Вы находитесь на странице: 1из 1

time tofor

process
followup
report
districts ISD
ofof eachMain
meeting
Kabul
the office
Province
with
province
province
Deviations
specified
Rehabilitation
5. making
initiating
process
structural of and
qulaitythe
designs,
Baghlan of toandprovide
existing
change
3.
Projects
contractors
supervion
2. submission sure
located and thethe
in various
Preparing
construction
approved
schools,
order
drawing
Province requests
andbudget
track
Projects status
the
as located
well as
projects
work
districts
1.
4. plan
responsible
Reponsible
Preparing
supervision are
of for
thecompleted
for each
workto
reportsprovince
preparing
supervise
plan
on for
Reporting
4. various
time
in arranging
schedule extetnion
specifications to
and Senior
kick
districtscost
in off
requests
relation
of and
the
within
2.
each
time contract
submission
contract
the
architecture
implementation
contract
to ISD and
Main theduration,
in office
Construction
followup
performance meeting Mnager
at with
6.
to
1. Delvering
education
province
Reponsible
specified
5.
supervision
initiating
structural
process
coordination of qulaity tocountry
construction
reports
the
designs,
Jawazjan
with supervise
and
changeon
senior
3. making
contractors
level
projects
2. ,pay
infrastructures
submission sure
status and
frequent the
Preparing
report
the
building visits
in of
the implementation
approved
time budget
order is to
engineer
projects
He
work also
plan
ISD
requests
provincejects
drawing and
are Main as
located
completed
responsible office
wellin as
, to
to
time
3.
construction
presentation
ISD/MoE.
supervision
process
4. making
arranging
various
5. of for
extetnion
specifications
Processing sure
districts
each
mode
reports
Panjshir
kick
the
sites
off
inrequests
the on
on
relation
of the
changeand
within
work
contract contract
with Provinsial duration,
Education Quality Improvement Program - EQUIP 1.
hold
time
The
The
5.
Reponsible
bimonthly
Province
followup
projects
meeting
the
8.
required
3.
in
regular
designers
to
6. initiating
Delvering
province
to education
order
ISD
requests
Regional
specified
Engineers
making
various
contractors
basis
Main
Projects
meeting
are
qulaity
implementation
certifying with
to for
sure the
to
follow-up
the
travel
districts
and
are
completed
supervise
office
constructionoften
located
with
aschange
the
well as
and
developing
invoices
to
ofthe
Preparingthe
projects
within
construction
responsible
approved
School
order contract
infrastructures
2.
timesubmission
extetnionstatus
construction
requests for
budget report
duration,
building
the
requests
manager
preparing
as well in
plan of
as
List of Tas to be sustained process
Implementing
and
projects
province
work
1.
in
time
making
plan
Reponsible
specified
presentation
supervision
ISD/MoE.
6. Guiding
structural
Responsible
4. arranging
line
manage
Projects
invoices
changes
within
2.
of
with
extetnion
submission
contract
are
sitesKabul
for
qulaitysure
completed
at
each
to
mode
reports
engineers
designs,
located to
thekick
Construction
are
inbudget
contract
Province
agencies,
the
times
supervise
and
analyze
NESPoff
requests
processed
structural
the
on
on for
and
in various
duration,
of
the
time implementation
bimonthly
approved
The designers
preparing
the
drawing to ISD
construction
followup
strategic and basis
Main are
presentation
meeting
plan. In often
office
with
addition on
6. Delvering construction
2018 districts
Deviations
smoothly
specified
design
supervision
5. initiating
process
4.
8.
3. arranging
certifying
required
making
bimonthly
specifications
supervision
contractors
to this
Currently
projects
construction
2.
at
he
submission
9.Forwarding
and
approved
time
order
ofof
foundations
to ISD
requests
tois
the
and
qulaity
Panjshir
sure
basis
the
status
budget
kick
the
travelin
reports
and
province
status
Main the
to
super-structure
reports
the andprovide
change
the off on
relationand
invoices
toforthe
Preparing
responsible
Engineering
report
technical
as where
office
well inthe
as
to
province
and
followup
projectsmaking
7. Reponsible
Spot
respective
to
workeducation
manage
team
1. plan
lack Projects
meeting
sites
are
checking
the sure
Regions
for at
each
assessment
electrical located
the
to times
completed with
of theof
New
supervise
presentation
supervision
Reporting
problem
4.
there
3. arranging
making are to to mode
reports
Senior
commitess
deviations
sure kick the off on
onand
from
time
in
invoices
within
changes
projects extetnion
various
contractors indistricts
are
contract and requests
processed
structural of
Preparing
duration, the
infrastructures
school
contract
process
engineers,
the
bimonthly
Construction
time
and
the
followup
building/
to ISD
follwup
typical of
implementation the
during
basis
Main building
structural
Mnager
designs.
meeting the
office
withAt the
of
pre Duration
projects
6.
8. Delvering
province
smoothly
work plan
Role/support are for completed
construction
each in
Departm Justification design
specified
Rehabilitation
ISD/MoE.
5. initiating
performance
construction
process
8.
1.
3. certifying
On
making
10.proper
contractors
at
Initiatiion
regular
construction
super-structure
ofqulaity
sure of
the
of
and
Panjshirof
the
contract
and
the
basis,
stage,theand
existing
change
existing
invoices
Preparing - to be
S/# TA Name Position Salary within
projects
2.
contract
9.Forwarding
approved
and
invoices
TheEQUIP
order
contract
submission
isdesigners
schools,
schools
construction
province
collects
and making
status
foundations
andbudget
track
requests
for disaster
Projects
data
duration,
report
the
technical
making
Remainingare
the
phase
of
sure as where
often
well
program
the risk
the
located
in
sure
as Linkage of Activities/Role Remarks
ent Main Responsibilities He
projects
1.
4.
the
also
administration
deviations
work plan
Reponsible
specified
presentation
supervision
problem
5. initiating
there
required
time
reduction
services are
arranging
invoices
schedule extetnion
are
to
to
of
responsible
and
at
from
for
qulaitycompleted
at
each
to
mode
reports
commitess
the
deviations
kick
are
travel
these cost
theprovisial
supervise
and
change
off
to
requests
regional
on
on to
from
and
the
level
spcilised
sustaine
in various
invoices
activities,
within
work
level
contract
design
the
order
and to
activities
and are
contract
with
implementation
approved
bimonthly
time ISD
requests
follwup
districts
reviews
processed
Provinsial
specifications
budget
basis
Main as
of
and
duration,
office
well
the
as
Under EQRA d
1 ISD Abdul Basir Engineer 43667
1. Reponsible to supervise the implementation process of Urozgan Province projects followup
the
6.
and typical
processed
performance
Delvering
skills
province
checks
smoothly
Engineers
specified
are
5.
8.
to
are plan
to meeting
sites
Continuation
11.Handling
needed
initiating
process
4. arranging
certifying
vacant
designs.
smoothly
needed
ensure
ofqulaity
forIRD
to
the
Urozgan
at
at
kick
thebe
with
times
country
construction
mitigation hence
that
developing
and
At
checked
change
off and
invoices
the
of
all
Dec.2018
3.
timemaking
10.properextetnion
construction sure
contract the
requests
Projects located in various districts of the province contractors
9.Forwarding
level
changes
projects
measures
ISD
2. ,pay
propse
submission
9.Forwarding
information
approved
School
Devaitions
order
by visits status
construction
requests
of inisstage,
and
inbudget
frequent
structural
and
to
the the Preparing
technical
report
technical
correct
respective
as
design
visits
retrofitting
recruit well in
one
and
plan as
2 ISD Abdul Hameed Engineer 1. Reponsible to supervise the implementation
2. submission the supervision reports on time to ISD Main office process of Daikundi province province
followup
and
projects
6.
work
problem
design
to making
Delvering
administration
deviationsplan
presentation
strategies
electrical
supervision
adequate
problem
in
4. line
arranging
provinces at
construction
with
Projects
meeting
are
to for
from
to
sure
completed
each
commitess the
super-structure
engineer
to mode
reports
commitess
thekick
located
sites
improve
NESP
with
the
construction
at provisial
off on
who
on ,the the
and
66333 team.
time
in extetnion
various
contractors
invoices are districts
and requests
processed of
Preparingthe employee will carryout the same tasksDec.2018
Projects
3. Making
making located
sure the in various
projects districts
are reports of the province
completed within contract duration,
within
level
projects
design
contract
and
hold tocontract
and
follwup status
foundations
bimonthlyregular
building’s
will perform duration,
report
specifications
follow-up
basis
performance.
the where
following in
3 ISD Abdul Hamid Senior Civil Engineer 1.
The
2. Regional
submission supervision
theconstruction
supervision reportsmanager onaretime submitted
Responsible
to ISD Main on time to
office thespecified followup
for analyze time
and
2. Compiles
smoothly
1.
follwup
strategic
6. Delvering
province
work plan
Reponsible
specified
presentation
11.Handling
5.
are initiating
needed
10.Archiving
there
meeting are
ISD plan.
for
Main
meetingall
qulaityIRD
to
the
data
In
each
to
mode
be
proper
deviations
with
office
withand
addition
construction
supervise
and
changeon
checked
fromto the
90222
qulaity and approved budget 8.
3. certifying
tasks:
making
information
10.proper
to
contractors
this he sure the
into
contract
is and the
responsibleinvoices
agreed
Preparing employee will carryout the same tasksDec.2018
repective
the
3. provinces
construction
making sure supervision reports for the respective specified othe
Regions at the
projects
Leading
2. same
submission
contract
9.Forwarding status
his
implementation
approved
Devaitions
bimonthly ofbudget time
team
basis
in the the
report
technicaland
respective in
4 ISD Abdul Karim Engineer 1.
4. Reponsible
2. arranging
Analyzing kick
the tothe offprojects
supervise
and followup
supervision
areimplementation
the completed
reports meeting with within contract
process
contractors duration,
of faryab Province
and Preparing
by
order
work
visits
manage
1.
requests
documentation
Implementing
the
and typical
projectsmaking
Assist
administration
system, plan
Reponsible
presentation
employee
deals
supervision
5. with
initiating
problem
process
ISD
of
are
tofor
the is
the
designs.
database
all
sure
in design
as
eachofthe
assessment
to
well
the
agencies,
reviewing
completed
at At as
provisial
and
supervise
reponsible
mode
reports
the
commitess
Badakhshan offon
changeon
the
andto the
Snr Environmental 72000
qulaity
New
Projects
Leading
work and
school
plan located
hisforapproved
team building/
each inand budget
variousdeals
contract Rehabilitation
districts
with allofEnvironmental
the province ofsupervion
existingissues for schools,
all EQUIP track 4.
