Вы находитесь на странице: 1из 7

Company: Project: Engineering Contractor:

OFFSITES ENGINEERING WORKS


FOR THE ERBIL REFINERY
40,000 B/D EXPANSION PROJECT

Contract no.: 10J01762-01


Company doc. no.: Job no.: 10J01762 Engineering doc. no.:
N/A Sheet 1 of 7 10J01762-MAC-DS-000-010

OFFSITES ENGINEERING WORKS FOR THE


ERBIL REFINERY 40,000 B/D EXPANSION PROJECT

FIREWATER DIESEL MAIN PUMPS - DATA SHEET

D2 13/09/2011 Re-Approved for Design G.Bonci G.Bonci F.Cilia


D1 29/06/2011 Re-Approved for Design G.Bonci G.Bonci F.Cilia
D0 17/06/2011 Approved for Design G.Bonci G.Bonci F.Cilia
C0 06/06/2011 Issued for Company approval G.Bonci G.Bonci F.Cilia
REV. DATE REVISION TITLE PREPARED CHECKED APPROVED
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Com pany doc. no.: Rev.: C0 D0 D1 D2 Engineering doc. no.:
N/A Sheet 2 to 7 10J01762-MAC-DS-000-010
FIRE WATER CENTRIFUGAL PUMP DATA SHEET (DIESEL)
N. of Units: 3 Manufacturer:
Service: Fire water reserve pump Item number: P-2122 A/B/C Reference standard: NFPA 20
1 SERVICE CONSTRUCTION
2 CONTINUOUS/INTERMIT./STAND BY n°2 Interm. / n°1 Stand by PUMP TYPE (Horizontal - vertical - in line) horizontal
3 ATTENDED/ UNATTENDED unattended DIRECT. OF ROTAT. FROM COUPLING END (CW - CCW )
4 HAZARDOUS / FLAMMABLE - FLANGE POSIT. (suction - discharge) "Side/Side"
5 INDIV./SERIES/PARALL. Individual / Parallel SUCTION NOZZLE (diameter - rating - facing) 150# RF (Nota 4)
6 LIQUID PUMPED fresh water DISCHARGE NOZZLE (diameter - rating - facing) 150# RF (Nota 4)
7 DRIVER TYPE diesel engine ALLOW . LOADS ON NOZZLES AS PER API 610 (YES-NO) 3 times
8 FLOW TEMPERATURE NORM. / MAX. °C 30 / 30 MAW P @ MAX. ALL. TEMP. barg
3
9 DENSITY @ NORM. F.T. kg/m 997 HYDROTEST PRESSURE barg
10 VISCOSITY @ NORM. F.T. cP 1 NUMBER OF STAGES 1
11 VP. PRESS. @ NORM. F. T. bara 0.041 ACTUAL IMPELLER DIAMETER mm
12 PRIMCIPAL CORROSIVES - MAX. IMPELLER DIAMETER mm

13 DESIGN P, T barg / °C full rating 150 @ 60 °C MIN. IMPELLER DIAMETER mm

14 PRIMARY SPECIFICATION - IMPELLER TYPE (open - closed) Closed


15 INSTALLATION SUCT 1ST STAGE (single - double)
16 ON SHORE/COAST/OFFSHORE on shore CASING SPLIT (axial - radial - barrel)
17 INDOOR/OUTDOOR/UNDER ROOF under roof CASING MOUNTING (Centerline - on foot)
18 ELECTR. AREA CLASSIF. (EN 60079-10) safe area CASING TYPE (sing. volute - double volute - with diffuser)
19 SITE DATA Note 1 CASING AUX. CONNECTION VENT YES
20 OPERATING CONDITIONS CASING AUX. CONNECTION DRAIN YES
3
21 RATED CAPACITY m /h 454.3 SPECIFIC SPEED 1st STAGE
22 RATED TOTAL DIFFER. HEAD m 100 SUCTION SPECIFIC SPEED at 3% dH 1st STAGE
23 NPSHA AT RATED CAPACITY (Nota 2) m 10 W EAR RINGS IMPELL./ CASING (FRONT/BACK) YES / YES
24 RATED SUCTION PRESSURE bara 1.0 BEARING TYPE RADIAL / THRUST BALL / BALL
25 MAX SUCTION PRESSURE bara 2.5 LUBRICATION METHOD OIL
26 DIFFER. PRESSURE AT RATED FLOW bar 9.77 COOLING N.A.

