C264) for Bay Control for measurement and control:

8
3. 220 kV Bus coupler Feeder:
Composite Numeric relay (P141) with following main functions enabled:
i. Three phase Over current (50/51)
ii. Earth fault Protection (50/51N)

Microcontroller based INST over current relay (MCTI40) with time delay relay for
Local breaker backup protection:

Composite Numeric relay (C264) for Bay Control for measurement and control:

Static High Impedance Bus bar Protection with check relay (PBDCB):

4. 33 kV Transformer Incomer (without station auxiliary TR):


Composite Numeric relay (P132) with following main functions enabled:
i. Three phase Directional Over current Protection (67)
ii. Directional Earth fault protection (67N)

Composite Numeric relay (C264) for Bay Control for measurement and control:

5. 33 kV Transformer Incomer (with station auxiliary TR):


Composite Numeric relay (P132) with following main functions enabled:
i. Three phase Directional Over current Protection (67)
ii. Directional Earth fault protection (67N)

Composite Numeric relay (P132) with following main functions enabled (For 11 kV
Tertiary Winding):
i. Three phase Directional/Non directional Over current Protection (50/51/67)
ii. Directional/Non directional Earth fault protection (50N/51N/67N)
iii. Neutral Displacement Protection (59N)

Composite Numeric relay (C264) for Bay Control for measurement and control:

6. 33 kV Out going Feeders:


Composite Numeric relay (P442) with following main functions enabled:
i. Distance protection (6 zone protection available in relay)
ii. Directional / Non directional over current protection & earth fault protection

Composite Numeric relay (P132) with following main functions enabled:


i. Three phase Directional Over current Protection (67)
ii. Directional Earth fault protection (67N)
No volt relay for Earth switch interlocks (27)

9
7. 33 kV Bus Coupler Feeder:
Composite Numeric relay (P132) with following main functions enabled:
i. Three phase Directional Over current Protection (50/51/67)
ii. Directional Earth fault protection (50N/51N/67N)

10
Short Circuit Analysis:

Following source scenarios are considered for Short circuit calculations and relay co-
ordination;

1. Maharani Bagh SS source is fed by 1x315 MVA 400/220 kV Transformer (minimum


fault MVA condition)

2. Maharani Bagh SS source is fed by 2x315 MVA 400/220 kV Transformer

3. Maharani Bagh SS source is fed by 2x315+2x500 MVA 400/220 kV Transformer


(Maximum fault MVA condition)

Following scenarios are considered for deriving minimum and maximum fault currents at 33
kV bus

1. Both 100 MVA TR running independent and feeding 33 kV bus

2. Both 100 MVA TR paralleled at 33 kV bus with minimum source fault MVA

3. Both 100 MVA TR paralleled at 33 kV bus with maximum source fault MVA
(SS max fault current at 33 kV level)

4. 220 kV bus paralleled with minimum source fault MVA

5. 220 kV bus paralleled with maximum source fault MVA


(SS max fault current at 220 kV level)

Results of short circuit currents are given in annexure – A/B/C.

11
Short Circuit Study Method & Procedure:

1. The short circuit study has been carried out based on IEC 909 method with the help
of ETAP Power Station software.

2. All calculations carried out with 400 kV fault level of 31.5 kA at Maharani bagh GIS
and then stepped down to 220 kV with 1x315 MVA, 2x315 MVA, 2x315+2x500 MVA
transformers (resultant fault MVA at 220 kV at Maharani baug SS is 3239 MVASC (8.5
kA), 6097 MVASC (16 kA), 15000 MVASC (39.365 kA)).

3. Both 100 MVA transformers are modeled with 400 kVA auxiliary transformers for
future station load requirement, if any.

4. Load centers are modeled with 5 MVA lump load considering 10 MVA feeder
capacity as per dtl distribution guideline for 33 kV level.

5. The detail results of the short circuit studies generated by ETAP software are
enclosed as APPENDICES with this report.
The results of the above studies are tabulated below:

Short Circuit Calculation Results:

The minimum fault levels at 220 kV, 33 kV and 415 V buses are tabulated below for quick
reference

Short-Circuit Summary
3-Phase, LG, LL, LLG Fault Currents
Bus Minimum SC in k Amps
ID kV Ik
33KV MAIN BUS1 33.000 9.314
33KV MAIN BUS2 33.000 9.314
AUX TR1 HT TB 11.000 18.813
AUX TR1 LT BUS 0.415 10.170
AUX TR1 LT TB 0.415 10.400
AUX TR2 HT TB 11.000 18.813
AUX TR2 LT BUS 0.415 10.170
AUX TR2 LT TB 0.415 10.400
B. D. MARG F1 33.000 7.207
CHURCH ROAD F1 33.000 7.361
CONNAUGHT PLACE F1 33.000 6.813
CONSTITUTION C-F1 33.000 8.465
CONSTITUTION C-F2 33.000 8.465
DELHI HC F1 33.000 7.361
DWL1 IC CB TB 220.000 6.181
DWL2 IC CB TB 220.000 6.181
DWL3 IC CB TB 220.000 6.181
DWL4 IC CB TB 220.000 6.181

12
Short-Circuit Summary
3-Phase, LG, LL, LLG Fault Currents
Bus Minimum SC in k Amps
ID kV Ik
HANUMAN ROAD F1 33.000 9.057
HCML F1 33.000 9.204
HCML IC L1 TB 220.000 6.181
HCML IC L2 TB 220.000 6.181
HCML IC L3 TB 220.000 6.181
HCML IC L4TB 220.000 6.181
HWL1 SELECT ISO TB 33.000 9.314
HWL2 SELECT ISO TB 33.000 9.314
HWL3 SELECT ISO TB 33.000 9.314
HWL4 SELECT ISO TB 33.000 9.314
HWL5 SELECT ISO TB 33.000 9.314
HWL6 SELECT ISO TB 33.000 9.314
HWL7 SELECT ISO TB 33.000 9.314
HWL8 SELECT ISO TB 33.000 9.314
HWL9 SELECT ISO TB 33.000 9.314
HWL10 SELECT ISO TB 33.000 9.314
HWL11 SELECT ISO TB 33.000 9.314
HWL12 SELECT ISO TB 33.000 9.314
HWL13 SELECT ISO TB 33.000 9.314
HWL14 SELECT ISO TB 33.000 9.314
HWL15 SELECT ISO TB 33.000 9.314
HWT1 IC CB TB 33.000 9.314
HWT3 IC2 CB TB 33.000 9.314
IGNCA F1 33.000 8.465
JANPATH LANE F1 33.000 8.180
MAHARNI SS BUS 220.000 7.361
MAIN BUS1 220.000 6.181
MAIN BUS2 220.000 6.181
MANDI HOUSE F1 33.000 8.311
OG AUX TR1 CB TB 11.000 19.145
OG AUX TR2 CB TB 11.000 19.145
PARK STREET SS BUS 220.000 5.942
RAJA BAZAR F1 33.000 7.361
SCHOOL LANE F1 33.000 7.899
SCINDIA HOUSE F1 33.000 9.068
TR1 HT BUS SELECT ISO TB 220.000 6.181
TR2 HT BUS SELECT ISO TB 220.000 6.181
TR1 11KV TB 11.000 19.482
TR1 33KV TB 33.000 9.320
TR2 11KV TB 11.000 19.482
TR2 33KV TB 33.000 9.320
VIDHYUT BHAVAN F1 33.000 7.734
Table: Minimum Steady state Short Circuit currents at various buses

13
Relay Co-ordination Study:
The relay co-ordination study of an electrical power system consists of an organized time-
current study of all devices in series from the utilization device to the source. This study is a
comparison of the time it takes for the individual devices to operate when certain levels of
normal or abnormal current pass through the protective devices.

The objective of a co-ordination study is to determine the characteristics, ratings and


settings of over current protective devices which will ensure that the minimum numbers of
healthy load feeders are interrupted when the protective devices clear fault anywhere in
the system. At the same time, the devices and settings selected must provide satisfactory
protection against overloads on the equipment and interrupt short circuit as rapidly as
possible. The co-ordination study provides data useful for the selection of instrument
transformer ratios, protective relay characteristics and settings, fuse ratings, low voltage
circuit breaker ratings, characteristics, and settings. It also provides other information
pertinent to the provision of optimum protection and selectivity. Thus, the practice of
protection engineering involves periodic fault studies followed by relay setting, checking and
co-ordination studies.

Relay co-ordination studies are necessary in order to ensure that the wide variety of
protective relays function correctly with proper discrimination to provide the required
reliable, sensitive and selective isolation of faulty section of the power system network.
Frequently, there is also the need to conduct a detailed post mortem analysis to evaluate
whether the relays and breakers respond correctly to certain system faults.

Relay Co-ordination Methodology:

The primary and the backup relay pairs are identified using the network topology and relay
locations as input. It should account for both directional and non-directional relays, fuses
and relays in multi-terminal lines.

The primary fault current and the backup fault currents are determined.

For a given CT secondary rating, different plug setting steps (pickup currents) are available.
The plug settings for phase and earth fault relays are determined (current above on which
the relay should operate) based on maximum load current flowing through the protective
device and unbalance factor.

The selection of TDS (Time Dial Setting) or TMS (Time Multiplier Setting) is most involved
task in this process and that is where the actual primary / backup co-ordination occurs.
Before co-ordination is attempted, each relay is set to its minimum TDS. The operating time
of the primary relay for close in fault is determined. All the backup relays are coordinated

14
with the given time discrimination and new time dial setting for each backup relay is
determined. If this new TDS is greater than the old TDS, the actual TDS is made equal to
new TDS and again the process is repeated. An iterative method is employed where by
several passes are made through the list of relays. Because of the inverse nature of the
relay characteristics, these iterations converge rapidly.

The procedure is same for both phase and earth fault protection. This is enabled by
changing the plug setting and primary backup relay current depending on the type of
protection.

The over current relay co-ordination is done such that the relays should operate for all short
circuits in its own zone and provide backup protection for short circuits in immediate
adjoining system elements in the downstream, if the relay in that adjoin system fails to
operate.

The relay co-ordination study is carried out for the maximum generation/grid supply
condition and the settings for the relays namely plug setting, time dial setting and
instantaneous settings are then cross checked for their performance for other generation /
grid distribution configurations and modified if necessary.

A discrimination time of 0.3 second is considered between the primary and backup relay
pairs, which are located on the same power system element (transformer primary side,
secondary side and cables).

Plug settings of the phase fault relays are computed based on the maximum load current.

The relay settings for HT (33 kV) distribution feeders are provided additionally with distance
protection relays to quick isolation of cable faults, minimizing damage to cables and to
provide better system.

15
Relay co-ordination Basis and Assumptions:

1. The network shown in Main Single Line diagram 5257PN095-HCM-E-SYD-SLD-001 Rev: 4


is modeled in ETAP power station software

2. Fault MVA at DTL Maharani bagh – 400 kV GIS is considered as 31.5 kA (21824 MVA)
with 2 x 315 + 2 x 500 MVA transformers having 12% ± 10% Z, X/R = 42 to determine
DC component in Source

3. %Z & X/R ratio for all plant transformers are as per manufacturer GTP

4. Cable Impedance details as per Manufacturers’ GTP are taken.

5. For calculation of maximum fault current at different voltage levels, Positive


tolerance of 10% of the bus voltage is considered as pre-fault voltage for voltages
above 1 kV and 5% for voltages below 1 kV.

6. Discrimination time gradation of 0.3 sec is considered between pair of primary and
backup relay pairs, which are located on the same power system element
(transformer primary side, secondary side and cables). 0.3 sec is selected as all relays
used are numeric/electronic and hence operating time range is having more
accuracy (20 ms for relay internal measuring delay + 20 ms for Master trip + 50 ms
for CB open time + 200 ms for tolerance & overlap margin = 290 ms ≅ 0.3 sec).

7. Distribution TR Feeder has to clear fault ( > LT Reflected Fault current)


instantaneously. Subsequent breaker (Remote load center Incomer) will trip with
discrimination time delay of 0.3 sec. Setting of Remote Incomer and OG at local SS is
set at 0.3 sec as backup to remote SS Incomer as distance protection relay is
protecting cable with < 0.1 sec delay.

8. Bus couplers and Incomers have clearance of 0.15 sec settings to permit Incomers to
clear faults within equipment arc flash safety limits.

9. U/V & O/V voltage cascade trip profile suggested for changeover and same can be
disabled, if not required.

16
References:

1. Main Single line diagram no: 5257PN095-HCM-E-SYD-SLD-001 Rev: 4


2. 220 kV Line Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3303 Rev: A
3. 220 kV Transformer Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3304
Rev: A
4. 220 kV Bus coupler Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3307
Rev: A
5. 220 kV Bus bar Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3308 Rev: A
6. 33 kV Transformer Incomer Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-
3319 Rev: C
7. 33 kV Bus coupler Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3321 R: C
8. 33 kV OG Feeder Protection C & R Panel schematics: 5257PN095-HCM-E-SYD-SCH-3311 R: C
9. 220 kV Cable length, Route details, GTP as per letter no: F.DTL/2011/Opr-Proj/DGM
(P-1B)/09-10/F-5&6/241 dated 15.12.2009 and annexure
F.DTL/2012/OPR(Project)/2009-10/Mgr.(Project)IIB-II/F-4/128 dated 11.12.2009
F.DTL/2012/OPR(Project)/2009-10/Mgr.(Project)IIB-II/F-6/214 dated 03.12.2009
F.DTL/2011/M(CWGP-II)A2/09-10/Opr.(Proj)/F-4/128 dated 03.12.2009
10. 33 kV Cable GTP for Transformer to GIS: GTP No: 5257PN095-HCM-E-SYD-GTP-5102
11. 33 kV Cable length & GTP for OG feeders: NDMC/P-33kV (Elect. Division)/3 pages
12. Northern Regional Power Committee (NRPC) – "Guidance for Distance protection" issued by
Protection subcommittee dated 10.12.2009

Standards used:

a. IEEE 242-2001 (BUFF Book)

b. ANSI C37.91-2001 Power transformer Protection

c. C57.109-1993 for TR SC withstand capability

d. ANSI C57.92 & IEEE C57.96-1999 for TR Loading capabilities

e. IEC 60076-8-1997 Power transformer application guide

f. IEC 60076-5-2000 Transformer ability to withstand SC

g. IEC 60354-1991 Loading guide for Oil immersed transformer

h. IEC TR 61912-2 Low voltage switchgear & control gear –over current protective devices
selectivity under over current conditions - application guide

i. Document IS-13234-1992. (Superseding IS-5728)

j. IEC Pub 60909 (2001)

17
Setting calculation example:

1. 33 kV OG Feeder (OG to Vidhyut Bhavan -1):

CT Ratio: 1000 – 500 / 1 Amp, selected CTR: 500/1A, VT Ratio: 33 kV/ √3 ⁄ 110 V/√3

Feeder Rating: 10 MVA, Full load Current: 175 Amps, Min. SC: 7.734 kA, Max. SC: 19.934 kA

67 (IDMT1 unit as short circuit protection):


Operating time of the relay shall be more than the operating time of the downstream
(remote SS) relays,
Hence, consider operating time of 0.3 sec. (As described in basis & methodology – Remote
SS – TR feeder relay operating time = INST, Remote SS incomer relay = 0.3 sec and OG feeder
relay setting kept same as remote SS as distance protection clears cable fault in < 0.1 sec
(INST+ CB fault clearing time))

Select Curve = IEC VERY INV (Curve – 2); set IS = 1.0 Amps

Plug setting multiplier (psm) = Fault current / (Is x CTR) = 19934 / 500 = 39.868 which is > 20

TMS = td x (psm1 – 1) / 13.5 (For IEC VI)

= 0.3 x (20 – 1) / 13.5 = 0.422 ≅ 0.42 (nearby TMS setting), op.time@0.42: 0.298 s
at minimum fault current (7.734 kA): 0.42 TMS: 0.392 sec

Set IDMT1> minimum operating time = 0.300 sec (For Max. SC minimum time clearance) so
operating time of 0.3 sec discrimination available irrespective of higher fault currents.

Stability checks on reflected fault current:


For reflected fault current for 10 MVA TR, Remote SS TR feeder shall provide 0.9 sec
clearance time and Incomer at remote SS / OG at local SS shall be > 1.200 sec
Neglecting source impedance; reflected fault current at 33 kV side = FLC/%Z
= 175/0.08 (%Z assumed) = 2.1875 kA
 Op. time at reflected fault current = (0.42 x 13.5) / ((2187.5/500)^1 – 1)
= 1.68 sec which is > 1.200 sec

67N (IDMT1 unit):

10 MVA FLC = 175 Amps, 10% of FLC = 17.5 Amps = 0.035 Amps in Secondary ≅ 0.04 A
setting on relay (20 A primary = 11.43% of 10 MVA base)

Time delay desired = 0.3 sec (as explained above for phase current setting)

Select Curve = IEC STD INV (Curve – 1); set IS = 0.04 Amps

TMS = td x (psm0.02 – 1) / 0.14 (For IEC SI)

= 0.3 x (300.02 – 1) / 0.14 = 0.151 ≅ 0.15 (nearby TMS setting),

Op. time @ 0.15 TMS: 0.298 sec

18
67 (IDMT2 unit as overload protection):
Operating current of the relay shall be more than the full load current of the downstream
(remote SS), i.e. 175 Amps @ 10 MVA
Select Curve = IEC STD INV (Curve – 1); set IS = 0.39 Amps

Time delay shall be ≥ primary protection op. time at reflected fault current i.e. 1.680 sec
@2.1875 kA

Plug setting multiplier (psm) = Fault current / (Is x CTR) = 2187.5 / 0.39x500 = 11.218

TMS = td x (psm0.02 – 1) / 0.14 (For IEC SI)

= 1.685 x (11.2180.02 – 1) / 0.14 = 0.836 ≅ 0.84 (nearby TMS setting),

op.time@0.84: 1.692 sec

On fault, minimum operating time > 1.2 sec is required; Actual op. time@ 0.84TMS: 1.671 s

50 (DTOC unit: stage 1: I> ):

Set current 1.3 times reflected fault current i.e. 2.1875 x 1.3 = 2.84375 kA = 5.6875 ≅ 5.69 A

Set relay I> = 5.69 A (2.845 kA), tI> = 0.300 sec

50N (DTOC unit: stage 1: IN> ):

Set current 100% FLC = 175 Amps = FLC x 1.05/0.95 = 0.39 Amps secondary (195 A Primary)

Set relay IN> = 0.39 A (195 A), tIN> = 0.300 sec

SCDD unit:

Select forward direction for trip enable for all functions (tI>, tI>>, tI>>>, tI>P etc…).
Set direction angle for G = -45°, VNG> 0.1 x VN/√3, Evaluation of VNG = Calculated,
VMEM=Enabled (0.15 VN)

2. 33 kV Transformer Incomer Feeder:

IDMT Over current (51) unit: (P132 – 33 kV Incomer):

ICT Full Load Current = 1749.6 Amps, CT Ratio: 2000 / 1 Amps

Pickup setting = FLC x (Pickup/drop off Ratio) / CTR = 1749.6 x (1.05 / 0.95) / 2000 = 0.97 A,

Operating time of the relay shall be more than the operating time of the LV (33 kV OG side)
relays,

Remote load center SS TR feeders relay setting for faults: INST

Remote load center SS Incomer relay setting for faults: 0.3 sec

19
Local OG Feeder relay relay fault clearing time delay 0.3 sec (Overlapping is done considering
– cable faults will be indicated & cleared by distance relay)

Hence, consider operating time of 0.6 sec.


Select Curve = IEC SI

Max Fault current seen by Incomer relay = 15.27 kA


Plug setting multiplier (psm) = Fault current / (Is x CTR) = 15270 / (0.97 x 2000) = 7.871

TMS = td x (psm0.02 – 1) / 0.14 (For IEC STD)

= 0.6 x (7.8710.02 – 1) / 0.14 = 0.180

INST Over current (50-1) unit: (P132 – 33 kV Incomer) I>>:

Unit to be set at 250% of full load current,


\ IS = 2.5 x 1749.6 / 2000 = 2.187 Amps ≅ 2.20 Amps (4.400 kA)
(shall be less than 80% of the minimum fault current fed by transformer to remote SS i.e.
6.813 kA (Connaught SS) = True)

Being secondary protection, delay needs to be provided to operate primary protections to


clear faults (OG Feeder relays depending on location of fault).
Hence, Set tI>> = 0.6 sec

INST Over current (50-2) unit: (P132 – 33 kV Incomer) I>>>:

For 33 kV SWGR faults need to be clear fast to contain arc flash energy within permissible
limits, set I>>> unit to 80% of minimum bolted fault current (10.755 kA) with time delay of
0.5 sec

Set I>>> unit = 0.8 x 10755/2000 = 4.302 ≅ 4.30 A (8.60 kA) tI>>> = 0.5 sec

Earth fault Protection (51N & 51NS) unit (P132 – 33 kV Incomer) IO>:
51N:
Being Star transformer, to provide stabilized earth fault protection over yard side ground
faults, set IO> unit to 30% of FLC = 0.3 x 1749.6 / 2000 = 0.2624 ≅ 0.26 Amps
Operating time for the relay shall be more than the upstream relays,
Hence, consider operating time of 0.6 sec.
Max fault current 15.27 kA, psm = 29.36, select curve = IEC SI
TMS = td x (psm0.02 – 1) / 0.14 (For IEC STD)
= 0.6(29.360.02 – 1 / 0.14) = 0.299 ≅ 0.30 (nearby TMS setting)
Operating time at TMS = 0.30, = 0.6006 sec

Set IO>>, IO>>> same as OC units i.e. IO>>: 2.20 Amps (4.4 kA), t IO>>: 0.6 sec
IO>>>: 4.30 A (8.60 kA) t IO>>>: 0.5 sec

20
3. 100 MVA Transformer Feeder

Differential Relay:

Equipment Detail:
Rating: HV – LV: 60/80/100 MVA, HV – IV: 20/26.66/33.33 (not loaded)
Voltage Rating: 220/33/11 kV, YNyn0d11 (IV vector group d11), ONAN/ONAF/OFAF,
+ 5% –10% OLTC, OLTC steps: 16, Step voltage: 1.25 %,
%Z = HV – LV: 16% ± 10%,
Current: HV: 262.4 Amps, LV: 1749.6 Amps
CT Ratio:
HV: 800 – 400/1 Amp, LV: 2000 /1 Amp, PT Ratio: HV:220 kV⁄√3 / 110 V⁄√3
Neutral CT: For 64R HV: 400/1A, LV: 2000/1A

Minimum Fault current at 220kV Tr side fault, @220 kV Transformer TB: 6.814 kA
Maximum Fault current at 220 kV Tr side fault, @220 kV Transformer TB: 25.861 kA (Peak)

Protection:
Primary Protection:
87T Three winding Transformer differential protection relay – P633
64R HV High Impedance Restricted earth fault protection – P141
64R LV High Impedance Restricted earth fault protection – P141

Secondary Protection:
50 / 51 / 50N / 51N INST/IDMT Over current / Earth fault Protection
50 / 51 / 50N / 51N INST/IDMT Over current / Earth fault protection

Differential Protection (87T): (P633):


To protect major portion of winding and sensitivity high,
Set Bias pickup current Id>= 0.1 Amps, Vector Group: HV-LV: 0, Bias Slop m1: 10%, m2: 80%,
IR: 1.5 x IN, Rated Ref Power: 100 MVA, Id>>: 7 x IN, Id>>>: 10.5 x IN , Id> CTS: 0.1 x IN, Op. mode
for Inrush: Non phase selective, 2nd Harmonic filter: Yes – 20%, HV IO filt: Yes, , LV IO filt: Yes,
Over flux block: Yes,
Disable V<>, f<>, 64R HV, 64R LV functions

Conformation calculations:
At Normal condition Current in HV Bias circuit (at Normal Tap):
HV Primary current: 262.4 Amps,
current in CT Secondary: 262.4/400 = 0.656 A (will be calculated by Relay)
Required ratio compensation: 1 / 0.656 = 1.5244 (will be calculated by Relay)
At Normal condition Current in LV Bias circuit (at Normal Tap):
LV Primary current: 1749.6 Amps,

21
current in CT Secondary: 1749.6 / 2000 = 0.8748 (will be calculated by Relay)
Required ratio compensation: 1 / 0.8748 = 1.1431 (will be calculated by Relay)

At -15% tap, current in HV Bias circuit (at Tap 17):


Primary current:308.7 Amps,
current in CT Secondary: 308.7 / 400 = 0.7718 A (will be calculated by Relay)
Current sensed by relay: 0.7718 x 1.5244 = 1.177 (will be calculated by Relay)

At +5% tap, current in HV Bias circuit (at Tap 01):


Primary current:249.9 Amps,
current in CT Secondary: 249.9 / 400 = 0.6248 A (will be calculated by Relay)
Current sensed by relay: 0.6248 x 1.5244 = 0.9524 (will be calculated by Relay)

Differential current at Tap extremities:


At -15% Tap: 1.177 – 1 = 0.177 Amps
At +5% Tap: 1 – 0.952 = 0.048 Amps

Bias current at Tap extremities:


I = IRHV + IRLV = 1.177 +1 = 1.09
bias1
2 2
I = IRHV + IRLV = 0.952 + 1 = 0.976
bias2
2 2
Operating current at Tap extremities:
At -15% Tap,
IOP1 = IS + (Bias setting x Bias current)
= 0.1 + (0.1 x 1.09)
= 0.209 A
For Stability of operation = (Idiff1 / IOP1) x 100 < 90%
= (0.177 / 0.209) x 100 = 84.69%
At +5% Tap,
IOP1 = IS + (Bias setting x Bias current)
= 0.1 + (0.1 x 0.952)
= 0.195 A
For Stability of operation = (Idiff1 / IOP1) x 100 < 90%
= (0.048 / 0.195) x 100 = 24.62%

Since the differential current is not greater than 90% of the operating current at
–15%+5% tap the relay will operate satisfactorily.
Hence, Bias setting of 10% till 1.5 times Full load current & 80% for through fault stability.

Id>> Setting:
Inrush current = ((FLC /%ZMIN)/(CT Primary)) x IN = (262.4 / 0.144) / (400)
= 4.556 x IN
Set 142% of 6.332 (Peak) i.e. 6.468 x IN ≈ 7 x IN,
\ Set Id>> = 7 x IN
Set Id>>> at 150% of Id>> setting, Id>>> = 10.5 x IN

22
100 MVA Transformer with 400 kVA aux TR on tertiary winding:

400 kVA TR 220 kV side current = 1.05 Amps

At -15% tap, current in HV Bias circuit (at Tap 17):


Primary current:308.7 Amps, + 400 kVA TR Load diff between HV/LV (1.05) = 309.75 A
current in CT Secondary: 309.75 / 400 = 0.7744 A (will be calculated by Relay)
Current sensed by relay: 0.7744 x 1.5244 = 1.180 (will be calculated by Relay)

At +5% tap, current in HV Bias circuit (at Tap 01):


Primary current:249.9 Amps, + 400 kVA TR Load diff between HV/LV (1.05) = 250.95 A
current in CT Secondary: 250.95 / 400 = 0.6274 A (will be calculated by Relay)
Current sensed by relay: 0.6274 x 1.5244 = 0.9564 (will be calculated by Relay)

Differential current at Tap extremities:


At -15% Tap: 1.180 – 1 = 0.180 Amps
At +5% Tap: 1 – 0.956 = 0.044 Amps

Bias current at Tap extremities:


I = IRHV + IRLV = 1.180 +1 = 1.09
bias1
2 2
I = IRHV + IRLV = 0.956 + 1 = 0.976
bias2
2 2
Operating current at Tap extremities:
At -15% Tap,
IOP1 = IS + (Bias setting x Bias current)
= 0.1 + (0.1 x 1.09)
= 0.209 A
For Stability of operation = (Idiff1 / IOP1) x 100 < 90%
= (0.18 / 0.209) x 100 = 86.12%
At +5% Tap,
IOP1 = IS + (Bias setting x Bias current)
= 0.1 + (0.1 x 0.956)
= 0.196 A
For Stability of operation = (Idiff1 / IOP1) x 100 < 90%
= (0.044 / 0.196) x 100 = 22.45%

Since the differential current is not greater than 90% of the operating current at
–15%+5% tap the relay will operate satisfactorily.
Hence, Bias setting of 10% till 1.5 times Full load current & 80% for through fault stability.

23
Over flux Settings (V/f):

Designed flux density: 1.6 T

Over flux 120% (1.92 T): 60 sec (as per GTP)

Over flux 140% (2.24 T): 5.0 sec (as per GTP)

Set V/f Alarm at 115% = 1.15 (15% increase in voltage & no change in frequency OR
combination of V& f variation of 15%)
Set V/f Trip at 120% = 1.20
Set V/f >>(INST unit) at 150% = 1.50
Set curve time delay = 1.0 sec
Set V/f>> time delay = 1 sec

081.211 | V/f | V/f> (alarm) PS1 | 1.15 Vnom/fnom


081.212 | V/f | V/f(t)> PS1 | 1.20 Vnom/fnom
081.213 | V/f | V/f>> PS1 | 1.50 Vnom/fnom
081.214 | V/f | tV/f> PS1 | 1 s

Curve setting: 081.217 | V/f | t at V/f=1.05 PS1 | 1000 s


081.218 | V/f | t at V/f=1.10 PS1 | 1000 s
081.219 | V/f | t at V/f=1.15 PS1 | 1000 s
081.220 | V/f | t at V/f=1.20 PS1 | 58.3 s
081.221 | V/f | t at V/f=1.25 PS1 | 41.6 s
081.222 | V/f | t at V/f=1.30 PS1 | 3.2 s
081.223 | V/f | t at V/f=1.35 PS1 | 2.8 s
081.224 | V/f | t at V/f=1.40 PS1 | 2.2 s
081.225 | V/f | t at V/f=1.45 PS1 | 1.9 s
081.226 | V/f | t at V/f=1.50 PS1 | 1.7 s
081.227 | V/f | t at V/f=1.55 PS1 | 1.5 s
081.228 | V/f | t at V/f=1.60 PS1 | 1.3 s
081.230 | V/f | Reset time PS1 | 0 s
081.229 | V/f | tV/f>> PS1 | 1 s

REF1 (64R HV) & REF2 (64R LV) Setting (P141):


HV Primary IN: 400 / 1 A, HV Neutral IN: 400 / 1 A, LV Primary IN: 2000 / 1 A, LV Neutral IN:
2000 / 1 A current mode: Measurement, Mode of Operation: High Impedance

Set REF Id>: 0.10 Amp (0.10 x FLC/CTR = 6.56% of winding unprotected)

Stabilizing Resistor Value:


Maximum Fault current at 220 kV yard side = 25.861 kA

Considering Max of Both side being summation CT measurement used,


IF sec side = 64.65 A (CT Ratio = 400/1A),
RCT = 2.0 ohm,

24
RL = 0.8 ohms (assumed),
(Length = 200 meter and 2.5 mm2 cable Imp = 8 ohms/km considered, 2C parallel),

VS = IF x (RCT + 2RL) = 64.65 x (2.0 + 2 x 0.8) = 232.74 Volts

RST = 1.1 ((VS – VAR) / ( IS)),


Since Numeric relays have negligible burden,

RST = 1.1 VS / IS = 1.1 (232.74 / 0.10) = 2560.14 ≅ 2560 ohms

HV winding stabilizing resistor setting = 2560 ohms (2.7 k Ohm, 144 W resistor to be used)

LV winding stabilizing resistor:

Maximum fault current neglecting source impedance = 1749.6/0.144 = 12.150 kA

Considering Max of Both side being summation CT measurement used,


IF sec side = 6.075 A (CT Ratio = 2000/1A),
RCT = 10.0 ohm,
RL = 0.8 ohms (assumed),
(Length = 200 meter and 2.5 mm2 cable Imp = 8 ohms/km considered, 2C parallel),

VS = IF x (RCT + 2RL) = 6.075 x (10.0 + 2 x 0.8) = 70.47 Volts

RST = 1.1 ((VS – VAR) / ( IS)),


Since Numeric relays have negligible burden,

RST = 1.1 VS / IS = 1.1 (70.47 / 0.10) = 775.17 ≅ 775 ohms (1 k Ohm, 144 W resistor to be used)

4. 100 MVA Transformer Feeder – 220 kV Line side:

IDMT Over current (51) unit: (P141 – 220 kV line side):

ICT Full Load Current = 262.4 Amps, CT Ratio: 400 / 1 Amps

Pickup setting = FLC x (Pickup/drop off Ratio) / CTR = 262.4 x (1.05 / 0.95) / 400 = 0.73 A,

Operating time of the relay shall be more than the operating time of the LV (yard side)
relays,
Hence, consider operating time of 01 sec.
Select Curve = IEC STD INV

Fault current at HV side for LV fault considering negative tolerance in Impedance and
neglecting source impedance = FLC / %Z = 262.4 / .144 = 1.822 kA
Plug setting multiplier (psm) = Fault current / (Is x CTR) = 1822.22 / (0.73 x 400) = 6.24

TMS = td x (psm0.02 – 1) / 0.14 (For IEC STD)

= 6.240.02 – 1 / 0.14 = 0.266 ≅ 0.27 (nearby TMS setting)

25
INST Over current (50) unit: (P141 – 220 kV line side) I>>>:

Unit to be set at 130% of LV fault current seen by HV side,


\ IS = 1.3 x 1822.22 / 400 = 5.92 Amps ≅ 6.0 Amps (2.40 kA)
(shall be less than 50%the line side minimum fault current fed from Grid i.e. 6.814 kA = True)

Being Primary protection, only delay for transient needs to be provided to clear faults.
Hence, Set tI>>> = 0.04 sec

Earth fault Protection (51N & 51NS) unit (P141 – 220 kV line side) IO>:
51N:
Being Star transformer, to provide stabilized earth fault protection over line side ground
faults, set IO> unit to 30% of FLC = 0.3 x 262.4 / 400 = 0.1968 ≅ 0.20 Amps
Operating time for the relay shall be more than the downstream relays,
Hence, consider operating time of 01 sec.
As psm is more than 20, calculate TMS for psm = 20,
TMS = td x (psm0.02 – 1) / 0.14 (For IEC STD)
= 200.02 – 1 / 0.14 = 0.441 ≅ 0.425 (nearby TMS setting)
Operating time at TMS = 0.425, = 0.964 sec
Set IO>> 1.3 x downstream reflected fault current, i.e. 6.0 A (2.4 kA) and time delay 0.05 sec

Disable IO>>> unit

26
Relay Setting Quick Reference Chart:

1. Output relays, LED s, Opto inputs front panel etc, need to be configured at site as per
schematic drawings approved.
2. Communication ports if used, to be set at site as per site requirement.
3. External trip, if any, to be set at site as per site requirement.

Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG VIDHYUT BHAVAN F1 1000 – 500 / 1 A Min. SC=7.734 kA FLC 350 A


20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC=15.577 kA
HWL1 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL1R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.298 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

33kV OG CONNAUGHT SS F1 1000 – 500 / 1 A Min. SC=6.813 kA FLC 350 A


20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC=14.442 kA
HWL2 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL2R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.298 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

27
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 – 500 / 1 A Min. SC=7.899 kA FLC 350 A


20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC=21.285 kA
HWL3 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL3R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.303 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

33kV OG HC Mathur Lane F1 1000 – 500 / 1 A Min. SC= 9.204 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 34.907 kA
HWL4 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL4R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.
33kV OG SCINDIA House F1 1000 – 500 / 1 A Min. SC= 9.068 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 31.901 kA
HWL5 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL5R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

28
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 – 500 / 1 A Min. SC= 9.057 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 31.666 kA kA 8.713
HWL6 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL6R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.304 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

33kV OG B. D. Marg F1 1000 – 500 / 1 A Min. SC= 7.207 kA FLC 350 A


20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 16.492 kA
HWL7 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL7R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.299 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.
33kV OG Mandi House F1 1000 – 500 / 1 A Min. SC= 8.311 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 23.494 kA
HWL8 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL8R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.299 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

29
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar F1 1000 – 500 / 1 A Min. SC= 7.361 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 17.410 kA
HWL9 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL9R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.299 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

33kV OG Constitution C F1/F2 1000 – 500 / 1 A Min. SC= 8.465 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 26.940 kA
HWL10 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
HWL11 protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL10R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
HWL11R1 op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.
33kV OG Janpath Lane F1 1000 – 500 / 1 A Min. SC= 8.180 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 23.845 kA kA 10.059
HWL12 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL12R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.298 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

30
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road F1 1000 – 500 / 1 A Min. SC= 7.361 kA FLC 175 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 17.410 kA
HWL13 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL13R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

33kV OG Delhi High Court F1 1000 – 500 / 1 A Min. SC= 7.361 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 17.410 kA
HWL14 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL14R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.
33kV OG IGNCA F1 1000 – 500 / 1 A Min. SC= 8.465 kA FLC 350 A
20 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 26.940 kA
HWL15 27 & 59 are additional 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
protection & can be 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
HWL15R1 Disabled. TD=0.3 s 67 "2" IDMT2 "1"
op. time: 0.300 sec IDMT1 IEC-VI 1.0 A 0.42 67-2 IEC-SI 0.39 A 0.84
Set IDMT1> minimum op. time = 0.3 sec, IDMT2> minimum op. time = 1.2 sec
Reflected fault 67N "1" 67N-2
current = 2.1875 kA IEC-SI 0.04 0.13 DIS.
Set IN1> minimum op. time = 0.3 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 5.69A 0.30 s DIS.
50N 50N-1 50N-2
DTOC1 0.39A 0.30 s DIS.

31
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Vidhyut Bhavan F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.734
LINE PARAMETERS & SYSTEM DATA / DETAILS : Vidhyut Bhavan Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 2.800 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 2.800 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%
Details of Protected Line
Length of protected line 2.8000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.6440 Ohm
Positive Sequence Reactance for Prot.line 0.2968 Ohm
Positive Sequence Impedence for Prot.line 0.7091 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.8682 Ohm
Zero Sequence Reactance for Prot.line 0.2548 Ohm
Zero Sequence Impedence for Prot.line 1.8855 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

32
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Vidhyut Bhavan F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.734
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

33
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Vidhyut Bhavan F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.734
ZONE SETTINGS
Dist Z1(polygon) 1.89
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 2.84 2.84
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next shortest line
2.45
Impedance)x(CTR/PTR) Whichever is higher.
DIST Z3 (polygon) 6.72
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 13.98
when operated in parallel ) x (CTR/PTR)
6.72
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 6.84
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.47
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

34
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Vidhyut Bhavan F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.734
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081
UNBLOCKING CURRENT THRESHOLDS:
Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

35
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Vidhyut Bhavan F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.734
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

36
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Connaught Place F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 6.813
LINE PARAMETERS & SYSTEM DATA / DETAILS : Connaught Place Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 4.600 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 3.800 KM
LONGEST LINE LENGTH (Far end) 4.600 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%
Details of Protected Line
Length of protected line 4.6000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 3.0691 Ohm
Zero Sequence Reactance for Prot.line 0.4186 Ohm
Zero Sequence Impedence for Prot.line 3.0975 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

37
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Connaught Place F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 6.813
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 3.80 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 0.8740 Ohm
Positive Sequence Reactance for Prot.line 0.4028 Ohm
Positive Sequence Impedence for Prot.line 0.9624 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)
Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58
RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58


Angle KG -26.70

38
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Connaught Place F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 6.813
ZONE SETTINGS
Dist Z1(polygon) 3.11
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 4.66 4.66
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 3.97
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 7.87
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
15.50
(100% of Protected Line Impedance + 80.% of ICT Impedance
when operated in parallel ) x (CTR/PTR)
7.87
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 8.06
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.78
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

39
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Connaught Place F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 6.813
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

40
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Connaught Place F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 6.813
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

41
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.899
LINE PARAMETERS & SYSTEM DATA / DETAILS : School Lane Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 2.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 2.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 2.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.5750 Ohm
Positive Sequence Reactance for Prot.line 0.2650 Ohm
Positive Sequence Impedence for Prot.line 0.6331 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.6680 Ohm
Zero Sequence Reactance for Prot.line 0.2275 Ohm
Zero Sequence Impedence for Prot.line 1.6834 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

42
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.899
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

43
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.899
ZONE SETTINGS
Dist Z1(polygon) 1.69
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 2.53 2.53
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 2.19
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 6.42
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 13.73
when operated in parallel ) x (CTR/PTR)
6.42
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 6.52
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.42
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

44
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.899
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

45
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG School Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.899
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

46
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG H C Mathur Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.204
LINE PARAMETERS & SYSTEM DATA / DETAILS : HC Mathur Lane Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 0.200 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 0.200 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 0.2000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.0460 Ohm
Positive Sequence Reactance for Prot.line 0.0212 Ohm
Positive Sequence Impedence for Prot.line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 0.1334 Ohm
Zero Sequence Reactance for Prot.line 0.0182 Ohm
Zero Sequence Impedence for Prot.line 0.1347 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

47
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG H C Mathur Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.204
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

48
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG H C Mathur Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.204
ZONE SETTINGS
Dist Z1(polygon) 0.14
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 0.20 0.25
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 0.25
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 4.09
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 11.78
when operated in parallel ) x (CTR/PTR)
4.09
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 4.09
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.03
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

49
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG H C Mathur Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.204
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

50
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG H C Mathur Lane F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.204
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :

A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

51
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Scindia House F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.068
LINE PARAMETERS & SYSTEM DATA / DETAILS : SCINDIA House Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 0.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 0.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 0.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.1150 Ohm
Positive Sequence Reactance for Prot.line 0.0530 Ohm
Positive Sequence Impedence for Prot.line 0.1266 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 0.3336 Ohm
Zero Sequence Reactance for Prot.line 0.0455 Ohm
Zero Sequence Impedence for Prot.line 0.3367 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

52
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Scindia House F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.068
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58


Angle KG -26.70

53
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Scindia House F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.068
ZONE SETTINGS
Dist Z1(polygon) 0.34
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 0.51 0.51
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 0.51
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 4.39
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 12.04
when operated in parallel ) x (CTR/PTR)
4.39
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 4.41
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.08
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

54
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Scindia House F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.068
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

55
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Scindia House F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.068
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

56
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.057
LINE PARAMETERS & SYSTEM DATA / DETAILS : Hanuman Road Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 0.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 0.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 0.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.1150 Ohm
Positive Sequence Reactance for Prot.line 0.0530 Ohm
Positive Sequence Impedence for Prot.line 0.1266 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 0.3336 Ohm
Zero Sequence Reactance for Prot.line 0.0455 Ohm
Zero Sequence Impedence for Prot.line 0.3367 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

57
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.057
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

58
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.057
ZONE SETTINGS
Dist Z1(polygon) 0.34
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 0.51 0.51
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 0.51
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 4.39
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 12.04
when operated in parallel ) x (CTR/PTR)
4.39
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 4.41
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.08
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

59
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.057
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

60
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Hanuman Road F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 9.057
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

61
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG B. D. Marg Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.207
LINE PARAMETERS & SYSTEM DATA / DETAILS : B. D. Marg Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 3.800 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 3.800 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 3.8000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.8740 Ohm
Positive Sequence Reactance for Prot.line 0.4028 Ohm
Positive Sequence Impedence for Prot.line 0.9624 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 2.5354 Ohm
Zero Sequence Reactance for Prot.line 0.3458 Ohm
Zero Sequence Impedence for Prot.line 2.5588 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

62
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG B. D. Marg Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.207
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

63
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG B. D. Marg Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.207
ZONE SETTINGS
Dist Z1(polygon) 2.57
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 3.85 3.85
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 3.29
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 7.73
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 14.82
when operated in parallel ) x (CTR/PTR)
7.73
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 7.89
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.64
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

64
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG B. D. Marg Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.207
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

65
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG B. D. Marg Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.207
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

66
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Mandi House Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.311
LINE PARAMETERS & SYSTEM DATA / DETAILS : Mandi House Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 2.000 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 2.000 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 2.0000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.4600 Ohm
Positive Sequence Reactance for Prot.line 0.2120 Ohm
Positive Sequence Impedence for Prot.line 0.5065 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.3344 Ohm
Zero Sequence Reactance for Prot.line 0.1820 Ohm
Zero Sequence Impedence for Prot.line 1.3468 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

67
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Mandi House Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.311
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

68
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Mandi House Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.311
ZONE SETTINGS
Dist Z1(polygon) 1.35
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 2.03 2.03
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 1.77
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 5.91
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 13.30
when operated in parallel ) x (CTR/PTR)
5.91
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 5.99
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.34
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

69
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Mandi House Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.311
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

70
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Mandi House Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.311
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

71
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
LINE PARAMETERS & SYSTEM DATA / DETAILS : Raja Bazar Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 3.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 3.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 3.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.8050 Ohm
Positive Sequence Reactance for Prot.line 0.3710 Ohm
Positive Sequence Impedence for Prot.line 0.8864 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 2.3352 Ohm
Zero Sequence Reactance for Prot.line 0.3185 Ohm
Zero Sequence Impedence for Prot.line 2.3568 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

72
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

73
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
ZONE SETTINGS
Dist Z1(polygon) 2.36
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 3.55 3.55
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 3.04
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 7.43
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 14.57
when operated in parallel ) x (CTR/PTR)
7.43
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 7.58
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.59
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

74
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

75
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Raja Bazar Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

76
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Constitution C. F1/F2 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
LINE PARAMETERS & SYSTEM DATA / DETAILS : Constitution Center Feeder F1/F2
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 1.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 1.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 1.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.3450 Ohm
Positive Sequence Reactance for Prot.line 0.1590 Ohm
Positive Sequence Impedence for Prot.line 0.3799 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.0008 Ohm
Zero Sequence Reactance for Prot.line 0.1365 Ohm
Zero Sequence Impedence for Prot.line 1.0101 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

77
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Constitution C. F1/F2 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

78
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Constitution C. F1/F2 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
ZONE SETTINGS
Dist Z1(polygon) 1.01
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 1.52 1.52
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 1.35
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 5.40
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 12.88
when operated in parallel ) x (CTR/PTR)
5.40
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 5.47
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.25
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

79
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Constitution C. F1/F2 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

80
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Constitution C. F1/F2 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

81
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Janpath Rd Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.180
LINE PARAMETERS & SYSTEM DATA / DETAILS : Janpath Road Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 2.000 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 2.000 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 2.0000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.4600 Ohm
Positive Sequence Reactance for Prot.line 0.2120 Ohm
Positive Sequence Impedence for Prot.line 0.5065 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.3344 Ohm
Zero Sequence Reactance for Prot.line 0.1820 Ohm
Zero Sequence Impedence for Prot.line 1.3468 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

82
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Janpath Rd Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.180
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

83
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Janpath Rd Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.180
ZONE SETTINGS
Dist Z1(polygon) 1.35
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 2.03 2.03
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 1.77
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 5.91
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 13.30
when operated in parallel ) x (CTR/PTR)
5.91
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 5.99
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.34
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

84
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Janpath Rd Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.180
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

85
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Janpath Rd Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.180
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

86
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
LINE PARAMETERS & SYSTEM DATA / DETAILS : Church Road Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 3.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 3.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 3.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.8050 Ohm
Positive Sequence Reactance for Prot.line 0.3710 Ohm
Positive Sequence Impedence for Prot.line 0.8864 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 2.3352 Ohm
Zero Sequence Reactance for Prot.line 0.3185 Ohm
Zero Sequence Impedence for Prot.line 2.3568 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

87
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

88
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
ZONE SETTINGS
Dist Z1(polygon) 2.36
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 3.55 3.55
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 3.04
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 7.43
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 14.57
when operated in parallel ) x (CTR/PTR)
7.43
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 7.58
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.59
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

89
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

90
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG Church Road Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

91
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG DELHI HC Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
LINE PARAMETERS & SYSTEM DATA / DETAILS : DELHI High Court Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 3.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 3.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 3.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.8050 Ohm
Positive Sequence Reactance for Prot.line 0.3710 Ohm
Positive Sequence Impedence for Prot.line 0.8864 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 2.3352 Ohm
Zero Sequence Reactance for Prot.line 0.3185 Ohm
Zero Sequence Impedence for Prot.line 2.3568 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

92
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG DELHI HC Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

93
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG DELHI HC Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
ZONE SETTINGS
Dist Z1(polygon) 2.36
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 3.55 3.55
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 3.04
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 7.43 7.43
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 14.57
when operated in parallel ) x (CTR/PTR)
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 7.58
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR)
1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.59
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

94
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG DELHI HC Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

95
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG DELHI HC Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 7.361
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
Time Set – 1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

96
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG IGNCA Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
LINE PARAMETERS & SYSTEM DATA / DETAILS : IGNCA Feeder F1
PROTECTED LINE 33 kV Aluminium, XLPE
PROTECTED LINE LENGTH 1.500 KM 3C x 400 mm2
SHORTEST LINE LENGTH 0.200 KM
LONGEST LINE LENGTH 4.600 KM
LONGEST LINE LENGTH (Far end) 1.500 KM
NO. OF ICTs in parallel 2
ICT Rating (MVA) 10 MVA
% IMPEDANCE OF ICT 8.00%

Details of Protected Line


Length of protected line 1.5000 KM
Positive Sequence Resistance per KM 0.2300 Ohms
Positive Sequence Reactance per KM 0.1060 Ohms
Positive sequence impedance per KM 0.2533 Ohms
Zero Sequence Resistance per KM 0.6672 Ohms
Zero Sequence Reactance per KM 0.0910 Ohms
Zero Sequence Impedance per KM 0.6734 Ohms
Mutual Resistance per KM 0.6672 Ohms
Mutual Reactance per KM 0.0910 Ohms
Positive Sequence Resistance for Prot.line 0.3450 Ohm
Positive Sequence Reactance for Prot.line 0.1590 Ohm
Positive Sequence Impedence for Prot.line 0.3799 Ohm
Positive sequence Impedence angle 24.73 Degree
Zero Sequence Resistance for Prot.line 1.0008 Ohm
Zero Sequence Reactance for Prot.line 0.1365 Ohm
Zero Sequence Impedence for Prot.line 1.0101 Ohm
Zero Sequence Impedence Angle 7.76 Degree

Details of Adjacent Shortest line


Length of the adjacent shortest line 0.20 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.0460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.0212 Ohm
Positive Sequence Impedence for Adjacent Shortest Line 0.0507 Ohm
Positive sequence Impedence angle 24.73 Degree

97
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG IGNCA Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
Details of ICT(ASSUMPTION)
ICT 10 MVA
VOLTAGE RATING 33 Kilo Volt
% IMPEDANCE 8.00% %
TOTAL NO. OF ICTS 2
Impedance when only one ICT is connected in the circuit 8.71 Ohms
(kv^2XP.U IMP )/(MVAX1000)
Impedance of parallel ICT's when connected in the circuit 4.36 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.60 KM
Pos.Seq. Resistance of Adj. Line per KM 0.2300 Ohm
Pos.Seq. Reactance of Adj. Line per KM 0.1060 Ohm
Pos.Seq. Impedence of Adj. Line per KM 0.2533 Ohm
Positive Sequence Resistance for Prot.line 1.0580 Ohm
Positive Sequence Reactance for Prot.line 0.4876 Ohm
Positive Sequence Impedence for Prot.line 1.1650 Ohm
Positive sequence Impedence angle 24.73 Degree

CT & PT Details
CT Primary 1000.00 Amp
CT Secondary 1.00 Amp
PT Primary 33.00 Kilo Volt
PT Secondary 110.00 Volt
CT/PT Ratio 3.33

GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)

Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.58


RL)))/(3*(SQRT(RL*RL)+(XL*XL)))

Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -26.70


Tan(XL/RL))*180*7/22

KZ1,KZ2,KZ3…. PS1 0.58

Angle KG -26.70

98
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG IGNCA Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
ZONE SETTINGS
Dist Z1(polygon) 1.01
(80% of Protected Line Impedence*(CTR/PTR))
DIST Z2 (polygon) 1.52 1.52
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 1.35
shortest line Impedance)x(CTR/PTR)
Whichever is higher.
DIST Z3 (polygon) 5.40
(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 12.88
when operated in parallel ) x (CTR/PTR)
5.40
(whichever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 5.47
line emanating from far end busbar+ 25% of Adjacent Longest line
emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedence) 0.25
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load Current 1000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 12.7021
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R2,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R3,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R4,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST RP,PP(polygon) PS1 (60% of 42.3403 Ohms) 25.40
DIST R1,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R2,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R3,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST R4,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87
DIST RP,PG(polygon) PS1 (80% of 42.3403 Ohms) 33.87

99
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG IGNCA Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
OPERATING TIME DELAYS
Z1 operating time (t1) 0.000 Sec
Z2 operating time (t2) 0.350 Sec
Z3 operating time (t3) 1 0.800 Sec
Z4 operating time (t4) 1.000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph setting
and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.40 5.081

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442

100
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV OG IGNCA Feeder F1 1000 / 1 A Select 1000 / 1 A FLC 350 A


20 MVA P442316B6M0500K 33kV/√3 ⁄ 110/√3V Minimum Fault current kA 8.465
BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)
I2/I1 Ratio –
1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442

Overload Alarm :
A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .
Full Load current in the Line : 1000 A
CTR used : 1000 /1A
Secondary Amps (Full Load / CTR ) 1.00 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.

Pickup Settings 1.00 A


Curve Selected DT (Definite Time )
Time Delay 20 Sec

Note : All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

101
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

33kV BC Bus Coupler – 33 kV 2000 / 1 A Min. SC= 9.314 kA FLC 875 A


50 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC= 34.278 kA
HWQ TD= 0.45 s 51 "1" IDMT2
HWQ-R1 op. time: 0.450 sec IDMT1 IEC-SI 0.5 A 0.23 51-2 DIS
Set IDMT1> minimum op. time = 0.45 sec, , SCDD= non directional or OFF
Reflected fault 51N "1" 51N-2
current = 2.1875 kA IEC-SI 0.08A 0.23 DIS.
Set IN1> minimum op. time = 0.45 sec
50 50-1 50-2
desired time: 0.3 sec DTOC1 2.20A 0.45 s DIS.
50N 50N-1 50N-2
DTOC1 1.00A 0.45 s DIS.