8.
time
and arranging
certifying
provinces
team.
projects
within
files
contract
the
Guide
extetnion
construction
manage
invoicesupdating
bimonthlyso are
contract
and
Environmental that
levelimplementation
process of the
kick
the
stage,
Construction
processed
they invoices
requests
Electrcial
consulting
basis duration,
are
structural
issues of
for
employee will carryout the same tasksDec.2018
3. Monthly Summary report for each province time
order
province
followup
and
6. to
follwup
making
Delvering
11.Handling ISD
requests Main
Projects
meeting sure as office
well
located
with
the
construction
IRD as
5 ISD Abdul Karim Specialist 104444 4.
2.
thearranging
submission
schedule
projects
5. Preparing
4. initiating kick
the the
work
off
change
plan
and
supervision
and costfollowup
order
for each reportsmeeting
performance
requests
contract onasin with
time
well attoascontractors
coordinationISD
timeMain
country extetnion
with
and Preparing
office
levelsenior,pay
requests
Deviations
deviations
smoothly
specifications
specified
11.Handling
readily
5.
8. initiating
performance
process
technical
all
3.
timecertifying
engineer Devaitions
in EQUIP
making
10.proper
available
of
extetnion
various
contractors
invoices
projects
at the same
from
and
qulaityIRD
the
Paktia
comments
projects
are sure
in
the
contract
districts
statusinand
the
to
the
processed
time
provide
relation
and
change
ofrequests
existing
invoices
offor
Preparing
report
the
respective in all the
the employee will carryout the same tasksDec.2018
work plan surefor each contract design
construction
9.Forwarding
to education
approved
1. Reponsible
accessible
Devaitions and specifications
budget
for
in status
technical
toassupervise
reports
respective
3.
6. making
1. Reponsible
frequent
Delvering visitstothe
construction projects
supervise
to constructionareimplementation
the
projects completed
status sites within
report , holdin contract
process of
regular
presentation duration,
Urozganfollow-up
mode specified
Province
on schools
order
province
projects
and
6. requests
making
Delvering
administration for
are disaster
Projects
being sure design
completed well
the
construction
at risk
located by
provisial as
6 ISD Abdul Khalid Monitoring Engineer 38000 5.
5. Processing
initiating
qulaity and thethe
approved
change
change order
order
budget
requests
requests asas well
well as astimetime extetnion
extetnion requests
requests
province
work
smoothly
1.
the
4.
time
plan
Reponsible
employee
presentation
provinces
Reporting
are
problemneeded
infrastructures
implementation
arranging
provinces
3. periodic
reduction
in extetnion
various
invoices
other
for
to
toat to each
to
isReporting
Senior
kick
districts
organization
are
be
commitess supervise
reponsible
modebuilding
off
requests
regional
processed of
on
checked
for and
of to
of the
level
the employee will carryout the same tasksDec.2018
Projects
bimonthly
6. Guiding
meeting located
basis
engineers
with in various
for
Implementing districts
preparing of the
presentation
agencies, province on
manage bimonthly basis
Construction within
projects
level
2.
the contract
submission
contract
9.Forwarding status
implementation
bimonthly
Guide
12.Reporting
by visits
Construction
and
ISD/MoE
followup
process
physical and
follwup ofof basis the
consulting
the
meeting
and Balkh
duration,
report
technical
todesign
MnagerISD
preparedprovince
financial with
in
ofall
7 ISD Abdul Mahboob Snr Safety Manager 6.
4.
2.
8. Delvering
arranging
submission
certifying construction
kickthe
the off andprojects
supervision
invoices projects
followup
and reports
making status
meeting on
sure report
withto
time
the in ISD
invoices presentation
contractorsMainare office mode on
and Preparing
processed
6.
andDelvering
province
ministry
smoothly
specified
1. to
Reponsible
presentation
11.Handling
supervision
5. initiating
problem
process
technical
8. certifying
Managment
plan
ofof
to
mitigation
construction
education.
qulaityIRD to change
mode
reports
the
commitess
Kandahar
comments the supervise
and on
onfor
invoices all the employee will carryout the same tasksDec.2018
118667 7. Spot
Deviations checking of the
andcontract
to provide construction status Reporting to team.
10.proper
the required
Projects
contractors
progress
projects contract
located
of
status thespecifications
and in various
Preparing
report
bimonthly
work
3.
1. plan sure
making
Reponsible
smoothly basis
for each
the
tothe projectsthe
supervise areimplementation
completed within contract
process ofare duration,
Balkh specified time
Province
measures
2.
the submission
9.Forwarding
order
and implementation
approved
bimonthly
Devaitions
province
projects to
making ISD
requests
follwup and
budget
basis
in
Main
Projects
being sure
the
technical
as
design wellin
retrofitting
respective
office
located
the byas
8 ISD Abdul Manan Engineer 8. Initiatiion
Senior
8. certifying of
Construction
the invoices
invoices and
Mnager
and making
making suresure thethe invoices
invoices are processed
processed
He
in
workaismanual
districts also
administration
plan
construction
strategies
presentation
supervision
ISD
problem
4.
process
8. have
arranging
certifying
provinces ofof
toa
responsible
for
totheform
reports
range at
each
commitess
Wardak
kick
the
provisial
province
projects
improve
mode of
off on
on to
the
and
invoices the employee will carryout the same tasksDec.2018
38000 5. initiating
qulaity
Projects and
9.Forwarding
smoothly located the
approved change
in various
technical order
budget
problem requests
districts as well
of the province
to commitess as time
and follwup extetnion requests 3.
time
work
at making
10.proper
in the
level
o
4.Guide
2.
1.
extetnion
various
other
invoices with
same
submission
contract
Interacts
Reponsible and sure
contract
districts
organization
are the
requests
processed
Provinsial
time
assist
with the
to of
for
the
teams
various the
smoothly bimonthly
building’s
time
typical
province
followup
and
projects
6. to designs
follwup
making
Delvering ISD basis
performance.
Main
Projects
meeting
are sure tosupervise
completed office
save
located
with
the
construction
9 ISD Abdul Rahman Senior Civil Engineer 90222 6.
The
4.
2. Delvering
Regional
arranging
submission
10.proper
9.Forwarding construction
kick
contracttheoff construction
technical andproblem
supervision projects
followup
administration reports status
tomanager
meeting
at on report
commitess with
time
provisial to in
level
and ISD presentation
Responsible
contractorsMain office
follwup and mode
toPreparing
analyzeon administration
province
smoothly
ministry
employee
Engineers
11.Handling
of
5.
the
8.
3. designers
supervision
initiating
departments of
implementation
certifying
making
time
10.proper
is
sure IRD
and
reports
the
the
indistricts
project
contract
at
education.
forreponsible provisial
ofdeveloping
changeontheto
Ministry
theinvoices of the employee will carryout the same tasksDec.2018
9.Forwarding technical problem to commitess and follwup contractors
in various
invoices
within
projects
level are
contract
status and
processedPreparing
of
duration,
report in
bimonthly
He
work
the
3. is also
plan
11.Handling
1. Reponsible
10.Archiving basis
for
construction
making sure responsible
IRDeach
tothe
proper contract
supervision
projects
Devaitions
supervise
documentation to
in
the work
arerespective
completed with
reports
implementation
of the Provinsial
provincesfor
within
projects process ofEngineers
the respective
contract duration,
Kabul Province for
Regions
specified 2.
timesubmission
9.Forwarding
School
Guide
Devaitions
engineers
order
process
and
projects to
Education, and
making
administration
preparation.
construction
ISD
requests
ofare in
Logarnew
Main
Donors
sure
the
technical
consulting
in respective
as
completed
To at
plan
of
designs,
office
well
andas
Province
makethe
provisial
10 ISD Abdul Saboor Monitoring Engineer 38000 1.
8.
5. On
10.properregular
certifying
initiating
qulaity
developing
New and
school thebasis,
contract
the
approved change
School
building/
collects
administration
invoices and
order
budget data
constructionmaking ofatprogram
requests
Rehabilitation provisial
sure
as
plan the
well activities,
level
ofininvoices
as time with
line
existing
reviews
areschools,
extetnion the and
processed checks to province
requests
NESP track
work
smoothly
specified
in line
provinces
review
time
3. making
helps
Projects
invoices
plan
presentation
11.Handling
supervision
problem
ISD
1. have
Making
technical inwith
and
extetnion toafor
qulaity
sure
the
each
mode
IRD
reports
commitess
range
comments
revise
sure
maintaining
located
are the and
NESP of
the
requests
the
processedin
on
onfor
high
various all the employee will carryout the same tasksDec.2018
Projects
11.Handling
ensure
11.Handling located
that IRD
all
IRD in various
Devaitions
information
Devaitions districts
isin respective
incorrect
respectiveofand
the province
provinces
adequate
provinces
within
these
level
contract
2.
approved
bimonthly
Devaitions
time
typical
and
contract
totypical
submission
9.Forwarding
1. Reponsible ISD
designs
follwup budget
basis
in
Main the
to duration,
design
technical
to sites
supervise
respective
office
save
11 ISD abdul Wajed Monitoring Engineer 1.
6.
4.