27 RATED DISCHARGE PRESS bara 12.27 COUPL ING (Note 5)


28 STARTING CONDITIONS WITH DISCH. VALVE: open-close open COUPLING MANIFACTURER
29 PERFORMANCES COUPLING SIZE/TYPE Flessibile
30 PUMP RATED SPEED rpm SPACER YES
31 EFFICIENCY AT RATED FLOW % MOUNT COUPLING HALF YES
32 REQ' RATED POW ER kW B ASEPL ATE
33 NPSHR AT RATED FLOW (Note 2) m TYPE Skid
34 SHUT-OFF HEAD @ ACT.IMP.DIA (Note 3) m TO ACCOMODATE : DRIVER+PUMP (Note 6) YES
35 SHUT-OFF HEAD @ MAX.IMP.DIA m HORIZ. ALIGM JACKSCREW YES
3
36 FLOW AT MAX EFFICIENCY m /h
3
37 CAPACITY AT END OF CURVE m /h
3
38 MIN.CONTIN.STABLE FLOW m /h MECHANICAL SEAL (Note 7)
39 FLOW RATIO: RATED / MAX. EFFICIENCY MECH SEAL API CODE
40 HEAD RATIO: MAX. / AT RATED FLOWRATE SEAL MANUFACTURER
41 S.- O. HEAD RATIO: MAX. IMPELLER / ACTUAL IMPELLER MODEL
42 DRIVER NAMEPLATE RATING kW MFR MATERIAL CODE
43 FIRST CRITICAL SPEED rpm SEAL CHAMBER PRESSURE
44 REQ' MAX POW ER kW CYCLONE SEPARATOR
45 POW ER AT SHUT OFF kW
3
46 PREFERRED OPER. REGION m /h
3
47 ALLOW ABLE OPER. REGION m /h
48 MAX. ALLOW . SOUND PRESS. LEV. (UNIT) dB(A) 85 dB(A) @ 1m

49
50

10J01762-MAC-DS-000-010-D2.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 D1 D2 Engineering doc. no.:
N/A Sheet 3 to 7 10J01762-MAC-DS-000-010
FIRE WATER CENTRIFUGAL PUMP DATA SHEET (DIESEL)
51 MATERIALS (Nota 8) INSTRUMENTATION
52 API CODE I2 (minimum) CONTROLLER (See diesel engine data sheet) YES
53 CASING C.I. RELIEF VALVE (NFPA20) YES
54 IMPELLERS Bronze MANOMETERS (NFPA20) YES
55 CASE WEAR RING (FRONT / BACK) Bronze PRESSURE SWITCHES (NFPA20) YES
56 IMPELLER WEAR RING (FRONT / BACK) Bronze /
57 SHAFT C.S. TEMPERATURE MONITORING
58 SHAFT SLEEVE C.S. NDE BEARING RTD
59 INTERNAL PARTS Bronze DE BEARING RTD
60 FLUSHING / COOLING / OIL PIPING C.S. CASING RTD
61 BASE PLATE C.S. VIBRATION MONITORING
62 FORCED FLUID LUBRICATION RADIAL BEARINGS HOUSING
63 ACCORDING TO N.A. THRUST BEARING HOUSING
64 MAIN OIL PUMP TYPE
65 AUXILIARY LUBE OIL PUMP TYPE AUTOMATIC RECIRCULATION VALVE (NFPA20) if required
66 MAIN LUBE OIL PUMP DRIVER TYPE AUTOMATIC AIR RELEASE VALVE (NFPA20) yes
67 AUXIL. LUBE OIL PUMP DRIVER TYPE
68 FILTER TYPE
69 FILTERING DEGREE WEIGHTS
70 COOLER TYPE PUMP kg
71 PIPING MATERIALS GEAR kg N.A.
72 OIL RESERVOIR MATERIAL DRIVER kg
73 TANK HEATING BASEPLATE kg
74 GAGE BOARD LUBE OIL SYSTEM kg N.A.
75 LUBE OIL RESERV.LEVEL INDICATOR TOTAL SKID kg
76 HIGH OIL FILTER DP SWITCH FUEL TANK (FULL / EMPTY) kg
77 LOW LUBE OIL PRESSURE SWITCH TOTAL kg
2 2
78 LOW LOW LUBE OIL PRESSURE SWITCH PD (PUMP ONLY) kg m
79 HIGH LUBE OIL TEMPERATURE SWICH
80 STAND-BY LUBE OIL PUMP START SKID DIMENSIONS (PUMP + DRIVER)
81 PAINTING SKID DIMENSIONS : LENGHT × WIDTH × HEIGHT (mm)
82 ACCORDING TO
83 VENDOR STANDARD (Note 9) no FUEL TANK DIMENSIONS
84 UTILITIES FUEL TANK + SUPPORT DIMENSIONS : L × W × H (mm) as per NFPA 20