33kV IC Incomer – 33 kV 2000 / 1 A Min. SC= 9.314 kA FLC 1750A


100 MVA P1322495040PO0BL00 33kV/√3 ⁄ 110/√3V Max. SC=36.227 kA
HWT1 /3 TD= 0.60 s 51 "1" IDMT2
HWT1-R1 op. time: 0.602 sec IDMT1 IEC-SI 0.97A 0.22 51-2 DIS
Set IDMT1> minimum op. time = 0.60 sec, , SCDD= non directional or OFF
HWT3-R1 Reflected fault 51N "1" 51N-2
current = 2.1875 kA IEC-SI 0.26 0.27 DIS.
Set IN1> minimum op. time = 0.60 sec
50 50-1 50-2
desired time: 0.60 sec DTOC1 2.20A 0.60 s 7.50A 0.45 s
50N 50N-1 50N-2
27 & 59 are additional DTOC1 2.20A 0.60 s 7.50A 0.45 s
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s

11kV IC Incomer – 11 kV 25 / 1 A Reflected LT fault FLC 21A


400 kVA P1322495040PO0BL00 11kV/√3 ⁄ 110/√3V current=475.8 A
KWT1 /3 TD= 0.60 s 51 "1" IDMT2
KWT1-R1 op. time: 0.602 sec IDMT1 IEC-SI 1.00A 0.30 51-2 DIS
Set IDMT1> minimum op. time = 0.60 sec, , SCDD= non directional or OFF
KWT3-R1 desired time: 0.30 sec 51N "1" 51N-2
IEC-SI 0.10 0.13 DIS.
Set IN1> minimum op. time = 0.60 sec
desired time: 0.04 sec 50 50-1 50-2
DTOC1 8.0 A 0.04 s DIS
desired time: 0.05 sec 50N 50N-1 50N-2
27 & 59 are additional DTOC1 1.0 A 0.05 s DIS
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s

102
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

11kV IC Incomer – 11 kV 25 / 1 A Reflected LT fault FLC 21A


400 kVA P922-0AS-F311 11kV/√3 ⁄ 110/√3V current=475.8 A
KWT1 /3 KWT1-R2 / KWT3-R2
Menu Function Parameter GENERAL Address Parameter Value
CONFIG Frequency 0104 50 – 60 50
Connection 0126 3pn,3pn+vr,3pp+vr,2pp+vr 3pn+vr
Protection 0127 p-p, p-n p-p
Display 0109 V-A, V-B, V-C, Vo V-A
Menu VT Ratio
CONFIG Main VT Primary 0120 0.1 – 100 kV step 0.01 11 kV
Main VT Sec 0122 57 – 130 V step 0.1 110 V
E/Gnd VT Primary 0123 0.1 – 100 kV step 0.01 11 kV
E/Gnd VT Sec 0125 57 – 130 V step 0.1 110 V
Menu LED
CONFIG LED 5 0150/0154/0158 all functions tV <
tV <<
LED 6 0151/0155/0159 all functions tV >
tV >>
LED 7 0152/0156/015A all functions tV0 >
tV0 >>
tV0 >>>
Menu Config Sel
CONFIG Change group 0142 Edge, level Edge
Setting Group 0140 1, 2 1
Menu Alarms
CONFIG INST. Self Reset 0141 Yes, No Yes
Alarms Battery 0143 Yes, No Yes
Menu Inputs
CONFIG Inputs 010D 00000 – 11111 11111
Voltage inputs 010F DC, AC DC
Menu 27 protection can be disabled.
protection V < Enable Yes, No Yes
G1 V<= 5.0 – 130 V step 0.1 99 V
Delay Type IDMT, DMT IDMT
TMS 0.5 – 100 step 0.5 2
tRESET V<= 0 – 100 s step 0.01 s 0.01
V << Enable Yes, No Yes
V << = 5.0 – 130 V step 0.1 66 V
tV <<= 0 – 599 s step 0.01 s 2.00 s
V <<< Enable Yes, No NO
Hysteresis 1.02 – 1.05 step 0.01 1.02

103
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

11kV IC Incomer – 11 kV 25 / 1 A Reflected LT fault FLC 21A


400 kVA P922-0AS-F311 11kV/√3 ⁄ 110/√3V current=475.8 A
KWT1 /3 KWT1-R2 / KWT3-R2
protection 59 protection can be disabled.
G1 V > Enable Yes, No Yes
V >= 5.0 – 200 V step 0.1 121 V
Delay Type IDMT, DMT IDMT
TMS 0.5 – 100 step 0.5 2
tRESET V>= 0 – 100 s step 0.01 s 0.01
V >> Enable Yes, No Yes
V >> = 5.0 – 260 V step 0.1 126.5 V
tV >>= 0 – 599 s step 0.01 s 2.00 s
V >>> Enable Yes, No NO
Hysteresis 0.98 – 0.95 step 0.01 0.98
protection 59N
G1 V0 >= Enable Yes, No Yes
V0 >= 0.5 – 130 V step 0.1 5.50 V
Delay type IDMT, DMT DMT
tV0 >= 0 – 599 s step 0.01 s 60.00 s
V0 >>= Enable Yes, No Yes
V0 >>= 0.5 – 130 V step 0.1 11.0 V
tV0 >>= 0 – 599 s step 0.01 s 10.00 s
V0 >>>= Enable Yes, No Yes
V0 >>>= 0.5 – 130 V step 0.1 66.0 V
tV0 >>>= 0 – 599 s step 0.01 s 0.60 s
All other protection functions to be disabled.

104
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

220kV TR TR FEEDER – 220 kV 800 – 400 / 1 A Min. SC=6.181 kA FLC 262.4A


100 MVA P14131AA6M0400J 220kV/√3 ⁄ 110/√3V Max. SC=27.291 kA IREFL 1.82kA
DWT1 /3 TD= 1.0 s for Reflected67 DIR-F I1>2
DWT1-R4 fault current I1> IEC-SI 0.73A 0.27 DIS.
DWT3-R4 For HV side fault 67 I1>3 I1>4
desired time: 0.04 sec I1> DIR-F 6.0 A 0.04 s DIS
I1> Angle: +45, VCO: Disabled, I1>Block: 00000000000
IN1> Angle: -45, IN1>Block: 00000000000, IN1>Pol: Zero Seq. IN1>VNpol: 4.0 Volts
Reflected fault 67N DIR-F IN1>2
current = 1.82 kA IN1>1 IEC-SI 0.20 0.43 DIS.
67N IN1>3 IN1>4
27 & 59 are additional IN1> 6.0 A 0.05 s DIS.
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s
220kV TR TR FEEDER – 220 kV 400 / 1 A (64R-HV) Min. SC=6.181 kA FLC 262.4A
100 MVA P14131AA6M0400J Max. SC=27.291 kA
DWT1 /3 64R-HV IREF>IS RSTAB 2560 Ohms 2.7kΩ
DWT1-R3 ENB. 0.10A
220kV TR TR FEEDER – 220 kV 2000 / 1 A (64R-LV) Max. SC=12.150 kA FLC 1749.6 A
100 MVA P14131AA6M0400J
DWT1 /3 64R-LV IREF>IS RSTAB 775 Ohms 1.0kΩ
DWT1-R3 ENB. 0.10A

220kV TR TR FEEDER – 220 kV 800 – 400 / 1 A Min. SC=6.181 kA FLC 262.4A


100 MVA MCTI40F1AB1001A Max. SC=27.291 kA
DWT1 /3 50Z IS 2/50Z
DWT1-R5 LBB ENB. 1.60A TIMER 0.5 s

220kV TR TR FEEDER – 220 kV 800 – 400 / 1 A Min. SC=6.181 kA FLC 262.4A


100 MVA 220kV/√3 ⁄ 110/√3V Max. SC=27.291 kA IREFL 1.82kA
DWT1/3 P633849114QNP02L00 400/1A 100 MVA, YNyn0d11, 220 / 33 / 11 kV, 220 kV side CT: 800 –
DWT1-R3 (87T,24) 2000/1A 400 /1 A, 33 kV side CT: 2000 / 1 A, ONAF, 100 MVA
DWT3-R3 continues with AF mode (Disable Other Functions & assign OP
relays / LEDs as per schematics)used as 02 winding Diff.
Address Parameter Value

Menu Function Parameter Global


Main 003.030 Protection Enabled ON
003.012 Test Mode User No
010.030 Nominal Frequency 50 Hz
010.049 Phase Sequence A-B-C
221.098 Time lag 1st edge, sorted

105
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

Address Parameter Value

019.020 Inom CT prim., end a 400 A


019.021 Inom CT prim., end b 2000 A
Tertiary not wired 019.022 Inom CT prim., end c 1A
019.027 Inom CT Yprim., end a 400 A
019.028 Inom CT Yprim., end b 2000 A
019.029 Inom CT Yprim., end c 1A
010.002 Vnom VT prim 220.0 kV
010.024 Inom device, end a 1.0 A
010.025 Inom device, end b 1.0 A
010.029 Inom device, end c 1.0 A
010.142 IY, nom device, end a 1.0 A
010.143 IY, nom device, end b 1.0 A
010.144 IY, nom device, end c 1.0 A
010.009 Vnom VT sec 110 V
010.140 Conn. meas. circ. IP, a Standard
010.150 Conn. meas. circ. IP, b Standard
010.160 Conn. meas. circ. IP, c Standard
010.141 Conn. meas. circ. IY, a Standard
010.151 Conn. meas. circ. IY, b Standard
010.161 Conn. meas. circ. IY, b Standard
Menu Function Parameter
Gen. Func. Main 016.096 Evaluation IN, end a Calculated
016.097 Evaluation IN, end b Calculated
016.098 Evaluation IN, end c Calculated
019.099 Current Summation without
018.009 Hold time dyn Param Blocked

Diff 019.080 General Enable Yes


019.016 Reference power, SREF 100 MVA
011.037 Meas. Value rel., IDIFF 0.000 IREF
011.037 Meas. Value rel., IRES 0.000 IREF

V/f 019.097 General enable USER Yes

Parameter subset 1 Main 019.017 Vnom prim., end a 220.0 kV


019.018 Vnom prim., end b 33.0 kV
019.019 Vnom prim., end c 11.0 kV
010.200 Phase reversal a PS1 No swap
010.204 Phase reversal b PS1 No swap
010.208 Phase reversal b PS1 No swap
019.080 General enable USER Yes

106
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

Address Parameter Value

DIFF 072.152 Enable PS1 Yes


019.010 Vec. gr. ends a-b PS1 0
019.011 Vec. gr. ends a-c PS1 11
072.142 Idiff> PS1 0.10 Iref
072.143 Idiff>> PS1 7.0 Iref
072.144 Idiff>>> PS1 13.5 Iref
080.000 Idiff> (CTS) PS1 0.10 Iref
072.145 m1 PS1 0.10
072.146 m2 PS1 0.80
072.147 IR, m2 PS1 1.5 Iref
072.148 Op. mode rush rst PS1 Not Ph. sel.
072.159 RushI(2f0)/I(f0) PS1 20%
072.155 0-seq. filt. a enab. PS1 Yes
072.156 0-seq. filt. b enab. PS1 Yes
072.157 0-seq. filt. c enab. PS1 No
072.158 Overflux bl. enable PS1 Yes
072.160 Ov. I(5f0)/I(f0) PS1 20%
010.162 Op. delay, trip sig. PS1 0.00 s
072.006 Hyst. effective PS1 Yes

V/f 081.210 Enable PS1 Yes


081.211 V/f> (alarm) PS1 1.15 Vnom/fnom
081.212 V/f(t)> PS1 1.20 Vnom/fnom
081.213 V/f>> PS1 1.50 Vnom/fnom
081.214 tV/f> PS1 1s
081.217 t at V/f=1.05 PS1 1000 s
081.218 t at V/f=1.10 PS1 1000 s
081.219 t at V/f=1.15 PS1 1000 s
081.220 t at V/f=1.20 PS1 58.3 s
081.221 t at V/f=1.25 PS1 41.6 s
081.222 t at V/f=1.30 PS1 3.2 s
081.223 t at V/f=1.35 PS1 2.8 s
081.224 t at V/f=1.40 PS1 2.2 s
081.225 t at V/f=1.45 PS1 1.9 s
081.226 t at V/f=1.50 PS1 1.7 s
081.227 t at V/f=1.55 PS1 1.5 s
081.228 t at V/f=1.60 PS1 1.3 s
081.230 Reset time PS1 0s
081.229 t V/f>> PS1 1.0 s

107
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

220kV Bus Coupler – 220 kV 1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
BC P14131AA6M0400J 220kV/√3 ⁄ 110/√3V Max. SC=27.291 kA IREFL 1.82kA
DWQ TD= 1.2 s for Reflected 51 Non DIR I1>2
DWQ-R3 fault current I1> IEC-SI 0.45A 0.18 DIS. time delay set
For HV side fault 50 I1>3 I1>4 0.2 s but can be
desired time: 0.35 sec I1> 1.75A 0.20 s DIS. match with
Reflected fault 51N Non DIR IN1>2 Incomer being
current = 1.82 kA IN1>1 IEC-SI 0.08 0.45 DIS. secondary
50N IN1>3 IN1>4 protection
27 & 59 are additional IN1> 1.75A 0.20 s DIS.
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s

220kV Bus Coupler – 220 kV 1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
BC MCTI40F1AB1001A Max. SC=27.291 kA IREFL 1.82kA
DWQ 50Z IS 2/50Z
DWQ-R4 LBB ENB. 0.90A TIMER 0.5 s

220kV Line FEEDER – 220 kV 1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P14131AA6M0400J 220kV/√3 ⁄ 110/√3V Max. SC=27.291 kA IREFL 1.82kA
DWL1 /2 TD= 1.35 s for 67 DIR-F I1>2
DWL1-R3 Reflected fault current I1> IEC-SI 0.90A 0.22 DIS.
DWL2-R3 For HV side fault 67 I1>3 I1>4
desired time: 0.35 sec I1> DIR-F 4.0 A 0.35 s DIS
I1> Angle: +45, VCO: Disabled, I1>Block: 00000000000
IN1> Angle: -45, IN1>Block: 00000000000, IN1>Pol: Zero Seq. IN1>VNpol: 4.0 Volts
Reflected fault 67N DIR-F IN1>2
current = 1.82 kA IN1>1 IEC-SI 0.15 0.53 DIS.
67N IN1>3 IN1>4
27 & 59 are additional IN1> 4.0 A 0.35 s
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s

220kV Line FEEDER – 220 kV 1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 MCTI40F1AB1001A Max. SC=27.291 kA IREFL 1.82kA
DWL1 /2 50Z IS 2/50Z
DWL1-R5 DWL2-R5 LBB ENB. 1.80A TIMER 0.5 s

108
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

220kV Line FEEDER – 220 kV Maharani Baug SS HCM Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P543217B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Pilot wire Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM
DWL1-R4 DWL2-R4 Function Name Parameter Setting Value
Phase Diff Scheme setup 2 terminal
En = 220kV/√3 Compensation Cap charging
C = 0.22 µF/kM Susceptance (P) 0.587 mS
β = 2ΠfC = 0.000069 Phase Is1 186 A (0.23A sec)
Ic = β x En = 8.764 A Phase Is2 1860 A (2.30 A sec)
Ich = Length x Ic x run = 74.494 A Phase k1 30%
Is1 > 2.5 x Ich = 186.24A(0.23 A s) Phase k2 150%
P=Length x β = 0.000587 S Phase Characteristics DT
Phase time delay 0.00 sec
PIT time 200 m sec
Phase CT correction 1.000
Configuration group Phase Diff Enabled
Tripping Mode 3 Pole
Inrush Restrain Disabled
Supervision Disabled
Fault Locator Disabled
Setting Values Primary
All other Functions Disabled

220kV Line FEEDER – 220 kV 1600 – 800 / 1 A Min. SC=5.942 kA FLC 632 A
L3 / L4 P14131AA6M0400J 220kV/√3 ⁄ 110/√3V Max. SC=23.656 kA IREFL 1.82kA
DWL3 /4 TD= 1.35 s for 67 DIR-F I1>2
DWL3-R3 Reflected fault current I1> IEC-SI 0.90A 0.22 DIS.
DWL4-R3 For HV side fault 67 I1>3 I1>4
desired time: 0.35 sec I1> DIR-F 4.0 A 0.35 s DIS
I1> Angle: +45, VCO: Disabled, I1>Block: 00000000000
IN1> Angle: -45, IN1>Block: 00000000000, IN1>Pol: Zero Seq. IN1>VNpol: 4.0 Volts
Reflected fault 67N DIR-F IN1>2
current = 1.82 kA IN1>1 IEC-SI 0.15 0.53 DIS.
67N IN1>3 IN1>4
27 & 59 are additional IN1> 4.0 A 0.35 s
protection & can be 27-1 IDMT 90% 1.0 27-2 DT 60% 2.0 s
disabled. 59-1 IDMT 110% 1.0 59-2 DT 115% 2.0 s

220kV Line FEEDER – 220 kV 1600 – 800 / 1 A Min. SC=5.942 kA FLC 632 A
L3 / L4 MCTI40F1AB1001A Max. SC=23.656 kA IREFL 1.82kA
DWL3 /4 50Z IS 2/50Z
DWL3-R5 DWL4-R5 LBB ENB. 1.80A TIMER 0.5 s

109
Feeder Description CT ratio / I> tI > I >> tI >> I >>> tI >>>

curve
Location Function

/Type

220kV Line FEEDER – 220 kV Park Street SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 632 A
L3 / L4 P543217B6M0500K Size= 1Cx1000 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Pilot wire Protection Select 800 / 1 A Run / Feeder = 01 Length 4.6 kM
DWL3-R4 DWL4-R4 Function Name Parameter Setting Value
Phase Diff Scheme setup 2 terminal
En = 220kV/√3 Compensation Cap charging
C = 0.206 µF/kM Susceptance (P) 0.298 mS
β = 2ΠfC = 0.00006474 Phase Is1 160A (0.2A sec)
Ic = β x En = 8.223 A Phase Is2 1600A (2 A sec)
Ich = Length x Ic x run = 37.826 A Phase k1 30%
Is1 > 2.5 x Ich =94.57A(0.12A sec ) Phase k2 150%
Min. available setting Is1 > = 0.20 A sec Phase Characteristics DT
P=Length x β = 0.000298 S Phase time delay 0.00 sec
PIT time 200 m sec
Phase CT correction 1.000
Configuration group Phase Diff Enabled
Tripping Mode 3 Pole
Inrush Restrain Disabled
Supervision Disabled
Fault Locator Disabled
Setting Values Primary
All other Functions Disabled

110
220 kV HC Mathur Lane SS to Maharani Baugh SS Distance Protection:

220kV Line FEEDER – 220 kV Maharani Baugh SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM

LINE PARAMETERS & SYSTEM DATA / DETAILS :


PROTECTED LINE 220 kV Maharani Baugh SS - HC Mathur Lane SS
PROTECTED LINE LENGTH 8.5 KM 1200 mm2 Cu
SHORTEST LINE LENGTH (Remote End) 3.581 KM
LONGEST LINE LENGTH (Remote End) 9.663 KM
NO. OF ICT in parallel (Remote end) 2
ICT Rating (MVA) (Remote end) 315 MVA
% IMPEDANCE OF ICT 12.50%
NO. OF ICT in parallel 2
Dist TR Rating (MVA) 100 MVA
% IMPEDANCE OF Dist TR 16.00%
NO. OF Dist TR in parallel 2
Details of Protected Line
Length of protected line 8.5000 KM
Positive Sequence Resistance per KM 0.0454 Ohms
Positive Sequence Reactance per KM 0.0948 Ohms
Positive sequence impedance per KM 0.1051 Ohms
Zero Sequence Resistance per KM 0.0585 Ohms
Zero Sequence Reactance per KM 0.0774 Ohms
Zero Sequence Impedance per KM 0.0971 Ohms
Mutual Resistance per KM 0.1771 Ohms
Mutual Reactance per KM 1.7290 Ohms
Positive Sequence Resistance for Prot. line 0.3862 Ohm
Positive Sequence Reactance for Prot. line 0.8058 Ohm
Positive Sequence Impedance for Prot. line 0.8936 Ohm
Positive sequence Impedance angle 64.3645 Degree
Zero Sequence Resistance for Prot. line 0.4975 Ohm
Zero Sequence Reactance for Prot. line 0.6582 Ohm
Zero Sequence Impedance for Prot. line 0.8251 Ohm
Zero Sequence Impedance Angle 52.8963 Degree

Details of Adjacent Shortest line at Maharani Baugh SS


Length of the adjacent shortest line 3.5810 KM
Pos. Seq. Resistance of Adj. Line per KM 0.0687 Ohm
Pos. Seq. Reactance of Adj. Line per KM 0.3986 Ohm
Pos. Seq. Impedance of Adj. Line per KM 0.4045 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.2460 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 1.4274 Ohm
Positive Sequence Impedance for Adjacent Shortest Line 1.4484 Ohm
Positive sequence Impedance angle 80.1887 Degree

111
220kV Line FEEDER – 220 kV Maharani Baugh SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM

Details of ICT(As per Transformer Data sheet)


ICT 315.0000 MVA
VOLTAGE RATING 220.0000 Kilo Volt
% IMPEDANCE 0.1250 %
TOTAL NO. OF ICTS 2.0000
Impedance when only one ICT is connected in the circuit 19.2063 Ohms
(kv^2XP.U IMP )/(MAVX1000)
Impedance of parallel ICT's when connected in the circuit 9.6032 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 9.6630 KM
Pos. Seq. Resistance of Adj. Line per KM 0.0687 Ohm
Pos. Seq. Reactance of Adj. Line per KM 0.3986 Ohm
Pos. Seq. Impedance of Adj. Line per KM 0.4045 Ohm
Positive Sequence Resistance for Prot. line 0.6638 Ohm
Positive Sequence Reactance for Prot. line 3.8517 Ohm
Positive Sequence Impedance for Prot. line 3.9085 Ohm
Positive sequence Impedance angle 80.1887 Degree
CT & PT Details
CT Primary 800.0000 Amp
CT Secondary 1.0000 Amp
PT Primary 220.0000 Kilo Volt
PT Secondary 110.0000 Volt
CT/PT Ratio 0.4000
GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)
Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.0689
RL)))/(3*(SQRT(RL*RL)+(XL*XL)))
Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -117.3257
Tan(XL/RL))*180*7/22
KZ1,KZ2,KZ3…. PS1 0.0689
Angle KG -117.3257
ZONE SETTINGS
Dist Z1(polygon) 0.2859
(80% of Protected Line Impedance*(CTR/PTR))
DIST Z2 (polygon) 0.43 0.6471
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 0.65
shortest line Impedance)x(CTR/PTR)
Whichever is higher.

112
220kV Line FEEDER – 220 kV Maharani Baugh SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM

DIST Z3 (polygon) 1.99


(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 3.43
when operated in parallel ) x (CTR/PTR)
1.9923
(which ever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 2.31
line emanating from far end busbar+ 25% of Adjacent Longest
line emanating from far end second line considered) x (CTR/PTR) 1
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedance) 0.0715
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load 800.0000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 105.8507
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R2,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R3,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R4,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST RP,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R1,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R2,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R3,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R4,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST RP,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722

OPERATING TIME DELAYS


Z1 operating time (t1) 0.0000 Sec
Z2 operating time (t2) 0.3500 Sec
Z3 operating time (t3) 1 0.8000 Sec
Z4 operating time (t4) 1.0000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph
setting and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.4042 5.0808

113
220kV Line FEEDER – 220 kV Maharani Baugh SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442

BACK-UP EARTH FAULT


To be kept OFF in P442.

BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)


I2/I1 Ratio – 1
Time Set –

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442 or can be set as per P141.

114
220kV Line FEEDER – 220 kV Maharani Baugh SS HC Mathur SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
L1 / L2 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=27.291 kA IREFL 1.82 kA
DWL1 /2 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 8.500 kM

Overload Alarm : P442


A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .

Full Load current in the Line : 656 A


CTR used : 800 /1A
Secondary Amps (Full Load / CTR ) 0.82 A
Over Load Alarm to be set at 110% of the loading and a time delay of 20 Sec as the same is being used for ALARM.
Pickup Settings 0.91 A
Curve Selected DT (Definite Time )
Time Delay 20 Sec

NOTE:
All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

115
220 kV HC Mathur Lane SS to Park Street SS Distance Protection:

220kV Line FEEDER – 220 kV Park Street SS HC Mathur Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 532 A
L3 / L4 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 4.600 kM

LINE PARAMETERS & SYSTEM DATA / DETAILS :


PROTECTED LINE 220 kV Park Street SS - HC Mathur Lane SS
PROTECTED LINE LENGTH 4.6 KM 1000 mm2 Cu
SHORTEST LINE LENGTH (Remote end) 4.6 KM
LONGEST LINE LENGTH (Remote end) 4.6 KM
NO. OF ICT in parallel (Remote end) 2
ICT Rating (MVA) (Remote end) 160 MVA
% IMPEDANCE OF ICT 14.00%
NO. OF ICT in parallel 2
Dist TR Rating (MVA) 100 MVA
% IMPEDANCE OF Dist TR 16.00%
NO. OF Dist TR in parallel 2
Details of Protected Line
Length of protected line 4.6000 KM
Positive Sequence Resistance per KM 0.0511 Ohms
Positive Sequence Reactance per KM 0.0904 Ohms
Positive sequence impedance per KM 0.1038 Ohms
Zero Sequence Resistance per KM 0.0551 Ohms
Zero Sequence Reactance per KM 0.0798 Ohms
Zero Sequence Impedance per KM 0.0970 Ohms
Mutual Resistance per KM 0.1777 Ohms
Mutual Reactance per KM 1.7353 Ohms
Positive Sequence Resistance for Prot. line 0.2352 Ohm
Positive Sequence Reactance for Prot. line 0.4156 Ohm
Positive Sequence Impedance for Prot. line 0.4775 Ohm
Positive sequence Impedance angle 60.4697 Degree
Zero Sequence Resistance for Prot. line 0.2536 Ohm
Zero Sequence Reactance for Prot. line 0.3671 Ohm
Zero Sequence Impedance for Prot. line 0.4462 Ohm
Zero Sequence Impedance Angle 55.3390 Degree

Details of Adjacent Shortest line at Park Street SS


Length of the adjacent shortest line 4.6000 KM
Pos. Seq. Resistance of Adj. Line per KM 0.0565 Ohm
Pos. Seq. Reactance of Adj. Line per KM 0.0931 Ohm
Pos. Seq. Impedance of Adj. Line per KM 0.1089 Ohm
Positive Sequence Resistance for Adjacent Shortest Line 0.2599 Ohm
Positive Sequence Reactance for Adjacent Shortest Line 0.4283 Ohm
Positive Sequence Impedance for Adjacent Shortest Line 0.5010 Ohm
Positive sequence Impedance angle 58.7239 Degree

116
220kV Line FEEDER – 220 kV Park Street SS HC Mathur Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 532 A
L3 / L4 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 4.600 kM

Details of ICT(As per Transformer Data sheet)


ICT 160.0000 MVA
VOLTAGE RATING 220.0000 Kilo Volt
% IMPEDANCE 0.1400 %
TOTAL NO. OF ICTS 2.0000
Impedance when only one ICT is connected in the circuit 42.3500 Ohms
(kv^2XP.U IMP )/(MAVX1000)
Impedance of parallel ICT's when connected in the circuit 21.1750 Ohms

Details of Next Adjacent Longest line


Length of the adjacent Longest line 4.6000 KM
Pos. Seq. Resistance of Adj. Line per KM 0.0565 Ohm
Pos. Seq. Reactance of Adj. Line per KM 0.0931 Ohm
Pos. Seq. Impedance of Adj. Line per KM 0.1089 Ohm
Positive Sequence Resistance for Prot. line 0.2599 Ohm
Positive Sequence Reactance for Prot. line 0.4283 Ohm
Positive Sequence Impedance for Prot. line 0.5010 Ohm
Positive sequence Impedance angle 58.7239 Degree

CT & PT Details
CT Primary 800.0000 Amp
CT Secondary 1.0000 Amp
PT Primary 220.0000 Kilo Volt
PT Secondary 110.0000 Volt
CT/PT Ratio 0.4000
GROUND FACTOR
Grounding Factor Kg = (Z0-Z1)/(3*Z1)
Magnitude of grounding Factor Kg = (SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0- 0.0362
RL)))/(3*(SQRT(RL*RL)+(XL*XL)))
Angle of Grounding Factor Kg=(arc Tan((X0-XL/(R0-RL)))-(arc -129.6778
Tan(XL/RL))*180*7/22
KZ1,KZ2,KZ3…. PS1 0.0362
Angle KG -129.6778
ZONE SETTINGS
Dist Z1(polygon) 0.1528
(80% of Protected Line Impedance*(CTR/PTR))
DIST Z2 (polygon) 0.23 0.2912
(1.2x length of the protected line Impedance ) x(CTR/PTR)
or
(100% Protected Line Impedence+50% of next 0.29
shortest line Impedance)x(CTR/PTR)
Whichever is higher.

117
220kV Line FEEDER – 220 kV Park Street SS HC Mathur Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 532 A
L3 / L4 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 4.600 kM

DIST Z3 (polygon) 0.43 0.4296


(120% of Protected Line Impedance + 100% of next longest line
Impedance)x(CTR/PTR)
OR
(100% of Protected Line Impedance + 80.% of ICT Impedance 6.97
when operated in parallel ) x (CTR/PTR)
(which ever is low)
OR
(100% of Protected Line Impedance + 100% of Adjacent longest 0.44
line emanating from far end busbar+ 25% of Adjacent Longest 1
line emanating from far end second line considered) x (CTR/PTR)
(whichever is low)
DIST Z4 (polygon) (25% of Zone 1 Impedance) 0.0382
RESISTIVE REACH SETTING:
Primary full load current, CTR considered as Full load 800.0000
Resistance at this current=(0.8*(PT Primary*10^3)/1.732)/(1.2*Primary full load 105.8507
current)
Load Resistance in secondary=Resistance at this current*(CTR/PTR)- RL 42.3403
Typically, phase fault distance zones would be set to avoid the minimum load impedance by a margin of 40%,
(bearing in mind that the PSB zone surrounds the Zone 3 characteristic) and earth fault distance zones would use a
20% margin.
DIST R1,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R2,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R3,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R4,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST RP,PP(polygon) PS1 (60% of 42.34 Ohms) 25.4042
DIST R1,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R2,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R3,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST R4,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722
DIST RP,PG(polygon) PS1 (80% of 42.34 Ohms) 33.8722

OPERATING TIME DELAYS


Z1 operating time (t1) 0.0000 Sec
Z2 operating time (t2) 0.3500 Sec
Z3 operating time (t3) 1 0.8000 Sec
Z4 operating time (t4) 1.0000 Sec
Note: Time delay are as per the given details.
POWER SWING SETTING(68):
PSB band settings:
Typically, the IR and IX band settings are both set between 10% and 30% of 3ph.Considering 20% of the R3Ph
setting and also for catering to the fastest power swings.
ΔR & ΔX = 0.2 * 25.4042 5.0808

118
220kV Line FEEDER – 220 kV Park Street SS HC Mathur Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 532 A
L3 / L4 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 4.600 kM

UNBLOCKING CURRENT THRESHOLDS:


Unblocking stages using to trip if any fault when relay blocked on PSB
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected
residual current unbalance, the maximum negative sequence unbalance and the maximum expected power Swing
current.
IN > 40%
I2 > 30%
Value of Imax line = 3 Inom
NOTE: PSB Block – Zone-1 , Zone 2, Zone 3, Zone 4
PSB Allowed to BLOCK.
Unblocking timer:
To be set to 2s typically to un block in case of a prolonged power swing.

DISTANCE SCHEME SETTING


Program Mode Standard Scheme
Standard Mode PUR Permissive Under Reach Scheme
Z1 Ext Fail Disabled
Trip Mode 1 Pole Z, CR Received

SWITCH-ON-TO-FAULT
Switch on to fault logic is pre-set in MiCOM P442
Operation on pick up of level detector method and activation of all zones is recommended.

BACK-UP OVER CURRENT


To be kept OFF in P442.

BACK-UP EARTH FAULT


To be kept OFF in P442.

BROKEN CONDUCTOR PROTECTION- Amar – (To be kept OFF in P442)


I2/I1 Ratio –
Time Set –
1

VT SUPERVISION
VTS Time Delay 5.00 Sec (Alarm Indication Time)
VTS I2> & I0> Inhibit 20mA
Detect 3P Enabled
Threshold 3P (U<) 10 Volts
Delta I> 100mA

OVER VOLTAGE PROTECTION ( OFF / Disable)


To be kept OFF in P442 or can be set as per P141.

119
220kV Line FEEDER – 220 kV Park Street SS HC Mathur Lane SS Cable 2 ckt 1 Run
1600 – 800 / 1 A Min. SC=5.942 kA FLC 532 A
L3 / L4 P442316B6M0500K Size= 1Cx1200 Cu Max. SC=23.656 kA IREFL 1.82 kA
DWL3 /4 Distance Protection Select 800 / 1 A Run / Feeder = 01 Length 4.600 kM

Overload Alarm : P442


A over current element (DTOC) to be used with pickup as full load current ( here it is taken as CTR ) with DT
characterstics of 20 Sec for Alarm Only .

Full Load current in the Line : 632 A


CTR used : 800 /1A
Secondary Amps (Full Load / CTR ) 0.79 A
Over Load Alarm to be set at 100% of the loading and a time delay of 20 Sec as the same is being used for ALARM.
Pickup Settings 0.90 A
Curve Selected DT (Definite Time )
Time Delay 20 Sec

NOTE:
All other stages to be kept OFF and above to be configured for ALARM only.
These settings are applicable if the protection is enabled only in the configuration menu. If the protection is
disabled in the configuration menu please ignore.

120
220 kV Bus Differential Protection:

220kV Busbar Differential


1600 – 800 / 1 A Min. SC=6.181 kA FLC 656 A
SBNH163R000000001 Max. SC=27.291 kA IREFL 1.82 kA
ZDRJ161R000000006 Select 1600 / 1 A RCT = < 4.0 ohms @1600

Function Basic Range Setting Range Remark


Differential unit Base pickup & Multiplier 25 V & step: 2V 25 – 87 V steps are 31 equal steps
50 V & step: 4V 50 – 174 V 50, 54, 58…..
100 V & step: 8V 100 – 348 V 100, 108, 116…..
Set at 94 Volts Basic: 50V 94 V 50 V+ 4 V x 11 step = 94 Volts
Supervision Unit: 2 – 14 Volts 4.0 volts

121
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 3239 MVAsc NO LOAD MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 35.602 13.276 9.314
33KV MAIN BUS2 33.000 35.602 13.276 9.314
AUX TR1 HT TB 11.000 56.242 21.724 18.813
AUX TR1 LT BUS 0.415 24.393 12.162 10.170
AUX TR1 LT TB 0.415 24.423 12.094 10.400
AUX TR2 HT TB 11.000 56.242 21.724 18.813
AUX TR2 LT BUS 0.415 24.393 12.162 10.170
AUX TR2 LT TB 0.415 24.423 12.094 10.400
B. D. MARG F1 33.000 18.770 9.988 7.207
CHURCH ROAD F1 33.000 19.656 10.289 7.361
CONNAUGHT PLACE F1 33.000 16.726 9.247 6.813
CONSTITUTION C-F1 33.000 27.633 12.418 8.465
CONSTITUTION C-F2 33.000 27.633 12.418 8.465
DELHI HC F1 33.000 19.656 10.289 7.361
DWL1 IC CB TB 220.000 17.765 7.300 6.181
DWL2 IC CB TB 220.000 17.765 7.300 6.181
DWL3 IC CB TB 220.000 17.765 7.300 6.181
DWL4 IC CB TB 220.000 17.765 7.300 6.181
HANUMAN ROAD F1 33.000 32.293 12.630 9.057
HCML F1 33.000 34.034 13.075 9.204
HCML IC L1 TB 220.000 17.765 7.300 6.181
HCML IC L2 TB 220.000 17.765 7.300 6.181
HCML IC L3 TB 220.000 17.765 7.300 6.181
HCML IC L4TB 220.000 17.765 7.300 6.181
HWL1 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL2 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL3 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL4 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL5 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL6 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL7 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL8 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL9 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL10 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL11 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL12 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL13 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL14 SELECT ISO TB 33.000 35.602 13.276 9.314
HWL15 SELECT ISO TB 33.000 35.602 13.276 9.314
HWT1 IC CB TB 33.000 35.602 13.276 9.314
HWT3 IC2 CB TB 33.000 35.602 13.276 9.314
IGNCA F1 33.000 27.633 12.418 8.465
JANPATH LANE F1 33.000 25.302 11.911 8.180
MAHARNI SS BUS 220.000 22.009 9.189 7.361
MAIN BUS1 220.000 17.765 7.300 6.181
MAIN BUS2 220.000 17.765 7.300 6.181
MANDI HOUSE F1 33.000 25.002 10.975 8.311
OG AUX TR1 CB TB 11.000 58.658 22.107 19.145
OG AUX TR2 CB TB 11.000 58.658 22.107 19.145
PARK STREET SS BUS 220.000 16.899 6.942 5.942
RAJA BAZAR F1 33.000 19.656 10.289 7.361
SCHOOL LANE F1 33.000 23.181 11.362 7.899
SCINDIA HOUSE F1 33.000 32.698 12.660 9.068
TR1 HT BUS SELECT ISO TB 220.000 17.765 7.300 6.181
TR2 HT BUS SELECT ISO TB 220.000 17.765 7.300 6.181
TR1 11KV TB 11.000 61.273 22.496 19.482
TR1 33KV TB 33.000 35.657 13.293 9.320
TR2 11KV TB 11.000 61.273 22.496 19.482
TR2 33KV TB 33.000 35.657 13.293 9.320
VIDHYUT BHAVAN F1 33.000 22.025 11.031 7.734
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 3239 MVAsc NORMAL MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 43.874 16.730 10.755
33KV MAIN BUS2 33.000 44.881 17.165 10.755
AUX TR1 HT TB 11.000 64.412 21.928 21.724
AUX TR1 LT BUS 0.415 28.753 14.522 11.743
AUX TR1 LT TB 0.415 29.424 14.460 12.009
AUX TR2 HT TB 11.000 65.302 22.276 21.724
AUX TR2 LT BUS 0.415 28.757 14.525 11.743
AUX TR2 LT TB 0.415 29.429 14.463 12.009
B. D. MARG F1 33.000 21.374 11.782 8.322
CHURCH ROAD F1 33.000 22.581 12.367 8.500
CONNAUGHT PLACE F1 33.000 19.035 10.815 7.867
CONSTITUTION C-F1 33.000 32.727 15.509 9.774
CONSTITUTION C-F2 33.000 32.727 15.509 9.774
DELHI HC F1 33.000 22.581 12.367 8.500
DWL1 IC CB TB 220.000 19.348 7.920 6.824
DWL2 IC CB TB 220.000 19.377 7.933 6.837
DWL3 IC CB TB 220.000 19.348 7.920 6.824
DWL4 IC CB TB 220.000 19.377 7.933 6.837
HANUMAN ROAD F1 33.000 39.008 15.732 10.458
HCML F1 33.000 41.542 16.411 10.628
HCML IC L1 TB 220.000 19.348 7.920 6.824
HCML IC L2 TB 220.000 19.377 7.933 6.837
HCML IC L3 TB 220.000 19.348 7.920 6.824
HCML IC L4TB 220.000 19.377 7.933 6.837
HWL1 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL2 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL3 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL4 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL5 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL6 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL7 SELECT ISO TB 33.000 43.874 16.730 10.755
HWL8 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL9 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL10 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL11 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL12 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL13 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL14 SELECT ISO TB 33.000 44.881 17.165 10.755
HWL15 SELECT ISO TB 33.000 44.881 17.165 10.755
HWT1 IC CB TB 33.000 43.874 16.730 10.755
HWT3 IC2 CB TB 33.000 44.881 17.165 10.755
IGNCA F1 33.000 32.727 15.509 9.774
JANPATH LANE F1 33.000 29.602 14.709 9.445
MAHARNI SS BUS 220.000 23.694 9.854 8.122
MAIN BUS1 220.000 19.348 7.920 6.824
MAIN BUS2 220.000 19.377 7.933 6.837
MANDI HOUSE F1 33.000 29.673 13.682 9.597
OG AUX TR1 CB TB 11.000 67.590 22.383 22.107
OG AUX TR2 CB TB 11.000 68.572 22.745 22.107
PARK STREET SS BUS 220.000 18.433 7.512 6.534
RAJA BAZAR F1 33.000 22.581 12.367 8.500
SCHOOL LANE F1 33.000 26.618 13.644 9.121
SCINDIA HOUSE F1 33.000 39.595 15.780 10.471
TR1 HT BUS SELECT ISO TB 220.000 19.348 7.920 6.824
TR2 HT BUS SELECT ISO TB 220.000 19.377 7.933 6.837
TR1 11KV TB 11.000 71.073 22.845 22.496
TR1 33KV TB 33.000 43.939 16.751 10.762
TR2 11KV TB 11.000 72.161 23.224 22.496
TR2 33KV TB 33.000 44.946 17.186 10.762
VIDHYUT BHAVAN F1 33.000 25.213 13.186 8.931
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 3239 MVAsc 33kV PAR MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 77.696 30.213 18.088
33KV MAIN BUS2 33.000 77.696 30.213 18.088
AUX TR1 HT TB 11.000 79.300 27.647 27.486
AUX TR1 LT BUS 0.415 28.815 14.556 11.794
AUX TR1 LT TB 0.415 29.490 14.500 12.062
AUX TR2 HT TB 11.000 79.300 27.647 27.486
AUX TR2 LT BUS 0.415 28.815 14.556 11.794
AUX TR2 LT TB 0.415 29.490 14.500 12.062
B. D. MARG F1 33.000 25.122 15.332 11.663
CHURCH ROAD F1 33.000 26.651 16.106 12.064
CONNAUGHT PLACE F1 33.000 21.807 13.574 10.421
CONSTITUTION C-F1 33.000 44.829 23.683 15.274
CONSTITUTION C-F2 33.000 44.829 23.683 15.274
DELHI HC F1 33.000 26.651 16.106 12.064
DWL1 IC CB TB 220.000 19.437 7.958 6.852
DWL2 IC CB TB 220.000 19.437 7.958 6.852
DWL3 IC CB TB 220.000 19.437 7.958 6.852
DWL4 IC CB TB 220.000 19.437 7.958 6.852
HANUMAN ROAD F1 33.000 63.116 26.962 17.238
HCML F1 33.000 70.326 29.072 17.718
HCML IC L1 TB 220.000 19.437 7.958 6.852
HCML IC L2 TB 220.000 19.437 7.958 6.852
HCML IC L3 TB 220.000 19.437 7.958 6.852
HCML IC L4TB 220.000 19.437 7.958 6.852
HWL1 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL2 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL3 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL4 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL5 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL6 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL7 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL8 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL9 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL10 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL11 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL12 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL13 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL14 SELECT ISO TB 33.000 77.696 30.213 18.088
HWL15 SELECT ISO TB 33.000 77.696 30.213 18.088
HWT1 IC CB TB 33.000 77.696 30.213 18.088
HWT3 IC2 CB TB 33.000 77.696 30.213 18.088
IGNCA F1 33.000 44.829 23.683 15.274
JANPATH LANE F1 33.000 38.372 21.317 14.387
MAHARNI SS BUS 220.000 23.695 9.854 8.122
MAIN BUS1 220.000 19.437 7.958 6.852
MAIN BUS2 220.000 19.437 7.958 6.852
MANDI HOUSE F1 33.000 40.601 20.642 14.892
OG AUX TR1 CB TB 11.000 84.201 28.280 28.212
OG AUX TR2 CB TB 11.000 84.201 28.280 28.212
PARK STREET SS BUS 220.000 18.504 7.546 6.560
RAJA BAZAR F1 33.000 26.651 16.106 12.064
SCHOOL LANE F1 33.000 33.472 19.289 13.553
SCINDIA HOUSE F1 33.000 64.769 27.131 17.281
TR1 HT BUS SELECT ISO TB 220.000 19.437 7.958 6.852
TR2 HT BUS SELECT ISO TB 220.000 19.437 7.958 6.852
TR1 11KV TB 11.000 89.699 28.958 28.926
TR1 33KV TB 33.000 77.655 30.202 18.088
TR2 11KV TB 11.000 89.699 28.958 28.926
TR2 33KV TB 33.000 77.655 30.202 18.088
VIDHYUT BHAVAN F1 33.000 31.082 18.223 13.081
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 3239 MVAsc 220kV PAR MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 44.626 17.007 10.954
33KV MAIN BUS2 33.000 45.627 17.440 10.954
AUX TR1 HT TB 11.000 65.041 22.142 21.993
AUX TR1 LT BUS 0.415 28.756 14.524 11.746
AUX TR1 LT TB 0.415 29.427 14.462 12.012
AUX TR2 HT TB 11.000 65.908 22.481 21.993
AUX TR2 LT BUS 0.415 28.760 14.526 11.746
AUX TR2 LT TB 0.415 29.432 14.465 12.012
B. D. MARG F1 33.000 21.509 11.890 8.434
CHURCH ROAD F1 33.000 22.727 12.481 8.618
CONNAUGHT PLACE F1 33.000 19.137 10.903 7.966
CONSTITUTION C-F1 33.000 33.099 15.720 9.937
CONSTITUTION C-F2 33.000 33.099 15.720 9.937
DELHI HC F1 33.000 22.727 12.481 8.618
DWL1 IC CB TB 220.000 21.603 8.912 7.488
DWL2 IC CB TB 220.000 21.603 8.912 7.488
DWL3 IC CB TB 220.000 21.603 8.912 7.488
DWL4 IC CB TB 220.000 21.603 8.912 7.488
HANUMAN ROAD F1 33.000 39.598 15.975 10.646
HCML F1 33.000 42.214 16.677 10.823
HCML IC L1 TB 220.000 21.603 8.912 7.488
HCML IC L2 TB 220.000 21.603 8.912 7.488
HCML IC L3 TB 220.000 21.603 8.912 7.488
HCML IC L4TB 220.000 21.603 8.912 7.488
HWL1 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL2 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL3 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL4 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL5 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL6 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL7 SELECT ISO TB 33.000 44.626 17.007 10.954
HWL8 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL9 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL10 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL11 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL12 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL13 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL14 SELECT ISO TB 33.000 45.627 17.440 10.954
HWL15 SELECT ISO TB 33.000 45.627 17.440 10.954
HWT1 IC CB TB 33.000 44.626 17.007 10.954
HWT3 IC2 CB TB 33.000 45.627 17.440 10.954
IGNCA F1 33.000 33.099 15.720 9.937
JANPATH LANE F1 33.000 29.889 14.889 9.595
MAHARNI SS BUS 220.000 23.694 9.854 8.122
MAIN BUS1 220.000 21.603 8.912 7.488
MAIN BUS2 220.000 21.603 8.912 7.488
MANDI HOUSE F1 33.000 29.998 13.858 9.754
OG AUX TR1 CB TB 11.000 68.283 22.605 22.386
OG AUX TR2 CB TB 11.000 69.240 22.959 22.386
PARK STREET SS BUS 220.000 20.254 8.352 7.140
RAJA BAZAR F1 33.000 22.727 12.481 8.618
SCHOOL LANE F1 33.000 26.849 13.802 9.260
SCINDIA HOUSE F1 33.000 40.204 16.025 10.660
TR1 HT BUS SELECT ISO TB 220.000 21.603 8.912 7.488
TR2 HT BUS SELECT ISO TB 220.000 21.603 8.912 7.488
TR1 11KV TB 11.000 71.839 23.077 22.784
TR1 33KV TB 33.000 44.693 17.028 10.962
TR2 11KV TB 11.000 72.901 23.447 22.784
TR2 33KV TB 33.000 45.695 17.462 10.962
VIDHYUT BHAVAN F1 33.000 25.415 13.329 9.063
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 6097 MVAsc NORMAL MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 46.854 17.693 11.801
33KV MAIN BUS2 33.000 47.853 18.124 11.801
AUX TR1 HT TB 11.000 67.362 23.105 22.832
AUX TR1 LT BUS 0.415 28.768 14.529 11.758
AUX TR1 LT TB 0.415 29.440 14.468 12.024
AUX TR2 HT TB 11.000 68.198 23.162 23.105
AUX TR2 LT BUS 0.415 28.772 14.532 11.758
AUX TR2 LT TB 0.415 29.444 14.470 12.024
B. D. MARG F1 33.000 21.924 12.201 8.916
CHURCH ROAD F1 33.000 23.178 12.810 9.124
CONNAUGHT PLACE F1 33.000 19.457 11.159 8.388
CONSTITUTION C-F1 33.000 34.176 16.278 10.632
CONSTITUTION C-F2 33.000 34.176 16.278 10.632
DELHI HC F1 33.000 23.178 12.810 9.124
DWL1 IC CB TB 220.000 30.645 12.153 10.770
DWL2 IC CB TB 220.000 30.697 12.171 10.789
DWL3 IC CB TB 220.000 30.645 12.153 10.770
DWL4 IC CB TB 220.000 30.697 12.171 10.789
HANUMAN ROAD F1 33.000 41.322 16.582 11.447
HCML F1 33.000 44.189 17.339 11.650
HCML IC L1 TB 220.000 30.645 12.153 10.770
HCML IC L2 TB 220.000 30.697 12.171 10.789
HCML IC L3 TB 220.000 30.645 12.153 10.770
HCML IC L4TB 220.000 30.697 12.171 10.789
HWL1 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL2 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL3 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL4 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL5 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL6 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL7 SELECT ISO TB 33.000 46.854 17.693 11.801
HWL8 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL9 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL10 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL11 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL12 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL13 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL14 SELECT ISO TB 33.000 47.853 18.124 11.801
HWL15 SELECT ISO TB 33.000 47.853 18.124 11.801
HWT1 IC CB TB 33.000 46.854 17.693 11.801
HWT3 IC2 CB TB 33.000 47.853 18.124 11.801
IGNCA F1 33.000 34.176 16.278 10.632
JANPATH LANE F1 33.000 30.732 15.379 10.240
MAHARNI SS BUS 220.000 41.707 17.376 14.617
MAIN BUS1 220.000 30.645 12.153 10.770
MAIN BUS2 220.000 30.697 12.171 10.789
MANDI HOUSE F1 33.000 30.997 14.343 10.424
OG AUX TR1 CB TB 11.000 70.841 23.537 23.323
OG AUX TR2 CB TB 11.000 71.768 23.668 23.537
PARK STREET SS BUS 220.000 28.626 11.254 10.065
RAJA BAZAR F1 33.000 23.178 12.810 9.124
SCHOOL LANE F1 33.000 27.536 14.236 9.856
SCINDIA HOUSE F1 33.000 41.989 16.635 11.462
TR1 HT BUS SELECT ISO TB 220.000 30.645 12.153 10.770
TR2 HT BUS SELECT ISO TB 220.000 30.697 12.171 10.789
TR1 11KV TB 11.000 74.670 23.975 23.824
TR1 33KV TB 33.000 46.929 17.716 11.809
TR2 11KV TB 11.000 75.701 24.184 23.975
TR2 33KV TB 33.000 47.929 18.148 11.809
VIDHYUT BHAVAN F1 33.000 26.020 13.730 9.631
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 15000 MVAsc NORMAL MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 49.322 18.472 12.626
33KV MAIN BUS2 33.000 50.309 18.900 12.626
AUX TR1 HT TB 11.000 69.685 24.137 23.537
AUX TR1 LT BUS 0.415 28.779 14.535 11.767
AUX TR1 LT TB 0.415 29.451 14.473 12.034
AUX TR2 HT TB 11.000 70.473 24.137 23.850
AUX TR2 LT BUS 0.415 28.782 14.537 11.767
AUX TR2 LT TB 0.415 29.455 14.476 12.034
B. D. MARG F1 33.000 22.349 12.528 9.364
CHURCH ROAD F1 33.000 23.639 13.156 9.597
CONNAUGHT PLACE F1 33.000 19.781 11.425 8.777
CONSTITUTION C-F1 33.000 35.331 16.893 11.299
CONSTITUTION C-F2 33.000 35.331 16.893 11.299
DELHI HC F1 33.000 23.639 13.156 9.597
DWL1 IC CB TB 220.000 53.856 20.879 17.923
DWL2 IC CB TB 220.000 53.938 20.879 17.939
DWL3 IC CB TB 220.000 53.856 20.879 17.923
DWL4 IC CB TB 220.000 53.938 20.879 17.939
HANUMAN ROAD F1 33.000 43.212 17.267 12.224
HCML F1 33.000 46.366 18.091 12.455
HCML IC L1 TB 220.000 53.856 20.879 17.923
HCML IC L2 TB 220.000 53.938 20.879 17.939
HCML IC L3 TB 220.000 53.856 20.879 17.923
HCML IC L4TB 220.000 53.938 20.879 17.939
HWL1 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL2 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL3 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL4 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL5 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL6 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL7 SELECT ISO TB 33.000 49.322 18.472 12.626
HWL8 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL9 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL10 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL11 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL12 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL13 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL14 SELECT ISO TB 33.000 50.309 18.900 12.626
HWL15 SELECT ISO TB 33.000 50.309 18.900 12.626
HWT1 IC CB TB 33.000 49.322 18.472 12.626
HWT3 IC2 CB TB 33.000 50.309 18.900 12.626
IGNCA F1 33.000 35.331 16.893 11.299
JANPATH LANE F1 33.000 31.624 15.911 10.854
MAHARNI SS BUS 220.000 97.706 40.758 34.851
MAIN BUS1 220.000 53.856 20.879 17.923
MAIN BUS2 220.000 53.938 20.879 17.939
MANDI HOUSE F1 33.000 32.054 14.871 11.065
OG AUX TR1 CB TB 11.000 73.411 24.607 24.057
OG AUX TR2 CB TB 11.000 74.287 24.607 24.385
PARK STREET SS BUS 220.000 47.918 18.684 15.545
RAJA BAZAR F1 33.000 23.639 13.156 9.597
SCHOOL LANE F1 33.000 28.255 14.703 10.420
SCINDIA HOUSE F1 33.000 43.947 17.324 12.241
TR1 HT BUS SELECT ISO TB 220.000 53.856 20.879 17.923
TR2 HT BUS SELECT ISO TB 220.000 53.938 20.879 17.939
TR1 11KV TB 11.000 77.525 25.084 24.588
TR1 33KV TB 33.000 49.407 18.498 12.636
TR2 11KV TB 11.000 78.503 25.084 24.932
TR2 33KV TB 33.000 50.395 18.926 12.636
VIDHYUT BHAVAN F1 33.000 26.650 14.160 10.166
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 15000 MVAsc 33kV PAR MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 95.991 36.227 24.098
33KV MAIN BUS2 33.000 95.991 36.227 24.098
AUX TR1 HT TB 11.000 87.255 31.683 29.992
AUX TR1 LT BUS 0.415 28.841 14.568 11.819
AUX TR1 LT TB 0.415 29.517 14.513 12.088
AUX TR2 HT TB 11.000 87.255 31.683 29.992
AUX TR2 LT BUS 0.415 28.841 14.568 11.819
AUX TR2 LT TB 0.415 29.517 14.513 12.088
B. D. MARG F1 33.000 26.406 16.492 12.612
CHURCH ROAD F1 33.000 28.114 17.410 13.441
CONNAUGHT PLACE F1 33.000 22.741 14.442 10.814
CONSTITUTION C-F1 33.000 49.577 26.940 19.281
CONSTITUTION C-F2 33.000 49.577 26.940 19.281
DELHI HC F1 33.000 28.114 17.410 13.441
DWL1 IC CB TB 220.000 54.359 21.102 18.133
DWL2 IC CB TB 220.000 54.359 21.102 18.133
DWL3 IC CB TB 220.000 54.359 21.102 18.133
DWL4 IC CB TB 220.000 54.359 21.102 18.133
HANUMAN ROAD F1 33.000 74.448 31.666 22.636
HCML F1 33.000 85.521 34.907 23.466
HCML IC L1 TB 220.000 54.359 21.102 18.133
HCML IC L2 TB 220.000 54.359 21.102 18.133
HCML IC L3 TB 220.000 54.359 21.102 18.133
HCML IC L4TB 220.000 54.359 21.102 18.133
HWL1 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL2 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL3 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL4 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL5 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL6 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL7 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL8 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL9 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL10 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL11 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL12 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL13 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL14 SELECT ISO TB 33.000 95.991 36.227 24.098
HWL15 SELECT ISO TB 33.000 95.991 36.227 24.098
HWT1 IC CB TB 33.000 95.991 36.227 24.098
HWT3 IC2 CB TB 33.000 95.991 36.227 24.098
IGNCA F1 33.000 49.577 26.940 19.281
JANPATH LANE F1 33.000 41.677 23.845 17.824
MAHARNI SS BUS 220.000 97.707 40.758 34.852
MAIN BUS1 220.000 54.359 21.102 18.133
MAIN BUS2 220.000 54.359 21.102 18.133
MANDI HOUSE F1 33.000 45.148 23.494 18.707
OG AUX TR1 CB TB 11.000 93.210 32.509 30.854
OG AUX TR2 CB TB 11.000 93.210 32.509 30.854
PARK STREET SS BUS 220.000 48.316 18.862 15.703
RAJA BAZAR F1 33.000 28.114 17.410 13.441
SCHOOL LANE F1 33.000 35.899 21.285 16.501
SCINDIA HOUSE F1 33.000 76.841 31.901 22.709
TR1 HT BUS SELECT ISO TB 220.000 54.359 21.102 18.133
TR2 HT BUS SELECT ISO TB 220.000 54.359 21.102 18.133
TR1 11KV TB 11.000 99.967 33.354 31.737
TR1 33KV TB 33.000 95.941 36.214 24.098
TR2 11KV TB 11.000 99.967 33.354 31.737
TR2 33KV TB 33.000 95.941 36.214 24.098
VIDHYUT BHAVAN F1 33.000 33.140 19.969 15.772
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus 15000 MVAsc 220kV PAR MODE
ID kV Max ip Max Ik Min Ik
33KV MAIN BUS1 33.000 50.269 18.808 12.901
33KV MAIN BUS2 33.000 51.254 19.236 12.901
AUX TR1 HT TB 11.000 70.416 24.470 23.781
AUX TR1 LT BUS 0.415 28.782 14.536 11.770
AUX TR1 LT TB 0.415 29.454 14.475 12.038
AUX TR2 HT TB 11.000 71.184 24.470 24.087
AUX TR2 LT BUS 0.415 28.785 14.538 11.770
AUX TR2 LT TB 0.415 29.458 14.477 12.038
B. D. MARG F1 33.000 22.494 12.648 9.505
CHURCH ROAD F1 33.000 23.798 13.284 9.746
CONNAUGHT PLACE F1 33.000 19.890 11.521 8.898
CONSTITUTION C-F1 33.000 35.760 17.142 11.516
CONSTITUTION C-F2 33.000 35.760 17.142 11.516
DELHI HC F1 33.000 23.798 13.284 9.746
DWL1 IC CB TB 220.000 69.626 27.291 24.403
DWL2 IC CB TB 220.000 69.626 27.291 24.403
DWL3 IC CB TB 220.000 69.626 27.291 24.403
DWL4 IC CB TB 220.000 69.626 27.291 24.403
HANUMAN ROAD F1 33.000 43.933 17.560 12.482
HCML F1 33.000 47.200 18.413 12.723
HCML IC L1 TB 220.000 69.626 27.291 24.403
HCML IC L2 TB 220.000 69.626 27.291 24.403
HCML IC L3 TB 220.000 69.626 27.291 24.403
HCML IC L4TB 220.000 69.626 27.291 24.403
HWL1 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL2 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL3 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL4 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL5 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL6 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL7 SELECT ISO TB 33.000 50.269 18.808 12.901
HWL8 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL9 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL10 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL11 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL12 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL13 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL14 SELECT ISO TB 33.000 51.254 19.236 12.901
HWL15 SELECT ISO TB 33.000 51.254 19.236 12.901
HWT1 IC CB TB 33.000 50.269 18.808 12.901
HWT3 IC2 CB TB 33.000 51.254 19.236 12.901
IGNCA F1 33.000 35.760 17.142 11.516
JANPATH LANE F1 33.000 31.948 16.121 11.052
MAHARNI SS BUS 220.000 97.706 40.758 34.851
MAIN BUS1 220.000 69.626 27.291 24.403
MAIN BUS2 220.000 69.626 27.291 24.403
MANDI HOUSE F1 33.000 32.434 15.080 11.274
OG AUX TR1 CB TB 11.000 74.223 24.953 24.312
OG AUX TR2 CB TB 11.000 75.078 24.953 24.633
PARK STREET SS BUS 220.000 60.011 23.656 20.849
RAJA BAZAR F1 33.000 23.798 13.284 9.746
SCHOOL LANE F1 33.000 28.511 14.883 10.600
SCINDIA HOUSE F1 33.000 44.694 17.619 12.500
TR1 HT BUS SELECT ISO TB 220.000 69.626 27.291 24.403
TR2 HT BUS SELECT ISO TB 220.000 69.626 27.291 24.403
TR1 11KV TB 11.000 78.429 25.444 24.854
TR1 33KV TB 33.000 50.357 18.835 12.911
TR2 11KV TB 11.000 79.386 25.444 25.191
TR2 33KV TB 33.000 51.343 19.263 12.911
VIDHYUT BHAVAN F1 33.000 26.872 14.323 10.336
Short-Circuit Summary Report
3-Phase, LG, LL, LLG Fault Currents
Bus Min / Max SC
ID kV Max Ik Min Ik
33KV MAIN BUS1 33.000 36.227 9.314
33KV MAIN BUS2 33.000 36.227 9.314
AUX TR1 HT TB 11.000 31.683 18.813
AUX TR1 LT BUS 0.415 14.568 10.170
AUX TR1 LT TB 0.415 14.513 10.400
AUX TR2 HT TB 11.000 31.683 18.813
AUX TR2 LT BUS 0.415 14.568 10.170
AUX TR2 LT TB 0.415 14.513 10.400
B. D. MARG F1 33.000 16.492 7.207
CHURCH ROAD F1 33.000 17.410 7.361
CONNAUGHT PLACE F1 33.000 14.442 6.813
CONSTITUTION C-F1 33.000 26.940 8.465
CONSTITUTION C-F2 33.000 26.940 8.465
DELHI HC F1 33.000 17.410 7.361
DWL1 IC CB TB 220.000 27.291 6.181
DWL2 IC CB TB 220.000 27.291 6.181
DWL3 IC CB TB 220.000 27.291 6.181
DWL4 IC CB TB 220.000 27.291 6.181
HANUMAN ROAD F1 33.000 31.666 9.057
HCML F1 33.000 34.907 9.204
HCML IC L1 TB 220.000 27.291 6.181
HCML IC L2 TB 220.000 27.291 6.181
HCML IC L3 TB 220.000 27.291 6.181
HCML IC L4TB 220.000 27.291 6.181
HWL1 SELECT ISO TB 33.000 36.227 9.314
HWL2 SELECT ISO TB 33.000 36.227 9.314
HWL3 SELECT ISO TB 33.000 36.227 9.314
HWL4 SELECT ISO TB 33.000 36.227 9.314
HWL5 SELECT ISO TB 33.000 36.227 9.314
HWL6 SELECT ISO TB 33.000 36.227 9.314
HWL7 SELECT ISO TB 33.000 36.227 9.314
HWL8 SELECT ISO TB 33.000 36.227 9.314
HWL9 SELECT ISO TB 33.000 36.227 9.314
HWL10 SELECT ISO TB 33.000 36.227 9.314
HWL11 SELECT ISO TB 33.000 36.227 9.314
HWL12 SELECT ISO TB 33.000 36.227 9.314
HWL13 SELECT ISO TB 33.000 36.227 9.314
HWL14 SELECT ISO TB 33.000 36.227 9.314
HWL15 SELECT ISO TB 33.000 36.227 9.314
HWT1 IC CB TB 33.000 36.227 9.314
HWT3 IC2 CB TB 33.000 36.227 9.314
IGNCA F1 33.000 26.940 8.465
JANPATH LANE F1 33.000 23.845 8.180
MAHARNI SS BUS 220.000 40.758 7.361
MAIN BUS1 220.000 27.291 6.181
MAIN BUS2 220.000 27.291 6.181
MANDI HOUSE F1 33.000 23.494 8.311
OG AUX TR1 CB TB 11.000 32.509 19.145
OG AUX TR2 CB TB 11.000 32.509 19.145
PARK STREET SS BUS 220.000 23.656 5.942
RAJA BAZAR F1 33.000 17.410 7.361
SCHOOL LANE F1 33.000 21.285 7.899
SCINDIA HOUSE F1 33.000 31.901 9.068
TR1 HT BUS SELECT ISO TB 220.000 27.291 6.181
TR2 HT BUS SELECT ISO TB 220.000 27.291 6.181
TR1 11KV TB 11.000 33.354 19.482
TR1 33KV TB 33.000 36.214 9.320
TR2 11KV TB 11.000 33.354 19.482
TR2 33KV TB 33.000 36.214 9.320
VIDHYUT BHAVAN F1 33.000 19.969 7.734
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
33KV MAIN BUS2 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
AUX TR1 HT TB 11.000 21.724 56.242 21.724 0.000 0.000 0.000 0.000 18.813 48.707 18.813 18.813 18.813 48.707 18.813 18.813
AUX TR1 LT BUS 0.415 11.743 23.552 11.743 11.478 23.020 11.478 11.478 10.170 20.397 10.170 10.170 12.162 24.393 12.162 12.162
AUX TR1 LT TB 0.415 12.009 24.252 12.009 12.094 24.423 12.094 12.094 10.400 21.003 10.400 10.400 12.068 24.372 12.068 12.068
AUX TR2 HT TB 11.000 21.724 56.242 21.724 0.000 0.000 0.000 0.000 18.813 48.707 18.813 18.813 18.813 48.707 18.813 18.813
AUX TR2 LT BUS 0.415 11.743 23.552 11.743 11.478 23.020 11.478 11.478 10.170 20.397 10.170 10.170 12.162 24.393 12.162 12.162
AUX TR2 LT TB 0.415 12.009 24.252 12.009 12.094 24.423 12.094 12.094 10.400 21.003 10.400 10.400 12.068 24.372 12.068 12.068
B. D. MARG F1 33.000 8.322 15.638 8.322 8.661 16.275 8.661 8.661 7.207 13.543 7.207 7.207 9.988 18.770 9.988 9.988
CHURCH ROAD F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
CONNAUGHT PLACE F1 33.000 7.867 14.230 7.867 7.881 14.254 7.881 7.881 6.813 12.324 6.813 6.813 9.247 16.726 9.247 9.247
CONSTITUTION C-F1 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
CONSTITUTION C-F2 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
DELHI HC F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
DWL1 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL2 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL3 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL4 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HANUMAN ROAD F1 33.000 10.458 26.739 10.458 12.630 32.293 12.630 12.630 9.057 23.157 9.057 9.057 12.296 31.439 12.296 12.296
HCML F1 33.000 10.628 27.666 10.628 13.075 34.034 13.075 13.075 9.204 23.959 9.204 9.204 12.853 33.458 12.853 12.853
HCML IC L1 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L2 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L3 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L4TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HWL1 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL2 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL3 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL4 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL5 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL6 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL7 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL8 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL9 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL10 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL11 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL12 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL13 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL15 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWT1 IC CB TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWT3 IC2 CB TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
IGNCA F1 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
JANPATH LANE F1 33.000 9.445 20.064 9.445 10.802 22.948 10.802 10.802 8.180 17.376 8.180 8.180 11.911 25.302 11.911 11.911
MAHARNI SS BUS 220.000 8.500 20.358 8.500 9.189 22.009 9.189 9.189 7.361 17.630 7.361 7.361 8.962 21.465 8.962 8.962
MAIN BUS1 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
MAIN BUS2 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
MANDI HOUSE F1 33.000 9.597 21.864 9.597 10.891 24.812 10.891 10.891 8.311 18.934 8.311 8.311 10.975 25.002 10.975 10.975
OG AUX TR1 CB TB 11.000 22.107 58.658 22.107 0.000 0.000 0.000 0.000 19.145 50.799 19.145 19.145 19.145 50.799 19.145 19.145
OG AUX TR2 CB TB 11.000 22.107 58.658 22.107 0.000 0.000 0.000 0.000 19.145 50.799 19.145 19.145 19.145 50.799 19.145 19.145
PARK STREET SS BUS 220.000 6.861 16.702 6.861 6.852 16.679 6.852 6.852 5.942 14.464 5.942 5.942 6.942 16.899 6.942 6.942
RAJA BAZAR F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
SCHOOL LANE F1 33.000 9.121 18.610 9.121 10.160 20.730 10.160 10.160 7.899 16.117 7.899 7.899 11.362 23.181 11.362 11.362
SCINDIA HOUSE F1 33.000 10.471 27.045 10.471 12.660 32.698 12.660 12.660 9.068 23.422 9.068 9.068 12.316 31.811 12.316 12.316
TR1 HT BUS SELECT ISO TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300