2. Reponsible
smoothly
Delvering
arranging
submission
12.Reporting
strategic kick
plan. to
the
to supervise
construction
off
ISD and
supervision
InManagment the
projects
followup
addition implementation
reports status
meeting
to this on hereport
with
time process
in
contractors
istoresponsible of
presentation
ISD Maindatabase Kabul
and
office Province
mode
Preparing
to,pay manageon supervision
strategic
existing
projects
6. Delvering
quality
districts
smoothly
specified
11.Handling
specific,
supervision
being
plan.
typical
are
data
of reports
the
qulaity
designersIRD
design
In
completed
construction
collection
reportsprovince
and
arebyof
addition
designsalong
on
43667 the
2. schedule
Compiles
Projects
9.Forwarding locatedall and
data
in
technical and
variouscost
problem performance
information
districts ofinto
the
to commitess agreedat
province country
system,
andcontract level and
follwup duration, specified process files so
5.
3.
the initiating
problem
4. arranging
certifying
provinces
10.proper
time
submitted
other
to this
school
projects
within
5. Serves
to
implementation
8. making sure
inas
organization
he is
buildings
contract on
status
the
commitess
kick
the
contract
project
time change
the
responsible
focal
off
and
report for
duration,
point
and
invoices the
other
in to the employee will carryout the same tasksDec.2018
bimonthly
work
3.
1.
the plan sure
making
Reponsible
assessmentbasis
for each
to the contract
projects
supervise
process areand
the completed
implementation
of the within
structural process of Baghlan
performance Province
of
2. submission
9.Forwarding
approved
with
followup
and
projects the
Devaitions
order
time torequests
follwup
making ISD
of budget
surveyin
Main
Kabul
meeting
are sure
the
technical
asteam
respective
completed office
well as
Province
with
the
Abdullah Engineer frequent
that they arevisits
readily to construction
available sites
accessible ,level
thefor hold regular follow-up preparation.
administration To make
at provisial
asreports
12 ISD 2. submission the supervision reports on time to ISD repective
manage
ministry
education
specified
presentation of
theprovinces
education.
qulaityassessment
infrastructures;
mode and on
timeMain are office
10.proper
8. certifying contract
the administration
invoices and making at provisial
sure invoices processed for provincial
supervision
problem to staff
reports
commitess for
on
Database 72000 5. initiating
qulaity
Projects
existing
3. periodic
meeting and
located the
approved
schools
Reporting
with
change
in for order
budget
various disaster
of physical
Implementing
requests
districts and of
risktheasreduction
well
province
financial
agencies, progress
manage at extetnion
regional
of the
requests
level
construction
Construction
4.
3.
timearranging
provinces
needmaking
10.proper
invoices
within
level
these
2.
process
and
to visit
extetnion
contractors
Projects contract
typical
Analyzing
prepare
bimonthly
approved
sending ofand
sure
the
budget
kick
the
contract
located
are and
the
new
basis
the off
sites.
requests
processed
duration,
design
structural
receiving
and the
Preparing
in various
sites
standard
employee will carryout the same tasksDec.2018
6. making
11.Handling
smoothly
responsible
4. Delvering sure IRDthe
for projects
Devaitions
preparing
construction arerespective
in completed
architecture
projects status and within
provinces
structural
report in contract
designs,
presentation duration,
drawing
mode specified
and
on time
and
followup
6.
projects to ISD
follwup
Delvering
administration are Main
meeting completed office
with
construction
at provisial
13 ISD Abdullah Hamidi Administrator 49333 2. arranging
submission
projects
and
qulaity to
Deviations andplan
kickthe off
mitigation
approved
and followup
supervision
tobudget reports
measures
meeting on and
with
time to contractors
ISD
retrofitting Main and
office Preparing
strategies
districts
work
smoothly
specified
specific,
to to designs
4.
8.
data
3.
plan
11.Handling
supervision
performance
ISD have
arranging
certifying
and
making
10.proper asof a the
for
qulaity
designersIRD
reports
range
per of
kick
the
information
sure
contract
province
each and along
existing
the
the of
offISDand the
invoices employee will carryout the same tasksDec.2018
9.Forwarding
specifications
bimonthly
work
3.
1. plan
making
Reponsible basis
for
sure inand
technical
each
to relation
the contract
projects
supervise
provide
problem
tothe
education toconstruction
commitess
areimplementation
completed infrastructures
within and status
follwup
contract
process building
of
Reporting
of ISD/MoE.
duration,
Jawazjan specified
contractors
Design
within
projects
level
contract
2. submission
9.Forwarding
approved
Devaitions
with
3.
schools
needs,
and
followup the
Monthly
typical making
engineers
contract
status
survey
designs
for
and in
and
budget the Preparing
technicalare
duration,
report
respective
Summary
disaster
submit
meeting sure team
to save
the risk
the
with
in
14 ISD Abdullah Mayar Engineer 4. Interacts
arranging
improve
10.proper
Senior
The designers
8. initiating
certifying with
thekick
contract
Construction
theare various
off and
building’s departments
followup
administration
often
invoices Mnager
required
and making meeting
performance.
at of Ministry
provisial
to travel
sure with
to
thethelevel of Education,
contractors
projects
invoices aresitesand Donors
Preparing
at requests
processed times of and projects
administration
work
required
1. plan
Reponsible
presentation
specified
11.Handling
supervision
5.
4.
1.
needinitiating
problem
arranging
Making
provinces
are
to
to
tocontract
visit
for completed
prepare
qulaity to
mode
IRD
reports
the at
each
commitess
sure kick
the the
provisial
change
off the
supervise
and on
on
sites. and
level the employee will carryout the same tasksDec.2018
72000 5.
qulaity and
provincejects
helps the
approved
in maintaining change
located in
high order
budget
various
quality requests
districts asof
data collection well
the as time
province extetnion report
reduction
the
final time
contractors
invoices
within
level
contract
techncal
for
products ineach
areatproject
and in province
regional
processed
documentations a
Preparing
duration,
work
changes
1. plan
11.Handling
Reponsible
smoothly
responsible in for IRDeach
structural
to contract
Devaitions
design
supervise in
the at respective
super-structure
implementation provinces and
process foundations
of Panjshir where there
Province the
time
and implementation
approved
bimonthly
Devaitions
order torequests
follwup
supervision
followup ISD budget
basis
in
Main
meeting respective
reportsas office
well
are
with as
as for preparing architecture and structural designs, drawing and
6. submission
Delvering construction projects status report inISD presentation mode on supervion
preparation.
and to plan To make
mitigation
15 ISD Afsar Khan Engineer 4.
2.
5. arranging
Serves kick
focalthe off andfor
supervision followup reportsmeeting on with
time ascontractors
to Main and
office Preparing and 1.
manual/drawing
smoothly
work
specified plan
Reponsible
11.Handling
5. initiating
for415 for
ofqulaity
incomplete IRD
theeach form
to change
supervise
andCC
inpoint provincial ofstaff for sending and receiving data process
8.
4. certifying
arranging
provinces Ghazni
kick
the invoices
off and
72000
areinitiating
deviations
Projects
9.Forwarding located
specifications
bimonthly the
basis change
from
technical
in various
relation order
theproblem
typical requests
todistricts designs.
education the
to commitess as well
Atprovince
the
infrastructures time
construction
and follwup extetnion
building stage, requests
deviations
of Province
ISD/MoE.
3.
time
4.
o making
10.properextetnion
contractors
submitted
Design
Preparing
measures
these
Assist
contract
9.Forwardingtypical
and sure
contract
on
engineers
and and time
work the
requests
design
build Preparing
for
are
plan
retrofitting
technical for the
the
sites employee will carryout the same tasksDec.2018
He
work
3. isplan
making also
information
1.
6. Reponsible
Delvering for
sure responsible
each
to the contract
projects
supervise
construction to
the
projects work
areimplementation
completed
statuswith reportProvinsial
within contract
process
in ofEngineers
presentation duration,
Kabul mode for
specified
on
approved
the
order implementation
Devaitions
Projects
Province
followup
and
6.
projects requests
making
Delvering
administration ,arebudget
as incompleted
Projects
meeting respective
well
sure asas
at welltheas
located
with
the
construction
provisial
16 ISD Ahmad Farid Engineer 72000 from
2.
8.
5. the
submission
10.proper
The designers
certifying
initiating
qulaity
developing and design
contractthe
the
the are
approved and specifications
supervision
administration
often
invoices
change
School required
budget and
order
construction reports
making to
requests are
at needed
on
sure
as
plantime
provisial
travel to
the
well the
in toprojects
to
level be checked
ISD
invoices
as time
line Mainare by
office
sites at
processed
extetnion
with the visits
times
requests
NESP
repective
work
required
1.
ofofthe within
each
specific,
strategies
capacity
problem
5.
time
plan
responsible
Reponsible
contract
initiating
process
4. arranging
provinces
projects
in of
extetnion
various
invoices
contractors
toprovinces
for for
designers
to
ofdistricts
to the each
prepare
to
inpreparing
improve
commitess
the
Samangan
terminated
are kick
and
teams
change
off
requests
processed of
the
supervise
alongthe
and
due
Preparing
in the
the employee will carryout the same tasksDec.2018
Projects
bimonthly located
basis in various districts of theprovinces
province projects
level
contract
2. Analyzing
techncal contract
status the
documentations duration,
report in
17 ISD Ahmad Gul Senior Civil Engineer design
3.
6.
The
4.
2.
making
11.Handling
changes
smoothly
responsibleteam.
Delvering insure
Regional
arranging
submission
IRDthe
structural
for
construction
kickthe
projects
Devaitions
preparing design
construction
offInand
supervision
are
in
projects
followup completed
atrespective
super-structure
architecture
reports status
manager
meeting and
on
within
report
with
time istoand
structuralin contract
foundations
designs,
presentation
Responsible
contractors
ISD Main
duration,
and towhere
drawing
to modeanalyze
Preparing there architecture
specified
and
on
the
order
and
6.
implementation
coordination
building’s
with
followup
Province the
electrical
Delvering
to initiating
unsatisfactory
province
work
smoothly plan
presentation
specified
survey
requests
follwup design
meeting
Projects
for
qulaity
and
with
performance.
asteam
ofsenior
well as
located
with
construction
each
mode and on
97333 strategic
8. certifying
qulaity
are andfor
deviations
9.Forwarding
plan.
the
approved
frominvoices
technical the
addition
budget and
typical
problem makingto
designs.
this
sure
to commitess
he
At thethe responsible
invoices
construction
and follwup are office
processed
stage,
manage
deviations
11.Handling
supervision
5.
for415
process
structural
engineer
need
education
10.proper
time
in
projects toincomplete
of
visit
extetnion
various
contractors
performance
IRD
reports
the
designs,
Nimrooz
the change
infrastructure,
contract
districts
status andof
CC
sites.
requests
report
the of
Preparingthe
in the employee will carryout the same tasksDec.2018
specifications
bimonthly
work
the
3.