85 ELECTRIC POWER MAIN V/ph/Hz


86 CONTROL & PROTECTION V/ph/Hz 230/1/50
87 INSTRUMENT AIR bar/°C
88 COOLING WATER SUPPLY (IN) bar/°C
89 COOLING WATER SUPPLY (OUT) bar/°C
90 INSPECTIONS AND TESTS
91 INSPECTION & TESTS (Note 13)
92
93
94
95
96
97
98
99

10J01762-MAC-DS-000-010-D2.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 D1 D2 Engineering doc. no.:
N/A Sheet 4 to 7 10J01762-MAC-DS-000-010
FIRE WATER CENTRIFUGAL PUMP DATA SHEET (DIESEL)
100 PUMPS GENERAL NOTES
101 1. Environmental conditions are:
102 - Min. / max temperature: 0-50 °C
103 - Min. /max relative air humidity: 20- 65 %
104 - Altitude: 330 m s.l.m.
105 2. The net positive suction head available shall exceed by a 10% or 0.5 m whichever is higher of the positive suction head required when the pump
106 is running at the maximum capacity.
107 3. The design of the pumps shall be that their performance curves rise steadily to the shut- off point. Drooping curve is not acceptable.
108 The head rise shall be at least 10% of the head at rated capacity.
109 4. Nozzles shall be FF (Flat Facing) type if case material is cast iron. Nozzles size by Manufacturer
110 5. Coupling guard shall be non spark type. Guards shall be fitted to all exposed moving parts such that they can not present a hazard to personnel.
111 Couplings shall be NFPA 20.
112 6. Pump supplier shall supply also the diesel engine driver controlled and all accessories to be mounted at shop on a common rigid baseplate,
113 such that the unit can be transported and installed without any undue stress being transmitted to the individual components.
114 7. deleted
115 8. All fasteners for process connections shall be provided. Materials shall be suitable for the required applications in order to prevent corrosive attack
116 by the operating environment and galvanic corrosion.
117 9. deleted
118 10. Spare parts for commissioning and start up shall be quoted.
119 11. The following codes and rules (updated issues) will be applied:
120 - NFPA 20 - Standard for the installation of stationary pumps for fire protection;
121 - ASME materila shhall be indicated
122 12. Should any conflict arise between the various documents, purchase order, data sheets, drawings, international codes and supplier bid
123 the most stringent interpretation shall apply.
124 13. The tests and inspections shall be as per NFPA 20. Tests certificates shall be submitted for client approval.
125 14. Diesel engine and controller shall be UL listed of FM approved. Pump shall be manufactured accoridng to NFPA 20. Pump NFPA 20 listed requirement is
126 not mandatory.
127 15. Fresh water from water wells.
128 16. Fire water centrifugal pump and diesel engine data sheets shall be returned properly fullfilled by the Vendor.
129 17. Vendor shall provide instrumentations and local control panels according to this data sheet and according to project P&IDs 10J01762-PRO-DW-000-012_2, where is
130 clearly indicated the battery limit of the supply. All instruments and local control panels shall be in accordance with NFPA 20 and shall be identified by tag numbers
131 using appropriate stainless steel tag. Mechanical protection shall be IP-65 (min) as per IEC 60529 for electronic instruments and IP-55 (min) for mechanical
132 instruments. As per NFPA 20, on project P&ID 10J01762-PRO-DW-000-012_2 are indicated the minimum local commands/status/alarms required and the minimum
133 status/alarms that shall be available for remote monitoring on DCS plant control system. Voltage free contacts available for control room remote monitoring shall be
SPDT
type, rating 2A@24VDC. The local control panel shall contains enough terminals to enable all the multi-pair cable to be terminated, including multi-pair cable spare
134
capacity of
20%. All such gland holes which are unused shall be supplied fitted with the correct, suitably sealed stop plugs compatible with the field local control panel
135
certification.
136 Local control panel will be fitted with earthing facilities (e.g. an earth stud) to enable the metalwork to be solidly earthed to the plant earthing system.
137 Local control panels shall be UL listed / FM approved.
138 The main electrical and diesel pumps are provided with test line for checking the normal running of the pumps. A local flow meter (Venturi type) will
139 be installed on that line and shall be part of Vendor’s scope of supply. The size of Venturi flowmeter on project P&ID 10J01762-PRO-DW-000-012_2 is
140 preliminary and shall be confirmed by Vendor.
141 18. Pump shall be able to start at a minimum head of approx. 10m before reach rated condition.
142
143
144
145
146