TR2 HT BUS SELECT ISO TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300

TR1 11KV TB 11.000 22.496 61.273 22.496 0.000 0.000 0.000 0.000 19.482 53.064 19.482 19.482 19.482 53.064 19.482 19.482
TR1 33KV TB 33.000 10.762 28.870 10.762 13.293 35.657 13.293 13.293 9.320 25.002 9.320 9.320 12.768 34.249 12.768 12.768
TR2 11KV TB 11.000 22.496 61.273 22.496 0.000 0.000 0.000 0.000 19.482 53.064 19.482 19.482 19.482 53.064 19.482 19.482
TR2 33KV TB 33.000 10.762 28.870 10.762 13.293 35.657 13.293 13.293 9.320 25.002 9.320 9.320 12.768 34.249 12.768 12.768
VIDHYUT BHAVAN F1 33.000 8.931 17.831 8.931 9.790 19.547 9.790 9.790 7.734 15.443 7.734 7.734 11.031 22.025 11.031 11.031

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02033 0.32094 0.32158 0.02033 0.32094 0.32158 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00616 0.02052 0.02142 0.00616 0.02052 0.02142 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00587 0.02011 0.02095 0.00587 0.02011 0.02095 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02033 0.32094 0.32158 0.02033 0.32094 0.32158 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00616 0.02052 0.02142 0.00616 0.02052 0.02142 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00587 0.02011 0.02095 0.00587 0.02011 0.02095 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.90549 2.35006 2.51847 0.90549 2.35006 2.51847 2.44042 1.18408 2.71250 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 1.08082 2.43486 2.66397 1.08082 2.43486 2.66397 2.94901 1.25688 3.20568 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14540 1.99876 2.00404 0.14540 1.99876 2.00404 0.14807 0.96128 0.97261 0.00000 0.00000 0.00000

HCML F1 33.000 0.11654 1.96846 1.97191 0.11654 1.96846 1.97191 0.15176 0.85648 0.86982 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.51101 2.15926 2.21891 0.51101 2.15926 2.21891 1.29609 1.02028 1.64949 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 2.03882 16.31057 16.43750 2.03882 16.31057 16.43750 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MAIN BUS2 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.36347 2.15326 2.18372 0.36347 2.15326 2.18372 0.51844 1.33028 1.42773 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01423 0.31569 0.31601 0.01423 0.31569 0.31601 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01423 0.31569 0.31601 0.01423 0.31569 0.31601 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 2.25825 20.23757 20.36317 2.25825 20.23757 20.36317 1.37853 20.41204 20.45854 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.62059 2.21226 2.29766 0.62059 2.21226 2.29766 1.61396 1.06578 1.93410 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.12994 1.99726 2.00148 0.12994 1.99726 2.00148 0.13653 0.95610 0.96580 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00813 0.31044 0.31054 0.00813 0.31044 0.31054 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07220 1.94599 1.94732 0.07220 1.94599 1.94732 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00813 0.31044 0.31054 0.00813 0.31044 0.31054 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07220 1.94599 1.94732 0.07220 1.94599 1.94732 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.68634 2.24406 2.34667 0.68634 2.24406 2.34667 1.80468 1.09308 2.10990 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
33KV MAIN BUS2 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
AUX TR1 HT TB 11.000 25.321 64.412 21.724 0.000 0.000 0.000 0.000 21.928 55.782 21.928 21.928 21.928 55.782 21.928 21.928
AUX TR1 LT BUS 0.415 14.568 28.753 11.743 13.123 25.901 13.123 13.123 12.616 24.901 12.616 12.616 14.522 28.663 14.522 14.522
AUX TR1 LT TB 0.415 14.818 29.424 12.009 13.858 27.517 13.858 13.858 12.833 25.482 12.833 12.833 14.460 28.712 14.460 14.460
AUX TR2 HT TB 11.000 25.722 65.302 21.724 0.000 0.000 0.000 0.000 22.276 56.554 22.276 22.276 22.276 56.554 22.276 22.276
AUX TR2 LT BUS 0.415 14.571 28.757 11.743 13.125 25.903 13.125 13.125 12.619 24.905 12.619 12.619 14.525 28.666 14.525 14.525
AUX TR2 LT TB 0.415 14.822 29.429 12.009 13.860 27.519 13.860 13.860 12.836 25.486 12.836 12.836 14.463 28.717 14.463 14.463
B. D. MARG F1 33.000 10.364 18.801 8.322 9.864 17.894 9.864 9.864 8.975 16.282 8.975 8.975 11.782 21.374 11.782 11.782
CHURCH ROAD F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
CONNAUGHT PLACE F1 33.000 9.680 17.037 7.867 8.852 15.580 8.852 8.852 8.383 14.755 8.383 8.383 10.815 19.035 10.815 10.815
CONSTITUTION C-F1 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
CONSTITUTION C-F2 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
DELHI HC F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
DWL1 IC CB TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
DWL2 IC CB TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
DWL3 IC CB TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
DWL4 IC CB TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HANUMAN ROAD F1 33.000 13.856 34.357 10.458 15.732 39.008 15.732 15.732 12.000 29.754 12.000 12.000 15.281 37.890 15.281 15.281
HCML F1 33.000 14.140 35.793 10.628 16.411 41.542 16.411 16.411 12.246 30.998 12.246 12.246 16.047 40.621 16.047 16.047
HCML IC L1 TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
HCML IC L2 TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HCML IC L3 TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
HCML IC L4TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HWL1 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL2 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL3 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL4 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL5 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL6 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL7 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL8 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL9 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL10 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL11 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL12 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL13 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL15 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWT1 IC CB TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWT3 IC2 CB TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
IGNCA F1 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
JANPATH LANE F1 33.000 12.469 25.094 9.445 13.081 26.325 13.081 13.081 10.799 21.732 10.799 10.799 14.709 29.602 14.709 14.709
MAHARNI SS BUS 220.000 9.378 22.549 8.500 9.854 23.694 9.854 9.854 8.122 19.528 8.122 8.122 9.700 23.323 9.700 9.700
MAIN BUS1 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
MAIN BUS2 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
MANDI HOUSE F1 33.000 12.783 27.722 9.597 13.393 29.045 13.393 13.393 11.070 24.008 11.070 11.070 13.682 29.673 13.682 13.682
OG AUX TR1 CB TB 11.000 25.845 67.590 22.107 0.000 0.000 0.000 0.000 22.383 58.535 22.383 22.383 22.383 58.535 22.383 22.383
OG AUX TR2 CB TB 11.000 26.264 68.572 22.107 0.000 0.000 0.000 0.000 22.745 59.386 22.745 22.745 22.745 59.386 22.745 22.745
PARK STREET SS BUS 220.000 7.545 18.433 6.861 7.292 17.814 7.292 7.292 6.534 15.963 6.534 6.534 7.512 18.352 7.512 7.512
RAJA BAZAR F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
SCHOOL LANE F1 33.000 11.620 22.667 9.121 11.925 23.264 11.925 11.925 10.063 19.631 10.063 10.063 13.644 26.618 13.644 13.644
SCINDIA HOUSE F1 33.000 13.881 34.830 10.471 15.780 39.595 15.780 15.780 12.021 30.164 12.021 12.021 15.318 38.435 15.318 15.318
TR1 HT BUS SELECT ISO TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920

TR2 HT BUS SELECT ISO TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933

TR1 11KV TB 11.000 26.379 71.073 22.496 0.000 0.000 0.000 0.000 22.845 61.551 22.845 22.845 22.845 61.551 22.845 22.845
TR1 33KV TB 33.000 14.363 37.675 10.762 16.751 43.939 16.751 16.751 12.439 32.628 12.439 12.439 16.096 42.220 16.096 16.096
TR2 11KV TB 11.000 26.816 72.161 22.496 0.000 0.000 0.000 0.000 23.224 62.493 23.224 23.224 23.224 62.493 23.224 23.224
TR2 33KV TB 33.000 14.846 38.827 10.762 17.186 44.946 17.186 17.186 12.857 33.625 12.857 12.857 16.533 43.239 16.533 16.533
VIDHYUT BHAVAN F1 33.000 11.314 21.635 8.931 11.401 21.800 11.401 11.401 9.799 18.736 9.799 9.799 13.186 25.213 13.186 13.186

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02134 0.27507 0.27590 0.02134 0.27507 0.27590 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01619 0.01698 0.00512 0.01619 0.01698 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02143 0.27075 0.27160 0.02143 0.27075 0.27160 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.84031 1.83935 2.02221 0.84031 1.83935 2.02221 2.44042 1.18408 2.71250 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.99654 1.92203 2.16502 0.99654 1.92203 2.16502 2.94901 1.25688 3.20568 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14723 1.50537 1.51256 0.14723 1.50537 1.51256 0.14807 0.96128 0.97261 0.00000 0.00000 0.00000

HCML F1 33.000 0.12041 1.47726 1.48216 0.12041 1.47726 1.48216 0.15176 0.85648 0.86982 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.48529 1.60914 1.68073 0.48529 1.60914 1.68073 1.29609 1.02028 1.64949 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80239 14.78924 14.89866 1.80239 14.78924 14.89866 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.34930 1.60190 1.63954 0.34930 1.60190 1.63954 0.51844 1.33028 1.42773 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01527 0.26987 0.27030 0.01527 0.26987 0.27030 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01536 0.26555 0.26599 0.01536 0.26555 0.26599 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 2.00190 18.40903 18.51756 2.00190 18.40903 18.51756 1.37853 20.41204 20.45854 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.58352 1.70667 1.80367 0.58352 1.70667 1.80367 1.61396 1.06578 1.93410 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.13289 1.50399 1.50985 0.13289 1.50399 1.50985 0.13653 0.95610 0.96580 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00920 0.26467 0.26483 0.00920 0.26467 0.26483 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07931 1.45700 1.45916 0.07931 1.45700 1.45916 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00929 0.26035 0.26051 0.00929 0.26035 0.26051 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07990 1.40940 1.41167 0.07990 1.40940 1.41167 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.64310 1.73710 1.85232 0.64310 1.73710 1.85232 1.80468 1.09308 2.10990 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
33KV MAIN BUS2 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
AUX TR1 HT TB 11.000 31.738 79.300 27.647 0.000 0.000 0.000 0.000 27.486 68.676 27.486 27.486 27.486 68.676 27.486 27.486
AUX TR1 LT BUS 0.415 14.610 28.815 11.794 13.146 25.927 13.146 13.146 12.653 24.955 12.653 12.653 14.556 28.708 14.556 14.556
AUX TR1 LT TB 0.415 14.863 29.490 12.062 13.884 27.548 13.884 13.884 12.871 25.539 12.871 12.871 14.500 28.771 14.500 14.500
AUX TR2 HT TB 11.000 31.738 79.300 27.647 0.000 0.000 0.000 0.000 27.486 68.676 27.486 27.486 27.486 68.676 27.486 27.486
AUX TR2 LT BUS 0.415 14.610 28.815 11.794 13.146 25.927 13.146 13.146 12.653 24.955 12.653 12.653 14.556 28.708 14.556 14.556
AUX TR2 LT TB 0.415 14.863 29.490 12.062 13.884 27.548 13.884 13.884 12.871 25.539 12.871 12.871 14.500 28.771 14.500 14.500
B. D. MARG F1 33.000 14.195 23.260 11.663 12.044 19.736 12.044 12.044 12.294 20.144 12.294 12.294 15.332 25.122 15.332 15.332
CHURCH ROAD F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
CONNAUGHT PLACE F1 33.000 12.773 20.521 10.689 10.421 16.741 10.421 10.421 11.062 17.771 11.062 11.062 13.574 21.807 13.574 13.574
CONSTITUTION C-F1 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
CONSTITUTION C-F2 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
DELHI HC F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
DWL1 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL2 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL3 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL4 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HANUMAN ROAD F1 33.000 23.927 56.011 17.238 26.962 63.116 26.962 26.962 20.721 48.507 20.721 20.721 26.495 62.022 26.495 26.495
HCML F1 33.000 24.848 60.108 17.718 29.072 70.326 29.072 29.072 21.519 52.055 21.519 21.519 28.995 70.141 28.995 28.995
HCML IC L1 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L2 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L3 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L4TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HWL1 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL2 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL3 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL4 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL5 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL6 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL7 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL8 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL9 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL10 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL11 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL12 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL13 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL15 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWT1 IC CB TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWT3 IC2 CB TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
IGNCA F1 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
JANPATH LANE F1 33.000 18.587 33.458 14.387 18.059 32.507 18.059 18.059 16.097 28.975 16.097 16.097 21.317 38.372 21.317 21.317
MAHARNI SS BUS 220.000 9.379 22.551 8.500 9.854 23.695 9.854 9.854 8.122 19.529 8.122 8.122 9.700 23.325 9.700 9.700
MAIN BUS1 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
MAIN BUS2 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
MANDI HOUSE F1 33.000 19.607 38.565 14.892 19.710 38.767 19.710 19.710 16.980 33.398 16.980 16.980 20.642 40.601 20.642 20.642
OG AUX TR1 CB TB 11.000 32.577 84.201 28.280 0.000 0.000 0.000 0.000 28.212 72.920 28.212 28.212 28.212 72.920 28.212 28.212
OG AUX TR2 CB TB 11.000 32.577 84.201 28.280 0.000 0.000 0.000 0.000 28.212 72.920 28.212 28.212 28.212 72.920 28.212 28.212
PARK STREET SS BUS 220.000 7.575 18.504 6.885 7.330 17.904 7.330 7.330 6.560 16.025 6.560 6.560 7.546 18.432 7.546 7.546
RAJA BAZAR F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
SCHOOL LANE F1 33.000 17.174 29.801 13.553 15.940 27.660 15.940 15.940 14.873 25.808 14.873 14.873 19.289 33.472 19.289 19.289
SCINDIA HOUSE F1 33.000 24.022 57.346 17.281 27.131 64.769 27.131 27.131 20.803 49.663 20.803 20.803 26.643 63.603 26.643 26.643
TR1 HT BUS SELECT ISO TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958

TR2 HT BUS SELECT ISO TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958

TR1 11KV TB 11.000 33.437 89.699 28.926 0.000 0.000 0.000 0.000 28.958 77.681 28.958 28.958 28.958 77.681 28.958 28.958
TR1 33KV TB 33.000 25.569 65.742 18.088 30.202 77.655 30.202 30.202 22.143 56.934 22.143 22.143 29.081 74.771 29.081 29.081
TR2 11KV TB 11.000 33.437 89.699 28.926 0.000 0.000 0.000 0.000 28.958 77.681 28.958 28.958 28.958 77.681 28.958 28.958
TR2 33KV TB 33.000 25.569 65.742 18.088 30.202 77.655 30.202 30.202 22.143 56.934 22.143 22.143 29.081 74.771 29.081 29.081
VIDHYUT BHAVAN F1 33.000 16.402 27.975 13.081 14.859 25.344 14.859 14.859 14.204 24.227 14.204 14.204 18.223 31.082 18.223 18.223

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02002 0.21920 0.22012 0.02002 0.21920 0.22012 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01638 0.01722 0.00531 0.01638 0.01722 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01613 0.01693 0.00512 0.01613 0.01693 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02002 0.21920 0.22012 0.02002 0.21920 0.22012 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01638 0.01722 0.00531 0.01638 0.01722 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01613 0.01693 0.00512 0.01613 0.01693 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.84107 1.21337 1.47637 0.84107 1.21337 1.47637 2.43048 0.78823 2.55510 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 1.00211 1.29918 1.64076 1.00211 1.29918 1.64076 2.93907 0.86103 3.06259 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12627 0.86676 0.87591 0.12627 0.86676 0.87591 0.13813 0.56543 0.58206 0.00000 0.00000 0.00000

HCML F1 33.000 0.09863 0.83767 0.84345 0.09863 0.83767 0.84345 0.14182 0.46063 0.48197 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.47348 1.02333 1.12756 0.47348 1.02333 1.12756 1.28615 0.62443 1.42971 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80231 14.78820 14.89762 1.80231 14.78820 14.89762 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.33341 1.01558 1.06891 0.33341 1.01558 1.06891 0.50850 0.93443 1.06383 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01394 0.21399 0.21444 0.01394 0.21399 0.21444 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01394 0.21399 0.21444 0.01394 0.21399 0.21444 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.99553 18.33644 18.44471 1.99553 18.33644 18.44471 1.37407 20.26168 20.30822 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.57632 1.07569 1.22035 0.57632 1.07569 1.22035 1.60402 0.66993 1.73830 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.11147 0.86530 0.87245 0.11147 0.86530 0.87245 0.12658 0.56025 0.57438 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00787 0.20878 0.20893 0.00787 0.20878 0.20893 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05667 0.81770 0.81966 0.05667 0.81770 0.81966 0.01467 0.44242 0.44267 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00787 0.20878 0.20893 0.00787 0.20878 0.20893 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05667 0.81770 0.81966 0.05667 0.81770 0.81966 0.01467 0.44242 0.44267 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.63775 1.10727 1.27780 0.63775 1.10727 1.27780 1.79474 0.69723 1.92541 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
33KV MAIN BUS2 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
AUX TR1 HT TB 11.000 25.567 65.041 21.993 0.000 0.000 0.000 0.000 22.142 56.327 22.142 22.142 22.142 56.327 22.142 22.142
AUX TR1 LT BUS 0.415 14.570 28.756 11.746 13.124 25.903 13.124 13.124 12.618 24.904 12.618 12.618 14.524 28.665 14.524 14.524
AUX TR1 LT TB 0.415 14.820 29.427 12.012 13.859 27.519 13.859 13.859 12.835 25.485 12.835 12.835 14.462 28.715 14.462 14.462
AUX TR2 HT TB 11.000 25.959 65.908 21.993 0.000 0.000 0.000 0.000 22.481 57.078 22.481 22.481 22.481 57.078 22.481 22.481
AUX TR2 LT BUS 0.415 14.573 28.760 11.746 13.126 25.904 13.126 13.126 12.621 24.907 12.621 12.621 14.526 28.668 14.526 14.526
AUX TR2 LT TB 0.415 14.824 29.432 12.012 13.861 27.521 13.861 13.861 12.838 25.489 12.838 12.838 14.465 28.719 14.465 14.465
B. D. MARG F1 33.000 10.470 18.940 8.434 9.938 17.977 9.938 9.938 9.067 16.403 9.067 9.067 11.890 21.509 11.890 11.890
CHURCH ROAD F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
CONNAUGHT PLACE F1 33.000 9.770 17.149 7.966 8.908 15.636 8.908 8.908 8.461 14.851 8.461 8.461 10.903 19.137 10.903 10.903
CONSTITUTION C-F1 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
CONSTITUTION C-F2 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
DELHI HC F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
DWL1 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL2 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL3 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL4 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HANUMAN ROAD F1 33.000 14.066 34.865 10.646 15.975 39.598 15.975 15.975 12.181 30.194 12.181 12.181 15.524 38.479 15.524 15.524
HCML F1 33.000 14.359 36.346 10.823 16.677 42.214 16.677 16.677 12.435 31.477 12.435 12.435 16.317 41.302 16.317 16.317
HCML IC L1 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L2 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L3 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L4TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HWL1 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL2 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL3 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL4 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL5 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL6 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL7 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL8 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL9 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL10 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL11 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL12 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL13 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL15 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWT1 IC CB TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWT3 IC2 CB TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
IGNCA F1 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
JANPATH LANE F1 33.000 12.621 25.335 9.595 13.224 26.545 13.224 13.224 10.930 21.941 10.930 10.930 14.889 29.889 14.889 14.889
MAHARNI SS BUS 220.000 9.378 22.549 8.500 9.854 23.694 9.854 9.854 8.122 19.528 8.122 8.122 9.700 23.323 9.700 9.700
MAIN BUS1 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
MAIN BUS2 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
MANDI HOUSE F1 33.000 12.945 28.021 9.754 13.555 29.342 13.555 13.555 11.210 24.267 11.210 11.210 13.858 29.998 13.858 13.858
OG AUX TR1 CB TB 11.000 26.102 68.283 22.386 0.000 0.000 0.000 0.000 22.605 59.134 22.605 22.605 22.605 59.134 22.605 22.605
OG AUX TR2 CB TB 11.000 26.511 69.240 22.386 0.000 0.000 0.000 0.000 22.959 59.964 22.959 22.959 22.959 59.964 22.959 22.959
PARK STREET SS BUS 220.000 8.245 19.994 7.435 8.282 20.085 8.282 8.282 7.140 17.315 7.140 7.140 8.352 20.254 8.352 8.352
RAJA BAZAR F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
SCHOOL LANE F1 33.000 11.759 22.876 9.260 12.046 23.434 12.046 12.046 10.184 19.811 10.184 10.184 13.802 26.849 13.802 13.802
SCINDIA HOUSE F1 33.000 14.091 35.352 10.660 16.025 40.204 16.025 16.025 12.203 30.616 12.203 12.203 15.562 39.042 15.562 15.562
TR1 HT BUS SELECT ISO TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877

TR2 HT BUS SELECT ISO TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877

TR1 11KV TB 11.000 26.647 71.839 22.784 0.000 0.000 0.000 0.000 23.077 62.214 23.077 23.077 23.077 62.214 23.077 23.077
TR1 33KV TB 33.000 14.589 38.291 10.962 17.028 44.693 17.028 17.028 12.635 33.161 12.635 12.635 16.360 42.938 16.360 16.360
TR2 11KV TB 11.000 27.074 72.901 22.784 0.000 0.000 0.000 0.000 23.447 63.134 23.447 23.447 23.447 63.134 23.447 23.447
TR2 33KV TB 33.000 15.070 39.435 10.962 17.462 45.695 17.462 17.462 13.051 34.152 13.051 13.051 16.795 43.950 16.795 16.795
VIDHYUT BHAVAN F1 33.000 11.446 21.823 9.063 11.508 21.943 11.508 11.508 9.912 18.899 9.912 9.912 13.329 25.415 13.329 13.329

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02113 0.27242 0.27324 0.02113 0.27242 0.27324 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01618 0.01698 0.00512 0.01618 0.01698 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02122 0.26828 0.26912 0.02122 0.26828 0.26912 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01643 0.01726 0.00531 0.01643 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.83931 1.81727 2.00173 0.83931 1.81727 2.00173 2.43995 1.16815 2.70517 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.99572 1.90006 2.14515 0.99572 1.90006 2.14515 2.94854 1.24095 3.19904 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14544 1.48289 1.49000 0.14544 1.48289 1.49000 0.14760 0.94535 0.95680 0.00000 0.00000 0.00000

HCML F1 33.000 0.11859 1.45474 1.45957 0.11859 1.45474 1.45957 0.15129 0.84055 0.85406 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.48391 1.58850 1.66057 0.48391 1.58850 1.66057 1.29562 1.00435 1.63931 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80239 14.78920 14.89863 1.80239 14.78920 14.89863 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.34778 1.58125 1.61904 0.34778 1.58125 1.61904 0.51797 1.31435 1.41273 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01506 0.26722 0.26764 0.01506 0.26722 0.26764 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01515 0.26308 0.26351 0.01515 0.26308 0.26351 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.93282 16.83551 16.94610 1.93282 16.83551 16.94610 1.28466 16.67452 16.72393 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.58223 1.68443 1.78222 0.58223 1.68443 1.78222 1.61349 1.04985 1.92498 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.13108 1.48150 1.48729 0.13108 1.48150 1.48729 0.13605 0.94018 0.94997 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00899 0.26202 0.26217 0.00899 0.26202 0.26217 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07744 1.43445 1.43654 0.07744 1.43445 1.43654 0.02336 0.81909 0.81942 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00908 0.25787 0.25803 0.00908 0.25787 0.25803 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07809 1.38853 1.39072 0.07809 1.38853 1.39072 0.02336 0.81909 0.81942 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.64188 1.71490 1.83109 0.64188 1.71490 1.83109 1.80421 1.07715 2.10129 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
33KV MAIN BUS2 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
AUX TR1 HT TB 11.000 26.365 67.362 23.105 0.000 0.000 0.000 0.000 22.832 58.338 22.832 22.832 22.832 58.338 22.832 22.832
AUX TR1 LT BUS 0.415 14.577 28.768 11.758 13.128 25.909 13.128 13.128 12.624 24.914 12.624 12.624 14.529 28.675 14.529 14.529
AUX TR1 LT TB 0.415 14.827 29.440 12.024 13.863 27.526 13.863 13.863 12.841 25.495 12.841 12.841 14.468 28.726 14.468 14.468
AUX TR2 HT TB 11.000 26.745 68.198 23.105 0.000 0.000 0.000 0.000 23.162 59.061 23.162 23.162 23.162 59.061 23.162 23.162
AUX TR2 LT BUS 0.415 14.579 28.772 11.758 13.129 25.910 13.129 13.129 12.626 24.917 12.626 12.626 14.532 28.677 14.532 14.532
AUX TR2 LT TB 0.415 14.830 29.444 12.024 13.865 27.527 13.865 13.865 12.843 25.499 12.843 12.843 14.470 28.729 14.470 14.470
B. D. MARG F1 33.000 10.828 19.457 8.916 10.129 18.201 10.129 10.129 9.377 16.850 9.377 9.377 12.201 21.924 12.201 12.201
CHURCH ROAD F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
CONNAUGHT PLACE F1 33.000 10.073 17.564 8.388 9.053 15.785 9.053 9.053 8.724 15.211 8.724 8.724 11.159 19.457 11.159 11.159
CONSTITUTION C-F1 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
CONSTITUTION C-F2 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
DELHI HC F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
DWL1 IC CB TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
DWL2 IC CB TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
DWL3 IC CB TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
DWL4 IC CB TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HANUMAN ROAD F1 33.000 14.762 36.788 11.447 16.582 41.322 16.582 16.582 12.785 31.859 12.785 12.785 16.162 40.274 16.162 16.162
HCML F1 33.000 15.086 38.445 11.650 17.339 44.189 17.339 17.339 13.065 33.294 13.065 13.065 17.006 43.338 17.006 17.006
HCML IC L1 TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
HCML IC L2 TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HCML IC L3 TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
HCML IC L4TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HWL1 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL2 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL3 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL4 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL5 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL6 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL7 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL8 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL9 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL10 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL11 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL12 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL13 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL15 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWT1 IC CB TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWT3 IC2 CB TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
IGNCA F1 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
JANPATH LANE F1 33.000 13.142 26.262 10.240 13.591 27.160 13.591 13.591 11.381 22.743 11.381 11.381 15.379 30.732 15.379 15.379
MAHARNI SS BUS 220.000 16.878 40.512 16.000 17.376 41.707 17.376 17.376 14.617 35.084 14.617 14.617 17.206 41.300 17.206 17.206
MAIN BUS1 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
MAIN BUS2 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
MANDI HOUSE F1 33.000 13.498 29.172 10.424 13.963 30.177 13.963 13.963 11.690 25.263 11.690 11.690 14.343 30.997 14.343 14.343
OG AUX TR1 CB TB 11.000 26.932 70.841 23.537 0.000 0.000 0.000 0.000 23.323 61.350 23.323 23.323 23.323 61.350 23.323 23.323
OG AUX TR2 CB TB 11.000 27.329 71.768 23.537 0.000 0.000 0.000 0.000 23.668 62.153 23.668 23.668 23.668 62.153 23.668 23.668
PARK STREET SS BUS 220.000 11.623 28.626 11.037 10.471 25.789 10.471 10.471 10.065 24.791 10.065 10.065 11.254 27.719 11.254 11.254
RAJA BAZAR F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
SCHOOL LANE F1 33.000 12.230 23.657 9.856 12.357 23.901 12.357 12.357 10.592 20.488 10.592 10.592 14.236 27.536 14.236 14.236
SCINDIA HOUSE F1 33.000 14.790 37.332 11.462 16.635 41.989 16.635 16.635 12.809 32.330 12.809 12.809 16.204 40.900 16.204 16.204
TR1 HT BUS SELECT ISO TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153

TR2 HT BUS SELECT ISO TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171

TR1 11KV TB 11.000 27.509 74.670 23.975 0.000 0.000 0.000 0.000 23.824 64.666 23.824 23.824 23.824 64.666 23.824 23.824
TR1 33KV TB 33.000 15.339 40.631 11.809 17.716 46.929 17.716 17.716 13.284 35.188 13.284 13.284 17.011 45.061 17.011 17.011
TR2 11KV TB 11.000 27.925 75.701 23.975 0.000 0.000 0.000 0.000 24.184 65.559 24.184 24.184 24.184 65.559 24.184 24.184
TR2 33KV TB 33.000 15.828 41.801 11.809 18.148 47.929 18.148 18.148 13.707 36.201 13.707 13.707 17.451 46.087 17.451 17.451
VIDHYUT BHAVAN F1 33.000 11.888 22.528 9.631 11.785 22.334 11.785 11.785 10.295 19.510 10.295 10.295 13.730 26.020 13.730 13.730

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01962 0.26425 0.26497 0.01962 0.26425 0.26497 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01642 0.01726 0.00531 0.01642 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01974 0.26046 0.26121 0.01974 0.26046 0.26121 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01642 0.01726 0.00531 0.01642 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82921 1.74887 1.93549 0.82921 1.74887 1.93549 2.43879 1.16513 2.70281 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.98620 1.83191 2.08050 0.98620 1.83191 2.08050 2.94738 1.23793 3.19679 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.13277 1.41345 1.41967 0.13277 1.41345 1.41967 0.14644 0.94233 0.95364 0.00000 0.00000 0.00000

HCML F1 33.000 0.10581 1.38521 1.38924 0.10581 1.38521 1.38924 0.15013 0.83753 0.85088 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.47279 1.52306 1.59475 0.47279 1.52306 1.59475 1.29446 1.00133 1.63654 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.01272 8.21602 8.27820 1.01272 8.21602 8.27820 0.82493 7.52194 7.56704 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.33619 1.51581 1.55265 0.33619 1.51581 1.55265 0.51681 1.31133 1.40950 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01355 0.25904 0.25940 0.01355 0.25904 0.25940 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01367 0.25526 0.25562 0.01367 0.25526 0.25562 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.22095 11.95921 12.02137 1.22095 11.95921 12.02137 1.01525 15.96392 15.99617 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.57119 1.61560 1.71360 0.57119 1.61560 1.71360 1.61233 1.04683 1.92235 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.11836 1.41206 1.41701 0.11836 1.41206 1.41701 0.13489 0.93715 0.94681 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00748 0.25384 0.25395 0.00748 0.25384 0.25395 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.06450 1.36483 1.36635 0.06450 1.36483 1.36635 0.02220 0.81607 0.81637 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00760 0.25005 0.25017 0.00760 0.25005 0.25017 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.06551 1.32248 1.32411 0.06551 1.32248 1.32411 0.02220 0.81607 0.81637 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.63105 1.64617 1.76298 0.63105 1.64617 1.76298 1.80305 1.07413 2.09875 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
33KV MAIN BUS2 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
AUX TR1 HT TB 11.000 27.178 69.685 24.137 0.000 0.000 0.000 0.000 23.537 60.349 23.537 23.537 23.537 60.349 23.537 23.537
AUX TR1 LT BUS 0.415 14.583 28.779 11.767 13.131 25.914 13.131 13.131 12.629 24.923 12.629 12.629 14.535 28.683 14.535 14.535
AUX TR1 LT TB 0.415 14.834 29.451 12.034 13.867 27.532 13.867 13.867 12.846 25.505 12.846 12.846 14.473 28.735 14.473 14.473
AUX TR2 HT TB 11.000 27.540 70.473 24.137 0.000 0.000 0.000 0.000 23.850 61.031 23.850 23.850 23.850 61.031 23.850 23.850
AUX TR2 LT BUS 0.415 14.585 28.782 11.767 13.133 25.915 13.133 13.133 12.631 24.926 12.631 12.631 14.537 28.686 14.537 14.537
AUX TR2 LT TB 0.415 14.836 29.455 12.034 13.868 27.533 13.868 13.868 12.849 25.508 12.849 12.849 14.476 28.739 14.476 14.476
B. D. MARG F1 33.000 11.191 19.964 9.364 10.332 18.431 10.332 10.332 9.692 17.289 9.692 9.692 12.528 22.349 12.528 12.528
CHURCH ROAD F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
CONNAUGHT PLACE F1 33.000 10.378 17.968 8.777 9.205 15.937 9.205 9.205 8.988 15.561 8.988 8.988 11.425 19.781 11.425 11.425
CONSTITUTION C-F1 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
CONSTITUTION C-F2 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
DELHI HC F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
DWL1 IC CB TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
DWL2 IC CB TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
DWL3 IC CB TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
DWL4 IC CB TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HANUMAN ROAD F1 33.000 15.498 38.785 12.224 17.267 43.212 17.267 17.267 13.422 33.589 13.422 13.422 16.878 42.238 16.878 16.878
HCML F1 33.000 15.855 40.636 12.455 18.091 46.366 18.091 18.091 13.731 35.192 13.731 13.731 17.788 45.590 17.788 17.788
HCML IC L1 TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
HCML IC L2 TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HCML IC L3 TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
HCML IC L4TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HWL1 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL2 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL3 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL4 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL5 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL6 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL7 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL8 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL9 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL10 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL11 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL12 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL13 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL15 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWT1 IC CB TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWT3 IC2 CB TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
IGNCA F1 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
JANPATH LANE F1 33.000 13.677 27.182 10.854 13.992 27.808 13.992 13.992 11.844 23.541 11.844 11.844 15.911 31.624 15.911 15.911
MAHARNI SS BUS 220.000 40.243 96.471 39.365 40.758 97.706 40.758 40.758 34.851 83.546 34.851 34.851 40.576 97.269 40.576 40.576
MAIN BUS1 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
MAIN BUS2 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
MANDI HOUSE F1 33.000 14.070 30.326 11.065 14.414 31.069 14.414 14.414 12.185 26.263 12.185 12.185 14.871 32.054 14.871 14.871
OG AUX TR1 CB TB 11.000 27.779 73.411 24.607 0.000 0.000 0.000 0.000 24.057 63.576 24.057 24.057 24.057 63.576 24.057 24.057
OG AUX TR2 CB TB 11.000 28.158 74.287 24.607 0.000 0.000 0.000 0.000 24.385 64.334 24.385 24.385 24.385 64.334 24.385 24.385
PARK STREET SS BUS 220.000 19.123 47.918 18.684 15.545 38.955 15.545 15.545 16.561 41.498 16.561 16.561 17.973 45.039 17.973 17.973
RAJA BAZAR F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
SCHOOL LANE F1 33.000 12.715 24.434 10.420 12.692 24.390 12.692 12.692 11.011 21.160 11.011 11.011 14.703 28.255 14.703 14.703
SCINDIA HOUSE F1 33.000 15.528 39.391 12.241 17.324 43.947 17.324 17.324 13.448 34.114 13.448 13.448 16.925 42.934 16.925 16.925
TR1 HT BUS SELECT ISO TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284

TR2 HT BUS SELECT ISO TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312

TR1 11KV TB 11.000 28.391 77.525 25.084 0.000 0.000 0.000 0.000 24.588 67.138 24.588 24.588 24.588 67.138 24.588 24.588
TR1 33KV TB 33.000 16.133 43.090 12.636 18.498 49.407 18.498 18.498 13.972 37.317 13.972 13.972 17.756 47.424 17.756 17.756
TR2 11KV TB 11.000 28.789 78.503 25.084 0.000 0.000 0.000 0.000 24.932 67.986 24.932 24.932 24.932 67.986 24.932 24.932
TR2 33KV TB 33.000 16.625 44.267 12.636 18.926 50.395 18.926 18.926 14.398 38.337 14.398 14.398 18.196 48.450 18.196 18.196
VIDHYUT BHAVAN F1 33.000 12.341 23.227 10.166 12.083 22.741 12.083 12.083 10.688 20.115 10.688 10.688 14.160 26.650 14.160 14.160

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01835 0.25639 0.25705 0.01835 0.25639 0.25705 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01850 0.25299 0.25367 0.01850 0.25299 0.25367 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82100 1.68319 1.87275 0.82100 1.68319 1.87275 2.43716 1.14968 2.69472 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.97854 1.76650 2.01942 0.97854 1.76650 2.01942 2.94575 1.22248 3.18934 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12211 1.34674 1.35226 0.12211 1.34674 1.35226 0.14481 0.92688 0.93813 0.00000 0.00000 0.00000

HCML F1 33.000 0.09506 1.31841 1.32183 0.09506 1.31841 1.32183 0.14850 0.82208 0.83539 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.46356 1.46058 1.53238 0.46356 1.46058 1.53238 1.29283 0.98588 1.62585 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44540 3.47190 0.42816 3.44540 3.47190 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.32652 1.45334 1.48957 0.32652 1.45334 1.48957 0.51519 1.29588 1.39453 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01228 0.25119 0.25149 0.01228 0.25119 0.25149 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01243 0.24779 0.24810 0.01243 0.24779 0.24810 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.64293 7.27816 7.30650 0.64293 7.27816 7.30650 0.65035 12.33731 12.35444 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.56208 1.54951 1.64831 0.56208 1.54951 1.64831 1.61070 1.03138 1.91262 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.10765 1.34535 1.34965 0.10765 1.34535 1.34965 0.13327 0.92171 0.93129 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00621 0.24598 0.24606 0.00621 0.24598 0.24606 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05359 1.29794 1.29904 0.05359 1.29794 1.29904 0.02057 0.80062 0.80088 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00636 0.24258 0.24266 0.00636 0.24258 0.24266 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05491 1.25941 1.26060 0.05491 1.25941 1.26060 0.02057 0.80062 0.80088 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.62215 1.58017 1.69824 0.62215 1.58017 1.69824 1.80142 1.05868 2.08948 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
33KV MAIN BUS2 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
AUX TR1 HT TB 11.000 34.632 87.255 31.683 0.000 0.000 0.000 0.000 29.992 75.565 29.992 29.992 29.992 75.565 29.992 29.992
AUX TR1 LT BUS 0.415 14.625 28.841 11.819 13.154 25.939 13.154 13.154 12.665 24.977 12.665 12.665 14.568 28.728 14.568 14.568
AUX TR1 LT TB 0.415 14.878 29.517 12.088 13.893 27.563 13.893 13.893 12.884 25.562 12.884 12.884 14.513 28.793 14.513 14.513
AUX TR2 HT TB 11.000 34.632 87.255 31.683 0.000 0.000 0.000 0.000 29.992 75.565 29.992 29.992 29.992 75.565 29.992 29.992
AUX TR2 LT BUS 0.415 14.625 28.841 11.819 13.154 25.939 13.154 13.154 12.665 24.977 12.665 12.665 14.568 28.728 14.568 14.568
AUX TR2 LT TB 0.415 14.878 29.517 12.088 13.893 27.563 13.893 13.893 12.884 25.562 12.884 12.884 14.513 28.793 14.513 14.513
B. D. MARG F1 33.000 15.608 24.990 13.667 12.612 20.193 12.612 12.612 13.517 21.642 13.517 13.517 16.492 26.406 16.492 16.492
CHURCH ROAD F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
CONNAUGHT PLACE F1 33.000 13.858 21.822 12.296 10.814 17.028 10.814 10.814 12.002 18.898 12.002 12.002 14.442 22.741 14.442 14.442
CONSTITUTION C-F1 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
CONSTITUTION C-F2 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
DELHI HC F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
DWL1 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL2 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL3 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL4 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HANUMAN ROAD F1 33.000 29.110 68.439 22.636 31.666 74.448 31.666 31.666 25.210 59.270 25.210 25.210 31.507 74.074 31.507 31.507
HCML F1 33.000 30.488 74.695 23.466 34.626 84.833 34.626 34.626 26.403 64.687 26.403 26.403 34.907 85.521 34.907 34.907
HCML IC L1 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L2 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L3 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L4TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HWL1 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL2 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL3 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL4 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL5 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL6 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL7 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL8 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL9 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL10 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL11 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL12 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL13 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL15 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWT1 IC CB TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWT3 IC2 CB TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
IGNCA F1 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
JANPATH LANE F1 33.000 21.374 37.359 17.824 19.676 34.391 19.676 19.676 18.511 32.354 18.511 18.511 23.845 41.677 23.845 23.845
MAHARNI SS BUS 220.000 40.243 96.473 39.365 40.758 97.707 40.758 40.758 34.852 83.548 34.852 34.852 40.576 97.270 40.576 40.576
MAIN BUS1 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
MAIN BUS2 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
MANDI HOUSE F1 33.000 22.861 43.932 18.707 22.010 42.298 22.010 22.010 19.798 38.046 19.798 19.798 23.494 45.148 23.494 23.494
OG AUX TR1 CB TB 11.000 35.627 93.210 32.509 0.000 0.000 0.000 0.000 30.854 80.722 30.854 30.854 30.854 80.722 30.854 30.854
OG AUX TR2 CB TB 11.000 35.627 93.210 32.509 0.000 0.000 0.000 0.000 30.854 80.722 30.854 30.854 30.854 80.722 30.854 30.854
PARK STREET SS BUS 220.000 19.281 48.316 18.862 15.703 39.349 15.703 15.703 16.698 41.843 16.698 16.698 18.129 45.429 18.129 18.129
RAJA BAZAR F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
SCHOOL LANE F1 33.000 19.456 32.815 16.501 17.106 28.852 17.106 17.106 16.850 28.419 16.850 16.850 21.285 35.899 21.285 21.285
SCINDIA HOUSE F1 33.000 29.248 70.451 22.709 31.901 76.841 31.901 31.901 25.330 61.013 25.330 25.330 31.731 76.431 31.731 31.731
TR1 HT BUS SELECT ISO TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484