1. plan
Reponsible
smoothly
the assessmentbasis
construction
making sure in
each
to relation
the contract
supervise
process tothe
supervision
projects education
are completed
implementation
of the infrastructures
reports for
within
structural the
contract
process building
respective
of
performance of ISD/MoE.
duration,
Panjshir Regions
specified
province
of
2. submission
9.Forwarding
contract
approved
bimonthly
Devaitions
order
3. Monthly
Projects
drawing
Province
5. requests
Processing ,andbudget
as basis
inwell
Summary
Projects the
technical
respective
theas well
as theas
located
change
18 ISD Ahmad Saleh Engineer responsible
at
4. the
10.proper
The
8. same
arranging
from the
designers
certifying for
designtime
kick
contract
the preparing
are the
off
and employee
and
administration
often
invoices structural
followup
specifications
required
and isto
making at designs,
reponsible
meeting
are needed
provisial
travel
sure with
to
the drawing
to
the to
level Guide
contractors
be
projects
invoices and
and
checked
are specifications
consulting
and
sites byatPreparing
processedvisits
times of in school
6. Delvering
ofofthe specifications
work
province
1.
presentation
contractors
supervision
5.
1.
8.
4.
buildings
administration
plan
Reponsible
initiating
problem
Making
certifying
arranging
provinces
for
toeach
sureor mode
the at
each
to
the
reports
commitess
kick
the the
and
construction
provisial
supervise
changeon
on
invoices
off and the employee will carryout the same tasksDec.2018
38000 5.
Newinitiating
qulaity
Projects and
school
9.Forwarding located the
approved change
building/
in
technical various order
budget requests
Rehabilitation
problemdistricts of as well
thereduction
to commitess as
ofofand
province time
existing extetnion
schools, requests
track report
time
projects
in
order
Design for
extetnion
various terminated
requests districts
engineers in province
requests
as due
relation
of
well
are theas
relation
existing
technical
work
design plan
11.Handling
changes to
team. education
schools
incomments
for IRDeach
structural infrastructures
for
for
contract
Devaitions
design disaster
all projects
inatrespective building
risk
being
super-structure design
provinces and byfollwup
ISD/MoE. at regional
other
foundations organization level for
there the
buildings
level
projects
2.
time
and submission
contract
order
for
status
implementation
bimonthly
contractor
to
follwupISD
requests basis
left other
Main report
the
the
as site
office
well inas
andatwhere
smoothly
6. Delvering construction projects status report in presentation mode on supervision
followupmaking
6. initiating
supervion
Delvering
unsatisfactory meetingreports
sure the
construction are
with
19 ISD Ahmad Shah Cost Estimate Engineer 111556 4.
2.
the
and
arranging
submission
10.proper
The designers
schedule
ministry
5. initiating
to of
plan
kick
contractthe
are
education.
the off
and
change
mitigation
and
supervision
costfollowup
administration
often required
order reportsmeeting
to
performance
requests
measures on
attravel as with
time
provisial to
well
and the
at to
as contractors
level ISD
projects
country
time
retrofitting Main office
sites
level
extetnion Preparing
times
,pay
requests
strategies of to
to education
province
time
required
process
8.
3.
time
extetnion
educational
presentation
11.Handling
5.
supervision
certifying
without
making
10.proper
submitted
invoices of
extetnion
contractors
to
are
prepare
IRD
reports
the
Wardak
completion
sure the
contract
on and
requests
facilities
mode
time change
the
requests
processed
the
on
on
invoices
for
Preparing the the employee will carryout the same tasksDec.2018
are
work
3. deviations
9.Forwarding
bimonthly basis
planinsure
making for from
technical
each theproblem
contract typical designs.
to commitess Atprovinces
the construction
and follwup duration,stage, deviations 4. Preparing
projects
performance
2.Guide
infrastructures
6.
o submission
Guiding
techncal
Devaitions
bimonthly status
and work
of report
the
engineers
documentations
train
basis
in the plan
building
wellfor
the
respective infor
of
11.Handling
changes
1. Reponsible
frequent
6. IRD
visitstothe
structural projects
Devaitions
design
supervise
to are
in
the
construction at completed
respective
super-structure
implementationsites within and contract
process
,level
hold foundations
of Panjshir
regular where
byfollow-up
specified
there
province time
order
Province
and
the projects
to
making ISD
requests Main
Projects
are sure as
completed office
located
the as
8. Delvering construction projects status report inGuidepresentation mode on administration
6. Delvering construction
at provisial
20 ISD Ahmad Shah Monitoring Engineer 38000 at
5. thethe
Currently
from
improve
10.proper same
certifying
initiating
qulaity and
the
design
thetime
contract
the
the
approved
the
Engineering
and
invoices
change employee team
specifications
building’s
administration
and
order
budget
is
lack
making reponsible
performance.
requests are
at electrical
needed
provisial
sure
as theto
well engineers,
to be
invoices
as time and consulting
areduring
checked processed
extetnion the
visits pre
requests of
of repective
work
smoothly
ISD/MoE. plan
presentation
each contract
contractors
supervision
preparing
for415
design
8.
time
3.
in certifying
provinces
making team
extetnion
various
invoices are
provinces
for
sureor each
mode
in
the
reports
presentation
incomplete and
the
districts CC
requests
the
processed of
on
onthe
other
invoices on the employee will carryout the same tasksDec.2018
are
ISD deviations
Projects
have
bimonthly
technical
meeting
construction
design
11.Handling located
team.a range
basis
comments
with from
inof
andDevaitions
IRD the
various
typical typical
districts
designs
for allprojects
Implementing
construction projects designs.
phase
in respective of
to the
being
agencies,At
save the
province
the construction
time
designmanage
the report
services
provinces by in
otherproject stage,
these organization
ofpresentation Construction
spcilised deviations
preparation. To within
projects
level
2. Analyzing
9.Forwarding
contract
forare responsible
skills coordination
bimonthly
contractor
time
The
Projects
contract
designers
to ISD status
,are
as basis
left
inMain
the
with
well
duration,
report
technical
the senior
site
areoffice
asoften in
theup
21 ISD Ahmad Sohail Noori Cost Estimate Engineer smoothly
6.
4. Delvering
arranging
from
2. the
submission designconstruction
kickthe off
and and followup
specifications
supervision reports status
meeting
are needed
on withto
time toin
contractors
be
ISD checked
Main and
office mode
by Preparing
visits on
of
engineers
and
projects
6.
province
smoothly
the specified
making
Delvering
11.Handling
presentation
supervision
5. initiating
problem qulaity
to
using
sure
completed
IRD
mode
reports
the
the
construction
for the
preparing
commitess and
changeon
111556 make
8.
ministry
needed these
certifying
Deviations
9.Forwarding of
hence typical
the
education.
ISD
and
technical design
invoices
propse
to sites
and
to
provide
problem specific,
making
recruit sure
one
toconstruction
commitessdesigners
the
electrical invoices
and along
engineer
status
follwup arewith the
processed
who
Reporting survey
will toteam
perform 8.
engineer
3.
7.
to certifying
without
required
making
Spot
projects
datecontract
invoices
projects
within completion
to sure
checking
terminated
software
are
status the
travel the
processed invoices
tothe
of
of
report the
the
duration,duein the employee will carryout the same tasksDec.2018
bimonthly
work
design
3.
need
1. plan
making team.
Reponsible
smoothlyto basis
for
sure
visit each
the
to the contract
projects
supervise
sites. areimplementation
the completed within contract
process of duration,
Urozgan specified
province
2.
5.
submission
9.Forwarding
architecture
approved
bimonthly
Devaitions
3. Monthly
order follwup
requests
to Processing
and
projectsmaking
unsatisfactoryarebudget
sites
and
basis
Summarythe
technical
incompleted
respective
the
sure
at astimes
well of
change
the as
22 ISD Aimal Monitoring Engineer the
at following
the
10.proper
Senior
8. same
certifying tasks:
time
contract
Construction
the the employee
administration
invoices Mnager
and is
making reponsible
at provisial
sure the tolevel Guide
invoices and
are consulting
processed of relevant
smoothly
specified
presentation
supervision
problem
structural field.
qulaity
to Prepare
mode
reports
commitess
designs, and on
on
Water Supply Design 38000 5. initiating
qulaity
Projects and
9.Forwarding
oISD haveISD
Assist located the
approved
a range
inIRD change
in
technical various order
budget
forproblem
of typical
reviewing and requests
districts
designs of
to the
to commitess as
save well
province
theandas
time time
byfollwup
extetnion
in project requests
preparation.
4. certifying
arranging
provinces
8.
report
time
10.proper
invoices
order
changes
within
8.
performance
forto To drawing
proper
9.Forwarding
forare
extetnion
requestsin
contract
Initiatiion each
training
kick
the
contract
structural
ofof
off
province
requests
processed
as well
duration,
the
the
action
technical
and
invoices as the employee will carryout the same tasksDec.2018
Aminullah Engineer
technical
11.Handling
smoothly
6.
at Delvering
thethese
same
comments Devaitions
construction
time the
all
employee inupdating
projects
projects respectivebeing
status
isprepare
Electrcial
reponsible
design
provinces
report to
specifications
inGuide
other
presentation
and
in
organizationrelation
mode
consulting on
of
1. Reponsible
bimonthly
approved
time
followup
and to ISD
follwup
making
supervion
administration
6. Delvering andbudget
basis
Main
meeting sureto supervise
office
with
the
construction
at provisial
23 ISD 83111 4.
2. arranging
submission
Design
10.proper
make
education
ministry engineers kick
ofcontract theoff
typical
infrastructures
education. and
supervision
aredesign followup
required
administrationsitesreports
building to meeting
specific,
of ISD/MoE with
ondesigners
at provisial time
the to
andcontractors
techncal
level ISD
along Main
prepared with and
office
documentations Preparing
thethe
all survey for415
team 3.
required
time
smoothly
specified
design
invoices
problem
the
4.
