Client: SNPL, Simara, Bara, Nepal Inspection Test Plan (ITP) for Sa

PMC: TAEC Consult Pvt. Ltd., Nepal


Contractor: AirTech Industries Pvt. Ltd., Nepal Residential Apartments for M

Procedure/
Matarials No. Activity Description Frequency Specification

Material Verification
1 Receiving Inspection 100% Materials According
-Raw Material to Specification

Approved Drawing
Exavation & backfilling
2 100% Vendor Drawing
for external piping

PVC & CPVC PIPE

Approved Drawing
Surface marking
3 100% Vendor Drawing
and location

Pipes supply, laying & Approved Drawing


4 100%
jointing Vendor Drawing

Material Verification
1 Receiving Inspection 100% Vendor Drawing
-Raw Material

Sanitary Fixtures and


fittings
Sanitary Fixtures and
fittings Approved Vendor
Drawing
Material verification of
2 Sanitary fixtures Each Unit Approved Drawing
-Installation
Technical
Specification

HDPE and RCC pipes 1 Material Verification Each Delivery MTC

Material Verification Related Material


1 Receiving Inspection 100% Specification
-Raw Material

Duct Approved Vendor


Drawing
Duct pipes
2 -Installation & Visual Each Set Approved Drawing
Check
Technical
Specification

* Legend: R(Review Point): To determine subject matter has achiev


M(Monitoring): Periodic and systematic check (does not imply any acti
W(Witness Point): Observation of an activitiy to ensure work is progressing
Inspection Test Plan (ITP) for Sanitary Works
Inspection By
Residential Apartments for Managers Remarks

Inspection Method/ Acceptance Criteria


Contractor PMC Client

As Per Specified in Applicable Specification and


Drawing
1. No Damage, Corrosion & Deformation W W
2. Shall be properly laid out on wooden supports clear
of the soil.

R
1.Check excavated trenches to required depth as per
working drawing and barricade.
2. Check Mark of pipe lines in ground according to
working drawings W W/M
3. Test the pipes for leaks under pressure

Location markers are in place and comply with


drawings W W

1.Check wheather pipes is in good condition


2.check pipe are laid according to drawing
3.Check pressure test for leakage W W
4.Check insulate hot water pipes with the specified
material.

As Per Specified in Applicable Specification and


Drawing
1. No Damage, Corrosion & Deformation W W
2. Shall be properly laid in accordance to drawing or
assignedposition of Client.

R
1.Check Installation materials and method as per R
installation drawing
2.Check paint damage, tag plate, tile damage or other
Visual damage etc. W W/M
3.Traps and other openings shall be checked against
drawing.

Aquire MTC on every delivery W W R

As Per Specified in Applicable Specification and


Drawing
1. No Damage,& Deformation W W R
2. Shall be properly laid out.

1. Check the position of equipment to be connected


and laid out.
2. Check assemble & install support as detail W W
3. Check visual damage.

determine subject matter has achieved objectives.


ematic check (does not imply any action will be taken.
activitiy to ensure work is progressing as per requirements.