TR2 HT BUS SELECT ISO TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484

TR1 11KV TB 11.000 36.647 99.967 33.354 0.000 0.000 0.000 0.000 31.737 86.574 31.737 31.737 31.737 86.574 31.737 31.737
TR1 33KV TB 33.000 31.562 83.617 24.098 36.214 95.941 36.214 36.214 27.334 72.415 27.334 27.334 34.791 92.171 34.791 34.791
TR2 11KV TB 11.000 36.647 99.967 33.354 0.000 0.000 0.000 0.000 31.737 86.574 31.737 31.737 31.737 86.574 31.737 31.737
TR2 33KV TB 33.000 31.562 83.617 24.098 36.214 95.941 36.214 36.214 27.334 72.415 27.334 27.334 34.791 92.171 34.791 34.791
VIDHYUT BHAVAN F1 33.000 18.434 30.593 15.772 15.831 26.274 15.831 15.831 15.964 26.494 15.964 15.964 19.969 33.140 19.969 19.969

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01706 0.20099 0.20172 0.01706 0.20099 0.20172 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01636 0.01720 0.00531 0.01636 0.01720 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01612 0.01691 0.00512 0.01612 0.01691 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01706 0.20099 0.20172 0.01706 0.20099 0.20172 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01636 0.01720 0.00531 0.01636 0.01720 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01612 0.01691 0.00512 0.01612 0.01691 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82196 1.06176 1.34274 0.82196 1.06176 1.34274 2.42722 0.75383 2.54158 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.98427 1.14817 1.51231 0.98427 1.14817 1.51231 2.93581 0.82663 3.04997 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.10152 0.71276 0.71995 0.10152 0.71276 0.71995 0.13487 0.53103 0.54789 0.00000 0.00000 0.00000

HCML F1 33.000 0.07365 0.68346 0.68741 0.07365 0.68346 0.68741 0.13856 0.42623 0.44819 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.45148 0.87039 0.98052 0.45148 0.87039 0.98052 1.28289 0.59003 1.41207 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44534 3.47185 0.42816 3.44534 3.47185 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.31033 0.86263 0.91675 0.31033 0.86263 0.91675 0.50524 0.90003 1.03215 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01098 0.19578 0.19609 0.01098 0.19578 0.19609 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01098 0.19578 0.19609 0.01098 0.19578 0.19609 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.63765 7.21817 7.24628 0.63765 7.21817 7.24628 0.64590 12.18694 12.20405 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.55512 0.92312 1.07718 0.55512 0.92312 1.07718 1.60076 0.63553 1.72230 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.08659 0.71130 0.71655 0.08659 0.71130 0.71655 0.12332 0.52586 0.54013 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00491 0.19056 0.19063 0.00491 0.19056 0.19063 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.03132 0.66328 0.66402 0.03132 0.66328 0.66402 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00491 0.19056 0.19063 0.00491 0.19056 0.19063 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.03132 0.66328 0.66402 0.03132 0.66328 0.66402 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.61704 0.95491 1.13692 0.61704 0.95491 1.13692 1.79148 0.66283 1.91017 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
33KV MAIN BUS2 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
AUX TR1 HT TB 11.000 27.459 70.416 24.470 0.000 0.000 0.000 0.000 23.781 60.982 23.781 23.781 23.781 60.982 23.781 23.781
AUX TR1 LT BUS 0.415 14.585 28.782 11.770 13.132 25.915 13.132 13.132 12.631 24.926 12.631 12.631 14.536 28.686 14.536 14.536
AUX TR1 LT TB 0.415 14.836 29.454 12.038 13.868 27.534 13.868 13.868 12.848 25.508 12.848 12.848 14.475 28.738 14.475 14.475
AUX TR2 HT TB 11.000 27.814 71.184 24.470 0.000 0.000 0.000 0.000 24.087 61.647 24.087 24.087 24.087 61.647 24.087 24.087
AUX TR2 LT BUS 0.415 14.587 28.785 11.770 13.134 25.917 13.134 13.134 12.633 24.929 12.633 12.633 14.538 28.688 14.538 14.538
AUX TR2 LT TB 0.415 14.838 29.458 12.038 13.870 27.535 13.870 13.870 12.850 25.511 12.850 12.850 14.477 28.742 14.477 14.477
B. D. MARG F1 33.000 11.312 20.119 9.505 10.410 18.514 10.410 10.410 9.797 17.424 9.797 9.797 12.648 22.494 12.648 12.648
CHURCH ROAD F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
CONNAUGHT PLACE F1 33.000 10.479 18.091 8.898 9.263 15.992 9.263 9.263 9.075 15.667 9.075 9.075 11.521 19.890 11.521 11.521
CONSTITUTION C-F1 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
CONSTITUTION C-F2 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
DELHI HC F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
DWL1 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL2 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL3 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL4 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HANUMAN ROAD F1 33.000 15.759 39.428 12.482 17.560 43.933 17.560 17.560 13.648 34.146 13.648 13.648 17.172 42.964 17.172 17.172
HCML F1 33.000 16.129 41.345 12.723 18.413 47.200 18.413 18.413 13.968 35.806 13.968 13.968 18.116 46.440 18.116 18.116
HCML IC L1 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L2 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L3 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L4TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HWL1 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL2 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL3 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL4 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL5 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL6 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL7 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL8 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL9 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL10 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL11 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL12 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL13 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL15 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWT1 IC CB TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWT3 IC2 CB TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
IGNCA F1 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
JANPATH LANE F1 33.000 13.860 27.467 11.052 14.154 28.050 14.154 14.154 12.003 23.787 12.003 12.003 16.121 31.948 16.121 16.121
MAHARNI SS BUS 220.000 40.243 96.471 39.365 40.758 97.706 40.758 40.758 34.851 83.546 34.851 34.851 40.576 97.269 40.576 40.576
MAIN BUS1 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
MAIN BUS2 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
MANDI HOUSE F1 33.000 14.267 30.687 11.274 14.603 31.408 14.603 14.603 12.356 26.575 12.356 12.356 15.080 32.434 15.080 15.080
OG AUX TR1 CB TB 11.000 28.073 74.223 24.953 0.000 0.000 0.000 0.000 24.312 64.279 24.312 24.312 24.312 64.279 24.312 24.312
OG AUX TR2 CB TB 11.000 28.444 75.078 24.953 0.000 0.000 0.000 0.000 24.633 65.019 24.633 24.633 24.633 65.019 24.633 24.633
PARK STREET SS BUS 220.000 24.320 60.011 23.656 20.849 51.445 20.849 20.849 21.062 51.971 21.062 21.062 23.174 57.184 23.174 23.174
RAJA BAZAR F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
SCHOOL LANE F1 33.000 12.880 24.674 10.600 12.826 24.570 12.826 12.826 11.155 21.368 11.155 11.155 14.883 28.511 14.883 14.883
SCINDIA HOUSE F1 33.000 15.790 40.056 12.500 17.619 44.694 17.619 17.619 13.675 34.689 13.675 13.675 17.221 43.685 17.221 17.221
TR1 HT BUS SELECT ISO TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250

TR2 HT BUS SELECT ISO TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250

TR1 11KV TB 11.000 28.699 78.429 25.444 0.000 0.000 0.000 0.000 24.854 67.922 24.854 24.854 24.854 67.922 24.854 24.854
TR1 33KV TB 33.000 16.417 43.891 12.911 18.835 50.357 18.835 18.835 14.217 38.011 14.217 14.217 18.075 48.324 18.075 18.075
TR2 11KV TB 11.000 29.088 79.386 25.444 0.000 0.000 0.000 0.000 25.191 68.750 25.191 25.191 25.191 68.750 25.191 25.191
TR2 33KV TB 33.000 16.908 45.066 12.911 19.263 51.343 19.263 19.263 14.643 39.028 14.643 14.643 18.515 49.347 18.515 18.515
VIDHYUT BHAVAN F1 33.000 12.495 23.442 10.336 12.201 22.890 12.201 12.201 10.821 20.301 10.821 10.821 14.323 26.872 14.323 14.323

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01814 0.25376 0.25441 0.01814 0.25376 0.25441 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01829 0.25050 0.25117 0.01829 0.25050 0.25117 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01616 0.01695 0.00512 0.01616 0.01695 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82002 1.66127 1.85264 0.82002 1.66127 1.85264 2.43669 1.13376 2.68754 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.97772 1.74469 1.99997 0.97772 1.74469 1.99997 2.94528 1.20656 3.18284 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12035 1.32441 1.32987 0.12035 1.32441 1.32987 0.14434 0.91096 0.92232 0.00000 0.00000 0.00000

HCML F1 33.000 0.09326 1.29605 1.29940 0.09326 1.29605 1.29940 0.14803 0.80616 0.81963 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.46217 1.43979 1.51214 0.46217 1.43979 1.51214 1.29236 0.96996 1.61586 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44540 3.47190 0.42816 3.44540 3.47190 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.32498 1.43253 1.46893 0.32498 1.43253 1.46893 0.51471 1.27996 1.37957 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01207 0.24856 0.24885 0.01207 0.24856 0.24885 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01222 0.24530 0.24560 0.01222 0.24530 0.24560 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.57486 5.71615 5.74498 0.57486 5.71615 5.74498 0.55649 8.59978 8.61777 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.56080 1.52743 1.62713 0.56080 1.52743 1.62713 1.61023 1.01546 1.90368 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.10587 1.32302 1.32725 0.10587 1.32302 1.32725 0.13280 0.90578 0.91546 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00600 0.24335 0.24342 0.00600 0.24335 0.24342 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05174 1.27555 1.27660 0.05174 1.27555 1.27660 0.02010 0.78469 0.78495 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00615 0.24009 0.24017 0.00615 0.24009 0.24017 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05308 1.23838 1.23951 0.05308 1.23838 1.23951 0.02010 0.78469 0.78495 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.62094 1.55813 1.67730 0.62094 1.55813 1.67730 1.80095 1.04276 2.08105 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 27 57

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 0 1

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\1x315 NO LOAD.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 2 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 2 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 2 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 2 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 2 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 2 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 2 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 2 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 2 100.00 0.00

DELHI HC F1 Load 33.000 33.000 2 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 2 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 2 100.00 0.00

HCML F1 Load 33.000 33.000 2 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L4TB Load 220.000 220.000 2 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 2 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 2 100.00 0.00

IGNCA F1 Load 33.000 33.000 2 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 2 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 2 100.00 0.00

MAIN BUS1 Load 220.000 220.000 2 100.00 0.00

MAIN BUS2 Load 220.000 220.000 2 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 2 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 2 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 2 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 2 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 2 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 2 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 2 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR1 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 2 100.00 0.00

TR2 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 2 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 2 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2

DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB
DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB

HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB
HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB

HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB
HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB

HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB
HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB

HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB
HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB

HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB
HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1

HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 1x315 MVA TR MAHARNI SS BUS 3238.935 220.000 0.38295 3.06359 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 3238.935 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 21.724 0.00 173.21 173.21 0.000 0.000 1.68E+000 2.65E+001

OG AUX TR1 CB TB AUX TR1 HT TB 2.50 21.724 0.00 173.21 173.21 0.000 0.000 1.68E+000 2.65E+001

AUX TR1 LT TB AUX TR1 HT TB 0.00 0.000 99.37 99.37 99.37 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.724 0.000 18.813 18.813
Peak Current (kA), Method C : 56.242 0.000 48.707 48.707
Breaking Current (kA, rms, symm) : 0.000 18.813 18.813
Steady State Current (kA, rms) : 21.724 0.000 18.813 18.813

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 11.743 0.00 96.30 106.26 11.478 11.478 3.62E+002 1.21E+003 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.33 11.743 8.16 99.50 99.84 11.478 11.478 3.62E+002 1.21E+003 6.06E+002 1.22E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.743 11.478 10.170 12.162
Peak Current (kA), Method C : 23.552 23.020 20.397 24.393
Breaking Current (kA, rms, symm) : 11.478 10.170 12.162
Steady State Current (kA, rms) : 11.743 11.478 10.170 12.162

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 12.009 0.00 99.51 99.79 12.094 12.094 3.45E+002 1.18E+003 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.00 0.000 0.00 99.51 99.79 0.000 0.000

AUX TR1 HT TB AUX TR1 LT TB 98.52 12.009 99.43 100.64 99.71 12.094 12.094 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.009 12.094 10.400 12.068
Peak Current (kA), Method C : 24.252 24.423 21.003 24.372
Breaking Current (kA, rms, symm) : 12.094 10.400 12.068
Steady State Current (kA, rms) : 12.009 12.094 10.400 12.068

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 21.724 0.00 173.21 173.21 0.000 0.000 1.68E+000 2.65E+001

OG AUX TR2 CB TB AUX TR2 HT TB 2.50 21.724 0.00 173.21 173.21 0.000 0.000 1.68E+000 2.65E+001

AUX TR2 LT TB AUX TR2 HT TB 0.00 0.000 99.37 99.37 99.37 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.724 0.000 18.813 18.813
Peak Current (kA), Method C : 56.242 0.000 48.707 48.707
Breaking Current (kA, rms, symm) : 0.000 18.813 18.813
Steady State Current (kA, rms) : 21.724 0.000 18.813 18.813

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 11.743 0.00 96.30 106.26 11.478 11.478 3.62E+002 1.21E+003 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.33 11.743 8.16 99.50 99.84 11.478 11.478 3.62E+002 1.21E+003 6.06E+002 1.22E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.743 11.478 10.170 12.162
Peak Current (kA), Method C : 23.552 23.020 20.397 24.393
Breaking Current (kA, rms, symm) : 11.478 10.170 12.162
Steady State Current (kA, rms) : 11.743 11.478 10.170 12.162

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 12.009 0.00 99.51 99.79 12.094 12.094 3.45E+002 1.18E+003 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.00 0.000 0.00 99.51 99.79 0.000 0.000

AUX TR2 HT TB AUX TR2 LT TB 98.52 12.009 99.43 100.64 99.71 12.094 12.094 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.009 12.094 10.400 12.068
Peak Current (kA), Method C : 24.252 24.423 21.003 24.372
Breaking Current (kA, rms, symm) : 12.094 10.400 12.068
Steady State Current (kA, rms) : 12.009 12.094 10.400 12.068

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 8.322 0.00 77.74 123.45 8.661 8.661 8.31E+000 2.16E+001 2.24E+001 1.09E+001

HWL7 SELECT ISO B. D. MARG F1 36.73 8.322 58.42 86.60 102.05 8.661 8.661 8.31E+000 2.16E+001 2.24E+001 1.09E+001
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.322 8.661 7.207 9.988
Peak Current (kA), Method C : 15.638 16.275 13.543 18.770
Breaking Current (kA, rms, symm) : 8.661 7.207 9.988
Steady State Current (kA, rms) : 8.322 8.661 7.207 9.988

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 8.500 0.00 77.06 122.22 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001

HWL13 SELECT ISO CHURCH ROAD F1 34.56 8.500 55.80 86.37 101.70 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.500 8.982 7.361 10.289
Peak Current (kA), Method C : 16.238 17.159 14.063 19.656
Breaking Current (kA, rms, symm) : 8.982 7.361 10.289
Steady State Current (kA, rms) : 8.500 8.982 7.361 10.289

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 7.867 0.00 79.87 126.04 7.881 7.881 9.92E+000 2.24E+001 2.71E+001 1.15E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 42.04 7.867 64.34 87.32 102.71 7.881 7.881 9.92E+000 2.24E+001 2.71E+001 1.15E+001
TB F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 7.867 7.881 6.813 9.247
Peak Current (kA), Method C : 14.230 14.254 12.324 16.726
Breaking Current (kA, rms, symm) : 7.881 6.813 9.247
Steady State Current (kA, rms) : 7.867 7.881 6.813 9.247

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 9.774 0.00 77.74 108.67 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000

HWL10 SELECT ISO CONSTITUTION C-F1 17.03 9.774 30.52 86.46 97.27 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.774 11.464 8.465 12.418
Peak Current (kA), Method C : 21.751 25.510 18.837 27.633
Breaking Current (kA, rms, symm) : 11.464 8.465 12.418
Steady State Current (kA, rms) : 9.774 11.464 8.465 12.418

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 9.774 0.00 77.74 108.67 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000

HWL11 SELECT ISO CONSTITUTION C-F2 17.03 9.774 30.52 86.46 97.27 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.774 11.464 8.465 12.418
Peak Current (kA), Method C : 21.751 25.510 18.837 27.633
Breaking Current (kA, rms, symm) : 11.464 8.465 12.418
Steady State Current (kA, rms) : 9.774 11.464 8.465 12.418

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 8.500 0.00 77.06 122.22 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001

HWL14 SELECT ISO DELHI HC F1 34.56 8.500 55.80 86.37 101.70 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.500 8.982 7.361 10.289
Peak Current (kA), Method C : 16.238 17.159 14.063 19.656
Breaking Current (kA, rms, symm) : 8.982 7.361 10.289
Steady State Current (kA, rms) : 8.500 8.982 7.361 10.289

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 10.458 0.00 89.62 93.20 12.630 12.630 1.34E+000 1.84E+001 1.36E+000 8.83E+000

HWL6 SELECT ISO HANUMAN ROAD F1 4.45 10.458 7.06 89.98 91.89 12.630 12.630 1.34E+000 1.84E+001 1.36E+000 8.83E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.458 12.630 9.057 12.296
Peak Current (kA), Method C : 26.739 32.293 23.157 31.439
Breaking Current (kA, rms, symm) : 12.630 9.057 12.296
Steady State Current (kA, rms) : 10.458 12.630 9.057 12.296

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 10.628 0.00 88.26 93.18 13.075 13.075 1.07E+000 1.81E+001 1.39E+000 7.86E+000

HWL4 SELECT ISO HCML F1 2.47 10.628 4.64 89.88 91.50 13.075 13.075 1.07E+000 1.81E+001 1.39E+000 7.86E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.628 13.075 9.204 12.853
Peak Current (kA), Method C : 27.666 34.034 23.959 33.458
Breaking Current (kA, rms, symm) : 13.075 9.204 12.853
Steady State Current (kA, rms) : 10.628 13.075 9.204 12.853

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

TR1 33KV TB HWT1 IC CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
HCML F1 HWL4 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
SCHOOL LANE F1 HWL3 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONNAUGHT HWL2 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 10.755 0.00 90.75 90.42 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 10.755 0.13 90.74 90.40 13.276 13.276 6.68E-001 1.79E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
DELHI HC F1 HWL14 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CHURCH ROAD F1 HWL13 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
JANPATH LANE F1 HWL12 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
RAJA BAZAR F1 HWL9 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.00 0.000 0.00 90.75 90.42 0.000 0.000
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.755 13.276 9.314 12.748
Peak Current (kA), Method C : 28.842 35.602 24.978 34.187
Breaking Current (kA, rms, symm) : 13.276 9.314 12.748
Steady State Current (kA, rms) : 10.755 13.276 9.314 12.748

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 9.774 0.00 77.74 108.67 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000

HWL15 SELECT ISO IGNCA F1 17.03 9.774 30.52 86.46 97.27 11.464 11.464 3.69E+000 1.93E+001 8.98E+000 8.95E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.774 11.464 8.465 12.418
Peak Current (kA), Method C : 21.751 25.510 18.837 27.633
Breaking Current (kA, rms, symm) : 11.464 8.465 12.418
Steady State Current (kA, rms) : 9.774 11.464 8.465 12.418

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 9.445 0.00 76.25 113.14 10.802 10.802 4.69E+000 1.98E+001 1.19E+001 9.37E+000

HWL12 SELECT ISO JANPATH LANE F1 21.94 9.445 38.35 86.02 98.82 10.802 10.802 4.69E+000 1.98E+001 1.19E+001 9.37E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.445 10.802 8.180 11.911
Peak Current (kA), Method C : 20.064 22.948 17.376 25.302
Breaking Current (kA, rms, symm) : 10.802 8.180 11.911
Steady State Current (kA, rms) : 9.445 10.802 8.180 11.911

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 8.500 0.00 96.90 95.51 9.189 9.189 4.21E-001 3.37E+000 2.60E-001 2.62E+000

HCML IC L1 TB MAHARNI SS BUS 0.00 0.000 1.99 96.04 94.66 0.346 1.038 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 0.00 0.000 1.99 96.04 94.66 0.346 1.038 2.66E-001 2.33E+001

MAHARANI 1x315 MAHARNI SS BUS 100.00 8.500 100.00 100.00 100.00 8.500 7.123 4.21E-001 3.37E+000 4.21E-001 3.37E+000
MVA TR
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.500 9.189 7.361 8.962
Peak Current (kA), Method C : 20.358 22.009 17.630 21.465
Breaking Current (kA, rms, symm) : 9.189 7.361 8.962
Steady State Current (kA, rms) : 8.500 9.189 7.361 8.962

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 9.597 0.00 88.82 99.31 10.891 10.891 3.34E+000 1.98E+001 4.76E+000 1.22E+001

HWL8 SELECT ISO MANDI HOUSE F1 16.32 9.597 24.34 88.88 95.15 10.891 10.891 3.34E+000 1.98E+001 4.76E+000 1.22E+001
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.597 10.891 8.311 10.975
Peak Current (kA), Method C : 21.864 24.812 18.934 25.002
Breaking Current (kA, rms, symm) : 10.891 8.311 10.975
Steady State Current (kA, rms) : 9.597 10.891 8.311 10.975

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 22.107 0.00 173.21 173.21 0.000 0.000 1.18E+000 2.61E+001

TR1 11KV TB OG AUX TR1 CB TB 2.55 22.107 0.00 173.21 173.21 0.000 0.000 1.18E+000 2.61E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.00 0.000 0.00 173.21 173.21 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 22.107 0.000 19.145 19.145
Peak Current (kA), Method C : 58.658 0.000 50.799 50.799
Breaking Current (kA, rms, symm) : 0.000 19.145 19.145
Steady State Current (kA, rms) : 22.107 0.000 19.145 19.145

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 22.107 0.00 173.21 173.21 0.000 0.000 1.18E+000 2.61E+001

TR2 11KV TB OG AUX TR2 CB TB 2.55 22.107 0.00 173.21 173.21 0.000 0.000 1.18E+000 2.61E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.00 0.000 0.00 173.21 173.21 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 22.107 0.000 19.145 19.145
Peak Current (kA), Method C : 58.658 0.000 50.799 50.799
Breaking Current (kA, rms, symm) : 0.000 19.145 19.145
Steady State Current (kA, rms) : 22.107 0.000 19.145 19.145

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 6.861 0.00 101.34 98.81 6.852 6.852 4.67E-001 4.18E+000 2.85E-001 4.22E+000
BUS

HCML IC L3 TB PARK STREET SS 3.86 6.861 5.85 100.27 97.92 6.852 6.852 4.67E-001 4.18E+000 2.85E-001 4.22E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 6.861 6.852 5.942 6.942
Peak Current (kA), Method C : 16.702 16.679 14.464 16.899
Breaking Current (kA, rms, symm) : 6.852 5.942 6.942
Steady State Current (kA, rms) : 6.861 6.852 5.942 6.942

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 8.500 0.00 77.06 122.22 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001

HWL9 SELECT ISO RAJA BAZAR F1 34.56 8.500 55.80 86.37 101.70 8.982 8.982 7.71E+000 2.13E+001 2.07E+001 1.06E+001
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.500 8.982 7.361 10.289
Peak Current (kA), Method C : 16.238 17.159 14.063 19.656
Breaking Current (kA, rms, symm) : 8.982 7.361 10.289
Steady State Current (kA, rms) : 8.500 8.982 7.361 10.289

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 9.121 0.00 75.83 116.81 10.160 10.160 5.70E+000 2.03E+001 1.48E+001 9.79E+000

HWL3 SELECT ISO SCHOOL LANE F1 26.49 9.121 45.08 85.93 100.04 10.160 10.160 5.70E+000 2.03E+001 1.48E+001 9.79E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.121 10.160 7.899 11.362
Peak Current (kA), Method C : 18.610 20.730 16.117 23.181
Breaking Current (kA, rms, symm) : 10.160 7.899 11.362
Steady State Current (kA, rms) : 9.121 10.160 7.899 11.362

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 10.471 0.00 89.66 93.08 12.660 12.660 1.19E+000 1.83E+001 1.25E+000 8.78E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 3.80 10.471 6.33 90.14 91.69 12.660 12.660 1.19E+000 1.83E+001 1.25E+000 8.78E+000
TB
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.471 12.660 9.068 12.316
Peak Current (kA), Method C : 27.045 32.698 23.422 31.811
Breaking Current (kA, rms, symm) : 12.660 9.068 12.316
Steady State Current (kA, rms) : 10.471 12.660 9.068 12.316

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 100.28 97.79 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 7.137 0.00 100.28 97.79 7.278 7.278 4.49E-001 4.02E+000 2.58E-001 3.80E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 0.00 0.000 18.10 92.45 90.83 0.327 0.981 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 0.00 0.000 56.46 57.90 100.00 0.100 0.301 * 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.08 7.137 22.45 96.94 95.57 6.851 5.998 4.49E-001 4.02E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.137 7.278 6.181 7.300
Peak Current (kA), Method C : 17.369 17.711 15.042 17.765
Breaking Current (kA, rms, symm) : 7.278 6.181 7.300
Steady State Current (kA, rms) : 7.137 7.278 6.181 7.300

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 22.496 0.00 173.21 173.21 0.000 0.000 6.72E-001 2.57E+001

OG AUX TR1 CB TB TR1 11KV TB 0.00 0.000 0.00 173.21 173.21 0.000 0.000

# TR1 HT BUS SELECT TR1 11KV TB 84.31 5.286 100.00 100.00 100.00 0.000 0.000 1.83E+000 1.09E+002
ISO TB
# TR1 33KV TB TR1 11KV TB 36.69 17.216 100.00 100.00 100.00 0.000 0.000 1.32E+000 3.35E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 22.496 0.000 19.482 19.482
Peak Current (kA), Method C : 61.273 0.000 53.064 53.064
Breaking Current (kA, rms, symm) : 0.000 19.482 19.482
Steady State Current (kA, rms) : 22.496 0.000 19.482 19.482

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 10.762 0.00 90.74 90.39 13.293 13.293 6.63E-001 1.79E+001 2.19E-001 7.67E+000

HWT1 IC CB TB TR1 33KV TB 0.00 0.000 0.00 90.74 90.39 0.000 0.000

# TR1 HT BUS SELECT TR1 33KV TB 77.46 9.335 77.63 97.89 96.87 9.355 5.006 8.94E-001 2.06E+001 6.75E-001 2.04E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 9.13 1.428 54.64 54.46 100.00 3.938 8.287 * 5.58E-001 1.35E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.762 13.293 9.320 12.768
Peak Current (kA), Method C : 28.870 35.657 25.002 34.249
Breaking Current (kA, rms, symm) : 13.293 9.320 12.768
Steady State Current (kA, rms) : 10.762 13.293 9.320 12.768

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 22.496 0.00 173.21 173.21 0.000 0.000 6.72E-001 2.57E+001

OG AUX TR2 CB TB TR2 11KV TB 0.00 0.000 0.00 173.21 173.21 0.000 0.000

# TR2 HT BUS SELECT TR2 11KV TB 84.31 5.286 100.00 100.00 100.00 0.000 0.000 1.83E+000 1.09E+002
ISO TB
# TR2 33KV TB TR2 11KV TB 36.69 17.216 100.00 100.00 100.00 0.000 0.000 1.32E+000 3.35E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 22.496 0.000 19.482 19.482
Peak Current (kA), Method C : 61.273 0.000 53.064 53.064
Breaking Current (kA, rms, symm) : 0.000 19.482 19.482
Steady State Current (kA, rms) : 22.496 0.000 19.482 19.482

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 10.762 0.00 90.74 90.39 13.293 13.293 6.63E-001 1.79E+001 2.19E-001 7.67E+000

HWT3 IC2 CB TB TR2 33KV TB 0.00 0.000 0.00 90.74 90.39 0.000 0.000

# TR2 HT BUS SELECT TR2 33KV TB 77.46 9.335 77.63 97.89 96.87 9.355 5.006 8.94E-001 2.06E+001 6.75E-001 2.04E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 9.13 1.428 54.64 54.46 100.00 3.938 8.287 * 5.58E-001 1.35E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.762 13.293 9.320 12.768
Peak Current (kA), Method C : 28.870 35.657 25.002 34.249
Breaking Current (kA, rms, symm) : 13.293 9.320 12.768
Steady State Current (kA, rms) : 10.762 13.293 9.320 12.768

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 8.931 0.00 75.97 118.68 9.790 9.790 6.30E+000 2.06E+001 1.66E+001 1.00E+001
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 29.05 8.931 48.65 85.99 100.64 9.790 9.790 6.30E+000 2.06E+001 1.66E+001 1.00E+001
TB F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.931 9.790 7.734 11.031
Peak Current (kA), Method C : 17.831 19.547 15.443 22.025
Breaking Current (kA, rms, symm) : 9.790 7.734 11.031
Steady State Current (kA, rms) : 8.931 9.790 7.734 11.031

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
33KV MAIN BUS2 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
AUX TR1 HT TB 11.000 21.724 56.242 21.724 0.000 0.000 0.000 0.000 18.813 48.707 18.813 18.813 18.813 48.707 18.813 18.813
AUX TR1 LT BUS 0.415 11.743 23.552 11.743 11.478 23.020 11.478 11.478 10.170 20.397 10.170 10.170 12.162 24.393 12.162 12.162
AUX TR1 LT TB 0.415 12.009 24.252 12.009 12.094 24.423 12.094 12.094 10.400 21.003 10.400 10.400 12.068 24.372 12.068 12.068
AUX TR2 HT TB 11.000 21.724 56.242 21.724 0.000 0.000 0.000 0.000 18.813 48.707 18.813 18.813 18.813 48.707 18.813 18.813
AUX TR2 LT BUS 0.415 11.743 23.552 11.743 11.478 23.020 11.478 11.478 10.170 20.397 10.170 10.170 12.162 24.393 12.162 12.162
AUX TR2 LT TB 0.415 12.009 24.252 12.009 12.094 24.423 12.094 12.094 10.400 21.003 10.400 10.400 12.068 24.372 12.068 12.068
B. D. MARG F1 33.000 8.322 15.638 8.322 8.661 16.275 8.661 8.661 7.207 13.543 7.207 7.207 9.988 18.770 9.988 9.988
CHURCH ROAD F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
CONNAUGHT PLACE F1 33.000 7.867 14.230 7.867 7.881 14.254 7.881 7.881 6.813 12.324 6.813 6.813 9.247 16.726 9.247 9.247
CONSTITUTION C-F1 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
CONSTITUTION C-F2 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
DELHI HC F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
DWL1 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL2 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL3 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
DWL4 IC CB TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HANUMAN ROAD F1 33.000 10.458 26.739 10.458 12.630 32.293 12.630 12.630 9.057 23.157 9.057 9.057 12.296 31.439 12.296 12.296
HCML F1 33.000 10.628 27.666 10.628 13.075 34.034 13.075 13.075 9.204 23.959 9.204 9.204 12.853 33.458 12.853 12.853
HCML IC L1 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L2 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L3 TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HCML IC L4TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
HWL1 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL2 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL3 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL4 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL5 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL6 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL7 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL8 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL9 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL10 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL11 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL12 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL13 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWL15 SELECT ISO TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWT1 IC CB TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
HWT3 IC2 CB TB 33.000 10.755 28.842 10.755 13.276 35.602 13.276 13.276 9.314 24.978 9.314 9.314 12.748 34.187 12.748 12.748
IGNCA F1 33.000 9.774 21.751 9.774 11.464 25.510 11.464 11.464 8.465 18.837 8.465 8.465 12.418 27.633 12.418 12.418
JANPATH LANE F1 33.000 9.445 20.064 9.445 10.802 22.948 10.802 10.802 8.180 17.376 8.180 8.180 11.911 25.302 11.911 11.911
MAHARNI SS BUS 220.000 8.500 20.358 8.500 9.189 22.009 9.189 9.189 7.361 17.630 7.361 7.361 8.962 21.465 8.962 8.962
MAIN BUS1 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
MAIN BUS2 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300
MANDI HOUSE F1 33.000 9.597 21.864 9.597 10.891 24.812 10.891 10.891 8.311 18.934 8.311 8.311 10.975 25.002 10.975 10.975
OG AUX TR1 CB TB 11.000 22.107 58.658 22.107 0.000 0.000 0.000 0.000 19.145 50.799 19.145 19.145 19.145 50.799 19.145 19.145
OG AUX TR2 CB TB 11.000 22.107 58.658 22.107 0.000 0.000 0.000 0.000 19.145 50.799 19.145 19.145 19.145 50.799 19.145 19.145
PARK STREET SS BUS 220.000 6.861 16.702 6.861 6.852 16.679 6.852 6.852 5.942 14.464 5.942 5.942 6.942 16.899 6.942 6.942
RAJA BAZAR F1 33.000 8.500 16.238 8.500 8.982 17.159 8.982 8.982 7.361 14.063 7.361 7.361 10.289 19.656 10.289 10.289
SCHOOL LANE F1 33.000 9.121 18.610 9.121 10.160 20.730 10.160 10.160 7.899 16.117 7.899 7.899 11.362 23.181 11.362 11.362
SCINDIA HOUSE F1 33.000 10.471 27.045 10.471 12.660 32.698 12.660 12.660 9.068 23.422 9.068 9.068 12.316 31.811 12.316 12.316
TR1 HT BUS SELECT ISO TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300

TR2 HT BUS SELECT ISO TB 220.000 7.137 17.369 7.137 7.278 17.711 7.278 7.278 6.181 15.042 6.181 6.181 7.300 17.765 7.300 7.300

TR1 11KV TB 11.000 22.496 61.273 22.496 0.000 0.000 0.000 0.000 19.482 53.064 19.482 19.482 19.482 53.064 19.482 19.482
TR1 33KV TB 33.000 10.762 28.870 10.762 13.293 35.657 13.293 13.293 9.320 25.002 9.320 9.320 12.768 34.249 12.768 12.768
TR2 11KV TB 11.000 22.496 61.273 22.496 0.000 0.000 0.000 0.000 19.482 53.064 19.482 19.482 19.482 53.064 19.482 19.482
TR2 33KV TB 33.000 10.762 28.870 10.762 13.293 35.657 13.293 13.293 9.320 25.002 9.320 9.320 12.768 34.249 12.768 12.768
VIDHYUT BHAVAN F1 33.000 8.931 17.831 8.931 9.790 19.547 9.790 9.790 7.734 15.443 7.734 7.734 11.031 22.025 11.031 11.031

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02033 0.32094 0.32158 0.02033 0.32094 0.32158 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00616 0.02052 0.02142 0.00616 0.02052 0.02142 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00587 0.02011 0.02095 0.00587 0.02011 0.02095 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02033 0.32094 0.32158 0.02033 0.32094 0.32158 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00616 0.02052 0.02142 0.00616 0.02052 0.02142 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00587 0.02011 0.02095 0.00587 0.02011 0.02095 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.90549 2.35006 2.51847 0.90549 2.35006 2.51847 2.44042 1.18408 2.71250 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 1.08082 2.43486 2.66397 1.08082 2.43486 2.66397 2.94901 1.25688 3.20568 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14540 1.99876 2.00404 0.14540 1.99876 2.00404 0.14807 0.96128 0.97261 0.00000 0.00000 0.00000

HCML F1 33.000 0.11654 1.96846 1.97191 0.11654 1.96846 1.97191 0.15176 0.85648 0.86982 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: NO-LOAD CONT

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.07271 1.94726 1.94862 0.07271 1.94726 1.94862 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.40144 2.10626 2.14417 0.40144 2.10626 2.14417 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.51101 2.15926 2.21891 0.51101 2.15926 2.21891 1.29609 1.02028 1.64949 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 2.03882 16.31057 16.43750 2.03882 16.31057 16.43750 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MAIN BUS2 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.36347 2.15326 2.18372 0.36347 2.15326 2.18372 0.51844 1.33028 1.42773 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01423 0.31569 0.31601 0.01423 0.31569 0.31601 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01423 0.31569 0.31601 0.01423 0.31569 0.31601 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 2.25825 20.23757 20.36317 2.25825 20.23757 20.36317 1.37853 20.41204 20.45854 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.83975 2.31826 2.46567 0.83975 2.31826 2.46567 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.62059 2.21226 2.29766 0.62059 2.21226 2.29766 1.61396 1.06578 1.93410 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.12994 1.99726 2.00148 0.12994 1.99726 2.00148 0.13653 0.95610 0.96580 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 2.17415 19.45557 19.57667 2.17415 19.45557 19.57667 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00813 0.31044 0.31054 0.00813 0.31044 0.31054 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07220 1.94599 1.94732 0.07220 1.94599 1.94732 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00813 0.31044 0.31054 0.00813 0.31044 0.31054 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07220 1.94599 1.94732 0.07220 1.94599 1.94732 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.68634 2.24406 2.34667 0.68634 2.24406 2.34667 1.80468 1.09308 2.10990 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 27 57

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 1x315.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 2 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 2 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 2 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 2 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 2 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 2 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 2 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 2 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 2 100.00 0.00

DELHI HC F1 Load 33.000 33.000 2 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 2 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 2 100.00 0.00

HCML F1 Load 33.000 33.000 2 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L4TB Load 220.000 220.000 2 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 2 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 2 100.00 0.00

IGNCA F1 Load 33.000 33.000 2 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 2 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 2 100.00 0.00

MAIN BUS1 Load 220.000 220.000 2 100.00 0.00

MAIN BUS2 Load 220.000 220.000 2 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 2 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 2 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 2 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 2 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 2 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 2 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 2 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR1 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 2 100.00 0.00

TR2 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 2 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 2 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2

DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB
DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB

HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB
HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB

HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB
HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB

HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB
HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB

HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB
HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB

HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB
HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1

HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 1x315 MVA TR MAHARNI SS BUS 3238.935 220.000 0.38295 3.06359 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 3238.935 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000

TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 25.321 0.00 173.21 173.21 0.000 0.000 1.76E+000 2.27E+001

OG AUX TR1 CB TB AUX TR1 HT TB 2.91 25.236 0.00 173.21 173.21 0.000 0.000 1.75E+000 2.28E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.321 0.000 21.928 21.928
Peak Current (kA), Method C : 64.412 0.000 55.782 55.782
Breaking Current (kA, rms, symm) : 0.000 21.928 21.928
Steady State Current (kA, rms) : 21.724 0.000 21.928 21.928

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.568 0.00 101.03 109.86 13.123 13.123 3.12E+002 9.66E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.34 11.776 9.07 104.10 102.42 11.446 13.123 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.568 13.123 12.616 14.522
Peak Current (kA), Method C : 28.753 25.901 24.901 28.663
Breaking Current (kA, rms, symm) : 13.123 12.616 14.522
Steady State Current (kA, rms) : 11.743 13.123 12.616 14.522

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.818 0.00 103.91 102.88 13.858 13.858 3.01E+002 9.52E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 103.97 103.00 1.739 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 98.80 12.043 99.68 100.64 99.88 12.127 13.858 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.818 13.858 12.833 14.460
Peak Current (kA), Method C : 29.424 27.517 25.482 28.712
Breaking Current (kA, rms, symm) : 13.858 12.833 14.460
Steady State Current (kA, rms) : 12.009 13.858 12.833 14.460

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 25.722 0.00 173.21 173.21 0.000 0.000 1.77E+000 2.24E+001

OG AUX TR2 CB TB AUX TR2 HT TB 2.95 25.637 0.00 173.21 173.21 0.000 0.000 1.75E+000 2.25E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.722 0.000 22.276 22.276
Peak Current (kA), Method C : 65.302 0.000 56.554 56.554
Breaking Current (kA, rms, symm) : 0.000 22.276 22.276
Steady State Current (kA, rms) : 21.724 0.000 22.276 22.276

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.571 0.00 101.03 109.87 13.125 13.125 3.12E+002 9.66E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.34 11.779 9.08 104.11 102.43 11.448 13.125 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.571 13.125 12.619 14.525
Peak Current (kA), Method C : 28.757 25.903 24.905 28.666
Breaking Current (kA, rms, symm) : 13.125 12.619 14.525
Steady State Current (kA, rms) : 11.743 13.125 12.619 14.525

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.822 0.00 103.92 102.88 13.860 13.860 3.01E+002 9.52E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 103.98 103.01 1.739 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 98.83 12.047 99.69 100.64 99.89 12.129 13.860 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.822 13.860 12.836 14.463
Peak Current (kA), Method C : 29.429 27.519 25.486 28.717
Breaking Current (kA, rms, symm) : 13.860 12.836 14.463
Steady State Current (kA, rms) : 12.009 13.860 12.836 14.463

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 10.364 0.00 84.30 126.66 9.864 9.864 7.72E+000 1.69E+001 2.24E+001 1.09E+001

HWL7 SELECT ISO B. D. MARG F1 43.66 9.892 65.14 91.30 101.70 9.564 9.864 8.37E+000 1.76E+001 2.24E+001 1.09E+001
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.317 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.364 9.864 8.975 11.782
Peak Current (kA), Method C : 18.801 17.894 16.282 21.374
Breaking Current (kA, rms, symm) : 9.864 8.975 11.782
Steady State Current (kA, rms) : 8.322 9.864 8.975 11.782

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 10.869 0.00 84.21 125.71 10.410 10.410 7.19E+000 1.62E+001 2.07E+001 1.06E+001

HWL13 SELECT ISO CHURCH ROAD F1 42.26 10.395 63.39 91.62 101.39 10.107 10.410 7.78E+000 1.68E+001 2.07E+001 1.06E+001
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.320 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.869 10.410 9.412 12.367
Peak Current (kA), Method C : 19.845 19.008 17.186 22.581
Breaking Current (kA, rms, symm) : 10.410 9.412 12.367
Steady State Current (kA, rms) : 8.500 10.410 9.412 12.367

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 9.680 0.00 86.81 128.97 8.852 8.852 9.15E+000 1.76E+001 2.71E+001 1.15E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 49.25 9.217 70.68 91.99 102.10 8.570 8.852 9.98E+000 1.83E+001 2.71E+001 1.15E+001
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.305 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.680 8.852 8.383 10.815
Peak Current (kA), Method C : 17.037 15.580 14.755 19.035
Breaking Current (kA, rms, symm) : 8.852 8.383 10.815
Steady State Current (kA, rms) : 7.867 8.852 8.383 10.815

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 13.053 0.00 81.55 112.62 14.129 14.129 3.53E+000 1.43E+001 8.98E+000 8.95E+000

HWL10 SELECT ISO CONSTITUTION C-F1 21.88 12.557 36.99 90.83 98.28 13.771 14.129 3.76E+000 1.49E+001 8.98E+000 8.95E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.053 14.129 11.304 15.509
Peak Current (kA), Method C : 27.543 29.814 23.853 32.727
Breaking Current (kA, rms, symm) : 14.129 11.304 15.509
Steady State Current (kA, rms) : 9.774 14.129 11.304 15.509

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 13.053 0.00 81.55 112.62 14.129 14.129 3.53E+000 1.43E+001 8.98E+000 8.95E+000

HWL11 SELECT ISO CONSTITUTION C-F2 21.88 12.557 36.99 90.83 98.28 13.771 14.129 3.76E+000 1.49E+001 8.98E+000 8.95E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.053 14.129 11.304 15.509
Peak Current (kA), Method C : 27.543 29.814 23.853 32.727
Breaking Current (kA, rms, symm) : 14.129 11.304 15.509
Steady State Current (kA, rms) : 9.774 14.129 11.304 15.509

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 10.869 0.00 84.21 125.71 10.410 10.410 7.19E+000 1.62E+001 2.07E+001 1.06E+001

HWL14 SELECT ISO DELHI HC F1 42.26 10.395 63.39 91.62 101.39 10.107 10.410 7.78E+000 1.68E+001 2.07E+001 1.06E+001
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.320 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.869 10.410 9.412 12.367
Peak Current (kA), Method C : 19.845 19.008 17.186 22.581
Breaking Current (kA, rms, symm) : 10.410 9.412 12.367
Steady State Current (kA, rms) : 8.500 10.410 9.412 12.367

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 13.856 0.00 92.56 95.38 15.732 15.732 1.35E+000 1.38E+001 1.36E+000 8.83E+000

HWL6 SELECT ISO HANUMAN ROAD F1 5.68 13.356 8.63 92.85 93.60 15.353 15.732 1.40E+000 1.43E+001 1.36E+000 8.83E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.379 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.856 15.732 12.000 15.281
Peak Current (kA), Method C : 34.357 39.008 29.754 37.890
Breaking Current (kA, rms, symm) : 15.732 12.000 15.281
Steady State Current (kA, rms) : 10.458 15.732 12.000 15.281

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 14.140 0.00 90.73 95.33 16.411 16.411 1.11E+000 1.36E+001 1.39E+000 7.86E+000

HWL4 SELECT ISO HCML F1 3.17 13.640 5.74 92.72 93.21 16.024 16.411 1.14E+000 1.41E+001 1.39E+000 7.86E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.387 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.140 16.411 12.246 16.047
Peak Current (kA), Method C : 35.793 41.542 30.998 40.621
Breaking Current (kA, rms, symm) : 16.411 12.246 16.047
Steady State Current (kA, rms) : 10.628 16.411 12.246 16.047

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000

MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000

MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 14.356 0.00 93.46 92.23 16.730 16.730 7.31E-001 1.34E+001 2.26E-001 7.70E+000

TR1 33KV TB HWT1 IC CB TB 0.07 10.884 0.14 93.44 92.20 14.032 16.730 6.53E-001 1.77E+001 2.26E-001 7.70E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.95 93.07 0.384 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.42 92.31 0.388 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.43 92.30 0.388 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.43 92.28 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.12 92.78 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.85 93.24 0.383 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.08 92.85 0.385 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.356 16.730 12.433 16.074
Peak Current (kA), Method C : 37.649 43.874 32.605 42.153
Breaking Current (kA, rms, symm) : 16.730 12.433 16.074
Steady State Current (kA, rms) : 10.755 16.730 12.433 16.074

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 14.840 0.00 93.84 92.49 17.165 17.165 7.36E-001 1.29E+001 2.26E-001 7.70E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 10.874 0.15 93.82 92.45 14.106 17.165 6.55E-001 1.77E+001 2.26E-001 7.70E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.57 92.92 0.383 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.64 92.82 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.38 93.25 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.69 92.79 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.840 17.165 12.852 16.511
Peak Current (kA), Method C : 38.802 44.881 33.603 43.172
Breaking Current (kA, rms, symm) : 17.165 12.852 16.511
Steady State Current (kA, rms) : 10.755 17.165 12.852 16.511

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 13.053 0.00 81.55 112.62 14.129 14.129 3.53E+000 1.43E+001 8.98E+000 8.95E+000

HWL15 SELECT ISO IGNCA F1 21.88 12.557 36.99 90.83 98.28 13.771 14.129 3.76E+000 1.49E+001 8.98E+000 8.95E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.053 14.129 11.304 15.509
Peak Current (kA), Method C : 27.543 29.814 23.853 32.727
Breaking Current (kA, rms, symm) : 14.129 11.304 15.509
Steady State Current (kA, rms) : 9.774 14.129 11.304 15.509

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 12.469 0.00 81.07 117.16 13.081 13.081 4.46E+000 1.48E+001 1.19E+001 9.37E+000

HWL12 SELECT ISO JANPATH LANE F1 27.83 11.979 45.62 90.75 99.45 12.737 13.081 4.76E+000 1.53E+001 1.19E+001 9.37E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.350 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.469 13.081 10.799 14.709
Peak Current (kA), Method C : 25.094 26.325 21.732 29.602
Breaking Current (kA, rms, symm) : 13.081 10.799 14.709
Steady State Current (kA, rms) : 9.445 13.081 10.799 14.709

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 9.378 0.00 98.19 96.94 9.854 9.854 3.72E-001 3.06E+000 2.60E-001 2.62E+000

HCML IC L1 TB MAHARNI SS BUS 0.94 0.417 2.80 97.38 96.10 0.663 1.113 6.38E+000 6.90E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 1.04 0.462 2.87 97.40 96.12 0.694 1.113 5.67E+000 6.23E+001 2.66E-001 2.33E+001

MAHARANI 1x315 MAHARNI SS BUS 100.00 8.500 100.00 100.00 100.00 8.500 7.638 4.21E-001 3.37E+000 4.21E-001 3.37E+000
MVA TR
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.378 9.854 8.122 9.700
Peak Current (kA), Method C : 22.549 23.694 19.528 23.323
Breaking Current (kA, rms, symm) : 9.854 8.122 9.700
Steady State Current (kA, rms) : 8.500 9.854 8.122 9.700

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 12.783 0.00 93.37 102.19 13.393 13.393 3.21E+000 1.47E+001 4.76E+000 1.22E+001

HWL8 SELECT ISO MANDI HOUSE F1 20.89 12.286 29.34 92.65 96.61 13.046 13.393 3.41E+000 1.53E+001 4.76E+000 1.22E+001
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.350 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.783 13.393 11.070 13.682
Peak Current (kA), Method C : 27.722 29.045 24.008 29.673
Breaking Current (kA, rms, symm) : 13.393 11.070 13.682
Steady State Current (kA, rms) : 9.597 13.393 11.070 13.682

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 25.845 0.00 173.21 173.21 0.000 0.000 1.26E+000 2.23E+001

TR1 11KV TB OG AUX TR1 CB TB 2.97 25.761 0.00 173.21 173.21 0.000 0.000 1.24E+000 2.24E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.845 0.000 22.383 22.383
Peak Current (kA), Method C : 67.590 0.000 58.535 58.535
Breaking Current (kA, rms, symm) : 0.000 22.383 22.383
Steady State Current (kA, rms) : 22.107 0.000 22.383 22.383

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 26.264 0.00 173.21 173.21 0.000 0.000 1.27E+000 2.19E+001

TR2 11KV TB OG AUX TR2 CB TB 3.02 26.179 0.00 173.21 173.21 0.000 0.000 1.25E+000 2.20E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.264 0.000 22.745 22.745
Peak Current (kA), Method C : 68.572 0.000 59.386 59.386
Breaking Current (kA, rms, symm) : 0.000 22.745 22.745
Steady State Current (kA, rms) : 22.107 0.000 22.745 22.745

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 7.545 0.00 102.93 100.53 7.292 7.292 4.14E-001 3.80E+000 2.85E-001 4.22E+000
BUS

HCML IC L3 TB PARK STREET SS 4.25 7.545 6.22 101.74 99.52 7.292 7.292 4.14E-001 3.80E+000 2.85E-001 4.22E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 7.545 7.292 6.534 7.512
Peak Current (kA), Method C : 18.433 17.814 15.963 18.352
Breaking Current (kA, rms, symm) : 7.292 6.534 7.512
Steady State Current (kA, rms) : 6.861 7.292 6.534 7.512

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 10.869 0.00 84.21 125.71 10.410 10.410 7.19E+000 1.62E+001 2.07E+001 1.06E+001

HWL9 SELECT ISO RAJA BAZAR F1 42.26 10.395 63.39 91.62 101.39 10.107 10.410 7.78E+000 1.68E+001 2.07E+001 1.06E+001
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.320 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.869 10.410 9.412 12.367
Peak Current (kA), Method C : 19.845 19.008 17.186 22.581
Breaking Current (kA, rms, symm) : 10.410 9.412 12.367
Steady State Current (kA, rms) : 8.500 10.410 9.412 12.367

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 11.620 0.00 80.88 120.48 11.925 11.925 5.36E+000 1.57E+001 1.48E+001 9.79E+000

HWL3 SELECT ISO SCHOOL LANE F1 32.33 11.133 51.92 90.35 100.35 11.592 11.925 5.76E+000 1.63E+001 1.48E+001 9.79E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.620 11.925 10.063 13.644
Peak Current (kA), Method C : 22.667 23.264 19.631 26.618
Breaking Current (kA, rms, symm) : 11.925 10.063 13.644
Steady State Current (kA, rms) : 9.121 11.925 10.063 13.644

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 13.881 0.00 92.55 95.28 15.780 15.780 1.22E+000 1.38E+001 1.25E+000 8.78E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 4.85 13.380 7.75 92.98 93.42 15.401 15.780 1.26E+000 1.43E+001 1.25E+000 8.78E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.379 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.881 15.780 12.021 15.318
Peak Current (kA), Method C : 34.830 39.595 30.164 38.435
Breaking Current (kA, rms, symm) : 15.780 12.021 15.318
Steady State Current (kA, rms) : 10.471 15.780 12.021 15.318

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 7.880 0.00 101.86 99.49 7.776 7.776 3.96E-001 3.64E+000 2.58E-001 3.80E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 32.59 95.96 93.69 0.589 1.049 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 62.73 65.12 100.00 0.144 0.322 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.86 99.49 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.81 7.459 23.36 98.00 96.80 7.043 6.408 4.22E-001 3.85E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.880 7.776 6.824 7.920
Peak Current (kA), Method C : 19.249 18.995 16.670 19.348
Breaking Current (kA, rms, symm) : 7.776 6.824 7.920
Steady State Current (kA, rms) : 7.137 7.776 6.824 7.920

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 7.895 0.00 101.89 99.52 7.785 7.785 3.96E-001 3.64E+000 2.58E-001 3.80E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 34.06 96.30 93.97 0.616 1.050 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 63.41 65.87 100.00 0.148 0.322 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.74 7.428 23.33 98.01 96.81 7.022 6.416 4.25E-001 3.86E+000 3.69E-001 4.61E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.895 7.785 6.837 7.933
Peak Current (kA), Method C : 19.284 19.017 16.700 19.377
Breaking Current (kA, rms, symm) : 7.785 6.837 7.933
Steady State Current (kA, rms) : 7.137 7.785 6.837 7.933

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 26.379 0.00 173.21 173.21 0.000 0.000 7.61E-001 2.19E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 86.32 5.412 100.00 100.00 100.00 0.000 0.000 1.92E+000 1.07E+002
ISO TB
# TR1 33KV TB TR1 11KV TB 44.53 20.893 100.00 100.00 100.00 0.000 0.000 1.30E+000 2.76E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.379 0.000 22.845 22.845
Peak Current (kA), Method C : 71.073 0.000 61.551 61.551
Breaking Current (kA, rms, symm) : 0.000 22.845 22.845
Steady State Current (kA, rms) : 22.496 0.000 22.845 22.845

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 14.363 0.00 93.44 92.19 16.751 16.751 7.28E-001 1.34E+001 2.19E-001 7.67E+000

HWT1 IC CB TB TR1 33KV TB 0.02 3.479 0.02 93.44 92.19 2.705 0.000 6.06E+000 5.50E+001

# TR1 HT BUS SELECT TR1 33KV TB 78.23 9.428 78.27 98.73 97.72 9.432 6.308 8.62E-001 2.04E+001 6.75E-001 2.04E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 9.36 1.464 55.99 56.33 100.00 4.618 10.443 * 1.17E-001 1.31E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.363 16.751 12.439 16.096
Peak Current (kA), Method C : 37.675 43.939 32.628 42.220
Breaking Current (kA, rms, symm) : 16.751 12.439 16.096
Steady State Current (kA, rms) : 10.762 16.751 12.439 16.096

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 26.816 0.00 173.21 173.21 0.000 0.000 7.67E-001 2.15E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 86.44 5.420 100.00 100.00 100.00 0.000 0.000 1.91E+000 1.07E+002
ISO TB
# TR2 33KV TB TR2 11KV TB 45.44 21.322 100.00 100.00 100.00 0.000 0.000 1.30E+000 2.70E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.816 0.000 23.224 23.224
Peak Current (kA), Method C : 72.161 0.000 62.493 62.493
Breaking Current (kA, rms, symm) : 0.000 23.224 23.224
Steady State Current (kA, rms) : 22.496 0.000 23.224 23.224