8.
extetnion
contractors
plan and
arranging
certifying
vacant
making
10.proper
specifications
contractors
invoices
atand qulaity
or
evaluate
to
implementation
are
requests
super-structure
making
the
commitess
sure kick
the
contract
and the
andthe
off
inreport
processedrelation
sure
and
invoices
Preparing Dec.2018
9.Forwarding
bimonthly
He isplan basis technical problem to commitess and follwup 4. Preparing
projects
level
9.Forwarding
6. Guiding status work
engineers
technicalplan in
forfor
24 ISD Anjila Civil/Design Engineer
work
3.
need toalso
technical
making
incomplete
11.Handling
10.proper
for
sure
visit
specifications CCresponsible
comments
IRDeach
the the
inProjects for ,all
contract
projects
aDevaitions
sites.
manual to
projects
in work
arerespective
asform
well completed
as the with
being Provinsial
design
within
projects
provinces by otherEngineers
contract
terminated organization
duration,
due to specified for
for and
approved
the
capacity
process
and
followup
projects
foundations
invoices
contractor
follwup
making
administration
to
workeducation
smoothly plan
responsible
each
of
contract
11.Handling
presentation
of
arebudget
left
for
are
the
logar
meeting sure the
completed
for
IRD in
modeat
each
where
site
Province
the
with
provisial
preparingon
111556 8. certifying
ministry
5. initiating
qulaity
developing and
unsatisfactory
o Guide
ISD have ofacontract
and
the
education.
the
approved
range change
School administration
invoices
performance
assist ofteams
typical order
budget
construction
ofthe the at
andofmaking
requests
designers
designs
provisial
sure
as
plan
contractors
and
to save
thein
well level
the or
invoices
as
engineers
time time
line
the inin
are processed
extetnion
with
contractor
new
project the
designs,requests
NESP
left the
preparation.review
preparing
problem
siteTo there
4. arranging
processed
without
counterparts
10.proper
Projects
contractors
invoices
within
level
infrastructures
contract
9.Forwarding
1.
architecture
Reponsible
coordination
Devaitions
to presentation
arecompletion
located
are
contract
commitess
deviations
kick
smoothly
and
processedinoff
inbuilding
contract different
technical
indesigns,
with
and
from
various
Preparing
toduration,
supervise
senior
respective
on the
of
employee will carryout the same tasksDec.2018
Arash Engineer 11.Handling
1.
6. Reponsible
smoothly
Delvering IRDto Devaitions
supervise
construction in
projects respective
implementation
status provinces
report process
in of Badakhshan
presentation mode on and
bimonthly
the follwup
typical
followup
9.Forwarding
intervals
administration
districts and
of basis
designs.
meeting
the technical
keep with
atchange At the
the
provisial
province
25 ISD 72000 without
4. arranging
Design
strategic
and
make revise completion
engineers
these kick
plan.
the
typical off
are
In
existing and
design followup
required
addition
typical
sites to
designsmeeting
prepare
to
specific,this with
the
he
ofdesigners
school contractors
techncal
is responsible
buildings
along and
documentations
and the
with toPreparing
other manage for415
education
survey smoothly
work
specified
ISD/MoE.
5. plan
11.Handling
initiating
problem
team construction
drawing
the
8.
7. certifying
Spot checking
10.proper
contractors
problem to
and
implementation
engineer
provinces to
for
qulaityIRD
theeach
commitess
the
contract
and
stage,
commitess
and
invoices
of the
Preparing the employee will carryout the same tasksDec.2018
province
9.Forwarding
ISD
work have
bimonthly
plan
incomplete Projects
afor
range
basis
CC each located
technical
ofcontract
Projects typical in
problem
, asthe various
designs
well to districts
commitess
to save
asstandard
the projects of the
and
the time province
follwup
inper
terminated project duepreparation.
toprovince
records
level
To deviations
2. submission
contract
9.Forwarding
approved
Devaitions
The
order ofbudget
designers
requests
follwup insure the
technical
respective
are
as often
well as
26 ISD Baryalai Engineer infrastructures;
1.
theReponsible
need to visit
assessment to
the and
sites.prepare
supervise
process newimplementation
of the designs
structural process as of
performance the ISD
Paktia needs,
of and process
specifications
5.
and
work
and
The
o
Processing
Be making
administration
projects plan
follwup
Regional
able
kapisa
from
for in
theat
each relation
the Province
change
the
provisial
72000 2.
5. submission
10.proper
make
8. these
certifying
initiating
unsatisfactory
submit the contract
the
final
the
typical
the supervision
changeadministration
design
invoices
performance
products sites
and
order
in of
a
reports
requests
the at
specific,
making on
sure
as
contractors
manual/drawing
time
provisial
designers
the
well to
level
as
or
form
ISD
invoicesalong
time
the Mainarewithoffice
extetnion
contractor theleft
processed survey
requests
theforteam
site
11.Handling
supervision
problem
5.
1.
4.
to initiating
Making
arranging
provinces
required
time
10.properextetnion
education
Projects
order
invoices toto
to sure
located
requests
are
plan
IRD
reports
commitess
the
kick
travel
contract the
as
processedin
and
change
off
to
requests onand
the
various
well as the employee will carryout the same tasksDec.2018
Projects
1.
3. Making
existing
making
11.Handling locatedsure
schools
sure IRD in
the thevarious
for
projects
Devaitions districts
supervision
disaster
arerespective
in of
risk
completed the
reports province
are
reduction
within
provinces submittedat
contract on
regional
duration, timelevel
specified the 8. Initiatiion
level
contract
design
10.Archiving
construction
coordinate
Devaitions
time
order
and to and
ISD
requests
follwup all
in of the
specifications
proper
manager
Main phases
respective
as office
well ofas
27 ISD Behzad Engineer 1.
6. Reponsible
need
smoothly
without
o
2. to and
Delvering
Assist
submission
Design visit
completion to
the
build
the supervise
sites.
constructioncapacity
supervision the
projects implementation
ofmeasures
the status
teams
reports oninreport process
electrical
time to inISD design
Main of Balkh
presentation province
mode
ofstrategies
education
office on supervision
followup
projects
6.
5. Delvering
administration
districts
infrastructures
time
smoothly extetnion
11.Handling
invoices
meeting
sites
of
and
reports
theIRD building
requests
making
areofof
with
atprovince
times
construction
at provisial
sure the
72000 and
qulaity
Projectstoengineers
repective and provinces
plan
located
are
mitigation
approved in various
required
budget to prepare the
and techncal
retrofitting documentations for415
to are3. needed
initiating
documentation
Responsible
projects
provinces
making
10.proper
time
submittedextetnion
contractors designs
sureto
the
to
incontract
on and
be
timeof
the checked
change
the
analyze
from
requests
forfor
Preparing the employee will carryout the same tasksDec.2018
9.Forwarding technical asdistricts
problem to theof the
commitess province and follwup
bimonthly basis changes
projects
level statusstructural
report in
infrastructure,
3.
2. making
incomplete
1. Analyzing
Reponsible sure
CC
the toschool
the
Projects
supervision
supervise buildings
projects are
, followup
well
the and
completed
as
reports buildings
implementation projects for
within other
contract
terminated
process educational
duration,
due Preparing
of Kandahar specified ISD/MoE.
to facilities
province
2.
6.
the submission
Guiding
9.Forwarding
1. Reponsible
order
by
the invoices
Devaitions
visits
projects requests in are
ofprovinces
construction
conceptualisation
projects
6. Delvering
administrationatare
the the
engineers
technical
toas supervise
respective
design
completed well
and
construction
at provisial as
28 ISD Dad Mohammad Engineer 72000 4. arranging
improve
Design
2. submission
10.proper
8.Guide
o certifyingand
unsatisfactory
qulaity
3. Monthly and the
engineers kick
contractthe
the
train
approved
Summary
off and
building’s
are
supervision
invoices
the
performance required
administration
design
budget
report and of reports
to
making
team
for the
each
meeting
performance.
prepare
at
and on
sure
other
contractors
province
with
time
provisialthe contractors
techncal
to
level
theengineers ISD
invoices
or the
supervion Mainare
in
and
documentations
office
processed
using
contractor the
left up
the for415
to date
site
repective
work
design
the
processed
team.
time
plan
presentation
11.Handling
supervision
The designers
preparing
problem extetnion
11.Handling
supervision
requirements to
implementation
provinces
for IRDeach
super-structure
mode
reports
are
presentation
commitess
smoothly
IRD
reportsrequests on
often
on on the
forinthe employee will carryout the same tasksDec.2018
Projects
work
3. making
incomplete
11.Handling located
plan sureforCCIRDeach in
the
Projectsvarious
contract
projects
Devaitions , as districts
are
well
in of
completed
as the
respective the province
within
projects
provinces contract
terminated duration,
due to specified
within
level
projects
2. Analyzing
contract
consideirng
and
required
time
and
contract
to ISD
follwup
status
foundations
bimonthly
Devaitions toGhor the
the
basis
in
travel
Main duration,
report
number
to the of
where
respective
office
29 ISD Ehsanullah Nikmal Monitoring Engineer 1. Reponsible
smoothly
software
arranging
without
4.