10J01762-MAC-DS-000-010-D2.xls
OFFSITES ENGINEERING WORK S FOR THE ERB IL REFINERY 40,000 B /D EXPANSION PROJ ECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Co m p an y d o c . n o .: Rev.: C0 D0 D1 D2 En g in eer in g d o c . n o .:
N/A Sheet 5 to 7 10J01762-MAC-DS-000-010
DATA SHEET FOR DIESEL ENGINE
Tag. N.: DP-2122A/B /C N. of units: 3 Manufacturer:
Service: Fire water pump driver Reference code: NFPA 20
1 SERVICE GOVERNOR AS PER NFPA 20
2 INSTALLATION MANUFACTURER:
3 DUTY (CONT.,INTER.,STAND BY, EMER.) n°2 Interm. / n°1 Stand by TYPE
4 DRIVEN EQUIPMENT Centr. Pump OPERATING SPEED RANGE (W ITH REF. TO NOM. SPEED)
%
5 AREA CLASSIFICATION (EN 60079-10) Safe CLASS
6 OPERATING CONDITIONS TURBOCHARGER
7 CONT.POW.ABS. BY DRIVEN EQ. kW MANUFACTURER:
8 MAX ABSORBED POWER kW TYPE
9 NOMINAL ENGINE SPEED rpm LUBRICATION (COMMON TO THE ENGINE)
10 CASING HYDROTEST PRESSURE
11 ALTITUDE m 330 COOLING BY
12 RELATIVE HUMIDITY MIN./MAX. % 20-65 IGNITION SYSTEM
13 AMBIENT TEMPERATURE MIN./MAX. °C 0-50 MANUFACTURER:
14 COOLING WATER TEMPERATURE °C 30 TYPE
15 ROTATION FROM COUPLING END (orario - antiorario) LUBRICATION
16 CONT. POWER ISO kW COMMON TO
17 CONT. POWER SITO @ MAX AMBIENT TEMP. kW CIRCULATING PUMPS N.
18 NOMINAL SPEED rpm DRIVEN (electr. - mecc.)
19 MEAN EFFECT. PRESSURE Bar PRELUBRICATING (hand pump / elect. pump)
20 MEAN SPEED PISTON rpm FILTERS (N. - type)
21 FUEL CONSUMPTION COOLING TYPE
22 LUBE OIL CONSUMPTION DESIGN PRESS.WATER SIDE
23 UTILITIES INLET/OUTLET WATER TEMP. °C
24 ELECTRIC POWER (CONTROL PANEL) V/Ph/Hz 230 / 1 / 50 OIL HEATER
25 INSTRUMENT AIR - AUTOMATIC OIL REFILLER
26 COOLING WATER - MATERIALS
27 GAS FUEL - CRANKCASE
28 CRANKSHAFT
29 CODES AND STANDARDS PISTONS
30 DIESEL ENGINE NFPA 20 VALVES
31 GEAR - CONNECTING RODS
32 PRESSURE VESSELS - CYLINDER SLEEVE
33 INSTRUMENT/ELEC.PARTS - CYLINDER HEAD
34 CONSTRUCTION CHARACTERISTICS FLYWHEEL
35 ENGINE TYPE (superch., interr...) CAMSHAFT
36 INJECTION TYPE (direct / pre-chamber) EXHAUST PIPING
37 N. OF STROKES WEIGHT
38 N. OF CYLINDERS DIESEL ENGINE- FLYWHEEL kg
39 CYLINDERS ARRANGEMENT BASEPLATE kg
40 CYLINDER BORE mm GEAR kg -
41 STROKE mm TOTAL (MAIN PUMP EXCLUDED) kg
42 TOTAL DISPLACEMENT
NOTE