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 14.846 0.00 93.82 92.44 17.186 17.186 7.34E-001 1.29E+001 2.19E-001 7.67E+000

HWT3 IC2 CB TB TR2 33KV TB 0.03 3.973 0.02 93.82 92.44 3.066 0.000 5.36E+000 4.81E+001

# TR2 HT BUS SELECT TR2 33KV TB 78.15 9.419 78.21 98.81 97.79 9.426 6.472 8.65E-001 2.04E+001 6.75E-001 2.04E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 9.35 1.463 56.16 56.57 100.00 4.699 10.714 * 1.33E-001 1.32E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.846 17.186 12.857 16.533
Peak Current (kA), Method C : 38.827 44.946 33.625 43.239
Breaking Current (kA, rms, symm) : 17.186 12.857 16.533
Steady State Current (kA, rms) : 10.762 17.186 12.857 16.533

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 11.314 0.00 81.48 122.26 11.401 11.401 5.91E+000 1.60E+001 1.66E+001 1.00E+001
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 35.23 10.831 55.57 90.52 100.77 11.076 11.401 6.36E+000 1.66E+001 1.66E+001 1.00E+001
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.336 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 11.314 11.401 9.799 13.186
Peak Current (kA), Method C : 21.635 21.800 18.736 25.213
Breaking Current (kA, rms, symm) : 11.401 9.799 13.186
Steady State Current (kA, rms) : 8.931 11.401 9.799 13.186

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
33KV MAIN BUS2 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
AUX TR1 HT TB 11.000 25.321 64.412 21.724 0.000 0.000 0.000 0.000 21.928 55.782 21.928 21.928 21.928 55.782 21.928 21.928
AUX TR1 LT BUS 0.415 14.568 28.753 11.743 13.123 25.901 13.123 13.123 12.616 24.901 12.616 12.616 14.522 28.663 14.522 14.522
AUX TR1 LT TB 0.415 14.818 29.424 12.009 13.858 27.517 13.858 13.858 12.833 25.482 12.833 12.833 14.460 28.712 14.460 14.460
AUX TR2 HT TB 11.000 25.722 65.302 21.724 0.000 0.000 0.000 0.000 22.276 56.554 22.276 22.276 22.276 56.554 22.276 22.276
AUX TR2 LT BUS 0.415 14.571 28.757 11.743 13.125 25.903 13.125 13.125 12.619 24.905 12.619 12.619 14.525 28.666 14.525 14.525
AUX TR2 LT TB 0.415 14.822 29.429 12.009 13.860 27.519 13.860 13.860 12.836 25.486 12.836 12.836 14.463 28.717 14.463 14.463
B. D. MARG F1 33.000 10.364 18.801 8.322 9.864 17.894 9.864 9.864 8.975 16.282 8.975 8.975 11.782 21.374 11.782 11.782
CHURCH ROAD F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
CONNAUGHT PLACE F1 33.000 9.680 17.037 7.867 8.852 15.580 8.852 8.852 8.383 14.755 8.383 8.383 10.815 19.035 10.815 10.815
CONSTITUTION C-F1 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
CONSTITUTION C-F2 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
DELHI HC F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
DWL1 IC CB TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
DWL2 IC CB TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
DWL3 IC CB TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
DWL4 IC CB TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HANUMAN ROAD F1 33.000 13.856 34.357 10.458 15.732 39.008 15.732 15.732 12.000 29.754 12.000 12.000 15.281 37.890 15.281 15.281
HCML F1 33.000 14.140 35.793 10.628 16.411 41.542 16.411 16.411 12.246 30.998 12.246 12.246 16.047 40.621 16.047 16.047
HCML IC L1 TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
HCML IC L2 TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HCML IC L3 TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
HCML IC L4TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
HWL1 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL2 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL3 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL4 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL5 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL6 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL7 SELECT ISO TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWL8 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL9 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL10 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL11 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL12 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL13 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWL15 SELECT ISO TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
HWT1 IC CB TB 33.000 14.356 37.649 10.755 16.730 43.874 16.730 16.730 12.433 32.605 12.433 12.433 16.074 42.153 16.074 16.074
HWT3 IC2 CB TB 33.000 14.840 38.802 10.755 17.165 44.881 17.165 17.165 12.852 33.603 12.852 12.852 16.511 43.172 16.511 16.511
IGNCA F1 33.000 13.053 27.543 9.774 14.129 29.814 14.129 14.129 11.304 23.853 11.304 11.304 15.509 32.727 15.509 15.509
JANPATH LANE F1 33.000 12.469 25.094 9.445 13.081 26.325 13.081 13.081 10.799 21.732 10.799 10.799 14.709 29.602 14.709 14.709
MAHARNI SS BUS 220.000 9.378 22.549 8.500 9.854 23.694 9.854 9.854 8.122 19.528 8.122 8.122 9.700 23.323 9.700 9.700
MAIN BUS1 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920
MAIN BUS2 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933
MANDI HOUSE F1 33.000 12.783 27.722 9.597 13.393 29.045 13.393 13.393 11.070 24.008 11.070 11.070 13.682 29.673 13.682 13.682
OG AUX TR1 CB TB 11.000 25.845 67.590 22.107 0.000 0.000 0.000 0.000 22.383 58.535 22.383 22.383 22.383 58.535 22.383 22.383
OG AUX TR2 CB TB 11.000 26.264 68.572 22.107 0.000 0.000 0.000 0.000 22.745 59.386 22.745 22.745 22.745 59.386 22.745 22.745
PARK STREET SS BUS 220.000 7.545 18.433 6.861 7.292 17.814 7.292 7.292 6.534 15.963 6.534 6.534 7.512 18.352 7.512 7.512
RAJA BAZAR F1 33.000 10.869 19.845 8.500 10.410 19.008 10.410 10.410 9.412 17.186 9.412 9.412 12.367 22.581 12.367 12.367
SCHOOL LANE F1 33.000 11.620 22.667 9.121 11.925 23.264 11.925 11.925 10.063 19.631 10.063 10.063 13.644 26.618 13.644 13.644
SCINDIA HOUSE F1 33.000 13.881 34.830 10.471 15.780 39.595 15.780 15.780 12.021 30.164 12.021 12.021 15.318 38.435 15.318 15.318
TR1 HT BUS SELECT ISO TB 220.000 7.880 19.249 7.137 7.776 18.995 7.776 7.776 6.824 16.670 6.824 6.824 7.920 19.348 7.920 7.920

TR2 HT BUS SELECT ISO TB 220.000 7.895 19.284 7.137 7.785 19.017 7.785 7.785 6.837 16.700 6.837 6.837 7.933 19.377 7.933 7.933

TR1 11KV TB 11.000 26.379 71.073 22.496 0.000 0.000 0.000 0.000 22.845 61.551 22.845 22.845 22.845 61.551 22.845 22.845
TR1 33KV TB 33.000 14.363 37.675 10.762 16.751 43.939 16.751 16.751 12.439 32.628 12.439 12.439 16.096 42.220 16.096 16.096
TR2 11KV TB 11.000 26.816 72.161 22.496 0.000 0.000 0.000 0.000 23.224 62.493 23.224 23.224 23.224 62.493 23.224 23.224
TR2 33KV TB 33.000 14.846 38.827 10.762 17.186 44.946 17.186 17.186 12.857 33.625 12.857 12.857 16.533 43.239 16.533 16.533
VIDHYUT BHAVAN F1 33.000 11.314 21.635 8.931 11.401 21.800 11.401 11.401 9.799 18.736 9.799 9.799 13.186 25.213 13.186 13.186

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02134 0.27507 0.27590 0.02134 0.27507 0.27590 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01619 0.01698 0.00512 0.01619 0.01698 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02143 0.27075 0.27160 0.02143 0.27075 0.27160 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.84031 1.83935 2.02221 0.84031 1.83935 2.02221 2.44042 1.18408 2.71250 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.99654 1.92203 2.16502 0.99654 1.92203 2.16502 2.94901 1.25688 3.20568 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14723 1.50537 1.51256 0.14723 1.50537 1.51256 0.14807 0.96128 0.97261 0.00000 0.00000 0.00000

HCML F1 33.000 0.12041 1.47726 1.48216 0.12041 1.47726 1.48216 0.15176 0.85648 0.86982 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: 1x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07960 1.45765 1.45982 0.07960 1.45765 1.45982 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.08017 1.40998 1.41226 0.08017 1.40998 1.41226 0.02461 0.83828 0.83864 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.38481 1.55885 1.60565 0.38481 1.55885 1.60565 0.97822 0.97478 1.38098 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.48529 1.60914 1.68073 0.48529 1.60914 1.68073 1.29609 1.02028 1.64949 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80239 14.78924 14.89866 1.80239 14.78924 14.89866 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.34930 1.60190 1.63954 0.34930 1.60190 1.63954 0.51844 1.33028 1.42773 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01527 0.26987 0.27030 0.01527 0.26987 0.27030 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01536 0.26555 0.26599 0.01536 0.26555 0.26599 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 2.00190 18.40903 18.51756 2.00190 18.40903 18.51756 1.37853 20.41204 20.45854 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78352 1.76194 1.92830 0.78352 1.76194 1.92830 2.24970 1.15678 2.52968 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.58352 1.70667 1.80367 0.58352 1.70667 1.80367 1.61396 1.06578 1.93410 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.13289 1.50399 1.50985 0.13289 1.50399 1.50985 0.13653 0.95610 0.96580 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.91781 17.62703 17.73105 1.91781 17.62703 17.73105 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.91514 17.59395 17.69788 1.91514 17.59395 17.69788 1.24757 18.41104 18.45326 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00920 0.26467 0.26483 0.00920 0.26467 0.26483 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07931 1.45700 1.45916 0.07931 1.45700 1.45916 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00929 0.26035 0.26051 0.00929 0.26035 0.26051 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07990 1.40940 1.41167 0.07990 1.40940 1.41167 0.02383 0.83501 0.83535 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.64310 1.73710 1.85232 0.64310 1.73710 1.85232 1.80468 1.09308 2.10990 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 28 58

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 33KV PAR MIN.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 2 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 2 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 2 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 2 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 2 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 2 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 2 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 2 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 2 100.00 0.00

DELHI HC F1 Load 33.000 33.000 2 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 2 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 2 100.00 0.00

HCML F1 Load 33.000 33.000 2 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L4TB Load 220.000 220.000 2 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 2 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 2 100.00 0.00

IGNCA F1 Load 33.000 33.000 2 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 2 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 2 100.00 0.00

MAIN BUS1 Load 220.000 220.000 2 100.00 0.00

MAIN BUS2 Load 220.000 220.000 2 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 2 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 2 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 2 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 2 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 2 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 2 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 2 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR1 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 2 100.00 0.00

TR2 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 2 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 2 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

HWQ BC Tie Breakr 33KV MAIN BUS1 33KV MAIN BUS2

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2


DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB

DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB
HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB

HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB
HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB

HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO2 Tie Switch 33KV MAIN BUS2 HWL7 SELECT ISO TB
HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB

HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB
HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB

HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB
HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB

HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1


HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 1x315 MVA TR MAHARNI SS BUS 3238.935 220.000 0.38295 3.06359 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 3238.935 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 31.738 0.00 173.21 173.21 0.000 0.000 1.65E+000 1.81E+001

OG AUX TR1 CB TB AUX TR1 HT TB 3.65 31.653 0.00 173.21 173.21 0.000 0.000 1.64E+000 1.82E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.738 0.000 27.486 27.486
Peak Current (kA), Method C : 79.300 0.000 68.676 68.676
Breaking Current (kA, rms, symm) : 0.000 27.486 27.486
Steady State Current (kA, rms) : 27.647 0.000 27.486 27.486

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.610 0.00 101.11 109.90 13.146 13.146 3.12E+002 9.63E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.35 11.818 9.09 104.18 102.45 11.470 13.146 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.682 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.610 13.146 12.653 14.556
Peak Current (kA), Method C : 28.815 25.927 24.955 28.708
Breaking Current (kA, rms, symm) : 13.146 12.653 14.556
Steady State Current (kA, rms) : 11.794 13.146 12.653 14.556

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.863 0.00 103.99 102.92 13.884 13.884 3.01E+002 9.49E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 104.05 103.04 1.737 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 99.16 12.088 99.87 100.64 100.02 12.155 13.884 * 3.45E+002 1.17E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.863 13.884 12.871 14.500
Peak Current (kA), Method C : 29.490 27.548 25.539 28.771
Breaking Current (kA, rms, symm) : 13.884 12.871 14.500
Steady State Current (kA, rms) : 12.062 13.884 12.871 14.500

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 31.738 0.00 173.21 173.21 0.000 0.000 1.65E+000 1.81E+001

OG AUX TR2 CB TB AUX TR2 HT TB 3.65 31.653 0.00 173.21 173.21 0.000 0.000 1.64E+000 1.82E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.738 0.000 27.486 27.486
Peak Current (kA), Method C : 79.300 0.000 68.676 68.676
Breaking Current (kA, rms, symm) : 0.000 27.486 27.486
Steady State Current (kA, rms) : 27.647 0.000 27.486 27.486

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.610 0.00 101.11 109.90 13.146 13.146 3.12E+002 9.63E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.35 11.818 9.09 104.18 102.45 11.470 13.146 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.682 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.610 13.146 12.653 14.556
Peak Current (kA), Method C : 28.815 25.927 24.955 28.708
Breaking Current (kA, rms, symm) : 13.146 12.653 14.556
Steady State Current (kA, rms) : 11.794 13.146 12.653 14.556

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.863 0.00 103.99 102.92 13.884 13.884 3.01E+002 9.49E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 104.05 103.04 1.737 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 99.16 12.088 99.87 100.64 100.02 12.155 13.884 * 3.45E+002 1.17E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.863 13.884 12.871 14.500
Peak Current (kA), Method C : 29.490 27.548 25.539 28.771
Breaking Current (kA, rms, symm) : 13.884 12.871 14.500
Steady State Current (kA, rms) : 12.062 13.884 12.871 14.500

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 14.195 0.00 92.36 131.34 12.044 12.044 7.72E+000 1.11E+001 2.23E+001 7.24E+000

HWL7 SELECT ISO B. D. MARG F1 60.74 13.760 80.06 93.13 102.38 11.798 12.044 8.17E+000 1.14E+001 2.23E+001 7.24E+000
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.283 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.195 12.044 12.294 15.332
Peak Current (kA), Method C : 23.260 19.736 20.144 25.122
Breaking Current (kA, rms, symm) : 12.044 12.294 15.332
Steady State Current (kA, rms) : 11.663 12.044 12.294 15.332

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 14.802 0.00 91.08 130.80 12.781 12.781 7.17E+000 1.08E+001 2.06E+001 6.99E+000

HWL13 SELECT ISO CHURCH ROAD F1 58.39 14.361 78.28 92.75 102.35 12.526 12.781 7.57E+000 1.11E+001 2.06E+001 6.99E+000
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.288 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.802 12.781 12.819 16.106
Peak Current (kA), Method C : 24.494 21.148 21.212 26.651
Breaking Current (kA, rms, symm) : 12.781 12.819 16.106
Steady State Current (kA, rms) : 12.064 12.781 12.819 16.106

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 12.773 0.00 95.28 132.35 10.421 10.421 9.20E+000 1.19E+001 2.70E+001 7.91E+000
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 66.00 12.351 83.73 94.02 102.36 10.191 10.421 9.78E+000 1.21E+001 2.70E+001 7.91E+000
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.272 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 12.773 10.421 11.062 13.574
Peak Current (kA), Method C : 20.521 16.741 17.771 21.807
Breaking Current (kA, rms, symm) : 10.421 11.062 13.574
Steady State Current (kA, rms) : 10.689 10.421 11.062 13.574

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 20.163 0.00 80.74 121.06 20.643 20.643 3.40E+000 8.92E+000 8.89E+000 5.32E+000

HWL10 SELECT ISO CONSTITUTION C-F1 34.29 19.680 54.37 89.76 100.46 20.313 20.643 3.54E+000 9.11E+000 8.89E+000 5.32E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 20.163 20.643 17.462 23.683
Peak Current (kA), Method C : 38.166 39.073 33.052 44.829
Breaking Current (kA, rms, symm) : 20.643 17.462 23.683
Steady State Current (kA, rms) : 15.274 20.643 17.462 23.683

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 20.163 0.00 80.74 121.06 20.643 20.643 3.40E+000 8.92E+000 8.89E+000 5.32E+000

HWL11 SELECT ISO CONSTITUTION C-F2 34.29 19.680 54.37 89.76 100.46 20.313 20.643 3.54E+000 9.11E+000 8.89E+000 5.32E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 20.163 20.643 17.462 23.683
Peak Current (kA), Method C : 38.166 39.073 33.052 44.829
Breaking Current (kA, rms, symm) : 20.643 17.462 23.683
Steady State Current (kA, rms) : 15.274 20.643 17.462 23.683

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 14.802 0.00 91.08 130.80 12.781 12.781 7.17E+000 1.08E+001 2.06E+001 6.99E+000

HWL14 SELECT ISO DELHI HC F1 58.39 14.361 78.28 92.75 102.35 12.526 12.781 7.57E+000 1.11E+001 2.06E+001 6.99E+000
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.288 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.802 12.781 12.819 16.106
Peak Current (kA), Method C : 24.494 21.148 21.212 26.651
Breaking Current (kA, rms, symm) : 12.781 12.819 16.106
Steady State Current (kA, rms) : 12.064 12.781 12.819 16.106

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 23.927 0.00 91.87 96.77 26.962 26.962 1.16E+000 7.96E+000 1.27E+000 5.19E+000

HWL6 SELECT ISO HANUMAN ROAD F1 9.96 23.427 14.90 92.10 93.91 26.587 26.962 1.19E+000 8.13E+000 1.27E+000 5.19E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.376 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 23.927 26.962 20.721 26.495
Peak Current (kA), Method C : 56.011 63.116 48.507 62.022
Breaking Current (kA, rms, symm) : 26.962 20.721 26.495
Steady State Current (kA, rms) : 17.238 26.962 20.721 26.495

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 24.848 0.00 88.33 97.12 29.072 29.072 9.06E-001 7.69E+000 1.30E+000 4.23E+000

HWL4 SELECT ISO HCML F1 5.66 24.347 10.23 91.75 93.32 28.681 29.072 9.27E-001 7.85E+000 1.30E+000 4.23E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.390 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 24.848 29.072 21.519 28.995
Peak Current (kA), Method C : 60.108 70.326 52.055 70.141
Breaking Current (kA, rms, symm) : 29.072 21.519 28.995
Steady State Current (kA, rms) : 17.718 29.072 21.519 28.995

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 25.581 0.00 93.14 91.44 30.213 30.213 5.19E-001 7.51E+000 1.35E-001 4.06E+000

TR2 33KV TB HWT3 IC2 CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

TR1 33KV TB HWT1 IC CB TB 0.06 9.068 0.13 93.12 91.42 12.175 15.107 1.11E+000 2.12E+001 2.69E-001 8.13E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.10 91.52 0.393 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.11 91.51 0.393 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.11 91.49 0.394 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.14 92.79 92.00 0.391 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.08 92.51 92.46 0.388 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.27 92.75 92.07 0.391 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.91 92.86 91.89 0.392 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.68 92.92 91.78 0.392 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.58 92.65 92.22 0.390 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.67 92.98 91.76 0.392 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.72 92.61 92.28 0.389 0.000 4.59E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.581 30.213 22.154 29.090
Peak Current (kA), Method C : 65.784 77.696 56.970 74.808
Breaking Current (kA, rms, symm) : 30.213 22.154 29.090
Steady State Current (kA, rms) : 18.088 30.213 22.154 29.090

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 20.163 0.00 80.74 121.06 20.643 20.643 3.40E+000 8.92E+000 8.89E+000 5.32E+000

HWL15 SELECT ISO IGNCA F1 34.29 19.680 54.37 89.76 100.46 20.313 20.643 3.54E+000 9.11E+000 8.89E+000 5.32E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 20.163 20.643 17.462 23.683
Peak Current (kA), Method C : 38.166 39.073 33.052 44.829
Breaking Current (kA, rms, symm) : 20.643 17.462 23.683
Steady State Current (kA, rms) : 15.274 20.643 17.462 23.683

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 18.587 0.00 83.18 125.18 18.059 18.059 4.35E+000 9.40E+000 1.18E+001 5.73E+000

HWL12 SELECT ISO JANPATH LANE F1 42.08 18.115 63.36 90.45 101.44 17.753 18.059 4.55E+000 9.60E+000 1.18E+001 5.73E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.324 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 18.587 18.059 16.097 21.317
Peak Current (kA), Method C : 33.458 32.507 28.975 38.372
Breaking Current (kA, rms, symm) : 18.059 16.097 21.317
Steady State Current (kA, rms) : 14.387 18.059 16.097 21.317

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 9.379 0.00 98.19 96.94 9.854 9.854 3.72E-001 3.06E+000 2.60E-001 2.62E+000

HCML IC L1 TB MAHARNI SS BUS 0.99 0.440 2.83 97.39 96.11 0.679 1.113 6.00E+000 6.54E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 0.99 0.440 2.83 97.39 96.11 0.679 1.113 6.00E+000 6.54E+001 2.66E-001 2.33E+001

MAHARANI 1x315 MAHARNI SS BUS 100.00 8.500 100.00 100.00 100.00 8.500 7.639 4.21E-001 3.37E+000 4.21E-001 3.37E+000
MVA TR
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.379 9.854 8.122 9.700
Peak Current (kA), Method C : 22.551 23.695 19.529 23.325
Breaking Current (kA, rms, symm) : 9.854 8.122 9.700
Steady State Current (kA, rms) : 8.500 9.854 8.122 9.700

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 19.607 0.00 94.64 105.11 19.710 19.710 3.06E+000 9.33E+000 4.67E+000 8.58E+000

HWL8 SELECT ISO MANDI HOUSE F1 32.51 19.119 43.49 91.96 97.84 19.382 19.710 3.19E+000 9.55E+000 4.67E+000 8.58E+000
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.335 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 19.607 19.710 16.980 20.642
Peak Current (kA), Method C : 38.565 38.767 33.398 40.601
Breaking Current (kA, rms, symm) : 19.710 16.980 20.642
Steady State Current (kA, rms) : 14.892 19.710 16.980 20.642

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 32.577 0.00 173.21 173.21 0.000 0.000 1.15E+000 1.77E+001

TR1 11KV TB OG AUX TR1 CB TB 3.74 32.492 0.00 173.21 173.21 0.000 0.000 1.14E+000 1.77E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 32.577 0.000 28.212 28.212
Peak Current (kA), Method C : 84.201 0.000 72.920 72.920
Breaking Current (kA, rms, symm) : 0.000 28.212 28.212
Steady State Current (kA, rms) : 28.280 0.000 28.212 28.212

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 32.577 0.00 173.21 173.21 0.000 0.000 1.15E+000 1.77E+001

TR2 11KV TB OG AUX TR2 CB TB 3.74 32.492 0.00 173.21 173.21 0.000 0.000 1.14E+000 1.77E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 32.577 0.000 28.212 28.212
Peak Current (kA), Method C : 84.201 0.000 72.920 72.920
Breaking Current (kA, rms, symm) : 0.000 28.212 28.212
Steady State Current (kA, rms) : 28.280 0.000 28.212 28.212

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 7.575 0.00 102.86 100.48 7.330 7.330 4.12E-001 3.79E+000 2.84E-001 4.19E+000
BUS

HCML IC L3 TB PARK STREET SS 4.26 7.575 6.26 101.67 99.46 7.330 7.330 4.12E-001 3.79E+000 2.84E-001 4.19E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 7.575 7.330 6.560 7.546
Peak Current (kA), Method C : 18.504 17.904 16.025 18.432
Breaking Current (kA, rms, symm) : 7.330 6.560 7.546
Steady State Current (kA, rms) : 6.885 7.330 6.560 7.546

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 14.802 0.00 91.08 130.80 12.781 12.781 7.17E+000 1.08E+001 2.06E+001 6.99E+000

HWL9 SELECT ISO RAJA BAZAR F1 58.39 14.361 78.28 92.75 102.35 12.526 12.781 7.57E+000 1.11E+001 2.06E+001 6.99E+000
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.288 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.802 12.781 12.819 16.106
Peak Current (kA), Method C : 24.494 21.148 21.212 26.651
Breaking Current (kA, rms, symm) : 12.781 12.819 16.106
Steady State Current (kA, rms) : 12.064 12.781 12.819 16.106

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 17.174 0.00 86.00 127.84 15.940 15.940 5.29E+000 9.88E+000 1.47E+001 6.15E+000

HWL3 SELECT ISO SCHOOL LANE F1 48.53 16.712 69.85 91.26 101.97 15.654 15.940 5.55E+000 1.01E+001 1.47E+001 6.15E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.310 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 17.174 15.940 14.873 19.289
Peak Current (kA), Method C : 29.801 27.660 25.808 33.472
Breaking Current (kA, rms, symm) : 15.940 14.873 19.289
Steady State Current (kA, rms) : 13.553 15.940 14.873 19.289

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 24.022 0.00 91.80 96.63 27.131 27.131 1.02E+000 7.95E+000 1.16E+000 5.14E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 8.53 23.522 13.42 92.31 93.61 26.755 27.131 1.05E+000 8.11E+000 1.16E+000 5.14E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.377 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 24.022 27.131 20.803 26.643
Peak Current (kA), Method C : 57.346 64.769 49.663 63.603
Breaking Current (kA, rms, symm) : 27.131 20.803 26.643
Steady State Current (kA, rms) : 17.281 27.131 20.803 26.643

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 101.78 99.43 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 7.912 0.00 101.78 99.43 7.819 7.819 3.95E-001 3.63E+000 2.57E-001 3.77E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 27.98 0.506 40.61 95.70 93.63 0.734 1.203 5.18E+000 5.68E+001 7.06E-001 2.46E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 24.81 0.078 65.13 67.67 100.00 0.158 0.321 * 1.66E+001 3.71E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 16.51 7.329 22.97 98.00 96.80 6.927 6.298 4.34E-001 3.91E+000 3.78E-001 4.68E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 7.912 7.819 6.852 7.958
Peak Current (kA), Method C : 19.327 19.098 16.737 19.437
Breaking Current (kA, rms, symm) : 7.819 6.852 7.958
Steady State Current (kA, rms) : 7.163 7.819 6.852 7.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 33.437 0.00 173.21 173.21 0.000 0.000 6.50E-001 1.73E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 84.18 5.278 100.00 100.00 100.00 0.000 0.000 1.59E+000 1.09E+002
ISO TB
# TR1 33KV TB TR1 11KV TB 59.85 28.084 100.00 100.00 100.00 0.000 0.000 9.53E-001 2.05E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 33.437 0.000 28.958 28.958
Peak Current (kA), Method C : 89.699 0.000 77.681 77.681
Breaking Current (kA, rms, symm) : 0.000 28.958 28.958
Steady State Current (kA, rms) : 28.926 0.000 28.958 28.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 25.569 0.00 93.14 91.44 30.202 30.202 5.20E-001 7.51E+000 1.35E-001 4.06E+000

HWT1 IC CB TB TR1 33KV TB 0.11 16.495 0.16 93.12 91.42 18.002 15.039 9.18E-001 1.16E+001 2.78E-001 8.16E+000

# TR1 HT BUS SELECT TR1 33KV TB 65.16 7.853 65.65 97.57 95.99 7.913 5.187 1.40E+000 2.45E+001 1.06E+000 2.36E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 7.83 1.224 54.96 55.74 100.00 4.289 9.978 * 2.65E+000 1.57E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.569 30.202 22.143 29.081
Peak Current (kA), Method C : 65.742 77.655 56.934 74.771
Breaking Current (kA, rms, symm) : 30.202 22.143 29.081
Steady State Current (kA, rms) : 18.088 30.202 22.143 29.081

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 33.437 0.00 173.21 173.21 0.000 0.000 6.50E-001 1.73E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 84.18 5.278 100.00 100.00 100.00 0.000 0.000 1.59E+000 1.09E+002
ISO TB
# TR2 33KV TB TR2 11KV TB 59.85 28.084 100.00 100.00 100.00 0.000 0.000 9.53E-001 2.05E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 33.437 0.000 28.958 28.958
Peak Current (kA), Method C : 89.699 0.000 77.681 77.681
Breaking Current (kA, rms, symm) : 0.000 28.958 28.958
Steady State Current (kA, rms) : 28.926 0.000 28.958 28.958

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 25.569 0.00 93.14 91.44 30.202 30.202 5.20E-001 7.51E+000 1.35E-001 4.06E+000

HWT3 IC2 CB TB TR2 33KV TB 0.11 16.495 0.16 93.12 91.42 18.002 15.039 9.18E-001 1.16E+001 2.78E-001 8.16E+000

# TR2 HT BUS SELECT TR2 33KV TB 65.16 7.853 65.65 97.57 95.99 7.913 5.187 1.40E+000 2.45E+001 1.06E+000 2.36E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 7.83 1.224 54.96 55.74 100.00 4.289 9.978 * 2.65E+000 1.57E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.569 30.202 22.143 29.081
Peak Current (kA), Method C : 65.742 77.655 56.934 74.771
Breaking Current (kA, rms, symm) : 30.202 22.143 29.081
Steady State Current (kA, rms) : 18.088 30.202 22.143 29.081

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 16.402 0.00 87.65 128.98 14.859 14.859 5.86E+000 1.02E+001 1.65E+001 6.40E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 51.87 15.947 72.89 91.74 102.15 14.584 14.859 6.16E+000 1.04E+001 1.65E+001 6.40E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.302 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 16.402 14.859 14.204 18.223
Peak Current (kA), Method C : 27.975 25.344 24.227 31.082
Breaking Current (kA, rms, symm) : 14.859 14.204 18.223
Steady State Current (kA, rms) : 13.081 14.859 14.204 18.223

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
33KV MAIN BUS2 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
AUX TR1 HT TB 11.000 31.738 79.300 27.647 0.000 0.000 0.000 0.000 27.486 68.676 27.486 27.486 27.486 68.676 27.486 27.486
AUX TR1 LT BUS 0.415 14.610 28.815 11.794 13.146 25.927 13.146 13.146 12.653 24.955 12.653 12.653 14.556 28.708 14.556 14.556
AUX TR1 LT TB 0.415 14.863 29.490 12.062 13.884 27.548 13.884 13.884 12.871 25.539 12.871 12.871 14.500 28.771 14.500 14.500
AUX TR2 HT TB 11.000 31.738 79.300 27.647 0.000 0.000 0.000 0.000 27.486 68.676 27.486 27.486 27.486 68.676 27.486 27.486
AUX TR2 LT BUS 0.415 14.610 28.815 11.794 13.146 25.927 13.146 13.146 12.653 24.955 12.653 12.653 14.556 28.708 14.556 14.556
AUX TR2 LT TB 0.415 14.863 29.490 12.062 13.884 27.548 13.884 13.884 12.871 25.539 12.871 12.871 14.500 28.771 14.500 14.500
B. D. MARG F1 33.000 14.195 23.260 11.663 12.044 19.736 12.044 12.044 12.294 20.144 12.294 12.294 15.332 25.122 15.332 15.332
CHURCH ROAD F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
CONNAUGHT PLACE F1 33.000 12.773 20.521 10.689 10.421 16.741 10.421 10.421 11.062 17.771 11.062 11.062 13.574 21.807 13.574 13.574
CONSTITUTION C-F1 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
CONSTITUTION C-F2 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
DELHI HC F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
DWL1 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL2 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL3 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
DWL4 IC CB TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HANUMAN ROAD F1 33.000 23.927 56.011 17.238 26.962 63.116 26.962 26.962 20.721 48.507 20.721 20.721 26.495 62.022 26.495 26.495
HCML F1 33.000 24.848 60.108 17.718 29.072 70.326 29.072 29.072 21.519 52.055 21.519 21.519 28.995 70.141 28.995 28.995
HCML IC L1 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L2 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L3 TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HCML IC L4TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
HWL1 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL2 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL3 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL4 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL5 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL6 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL7 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL8 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL9 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL10 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL11 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL12 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL13 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWL15 SELECT ISO TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWT1 IC CB TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
HWT3 IC2 CB TB 33.000 25.581 65.784 18.088 30.213 77.696 30.213 30.213 22.154 56.970 22.154 22.154 29.090 74.808 29.090 29.090
IGNCA F1 33.000 20.163 38.166 15.274 20.643 39.073 20.643 20.643 17.462 33.052 17.462 17.462 23.683 44.829 23.683 23.683
JANPATH LANE F1 33.000 18.587 33.458 14.387 18.059 32.507 18.059 18.059 16.097 28.975 16.097 16.097 21.317 38.372 21.317 21.317
MAHARNI SS BUS 220.000 9.379 22.551 8.500 9.854 23.695 9.854 9.854 8.122 19.529 8.122 8.122 9.700 23.325 9.700 9.700
MAIN BUS1 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
MAIN BUS2 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958
MANDI HOUSE F1 33.000 19.607 38.565 14.892 19.710 38.767 19.710 19.710 16.980 33.398 16.980 16.980 20.642 40.601 20.642 20.642
OG AUX TR1 CB TB 11.000 32.577 84.201 28.280 0.000 0.000 0.000 0.000 28.212 72.920 28.212 28.212 28.212 72.920 28.212 28.212
OG AUX TR2 CB TB 11.000 32.577 84.201 28.280 0.000 0.000 0.000 0.000 28.212 72.920 28.212 28.212 28.212 72.920 28.212 28.212
PARK STREET SS BUS 220.000 7.575 18.504 6.885 7.330 17.904 7.330 7.330 6.560 16.025 6.560 6.560 7.546 18.432 7.546 7.546
RAJA BAZAR F1 33.000 14.802 24.494 12.064 12.781 21.148 12.781 12.781 12.819 21.212 12.819 12.819 16.106 26.651 16.106 16.106
SCHOOL LANE F1 33.000 17.174 29.801 13.553 15.940 27.660 15.940 15.940 14.873 25.808 14.873 14.873 19.289 33.472 19.289 19.289
SCINDIA HOUSE F1 33.000 24.022 57.346 17.281 27.131 64.769 27.131 27.131 20.803 49.663 20.803 20.803 26.643 63.603 26.643 26.643
TR1 HT BUS SELECT ISO TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958

TR2 HT BUS SELECT ISO TB 220.000 7.912 19.327 7.163 7.819 19.098 7.819 7.819 6.852 16.737 6.852 6.852 7.958 19.437 7.958 7.958

TR1 11KV TB 11.000 33.437 89.699 28.926 0.000 0.000 0.000 0.000 28.958 77.681 28.958 28.958 28.958 77.681 28.958 28.958
TR1 33KV TB 33.000 25.569 65.742 18.088 30.202 77.655 30.202 30.202 22.143 56.934 22.143 22.143 29.081 74.771 29.081 29.081
TR2 11KV TB 11.000 33.437 89.699 28.926 0.000 0.000 0.000 0.000 28.958 77.681 28.958 28.958 28.958 77.681 28.958 28.958
TR2 33KV TB 33.000 25.569 65.742 18.088 30.202 77.655 30.202 30.202 22.143 56.934 22.143 22.143 29.081 74.771 29.081 29.081
VIDHYUT BHAVAN F1 33.000 16.402 27.975 13.081 14.859 25.344 14.859 14.859 14.204 24.227 14.204 14.204 18.223 31.082 18.223 18.223

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02002 0.21920 0.22012 0.02002 0.21920 0.22012 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01638 0.01722 0.00531 0.01638 0.01722 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01613 0.01693 0.00512 0.01613 0.01693 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02002 0.21920 0.22012 0.02002 0.21920 0.22012 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01638 0.01722 0.00531 0.01638 0.01722 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01613 0.01693 0.00512 0.01613 0.01693 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.84107 1.21337 1.47637 0.84107 1.21337 1.47637 2.43048 0.78823 2.55510 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 1.00211 1.29918 1.64076 1.00211 1.29918 1.64076 2.93907 0.86103 3.06259 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12627 0.86676 0.87591 0.12627 0.86676 0.87591 0.13813 0.56543 0.58206 0.00000 0.00000 0.00000

HCML F1 33.000 0.09863 0.83767 0.84345 0.09863 0.83767 0.84345 0.14182 0.46063 0.48197 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-33KV MIN

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05654 0.81732 0.81927 0.05654 0.81732 0.81927 0.01467 0.44243 0.44267 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.37008 0.97131 1.03942 0.37008 0.97131 1.03942 0.96828 0.57893 1.12815 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.47348 1.02333 1.12756 0.47348 1.02333 1.12756 1.28615 0.62443 1.42971 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80231 14.78820 14.89762 1.80231 14.78820 14.89762 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.33341 1.01558 1.06891 0.33341 1.01558 1.06891 0.50850 0.93443 1.06383 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01394 0.21399 0.21444 0.01394 0.21399 0.21444 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01394 0.21399 0.21444 0.01394 0.21399 0.21444 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.99553 18.33644 18.44471 1.99553 18.33644 18.44471 1.37407 20.26168 20.30822 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78031 1.18141 1.41584 0.78031 1.18141 1.41584 2.23975 0.76093 2.36548 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.57632 1.07569 1.22035 0.57632 1.07569 1.22035 1.60402 0.66993 1.73830 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.11147 0.86530 0.87245 0.11147 0.86530 0.87245 0.12658 0.56025 0.57438 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.91144 17.55444 17.65820 1.91144 17.55444 17.65820 1.24311 18.26068 18.30294 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00787 0.20878 0.20893 0.00787 0.20878 0.20893 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05667 0.81770 0.81966 0.05667 0.81770 0.81966 0.01467 0.44242 0.44267 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00787 0.20878 0.20893 0.00787 0.20878 0.20893 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05667 0.81770 0.81966 0.05667 0.81770 0.81966 0.01467 0.44242 0.44267 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.63775 1.10727 1.27780 0.63775 1.10727 1.27780 1.79474 0.69723 1.92541 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 28 58

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 220KV PAR MIN.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 2 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 2 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 2 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 2 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 2 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 2 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 2 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 2 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 2 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 2 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 2 100.00 0.00

DELHI HC F1 Load 33.000 33.000 2 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 2 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 2 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 2 100.00 0.00

HCML F1 Load 33.000 33.000 2 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 2 100.00 0.00

HCML IC L4TB Load 220.000 220.000 2 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 2 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 2 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 2 100.00 0.00

IGNCA F1 Load 33.000 33.000 2 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 2 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 2 100.00 0.00

MAIN BUS1 Load 220.000 220.000 2 100.00 0.00

MAIN BUS2 Load 220.000 220.000 2 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 2 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 2 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 2 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 2 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 2 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 2 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 2 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 2 100.00 0.00

TR1 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 2 100.00 0.00

TR2 11KV TB Load 11.000 11.000 2 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 2 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 2 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWQ1 BC Tie Breakr MAIN BUS1 MAIN BUS2

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2


DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB

DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB
HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB

HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB
HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB

HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB
HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB

HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB
HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB

HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB
HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB

HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1


HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 1x315 MVA TR MAHARNI SS BUS 3238.935 220.000 0.38295 3.06359 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 3238.935 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000

TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 25.567 0.00 173.21 173.21 0.000 0.000 1.75E+000 2.25E+001

OG AUX TR1 CB TB AUX TR1 HT TB 2.94 25.482 0.00 173.21 173.21 0.000 0.000 1.73E+000 2.26E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.567 0.000 22.142 22.142
Peak Current (kA), Method C : 65.041 0.000 56.327 56.327
Breaking Current (kA, rms, symm) : 0.000 22.142 22.142
Steady State Current (kA, rms) : 21.993 0.000 22.142 22.142

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.570 0.00 101.03 109.87 13.124 13.124 3.12E+002 9.66E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.34 11.778 9.08 104.11 102.42 11.447 13.124 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.570 13.124 12.618 14.524
Peak Current (kA), Method C : 28.756 25.903 24.904 28.665
Breaking Current (kA, rms, symm) : 13.124 12.618 14.524
Steady State Current (kA, rms) : 11.746 13.124 12.618 14.524

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.820 0.00 103.91 102.88 13.859 13.859 3.01E+002 9.52E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 103.97 103.01 1.739 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 98.82 12.046 99.68 100.64 99.89 12.129 13.859 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.820 13.859 12.835 14.462
Peak Current (kA), Method C : 29.427 27.519 25.485 28.715
Breaking Current (kA, rms, symm) : 13.859 12.835 14.462
Steady State Current (kA, rms) : 12.012 13.859 12.835 14.462

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 25.959 0.00 173.21 173.21 0.000 0.000 1.75E+000 2.22E+001

OG AUX TR2 CB TB AUX TR2 HT TB 2.98 25.874 0.00 173.21 173.21 0.000 0.000 1.74E+000 2.22E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 25.959 0.000 22.481 22.481
Peak Current (kA), Method C : 65.908 0.000 57.078 57.078
Breaking Current (kA, rms, symm) : 0.000 22.481 22.481
Steady State Current (kA, rms) : 21.993 0.000 22.481 22.481

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.573 0.00 101.04 109.87 13.126 13.126 3.12E+002 9.66E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.34 11.781 9.08 104.11 102.43 11.449 13.126 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.573 13.126 12.621 14.526
Peak Current (kA), Method C : 28.760 25.904 24.907 28.668
Breaking Current (kA, rms, symm) : 13.126 12.621 14.526
Steady State Current (kA, rms) : 11.746 13.126 12.621 14.526

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.824 0.00 103.92 102.88 13.861 13.861 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 103.98 103.01 1.739 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 98.85 12.049 99.70 100.64 99.90 12.131 13.861 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.824 13.861 12.838 14.465
Peak Current (kA), Method C : 29.432 27.521 25.489 28.719
Breaking Current (kA, rms, symm) : 13.861 12.838 14.465
Steady State Current (kA, rms) : 12.012 13.861 12.838 14.465

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 10.470 0.00 84.44 126.87 9.938 9.938 7.71E+000 1.67E+001 2.24E+001 1.07E+001

HWL7 SELECT ISO B. D. MARG F1 44.13 9.998 65.65 91.30 101.76 9.639 9.938 8.36E+000 1.73E+001 2.24E+001 1.07E+001
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.317 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.470 9.938 9.067 11.890
Peak Current (kA), Method C : 18.940 17.977 16.403 21.509
Breaking Current (kA, rms, symm) : 9.938 9.067 11.890
Steady State Current (kA, rms) : 8.434 9.938 9.067 11.890

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 10.977 0.00 84.32 125.93 10.490 10.490 7.19E+000 1.60E+001 2.07E+001 1.05E+001

HWL13 SELECT ISO CHURCH ROAD F1 42.70 10.504 63.88 91.60 101.45 10.188 10.490 7.76E+000 1.66E+001 2.07E+001 1.05E+001
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.319 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.977 10.490 9.507 12.481
Peak Current (kA), Method C : 19.989 19.101 17.311 22.727
Breaking Current (kA, rms, symm) : 10.490 9.507 12.481
Steady State Current (kA, rms) : 8.618 10.490 9.507 12.481

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 9.770 0.00 86.99 129.14 8.908 8.908 9.14E+000 1.74E+001 2.71E+001 1.14E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 49.73 9.308 71.14 92.01 102.14 8.627 8.908 9.96E+000 1.81E+001 2.71E+001 1.14E+001
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.304 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.770 8.908 8.461 10.903
Peak Current (kA), Method C : 17.149 15.636 14.851 19.137
Breaking Current (kA, rms, symm) : 8.908 8.461 10.903
Steady State Current (kA, rms) : 7.966 8.908 8.461 10.903

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 13.221 0.00 81.41 112.87 14.302 14.302 3.52E+000 1.41E+001 8.98E+000 8.80E+000

HWL10 SELECT ISO CONSTITUTION C-F1 22.17 12.726 37.45 90.74 98.35 13.945 14.302 3.74E+000 1.47E+001 8.98E+000 8.80E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.221 14.302 11.450 15.720
Peak Current (kA), Method C : 27.837 30.114 24.108 33.099
Breaking Current (kA, rms, symm) : 14.302 11.450 15.720
Steady State Current (kA, rms) : 9.937 14.302 11.450 15.720

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 13.221 0.00 81.41 112.87 14.302 14.302 3.52E+000 1.41E+001 8.98E+000 8.80E+000

HWL11 SELECT ISO CONSTITUTION C-F2 22.17 12.726 37.45 90.74 98.35 13.945 14.302 3.74E+000 1.47E+001 8.98E+000 8.80E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.221 14.302 11.450 15.720
Peak Current (kA), Method C : 27.837 30.114 24.108 33.099
Breaking Current (kA, rms, symm) : 14.302 11.450 15.720
Steady State Current (kA, rms) : 9.937 14.302 11.450 15.720

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 10.977 0.00 84.32 125.93 10.490 10.490 7.19E+000 1.60E+001 2.07E+001 1.05E+001

HWL14 SELECT ISO DELHI HC F1 42.70 10.504 63.88 91.60 101.45 10.188 10.490 7.76E+000 1.66E+001 2.07E+001 1.05E+001
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.319 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.977 10.490 9.507 12.481
Peak Current (kA), Method C : 19.989 19.101 17.311 22.727
Breaking Current (kA, rms, symm) : 10.490 9.507 12.481
Steady State Current (kA, rms) : 8.618 10.490 9.507 12.481

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 14.066 0.00 92.50 95.41 15.975 15.975 1.34E+000 1.36E+001 1.36E+000 8.68E+000

HWL6 SELECT ISO HANUMAN ROAD F1 5.77 13.565 8.76 92.79 93.60 15.597 15.975 1.38E+000 1.41E+001 1.36E+000 8.68E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.379 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.066 15.975 12.181 15.524
Peak Current (kA), Method C : 34.865 39.598 30.194 38.479
Breaking Current (kA, rms, symm) : 15.975 12.181 15.524
Steady State Current (kA, rms) : 10.646 15.975 12.181 15.524

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 14.359 0.00 90.63 95.37 16.677 16.677 1.09E+000 1.34E+001 1.39E+000 7.72E+000

HWL4 SELECT ISO HCML F1 3.22 13.859 5.83 92.66 93.21 16.290 16.677 1.12E+000 1.38E+001 1.39E+000 7.72E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.387 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.359 16.677 12.435 16.317
Peak Current (kA), Method C : 36.346 42.214 31.477 41.302
Breaking Current (kA, rms, symm) : 16.677 12.435 16.317
Steady State Current (kA, rms) : 10.823 16.677 12.435 16.317

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 14.582 0.00 93.41 92.21 17.007 17.007 7.14E-001 1.32E+001 2.22E-001 7.55E+000

TR1 33KV TB HWT1 IC CB TB 0.07 11.109 0.15 93.40 92.18 14.306 17.007 6.35E-001 1.73E+001 2.22E-001 7.55E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.70 92.91 93.04 0.385 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.17 93.37 92.29 0.389 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.38 92.28 0.389 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.38 92.26 0.389 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.12 93.07 92.76 0.386 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.05 92.80 93.22 0.384 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.25 93.03 92.83 0.386 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.582 17.007 12.629 16.337
Peak Current (kA), Method C : 38.264 44.626 33.137 42.868
Breaking Current (kA, rms, symm) : 17.007 12.629 16.337
Steady State Current (kA, rms) : 10.954 17.007 12.629 16.337

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 15.063 0.00 93.78 92.46 17.440 17.440 7.20E-001 1.28E+001 2.22E-001 7.55E+000

TR2 33KV TB HWT3 IC2 CB TB 0.07 11.097 0.15 93.77 92.43 14.378 17.440 6.39E-001 1.73E+001 2.22E-001 7.55E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.89 93.52 92.90 0.384 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.67 93.58 92.79 0.384 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.55 93.32 93.22 0.382 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.63 92.76 0.384 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.063 17.440 13.045 16.772
Peak Current (kA), Method C : 39.409 45.627 34.129 43.881
Breaking Current (kA, rms, symm) : 17.440 13.045 16.772
Steady State Current (kA, rms) : 10.954 17.440 13.045 16.772

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 13.221 0.00 81.41 112.87 14.302 14.302 3.52E+000 1.41E+001 8.98E+000 8.80E+000

HWL15 SELECT ISO IGNCA F1 22.17 12.726 37.45 90.74 98.35 13.945 14.302 3.74E+000 1.47E+001 8.98E+000 8.80E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.361 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.221 14.302 11.450 15.720
Peak Current (kA), Method C : 27.837 30.114 24.108 33.099
Breaking Current (kA, rms, symm) : 14.302 11.450 15.720
Steady State Current (kA, rms) : 9.937 14.302 11.450 15.720

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 12.621 0.00 81.00 117.42 13.224 13.224 4.44E+000 1.46E+001 1.19E+001 9.22E+000

HWL12 SELECT ISO JANPATH LANE F1 28.18 12.130 46.13 90.69 99.53 12.881 13.224 4.75E+000 1.51E+001 1.19E+001 9.22E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.350 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.621 13.224 10.930 14.889
Peak Current (kA), Method C : 25.335 26.545 21.941 29.889
Breaking Current (kA, rms, symm) : 13.224 10.930 14.889
Steady State Current (kA, rms) : 9.595 13.224 10.930 14.889

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 9.378 0.00 98.19 96.94 9.854 9.854 3.72E-001 3.06E+000 2.60E-001 2.62E+000

HCML IC L1 TB MAHARNI SS BUS 0.99 0.439 2.83 97.39 96.11 0.678 1.113 6.00E+000 6.55E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 0.99 0.439 2.83 97.39 96.11 0.678 1.113 6.00E+000 6.55E+001 2.66E-001 2.33E+001

MAHARANI 1x315 MAHARNI SS BUS 100.00 8.500 100.00 100.00 100.00 8.500 7.638 4.21E-001 3.37E+000 4.21E-001 3.37E+000
MVA TR
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 9.378 9.854 8.122 9.700
Peak Current (kA), Method C : 22.549 23.694 19.528 23.323
Breaking Current (kA, rms, symm) : 9.854 8.122 9.700
Steady State Current (kA, rms) : 8.500 9.854 8.122 9.700

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 12.945 0.00 93.34 102.28 13.555 13.555 3.19E+000 1.45E+001 4.76E+000 1.21E+001

HWL8 SELECT ISO MANDI HOUSE F1 21.16 12.448 29.71 92.59 96.65 13.208 13.555 3.39E+000 1.51E+001 4.76E+000 1.21E+001
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.349 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.945 13.555 11.210 13.858
Peak Current (kA), Method C : 28.021 29.342 24.267 29.998
Breaking Current (kA, rms, symm) : 13.555 11.210 13.858
Steady State Current (kA, rms) : 9.754 13.555 11.210 13.858

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 26.102 0.00 173.21 173.21 0.000 0.000 1.24E+000 2.21E+001

TR1 11KV TB OG AUX TR1 CB TB 3.00 26.018 0.00 173.21 173.21 0.000 0.000 1.22E+000 2.22E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.102 0.000 22.605 22.605
Peak Current (kA), Method C : 68.283 0.000 59.134 59.134
Breaking Current (kA, rms, symm) : 0.000 22.605 22.605
Steady State Current (kA, rms) : 22.386 0.000 22.605 22.605

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 26.511 0.00 173.21 173.21 0.000 0.000 1.25E+000 2.17E+001

TR2 11KV TB OG AUX TR2 CB TB 3.04 26.427 0.00 173.21 173.21 0.000 0.000 1.23E+000 2.18E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.511 0.000 22.959 22.959
Peak Current (kA), Method C : 69.240 0.000 59.964 59.964
Breaking Current (kA, rms, symm) : 0.000 22.959 22.959
Steady State Current (kA, rms) : 22.386 0.000 22.959 22.959

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 8.245 0.00 100.86 98.70 8.282 8.282 3.99E-001 3.48E+000 2.65E-001 3.45E+000
BUS

HCML IC L3 TB PARK STREET SS 4.64 8.245 7.07 99.56 97.65 8.282 8.282 3.99E-001 3.48E+000 2.65E-001 3.45E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 8.245 8.282 7.140 8.352
Peak Current (kA), Method C : 19.994 20.085 17.315 20.254
Breaking Current (kA, rms, symm) : 8.282 7.140 8.352
Steady State Current (kA, rms) : 7.435 8.282 7.140 8.352

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 10.977 0.00 84.32 125.93 10.490 10.490 7.19E+000 1.60E+001 2.07E+001 1.05E+001

HWL9 SELECT ISO RAJA BAZAR F1 42.70 10.504 63.88 91.60 101.45 10.188 10.490 7.76E+000 1.66E+001 2.07E+001 1.05E+001
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.319 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.977 10.490 9.507 12.481
Peak Current (kA), Method C : 19.989 19.101 17.311 22.727
Breaking Current (kA, rms, symm) : 10.490 9.507 12.481
Steady State Current (kA, rms) : 8.618 10.490 9.507 12.481

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 11.759 0.00 80.89 120.74 12.046 12.046 5.35E+000 1.55E+001 1.48E+001 9.64E+000

HWL3 SELECT ISO SCHOOL LANE F1 32.74 11.273 52.46 90.31 100.42 11.714 12.046 5.74E+000 1.61E+001 1.48E+001 9.64E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.759 12.046 10.184 13.802
Peak Current (kA), Method C : 22.876 23.434 19.811 26.849
Breaking Current (kA, rms, symm) : 12.046 10.184 13.802
Steady State Current (kA, rms) : 9.260 12.046 10.184 13.802

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 14.091 0.00 92.49 95.31 16.025 16.025 1.20E+000 1.36E+001 1.25E+000 8.63E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 4.93 13.591 7.87 92.93 93.43 15.646 16.025 1.24E+000 1.41E+001 1.25E+000 8.63E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.379 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.091 16.025 12.203 15.562
Peak Current (kA), Method C : 35.352 40.204 30.616 39.042
Breaking Current (kA, rms, symm) : 16.025 12.203 15.562
Steady State Current (kA, rms) : 10.660 16.025 12.203 15.562

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 8.646 0.00 99.53 97.48 8.912 8.912 3.82E-001 3.32E+000 2.38E-001 3.03E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 33.04 95.24 93.05 0.597 0.959 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 62.14 64.56 100.00 0.141 0.294 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 31.52 94.92 92.79 0.570 0.959 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 61.47 63.82 100.00 0.137 0.294 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 99.53 97.48 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

MAHARNI SS BUS HCML IC L2 TB 8.74 3.880 12.17 97.69 96.41 3.735 3.208 8.70E-001 7.39E+000 8.86E-001 8.40E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.646 8.912 7.488 8.877
Peak Current (kA), Method C : 20.958 21.603 18.150 21.518
Breaking Current (kA, rms, symm) : 8.912 7.488 8.877
Steady State Current (kA, rms) : 7.759 8.912 7.488 8.877