2. Preparing
submission of thekick
completion to
work
the supervise
relevant
off
planandfor
supervision the
field.
followup
each implementation
Preparemeeting
contract
reports proper
on in with
time process
training
contractors
coordination
to ISD Main of
action Wardak
with plan
andsenior
office province
and
Preparing
process
9.Forwarding
6.
engineer Projects Delvering
Devaitions
respective
determination
specified
presentation
11.Handling
supervision
projects
5. initiating
there
8. are
certifying
provinces
of in
Regions
qulaity
,The mode
IRD
reports
the
Province
technical
construction
respective
through
and
Existing
deviations
the changeNew
onfrom
invoices the employee will carryout the same tasksDec.2018
43667 5. initiating
qulaity
Projects and
unsatisfactory
9.Forwarding located the
approved change
performance
inchange
technical various order
budget
problem of requests
the
districts as
to contractors well
of theasprovince
commitess as
orasthe
and time extetnion
contractor
follwup requests
left the site 3.
projects
7. making
Spot
10.proper
problem
at the same
projects
provinces
school
planning,
sites
sure
checking
contract
located
to
status
building/
at
commitess
designtime the
times
inof the
various
the final
report
and inof
evaluate
work
5.
3.
1.
6. plan
Processing
making
Reponsible
Delvering the
for
sure capacity
each
the
to thesupervise
construction of
contract
projects the
order
the counterparts
are
projects requests
completed
implementation
status inwithin
report different
well process
in time
contractintervals
extetnion
of
presentation Logar and
duration,
mode keep onthe 3.
requests
specified
Province 1.
the
and Reponsible
approved
Devaitions
bimonthly
Monthly
order
number
changes
projects requests
typical
making
administration ofinbudget
are basis
in
Summarytoas
engineers
designs.
sure
structural
completed
at
supervise
respective
well
the Atare
provisial as
the
30 ISD Esmatullah Engineer 72000 4.
2. arranging
without
submission
10.proper
records
5.
6. initiating
Guiding
qulaity and
kick
completion
contract
the the
engineers
approved
off
change and
supervision
for followup
administration
order
preparing
budget reportsmeeting
requestsat onas
presentation with
time
provisialwell to
as contractors
levelonISD
time Main
extetnion
bimonthly and
office Preparing
basisrequests
districts
and
1. follwup
Reponsible
presentation
employee
12.Reporting
Rehabilitation
execution;
4.
the
8. arranging
report
not
time
of
implementation
certifying
provinces for
suffcent
extetnion
construction
invoices are
isthe
each
to
kick
tothe
province
supervise
reponsible
mode
to
of ISDoffon andto the
existing
invoices
province
perform
requests
stage,
processed employee will carryout the same tasksDec.2018
Projects
1.
3. Making
bimonthly
work plan
making
11.Handling locatedsure
basis
for
sure IRDeach in
the thevarious
contract
projects
Devaitions districts
supervision
arerespective
in of
completed theprovinces
reports province
are submitted
within contract on timespecified
duration, for the thewithin
design
8.
level
2.
Guide
o Work
process
contract
submission
10.Archiving at
Initiatiion
implementation
bimonthly
Managment
schools,
followup
and and
making
super-structure
track
closely
of
of the
proper
consulting
basis
Kunar
meeting surethe
duration,
the
with the
Province
with
the of
Farhad Environmental Officer o
6.Be
7.
4. Spotable
Delvering
arranging to
checking plan
kick and
construction
of
off the
and coordinate
projects
projects
followup all phases
status
meeting reportof to
with projects
inISD designs
presentation andfrommode on supervion
6.
the Delvering
supervision
deviations from construction
and
the
31 ISD ascontractors Preparing
2. submission the supervision reports on smoothly
and foundations
specified qulaity where
and
astime Main office
repective
8. certifying provinces
the invoices and making sure the invoices are processed invoices
11.Handling
supervision
documentation
process
8.
technical
certifying ofand making
IRD
reports
Relevent
comments the of theon
invoicessure
for all
89000 5. initiating
qulaity and
conceptualisation
bimonthly
8. Initiatiion the
approved
basis of change
and
the order
budget
requirements
invoices requests
and well
determination
making sure time
the extetnion
through
invoices requests
planning,
are
schedule
other
contractors
Projects
invoices
4.
design there
processed
National
Preparing
reporting
projects
design
9.Forwarding and and
located
are
status
tasksand
workcost
Technical
,Preparing
processedin
report
specifications
technicalplan
hence infor the
various employee will carryout the same tasksDec.2018
work
3.
2.
1.
6. plan
making
Analyzing
Reponsible
smoothly
Delvering for
surethe each
to the contract
projects
supervision
supervise
construction are
the
projects completed
reports
implementation
status within
report contract
process
in of
presentation duration,
Kabul specified
Province
mode on
approved
the
time
Province
projects
and toare
invoices
Devaitions
making
performance
Advisors ISD deviations
budget
in
Projects
being
in
are
Main respective
sure
at design
reviewing officefrom
located
the
country by
of
32 ISD Farhad Niaz Engineer 38000 4.
and
8. arranging
final
certifying
smoothly
5. initiating
qulaity
3. Monthly and
kick
execution;
the
the
approved
Summary
off andorder
invoices
change followup
budget
report and making meeting
requests
for each sure
as withinvoices
the
well as contractors
time are and Preparing
processed
extetnion requests
districts
work
smoothly
each
the
4.
3.
plan
contract
presentation
there
are
problem is
needed
typical
arranging
processed
provinces
making
11.Handling a of the
for
need to
todistricts in
mode
designs.
sure kick
smoothly
IRD
province
each
be
commitessof
the off on
checked
At
and the the employee will carryout the same tasksDec.2018
Projects
9.Forwarding
bimonthly
work plan located
basis
for each in various
technical contractproblemdistricts ofprovince
the province
to commitess supervion
and follwup in various
invoices
other
level
typical
contract
2. organization
,pay
submission
9.Forwarding
coordination
recruting
bimonthly
by
and visits
are
buildings’
follwup of
processed
frequent
basis
the the
with
additionl
of
for
design
technical
designsenior
the
visits
33 ISD Faridoon Amin Monitoring Engineer o
6. Work
consideirng
smoothly
9.Forwarding
Delvering
arrangingclosely the with
number
technical
construction
kick off the
andfor other
of
problem
projects
followup National
projects ,The
tomeeting Technical
commitess
status Existing
report
with and Advisors
innumber
follwup
presentation inoffice
of reviewing
engineers
mode of not construction
are
on followup
9.Forwarding
projects
Devaitions
province
ministry meeting
are
of in stage,
technical
completed with
respective
education.
ascontractors and Preparing
4.
2. Preparing
submission
10.proper work
contractthe plan
supervision
administration each contract
reports at on in
time
provisial coordination
to
level ISD Main with senior engineer smoothly
to
and construction
drawings,
supervision
5. initiating
problem to sites
developing
reports
the
commitess changeon,
Electrical Design 38000 8.
5. certifying
initiating
suffcent
typical buildings’
9.Forwarding
10.Archiving tosure the
the
perform invoices
change
design
technical
proper the and
order
supervision
and
problem
documentation making
requests
drawings, ofsure
and
to commitess the
asreporting
well
developing
the invoices
and
projects time
tasks
and
follwup are processed
extetnion
implementing
, hence requests
there Design
is a
engineer
8. certifying
engineers
team.
10.proper
deviations
contractors
problem
within
provinces tocontract
contract from
andthe
commitess invoices
the
Preparing
duration, the employee will carryout the same tasksDec.2018
bimonthly
work
5.
3. plan
Processing
making
11.Handling
smoothly basis
for IRDeach
the the contract
change
projects
Devaitions order
are
in requests
completed
respective as well
within
provinces as time
contract extetnion
duration, requests
specified 2.
hold
and submission
9.Forwarding
order
time
5.
and regular
implementing
torequests
follwup
Processing
making ISDfor Main the
technical
follow-up
the
sure Design
asoffice
well
change
the as
34 ISD Feroz Engineer 6. Delvering
need
Manual. of
10.proper
11.Handling
8. certifying construction
recruting
contract
IRD
the additionl projects
administration
Devaitions
invoices andengineers
in making status
at
respective report
provisial
sure provinces
the in presentation
level
invoices are mode on
processed
administration
work
design
and plan
supervision
ISD
problem
meeting
Manual. have and
follwup
specified
12.Reporting qulaity
toa
with reports
range at
each
commitess provisial
specifications
and
torequests
ISD ofon
76000 5.
6. initiating
Guiding
qulaity
9.Forwarding
1. Making the
andengineers
approved
sure change
technical
the for order
preparing
budget
problem
supervision requests
to as well
presentation
commitess
reports are ason
and time
follwup
submitted extetnion
bimonthly onbasisrequests
time for the 3.
timemaking
10.proper
order
invoices
at the
level extetnion
requests
same are sure
contract
time the
as the
processed well as the employee will carryout the same tasksDec.2018
bimonthly
11.Handling
12.Reporting
smoothly basisIRD
to ISD Devaitions
Managment in respective provinces are
and
typicalneeded
contract
10.Archiving
approved
Managment
time to
follwup
Implementing
6.
projects ISD
designs to
budget be
proper
Main to checked
office
save
agencies,
35 ISD Ghulam Mohammad Environmental Officer 89000 6.
7.
4. Delvering
Spot
arranging
10.proper
repective
8. checking
certifying construction
kick
contract
provinces
the of the
andprojects
offadministration
invoices projects
followup
and making status
meetingsurereport
at provisial with
the in
level
invoices presentation
contractors are processed mode on
and Preparing 5. Delvering
administration
time
smoothly
employee extetnion
11.Handling
by
4.
3.
the initiating
visits
documentation
arranging
making
time
10.proper
are
of isthe
sure
completed
construction
IRD
the
kick
incontract
project
at provisial
requests
reponsible
design
of
the theandto the
change
off employee will carryout the same tasksDec.2018
9.Forwarding technical problem to commitess and follwup manage Construction
bimonthly
8.
workInitiatiion
plan for
11.Handling
2.