10J01762-MAC-DS-000-010-D2.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Com pany doc. no.: Rev.: C0 D0 D1 D2 Engineering doc. no.:
N/A Sheet 6 to 7 10J01762-MAC-DS-000-010
DATA SHEET FOR DIESEL ENGINE
43 COOLING SYSTEM CONTROL PANEL (Note 1)
44 TYPE INSTALLATION NFPA 20
45 RADIATOR / HEAT EXCHANGER (installation) RADIATOR HEATER
46 AIR COOLED / W ATER COOLED (From pump discharge) AIR COOLED PUSHBUTTON (start/stop - test lamp) YES
47 CIRCULATING PUMPS on crackshaft INDICATORS
48 INLET / OUTLET COOLING WATER TEMPERATURE°C -- VOLTMETER B1 YES
3
49 COOLING W ATER FLOWRATE m /h -- AMPEREMETER B1 YES
50 VOLTMETER B2 YES
51 FUEL SYSTEM AMPEREMETER B2 YES
52 FUEL TYPE Diesel (vendor to specify) AMPEREMETER YES
53 FUEL TANK YES (Note 3) SPEED INDICATOR (NFPA 20) YES
54 FUEL TANK CAPACITY NFPA 20 (Note 4) HOUR METER YES
55 FEEDING PRESSURE barg ALARM & SHUTDOWNS
56 AUTOMATIC REFILLING SYSTEM ACOUSTIC SIGNAL YES
57 FUEL TANK LOCATION NFPA 20 OVERSPEED YES
58 LUBE OIL LOW PRESSURE YES
59 STARTING SYSTEM COOLING W ATER HIGH TEMPERATURE YES
60 TYPE ( air cylinder/air motor/electric) Electric LOW VOLTAGE BATTERY B1 YES
61 N. OF STARTINGS (automatic sequence.) NFPA 20 LOW VOLTAGE BATTERY B2 YES
62 N. OF RESERVOIRS (capacity / pressure) L / barg / EXTERNAL SOURCE LOW VOLTAGE YES
63 AIR COMPRESSOR (Num. / Elec.-Diesel) / HIGH / LOW FUEL PRESSURE YES
64 RECHARGING TIME - FAILURE TO START YES
65 ENGINE FAILURE YES
66 AIR SUCTION FILTER FUEL TANK LOW LEVEL YES
67 MANUFACTURER TEST LAMP BATTERY B1 OPERATING YES
68 TYPE (suitable for environmental) TEST LAMP BATTERY B2 OPERATING YES
69 N. OF FILTRATION STAGES TEST LAMP AUTO MODE YES
70 FILTRATION DEGREE CIRCUIT IN STARTING YES
71 DIFF. PRESS. INDICATOR COMMANDS
72 NOISE SELECTOR CB1 YES
73 ENGINE dB(A) (Note 2) SELECTOR CB2 YES
74 EXHAUST SILENCER dB(A) SILENCING ALARM YES
75 LAMP TEST YES
76 RESET YES
77 MISCELLANEOUS START YES
78 COUPLING Type NFPA 20 YES STOP YES
79 COUPLING GUARD (Antispark/Fire Wall) YES SELECTOR MANUAL / AUTO STARTING MODE YES
80 EXHAUST PIPING INSULATION YES STARTING B1 YES
81 EXPANSION JOINT YES STARTING B2 YES
82 INSTRUMENTATION (Note 1) SIGNALS TO TERM. BOARD (SPDT volt free): YES
83 PRESS. GAUGES OIL YES RUNNING STATUS YES
84 DIFF. PRESS. GAUGES LUBE OIL FILTER SYSTEM ON TEST YES
85 DIFF. PRESS. GAUGES AIR FILTER TERMAL PROTECTION YES
86 PRESS. GAUGES COOLING WATER ALARM CUMUL YES
87 TEMP. GAUGES COOLING WATER (INLET) YES SHUTDOW N CUMUL YES
88 TEMP. GAUGES COOLING WATER (MOTOR OUTLET)
89 TEMP. GAUGES EXHAUST GASES
90
NOTE: 1. Instrumentation and control panel shall be provided in compliance with NFPA 20.
2. Max allowable noise level for the complete unit is 85 dB(A) (Ref. sheet 2 row 48). Vendor shall indicate the noise with and W/O noise enclosure treatment.
3. Fuel tank shall be provided with over flow connection, steel support and anchor bolts; low fuel level switch, valved drain and interconnecting piping
4. Fuel tank capacity for each pump shall guarantee a continous operation of each pump for a time not less than 6 hours.