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 26.647 0.00 173.21 173.21 0.000 0.000 7.43E-001 2.17E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 87.41 5.480 100.00 100.00 100.00 0.000 0.000 1.93E+000 1.05E+002
ISO TB
# TR1 33KV TB TR1 11KV TB 44.95 21.092 100.00 100.00 100.00 0.000 0.000 1.27E+000 2.73E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.647 0.000 23.077 23.077
Peak Current (kA), Method C : 71.839 0.000 62.214 62.214
Breaking Current (kA, rms, symm) : 0.000 23.077 23.077
Steady State Current (kA, rms) : 22.784 0.000 23.077 23.077

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 14.589 0.00 93.39 92.16 17.028 17.028 7.11E-001 1.32E+001 2.14E-001 7.52E+000

HWT1 IC CB TB TR1 33KV TB 0.02 3.479 0.02 93.39 92.17 2.707 0.000 6.06E+000 5.50E+001

# TR1 HT BUS SELECT TR1 33KV TB 79.85 9.624 80.43 98.57 97.61 9.693 6.615 8.40E-001 2.00E+001 6.37E-001 1.94E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 9.55 1.494 56.03 56.36 100.00 4.633 10.413 * 7.04E-002 1.29E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.589 17.028 12.635 16.360
Peak Current (kA), Method C : 38.291 44.693 33.161 42.938
Breaking Current (kA, rms, symm) : 17.028 12.635 16.360
Steady State Current (kA, rms) : 10.962 17.028 12.635 16.360

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 27.074 0.00 173.21 173.21 0.000 0.000 7.50E-001 2.13E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 87.51 5.487 100.00 100.00 100.00 0.000 0.000 1.93E+000 1.05E+002
ISO TB
# TR2 33KV TB TR2 11KV TB 45.85 21.513 100.00 100.00 100.00 0.000 0.000 1.27E+000 2.68E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.074 0.000 23.447 23.447
Peak Current (kA), Method C : 72.901 0.000 63.134 63.134
Breaking Current (kA, rms, symm) : 0.000 23.447 23.447
Steady State Current (kA, rms) : 22.784 0.000 23.447 23.447

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 15.070 0.00 93.76 92.41 17.462 17.462 7.17E-001 1.28E+001 2.14E-001 7.52E+000

HWT3 IC2 CB TB TR2 33KV TB 0.03 3.973 0.02 93.76 92.41 3.069 0.000 5.36E+000 4.81E+001

# TR2 HT BUS SELECT TR2 33KV TB 79.76 9.613 80.38 98.64 97.66 9.687 6.783 8.44E-001 2.00E+001 6.37E-001 1.94E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 9.54 1.493 56.20 56.59 100.00 4.711 10.679 * 8.85E-002 1.29E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.070 17.462 13.051 16.795
Peak Current (kA), Method C : 39.435 45.695 34.152 43.950
Breaking Current (kA, rms, symm) : 17.462 13.051 16.795
Steady State Current (kA, rms) : 10.962 17.462 13.051 16.795

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 11.446 0.00 81.52 122.52 11.508 11.508 5.89E+000 1.57E+001 1.66E+001 9.89E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 35.66 10.963 56.11 90.49 100.84 11.184 11.508 6.35E+000 1.64E+001 1.66E+001 9.89E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.335 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 11.446 11.508 9.912 13.329
Peak Current (kA), Method C : 21.823 21.943 18.899 25.415
Breaking Current (kA, rms, symm) : 11.508 9.912 13.329
Steady State Current (kA, rms) : 9.063 11.508 9.912 13.329

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
33KV MAIN BUS2 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
AUX TR1 HT TB 11.000 25.567 65.041 21.993 0.000 0.000 0.000 0.000 22.142 56.327 22.142 22.142 22.142 56.327 22.142 22.142
AUX TR1 LT BUS 0.415 14.570 28.756 11.746 13.124 25.903 13.124 13.124 12.618 24.904 12.618 12.618 14.524 28.665 14.524 14.524
AUX TR1 LT TB 0.415 14.820 29.427 12.012 13.859 27.519 13.859 13.859 12.835 25.485 12.835 12.835 14.462 28.715 14.462 14.462
AUX TR2 HT TB 11.000 25.959 65.908 21.993 0.000 0.000 0.000 0.000 22.481 57.078 22.481 22.481 22.481 57.078 22.481 22.481
AUX TR2 LT BUS 0.415 14.573 28.760 11.746 13.126 25.904 13.126 13.126 12.621 24.907 12.621 12.621 14.526 28.668 14.526 14.526
AUX TR2 LT TB 0.415 14.824 29.432 12.012 13.861 27.521 13.861 13.861 12.838 25.489 12.838 12.838 14.465 28.719 14.465 14.465
B. D. MARG F1 33.000 10.470 18.940 8.434 9.938 17.977 9.938 9.938 9.067 16.403 9.067 9.067 11.890 21.509 11.890 11.890
CHURCH ROAD F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
CONNAUGHT PLACE F1 33.000 9.770 17.149 7.966 8.908 15.636 8.908 8.908 8.461 14.851 8.461 8.461 10.903 19.137 10.903 10.903
CONSTITUTION C-F1 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
CONSTITUTION C-F2 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
DELHI HC F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
DWL1 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL2 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL3 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
DWL4 IC CB TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HANUMAN ROAD F1 33.000 14.066 34.865 10.646 15.975 39.598 15.975 15.975 12.181 30.194 12.181 12.181 15.524 38.479 15.524 15.524
HCML F1 33.000 14.359 36.346 10.823 16.677 42.214 16.677 16.677 12.435 31.477 12.435 12.435 16.317 41.302 16.317 16.317
HCML IC L1 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L2 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L3 TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HCML IC L4TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
HWL1 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL2 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL3 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL4 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL5 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL6 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL7 SELECT ISO TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWL8 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL9 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL10 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL11 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL12 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL13 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWL15 SELECT ISO TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
HWT1 IC CB TB 33.000 14.582 38.264 10.954 17.007 44.626 17.007 17.007 12.629 33.137 12.629 12.629 16.337 42.868 16.337 16.337
HWT3 IC2 CB TB 33.000 15.063 39.409 10.954 17.440 45.627 17.440 17.440 13.045 34.129 13.045 13.045 16.772 43.881 16.772 16.772
IGNCA F1 33.000 13.221 27.837 9.937 14.302 30.114 14.302 14.302 11.450 24.108 11.450 11.450 15.720 33.099 15.720 15.720
JANPATH LANE F1 33.000 12.621 25.335 9.595 13.224 26.545 13.224 13.224 10.930 21.941 10.930 10.930 14.889 29.889 14.889 14.889
MAHARNI SS BUS 220.000 9.378 22.549 8.500 9.854 23.694 9.854 9.854 8.122 19.528 8.122 8.122 9.700 23.323 9.700 9.700
MAIN BUS1 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
MAIN BUS2 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877
MANDI HOUSE F1 33.000 12.945 28.021 9.754 13.555 29.342 13.555 13.555 11.210 24.267 11.210 11.210 13.858 29.998 13.858 13.858
OG AUX TR1 CB TB 11.000 26.102 68.283 22.386 0.000 0.000 0.000 0.000 22.605 59.134 22.605 22.605 22.605 59.134 22.605 22.605
OG AUX TR2 CB TB 11.000 26.511 69.240 22.386 0.000 0.000 0.000 0.000 22.959 59.964 22.959 22.959 22.959 59.964 22.959 22.959
PARK STREET SS BUS 220.000 8.245 19.994 7.435 8.282 20.085 8.282 8.282 7.140 17.315 7.140 7.140 8.352 20.254 8.352 8.352
RAJA BAZAR F1 33.000 10.977 19.989 8.618 10.490 19.101 10.490 10.490 9.507 17.311 9.507 9.507 12.481 22.727 12.481 12.481
SCHOOL LANE F1 33.000 11.759 22.876 9.260 12.046 23.434 12.046 12.046 10.184 19.811 10.184 10.184 13.802 26.849 13.802 13.802
SCINDIA HOUSE F1 33.000 14.091 35.352 10.660 16.025 40.204 16.025 16.025 12.203 30.616 12.203 12.203 15.562 39.042 15.562 15.562
TR1 HT BUS SELECT ISO TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877

TR2 HT BUS SELECT ISO TB 220.000 8.646 20.958 7.759 8.912 21.603 8.912 8.912 7.488 18.150 7.488 7.488 8.877 21.518 8.877 8.877

TR1 11KV TB 11.000 26.647 71.839 22.784 0.000 0.000 0.000 0.000 23.077 62.214 23.077 23.077 23.077 62.214 23.077 23.077
TR1 33KV TB 33.000 14.589 38.291 10.962 17.028 44.693 17.028 17.028 12.635 33.161 12.635 12.635 16.360 42.938 16.360 16.360
TR2 11KV TB 11.000 27.074 72.901 22.784 0.000 0.000 0.000 0.000 23.447 63.134 23.447 23.447 23.447 63.134 23.447 23.447
TR2 33KV TB 33.000 15.070 39.435 10.962 17.462 45.695 17.462 17.462 13.051 34.152 13.051 13.051 16.795 43.950 16.795 16.795
VIDHYUT BHAVAN F1 33.000 11.446 21.823 9.063 11.508 21.943 11.508 11.508 9.912 18.899 9.912 9.912 13.329 25.415 13.329 13.329

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.02113 0.27242 0.27324 0.02113 0.27242 0.27324 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01643 0.01727 0.00531 0.01643 0.01727 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01618 0.01698 0.00512 0.01618 0.01698 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.02122 0.26828 0.26912 0.02122 0.26828 0.26912 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01643 0.01726 0.00531 0.01643 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.83931 1.81727 2.00173 0.83931 1.81727 2.00173 2.43995 1.16815 2.70517 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.99572 1.90006 2.14515 0.99572 1.90006 2.14515 2.94854 1.24095 3.19904 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.14544 1.48289 1.49000 0.14544 1.48289 1.49000 0.14760 0.94535 0.95680 0.00000 0.00000 0.00000

HCML F1 33.000 0.11859 1.45474 1.45957 0.11859 1.45474 1.45957 0.15129 0.84055 0.85406 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 3239 MVA
Filename: HCML Config.: PAR-220KV MI

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.07774 1.43510 1.43721 0.07774 1.43510 1.43721 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.07836 1.38912 1.39133 0.07836 1.38912 1.39133 0.02414 0.82235 0.82271 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.38332 1.53815 1.58520 0.38332 1.53815 1.58520 0.97775 0.95885 1.36945 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.48391 1.58850 1.66057 0.48391 1.58850 1.66057 1.29562 1.00435 1.63931 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.80239 14.78920 14.89863 1.80239 14.78920 14.89863 1.25796 12.67933 12.74158 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.34778 1.58125 1.61904 0.34778 1.58125 1.61904 0.51797 1.31435 1.41273 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01506 0.26722 0.26764 0.01506 0.26722 0.26764 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01515 0.26308 0.26351 0.01515 0.26308 0.26351 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.93282 16.83551 16.94610 1.93282 16.83551 16.94610 1.28466 16.67452 16.72393 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.78246 1.74147 1.90918 0.78246 1.74147 1.90918 2.24923 1.14085 2.52202 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.58223 1.68443 1.78222 0.58223 1.68443 1.78222 1.61349 1.04985 1.92498 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.13108 1.48150 1.48729 0.13108 1.48150 1.48729 0.13605 0.94018 0.94997 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.84872 16.05351 16.15961 1.84872 16.05351 16.15961 1.15371 14.67352 14.71880 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00899 0.26202 0.26217 0.00899 0.26202 0.26217 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.07744 1.43445 1.43654 0.07744 1.43445 1.43654 0.02336 0.81909 0.81942 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00908 0.25787 0.25803 0.00908 0.25787 0.25803 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.07809 1.38853 1.39072 0.07809 1.38853 1.39072 0.02336 0.81909 0.81942 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.64188 1.71490 1.83109 0.64188 1.71490 1.83109 1.80421 1.07715 2.10129 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 27 57

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 2x315.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 3 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 3 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 3 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 3 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 3 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 3 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 3 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 3 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 3 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 3 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 3 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 3 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 3 100.00 0.00

DELHI HC F1 Load 33.000 33.000 3 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 3 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 3 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 3 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 3 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 3 100.00 0.00

HCML F1 Load 33.000 33.000 3 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 3 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 3 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 3 100.00 0.00

HCML IC L4TB Load 220.000 220.000 3 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 3 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 3 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 3 100.00 0.00

IGNCA F1 Load 33.000 33.000 3 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 3 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 3 100.00 0.00

MAIN BUS1 Load 220.000 220.000 3 100.00 0.00

MAIN BUS2 Load 220.000 220.000 3 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 3 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 3 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 3 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 3 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 3 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 3 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 3 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 3 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 3 100.00 0.00

TR1 11KV TB Load 11.000 11.000 3 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 3 100.00 0.00

TR2 11KV TB Load 11.000 11.000 3 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 3 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 3 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2

DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB
DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB

HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB
HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB

HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB
HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB

HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB
HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB

HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB
HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB

HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB
HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1

HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 2x315 MVA TR MAHARNI SS BUS 6096.819 220.000 0.20344 1.62753 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 6096.819 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000

TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 26.365 0.00 173.21 173.21 0.000 0.000 1.62E+000 2.18E+001

OG AUX TR1 CB TB AUX TR1 HT TB 3.03 26.280 0.00 173.21 173.21 0.000 0.000 1.60E+000 2.19E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.365 0.000 22.832 22.832
Peak Current (kA), Method C : 67.362 0.000 58.338 58.338
Breaking Current (kA, rms, symm) : 0.000 22.832 22.832
Steady State Current (kA, rms) : 23.105 0.000 22.832 22.832

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.577 0.00 101.04 109.87 13.128 13.128 3.12E+002 9.66E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.34 11.784 9.08 104.12 102.43 11.451 13.128 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.577 13.128 12.624 14.529
Peak Current (kA), Method C : 28.768 25.909 24.914 28.675
Breaking Current (kA, rms, symm) : 13.128 12.624 14.529
Steady State Current (kA, rms) : 11.758 13.128 12.624 14.529

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.827 0.00 103.92 102.89 13.863 13.863 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 103.98 103.01 1.739 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 98.88 12.052 99.71 100.64 99.91 12.133 13.863 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.827 13.863 12.841 14.468
Peak Current (kA), Method C : 29.440 27.526 25.495 28.726
Breaking Current (kA, rms, symm) : 13.863 12.841 14.468
Steady State Current (kA, rms) : 12.024 13.863 12.841 14.468

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 26.745 0.00 173.21 173.21 0.000 0.000 1.63E+000 2.15E+001

OG AUX TR2 CB TB AUX TR2 HT TB 3.07 26.660 0.00 173.21 173.21 0.000 0.000 1.62E+000 2.16E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.745 0.000 23.162 23.162
Peak Current (kA), Method C : 68.198 0.000 59.061 59.061
Breaking Current (kA, rms, symm) : 0.000 23.162 23.162
Steady State Current (kA, rms) : 23.105 0.000 23.162 23.162

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.579 0.00 101.05 109.88 13.129 13.129 3.12E+002 9.65E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.34 11.787 9.08 104.12 102.43 11.453 13.129 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.579 13.129 12.626 14.532
Peak Current (kA), Method C : 28.772 25.910 24.917 28.677
Breaking Current (kA, rms, symm) : 13.129 12.626 14.532
Steady State Current (kA, rms) : 11.758 13.129 12.626 14.532

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.830 0.00 103.93 102.89 13.865 13.865 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 103.99 103.01 1.739 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 98.90 12.055 99.73 100.64 99.92 12.135 13.865 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.830 13.865 12.843 14.470
Peak Current (kA), Method C : 29.444 27.527 25.499 28.729
Breaking Current (kA, rms, symm) : 13.865 12.843 14.470
Steady State Current (kA, rms) : 12.024 13.865 12.843 14.470

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 10.828 0.00 85.54 127.34 10.129 10.129 7.61E+000 1.61E+001 2.24E+001 1.07E+001

HWL7 SELECT ISO B. D. MARG F1 45.72 10.358 66.96 92.02 101.78 9.836 10.129 8.23E+000 1.67E+001 2.24E+001 1.07E+001
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.312 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.828 10.129 9.377 12.201
Peak Current (kA), Method C : 19.457 18.201 16.850 21.924
Breaking Current (kA, rms, symm) : 10.129 9.377 12.201
Steady State Current (kA, rms) : 8.916 10.129 9.377 12.201

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 11.354 0.00 85.37 126.41 10.696 10.696 7.09E+000 1.54E+001 2.06E+001 1.04E+001

HWL13 SELECT ISO CHURCH ROAD F1 44.24 10.882 65.19 92.32 101.48 10.400 10.696 7.64E+000 1.59E+001 2.06E+001 1.04E+001
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.314 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.354 10.696 9.833 12.810
Peak Current (kA), Method C : 20.543 19.353 17.791 23.178
Breaking Current (kA, rms, symm) : 10.696 9.833 12.810
Steady State Current (kA, rms) : 9.124 10.696 9.833 12.810

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 10.073 0.00 88.12 129.50 9.053 9.053 9.06E+000 1.68E+001 2.71E+001 1.14E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 51.37 9.613 72.35 92.71 102.10 8.777 9.053 9.84E+000 1.74E+001 2.71E+001 1.14E+001
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.300 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.073 9.053 8.724 11.159
Peak Current (kA), Method C : 17.564 15.785 15.211 19.457
Breaking Current (kA, rms, symm) : 9.053 8.724 11.159
Steady State Current (kA, rms) : 8.388 9.053 8.724 11.159

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 13.799 0.00 81.95 113.61 14.747 14.747 3.41E+000 1.35E+001 8.97E+000 8.78E+000

HWL10 SELECT ISO CONSTITUTION C-F1 23.18 13.304 38.64 91.34 98.65 14.395 14.747 3.62E+000 1.40E+001 8.97E+000 8.78E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.356 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.799 14.747 11.950 16.278
Peak Current (kA), Method C : 28.972 30.962 25.090 34.176
Breaking Current (kA, rms, symm) : 14.747 11.950 16.278
Steady State Current (kA, rms) : 10.632 14.747 11.950 16.278

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 13.799 0.00 81.95 113.61 14.747 14.747 3.41E+000 1.35E+001 8.97E+000 8.78E+000

HWL11 SELECT ISO CONSTITUTION C-F2 23.18 13.304 38.64 91.34 98.65 14.395 14.747 3.62E+000 1.40E+001 8.97E+000 8.78E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.356 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.799 14.747 11.950 16.278
Peak Current (kA), Method C : 28.972 30.962 25.090 34.176
Breaking Current (kA, rms, symm) : 14.747 11.950 16.278
Steady State Current (kA, rms) : 10.632 14.747 11.950 16.278

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 11.354 0.00 85.37 126.41 10.696 10.696 7.09E+000 1.54E+001 2.06E+001 1.04E+001

HWL14 SELECT ISO DELHI HC F1 44.24 10.882 65.19 92.32 101.48 10.400 10.696 7.64E+000 1.59E+001 2.06E+001 1.04E+001
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.314 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.354 10.696 9.833 12.810
Peak Current (kA), Method C : 20.543 19.353 17.791 23.178
Breaking Current (kA, rms, symm) : 10.696 9.833 12.810
Steady State Current (kA, rms) : 9.124 10.696 9.833 12.810

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 14.762 0.00 92.88 96.02 16.582 16.582 1.22E+000 1.30E+001 1.34E+000 8.65E+000

HWL6 SELECT ISO HANUMAN ROAD F1 6.06 14.262 9.10 93.16 94.12 16.207 16.582 1.26E+000 1.34E+001 1.34E+000 8.65E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.375 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.762 16.582 12.785 16.162
Peak Current (kA), Method C : 36.788 41.322 31.859 40.274
Breaking Current (kA, rms, symm) : 16.582 12.785 16.162
Steady State Current (kA, rms) : 11.447 16.582 12.785 16.162

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 15.086 0.00 90.92 95.97 17.339 17.339 9.72E-001 1.27E+001 1.38E+000 7.69E+000

HWL4 SELECT ISO HCML F1 3.39 14.586 6.07 93.02 93.74 16.956 17.339 9.94E-001 1.32E+001 1.38E+000 7.69E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.383 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.086 17.339 13.065 17.006
Peak Current (kA), Method C : 38.445 44.189 33.294 43.338
Breaking Current (kA, rms, symm) : 17.339 13.065 17.006
Steady State Current (kA, rms) : 11.650 17.339 13.065 17.006

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000

MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000

MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 15.331 0.00 93.74 92.78 17.693 17.693 5.95E-001 1.25E+001 2.11E-001 7.52E+000

TR1 33KV TB HWT1 IC CB TB 0.08 11.860 0.15 93.72 92.75 15.021 17.693 4.73E-001 1.62E+001 2.11E-001 7.52E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.68 93.24 93.60 0.381 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.70 92.85 0.384 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.71 92.84 0.384 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.71 92.82 0.385 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.11 93.41 93.32 0.382 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.03 93.15 93.77 0.380 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.24 93.37 93.39 0.382 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.331 17.693 13.277 16.987
Peak Current (kA), Method C : 40.599 46.854 35.160 44.985
Breaking Current (kA, rms, symm) : 17.693 13.277 16.987
Steady State Current (kA, rms) : 11.801 17.693 13.277 16.987

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 15.820 0.00 94.11 93.03 18.124 18.124 6.04E-001 1.21E+001 2.11E-001 7.52E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 11.856 0.16 94.10 93.00 15.096 18.124 4.74E-001 1.62E+001 2.11E-001 7.52E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.86 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.92 93.36 0.380 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.67 93.79 0.378 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.97 93.34 0.380 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.820 18.124 13.701 17.427
Peak Current (kA), Method C : 41.770 47.853 36.174 46.011
Breaking Current (kA, rms, symm) : 18.124 13.701 17.427
Steady State Current (kA, rms) : 11.801 18.124 13.701 17.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 13.799 0.00 81.95 113.61 14.747 14.747 3.41E+000 1.35E+001 8.97E+000 8.78E+000

HWL15 SELECT ISO IGNCA F1 23.18 13.304 38.64 91.34 98.65 14.395 14.747 3.62E+000 1.40E+001 8.97E+000 8.78E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.356 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.799 14.747 11.950 16.278
Peak Current (kA), Method C : 28.972 30.962 25.090 34.176
Breaking Current (kA, rms, symm) : 14.747 11.950 16.278
Steady State Current (kA, rms) : 10.632 14.747 11.950 16.278

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 13.142 0.00 81.72 118.13 13.591 13.591 4.34E+000 1.40E+001 1.19E+001 9.19E+000

HWL12 SELECT ISO JANPATH LANE F1 29.39 12.652 47.45 91.34 99.75 13.254 13.591 4.62E+000 1.45E+001 1.19E+001 9.19E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.345 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.142 13.591 11.381 15.379
Peak Current (kA), Method C : 26.262 27.160 22.743 30.732
Breaking Current (kA, rms, symm) : 13.591 11.381 15.379
Steady State Current (kA, rms) : 10.240 13.591 11.381 15.379

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 16.878 0.00 98.94 98.18 17.376 17.376 2.09E-001 1.70E+000 1.70E-001 1.55E+000

HCML IC L1 TB MAHARNI SS BUS 0.94 0.417 2.88 98.07 97.25 0.674 1.166 6.38E+000 6.90E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 1.04 0.462 2.95 98.08 97.26 0.705 1.166 5.67E+000 6.23E+001 2.66E-001 2.33E+001

MAHARANI 2x315 MAHARNI SS BUS 100.00 16.000 100.00 100.00 100.00 16.000 15.057 2.24E-001 1.79E+000 2.24E-001 1.79E+000
MVA TR
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 16.878 17.376 14.617 17.206
Peak Current (kA), Method C : 40.512 41.707 35.084 41.300
Breaking Current (kA, rms, symm) : 17.376 14.617 17.206
Steady State Current (kA, rms) : 16.000 17.376 14.617 17.206

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 13.498 0.00 93.95 102.87 13.963 13.963 3.09E+000 1.39E+001 4.75E+000 1.20E+001

HWL8 SELECT ISO MANDI HOUSE F1 22.11 13.001 30.62 93.06 97.04 13.621 13.963 3.27E+000 1.44E+001 4.75E+000 1.20E+001
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.345 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.498 13.963 11.690 14.343
Peak Current (kA), Method C : 29.172 30.177 25.263 30.997
Breaking Current (kA, rms, symm) : 13.963 11.690 14.343
Steady State Current (kA, rms) : 10.424 13.963 11.690 14.343

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 26.932 0.00 173.21 173.21 0.000 0.000 1.12E+000 2.14E+001

TR1 11KV TB OG AUX TR1 CB TB 3.09 26.847 0.00 173.21 173.21 0.000 0.000 1.10E+000 2.15E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.932 0.000 23.323 23.323
Peak Current (kA), Method C : 70.841 0.000 61.350 61.350
Breaking Current (kA, rms, symm) : 0.000 23.323 23.323
Steady State Current (kA, rms) : 23.537 0.000 23.323 23.323

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 27.329 0.00 173.21 173.21 0.000 0.000 1.13E+000 2.11E+001

TR2 11KV TB OG AUX TR2 CB TB 3.14 27.245 0.00 173.21 173.21 0.000 0.000 1.11E+000 2.12E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.329 0.000 23.668 23.668
Peak Current (kA), Method C : 71.768 0.000 62.153 62.153
Breaking Current (kA, rms, symm) : 0.000 23.668 23.668
Steady State Current (kA, rms) : 23.537 0.000 23.668 23.668

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 11.623 0.00 106.45 104.18 10.471 10.471 2.52E-001 2.47E+000 2.10E-001 3.30E+000
BUS

HCML IC L3 TB PARK STREET SS 6.54 11.623 8.94 104.64 102.59 10.471 10.471 2.52E-001 2.47E+000 2.10E-001 3.30E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 11.623 10.471 10.065 11.254
Peak Current (kA), Method C : 28.626 25.789 24.791 27.719
Breaking Current (kA, rms, symm) : 10.471 10.065 11.254
Steady State Current (kA, rms) : 11.037 10.471 10.065 11.254

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 11.354 0.00 85.37 126.41 10.696 10.696 7.09E+000 1.54E+001 2.06E+001 1.04E+001

HWL9 SELECT ISO RAJA BAZAR F1 44.24 10.882 65.19 92.32 101.48 10.400 10.696 7.64E+000 1.59E+001 2.06E+001 1.04E+001
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.314 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.354 10.696 9.833 12.810
Peak Current (kA), Method C : 20.543 19.353 17.791 23.178
Breaking Current (kA, rms, symm) : 10.696 9.833 12.810
Steady State Current (kA, rms) : 9.124 10.696 9.833 12.810

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 12.230 0.00 81.75 121.41 12.357 12.357 5.25E+000 1.48E+001 1.48E+001 9.61E+000

HWL3 SELECT ISO SCHOOL LANE F1 34.11 11.745 53.85 91.00 100.58 12.030 12.357 5.62E+000 1.54E+001 1.48E+001 9.61E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.337 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.230 12.357 10.592 14.236
Peak Current (kA), Method C : 23.657 23.901 20.488 27.536
Breaking Current (kA, rms, symm) : 12.357 10.592 14.236
Steady State Current (kA, rms) : 9.856 12.357 10.592 14.236

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 14.790 0.00 92.86 95.92 16.635 16.635 1.09E+000 1.30E+001 1.24E+000 8.61E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 5.18 14.290 8.18 93.28 93.95 16.260 16.635 1.12E+000 1.34E+001 1.24E+000 8.61E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.375 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.790 16.635 12.809 16.204
Peak Current (kA), Method C : 37.332 41.989 32.330 40.900
Breaking Current (kA, rms, symm) : 16.635 12.809 16.204
Steady State Current (kA, rms) : 11.462 16.635 12.809 16.204

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 12.436 0.00 105.11 102.86 11.498 11.498 2.35E-001 2.31E+000 1.83E-001 2.88E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.10 97.36 95.21 0.616 1.176 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 64.69 66.91 100.00 0.155 0.361 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 105.11 102.86 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 27.07 12.016 35.83 98.79 98.08 10.728 9.964 2.44E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.436 11.498 10.770 12.153
Peak Current (kA), Method C : 30.645 28.333 26.539 29.947
Breaking Current (kA, rms, symm) : 11.498 10.770 12.153
Steady State Current (kA, rms) : 11.768 11.498 10.770 12.153

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 12.458 0.00 105.15 102.89 11.511 11.511 2.35E-001 2.31E+000 1.83E-001 2.88E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 35.47 97.70 95.50 0.641 1.177 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 65.36 67.64 100.00 0.159 0.361 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 27.02 11.992 35.80 98.80 98.09 10.711 9.975 2.45E-001 2.39E+000 2.38E-001 3.33E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.458 11.511 10.789 12.171
Peak Current (kA), Method C : 30.697 28.362 26.584 29.991
Breaking Current (kA, rms, symm) : 11.511 10.789 12.171
Steady State Current (kA, rms) : 11.768 11.511 10.789 12.171

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 27.509 0.00 173.21 173.21 0.000 0.000 6.18E-001 2.10E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 90.95 5.703 100.00 100.00 100.00 0.000 0.000 2.39E+000 1.01E+002
ISO TB
# TR1 33KV TB TR1 11KV TB 46.32 21.733 100.00 100.00 100.00 0.000 0.000 1.12E+000 2.65E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.509 0.000 23.824 23.824
Peak Current (kA), Method C : 74.670 0.000 64.666 64.666
Breaking Current (kA, rms, symm) : 0.000 23.824 23.824
Steady State Current (kA, rms) : 23.975 0.000 23.824 23.824

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 15.339 0.00 93.72 92.73 17.716 17.716 5.92E-001 1.25E+001 2.04E-001 7.49E+000

HWT1 IC CB TB TR1 33KV TB 0.02 3.479 0.02 93.72 92.73 2.679 0.000 6.06E+000 5.50E+001

# TR1 HT BUS SELECT TR1 33KV TB 85.26 10.276 84.80 99.42 98.79 10.220 6.922 6.46E-001 1.87E+001 5.65E-001 1.92E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 10.19 1.594 56.64 56.73 100.00 4.824 10.794 * 8.80E-001 1.21E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.339 17.716 13.284 17.011
Peak Current (kA), Method C : 40.631 46.929 35.188 45.061
Breaking Current (kA, rms, symm) : 17.716 13.284 17.011
Steady State Current (kA, rms) : 11.809 17.716 13.284 17.011

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 27.925 0.00 173.21 173.21 0.000 0.000 6.28E-001 2.07E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 91.05 5.709 100.00 100.00 100.00 0.000 0.000 2.39E+000 1.01E+002
ISO TB
# TR2 33KV TB TR2 11KV TB 47.19 22.143 100.00 100.00 100.00 0.000 0.000 1.12E+000 2.60E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.925 0.000 24.184 24.184
Peak Current (kA), Method C : 75.701 0.000 65.559 65.559
Breaking Current (kA, rms, symm) : 0.000 24.184 24.184
Steady State Current (kA, rms) : 23.975 0.000 24.184 24.184

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 15.828 0.00 94.09 92.98 18.148 18.148 6.02E-001 1.21E+001 2.04E-001 7.49E+000

HWT3 IC2 CB TB TR2 33KV TB 0.03 3.973 0.02 94.10 92.98 3.037 0.000 5.36E+000 4.81E+001

# TR2 HT BUS SELECT TR2 33KV TB 85.24 10.273 84.77 99.48 98.85 10.216 7.091 6.47E-001 1.87E+001 5.65E-001 1.92E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 10.19 1.593 56.81 56.97 100.00 4.902 11.057 * 8.75E-001 1.21E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.828 18.148 13.707 17.451
Peak Current (kA), Method C : 41.801 47.929 36.201 46.087
Breaking Current (kA, rms, symm) : 18.148 13.707 17.451
Steady State Current (kA, rms) : 11.809 18.148 13.707 17.451

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 11.888 0.00 82.47 123.14 11.785 11.785 5.79E+000 1.51E+001 1.66E+001 9.86E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 37.10 11.406 57.50 91.20 100.96 11.467 11.785 6.22E+000 1.57E+001 1.66E+001 9.86E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.331 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 11.888 11.785 10.295 13.730
Peak Current (kA), Method C : 22.528 22.334 19.510 26.020
Breaking Current (kA, rms, symm) : 11.785 10.295 13.730
Steady State Current (kA, rms) : 9.631 11.785 10.295 13.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
33KV MAIN BUS2 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
AUX TR1 HT TB 11.000 26.365 67.362 23.105 0.000 0.000 0.000 0.000 22.832 58.338 22.832 22.832 22.832 58.338 22.832 22.832
AUX TR1 LT BUS 0.415 14.577 28.768 11.758 13.128 25.909 13.128 13.128 12.624 24.914 12.624 12.624 14.529 28.675 14.529 14.529
AUX TR1 LT TB 0.415 14.827 29.440 12.024 13.863 27.526 13.863 13.863 12.841 25.495 12.841 12.841 14.468 28.726 14.468 14.468
AUX TR2 HT TB 11.000 26.745 68.198 23.105 0.000 0.000 0.000 0.000 23.162 59.061 23.162 23.162 23.162 59.061 23.162 23.162
AUX TR2 LT BUS 0.415 14.579 28.772 11.758 13.129 25.910 13.129 13.129 12.626 24.917 12.626 12.626 14.532 28.677 14.532 14.532
AUX TR2 LT TB 0.415 14.830 29.444 12.024 13.865 27.527 13.865 13.865 12.843 25.499 12.843 12.843 14.470 28.729 14.470 14.470
B. D. MARG F1 33.000 10.828 19.457 8.916 10.129 18.201 10.129 10.129 9.377 16.850 9.377 9.377 12.201 21.924 12.201 12.201
CHURCH ROAD F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
CONNAUGHT PLACE F1 33.000 10.073 17.564 8.388 9.053 15.785 9.053 9.053 8.724 15.211 8.724 8.724 11.159 19.457 11.159 11.159
CONSTITUTION C-F1 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
CONSTITUTION C-F2 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
DELHI HC F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
DWL1 IC CB TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
DWL2 IC CB TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
DWL3 IC CB TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
DWL4 IC CB TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HANUMAN ROAD F1 33.000 14.762 36.788 11.447 16.582 41.322 16.582 16.582 12.785 31.859 12.785 12.785 16.162 40.274 16.162 16.162
HCML F1 33.000 15.086 38.445 11.650 17.339 44.189 17.339 17.339 13.065 33.294 13.065 13.065 17.006 43.338 17.006 17.006
HCML IC L1 TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
HCML IC L2 TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HCML IC L3 TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
HCML IC L4TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
HWL1 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL2 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL3 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL4 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL5 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL6 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL7 SELECT ISO TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWL8 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL9 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL10 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL11 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL12 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL13 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWL15 SELECT ISO TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
HWT1 IC CB TB 33.000 15.331 40.599 11.801 17.693 46.854 17.693 17.693 13.277 35.160 13.277 13.277 16.987 44.985 16.987 16.987
HWT3 IC2 CB TB 33.000 15.820 41.770 11.801 18.124 47.853 18.124 18.124 13.701 36.174 13.701 13.701 17.427 46.011 17.427 17.427
IGNCA F1 33.000 13.799 28.972 10.632 14.747 30.962 14.747 14.747 11.950 25.090 11.950 11.950 16.278 34.176 16.278 16.278
JANPATH LANE F1 33.000 13.142 26.262 10.240 13.591 27.160 13.591 13.591 11.381 22.743 11.381 11.381 15.379 30.732 15.379 15.379
MAHARNI SS BUS 220.000 16.878 40.512 16.000 17.376 41.707 17.376 17.376 14.617 35.084 14.617 14.617 17.206 41.300 17.206 17.206
MAIN BUS1 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153
MAIN BUS2 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171
MANDI HOUSE F1 33.000 13.498 29.172 10.424 13.963 30.177 13.963 13.963 11.690 25.263 11.690 11.690 14.343 30.997 14.343 14.343
OG AUX TR1 CB TB 11.000 26.932 70.841 23.537 0.000 0.000 0.000 0.000 23.323 61.350 23.323 23.323 23.323 61.350 23.323 23.323
OG AUX TR2 CB TB 11.000 27.329 71.768 23.537 0.000 0.000 0.000 0.000 23.668 62.153 23.668 23.668 23.668 62.153 23.668 23.668
PARK STREET SS BUS 220.000 11.623 28.626 11.037 10.471 25.789 10.471 10.471 10.065 24.791 10.065 10.065 11.254 27.719 11.254 11.254
RAJA BAZAR F1 33.000 11.354 20.543 9.124 10.696 19.353 10.696 10.696 9.833 17.791 9.833 9.833 12.810 23.178 12.810 12.810
SCHOOL LANE F1 33.000 12.230 23.657 9.856 12.357 23.901 12.357 12.357 10.592 20.488 10.592 10.592 14.236 27.536 14.236 14.236
SCINDIA HOUSE F1 33.000 14.790 37.332 11.462 16.635 41.989 16.635 16.635 12.809 32.330 12.809 12.809 16.204 40.900 16.204 16.204
TR1 HT BUS SELECT ISO TB 220.000 12.436 30.645 11.768 11.498 28.333 11.498 11.498 10.770 26.539 10.770 10.770 12.153 29.947 12.153 12.153

TR2 HT BUS SELECT ISO TB 220.000 12.458 30.697 11.768 11.511 28.362 11.511 11.511 10.789 26.584 10.789 10.789 12.171 29.991 12.171 12.171

TR1 11KV TB 11.000 27.509 74.670 23.975 0.000 0.000 0.000 0.000 23.824 64.666 23.824 23.824 23.824 64.666 23.824 23.824
TR1 33KV TB 33.000 15.339 40.631 11.809 17.716 46.929 17.716 17.716 13.284 35.188 13.284 13.284 17.011 45.061 17.011 17.011
TR2 11KV TB 11.000 27.925 75.701 23.975 0.000 0.000 0.000 0.000 24.184 65.559 24.184 24.184 24.184 65.559 24.184 24.184
TR2 33KV TB 33.000 15.828 41.801 11.809 18.148 47.929 18.148 18.148 13.707 36.201 13.707 13.707 17.451 46.087 17.451 17.451
VIDHYUT BHAVAN F1 33.000 11.888 22.528 9.631 11.785 22.334 11.785 11.785 10.295 19.510 10.295 10.295 13.730 26.020 13.730 13.730

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01962 0.26425 0.26497 0.01962 0.26425 0.26497 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01642 0.01726 0.00531 0.01642 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01618 0.01697 0.00512 0.01618 0.01697 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01974 0.26046 0.26121 0.01974 0.26046 0.26121 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01642 0.01726 0.00531 0.01642 0.01726 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82921 1.74887 1.93549 0.82921 1.74887 1.93549 2.43879 1.16513 2.70281 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.98620 1.83191 2.08050 0.98620 1.83191 2.08050 2.94738 1.23793 3.19679 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.13277 1.41345 1.41967 0.13277 1.41345 1.41967 0.14644 0.94233 0.95364 0.00000 0.00000 0.00000

HCML F1 33.000 0.10581 1.38521 1.38924 0.10581 1.38521 1.38924 0.15013 0.83753 0.85088 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 6097 MVA
Filename: HCML Config.: 2x315MVA NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.06481 1.36551 1.36705 0.06481 1.36551 1.36705 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.06580 1.32310 1.32474 0.06580 1.32310 1.32474 0.02298 0.81933 0.81965 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.37185 1.47256 1.51879 0.37185 1.47256 1.51879 0.97659 0.95583 1.36650 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.47279 1.52306 1.59475 0.47279 1.52306 1.59475 1.29446 1.00133 1.63654 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 1.01272 8.21602 8.27820 1.01272 8.21602 8.27820 0.82493 7.52194 7.56704 0.00000 0.00000 0.00000

MAIN BUS1 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

MAIN BUS2 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.33619 1.51581 1.55265 0.33619 1.51581 1.55265 0.51681 1.31133 1.40950 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01355 0.25904 0.25940 0.01355 0.25904 0.25940 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01367 0.25526 0.25562 0.01367 0.25526 0.25562 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 1.22095 11.95921 12.02137 1.22095 11.95921 12.02137 1.01525 15.96392 15.99617 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.77238 1.67647 1.84584 0.77238 1.67647 1.84584 2.24806 1.13783 2.51961 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.57119 1.61560 1.71360 0.57119 1.61560 1.71360 1.61233 1.04683 1.92235 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.11836 1.41206 1.41701 0.11836 1.41206 1.41701 0.13489 0.93715 0.94681 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 1.13685 11.17721 11.23487 1.13685 11.17721 11.23487 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 1.13534 11.15741 11.21502 1.13534 11.15741 11.21502 0.88429 13.96292 13.99089 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00748 0.25384 0.25395 0.00748 0.25384 0.25395 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.06450 1.36483 1.36635 0.06450 1.36483 1.36635 0.02220 0.81607 0.81637 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00760 0.25005 0.25017 0.00760 0.25005 0.25017 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.06551 1.32248 1.32411 0.06551 1.32248 1.32411 0.02220 0.81607 0.81637 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.63105 1.64617 1.76298 0.63105 1.64617 1.76298 1.80305 1.07413 2.09875 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 27 57

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 15G.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 1 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 1 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 1 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 1 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 1 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 1 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 1 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 1 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 1 100.00 0.00

DELHI HC F1 Load 33.000 33.000 1 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 1 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 1 100.00 0.00

HCML F1 Load 33.000 33.000 1 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L4TB Load 220.000 220.000 1 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 1 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 1 100.00 0.00

IGNCA F1 Load 33.000 33.000 1 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 1 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 1 100.00 0.00

MAIN BUS1 Load 220.000 220.000 1 100.00 0.00

MAIN BUS2 Load 220.000 220.000 1 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 1 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 1 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 1 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 1 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 1 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 1 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 1 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR1 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 1 100.00 0.00

TR2 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 1 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 1 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2

DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB
DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB

HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB
HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB

HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB
HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB

HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB
HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB

HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB
HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB

HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB
HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1

HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 2x315+2x500 MVA MAHARNI SS BUS 15000.000 220.000 0.08269 0.66152 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 15000.000 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 27.178 0.00 173.21 173.21 0.000 0.000 1.52E+000 2.12E+001

OG AUX TR1 CB TB AUX TR1 HT TB 3.12 27.093 0.00 173.21 173.21 0.000 0.000 1.50E+000 2.13E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.178 0.000 23.537 23.537
Peak Current (kA), Method C : 69.685 0.000 60.349 60.349
Breaking Current (kA, rms, symm) : 0.000 23.537 23.537
Steady State Current (kA, rms) : 24.137 0.000 23.537 23.537

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.583 0.00 101.05 109.88 13.131 13.131 3.12E+002 9.65E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.34 11.791 9.08 104.13 102.44 11.455 13.131 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.583 13.131 12.629 14.535
Peak Current (kA), Method C : 28.779 25.914 24.923 28.683
Breaking Current (kA, rms, symm) : 13.131 12.629 14.535
Steady State Current (kA, rms) : 11.767 13.131 12.629 14.535

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.834 0.00 103.93 102.90 13.867 13.867 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 103.99 103.02 1.738 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 98.93 12.059 99.74 100.64 99.94 12.137 13.867 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.834 13.867 12.846 14.473
Peak Current (kA), Method C : 29.451 27.532 25.505 28.735
Breaking Current (kA, rms, symm) : 13.867 12.846 14.473
Steady State Current (kA, rms) : 12.034 13.867 12.846 14.473

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 27.540 0.00 173.21 173.21 0.000 0.000 1.53E+000 2.09E+001

OG AUX TR2 CB TB AUX TR2 HT TB 3.16 27.455 0.00 173.21 173.21 0.000 0.000 1.51E+000 2.10E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.540 0.000 23.850 23.850
Peak Current (kA), Method C : 70.473 0.000 61.031 61.031
Breaking Current (kA, rms, symm) : 0.000 23.850 23.850
Steady State Current (kA, rms) : 24.137 0.000 23.850 23.850

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.585 0.00 101.06 109.88 13.133 13.133 3.12E+002 9.65E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.34 11.793 9.08 104.13 102.44 11.456 13.133 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.585 13.133 12.631 14.537
Peak Current (kA), Method C : 28.782 25.915 24.926 28.686
Breaking Current (kA, rms, symm) : 13.133 12.631 14.537
Steady State Current (kA, rms) : 11.767 13.133 12.631 14.537

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.836 0.00 103.94 102.90 13.868 13.868 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 104.00 103.02 1.738 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 98.95 12.061 99.75 100.64 99.94 12.139 13.868 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.836 13.868 12.849 14.476
Peak Current (kA), Method C : 29.455 27.533 25.508 28.739
Breaking Current (kA, rms, symm) : 13.868 12.849 14.476
Steady State Current (kA, rms) : 12.034 13.868 12.849 14.476

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 11.191 0.00 86.49 127.84 10.332 10.332 7.54E+000 1.55E+001 2.24E+001 1.06E+001

HWL7 SELECT ISO B. D. MARG F1 47.33 10.723 68.35 92.56 101.82 10.043 10.332 8.13E+000 1.60E+001 2.24E+001 1.06E+001
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.308 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.191 10.332 9.692 12.528
Peak Current (kA), Method C : 19.964 18.431 17.289 22.349
Breaking Current (kA, rms, symm) : 10.332 9.692 12.528
Steady State Current (kA, rms) : 9.364 10.332 9.692 12.528

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 11.733 0.00 86.25 126.93 10.915 10.915 7.02E+000 1.48E+001 2.06E+001 1.03E+001

HWL13 SELECT ISO CHURCH ROAD F1 45.79 11.263 66.56 92.83 101.54 10.623 10.915 7.54E+000 1.53E+001 2.06E+001 1.03E+001
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.310 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.733 10.915 10.161 13.156
Peak Current (kA), Method C : 21.083 19.612 18.259 23.639
Breaking Current (kA, rms, symm) : 10.915 10.161 13.156
Steady State Current (kA, rms) : 9.597 10.915 10.161 13.156

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 10.378 0.00 89.12 129.88 9.205 9.205 8.99E+000 1.62E+001 2.71E+001 1.12E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 53.01 9.920 73.62 93.25 102.09 8.934 9.205 9.74E+000 1.68E+001 2.71E+001 1.12E+001
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.296 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.378 9.205 8.988 11.425
Peak Current (kA), Method C : 17.968 15.937 15.561 19.781
Breaking Current (kA, rms, symm) : 9.205 8.988 11.425
Steady State Current (kA, rms) : 8.777 9.205 8.988 11.425

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 14.397 0.00 82.28 114.37 15.237 15.237 3.33E+000 1.29E+001 8.95E+000 8.64E+000

HWL10 SELECT ISO CONSTITUTION C-F1 24.22 13.902 39.95 91.73 98.93 14.888 15.237 3.52E+000 1.34E+001 8.95E+000 8.64E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.397 15.237 12.468 16.893
Peak Current (kA), Method C : 30.109 31.865 26.075 35.331
Breaking Current (kA, rms, symm) : 15.237 12.468 16.893
Steady State Current (kA, rms) : 11.299 15.237 12.468 16.893

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 14.397 0.00 82.28 114.37 15.237 15.237 3.33E+000 1.29E+001 8.95E+000 8.64E+000

HWL11 SELECT ISO CONSTITUTION C-F2 24.22 13.902 39.95 91.73 98.93 14.888 15.237 3.52E+000 1.34E+001 8.95E+000 8.64E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.397 15.237 12.468 16.893
Peak Current (kA), Method C : 30.109 31.865 26.075 35.331
Breaking Current (kA, rms, symm) : 15.237 12.468 16.893
Steady State Current (kA, rms) : 11.299 15.237 12.468 16.893

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 11.733 0.00 86.25 126.93 10.915 10.915 7.02E+000 1.48E+001 2.06E+001 1.03E+001

HWL14 SELECT ISO DELHI HC F1 45.79 11.263 66.56 92.83 101.54 10.623 10.915 7.54E+000 1.53E+001 2.06E+001 1.03E+001
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.310 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.733 10.915 10.161 13.156
Peak Current (kA), Method C : 21.083 19.612 18.259 23.639
Breaking Current (kA, rms, symm) : 10.915 10.161 13.156
Steady State Current (kA, rms) : 9.597 10.915 10.161 13.156

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 15.498 0.00 93.13 96.51 17.267 17.267 1.12E+000 1.24E+001 1.33E+000 8.51E+000

HWL6 SELECT ISO HANUMAN ROAD F1 6.38 14.998 9.49 93.39 94.53 16.896 17.267 1.15E+000 1.28E+001 1.33E+000 8.51E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.372 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.498 17.267 13.422 16.878
Peak Current (kA), Method C : 38.785 43.212 33.589 42.238
Breaking Current (kA, rms, symm) : 17.267 13.422 16.878
Steady State Current (kA, rms) : 12.224 17.267 13.422 16.878

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 15.855 0.00 91.07 96.47 18.091 18.091 8.73E-001 1.21E+001 1.36E+000 7.55E+000

HWL4 SELECT ISO HCML F1 3.57 15.355 6.34 93.24 94.15 17.710 18.091 8.90E-001 1.25E+001 1.36E+000 7.55E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.381 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.855 18.091 13.731 17.788
Peak Current (kA), Method C : 40.636 46.366 35.192 45.590
Breaking Current (kA, rms, symm) : 18.091 13.731 17.788
Steady State Current (kA, rms) : 12.455 18.091 13.731 17.788

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000

MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000

MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 16.124 0.00 93.95 93.20 18.472 18.472 4.95E-001 1.19E+001 1.96E-001 7.38E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.655 0.16 93.93 93.17 15.822 18.472 3.46E-001 1.52E+001 1.96E-001 7.38E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.47 94.02 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.91 93.28 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.92 93.26 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.92 93.24 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.63 93.74 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.37 94.19 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.59 93.81 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.124 18.472 13.964 17.730
Peak Current (kA), Method C : 43.053 49.322 37.285 47.340
Breaking Current (kA, rms, symm) : 18.472 13.964 17.730
Steady State Current (kA, rms) : 12.626 18.472 13.964 17.730

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 16.616 0.00 94.32 93.45 18.900 18.900 5.07E-001 1.16E+001 1.96E-001 7.38E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.654 0.16 94.30 93.41 15.895 18.900 3.46E-001 1.52E+001 1.96E-001 7.38E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.07 93.88 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.13 93.77 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.89 94.20 0.375 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.18 93.75 0.377 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.616 18.900 14.390 18.170
Peak Current (kA), Method C : 44.231 50.309 38.305 48.366
Breaking Current (kA, rms, symm) : 18.900 14.390 18.170
Steady State Current (kA, rms) : 12.626 18.900 14.390 18.170

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 14.397 0.00 82.28 114.37 15.237 15.237 3.33E+000 1.29E+001 8.95E+000 8.64E+000

HWL15 SELECT ISO IGNCA F1 24.22 13.902 39.95 91.73 98.93 14.888 15.237 3.52E+000 1.34E+001 8.95E+000 8.64E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.397 15.237 12.468 16.893
Peak Current (kA), Method C : 30.109 31.865 26.075 35.331
Breaking Current (kA, rms, symm) : 15.237 12.468 16.893
Steady State Current (kA, rms) : 11.299 15.237 12.468 16.893

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 13.677 0.00 82.23 118.86 13.992 13.992 4.26E+000 1.34E+001 1.19E+001 9.05E+000

HWL12 SELECT ISO JANPATH LANE F1 30.64 13.187 48.88 91.78 99.96 13.658 13.992 4.52E+000 1.39E+001 1.19E+001 9.05E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.341 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.677 13.992 11.844 15.911
Peak Current (kA), Method C : 27.182 27.808 23.541 31.624
Breaking Current (kA, rms, symm) : 13.992 11.844 15.911
Steady State Current (kA, rms) : 10.854 13.992 11.844 15.911

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 40.243 0.00 99.54 99.20 40.758 40.758 8.85E-002 7.12E-001 8.10E-002 6.85E-001

HCML IC L1 TB MAHARNI SS BUS 0.94 0.417 2.95 98.61 98.19 0.683 1.207 6.38E+000 6.90E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 1.04 0.462 3.02 98.63 98.21 0.714 1.207 5.67E+000 6.23E+001 2.66E-001 2.33E+001

MAHARANI MAHARNI SS BUS 100.00 39.365 100.00 100.00 100.00 39.365 38.358 9.10E-002 7.28E-001 9.10E-002 7.28E-001
2x315+2x500 MVA
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 40.243 40.758 34.851 40.576
Peak Current (kA), Method C : 96.471 97.706 83.546 97.269
Breaking Current (kA, rms, symm) : 40.758 34.851 40.576
Steady State Current (kA, rms) : 39.365 40.758 34.851 40.576

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 14.070 0.00 94.40 103.39 14.414 14.414 3.00E+000 1.33E+001 4.73E+000 1.19E+001

HWL8 SELECT ISO MANDI HOUSE F1 23.08 13.573 31.64 93.37 97.36 14.075 14.414 3.17E+000 1.38E+001 4.73E+000 1.19E+001
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.342 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.070 14.414 12.185 14.871
Peak Current (kA), Method C : 30.326 31.069 26.263 32.054
Breaking Current (kA, rms, symm) : 14.414 12.185 14.871
Steady State Current (kA, rms) : 11.065 14.414 12.185 14.871

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 27.779 0.00 173.21 173.21 0.000 0.000 1.02E+000 2.08E+001

TR1 11KV TB OG AUX TR1 CB TB 3.19 27.695 0.00 173.21 173.21 0.000 0.000 9.97E-001 2.08E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.779 0.000 24.057 24.057
Peak Current (kA), Method C : 73.411 0.000 63.576 63.576
Breaking Current (kA, rms, symm) : 0.000 24.057 24.057
Steady State Current (kA, rms) : 24.607 0.000 24.057 24.057

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 28.158 0.00 173.21 173.21 0.000 0.000 1.03E+000 2.05E+001

TR2 11KV TB OG AUX TR2 CB TB 3.23 28.074 0.00 173.21 173.21 0.000 0.000 1.01E+000 2.05E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.158 0.000 24.385 24.385
Peak Current (kA), Method C : 74.287 0.000 64.334 64.334
Breaking Current (kA, rms, symm) : 0.000 24.385 24.385
Steady State Current (kA, rms) : 24.607 0.000 24.385 24.385

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 19.123 0.00 111.59 109.52 15.545 15.545 1.33E-001 1.50E+000 1.34E-001 2.55E+000
BUS

HCML IC L3 TB PARK STREET SS 10.76 19.123 13.27 108.74 106.86 15.545 15.545 1.33E-001 1.50E+000 1.34E-001 2.55E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 19.123 15.545 16.561 17.973
Peak Current (kA), Method C : 47.918 38.955 41.498 45.039
Breaking Current (kA, rms, symm) : 15.545 16.561 17.973
Steady State Current (kA, rms) : 18.684 15.545 16.561 17.973

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 11.733 0.00 86.25 126.93 10.915 10.915 7.02E+000 1.48E+001 2.06E+001 1.03E+001

HWL9 SELECT ISO RAJA BAZAR F1 45.79 11.263 66.56 92.83 101.54 10.623 10.915 7.54E+000 1.53E+001 2.06E+001 1.03E+001
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.310 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.733 10.915 10.161 13.156
Peak Current (kA), Method C : 21.083 19.612 18.259 23.639
Breaking Current (kA, rms, symm) : 10.915 10.161 13.156
Steady State Current (kA, rms) : 9.597 10.915 10.161 13.156