1. Analyzing
Reponsible
smoothly basis of
IRD
the each thecontract
invoices
Devaitions
to supervision
supervise and
inreports
the respective making
implementation sure
provinces the
process invoices
of Ghazni are processed within
Province
projects
level
6. Guiding
9.Forwarding
Guide
Devaitions
team.
order
projects
followup
projects
contract
and status
requests
administration
preparation.
engineers
meeting
are To
duration,
report
technical
consulting
incompleted
respective
as
at
make well
with
in
for
of
provisial as
36 ISD Ghulam Rabani Engineer 72000 10.proper
8. certifying
smoothly
5.
3. initiating
Monthly contract
the
the
Summary changeadministration
invoices and
order
report making
forrequests
each at provisial
sure
as province
province well level
the andinvoices
as time
supervion are processed
extetnion requests
Deviations
presentation
specified
11.Handling
preparing
problem
technical
provinces
time extetnion
11.Handling
contractors to and
qulaity
comments mode
IRD
presentation
commitess
IRD
and
toandprovide
requests onforon
Preparing all the employee will carryout the same tasksDec.2018
Projects
9.Forwarding
11.Handling located IRD in
technical various
Devaitions problemdistricts
in to
respectiveof the
commitess provinces follwup within
these
level
Focal
construction
approved
Devaitions
bimonthly
and
contract
typical
point
follwup for
budget
basisstatus
intime duration,
design
TPM
respective sites
37 ISD Ghulam Sakhi Engineer 1.
6.
4.
2. Reponsible
smoothly
9.Forwarding
Delvering
Preparing
submission
10.proper to
work
contract supervise
technical
constructionplan
the supervision problem
administration the
forprojects implementation
eachreportsto commitess
status
contract on in
at provisialreport
time process
and
toinISD
coordination
level follwup
Main of
presentation Samangan
with mode
senior
office Province
on
engineer
projects
at
6.
workthe
specified
11.Handling
specific,
Reporting
program
8.
4.
same
Delvering
Devaitionsplan
certifying
arranging
provinces
being in
for
qulaity
designers
andto IRD
design
Senior
the
construction
respective
each and
responsible
kick
the along
invoices
off
by
and
72000
Projects 7. Spot
10.proper
other checking
contract
organization of the
for into the employee will carryout the same tasksDec.2018
makinglocated
9.Forwarding in
technical various problemdistricts ofofthe
to commitess province
welland follwup
10.Archiving
bimonthly basis proper documentation the projects projects
employee
provinces
contract the status isinreponsible
report
5.
3.
1. Processing
11.Handling
Reponsible sure the
IRDto the change
projects
Devaitions
supervise order
in
the requests
arerespective
completed
implementation as within
provinces ascontract
processtime extetnion
of duration,
Nimrooz specified approved
requests
Province with
Devaitions
for
Construction
contacting
followup
and
projectsmaking
administration
budget
survey
meeting Mnager
sure team
respective
provinces
toat
withof
the
provisial
38 ISD Gul Agha Engineer 72000 2.
6. submission
10.proper
11.Handling
8. certifying
Guiding
qulaity and contract
IRDtheDevaitions
the
engineers
approved supervision
administration
invoicesfor and in
preparing
budget reports
making at
respective on provinces
sure
presentationtime
provisial the to
level ISDbimonthly
invoices
on Mainare office
processed
basis
ministry
Guide
presentation
12.Reporting
5.
4.
for
and
initiating
arranging
provinces
need to
taking
invoices
contractors
of
visit
are
education.
consulting
mode
the
kick
the
actions
and
ISD
processed
change
off on
sites.
for and the
Preparing employee will carryout the same tasksDec.2018
Projects
3. making
11.Handling located
sure IRD in
the various
projects
Devaitions districts
arerespective
in of theprovinces
completed province
within contract duration, specified
8. Initiatiion
level
bimonthly
technical
Managment
order requests of
comments the
basisas with well forasall
39 ISD Habib ur Rahman Environmental Officer 12.Reporting
smoothly
responsible
7.
4.
2. Spot
arrangingchecking
submission for to
kickthe ISD
preparing
of
off Managment
the
andprojects
supervision architecture
followup reportsmeeting andtime
on structural
with tocontractors
ISD Maindesigns, and drawing
office Preparing and followup
corrections
He
work ishave
smoothly
invoices also
plan
11.Handling
ISD
ISD focal
meeting
andaresponsible
for
point
and
IRDeach
making
range finding
for of
EQUIP
to
sure
projects
8. certifying being thedesign
invoices by
89000
qulaity andfor
9.Forwarding
specifications
8. Initiatiion approved
technical
inthe
of relation
the budget
problem
tothe
invoices education
andto commitess
infrastructures
making sureandcontract
follwup
the building
invoices ofareISD/MoE.
processed
time
Design
work
solutionsextetnion
contractors
with
9.Forwarding
contract engineers
as and
Provinsial
insoon
requests
Preparing
technicalare
as IRD the employee will carryout the same tasksDec.2018
work
3.
1. plan
making
Reponsible sure each
to contract
projects
supervise are completed
implementation within process of duration,
Wardak specified
Province the
typical
program
and
other
6. invoices
Devaitions
makingdesigns
who
organization
Delvering arerespective
is tothe
sure save
constructionfor
40 ISD Habibu Rahman Engineer 4. arranging
10.proper
The designers kick
contract are offadministration
and followup meeting
attravel
provisial with ascontractors
level andatPreparing work
required
finds
Engineers plan
anyto to for each
prepare
deviations
for developingthe
inoften required to to the projects sites times of for ministry
smoothly 5. initiating
problem the
commitess change
Infrastructure 43667 5. initiating
Focal
qulaity
Projects
work
point
and
plan located the
for
approved change
TPM order
program
budget
various requests
districts and theas province
well
ofresponsible time extetnion
for contacting requests
provinces processed
provinces
the time
responsible
invoices
projects
contract
techncal
in
of
are smoothly
status project
for dealing
education.
processed
documentationsreport in the employee will carryout the same tasksDec.2018
Habibullah Embedded 11.Handling
changes
9.Forwarding
6. Delvering
taking infor
actions IRDeach
structural
technical
construction contract
forDevaitions
design
problem
corrections inatrespective
projects super-structure
and tomeeting
commitess
status
finding provinces
withand
report
solutionsand
in foundations
follwup
presentation
as soon as where
mode there
on
IRD finds
School
during
and
order
preparation.
with
any 5. the
construction
third-party
follwup
requests
9.Forwarding matters To as
technical
make well
of
plan
all as
41 ISD Monitoring Engineer 4.
2. arranging
submission kickthe off and
supervision followup reports on time to contractors
ISD Main and
office Preparing smoothly
presentation
initiating
for415 incomplete mode
the change
CCon
111556 5. initiating the change order requests as well as time extetnion requests monitoring
in
timeline
10.proper
problem with
extetnion to the
contract NESP
requests
commitess the employee will carryout the same tasksDec.2018
are
work
3. deviations
10.Archiving
bimonthly
deviations
plan sure
making basis
during
for from
proper the
thethird-party
each contract
projects typical
documentation are designs.
monitoring
completed At the
of the projects
within construction
contract stage,
duration, deviations
specified
these
types
ISD
9.Forwarding
bimonthly
order
Projects
strategic
typical
of
have EQUIP
requests a basis
, plan.
as
design
range projects
technical
well asas
In
of
well sites
theas
addition
42 ISD Hafizullah Engineering 6. Delvering
from the designconstruction
and projects
specifications status
are report
needed tointime
be presentation
checked by mode
visits onthe 6. administration
and Delvering
follwup construction
at provisial
withof
11.Handling IRD Devaitions in making
respective specific,
leads designers
toall EQUIP along
staff
Infrastructure 43667 8.
5. certifying
initiating
ISD focal
qulaity
1. Making
bimonthly and point thefor
the
approved
sure
basis
invoices
change
theEQUIP budget and
order
program
supervision requests who sure
reports isprovinces
as the
well are invoices
as
responsible submitted aredealing
processed
extetnion
for on requests
time the
for the
problem
typical
8.
timecertifying
projects
to this
projects
level
designs
extetnion
10.Archiving
with
within the heterminated
status
survey
center
commitess
the toinvoices
save
requests
is responsible
report
proper
and team
duein to0 the employee will carryout the same tasksDec.2018
design
smoothly
6.
matters team.
12.Reporting
Delvering ofprovincesto
typesISD
allconstruction
offof Managment
EQUIP projects
projects statusandreportleads in
all presentation
EQUIP modecenter on the
and
6.
to time
follwup
making
Delvering
unsatisfactory in project
the sure the
construction
43 ISD Hamidullah Embedded Engineer 4. arranging kick and followup meeting withinvoices
contractors arestaffandwithin
Preparing
repective manage
11.Handling
presentation
documentation assessment
IRD
mode ofsites.
theon
156444 8. certifying
9.Forwarding the invoices
technical and
problem making sure
to commitess the and follwup processed need
provinces
10.proper to visit
preparation.
invoices
projects
performance are the
contract
status To make
processed
report
the in the employee will carryout the same tasksDec.2018
bimonthly
and
work
2. provinces
plan for
Analyzing basis
the each contract
supervision reports process
bimonthly
Devaitions
projects of in of
the
basis structural
respective
44 ISD Haroon Engineer 1.
at Reponsible
smoothly
responsible
the
10.proper same for
time
contracttopreparing
supervise
the employee
administration the implementation
architectureis and
reponsible
at provisial to process
structural
level Guide of logar
designs,
and Province
drawing
consulting and
of these
smoothly
presentation
contractors
performance
typical
administration or design
mode
of at
the on
existing
sites
provisial
Infrastructure 49333 8.
5.
3. certifying
initiating
Monthly
Projects
9.Forwarding the
the
Summary
located invoices
change
in
technical report
various and
order
problem making
forrequests
districts each
to of sure
as
province
the
commitess the and
well
province invoices
as time
supervionfollwup are processed
extetnion requests provinces
8. certifying
11.Handling
Design
level
specific, engineers
designers the invoices
IRD are
along the employee will carryout the same tasksDec.2018
specifications
technical
11.Handling
smoothly comments
IRDin relation for all
Devaitions toprojects
education
in respective beinginfrastructures
designinbypresentation
provinces building
other of ISD/MoE.
organization for 9.Forwarding
bimonthly
contractor
schools
and making for basis
left technical
disaster
sure thethe site
risk
45 ISD Hedayatullah Embedded Engineer 6.
4.
