Вы находитесь на странице: 1из 15

SITE DUCUMENT 2014112801

OPENMARK III

(2014)
_________________________________________________________________________________________________________________________
SHENZHEN ANKE HIGH-TECH CO., LTD Tel: (86) (755) 2668 8889
Address:26 Yanshan Road, Shekou ,Shenzhen,Guangdong,China
Fax:(86)(755) 2669 5307 Http:www.anke.com Zip Code:518067
Site document

Catalog

I、 Site drawing (mm) .......................................................................... 2

II、 Equipment drawing ........................................................................ 5

III、 Scanning room holes drawing ..................................................... 6

IV、 Preparation for moving magnet .................................................. 9

V、 Power design.................................................................................. 11

i. Receptacle position ..................................................................... 11

ii. distribution box .......................................................................... 11


First Accessory :Technical reference for scanning room construction .12

Second Accessory: Technical reference for 1 ohm earth wire ............. 14

1
Site document

一、 external environmental requirements


1. MR magnet magnetic field of large mobile metal objects can produce with the
surrounding environment influence each other, usually from the center of magnet
is 13 m to the elevator, car large metal objects, such as specific limit please see the
table below:

Center of minimum distance with


object
magnet (m)
Below 50 kg metal objects (wheelchair,
hospital bed, etc.) 3.0

The transport device under 200 kg 5.0


The vehicle under 900 kg 6.0
4500 kg of the following vehicles, elevators 12.0
Trams, diesel locomotive 100.0
2. MR high-tension line near the site, transformer, the current in the large generator
will affect the image quality, specific restrictions, please refer to the table below:
object Center of minimum distance with magnet
Ac power cord 5.0
High current low voltage cable 10.0
Transformer, high voltage power lines 25.0
3. MR magnets, magnetic field and the surrounding equipment will produce influence
each other, specific restrictions, please refer to the table below:

equipment Gaussian (Gs)


A small motor, watches, cameras, magnetic data carrier ≤30Gs
The processor, disk drives, oscilloscope ≤10Gs
Black and white monitor, X-ray tube, magnetic data
≤5Gs
storage carrier, the boo, insulin pump
The main passive shielding type color monitor ≤3Gs
CT bulb ≤2Gs
Color monitor, ultrasound equipment ≤1Gs
X-ray image intensifier, gamma camera, linear accelerator ≤0.5Gs

4. The vibrations will affect the quality of MR image, vibration requirements for
MR site for:
a) Steady-state vibration (usually caused by the motor, pump, air conditioning
compressor, etc) in 0.5 80 Hz frequency range shall not be more than 0.001 m/s
squared.
b) The transient vibration (usually caused by vehicles, pedestrians, doors, etc) shall
not be more than 0.01 m/s squared (0) to the peak.
c) MR site try to stay away from the following sources: parking lot, highway,
subway, train, water pump, large motor, etc.
d) near the site of MR high-tension line, transformer, the current in the large
generator and motor will affect image quality, such as nearby objects exist above
please submit to the Bianca company engineers to do evaluation.

2
Site document

Site drawing (mm):

(Scanning the room interior wall (wall) cannot protrude pillars or other object )

3
Site document

Graphic design (unit: mm) :

Notice:
i、 The magnet base should bear17T.
ii、 The ground level of scanning room (including magnet base) should be
-0.22m than other rooms and the floor should receive a water-tight.
iii、 Make 25cm depth baton in the other floor except magnet base in
scanning room

4
Site document

I、 Equipment drawing

Notice:
i、 Air-condition room need 5HP cold & heat air-condition and central
heating. Equipment room just need 2HP cold air-condition and no need
central heating.
ii、 The red area is for building shielding room (by Anke)

5
Site document

II、 Scanning room holes drawing


i、 drawing of scanning room

(Seeing from the inside to outside)

6
Site document

ii、 hole of RF door、Air in and air out

A-A
(Seeing from the inside to outside)

5HP air-condition:

7
Site document

iii、 hole of conduction board and observation window

B-B
(Seeing from the inside to outside)

8
Site document

III、 Preparation for moving magnet:

9
Site document
Notice:
i、 Make one steel tube (Ø50mm) for move the magnet (up ground 0.6m,
down ground 0.6m).

ii、 Prepare 35T cane and 4-8 workers

10
Site document

IV、 Power design


i. Receptacle position
ii. distribution box
Appropriative
power supply
wire
N A B C G
Cu wire
4 ohm protect GND
3×35+2×16

200A

8# 15A 7# 15A 6# 15A 5# 15A 4# 15A 3# 15A 2# 20A 1# 60A

N G N G N G N G N G G N G N N G

Thr-phase
Stand Stand Stand Power 2HP air- 5HP air-
receptacle condition condition
electric voltage
by by by filter regulator

(MRI requires independent distribution system. Can not be shared with other
devices.)

11
Site document

First Accessory :Technical reference for scanning room construction 

0 0
ffl -220 ffl
ffl
1200

Natural soil
0.0
ffl

(Construction draws of scanning room)

Notice:

i. Dig one hole(2500mm length ×2500mm width ×1200mm depth) in


the position of the magnet base and backfill with baton,
ii.

iii. The ground level of scanning room (including magnet base) should
be -0.22m than other rooms and the floor should receive a
water-tight.

iv. Make 25cm depth baton in the other floor except magnet base in
Scanning room

12
Site document

Scanning room Floor flatness requirements:

Magnet base

Natural soil

Waterproof treatment:

13
Site document

Second Accessory: Technical reference for 1 ohm earth wire 
i. Prepare one purple copper sheet (1500mm length ×600mm
width×4mm thickness), and one purple copper bar( 40mm
width×4mm thickness) the length is depending on the distance
between the purple copper embed point and the conduct board, fix
the purple copper bar on the purple copper sheet by copper bolt
nail( as following drawing)

 
ii. Dig one hole (2000mm depth ×1600mm length ×600mm
width)outside the equipment room,put the welded purple copper
sheet at the hole bottom, uniform mixing 100kilograms charcoal,
150 kilograms Industrial salt and soil. Backfill it. And connect the
purple copper bar with the conduct board
mixing 100kilograms charcoal, 150 
kilograms Industrial salt and soil. Backfill it

0.0m
ffl

purple copper bar

-2.0m
ffl

1600mm
purple copper
sheet

14

Вам также может понравиться