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 12.715 0.00 82.44 122.11 12.692 12.692 5.16E+000 1.42E+001 1.48E+001 9.47E+000

HWL3 SELECT ISO SCHOOL LANE F1 35.52 12.230 55.35 91.50 100.75 12.370 12.692 5.51E+000 1.47E+001 1.48E+001 9.47E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.333 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.715 12.692 11.011 14.703
Peak Current (kA), Method C : 24.434 24.390 21.160 28.255
Breaking Current (kA, rms, symm) : 12.692 11.011 14.703
Steady State Current (kA, rms) : 10.420 12.692 11.011 14.703

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 15.528 0.00 93.09 96.42 17.324 17.324 9.89E-001 1.24E+001 1.22E+000 8.46E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 5.45 15.028 8.52 93.52 94.36 16.952 17.324 1.01E+000 1.28E+001 1.22E+000 8.46E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.372 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.528 17.324 13.448 16.925
Peak Current (kA), Method C : 39.391 43.947 34.114 42.934
Breaking Current (kA, rms, symm) : 17.324 13.448 16.925
Steady State Current (kA, rms) : 12.241 17.324 13.448 16.925

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 21.429 0.00 110.16 108.07 17.923 17.923 1.15E-001 1.34E+000 1.07E-001 2.14E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 36.23 99.52 97.54 0.655 1.356 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 67.60 69.59 100.00 0.170 0.416 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.16 108.07 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 47.33 21.008 57.42 99.45 99.13 17.099 16.154 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.429 17.923 18.558 20.284
Peak Current (kA), Method C : 53.856 45.046 46.641 50.978
Breaking Current (kA, rms, symm) : 17.923 18.558 20.284
Steady State Current (kA, rms) : 20.879 17.923 18.558 20.284

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 21.462 0.00 110.19 108.10 17.939 17.939 1.15E-001 1.34E+000 1.07E-001 2.14E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 37.48 99.85 97.83 0.677 1.357 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 68.24 70.28 100.00 0.174 0.417 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 47.30 20.996 57.42 99.45 99.14 17.089 16.168 1.18E-001 1.37E+000 1.29E-001 2.37E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.462 17.939 18.587 20.312
Peak Current (kA), Method C : 53.938 45.083 46.711 51.047
Breaking Current (kA, rms, symm) : 17.939 18.587 20.312
Steady State Current (kA, rms) : 20.879 17.939 18.587 20.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 28.391 0.00 173.21 173.21 0.000 0.000 5.13E-001 2.03E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 94.58 5.930 100.00 100.00 100.00 0.000 0.000 2.74E+000 9.73E+001
ISO TB
# TR1 33KV TB TR1 11KV TB 47.71 22.389 100.00 100.00 100.00 0.000 0.000 9.79E-001 2.58E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.391 0.000 24.588 24.588
Peak Current (kA), Method C : 77.525 0.000 67.138 67.138
Breaking Current (kA, rms, symm) : 0.000 24.588 24.588
Steady State Current (kA, rms) : 25.084 0.000 24.588 24.588

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 16.133 0.00 93.93 93.15 18.498 18.498 4.92E-001 1.19E+001 1.89E-001 7.35E+000

HWT1 IC CB TB TR1 33KV TB 0.02 3.479 0.02 93.93 93.15 2.659 0.000 6.06E+000 5.50E+001

# TR1 HT BUS SELECT TR1 33KV TB 91.00 10.967 90.14 99.93 99.61 10.863 7.442 4.93E-001 1.75E+001 4.68E-001 1.83E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 10.86 1.699 57.17 57.05 100.00 4.983 11.056 * 1.59E+000 1.13E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.133 18.498 13.972 17.756
Peak Current (kA), Method C : 43.090 49.407 37.317 47.424
Breaking Current (kA, rms, symm) : 18.498 13.972 17.756
Steady State Current (kA, rms) : 12.636 18.498 13.972 17.756

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 28.789 0.00 173.21 173.21 0.000 0.000 5.26E-001 2.00E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 94.64 5.934 100.00 100.00 100.00 0.000 0.000 2.73E+000 9.73E+001
ISO TB
# TR2 33KV TB TR2 11KV TB 48.55 22.782 100.00 100.00 100.00 0.000 0.000 9.88E-001 2.53E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.789 0.000 24.932 24.932
Peak Current (kA), Method C : 78.503 0.000 67.986 67.986
Breaking Current (kA, rms, symm) : 0.000 24.932 24.932
Steady State Current (kA, rms) : 25.084 0.000 24.932 24.932

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 16.625 0.00 94.30 93.40 18.926 18.926 5.04E-001 1.16E+001 1.89E-001 7.35E+000

HWT3 IC2 CB TB TR2 33KV TB 0.03 3.973 0.02 94.30 93.40 3.015 0.000 5.36E+000 4.81E+001

# TR2 HT BUS SELECT TR2 33KV TB 90.99 10.966 90.11 99.98 99.65 10.860 7.614 4.93E-001 1.75E+001 4.68E-001 1.83E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 10.86 1.699 57.34 57.28 100.00 5.059 11.312 * 1.58E+000 1.13E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.625 18.926 14.398 18.196
Peak Current (kA), Method C : 44.267 50.395 38.337 48.450
Breaking Current (kA, rms, symm) : 18.926 14.398 18.196
Steady State Current (kA, rms) : 12.636 18.926 14.398 18.196

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 12.341 0.00 83.24 123.80 12.083 12.083 5.71E+000 1.45E+001 1.65E+001 9.72E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 38.57 11.860 58.99 91.71 101.10 11.769 12.083 6.12E+000 1.50E+001 1.65E+001 9.72E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.327 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 12.341 12.083 10.688 14.160
Peak Current (kA), Method C : 23.227 22.741 20.115 26.650
Breaking Current (kA, rms, symm) : 12.083 10.688 14.160
Steady State Current (kA, rms) : 10.166 12.083 10.688 14.160

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
33KV MAIN BUS2 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
AUX TR1 HT TB 11.000 27.178 69.685 24.137 0.000 0.000 0.000 0.000 23.537 60.349 23.537 23.537 23.537 60.349 23.537 23.537
AUX TR1 LT BUS 0.415 14.583 28.779 11.767 13.131 25.914 13.131 13.131 12.629 24.923 12.629 12.629 14.535 28.683 14.535 14.535
AUX TR1 LT TB 0.415 14.834 29.451 12.034 13.867 27.532 13.867 13.867 12.846 25.505 12.846 12.846 14.473 28.735 14.473 14.473
AUX TR2 HT TB 11.000 27.540 70.473 24.137 0.000 0.000 0.000 0.000 23.850 61.031 23.850 23.850 23.850 61.031 23.850 23.850
AUX TR2 LT BUS 0.415 14.585 28.782 11.767 13.133 25.915 13.133 13.133 12.631 24.926 12.631 12.631 14.537 28.686 14.537 14.537
AUX TR2 LT TB 0.415 14.836 29.455 12.034 13.868 27.533 13.868 13.868 12.849 25.508 12.849 12.849 14.476 28.739 14.476 14.476
B. D. MARG F1 33.000 11.191 19.964 9.364 10.332 18.431 10.332 10.332 9.692 17.289 9.692 9.692 12.528 22.349 12.528 12.528
CHURCH ROAD F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
CONNAUGHT PLACE F1 33.000 10.378 17.968 8.777 9.205 15.937 9.205 9.205 8.988 15.561 8.988 8.988 11.425 19.781 11.425 11.425
CONSTITUTION C-F1 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
CONSTITUTION C-F2 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
DELHI HC F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
DWL1 IC CB TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
DWL2 IC CB TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
DWL3 IC CB TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
DWL4 IC CB TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HANUMAN ROAD F1 33.000 15.498 38.785 12.224 17.267 43.212 17.267 17.267 13.422 33.589 13.422 13.422 16.878 42.238 16.878 16.878
HCML F1 33.000 15.855 40.636 12.455 18.091 46.366 18.091 18.091 13.731 35.192 13.731 13.731 17.788 45.590 17.788 17.788
HCML IC L1 TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
HCML IC L2 TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HCML IC L3 TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
HCML IC L4TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
HWL1 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL2 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL3 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL4 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL5 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL6 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL7 SELECT ISO TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWL8 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL9 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL10 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL11 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL12 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL13 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWL15 SELECT ISO TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
HWT1 IC CB TB 33.000 16.124 43.053 12.626 18.472 49.322 18.472 18.472 13.964 37.285 13.964 13.964 17.730 47.340 17.730 17.730
HWT3 IC2 CB TB 33.000 16.616 44.231 12.626 18.900 50.309 18.900 18.900 14.390 38.305 14.390 14.390 18.170 48.366 18.170 18.170
IGNCA F1 33.000 14.397 30.109 11.299 15.237 31.865 15.237 15.237 12.468 26.075 12.468 12.468 16.893 35.331 16.893 16.893
JANPATH LANE F1 33.000 13.677 27.182 10.854 13.992 27.808 13.992 13.992 11.844 23.541 11.844 11.844 15.911 31.624 15.911 15.911
MAHARNI SS BUS 220.000 40.243 96.471 39.365 40.758 97.706 40.758 40.758 34.851 83.546 34.851 34.851 40.576 97.269 40.576 40.576
MAIN BUS1 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284
MAIN BUS2 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312
MANDI HOUSE F1 33.000 14.070 30.326 11.065 14.414 31.069 14.414 14.414 12.185 26.263 12.185 12.185 14.871 32.054 14.871 14.871
OG AUX TR1 CB TB 11.000 27.779 73.411 24.607 0.000 0.000 0.000 0.000 24.057 63.576 24.057 24.057 24.057 63.576 24.057 24.057
OG AUX TR2 CB TB 11.000 28.158 74.287 24.607 0.000 0.000 0.000 0.000 24.385 64.334 24.385 24.385 24.385 64.334 24.385 24.385
PARK STREET SS BUS 220.000 19.123 47.918 18.684 15.545 38.955 15.545 15.545 16.561 41.498 16.561 16.561 17.973 45.039 17.973 17.973
RAJA BAZAR F1 33.000 11.733 21.083 9.597 10.915 19.612 10.915 10.915 10.161 18.259 10.161 10.161 13.156 23.639 13.156 13.156
SCHOOL LANE F1 33.000 12.715 24.434 10.420 12.692 24.390 12.692 12.692 11.011 21.160 11.011 11.011 14.703 28.255 14.703 14.703
SCINDIA HOUSE F1 33.000 15.528 39.391 12.241 17.324 43.947 17.324 17.324 13.448 34.114 13.448 13.448 16.925 42.934 16.925 16.925
TR1 HT BUS SELECT ISO TB 220.000 21.429 53.856 20.879 17.923 45.046 17.923 17.923 18.558 46.641 18.558 18.558 20.284 50.978 20.284 20.284

TR2 HT BUS SELECT ISO TB 220.000 21.462 53.938 20.879 17.939 45.083 17.939 17.939 18.587 46.711 18.587 18.587 20.312 51.047 20.312 20.312

TR1 11KV TB 11.000 28.391 77.525 25.084 0.000 0.000 0.000 0.000 24.588 67.138 24.588 24.588 24.588 67.138 24.588 24.588
TR1 33KV TB 33.000 16.133 43.090 12.636 18.498 49.407 18.498 18.498 13.972 37.317 13.972 13.972 17.756 47.424 17.756 17.756
TR2 11KV TB 11.000 28.789 78.503 25.084 0.000 0.000 0.000 0.000 24.932 67.986 24.932 24.932 24.932 67.986 24.932 24.932
TR2 33KV TB 33.000 16.625 44.267 12.636 18.926 50.395 18.926 18.926 14.398 38.337 14.398 14.398 18.196 48.450 18.196 18.196
VIDHYUT BHAVAN F1 33.000 12.341 23.227 10.166 12.083 22.741 12.083 12.083 10.688 20.115 10.688 10.688 14.160 26.650 14.160 14.160

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01835 0.25639 0.25705 0.01835 0.25639 0.25705 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01850 0.25299 0.25367 0.01850 0.25299 0.25367 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82100 1.68319 1.87275 0.82100 1.68319 1.87275 2.43716 1.14968 2.69472 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.97854 1.76650 2.01942 0.97854 1.76650 2.01942 2.94575 1.22248 3.18934 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12211 1.34674 1.35226 0.12211 1.34674 1.35226 0.14481 0.92688 0.93813 0.00000 0.00000 0.00000

HCML F1 33.000 0.09506 1.31841 1.32183 0.09506 1.31841 1.32183 0.14850 0.82208 0.83539 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MAX SC NOR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05391 1.29865 1.29977 0.05391 1.29865 1.29977 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05522 1.26006 1.26127 0.05522 1.26006 1.26127 0.02136 0.80388 0.80416 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.36229 1.40994 1.45574 0.36229 1.40994 1.45574 0.97496 0.94038 1.35457 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.46356 1.46058 1.53238 0.46356 1.46058 1.53238 1.29283 0.98588 1.62585 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44540 3.47190 0.42816 3.44540 3.47190 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.32652 1.45334 1.48957 0.32652 1.45334 1.48957 0.51519 1.29588 1.39453 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01228 0.25119 0.25149 0.01228 0.25119 0.25149 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01243 0.24779 0.24810 0.01243 0.24779 0.24810 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.64293 7.27816 7.30650 0.64293 7.27816 7.30650 0.65035 12.33731 12.35444 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76415 1.61445 1.78616 0.76415 1.61445 1.78616 2.24644 1.12238 2.51122 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.56208 1.54951 1.64831 0.56208 1.54951 1.64831 1.61070 1.03138 1.91262 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.10765 1.34535 1.34965 0.10765 1.34535 1.34965 0.13327 0.92171 0.93129 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.55884 6.49616 6.52015 0.55884 6.49616 6.52015 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.55818 6.48600 6.50997 0.55818 6.48600 6.50997 0.51939 10.33631 10.34935 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00621 0.24598 0.24606 0.00621 0.24598 0.24606 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05359 1.29794 1.29904 0.05359 1.29794 1.29904 0.02057 0.80062 0.80088 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00636 0.24258 0.24266 0.00636 0.24258 0.24266 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05491 1.25941 1.26060 0.05491 1.25941 1.26060 0.02057 0.80062 0.80088 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.62215 1.58017 1.69824 0.62215 1.58017 1.69824 1.80142 1.05868 2.08948 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 28 58

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 15G 33kv PAR.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 1 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 1 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 1 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 1 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 1 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 1 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 1 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 1 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 1 100.00 0.00

DELHI HC F1 Load 33.000 33.000 1 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 1 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 1 100.00 0.00

HCML F1 Load 33.000 33.000 1 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L4TB Load 220.000 220.000 1 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 1 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 1 100.00 0.00

IGNCA F1 Load 33.000 33.000 1 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 1 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 1 100.00 0.00

MAIN BUS1 Load 220.000 220.000 1 100.00 0.00

MAIN BUS2 Load 220.000 220.000 1 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 1 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 1 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 1 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 1 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 1 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 1 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 1 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR1 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 1 100.00 0.00

TR2 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 1 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 1 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

HWQ BC Tie Breakr 33KV MAIN BUS1 33KV MAIN BUS2

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2


DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB

DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB
HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB

HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB
HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB

HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB
HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB

HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB
HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB

HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB
HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB

HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1


HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 2x315+2x500 MVA MAHARNI SS BUS 15000.000 220.000 0.08269 0.66152 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 15000.000 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 34.632 0.00 173.21 173.21 0.000 0.000 1.41E+000 1.66E+001

OG AUX TR1 CB TB AUX TR1 HT TB 3.98 34.547 0.00 173.21 173.21 0.000 0.000 1.40E+000 1.67E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 34.632 0.000 29.992 29.992
Peak Current (kA), Method C : 87.255 0.000 75.565 75.565
Breaking Current (kA, rms, symm) : 0.000 29.992 29.992
Steady State Current (kA, rms) : 31.683 0.000 29.992 29.992

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.625 0.00 101.13 109.92 13.154 13.154 3.12E+002 9.62E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.35 11.832 9.10 104.21 102.46 11.479 13.154 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.682 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.625 13.154 12.665 14.568
Peak Current (kA), Method C : 28.841 25.939 24.977 28.728
Breaking Current (kA, rms, symm) : 13.154 12.665 14.568
Steady State Current (kA, rms) : 11.819 13.154 12.665 14.568

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.878 0.00 104.01 102.93 13.893 13.893 3.01E+002 9.48E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.34 104.07 103.06 1.737 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 99.29 12.103 99.93 100.64 100.08 12.164 13.893 * 3.45E+002 1.17E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.878 13.893 12.884 14.513
Peak Current (kA), Method C : 29.517 27.563 25.562 28.793
Breaking Current (kA, rms, symm) : 13.893 12.884 14.513
Steady State Current (kA, rms) : 12.088 13.893 12.884 14.513

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 34.632 0.00 173.21 173.21 0.000 0.000 1.41E+000 1.66E+001

OG AUX TR2 CB TB AUX TR2 HT TB 3.98 34.547 0.00 173.21 173.21 0.000 0.000 1.40E+000 1.67E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 34.632 0.000 29.992 29.992
Peak Current (kA), Method C : 87.255 0.000 75.565 75.565
Breaking Current (kA, rms, symm) : 0.000 29.992 29.992
Steady State Current (kA, rms) : 31.683 0.000 29.992 29.992

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.625 0.00 101.13 109.92 13.154 13.154 3.12E+002 9.62E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.35 11.832 9.10 104.21 102.46 11.479 13.154 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.682 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.625 13.154 12.665 14.568
Peak Current (kA), Method C : 28.841 25.939 24.977 28.728
Breaking Current (kA, rms, symm) : 13.154 12.665 14.568
Steady State Current (kA, rms) : 11.819 13.154 12.665 14.568

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.878 0.00 104.01 102.93 13.893 13.893 3.01E+002 9.48E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.34 104.07 103.06 1.737 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 99.29 12.103 99.93 100.64 100.08 12.164 13.893 * 3.45E+002 1.17E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.878 13.893 12.884 14.513
Peak Current (kA), Method C : 29.517 27.563 25.562 28.793
Breaking Current (kA, rms, symm) : 13.893 12.884 14.513
Steady State Current (kA, rms) : 12.088 13.893 12.884 14.513

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 15.608 0.00 96.20 132.06 12.612 12.612 7.55E+000 9.75E+000 2.23E+001 6.92E+000

HWL7 SELECT ISO B. D. MARG F1 67.03 15.186 83.96 95.07 102.05 12.384 12.612 7.93E+000 9.88E+000 2.23E+001 6.92E+000
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.270 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.608 12.612 13.517 16.492
Peak Current (kA), Method C : 24.990 20.193 21.642 26.406
Breaking Current (kA, rms, symm) : 12.612 13.517 16.492
Steady State Current (kA, rms) : 13.667 12.612 13.517 16.492

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 16.372 0.00 95.03 131.69 13.441 13.441 6.99E+000 9.45E+000 2.05E+001 6.67E+000

HWL13 SELECT ISO CHURCH ROAD F1 64.82 15.944 82.46 94.75 102.07 13.206 13.441 7.33E+000 9.59E+000 2.05E+001 6.67E+000
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.274 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.372 13.441 14.178 17.410
Peak Current (kA), Method C : 26.438 21.705 22.896 28.114
Breaking Current (kA, rms, symm) : 13.441 14.178 17.410
Steady State Current (kA, rms) : 14.249 13.441 14.178 17.410

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 13.858 0.00 98.80 132.75 10.814 10.814 9.04E+000 1.05E+001 2.70E+001 7.59E+000
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 71.87 13.451 87.03 95.77 101.96 10.601 10.814 9.54E+000 1.07E+001 2.70E+001 7.59E+000
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.260 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 13.858 10.814 12.002 14.442
Peak Current (kA), Method C : 21.822 17.028 18.898 22.741
Breaking Current (kA, rms, symm) : 10.814 12.002 14.442
Steady State Current (kA, rms) : 12.296 10.814 12.002 14.442

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 23.583 0.00 83.81 123.83 22.945 22.945 3.19E+000 7.51E+000 8.86E+000 5.00E+000

HWL10 SELECT ISO CONSTITUTION C-F1 40.26 23.106 60.53 91.81 101.05 22.635 22.945 3.30E+000 7.65E+000 8.86E+000 5.00E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.325 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 23.583 22.945 20.424 26.940
Peak Current (kA), Method C : 43.400 42.224 37.585 49.577
Breaking Current (kA, rms, symm) : 22.945 20.424 26.940
Steady State Current (kA, rms) : 19.281 22.945 20.424 26.940

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 23.583 0.00 83.81 123.83 22.945 22.945 3.19E+000 7.51E+000 8.86E+000 5.00E+000

HWL11 SELECT ISO CONSTITUTION C-F2 40.26 23.106 60.53 91.81 101.05 22.635 22.945 3.30E+000 7.65E+000 8.86E+000 5.00E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.325 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 23.583 22.945 20.424 26.940
Peak Current (kA), Method C : 43.400 42.224 37.585 49.577
Breaking Current (kA, rms, symm) : 22.945 20.424 26.940
Steady State Current (kA, rms) : 19.281 22.945 20.424 26.940

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 16.372 0.00 95.03 131.69 13.441 13.441 6.99E+000 9.45E+000 2.05E+001 6.67E+000

HWL14 SELECT ISO DELHI HC F1 64.82 15.944 82.46 94.75 102.07 13.206 13.441 7.33E+000 9.59E+000 2.05E+001 6.67E+000
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.274 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.372 13.441 14.178 17.410
Peak Current (kA), Method C : 26.438 21.705 22.896 28.114
Breaking Current (kA, rms, symm) : 13.441 14.178 17.410
Steady State Current (kA, rms) : 14.249 13.441 14.178 17.410

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 29.110 0.00 93.04 98.84 31.666 31.666 9.32E-001 6.55E+000 1.24E+000 4.88E+000

HWL6 SELECT ISO HANUMAN ROAD F1 12.16 28.610 17.54 93.12 95.42 31.303 31.666 9.53E-001 6.66E+000 1.24E+000 4.88E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.363 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 29.110 31.666 25.210 31.507
Peak Current (kA), Method C : 68.439 74.448 59.270 74.074
Breaking Current (kA, rms, symm) : 31.666 25.210 31.507
Steady State Current (kA, rms) : 22.636 31.666 25.210 31.507

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 30.488 0.00 88.73 99.34 34.626 34.626 6.76E-001 6.28E+000 1.27E+000 3.91E+000

HWL4 SELECT ISO HCML F1 6.97 29.988 12.21 92.71 94.86 34.247 34.626 6.88E-001 6.38E+000 1.27E+000 3.91E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.379 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 30.488 34.626 26.403 34.907
Peak Current (kA), Method C : 74.695 84.833 64.687 85.521
Breaking Current (kA, rms, symm) : 34.626 26.403 34.907
Steady State Current (kA, rms) : 23.466 34.626 26.403 34.907

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB
B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 31.577 0.00 93.99 93.03 36.227 36.227 2.87E-001 6.09E+000 1.05E-001 3.75E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.071 0.16 93.97 93.00 15.270 18.113 4.39E-001 1.59E+001 2.10E-001 7.49E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.50 93.86 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.95 93.11 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.96 93.10 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.96 93.08 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.67 93.58 0.380 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.02 93.41 94.03 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.63 93.64 0.379 0.000 4.39E+001 3.85E+002
F1 TB
IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 93.73 93.47 0.380 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 93.79 93.36 0.381 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.54 93.54 93.79 0.379 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.65 93.84 93.34 0.381 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.577 36.227 27.347 34.803
Peak Current (kA), Method C : 83.670 95.991 72.460 92.217
Breaking Current (kA, rms, symm) : 36.227 27.347 34.803
Steady State Current (kA, rms) : 24.098 36.227 27.347 34.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 23.583 0.00 83.81 123.83 22.945 22.945 3.19E+000 7.51E+000 8.86E+000 5.00E+000

HWL15 SELECT ISO IGNCA F1 40.26 23.106 60.53 91.81 101.05 22.635 22.945 3.30E+000 7.65E+000 8.86E+000 5.00E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.325 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 23.583 22.945 20.424 26.940
Peak Current (kA), Method C : 43.400 42.224 37.585 49.577
Breaking Current (kA, rms, symm) : 22.945 20.424 26.940
Steady State Current (kA, rms) : 19.281 22.945 20.424 26.940

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 21.374 0.00 86.99 127.36 19.676 19.676 4.15E+000 7.99E+000 1.18E+001 5.42E+000

HWL12 SELECT ISO JANPATH LANE F1 48.58 20.910 69.15 92.63 101.69 19.391 19.676 4.31E+000 8.13E+000 1.18E+001 5.42E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.307 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.374 19.676 18.511 23.845
Peak Current (kA), Method C : 37.359 34.391 32.354 41.677
Breaking Current (kA, rms, symm) : 19.676 18.511 23.845
Steady State Current (kA, rms) : 17.824 19.676 18.511 23.845

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 40.243 0.00 99.54 99.20 40.758 40.758 8.85E-002 7.12E-001 8.10E-002 6.85E-001

HCML IC L1 TB MAHARNI SS BUS 0.99 0.440 2.99 98.62 98.20 0.699 1.207 6.00E+000 6.54E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 0.99 0.440 2.99 98.62 98.20 0.699 1.207 6.00E+000 6.54E+001 2.66E-001 2.33E+001

MAHARANI MAHARNI SS BUS 100.00 39.365 100.00 100.00 100.00 39.365 38.358 9.10E-002 7.28E-001 9.10E-002 7.28E-001
2x315+2x500 MVA
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 40.243 40.758 34.852 40.576
Peak Current (kA), Method C : 96.473 97.707 83.548 97.270
Breaking Current (kA, rms, symm) : 40.758 34.852 40.576
Steady State Current (kA, rms) : 39.365 40.758 34.852 40.576

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 22.861 0.00 97.16 106.93 22.010 22.010 2.85E+000 7.92E+000 4.64E+000 8.26E+000

HWL8 SELECT ISO MANDI HOUSE F1 38.05 22.376 48.66 93.45 98.81 21.699 22.010 2.96E+000 8.08E+000 4.64E+000 8.26E+000
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.321 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 22.861 22.010 19.798 23.494
Peak Current (kA), Method C : 43.932 42.298 38.046 45.148
Breaking Current (kA, rms, symm) : 22.010 19.798 23.494
Steady State Current (kA, rms) : 18.707 22.010 19.798 23.494

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 35.627 0.00 173.21 173.21 0.000 0.000 9.08E-001 1.62E+001

TR1 11KV TB OG AUX TR1 CB TB 4.09 35.542 0.00 173.21 173.21 0.000 0.000 8.97E-001 1.62E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 35.627 0.000 30.854 30.854
Peak Current (kA), Method C : 93.210 0.000 80.722 80.722
Breaking Current (kA, rms, symm) : 0.000 30.854 30.854
Steady State Current (kA, rms) : 32.509 0.000 30.854 30.854

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 35.627 0.00 173.21 173.21 0.000 0.000 9.08E-001 1.62E+001

TR2 11KV TB OG AUX TR2 CB TB 4.09 35.542 0.00 173.21 173.21 0.000 0.000 8.97E-001 1.62E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 35.627 0.000 30.854 30.854
Peak Current (kA), Method C : 93.210 0.000 80.722 80.722
Breaking Current (kA, rms, symm) : 0.000 30.854 30.854
Steady State Current (kA, rms) : 32.509 0.000 30.854 30.854

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 19.281 0.00 111.49 109.44 15.703 15.703 1.32E-001 1.49E+000 1.33E-001 2.52E+000
BUS

HCML IC L3 TB PARK STREET SS 10.85 19.281 13.40 108.62 106.76 15.703 15.703 1.32E-001 1.49E+000 1.33E-001 2.52E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 19.281 15.703 16.698 18.129
Peak Current (kA), Method C : 48.316 39.349 41.843 45.429
Breaking Current (kA, rms, symm) : 15.703 16.698 18.129
Steady State Current (kA, rms) : 18.862 15.703 16.698 18.129

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 16.372 0.00 95.03 131.69 13.441 13.441 6.99E+000 9.45E+000 2.05E+001 6.67E+000

HWL9 SELECT ISO RAJA BAZAR F1 64.82 15.944 82.46 94.75 102.07 13.206 13.441 7.33E+000 9.59E+000 2.05E+001 6.67E+000
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.274 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.372 13.441 14.178 17.410
Peak Current (kA), Method C : 26.438 21.705 22.896 28.114
Breaking Current (kA, rms, symm) : 13.441 14.178 17.410
Steady State Current (kA, rms) : 14.249 13.441 14.178 17.410

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 19.456 0.00 90.08 129.49 17.106 17.106 5.10E+000 8.48E+000 1.47E+001 5.84E+000

HWL3 SELECT ISO SCHOOL LANE F1 55.19 19.005 75.09 93.44 101.97 16.842 17.106 5.32E+000 8.62E+000 1.47E+001 5.84E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.293 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 19.456 17.106 16.850 21.285
Peak Current (kA), Method C : 32.815 28.852 28.419 35.899
Breaking Current (kA, rms, symm) : 17.106 16.850 21.285
Steady State Current (kA, rms) : 16.501 17.106 16.850 21.285

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 29.248 0.00 92.87 98.76 31.901 31.901 7.95E-001 6.53E+000 1.13E+000 4.83E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 10.42 28.748 15.81 93.31 95.13 31.537 31.901 8.11E-001 6.65E+000 1.13E+000 4.83E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.364 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 29.248 31.901 25.330 31.731
Peak Current (kA), Method C : 70.451 76.841 61.013 76.431
Breaking Current (kA, rms, symm) : 31.901 25.330 31.731
Steady State Current (kA, rms) : 22.709 31.901 25.330 31.731

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 110.03 107.95 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 21.629 0.00 110.03 107.95 18.133 18.133 1.14E-001 1.33E+000 1.06E-001 2.10E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 39.59 0.716 53.77 98.65 97.09 0.972 1.716 2.97E+000 4.02E+001 6.29E-001 2.23E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 35.03 0.110 73.44 75.45 100.00 0.200 0.415 * 7.11E+000 2.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 46.87 20.803 56.94 99.44 99.13 16.962 16.004 1.20E-001 1.38E+000 1.31E-001 2.38E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 21.629 18.133 18.731 20.484
Peak Current (kA), Method C : 54.359 45.575 47.076 51.482
Breaking Current (kA, rms, symm) : 18.133 18.731 20.484
Steady State Current (kA, rms) : 21.102 18.133 18.731 20.484

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 36.647 0.00 173.21 173.21 0.000 0.000 4.05E-001 1.57E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 94.51 5.926 100.00 100.00 100.00 0.000 0.000 2.66E+000 9.74E+001
ISO TB
# TR1 33KV TB TR1 11KV TB 65.32 30.648 100.00 100.00 100.00 0.000 0.000 6.59E-001 1.88E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 36.647 0.000 31.737 31.737
Peak Current (kA), Method C : 99.967 0.000 86.574 86.574
Breaking Current (kA, rms, symm) : 0.000 31.737 31.737
Steady State Current (kA, rms) : 33.354 0.000 31.737 31.737

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 31.562 0.00 93.99 93.03 36.214 36.214 2.88E-001 6.09E+000 1.05E-001 3.75E+000

HWT1 IC CB TB TR1 33KV TB 0.13 19.485 0.19 93.97 93.01 20.915 18.032 5.88E-001 9.86E+000 2.17E-001 7.52E+000

# TR1 HT BUS SELECT TR1 33KV TB 86.80 10.461 86.17 99.61 99.09 10.385 7.150 6.04E-001 1.84E+001 5.53E-001 1.90E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 10.37 1.622 56.90 56.96 100.00 4.917 11.032 * 1.07E+000 1.19E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.562 36.214 27.334 34.791
Peak Current (kA), Method C : 83.617 95.941 72.415 92.171
Breaking Current (kA, rms, symm) : 36.214 27.334 34.791
Steady State Current (kA, rms) : 24.098 36.214 27.334 34.791

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 36.647 0.00 173.21 173.21 0.000 0.000 4.05E-001 1.57E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 94.51 5.926 100.00 100.00 100.00 0.000 0.000 2.66E+000 9.74E+001
ISO TB
# TR2 33KV TB TR2 11KV TB 65.32 30.648 100.00 100.00 100.00 0.000 0.000 6.59E-001 1.88E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 36.647 0.000 31.737 31.737
Peak Current (kA), Method C : 99.967 0.000 86.574 86.574
Breaking Current (kA, rms, symm) : 0.000 31.737 31.737
Steady State Current (kA, rms) : 33.354 0.000 31.737 31.737

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 31.562 0.00 93.99 93.03 36.214 36.214 2.88E-001 6.09E+000 1.05E-001 3.75E+000

HWT3 IC2 CB TB TR2 33KV TB 0.13 19.485 0.19 93.97 93.01 20.915 18.032 5.88E-001 9.86E+000 2.17E-001 7.52E+000

# TR2 HT BUS SELECT TR2 33KV TB 86.80 10.461 86.17 99.61 99.09 10.385 7.150 6.04E-001 1.84E+001 5.53E-001 1.90E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 10.37 1.622 56.90 56.96 100.00 4.917 11.032 * 1.07E+000 1.19E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 31.562 36.214 27.334 34.791
Peak Current (kA), Method C : 83.617 95.941 72.415 92.171
Breaking Current (kA, rms, symm) : 36.214 27.334 34.791
Steady State Current (kA, rms) : 24.098 36.214 27.334 34.791

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 18.434 0.00 91.74 130.36 15.831 15.831 5.67E+000 8.77E+000 1.65E+001 6.09E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 58.51 17.990 77.79 93.87 102.04 15.577 15.831 5.92E+000 8.91E+000 1.65E+001 6.09E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.286 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 18.434 15.831 15.964 19.969
Peak Current (kA), Method C : 30.593 26.274 26.494 33.140
Breaking Current (kA, rms, symm) : 15.831 15.964 19.969
Steady State Current (kA, rms) : 15.772 15.831 15.964 19.969

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
33KV MAIN BUS2 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
AUX TR1 HT TB 11.000 34.632 87.255 31.683 0.000 0.000 0.000 0.000 29.992 75.565 29.992 29.992 29.992 75.565 29.992 29.992
AUX TR1 LT BUS 0.415 14.625 28.841 11.819 13.154 25.939 13.154 13.154 12.665 24.977 12.665 12.665 14.568 28.728 14.568 14.568
AUX TR1 LT TB 0.415 14.878 29.517 12.088 13.893 27.563 13.893 13.893 12.884 25.562 12.884 12.884 14.513 28.793 14.513 14.513
AUX TR2 HT TB 11.000 34.632 87.255 31.683 0.000 0.000 0.000 0.000 29.992 75.565 29.992 29.992 29.992 75.565 29.992 29.992
AUX TR2 LT BUS 0.415 14.625 28.841 11.819 13.154 25.939 13.154 13.154 12.665 24.977 12.665 12.665 14.568 28.728 14.568 14.568
AUX TR2 LT TB 0.415 14.878 29.517 12.088 13.893 27.563 13.893 13.893 12.884 25.562 12.884 12.884 14.513 28.793 14.513 14.513
B. D. MARG F1 33.000 15.608 24.990 13.667 12.612 20.193 12.612 12.612 13.517 21.642 13.517 13.517 16.492 26.406 16.492 16.492
CHURCH ROAD F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
CONNAUGHT PLACE F1 33.000 13.858 21.822 12.296 10.814 17.028 10.814 10.814 12.002 18.898 12.002 12.002 14.442 22.741 14.442 14.442
CONSTITUTION C-F1 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
CONSTITUTION C-F2 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
DELHI HC F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
DWL1 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL2 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL3 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
DWL4 IC CB TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HANUMAN ROAD F1 33.000 29.110 68.439 22.636 31.666 74.448 31.666 31.666 25.210 59.270 25.210 25.210 31.507 74.074 31.507 31.507
HCML F1 33.000 30.488 74.695 23.466 34.626 84.833 34.626 34.626 26.403 64.687 26.403 26.403 34.907 85.521 34.907 34.907
HCML IC L1 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L2 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L3 TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HCML IC L4TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
HWL1 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL2 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL3 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL4 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL5 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL6 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL7 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL8 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL9 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL10 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL11 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL12 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL13 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWL15 SELECT ISO TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWT1 IC CB TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
HWT3 IC2 CB TB 33.000 31.577 83.670 24.098 36.227 95.991 36.227 36.227 27.347 72.460 27.347 27.347 34.803 92.217 34.803 34.803
IGNCA F1 33.000 23.583 43.400 19.281 22.945 42.224 22.945 22.945 20.424 37.585 20.424 20.424 26.940 49.577 26.940 26.940
JANPATH LANE F1 33.000 21.374 37.359 17.824 19.676 34.391 19.676 19.676 18.511 32.354 18.511 18.511 23.845 41.677 23.845 23.845
MAHARNI SS BUS 220.000 40.243 96.473 39.365 40.758 97.707 40.758 40.758 34.852 83.548 34.852 34.852 40.576 97.270 40.576 40.576
MAIN BUS1 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
MAIN BUS2 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484
MANDI HOUSE F1 33.000 22.861 43.932 18.707 22.010 42.298 22.010 22.010 19.798 38.046 19.798 19.798 23.494 45.148 23.494 23.494
OG AUX TR1 CB TB 11.000 35.627 93.210 32.509 0.000 0.000 0.000 0.000 30.854 80.722 30.854 30.854 30.854 80.722 30.854 30.854
OG AUX TR2 CB TB 11.000 35.627 93.210 32.509 0.000 0.000 0.000 0.000 30.854 80.722 30.854 30.854 30.854 80.722 30.854 30.854
PARK STREET SS BUS 220.000 19.281 48.316 18.862 15.703 39.349 15.703 15.703 16.698 41.843 16.698 16.698 18.129 45.429 18.129 18.129
RAJA BAZAR F1 33.000 16.372 26.438 14.249 13.441 21.705 13.441 13.441 14.178 22.896 14.178 14.178 17.410 28.114 17.410 17.410
SCHOOL LANE F1 33.000 19.456 32.815 16.501 17.106 28.852 17.106 17.106 16.850 28.419 16.850 16.850 21.285 35.899 21.285 21.285
SCINDIA HOUSE F1 33.000 29.248 70.451 22.709 31.901 76.841 31.901 31.901 25.330 61.013 25.330 25.330 31.731 76.431 31.731 31.731
TR1 HT BUS SELECT ISO TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484

TR2 HT BUS SELECT ISO TB 220.000 21.629 54.359 21.102 18.133 45.575 18.133 18.133 18.731 47.076 18.731 18.731 20.484 51.482 20.484 20.484

TR1 11KV TB 11.000 36.647 99.967 33.354 0.000 0.000 0.000 0.000 31.737 86.574 31.737 31.737 31.737 86.574 31.737 31.737
TR1 33KV TB 33.000 31.562 83.617 24.098 36.214 95.941 36.214 36.214 27.334 72.415 27.334 27.334 34.791 92.171 34.791 34.791
TR2 11KV TB 11.000 36.647 99.967 33.354 0.000 0.000 0.000 0.000 31.737 86.574 31.737 31.737 31.737 86.574 31.737 31.737
TR2 33KV TB 33.000 31.562 83.617 24.098 36.214 95.941 36.214 36.214 27.334 72.415 27.334 27.334 34.791 92.171 34.791 34.791
VIDHYUT BHAVAN F1 33.000 18.434 30.593 15.772 15.831 26.274 15.831 15.831 15.964 26.494 15.964 15.964 19.969 33.140 19.969 19.969

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01706 0.20099 0.20172 0.01706 0.20099 0.20172 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01636 0.01720 0.00531 0.01636 0.01720 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01612 0.01691 0.00512 0.01612 0.01691 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01706 0.20099 0.20172 0.01706 0.20099 0.20172 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01636 0.01720 0.00531 0.01636 0.01720 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01612 0.01691 0.00512 0.01612 0.01691 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82196 1.06176 1.34274 0.82196 1.06176 1.34274 2.42722 0.75383 2.54158 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.98427 1.14817 1.51231 0.98427 1.14817 1.51231 2.93581 0.82663 3.04997 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.10152 0.71276 0.71995 0.10152 0.71276 0.71995 0.13487 0.53103 0.54789 0.00000 0.00000 0.00000

HCML F1 33.000 0.07365 0.68346 0.68741 0.07365 0.68346 0.68741 0.13856 0.42623 0.44819 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC 33 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.03122 0.66297 0.66370 0.03122 0.66297 0.66370 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.34726 0.81801 0.88867 0.34726 0.81801 0.88867 0.96502 0.54453 1.10805 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.45148 0.87039 0.98052 0.45148 0.87039 0.98052 1.28289 0.59003 1.41207 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44534 3.47185 0.42816 3.44534 3.47185 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.31033 0.86263 0.91675 0.31033 0.86263 0.91675 0.50524 0.90003 1.03215 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01098 0.19578 0.19609 0.01098 0.19578 0.19609 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01098 0.19578 0.19609 0.01098 0.19578 0.19609 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.63765 7.21817 7.24628 0.63765 7.21817 7.24628 0.64590 12.18694 12.20405 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76072 1.02957 1.28012 0.76072 1.02957 1.28012 2.23650 0.72653 2.35155 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.55512 0.92312 1.07718 0.55512 0.92312 1.07718 1.60076 0.63553 1.72230 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.08659 0.71130 0.71655 0.08659 0.71130 0.71655 0.12332 0.52586 0.54013 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.55355 6.43617 6.45993 0.55355 6.43617 6.45993 0.51494 10.18594 10.19895 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00491 0.19056 0.19063 0.00491 0.19056 0.19063 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.03132 0.66328 0.66402 0.03132 0.66328 0.66402 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00491 0.19056 0.19063 0.00491 0.19056 0.19063 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.03132 0.66328 0.66402 0.03132 0.66328 0.66402 0.01141 0.40803 0.40819 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.61704 0.95491 1.13692 0.61704 0.95491 1.13692 1.79148 0.66283 1.91017 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 1
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents
Short-Circuit Current Based on User-Defined c Factor

Swing V-Control Load Total


Number of Buses: 1 0 59 60

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 2 0 26 0 28 58

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 17 18

System Frequency: 50 Hz

Unit System: Metric

Project Filename: HCML

Output Filename: D:\My Documents\areva\dtl\HCML\SC 15G 220kv PAR.SI2


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 2
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 3
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

33KV MAIN BUS1 Load 33.000 33.000 1 100.00 0.00

33KV MAIN BUS2 Load 33.000 33.000 1 100.00 0.00

AUX TR1 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR1 LT BUS Load 0.415 0.412 1 99.90 -60.01

AUX TR1 LT TB Load 0.415 0.412 1 99.90 -60.01

AUX TR2 HT TB Load 11.000 11.000 1 100.00 -30.00

AUX TR2 LT BUS Load 0.415 0.412 1 99.89 -60.01

AUX TR2 LT TB Load 0.415 0.412 1 99.89 -60.01

B. D. MARG F1 Load 33.000 33.000 1 100.00 0.00

CHURCH ROAD F1 Load 33.000 33.000 1 100.00 0.00

CONNAUGHT PLACE F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F1 Load 33.000 33.000 1 100.00 0.00

CONSTITUTION C-F2 Load 33.000 33.000 1 100.00 0.00

DELHI HC F1 Load 33.000 33.000 1 100.00 0.00

DWL1 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL2 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL3 IC CB TB Load 220.000 220.000 1 100.00 0.00

DWL4 IC CB TB Load 220.000 220.000 1 100.00 0.00

HANUMAN ROAD F1 Load 33.000 33.000 1 100.00 0.00

HCML F1 Load 33.000 33.000 1 100.00 0.00

HCML IC L1 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L2 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L3 TB Load 220.000 220.000 1 100.00 0.00

HCML IC L4TB Load 220.000 220.000 1 100.00 0.00

HWL1 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL2 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL3 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL4 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL5 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL6 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL7 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL8 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL9 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL10 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL11 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 4
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

HWL12 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL13 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL14 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWL15 SELECT ISO TB Load 33.000 33.000 1 100.00 0.00

HWT1 IC CB TB Load 33.000 33.000 1 100.00 0.00

HWT3 IC2 CB TB Load 33.000 33.000 1 100.00 0.00

IGNCA F1 Load 33.000 33.000 1 100.00 0.00

JANPATH LANE F1 Load 33.000 33.000 1 100.00 0.00

MAHARNI SS BUS SWNG 220.000 220.000 1 100.00 0.00

MAIN BUS1 Load 220.000 220.000 1 100.00 0.00

MAIN BUS2 Load 220.000 220.000 1 100.00 0.00

MANDI HOUSE F1 Load 33.000 33.000 1 100.00 0.00

OG AUX TR1 CB TB Load 11.000 11.000 1 100.00 -30.00

OG AUX TR2 CB TB Load 11.000 11.000 1 100.00 -30.00

PARK STREET SS BUS Load 220.000 220.000 1 100.00 0.00

RAJA BAZAR F1 Load 33.000 33.000 1 100.00 0.00

SCHOOL LANE F1 Load 33.000 33.000 1 100.00 0.00

SCINDIA HOUSE F1 Load 33.000 33.000 1 100.00 0.00

TR1 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR2 HT BUS SELECT ISO TB Load 220.000 220.000 1 100.00 0.00

TR1 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR1 33KV TB Load 33.000 33.000 1 100.00 0.00

TR2 11KV TB Load 11.000 11.000 1 100.00 -30.00

TR2 33KV TB Load 33.000 33.000 1 100.00 0.00

VIDHYUT BHAVAN F1 Load 33.000 33.000 1 100.00 0.00

60 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 5
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

11KV AUX TR1 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

11KV AUX TR2 IC CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

AUX TR1 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

AUX TR2 LT CAB 1.1NALS1 630 10.0 0.0 2 75 0.0571707 0.082 0.000254 0.8918629 0.2091

HCML CKT-1 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HCML CKT-2 CAB 230NCUS1 1200 8500.0 0.0 1 20 0.015921 0.37 0.000069 0.0248618 0.947

HWL1 CAB 36NALN3 400 2800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL2 CAB 36NALN3 400 4600.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL3 CAB 36NALN3 400 2500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL4 CAB 36NALN3 400 200.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL5 CAB 36NALN3 400 500.0 0.0 1 75 0.1144719 0.1 0.000164 0.2238249 0.23565

HWL6 CAB 36NALN3 300 500.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL7 CAB 36NALN3 400 3800.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL8 CAB 36NALN3 300 2000.0 0.0 1 75 0.1453805 0.103 0.000149 0.2469147 0.246

HWL9 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL10 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL11 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL12 CAB 36NALN3 400 2000.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL13 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL14 CAB 36NALN3 400 3500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

HWL15 CAB 36NALN3 400 1500.0 0.0 1 75 0.2191544 0.106 0.000078 0.6357382 0.091

OG AUX TR1 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

OG AUX TR2 CAB 36NALN1 300 50.0 0.0 1 75 0.1219642 0.105 0.1969531 0.2667

PARK STREET CKT-1 CAB 230NCUS1 1000 4600.0 0.0 1 20 0.0182817 0.17 0.000053 0.0284695 0.435

TR1 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

TR2 33KV CAB 36NCUN1 630 50.0 0.0 4 75 0.0400586 0.102 0.0000918 0.0627584 0.261

Line / Cable resistances are listed at the specified temperatures.