2. Delvering
Preparing
submission
10.proper construction
work
the plan
are supervision for projects
each tostatus
contract
reports on inreport
tocoordination
time to projects
ISD Main with atmode
senior
office on
engineer Devaitions
required
with to in
thecompletion
11.Handling survey respective
prepare
theteam
IRD the
111556 The
ministry
9.Forwarding
bimonthly ofcontract
designers education.
basis technical
administration
often required
problem to
attravel
provisial
commitess thelevel
and follwup sites times of problem
8. certifying
without
reduction
invoices
provinces
techncal
to
areatcommitess
regional
processed
documentations
invoiceslevel the employee will carryout the same tasksDec.2018
5.
3. Processing
makinginsure
11.Handling
changes
1. Reponsible the
IRDtothe
structural change
projects
Devaitions
design
supervise order
are
in
the requests
completed
atrespective
super-structure
implementation as welland
within
provinces ascontract
processtime extetnion
foundations
of duration,
kapisa whererequests
specified
Province Devaitions
need
and
there 12.Reporting to
follwup
andmaking
visit
plan sure
to incomplete
in the
respective
mitigation
sites.
the
46 ISD Hekmatullah Monitoring Engineer 38000 10.proper
8.
6. certifying
Guiding contract
the administration
invoices and making at provisial
sure thelevel
invoices are processed
smoothly
for415
provinces to ISDCC the employee will carryout the same tasksDec.2018
aengineers for preparing presentation on bimonthly basis
qulaity and approved budget 10.proper contract
are deviations
Projects
ISD have
responsible
11.Handling
smoothly
located
range
for
IRD from
in
preparingthe
ofvarious
typical
Devaitions typical
districts
designs designs.
architecture
in respective of
to the Atprovinces
save
designs,the
theconstruction
province time
drawing andstage,
in project deviations
preparation.
specifications inTo invoices
measures
9.Forwarding
Managment
Projects
Design
administration
are
, as and
engineers
processed
retrofitting
technical
well at as are the
provisial
47 ISD Hikmatullah Environmental Officer 89000 7.
4.
2. Spot
arranging
from the checking
submission
make
relation these designkickthe
typical
to education of
off
and the
and
supervision
design projects
followup
specifications reports
sites specific,
infrastructures meeting
are needed
on with
time
designers
building to
to
ofandcontractors
be
ISD
along
ISD/MoE. checked
Main andby
office Preparing
visits of the
with the survey team required smoothly
strategies
problem
projects to to
terminated improve
commitess duethe the employee will carryout the same tasksDec.2018
9.Forwarding technical problem to commitess follwup level to prepare the
8.
work
3.
need
The Initiatiion
design plan
toteam.
making forthe
sure
visit
designers of
each
the
are the invoices
contract
projects
sites.
often areand
required completed
to makingto sure
within the invoices
contract atare
duration, processed
specified 9.Forwarding
building’s
and follwup technical
performance.
attravel the projects sites times of
The Regional construction manager Responsible to analyze to unsatisfactory
48 ISD Hoshang Senior Civil Engineer 90222 10.proper
smoothly
5. initiating contract
the change administration
orderatrequests provisial
as welllevel as time extetnionwhere requests
techncal
11.Handling
problem documentations
to IRD
commitess the employee will carryout the same tasksDec.2018
qulaity
changes
the and
construction
11.Handling
approved
in structural
IRD
budget
design
supervision
Devaitions super-structure
in respective reports provincesforand thefoundations
respective there 10.proper
Regions performance
for415
Devaitions
and follwup
contract
incompletein of theCC
respective
49 ISD Hukam Khan Engineer 72000
1.
6.
at
4.
areReponsible
9.Forwarding
Delvering
the same
arranging
Design engineers
deviations time
kicktofromsupervise
technical
construction
the
off and
arethe problem
employee the
projects
followup
required
typical implementation
to to
is commitess
status
reponsible
meeting
prepare
designs. report
Atthe with
the to process
andin follwup
Guide
contractors
techncal
construction of
presentation
and Ghor
and
documentations Province
mode
consulting
Preparing
stage, deviations on
of administration
contractors
for415 10.proper
Projects ,
provinces contract as or
well at as
the provisial
the the employee will carryout the same tasksDec.2018
New
Projects school
located building/
in various Rehabilitation of existing schools, track
10.Archiving proper asdistricts
documentation ofofthe
the province
projects
bimonthly basis level
technical
work plan
incomplete
from the comments
forCC
design each
Projects
and for
contract ,all projects
well as are
specifications being
the design
projects
needed bybeother
toterminatedchecked organization
due
by tovisits offorthe projects
contractor
administration left the
terminated site
due
at provisial
50 ISD Huma Sadat W/S Engineer 111556 2.
8. submission
11.Handling
the schedule
certifying
ministry
5. initiating
unsatisfactory
design IRDthe
the
of education.
team. the supervision
Devaitions
and
invoices
change
performance cost and
order in reports
respective
performance
ofmaking
requests on
sure
the contractors time
the
well atto
asprovinces ISD
timeMain
ascountry
invoices
or the office
arelevel
processed
extetnion
contractor ,pay 11.Handling
the site without
requests
left completion
to unsatisfactory
level
IRD the employee will carryout the same tasksDec.2018
3. making sure Devaitions in respective
51 ISD Imranullah Engineer 38000
12.Reporting
1.
6. Reponsible
smoothly
frequent
Delvering
without visitstothe
to ISD
construction
completion projects
Managment
supervise
to areimplementation
the
construction
projects completed
status sites within
report , holdin contract
process regular
presentation duration,
of Kunar follow-up
mode specified
Province on performance
11.Handling IRD
provinces
of the
the employee will carryout the same tasksDec.2018
qulaity
Projects
bimonthly
meeting
at the and
9.Forwarding
ISD have located
same approved
abasis
range
with
time inofvarious
technical
the budget
problem
typical
Implementing
employee districts
designs of
to the
saveprovince
istoreponsible
commitess
agencies, thetoand
time
manage follwup
Guide in project
and preparation.
Construction
consulting of To contractors
Devaitions in orrespective
the
52 ISD Inayatullah Engineer 1.
4. Reponsible
arranging kickto supervise
off and the
followup implementation
meeting with process
contractors of Relevent
and Province
Infrastructure 72000 2. submission
10.proper
make
8.
technicalthese
certifying
Deviations
Projects
contract
comments
located
the
typical
the andin
supervision
administration
design
invoices
forprovide
to
various all sites
and reports
making
projects
districts
atbeing
specific, ondesigners
sure
construction
of the
time
provisial the
design
province
to
level ISD
invoices
by along Main
other
status arewith thePreparing
office
processed
organization
Reporting surveyfortoteam contractor
provinces left the site the employee will carryout the same tasksDec.2018
work
3. plan
making
11.Handling
need
smoothly
ministryto visit for
ofsure IRDeach
the the
education. contract in
projects
Devaitions
sites. arerespective
completed within contract duration, specified without completion
provinces
53 ISD Khalilullah Yousufzai Embedded Engineer 111556 2.
5. submission
Senior
initiating
qulaity and the
Construction
the
approved supervision
change Mnager
order
budget reports on
requests astime
well to as ISD timeMain office requests
extetnion the employee will carryout the same tasksDec.2018
9.Forwarding
3. making sure technical problem to commitess andcontract
follwup duration, specified
6.
4. Delvering
arranging
Design
10.proper
ISD have kickthe
engineers
acontract
range offprojects
construction
are
of and
required
are completed
projects
followup
administration
typical status
meeting
to prepare
designs
within
report
with
the in presentation
contractors
thetechncal
attoprovisial
save level
time mode on
andpreparation.
Preparing
documentations
in project for415
To
qulaity
bimonthly
He
work is and
also
plan approved
basis
forresponsible
each budget
contract to work with Provinsial Engineers for
incomplete
11.Handling
make
4. CC
IRDProjects
these typical
arranging kick off ,
Devaitions
design
and as well
in as the
respective
sites specific,
followup meeting projects
provinces
designers
with terminated
along with
contractors due tosurvey
thePreparing
and team
8.
5. certifying
initiating
developing
unsatisfactory
need to visit the
the invoices
change
School
the sites. andofmaking
order requests
construction
performance the sure
as
plan
contractorsthein
well invoices
asline
or the are processed
timecontractor
extetnion
with the requests
NESP
left the site
work plan forconstruction
smoothly
6. Delvering each contract projectstostatus
without
strategic
5. completion
initiating plan.
the In addition
change order requests thisasreport
he in presentationtomode
wellisand
asresponsible
time
on
manage
extetnion requests
9.Forwarding
bimonthly
Design basis
engineerstechnical problem
areprocess
required totoprepare
commitessthe techncalfollwup
documentations for415
the
6. assessment
Delvering
10.proper construction
contract of
projects
administration the
status
at structural
report
provisial performance
in presentation
level mode of on
8. certifying
incompleteschoolsthe invoices
CC Projects and making sure the invoices are processed
bimonthly
smoothly basis
existing
11.Handling IRD for, disaster
Devaitions
as well as the
in riskprojects
respective reduction
provinces
terminated due to level
at regional
unsatisfactory
8.
andcertifying
to planthe performance
invoices
mitigation of the
andmeasures
makingcontractors
sureand or
the and the
invoices contractor
strategiessite
left
are processed
retrofitting the to
9.Forwarding
without technical
completion problem to commitess follwup
smoothly
improve contract
10.proper the building’s performance.
administration at provisial level
9.Forwarding technical problem to commitess
11.Handling IRD Devaitions in respective provinces and follwup
10.proper contract administration at provisial level
11.Handling IRD Devaitions in respective provinces

Вам также может понравиться