10J01762-MAC-DS-000-010-D2.xls
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
FIREWATER DIESEL MAIN PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 D1 D2 Engineering doc. no.:
N/A Sheet 7 to 7 10J01762-MAC-DS-000-010
FIRE WATER CENTRIFUGAL PUMP DATA SHEET (DIESEL)
146 EXTENT OF SUPPLY (PUMP + DIESEL ENGINE)
147 DIESEL ENGINE (NFPA 20) YES
148 DRIVEN EQUIPMENT (PUMP) (NFPA 20) YES
149 GEAR -
150 BASEPLATE(skid type) YES
151 FOUNDATION BOLTS, PLATES, etc... YES
152 ANTIVIBRATION MOUNTING PADS (IF NECESSARY) YES
153 COUPLINGS BETWEEN ENGINE AND PUMP YES
154 COUPLING GUARDS YES
155 SPECIAL TOOLS YES
156 SHOP TESTS YES
157 TESTS ON SITE YES
158 MATERIAL CERTIFICATES YES
159 TESTS CERTIFICATES YES
160 COMMISSIONING AND START UP SPARE PARTS YES
161 SPARE PARTS (TWO YEARS) YES
162 TECHNICAL DOCUMENTATION AND I&OM (IN ENGLISH) YES
163 PAINTING YES
164
165 PUMP
166 DRAIN WITH VALVES YES
167 CASE VENT WITH VALVES YES
168 SAFETY VALVES (NFPA 20) YES
169 SUCTION TEMPORARY STRAINER YES
170 LUBRICATION SYSTEM -
171
172 DIESEL ENGINE
173 FIRE WALL -
174 AIR SUCTION FILTERS YES
175 EXHAUST SILENCER YES
176 EXHAUST PIPING YES
177 EXHAUST FLEXIBLE COUPLING YES
178 INTERCONN. PIPING (Assembled) YES
179 FUEL SUPPLY SYSTEM YES
180 INTERCONN. PIPING FOR START. AIR SYSTEM -
181 INTERCONN.PIPING (from fuel tank to diesel engine etc...) YES
182 COOLING SYSTEM YES
183 STARTING SYSTEM YES
184 WATER HEATER YES
185 OIL HEATER (If Necessary) YES
186 CONTROL PANEL YES
187 GAUGE PANEL YES
188 INSTRUMENTATION AS PER SPC. YES
189 INTERCONNECTING WIRING YES
190 TORSIONAL CRIT.SPEED ANALYSIS YES
191 N. 2 NICKEL CADMIUM BATTERIES YES
192 BATTERY CHARGER YES
193 FW PUMPS ROOM VENTILATION DUCTS - in case of installation of the skid (engine) inside a
194 FW PUMPS ROOM VENTILATION SYSTEM (FANS, ETC...) - noise enclosure the design of a ventilation system can be
195 AUTOMATIC LUBE OIL REFILLING SYSTEM YES required to the vendor (extractors, ducts etc...)
196 ENCLOSURE FOR NOISE INSULATION (If Necessary) as option For this purpose the installation diagram of the skid inside the
197 enclosure (with room dimensions) shall be attached to the
198 project data sheet
199

10J01762-MAC-DS-000-010-D2.xls

Вам также может понравиться