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 6
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

AUX TR1 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

AUX TR2 0.400 11.000 0.433 5.00 3.36 0 0 -10.0 5.000 0 4.5000 Std Pos. Seq. -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

AUX TR1 0.400 11.000 0.433 D/Y Solid

AUX TR2 0.400 11.000 0.433 D/Y Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

TR1 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

TR2 HCML Primary: 100.000 220.000 0 Zps = 16.00 64.77 100.000 -10.0 0 0

Secondary: 100.000 33.000 0 Zpt = 24.00 97.16 100.000 -10.0 Std Pos. Seq. 0.000

Tertiary: 33.330 11.000 0 Zst = 12.00 48.57 100.000 -10.0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR1 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 7
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

TR2 HCML Primary: 100.000 220.000 Wye Solid

Secondary: 100.000 33.000 Wye Solid

Tertiary: 33.330 11.000 Delta


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 8
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

AUX TR1 2W XFMR AUX TR1 HT TB AUX TR1 LT TB 343.73 1155.98 1206.00

AUX TR2 2W XFMR AUX TR2 HT TB AUX TR2 LT TB 343.73 1155.98 1206.00
TR1 HCML 3W Xfmr TR1 HT BUS SELECT ISO TB TR1 33KV TB 0.35 15.96 15.97
3W Xfmr TR1 HT BUS SELECT ISO TB TR1 11KV TB -3.01 92.04 92.08

3W Xfmr TR1 33KV TB TR1 11KV TB 0.32 12.30 12.30

TR2 HCML 3W Xfmr TR2 HT BUS SELECT ISO TB TR2 33KV TB 0.35 15.96 15.97
3W Xfmr TR2 HT BUS SELECT ISO TB TR2 11KV TB -3.01 92.04 92.08

3W Xfmr TR2 33KV TB TR2 11KV TB 0.32 12.30 12.30

11KV AUX TR1 IC CAB Cable TR1 11KV TB OG AUX TR1 CB TB 0.50 0.43 0.67

11KV AUX TR2 IC CAB Cable TR2 11KV TB OG AUX TR2 CB TB 0.50 0.43 0.67

AUX TR1 LT CAB Cable AUX TR1 LT TB AUX TR1 LT BUS 16.81 24.11 29.39 0.0000009

AUX TR2 LT CAB Cable AUX TR2 LT TB AUX TR2 LT BUS 16.81 24.11 29.39 0.0000009

HCML CKT-1 CAB Cable MAHARNI SS BUS HCML IC L1 TB 0.03 0.65 0.65 28.3866000

HCML CKT-2 CAB Cable MAHARNI SS BUS HCML IC L2 TB 0.03 0.65 0.65 28.3866000

HWL1 CAB Cable HWL1 SELECT ISO TB VIDHYUT BHAVAN F1 5.63 2.73 6.26 0.2378376

HWL2 CAB Cable HWL2 SELECT ISO TB CONNAUGHT PLACE F1 9.26 4.48 10.28 0.3907332

HWL3 CAB Cable HWL3 SELECT ISO TB SCHOOL LANE F1 5.03 2.43 5.59 0.2123550

HWL4 CAB Cable HWL4 SELECT ISO TB HCML F1 0.40 0.19 0.45 0.0169884

HWL5 CAB Cable HWL5 SELECT ISO TB SCINDIA HOUSE F1 0.53 0.46 0.70 0.0892980

HWL6 CAB Cable HWL6 SELECT ISO TB HANUMAN ROAD F1 0.67 0.47 0.82 0.0811305

HWL7 CAB Cable HWL7 SELECT ISO TB B. D. MARG F1 7.65 3.70 8.49 0.3227796

HWL8 CAB Cable HWL8 SELECT ISO TB MANDI HOUSE F1 2.67 1.89 3.27 0.3245220

HWL9 CAB Cable HWL9 SELECT ISO TB RAJA BAZAR F1 7.04 3.41 7.82 0.2972970

HWL10 CAB Cable HWL10 SELECT ISO TB CONSTITUTION C-F1 3.02 1.46 3.35 0.1274130

HWL11 CAB Cable HWL11 SELECT ISO TB CONSTITUTION C-F2 3.02 1.46 3.35 0.1274130

HWL12 CAB Cable HWL12 SELECT ISO TB JANPATH LANE F1 4.02 1.95 4.47 0.1698840

HWL13 CAB Cable HWL13 SELECT ISO TB CHURCH ROAD F1 7.04 3.41 7.82 0.2972970

HWL14 CAB Cable HWL14 SELECT ISO TB DELHI HC F1 7.04 3.41 7.82 0.2972970

HWL15 CAB Cable HWL15 SELECT ISO TB IGNCA F1 3.02 1.46 3.35 0.1274130

OG AUX TR1 CAB Cable OG AUX TR1 CB TB AUX TR1 HT TB 0.50 0.43 0.67

OG AUX TR2 CAB Cable OG AUX TR2 CB TB AUX TR2 HT TB 0.50 0.43 0.67

PARK STREET CKT-1 CAB Cable PARK STREET SS BUS HCML IC L3 TB 0.02 0.16 0.16 11.7999200

TR1 33KV CAB Cable TR1 33KV TB HWT1 IC CB TB 0.00 0.01 0.01 0.0199940

TR2 33KV CAB Cable TR2 33KV TB HWT3 IC2 CB TB 0.00 0.01 0.01 0.0199940

DWL1 IC Tie Breakr HCML IC L1 TB DWL1 IC CB TB

DWL2 IC Tie Breakr HCML IC L2 TB DWL2 IC CB TB

DWL3 IC Tie Breakr HCML IC L3 TB DWL3 IC CB TB


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 9
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

DWL4 IC Tie Breakr HCML IC L4TB DWL4 IC CB TB

DWQ1 BC Tie Breakr MAIN BUS1 MAIN BUS2

DWL1 ISO1 Tie Switch DWL1 IC CB TB MAIN BUS1

DWL2 ISO2 Tie Switch DWL2 IC CB TB MAIN BUS2

DWL3 ISO1 Tie Switch DWL3 IC CB TB MAIN BUS1

DWL4 ISO2 Tie Switch DWL4 IC CB TB MAIN BUS2


DWT1 ISO1 Tie Switch MAIN BUS1 TR1 HT BUS SELECT ISO TB

DWT3 ISO2 Tie Switch MAIN BUS2 TR2 HT BUS SELECT ISO TB

HWL1 ISO1 Tie Switch 33KV MAIN BUS1 HWL1 SELECT ISO TB
HWL2 ISO1 Tie Switch 33KV MAIN BUS1 HWL2 SELECT ISO TB

HWL3 ISO1 Tie Switch 33KV MAIN BUS1 HWL3 SELECT ISO TB

HWL4 ISO1 Tie Switch 33KV MAIN BUS1 HWL4 SELECT ISO TB
HWL5 ISO1 Tie Switch 33KV MAIN BUS1 HWL5 SELECT ISO TB

HWL6 ISO1 Tie Switch 33KV MAIN BUS1 HWL6 SELECT ISO TB

HWL7 ISO1 Tie Switch 33KV MAIN BUS1 HWL7 SELECT ISO TB
HWL8 ISO2 Tie Switch 33KV MAIN BUS2 HWL8 SELECT ISO TB

HWL9 ISO2 Tie Switch 33KV MAIN BUS2 HWL9 SELECT ISO TB

HWL10 ISO2 Tie Switch 33KV MAIN BUS2 HWL10 SELECT ISO TB
HWL11 ISO2 Tie Switch 33KV MAIN BUS2 HWL11 SELECT ISO TB

HWL12 ISO2 Tie Switch 33KV MAIN BUS2 HWL12 SELECT ISO TB

HWL13 ISO2 Tie Switch 33KV MAIN BUS2 HWL13 SELECT ISO TB
HWL14 ISO2 Tie Switch 33KV MAIN BUS2 HWL14 SELECT ISO TB

HWL15 ISO2 Tie Switch 33KV MAIN BUS2 HWL15 SELECT ISO TB

HWT1 ISO1 Tie Switch HWT1 IC CB TB 33KV MAIN BUS1


HWT3 ISO2 Tie Switch HWT3 IC2 CB TB 33KV MAIN BUS2
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 10
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

MAHARANI 2x315+2x500 MVA MAHARNI SS BUS 15000.000 220.000 0.08269 0.66152 0.13 Wye - Solid

Total Connected Power Grids ( = 1 ): 15000.000 MVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 11
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
AUX TR1 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

AUX TR2 LT LOAD 400.0 0.415 556.48 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.27

B. D. MARG L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CHURCH ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONNAUGHT PLACE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

CONSTITUTION C-L2 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

DELHI HC L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HANUMAN ROAD L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

HCML L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

IGNCA L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

JANPATH LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

MANDI HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

RAJA BAZAR L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCHOOL LANE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

SCINDIA HOUSE L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

VIDHYUT BHAVAN L1 5000.0 33.000 87.48 85.00 80 20 3400.00 2107.13 1.53 15.31 0.10 Delta 3.40

Total Connected Lumped Loads ( = 17 ): 75800.0 kVA


Project: 220/33 KV GIS AT HCM LANE ETAP Page: 12
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

SHORT- CIRCUIT REPORT

Fault at bus: 33KV MAIN BUS1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS1 Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 13
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: 33KV MAIN BUS2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV MAIN BUS2 Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 14
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 HT TB Total 0.00 27.459 0.00 173.21 173.21 0.000 0.000 1.50E+000 2.10E+001

OG AUX TR1 CB TB AUX TR1 HT TB 3.15 27.375 0.00 173.21 173.21 0.000 0.000 1.48E+000 2.10E+001

AUX TR1 LT TB AUX TR1 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.459 0.000 23.781 23.781
Peak Current (kA), Method C : 70.416 0.000 60.982 60.982
Breaking Current (kA, rms, symm) : 0.000 23.781 23.781
Steady State Current (kA, rms) : 24.470 0.000 23.781 23.781

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 15
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT BUS Total 0.00 14.585 0.00 101.06 109.88 13.132 13.132 3.12E+002 9.65E+002 6.06E+002 1.22E+003

AUX TR1 LT TB AUX TR1 LT BUS 2.34 11.793 9.08 104.13 102.44 11.456 13.132 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR1 LT LOAD AUX TR1 LT BUS 100.00 2.805 100.00 100.00 100.00 1.684 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.585 13.132 12.631 14.536
Peak Current (kA), Method C : 28.782 25.915 24.926 28.686
Breaking Current (kA, rms, symm) : 13.132 12.631 14.536
Steady State Current (kA, rms) : 11.770 13.132 12.631 14.536

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 16
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR1 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR1 LT TB Total 0.00 14.836 0.00 103.94 102.90 13.868 13.868 3.01E+002 9.51E+002 3.44E+002 1.16E+003

AUX TR1 LT BUS AUX TR1 LT TB 0.55 2.789 0.35 104.00 103.02 1.738 0.000 2.06E+003 4.89E+003

AUX TR1 HT TB AUX TR1 LT TB 98.95 12.061 99.75 100.64 99.94 12.138 13.868 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.836 13.868 12.848 14.475
Peak Current (kA), Method C : 29.454 27.534 25.508 28.738
Breaking Current (kA, rms, symm) : 13.868 12.848 14.475
Steady State Current (kA, rms) : 12.038 13.868 12.848 14.475

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 17
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 HT TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 HT TB Total 0.00 27.814 0.00 173.21 173.21 0.000 0.000 1.51E+000 2.07E+001

OG AUX TR2 CB TB AUX TR2 HT TB 3.19 27.729 0.00 173.21 173.21 0.000 0.000 1.50E+000 2.08E+001

AUX TR2 LT TB AUX TR2 HT TB 18.43 0.089 99.37 99.37 99.37 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.814 0.000 24.087 24.087
Peak Current (kA), Method C : 71.184 0.000 61.647 61.647
Breaking Current (kA, rms, symm) : 0.000 24.087 24.087
Steady State Current (kA, rms) : 24.470 0.000 24.087 24.087

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 18
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT BUS


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT BUS Total 0.00 14.587 0.00 101.06 109.89 13.134 13.134 3.12E+002 9.65E+002 6.06E+002 1.22E+003

AUX TR2 LT TB AUX TR2 LT BUS 2.34 11.795 9.08 104.14 102.44 11.457 13.134 3.62E+002 1.20E+003 6.06E+002 1.22E+003

AUX TR2 LT LOAD AUX TR2 LT BUS 100.00 2.805 100.00 100.00 100.00 1.683 0.000 2.04E+003 4.86E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.587 13.134 12.633 14.538
Peak Current (kA), Method C : 28.785 25.917 24.929 28.688
Breaking Current (kA, rms, symm) : 13.134 12.633 14.538
Steady State Current (kA, rms) : 11.770 13.134 12.633 14.538

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 19
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: AUX TR2 LT TB


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

AUX TR2 LT TB Total 0.00 14.838 0.00 103.94 102.90 13.870 13.870 3.01E+002 9.50E+002 3.44E+002 1.16E+003

AUX TR2 LT BUS AUX TR2 LT TB 0.55 2.789 0.35 104.00 103.02 1.738 0.000 2.06E+003 4.89E+003

AUX TR2 HT TB AUX TR2 LT TB 98.97 12.063 99.76 100.64 99.95 12.140 13.870 * 3.45E+002 1.18E+003 3.44E+002 1.16E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.838 13.870 12.850 14.477
Peak Current (kA), Method C : 29.458 27.535 25.511 28.742
Breaking Current (kA, rms, symm) : 13.870 12.850 14.477
Steady State Current (kA, rms) : 12.038 13.870 12.850 14.477

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 20
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: B. D. MARG F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

B. D. MARG F1 Total 0.00 11.312 0.00 86.68 128.05 10.410 10.410 7.53E+000 1.53E+001 2.24E+001 1.04E+001

HWL7 SELECT ISO B. D. MARG F1 47.87 10.845 68.88 92.58 101.87 10.123 10.410 8.11E+000 1.58E+001 2.24E+001 1.04E+001
TB
B. D. MARG L1 B. D. MARG F1 100.00 0.500 100.00 100.00 100.00 0.307 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.312 10.410 9.797 12.648
Peak Current (kA), Method C : 20.119 18.514 17.424 22.494
Breaking Current (kA, rms, symm) : 10.410 9.797 12.648
Steady State Current (kA, rms) : 9.505 10.410 9.797 12.648

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 21
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CHURCH ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CHURCH ROAD F1 Total 0.00 11.860 0.00 86.41 127.15 11.000 11.000 7.01E+000 1.46E+001 2.06E+001 1.02E+001

HWL13 SELECT ISO CHURCH ROAD F1 46.31 11.391 67.10 92.83 101.60 10.710 11.000 7.52E+000 1.51E+001 2.06E+001 1.02E+001
TB
CHURCH ROAD L1 CHURCH ROAD F1 100.00 0.500 100.00 100.00 100.00 0.309 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.860 11.000 10.271 13.283
Peak Current (kA), Method C : 21.248 19.707 18.401 23.798
Breaking Current (kA, rms, symm) : 11.000 10.271 13.283
Steady State Current (kA, rms) : 9.746 11.000 10.271 13.283

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 22
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONNAUGHT PLACE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONNAUGHT Total 0.00 10.479 0.00 89.34 130.05 9.263 9.263 8.98E+000 1.60E+001 2.70E+001 1.11E+001
PLACE F1

HWL2 SELECT ISO CONNAUGHT PLACE 53.55 10.022 74.10 93.28 102.13 8.994 9.263 9.72E+000 1.66E+001 2.70E+001 1.11E+001
TB F1
CONNAUGHT CONNAUGHT PLACE 100.00 0.500 100.00 100.00 100.00 0.295 0.000 3.83E+001 3.83E+002
PLACE L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 10.479 9.263 9.075 11.521
Peak Current (kA), Method C : 18.091 15.992 15.667 19.890
Breaking Current (kA, rms, symm) : 9.263 9.075 11.521
Steady State Current (kA, rms) : 8.898 9.263 9.075 11.521

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 23
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F1 Total 0.00 14.603 0.00 82.17 114.64 15.438 15.438 3.31E+000 1.28E+001 8.95E+000 8.49E+000

HWL10 SELECT ISO CONSTITUTION C-F1 24.58 14.109 40.49 91.66 99.00 15.090 15.438 3.50E+000 1.32E+001 8.95E+000 8.49E+000
TB
CONSTITUTION C-L1 CONSTITUTION C-F1 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.603 15.438 12.647 17.142
Peak Current (kA), Method C : 30.463 32.205 26.382 35.760
Breaking Current (kA, rms, symm) : 15.438 12.647 17.142
Steady State Current (kA, rms) : 11.516 15.438 12.647 17.142

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 24
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: CONSTITUTION C-F2


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

CONSTITUTION C-F2 Total 0.00 14.603 0.00 82.17 114.64 15.438 15.438 3.31E+000 1.28E+001 8.95E+000 8.49E+000

HWL11 SELECT ISO CONSTITUTION C-F2 24.58 14.109 40.49 91.66 99.00 15.090 15.438 3.50E+000 1.32E+001 8.95E+000 8.49E+000
TB
CONSTITUTION C-L2 CONSTITUTION C-F2 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.603 15.438 12.647 17.142
Peak Current (kA), Method C : 30.463 32.205 26.382 35.760
Breaking Current (kA, rms, symm) : 15.438 12.647 17.142
Steady State Current (kA, rms) : 11.516 15.438 12.647 17.142

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 25
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DELHI HC F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DELHI HC F1 Total 0.00 11.860 0.00 86.41 127.15 11.000 11.000 7.01E+000 1.46E+001 2.06E+001 1.02E+001

HWL14 SELECT ISO DELHI HC F1 46.31 11.391 67.10 92.83 101.60 10.710 11.000 7.52E+000 1.51E+001 2.06E+001 1.02E+001
TB
DELHI HC L1 DELHI HC F1 100.00 0.500 100.00 100.00 100.00 0.309 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.860 11.000 10.271 13.283
Peak Current (kA), Method C : 21.248 19.707 18.401 23.798
Breaking Current (kA, rms, symm) : 11.000 10.271 13.283
Steady State Current (kA, rms) : 9.746 11.000 10.271 13.283

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 26
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL1 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL1 IC CB TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 27
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL2 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL2 IC CB TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 28
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL3 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL3 IC CB TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 29
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: DWL4 IC CB TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DWL4 IC CB TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 30
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HANUMAN ROAD F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HANUMAN ROAD F1 Total 0.00 15.759 0.00 93.07 96.56 17.560 17.560 1.11E+000 1.22E+001 1.33E+000 8.37E+000

HWL6 SELECT ISO HANUMAN ROAD F1 6.49 15.259 9.65 93.34 94.55 17.188 17.560 1.14E+000 1.26E+001 1.33E+000 8.37E+000
TB
HANUMAN ROAD L1 HANUMAN ROAD F1 100.00 0.500 100.00 100.00 100.00 0.372 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.759 17.560 13.648 17.172
Peak Current (kA), Method C : 39.428 43.933 34.146 42.964
Breaking Current (kA, rms, symm) : 17.560 13.648 17.172
Steady State Current (kA, rms) : 12.482 17.560 13.648 17.172

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 31
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML F1 Total 0.00 16.129 0.00 90.97 96.52 18.413 18.413 8.56E-001 1.19E+001 1.36E+000 7.40E+000

HWL4 SELECT ISO HCML F1 3.63 15.629 6.45 93.19 94.16 18.032 18.413 8.73E-001 1.23E+001 1.36E+000 7.40E+000
TB
HCML L1 HCML F1 100.00 0.500 100.00 100.00 100.00 0.381 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.129 18.413 13.968 18.116
Peak Current (kA), Method C : 41.345 47.200 35.806 46.440
Breaking Current (kA, rms, symm) : 18.413 13.968 18.116
Steady State Current (kA, rms) : 12.723 18.413 13.968 18.116

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 32
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L1 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L1 TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 33
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L2 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L2 TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 34
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L3 TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L3 TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 35
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HCML IC L4TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HCML IC L4TB Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 36
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL1 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL1 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 37
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL2 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL2 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 38
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL3 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL3 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 39
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL4 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL4 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 40
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL5 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL5 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 41
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL6 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL6 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 42
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL7 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL7 SELECT ISO Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000
TB

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 43
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL8 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL8 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 44
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL9 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL9 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 45
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL10 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL10 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 46
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL11 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL11 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 47
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL12 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL12 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 48
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL13 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL13 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 49
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL14 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL14 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 50
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWL15 SELECT ISO TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWL15 SELECT ISO Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000
TB

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 51
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT1 IC CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT1 IC CB TB Total 0.00 16.408 0.00 93.90 93.19 18.808 18.808 4.78E-001 1.17E+001 1.92E-001 7.24E+000

TR1 33KV TB HWT1 IC CB TB 0.08 12.938 0.16 93.89 93.16 16.156 18.808 3.31E-001 1.49E+001 1.92E-001 7.24E+000

B. D. MARG F1 HWL7 SELECT ISO 2.18 0.495 1.67 93.42 94.01 0.378 0.000 4.59E+001 3.86E+002
TB
HANUMAN ROAD F1 HWL6 SELECT ISO 0.21 0.500 0.16 93.87 93.27 0.382 0.000 3.89E+001 3.83E+002
TB
SCINDIA HOUSE F1 HWL5 SELECT ISO 0.18 0.500 0.14 93.88 93.25 0.382 0.000 3.88E+001 3.83E+002
TB
HCML F1 HWL4 SELECT ISO 0.12 0.500 0.09 93.88 93.23 0.382 0.000 3.87E+001 3.83E+002
TB
SCHOOL LANE F1 HWL3 SELECT ISO 1.44 0.497 1.10 93.58 93.73 0.379 0.000 4.33E+001 3.85E+002
TB
CONNAUGHT HWL2 SELECT ISO 2.64 0.493 2.01 93.33 94.18 0.377 0.000 4.75E+001 3.87E+002
PLACE F1 TB
VIDHYUT BHAVAN HWL1 SELECT ISO 1.61 0.496 1.23 93.54 93.80 0.379 0.000 4.39E+001 3.85E+002
F1 TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.408 18.808 14.209 18.048
Peak Current (kA), Method C : 43.852 50.269 37.977 48.236
Breaking Current (kA, rms, symm) : 18.808 14.209 18.048
Steady State Current (kA, rms) : 12.901 18.808 14.209 18.048

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 52
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: HWT3 IC2 CB TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

HWT3 IC2 CB TB Total 0.00 16.899 0.00 94.27 93.43 19.236 19.236 4.90E-001 1.14E+001 1.92E-001 7.24E+000

TR2 33KV TB HWT3 IC2 CB TB 0.08 12.937 0.17 94.25 93.40 16.228 19.236 3.31E-001 1.49E+001 1.92E-001 7.24E+000

IGNCA F1 HWL15 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
DELHI HC F1 HWL14 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
CHURCH ROAD F1 HWL13 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
JANPATH LANE F1 HWL12 SELECT ISO 1.16 0.497 0.88 94.02 93.87 0.377 0.000 4.23E+001 3.85E+002
TB
CONSTITUTION C-F2 HWL11 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
CONSTITUTION C-F1 HWL10 SELECT ISO 0.87 0.498 0.66 94.08 93.76 0.378 0.000 4.13E+001 3.84E+002
TB
RAJA BAZAR F1 HWL9 SELECT ISO 2.01 0.495 1.53 93.83 94.19 0.376 0.000 4.53E+001 3.86E+002
TB
MANDI HOUSE F1 HWL8 SELECT ISO 0.85 0.498 0.64 94.13 93.74 0.378 0.000 4.09E+001 3.85E+002
TB

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.899 19.236 14.635 18.487
Peak Current (kA), Method C : 45.027 51.254 38.995 49.260
Breaking Current (kA, rms, symm) : 19.236 14.635 18.487
Steady State Current (kA, rms) : 12.901 19.236 14.635 18.487

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 53
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: IGNCA F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

IGNCA F1 Total 0.00 14.603 0.00 82.17 114.64 15.438 15.438 3.31E+000 1.28E+001 8.95E+000 8.49E+000

HWL15 SELECT ISO IGNCA F1 24.58 14.109 40.49 91.66 99.00 15.090 15.438 3.50E+000 1.32E+001 8.95E+000 8.49E+000
TB
IGNCA L1 IGNCA F1 100.00 0.500 100.00 100.00 100.00 0.353 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.603 15.438 12.647 17.142
Peak Current (kA), Method C : 30.463 32.205 26.382 35.760
Breaking Current (kA, rms, symm) : 15.438 12.647 17.142
Steady State Current (kA, rms) : 11.516 15.438 12.647 17.142

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 54
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: JANPATH LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

JANPATH LANE F1 Total 0.00 13.860 0.00 82.21 119.15 14.154 14.154 4.24E+000 1.32E+001 1.19E+001 8.91E+000

HWL12 SELECT ISO JANPATH LANE F1 31.06 13.371 49.45 91.73 100.04 13.821 14.154 4.51E+000 1.37E+001 1.19E+001 8.91E+000
TB
JANPATH LANE L1 JANPATH LANE F1 100.00 0.500 100.00 100.00 100.00 0.341 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 13.860 14.154 12.003 16.121
Peak Current (kA), Method C : 27.467 28.050 23.787 31.948
Breaking Current (kA, rms, symm) : 14.154 12.003 16.121
Steady State Current (kA, rms) : 11.052 14.154 12.003 16.121

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 55
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAHARNI SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAHARNI SS BUS Total 0.00 40.243 0.00 99.54 99.20 40.758 40.758 8.85E-002 7.12E-001 8.10E-002 6.85E-001

HCML IC L1 TB MAHARNI SS BUS 0.99 0.439 2.99 98.62 98.20 0.698 1.207 6.00E+000 6.55E+001 2.66E-001 2.33E+001

HCML IC L2 TB MAHARNI SS BUS 0.99 0.439 2.99 98.62 98.20 0.698 1.207 6.00E+000 6.55E+001 2.66E-001 2.33E+001

MAHARANI MAHARNI SS BUS 100.00 39.365 100.00 100.00 100.00 39.365 38.358 9.10E-002 7.28E-001 9.10E-002 7.28E-001
2x315+2x500 MVA
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 40.243 40.758 34.851 40.576
Peak Current (kA), Method C : 96.471 97.706 83.546 97.269
Breaking Current (kA, rms, symm) : 40.758 34.851 40.576
Steady State Current (kA, rms) : 39.365 40.758 34.851 40.576

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 56
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS1


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS1 Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 57
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MAIN BUS2


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MAIN BUS2 Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 58
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: MANDI HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MANDI HOUSE F1 Total 0.00 14.267 0.00 94.39 103.49 14.603 14.603 2.98E+000 1.32E+001 4.73E+000 1.18E+001

HWL8 SELECT ISO MANDI HOUSE F1 23.41 13.771 32.06 93.32 97.40 14.264 14.603 3.15E+000 1.36E+001 4.73E+000 1.18E+001
TB
MANDI HOUSE L1 MANDI HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.341 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 14.267 14.603 12.356 15.080
Peak Current (kA), Method C : 30.687 31.408 26.575 32.434
Breaking Current (kA, rms, symm) : 14.603 12.356 15.080
Steady State Current (kA, rms) : 11.274 14.603 12.356 15.080

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 59
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR1 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR1 CB TB Total 0.00 28.073 0.00 173.21 173.21 0.000 0.000 9.97E-001 2.05E+001

TR1 11KV TB OG AUX TR1 CB TB 3.22 27.989 0.00 173.21 173.21 0.000 0.000 9.79E-001 2.06E+001

AUX TR1 HT TB OG AUX TR1 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.073 0.000 24.312 24.312
Peak Current (kA), Method C : 74.223 0.000 64.279 64.279
Breaking Current (kA, rms, symm) : 0.000 24.312 24.312
Steady State Current (kA, rms) : 24.953 0.000 24.312 24.312

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 60
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: OG AUX TR2 CB TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

OG AUX TR2 CB TB Total 0.00 28.444 0.00 173.21 173.21 0.000 0.000 1.01E+000 2.03E+001

TR2 11KV TB OG AUX TR2 CB TB 3.27 28.360 0.00 173.21 173.21 0.000 0.000 9.92E-001 2.03E+001

AUX TR2 HT TB OG AUX TR2 CB TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.444 0.000 24.633 24.633
Peak Current (kA), Method C : 75.078 0.000 65.019 65.019
Breaking Current (kA, rms, symm) : 0.000 24.633 24.633
Steady State Current (kA, rms) : 24.953 0.000 24.633 24.633

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 61
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: PARK STREET SS BUS


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PARK STREET SS Total 0.00 24.320 0.00 108.91 106.81 20.849 20.849 1.19E-001 1.18E+000 1.15E-001 1.78E+000
BUS

HCML IC L3 TB PARK STREET SS 13.69 24.320 17.79 105.21 103.50 20.849 20.849 1.19E-001 1.18E+000 1.15E-001 1.78E+000
BUS
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 24.320 20.849 21.062 23.174
Peak Current (kA), Method C : 60.011 51.445 51.971 57.184
Breaking Current (kA, rms, symm) : 20.849 21.062 23.174
Steady State Current (kA, rms) : 23.656 20.849 21.062 23.174

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 62
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: RAJA BAZAR F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

RAJA BAZAR F1 Total 0.00 11.860 0.00 86.41 127.15 11.000 11.000 7.01E+000 1.46E+001 2.06E+001 1.02E+001

HWL9 SELECT ISO RAJA BAZAR F1 46.31 11.391 67.10 92.83 101.60 10.710 11.000 7.52E+000 1.51E+001 2.06E+001 1.02E+001
TB
RAJA BAZAR L1 RAJA BAZAR F1 100.00 0.500 100.00 100.00 100.00 0.309 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.860 11.000 10.271 13.283
Peak Current (kA), Method C : 21.248 19.707 18.401 23.798
Breaking Current (kA, rms, symm) : 11.000 10.271 13.283
Steady State Current (kA, rms) : 9.746 11.000 10.271 13.283

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 63
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCHOOL LANE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCHOOL LANE F1 Total 0.00 12.880 0.00 82.50 122.39 12.826 12.826 5.15E+000 1.40E+001 1.48E+001 9.32E+000

HWL3 SELECT ISO SCHOOL LANE F1 36.00 12.396 55.95 91.48 100.82 12.504 12.826 5.50E+000 1.45E+001 1.48E+001 9.32E+000
TB
SCHOOL LANE L1 SCHOOL LANE F1 100.00 0.500 100.00 100.00 100.00 0.332 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.880 12.826 11.155 14.883
Peak Current (kA), Method C : 24.674 24.570 21.368 28.511
Breaking Current (kA, rms, symm) : 12.826 11.155 14.883
Steady State Current (kA, rms) : 10.600 12.826 11.155 14.883

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 64
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: SCINDIA HOUSE F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SCINDIA HOUSE F1 Total 0.00 15.790 0.00 93.03 96.47 17.619 17.619 9.72E-001 1.21E+001 1.22E+000 8.32E+000

HWL5 SELECT ISO SCINDIA HOUSE F1 5.54 15.290 8.67 93.47 94.37 17.247 17.619 9.96E-001 1.25E+001 1.22E+000 8.32E+000
TB
SCINDIA HOUSE L1 SCINDIA HOUSE F1 100.00 0.500 100.00 100.00 100.00 0.372 0.000 3.83E+001 3.83E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 15.790 17.619 13.675 17.221
Peak Current (kA), Method C : 40.056 44.694 34.689 43.685
Breaking Current (kA, rms, symm) : 17.619 13.675 17.221
Steady State Current (kA, rms) : 12.500 17.619 13.675 17.221

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 65
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 HT BUS SELECT Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000
ISO TB

# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 66
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 HT BUS SELECT ISO TB


Nominal kV = 220.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 HT BUS SELECT Total 0.00 28.178 0.00 106.39 104.33 25.362 25.362 1.01E-001 1.02E+000 8.79E-002 1.36E+000
ISO TB

# TR2 33KV TB TR2 HT BUS SELECT 22.37 0.404 36.01 98.22 96.16 0.651 1.226 6.94E+000 7.11E+001 6.64E-001 2.83E+001
ISO TB
# TR2 11KV TB TR2 HT BUS SELECT 19.87 0.062 66.16 68.31 100.00 0.163 0.376 * 2.39E+001 4.63E+002 3.01E+000 9.20E+001
ISO TB
# TR1 33KV TB TR1 HT BUS SELECT 20.16 0.364 34.69 97.89 95.89 0.627 1.226 7.81E+000 7.88E+001 6.64E-001 2.83E+001
ISO TB
# TR1 11KV TB TR1 HT BUS SELECT 17.92 0.056 65.52 67.61 100.00 0.159 0.376 * 2.73E+001 5.13E+002 3.01E+000 9.20E+001
ISO TB
PARK STREET SS HCML IC L3 TB 0.00 0.000 0.00 106.39 104.33 0.000 0.000
BUS
MAHARNI SS BUS HCML IC L1 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

MAHARNI SS BUS HCML IC L2 TB 30.74 13.645 39.73 99.20 98.81 11.882 11.082 2.10E-001 2.11E+000 2.26E-001 3.12E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.178 25.362 24.403 27.250
Peak Current (kA), Method C : 69.626 62.668 60.298 67.334
Breaking Current (kA, rms, symm) : 25.362 24.403 27.250
Steady State Current (kA, rms) : 27.291 25.362 24.403 27.250

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 67
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 11KV TB Total 0.00 28.699 0.00 173.21 173.21 0.000 0.000 4.96E-001 2.01E+001

OG AUX TR1 CB TB TR1 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR1 HT BUS SELECT TR1 11KV TB 95.83 6.009 100.00 100.00 100.00 0.000 0.000 2.75E+000 9.60E+001
ISO TB
# TR1 33KV TB TR1 11KV TB 48.20 22.617 100.00 100.00 100.00 0.000 0.000 9.55E-001 2.55E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.699 0.000 24.854 24.854
Peak Current (kA), Method C : 78.429 0.000 67.922 67.922
Breaking Current (kA, rms, symm) : 0.000 24.854 24.854
Steady State Current (kA, rms) : 25.444 0.000 24.854 24.854

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 68
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR1 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR1 33KV TB Total 0.00 16.417 0.00 93.88 93.14 18.835 18.835 4.75E-001 1.17E+001 1.85E-001 7.21E+000

HWT1 IC CB TB TR1 33KV TB 0.02 3.479 0.02 93.88 93.14 2.661 0.000 6.06E+000 5.50E+001

# TR1 HT BUS SELECT TR1 33KV TB 93.04 11.213 92.74 99.78 99.50 11.177 7.801 4.74E-001 1.72E+001 4.43E-001 1.74E+001
ISO TB
# TR1 11KV TB TR1 33KV TB 11.10 1.737 57.24 57.09 100.00 5.005 11.034 * 1.62E+000 1.11E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.417 18.835 14.217 18.075
Peak Current (kA), Method C : 43.891 50.357 38.011 48.324
Breaking Current (kA, rms, symm) : 18.835 14.217 18.075
Steady State Current (kA, rms) : 12.911 18.835 14.217 18.075

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 69
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 11KV TB


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 11KV TB Total 0.00 29.088 0.00 173.21 173.21 0.000 0.000 5.08E-001 1.98E+001

OG AUX TR2 CB TB TR2 11KV TB 0.01 0.089 0.00 173.21 173.21 0.000 0.000 2.40E+003 6.04E+003

# TR2 HT BUS SELECT TR2 11KV TB 95.88 6.011 100.00 100.00 100.00 0.000 0.000 2.75E+000 9.60E+001
ISO TB
# TR2 33KV TB TR2 11KV TB 49.02 23.004 100.00 100.00 100.00 0.000 0.000 9.64E-001 2.51E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 29.088 0.000 25.191 25.191
Peak Current (kA), Method C : 79.386 0.000 68.750 68.750
Breaking Current (kA, rms, symm) : 0.000 25.191 25.191
Steady State Current (kA, rms) : 25.444 0.000 25.191 25.191

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 70
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: TR2 33KV TB


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TR2 33KV TB Total 0.00 16.908 0.00 94.25 93.38 19.263 19.263 4.87E-001 1.14E+001 1.85E-001 7.21E+000

HWT3 IC2 CB TB TR2 33KV TB 0.03 3.973 0.02 94.25 93.38 3.018 0.000 5.36E+000 4.81E+001

# TR2 HT BUS SELECT TR2 33KV TB 93.03 11.212 92.72 99.81 99.53 11.175 7.979 4.74E-001 1.72E+001 4.43E-001 1.74E+001
ISO TB
# TR2 11KV TB TR2 33KV TB 11.10 1.737 57.41 57.32 100.00 5.079 11.285 * 1.62E+000 1.11E+002 3.17E-001 1.23E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.908 19.263 14.643 18.515
Peak Current (kA), Method C : 45.066 51.343 39.028 49.347
Breaking Current (kA, rms, symm) : 19.263 14.643 18.515
Steady State Current (kA, rms) : 12.911 19.263 14.643 18.515

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 71
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Fault at bus: VIDHYUT BHAVAN F1


Nominal kV = 33.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

VIDHYUT BHAVAN Total 0.00 12.495 0.00 83.34 124.07 12.201 12.201 5.70E+000 1.43E+001 1.65E+001 9.58E+000
F1

HWL1 SELECT ISO VIDHYUT BHAVAN 39.08 12.015 59.58 91.70 101.17 11.888 12.201 6.10E+000 1.48E+001 1.65E+001 9.58E+000
TB F1
VIDHYUT BHAVAN VIDHYUT BHAVAN 100.00 0.500 100.00 100.00 100.00 0.326 0.000 3.83E+001 3.83E+002
L1 F1
3-Phase L-G L-L L-L-G
Initial Symmetrical Current (kA, rms) : 12.495 12.201 10.821 14.323
Peak Current (kA), Method C : 23.442 22.890 20.301 26.872
Breaking Current (kA, rms, symm) : 12.201 10.821 14.323
Steady State Current (kA, rms) : 10.336 12.201 10.821 14.323

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 72
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

33KV MAIN BUS1 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
33KV MAIN BUS2 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
AUX TR1 HT TB 11.000 27.459 70.416 24.470 0.000 0.000 0.000 0.000 23.781 60.982 23.781 23.781 23.781 60.982 23.781 23.781
AUX TR1 LT BUS 0.415 14.585 28.782 11.770 13.132 25.915 13.132 13.132 12.631 24.926 12.631 12.631 14.536 28.686 14.536 14.536
AUX TR1 LT TB 0.415 14.836 29.454 12.038 13.868 27.534 13.868 13.868 12.848 25.508 12.848 12.848 14.475 28.738 14.475 14.475
AUX TR2 HT TB 11.000 27.814 71.184 24.470 0.000 0.000 0.000 0.000 24.087 61.647 24.087 24.087 24.087 61.647 24.087 24.087
AUX TR2 LT BUS 0.415 14.587 28.785 11.770 13.134 25.917 13.134 13.134 12.633 24.929 12.633 12.633 14.538 28.688 14.538 14.538
AUX TR2 LT TB 0.415 14.838 29.458 12.038 13.870 27.535 13.870 13.870 12.850 25.511 12.850 12.850 14.477 28.742 14.477 14.477
B. D. MARG F1 33.000 11.312 20.119 9.505 10.410 18.514 10.410 10.410 9.797 17.424 9.797 9.797 12.648 22.494 12.648 12.648
CHURCH ROAD F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
CONNAUGHT PLACE F1 33.000 10.479 18.091 8.898 9.263 15.992 9.263 9.263 9.075 15.667 9.075 9.075 11.521 19.890 11.521 11.521
CONSTITUTION C-F1 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
CONSTITUTION C-F2 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
DELHI HC F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
DWL1 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL2 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL3 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
DWL4 IC CB TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HANUMAN ROAD F1 33.000 15.759 39.428 12.482 17.560 43.933 17.560 17.560 13.648 34.146 13.648 13.648 17.172 42.964 17.172 17.172
HCML F1 33.000 16.129 41.345 12.723 18.413 47.200 18.413 18.413 13.968 35.806 13.968 13.968 18.116 46.440 18.116 18.116
HCML IC L1 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L2 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L3 TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HCML IC L4TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
HWL1 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL2 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL3 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL4 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL5 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL6 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL7 SELECT ISO TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWL8 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL9 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL10 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL11 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL12 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL13 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 73
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

HWL14 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWL15 SELECT ISO TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
HWT1 IC CB TB 33.000 16.408 43.852 12.901 18.808 50.269 18.808 18.808 14.209 37.977 14.209 14.209 18.048 48.236 18.048 18.048
HWT3 IC2 CB TB 33.000 16.899 45.027 12.901 19.236 51.254 19.236 19.236 14.635 38.995 14.635 14.635 18.487 49.260 18.487 18.487
IGNCA F1 33.000 14.603 30.463 11.516 15.438 32.205 15.438 15.438 12.647 26.382 12.647 12.647 17.142 35.760 17.142 17.142
JANPATH LANE F1 33.000 13.860 27.467 11.052 14.154 28.050 14.154 14.154 12.003 23.787 12.003 12.003 16.121 31.948 16.121 16.121
MAHARNI SS BUS 220.000 40.243 96.471 39.365 40.758 97.706 40.758 40.758 34.851 83.546 34.851 34.851 40.576 97.269 40.576 40.576
MAIN BUS1 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
MAIN BUS2 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250
MANDI HOUSE F1 33.000 14.267 30.687 11.274 14.603 31.408 14.603 14.603 12.356 26.575 12.356 12.356 15.080 32.434 15.080 15.080
OG AUX TR1 CB TB 11.000 28.073 74.223 24.953 0.000 0.000 0.000 0.000 24.312 64.279 24.312 24.312 24.312 64.279 24.312 24.312
OG AUX TR2 CB TB 11.000 28.444 75.078 24.953 0.000 0.000 0.000 0.000 24.633 65.019 24.633 24.633 24.633 65.019 24.633 24.633
PARK STREET SS BUS 220.000 24.320 60.011 23.656 20.849 51.445 20.849 20.849 21.062 51.971 21.062 21.062 23.174 57.184 23.174 23.174
RAJA BAZAR F1 33.000 11.860 21.248 9.746 11.000 19.707 11.000 11.000 10.271 18.401 10.271 10.271 13.283 23.798 13.283 13.283
SCHOOL LANE F1 33.000 12.880 24.674 10.600 12.826 24.570 12.826 12.826 11.155 21.368 11.155 11.155 14.883 28.511 14.883 14.883
SCINDIA HOUSE F1 33.000 15.790 40.056 12.500 17.619 44.694 17.619 17.619 13.675 34.689 13.675 13.675 17.221 43.685 17.221 17.221
TR1 HT BUS SELECT ISO TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250

TR2 HT BUS SELECT ISO TB 220.000 28.178 69.626 27.291 25.362 62.668 25.362 25.362 24.403 60.298 24.403 24.403 27.250 67.334 27.250 27.250

TR1 11KV TB 11.000 28.699 78.429 25.444 0.000 0.000 0.000 0.000 24.854 67.922 24.854 24.854 24.854 67.922 24.854 24.854
TR1 33KV TB 33.000 16.417 43.891 12.911 18.835 50.357 18.835 18.835 14.217 38.011 14.217 14.217 18.075 48.324 18.075 18.075
TR2 11KV TB 11.000 29.088 79.386 25.444 0.000 0.000 0.000 0.000 25.191 68.750 25.191 25.191 25.191 68.750 25.191 25.191
TR2 33KV TB 33.000 16.908 45.066 12.911 19.263 51.343 19.263 19.263 14.643 39.028 14.643 14.643 18.515 49.347 18.515 18.515
VIDHYUT BHAVAN F1 33.000 12.495 23.442 10.336 12.201 22.890 12.201 12.201 10.821 20.301 10.821 10.821 14.323 26.872 14.323 14.323

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 74
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

33KV MAIN BUS1 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

33KV MAIN BUS2 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

AUX TR1 HT TB 11.000 0.01814 0.25376 0.25441 0.01814 0.25376 0.25441 0.00000 0.00000 0.00000

AUX TR1 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR1 LT TB 0.415 0.00512 0.01617 0.01696 0.00512 0.01617 0.01696 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

AUX TR2 HT TB 11.000 0.01829 0.25050 0.25117 0.01829 0.25050 0.25117 0.00000 0.00000 0.00000

AUX TR2 LT BUS 0.415 0.00531 0.01641 0.01725 0.00531 0.01641 0.01725 0.01030 0.02070 0.02313 0.00000 0.00000 0.00000

AUX TR2 LT TB 0.415 0.00512 0.01616 0.01695 0.00512 0.01616 0.01695 0.00585 0.01966 0.02051 0.00000 0.00000 0.00000

B. D. MARG F1 33.000 0.82002 1.66127 1.85264 0.82002 1.66127 1.85264 2.43669 1.13376 2.68754 0.00000 0.00000 0.00000

CHURCH ROAD F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

CONNAUGHT PLACE F1 33.000 0.97772 1.74469 1.99997 0.97772 1.74469 1.99997 2.94528 1.20656 3.18284 0.00000 0.00000 0.00000

CONSTITUTION C-F1 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

CONSTITUTION C-F2 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

DELHI HC F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

DWL1 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL2 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL3 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

DWL4 IC CB TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HANUMAN ROAD F1 33.000 0.12035 1.32441 1.32987 0.12035 1.32441 1.32987 0.14434 0.91096 0.92232 0.00000 0.00000 0.00000

HCML F1 33.000 0.09326 1.29605 1.29940 0.09326 1.29605 1.29940 0.14803 0.80616 0.81963 0.00000 0.00000 0.00000

HCML IC L1 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L2 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L3 TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HCML IC L4TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

HWL1 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL2 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL3 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL4 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL5 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL6 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL7 SELECT ISO TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL8 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL9 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL10 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL11 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000
Project: 220/33 KV GIS AT HCM LANE ETAP Page: 75
7.0.0
Location: HCML, New Delhi Date: 10-10-2011
Contract: AREVA T & D India Limited SN: OMTECHSERV
Engineer: Revision: Base
Study Case: SC 15000 MVA
Filename: HCML Config.: MX SC220 PAR

DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

HWL12 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL13 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL14 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWL15 SELECT ISO TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWT1 IC CB TB 33.000 0.05206 1.27627 1.27733 0.05206 1.27627 1.27733 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

HWT3 IC2 CB TB 33.000 0.05339 1.23904 1.24019 0.05339 1.23904 1.24019 0.02088 0.78796 0.78823 0.00000 0.00000 0.00000

IGNCA F1 33.000 0.36078 1.38909 1.43518 0.36078 1.38909 1.43518 0.97449 0.92446 1.34322 0.00000 0.00000 0.00000

JANPATH LANE F1 33.000 0.46217 1.43979 1.51214 0.46217 1.43979 1.51214 1.29236 0.96996 1.61586 0.00000 0.00000 0.00000

MAHARNI SS BUS 220.000 0.42816 3.44540 3.47190 0.42816 3.44540 3.47190 0.39218 3.31724 3.34034 0.00000 0.00000 0.00000

MAIN BUS1 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

MAIN BUS2 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

MANDI HOUSE F1 33.000 0.32498 1.43253 1.46893 0.32498 1.43253 1.46893 0.51471 1.27996 1.37957 0.00000 0.00000 0.00000

OG AUX TR1 CB TB 11.000 0.01207 0.24856 0.24885 0.01207 0.24856 0.24885 0.00000 0.00000 0.00000

OG AUX TR2 CB TB 11.000 0.01222 0.24530 0.24560 0.01222 0.24530 0.24560 0.00000 0.00000 0.00000

PARK STREET SS BUS 220.000 0.57486 5.71615 5.74498 0.57486 5.71615 5.74498 0.55649 8.59978 8.61777 0.00000 0.00000 0.00000

RAJA BAZAR F1 33.000 0.76307 1.59382 1.76707 0.76307 1.59382 1.76707 2.24597 1.10646 2.50372 0.00000 0.00000 0.00000

SCHOOL LANE F1 33.000 0.56080 1.52743 1.62713 0.56080 1.52743 1.62713 1.61023 1.01546 1.90368 0.00000 0.00000 0.00000

SCINDIA HOUSE F1 33.000 0.10587 1.32302 1.32725 0.10587 1.32302 1.32725 0.13280 0.90578 0.91546 0.00000 0.00000 0.00000

TR1 HT BUS SELECT ISO TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

TR2 HT BUS SELECT ISO TB 220.000 0.49076 4.93415 4.95849 0.49076 4.93415 4.95849 0.42553 6.59878 6.61249 0.00000 0.00000 0.00000

TR1 11KV TB 11.000 0.00600 0.24335 0.24342 0.00600 0.24335 0.24342 0.00000 0.00000 0.00000

TR1 33KV TB 33.000 0.05174 1.27555 1.27660 0.05174 1.27555 1.27660 0.02010 0.78469 0.78495 0.00000 0.00000 0.00000

TR2 11KV TB 11.000 0.00615 0.24009 0.24017 0.00615 0.24009 0.24017 0.00000 0.00000 0.00000

TR2 33KV TB 33.000 0.05308 1.23838 1.23951 0.05308 1.23838 1.23951 0.02010 0.78469 0.78495 0.00000 0.00000 0.00000

VIDHYUT BHAVAN F1 33.000 0.62094 1.55813 1.67730 0.62094 1.55813 1.67730 1.80095 1.04276 2.08105 0.00000 0.00000 0.00000
R DWL1 R4

R DWQ1 R4

R DWT1 R4
R DWL1 R4

R DWQ1 R4

R DWT1 R4
Amps X 100 TR1 HT BUS SELECT ISO TB (Nom. kV=220, Plot Ref. kV=220)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 FLA 500

300 300

100 100
TR1 HCML o

R DWT1 R3
50 50

30 30
o DWT1 R4
R
DWT1 R4 - P
OC1 - 67
10 AREVA 10
P141 (B/C/G)
CT Ratio 400:1 DWT1 OG TR1
5 IEC - Standard Inverse 5

Seconds
Seconds

Pickup = 0.73 (0.08 - 4 xCT Sec)


Time Dial = 0.27
3 3
3x = 1.7 s, 5x = 1.16 s, 8x = 0.89 s
Inst = 6 (0.08 - 32 xCT Sec) o
TR1 HCML
Time Delay = 0.04 s 100/100/33.33 MVA

1 1
HWT1 R1 - P o

AREVA
.5 P141 (B/C/G) .5
CT Ratio 2000:1
.3
OC1 .3
TR1 33KV CAB
TR1 33KV CAB
IEC - Standard Inverse
Pickup = 0.97 (0.08 - 4 xCT Sec) 12-1/C 630
Time Dial = 0.22
3x = 1.39 s, 5x = 0.942 s, 8x = 0.725 s o

.1 Inst = 2.2 (0.08 - 4 xCT Sec) Inrush .1


Time Delay = 0.6 s
OC2
o
.05 Inst = 7.5 (0.08 - 32 xCT Sec) .05
R HWT1 R1
Time Delay = 0.45 s
.03 .03

HWT1 R1 - 3P

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 TR1 HT BUS SELECT ISO TB (Nom. kV=220, Plot Ref. kV=220)
1K 3K 5K 10K 30K 50K 100K 300K 500K 1000K 3000K 1E+04K 2E+04K

Amps (Plot Ref. kV=11) ETAP Star 7.0.0

100 MVA TR

Project: 220/33 KV GIS AT HCM LANE Date: 10.10.2011 R0


Location: HCML, New Delhi Fault: Phase
DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO
Amps X 10 TR1 HT BUS SELECT ISO TB (Nom. kV=220, Plot Ref. kV=220)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R DWT1 R3
50 50

30 30
o DWT1 R4
R

DWT1 R4 - N
OC1 - 67
10 10
AREVA
P141 (B/C/G) DWT1 OG TR1
5
CT Ratio 400:1 5
IEC - Standard Inverse

Seconds
Seconds

Pickup = 0.2 (0.08 - 4 xCT Sec)


3 HWT1 R1 - N Time Dial = 0.43 3
AREVA 3x = 2.71 s, 5x = 1.84 s, 8x = 1.42 s TR1 HCML
P141 (B/C/G) Inst = 6 (0.08 - 32 xCT Sec)
o
100/100/33.33 MVA
CT Ratio 2000:1 Time Delay = 0.05 s
OC1
1 1
IEC - Standard Inverse o

Pickup = 0.26 (0.08 - 4 xCT Sec) ∆ 0.326 s


Time Dial = 0.27
.5 .5
3x = 1.7 s, 5x = 1.16 s, 8x = 0.89 s
Inst = 2.2 (0.08 - 4 xCT Sec)
TR1 33KV CAB
.3 Time Delay = 0.6 s .3

OC2
12-1/C 630
Inst = 9.52 (0.08 - 32 xCT Sec)
Time Delay = 0.45 s
o

.1 .1

o
.05 .05
R HWT1 R1
.03 .03

HWT1 R1 - LG

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 TR1 HT BUS SELECT ISO TB (Nom. kV=220, Plot Ref. kV=220)
100 300 500 1K 3K 5K 10K 30K 50K 100K 300K 500K 1000K 2000K

Amps (Plot Ref. kV=11) ETAP Star 7.0.0

100 MVA TR

Project: 220/33 KV GIS AT HCM LANE Date: 10.10.2011 R0


Location: HCML, New Delhi Fault: Ground
DOC. NO: 5257PN095-HCM-E-SYD-CAL-0601 RO
o

HWL1 R1

R HWQ R1

R HWT1 R1
o

HWL1 R1

R HWQ R1

R HWT1 R1
One-Line Diagram - SLD (Edit Mode)
220 kV
MAHARANI 2x315+2x500 MVA
15000 MVAsc

245 kV 2500 A 15000 MSc CB


40 kA

220 kV MAHARNI SS BUS 2500 A 100 kA 220 kV PARK STREET SS BUS2500 A 100 kA
245 kV 1600 A OG HCML L1 245 kV 4000 A OG HCML L2 245 kV 1600 A PARK STREET L1 IC 245 kV 4000 A PARK STREET L2 IC
40 kA 40 kA 40 kA 40 kA
Open
HCML CKT-1 CAB HCML CKT-2 CAB PARK STREET CKT-1 CAB PARK STREET CKT-2 CAB
CU 8.5 km CU 8.5 km CU 4.6 km CU 4.6 km
3-1/C 1200 3-1/C 1200 3-1/C 1000 3-1/C 1000

220/0.11 220/0.11 220/0.11 220/0.11


o o
o o

1600/1 d I> DWL1 R1 1600/1 d I> DWL2 R1 1600/1 d I> DWL3 R1 1600/1 d I> DWL4 R1

PBDCB MAIN PBDCB MAIN PBDCB MAIN PBDCB MAIN

o o
o o

1600/1 DWL1 R2 1600/1 d I> DWL2 R2 1600/1 DWL3 R2 1600/1 d I> DWL4 R2
d I> d I>

PBDCB CHECK PBDCB CHECK PBDCB CHECK PBDCB CHECK


o o
o o

800/1 DWL1 R3 800/1 R DWL2 R3 800/1 DWL3 R3 800/1 R DWL4 R3


R R

P442 P442 P442 P442

o o
o o

800/1 DWL1 R4 800/1 R DWL2 R4 800/1 DWL3 R4 800/1 R DWL4 R4


R R

P543 P543 P543 P543

245 kV 1600 A 245 kV 1600 A DWL2 IC 245 kV 1600 A 245 kV 1600 A DWL4 IC
DWL1 IC 40 kA DWL3 IC 40 kA
40 kA 40 kA

DWL1 ISO1 DWL1 ISO2 DWL2 ISO1 DWL2 ISO2 DWL3 ISO1 DWL3 ISO2 DWL4 ISO1 DWL4 ISO2
Open Open Open Open

2500 A 220 kV MAIN BUS1 100 kA

o 220/0.11
1600/1 d I> DWQ1 R1
PBDCB MAIN

1600/1 d I> DWQ1 R2


PBDCB CHECK
o

1600/1 I> DWQ1 R3


MCTI40
o

1600/1 R DWQ1 R4
P141

245 kV 2500 A DWQ1 BC 220/0.11


40 kA
Open

2500 A 220 kV MAIN BUS2 100 kA

DWT1 ISO1 DWT1 ISO2 DWT3 ISO1 DWT3 ISO2


Open Open

o o

1600/1 d I> DWT1 R1 1600/1 d I> DWT3 R1


PBDCB MAIN PBDCB MAIN

o o

1600/1 d I> DWT1 R2 1600/1 d I> DWT3 R2


PBDCB CHECK PBDCB CHECK
o o
400/1 R DWT1 R3 400/1 R DWT3 R3
P633 P633

o DWT1 R4 o DWT3 R4
400/1 R I> DWT1 R5 400/1 R I> DWT3 R5
P141 MCTI40 P141 MCTI40

245 kV 2500 A DWT1 OG TR1 245 kV 2500 A DWT3 OG TR2


40 kA 40 kA

TR1 HCML TR2 HCML


o o

400/1 100/100/33.33 MVA 400/1 100/100/33.33 MVA

o o

2000/1 2000/1
11/0.11 AUX TR1 11/0.11 AUX TR2
TR1 33KV CAB 11KV AUX TR1 IC CAB 400 kVA TR2 33KV CAB 11KV AUX TR2 IC CAB 400 kVA
CU 50 m AL 50 m CU 50 m AL 50 m
12-1/C 630 3-1/C 300 12-1/C 630 3-1/C 300

o o AUX TR1 LT CAB o o


AUX TR2 LT CAB
2000/1 25/1 KWT1 R1 2000/1 25/1 KWT2 R1 AL 10 m
I> AL 10 m I>

P132 6-1/C 630 P132 6-1/C 630


o o

2000/1 R HWT1 R1 12 kV 800 A KWT1 11KV IC1 2000/1 R HWT3 R1 12 kV 800 A KWT2 11KV IC2 0.44 kV 800 A
40 kA 0.44 kV800 A AUX TR1 LT CB 40 kA AUX TR2 LT CB
P141 35 kA P141 35 kA
OG AUX TR1 CAB 0.415 kV OG AUX TR2 CAB 0.415 kV
36 kV 2500 A AL 50 m 36 kV 2500 A AL 50 m 600 A 40 kA
HWT1 33KV IC1 3-1/C 300 600 A 40 kA HWT3 33KV IC2 3-1/C 300
31.5 kA AUX TR1 LT BUS 31.5 kA AUX TR2 LT BUS

HWT1 ISO1 HWT1 ISO2 AUX TR1 LT LOAD HWT3 ISO1 HWT3 ISO2 AUX TR2 LT LOAD
400 kVA 400 kVA
Open Open
33 kV 33KV MAIN BUS1 2500 A 80 kA

33 kV 33KV MAIN BUS2 2500 A 80 kA

HWL1 ISO1 HWL1 ISO2 HWL2 ISO1 HWL2 ISO2 HWL3 ISO1 HWL3 ISO2 HWL4 ISO1 HWL4 ISO2 HWL5 ISO1 HWL5 ISO2 HWL6 ISO1 HWL6 ISO2 HWL7 ISO1 HWL7 ISO2 HWL8 ISO1 HWL8 ISO2 HWL9 ISO1 HWL9 ISO2 HWL10 ISO1 HWL10 ISO2 HWL11 ISO1 HWL11 ISO2 HWL12 ISO1 HWL12 ISO2 HWL13 ISO1 HWL13 ISO2 HWL14 ISO1 HWL14 ISO2 HWL15 ISO1 HWL15 ISO2
Open
Open Open Open Open Open Open Open o
Open Open Open Open Open Open Open
2000/1 R HWQ R1
P141

36 kV 1250 A OG HWL1 36 kV 1250 A OG HWL2 36 kV 1250 A OG HWL3 36 kV 1250 A OG HWL4 36 kV 1250 A OG HWL5 36 kV 1250 A OG HWL6 36 kV 1250 A OG HWL7 36 kV 2500 A HWQ BC 36 kV 1250 A OG HWL8 36 kV 1250 A OG HWL9 36 kV 1250 A OG HWL10 36 kV 1250 A OG HWL11 36 kV 1250 A OG HWL12 36 kV 1250 A OG HWL13 36 kV 1250 A OG HWL14 36 kV 1250 A OG HWL15
31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA 31.5 kA
Open
o o o o o o o o o o o o o o o

1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R

HWL1 R1 P141 HWL2 R1 P141 HWL3 R1 P141 HWL4 R1 P141 HWL5 R1 P141 HWL6 R1 P141 HWL7 R1 P141 HWL8 R1P141 HWL9 R1 P141 HWL10 R1P141 HWL11 R1 P141 HWL12 R1 P141 HWL13 R1 P141 HWL14 R1 P141 HWL15 R1 P141
o o o o o o o o o o o o o o o

1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R 1000/1 R

HWL1 R2 P442 HWL2 R2 P442 HWL3 R2 P442 HWL4 R2 P442 HWL5 R2 P442 HWL6 R2 P442 HWL7 R2 P442 HWL8 R2 P442 HWL9 R2 P442 HWL10 R2 P442 HWL11 R2 P442 HWL12 R2 P442 HWL13 R2 P442 HWL14 R2 P442 HWL15 R2 P442
HWL1 CAB HWL2 CAB HWL3 CAB HWL4 CAB HWL5 CAB HWL6 CAB HWL7 CAB HWL8 CAB HWL9 CAB HWL10 CAB HWL11 CAB HWL12 CAB HWL13 CAB HWL14 CAB HWL15 CAB
AL 2.8 km AL 4.6 km AL 2.5 km AL 0.2 km AL 0.5 km AL 0.5 km AL 3.8 km AL 2 km AL 3.5 km AL 1.5 km AL 1.5 km AL 2 km AL 3.5 km AL 3.5 km AL 1.5 km
1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 300 1-3/C 400 1-3/C 300 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400 1-3/C 400

33 kV VIDHYUT BHAVAN F1 33 kV CONNAUGHT PLACE F1 33 kV SCHOOL LANE F1 33 kV HCML F1 33 kV SCINDIA HOUSE F1 33 kV HANUMAN ROAD F1 33 kV B. D. MARG F1 33 kV MANDI HOUSE F1 33 kV RAJA BAZAR F1 33 kV CONSTITUTION C-F1 33 kV CONSTITUTION C-F2 33 kV JANPATH LANE F1 33 kV CHURCH ROAD F1 33 kV DELHI HC F1 33 kV IGNCA F1
1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA 1200 A 80 kA

VIDHYUT BHAVAN L1 CONNAUGHT PLACE L1 SCHOOL LANE L1 HCML L1 SCINDIA HOUSE L1 HANUMAN ROAD L1 B. D. MARG L1 MANDI HOUSE L1 RAJA BAZAR L1 CONSTITUTION C-L1 CONSTITUTION C-L2 JANPATH LANE L1 CHURCH ROAD L1 DELHI HC L1 IGNCA L1
5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA 5 MVA