EMPLOYER: PMC: ENGINEER:

PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
Car Park Foundation (Basement-2) Raft Thickening
YSD-P01-0505-ST-HIL-DG-
1 YSD-P01-0505-ST-HIL-AB-000501 00 Structural Bottom (B1 Layer) Reinforcement Details [POUR 1, 2, 3 &
000501
4] Park Foundation (Basement-2) Raft Thickening
Car
YSD-P01-0505-ST-HIL-DG-
2 YSD-P01-0505-ST-HIL-AB-000502 00 Bottom (B1 Layer) Reinforcement Details [POUR 1, 2, 3 &
Structural 000502
4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Thickening Side
3 YSD-P01-0505-ST-HIL-AB-000503 00 Structural 000503 Bars & Trench Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom - B1
4 YSD-P01-0505-ST-HIL-AB-000504 00 Structural 000504 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom - B1
5 YSD-P01-0505-ST-HIL-AB-000505 00
Structural 000505 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top - T2
6 YSD-P01-0505-ST-HIL-AB-000506 00
Structural 000506 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top - T1
7 YSD-P01-0505-ST-HIL-AB-000507 00 Structural 000507 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom -
8 YSD-P01-0505-ST-HIL-AB-000508 00 Structural 000508 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top -
9 YSD-P01-0505-ST-HIL-AB-000509 00 Structural 000509 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top -
10 YSD-P01-0505-ST-HIL-AB-000510 00 Structural 000510 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
11 YSD-P01-0505-ST-HIL-AB-000511 00 Structural 000511 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
12 YSD-P01-0505-ST-HIL-AB-000512 00 Structural 000512 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
13 YSD-P01-0505-ST-HIL-AB-000513 00 Structural 000513 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
14 YSD-P01-0505-ST-HIL-AB-000529 00 Structural 000529 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
15 YSD-P01-0505-ST-HIL-AB-000530 00
Structural 000530 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
16 YSD-P01-0505-ST-HIL-AB-000531 00 Structural 000531 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
17 YSD-P01-0505-ST-HIL-AB-000532 00 Structural 000532 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
18 YSD-P01-0505-ST-HIL-AB-000533 00
000533 Reinforcement Details Pour (1, 2, 3 & 4)
Structural
Page 1 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.

YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1


19 YSD-P01-0505-ST-HIL-AB-000534 00
Structural 000534 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
20 YSD-P01-0505-ST-HIL-AB-000535 00
Structural 000535 Reinforcement Details Pour (1, 2, 3 & 4)
Car Park Foundation (Basement-2) Raft Thickening
YSD-P01-0505-ST-HIL-DG-
21 YSD-P01-0505-ST-HIL-AB-000514 00 Bottom - B1 Layer Reinforcement Details [POUR
Structural 000514
47.1,47.2, 49 & 50] (Basement-2) Raft Thickening
Car Park Foundation
YSD-P01-0505-ST-HIL-DG-
22 YSD-P01-0505-ST-HIL-AB-000515 00 Bottom - B2 Layer Reinforcement Details [POUR
Structural 000515 Car Park Foundation
YSD-P01-0505-ST-HIL-DG- 47.1,47.2, 49 & 50] (Basement-2) Raft Thickening Side
23 YSD-P01-0505-ST-HIL-AB-000516 00 Structural Bar & Trench Reinforcement Details [POUR 47.1, 47.2, 49
000516
YSD-P01-0505-ST-HIL-DG- 7 50]Park Foundation (Basement-2) Raft Slab [Bottom - B1
Car
24 YSD-P01-0505-ST-HIL-AB-000517 00
Structural 000517 Layer] Reinforcement Details [POUR 47.1,47.2, 49 & 50]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab [Bottom - B2
25 YSD-P01-0505-ST-HIL-AB-000518 00 Structural 000518
YSD-P01-0505-ST-HIL-DG- Layer]
Car ParkReinforcement Details [POURRaft
Foundation (Basement-2) 47.1,47.2,
Slab [Top49-&T250]
26 YSD-P01-0505-ST-HIL-AB-000519 00 Structural 000519 Layer] Reinforcement Details [POUR 47.1,47.2, 49 & 50]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab [Top - T1
27 YSD-P01-0505-ST-HIL-AB-000520 00 Structural Car Park Foundation (Basement-2)
000520
YSD-P01-0505-ST-HIL-DG- Layer] Reinforcement Details [POURRaft Slab Bottom
47.1,47.2, 49 & 50]
28 YSD-P01-0505-ST-HIL-AB-000521 00 Structural Additional (B1 & B3 Layer) Reinforcement
Car Park Foundation (Basement-2) Raft Slab Details
Bottom[POUR
000521
YSD-P01-0505-ST-HIL-DG-
29 YSD-P01-0505-ST-HIL-AB-000522 00 47.1,47.2, (B2
Additional 49 &&50]
Structural 000522 Car Park Foundation (Basement-2) Raft Slab Top [POUR
B4 Layer) Reinforcement Details
YSD-P01-0505-ST-HIL-DG- 47.1,47.2, 49 & 50]
30 YSD-P01-0505-ST-HIL-AB-000523 00 Structural Additional (T1,T2 & T4 Layer) Reinforcement Details
000523
YSD-P01-0505-ST-HIL-DG- Car Park47.1,47.2,
Foundation
31 YSD-P01-0505-ST-HIL-AB-000524 00 Structural [POUR 49 (Basement-2)
& 50] Raft Slab Section
000524
YSD-P01-0505-ST-HIL-DG- Reinforcement Details(Basement-2)
Car Park Foundation [POUR 47.1,47.2, 49Reinforcement
Starter & 50]
32 YSD-P01-0505-ST-HIL-AB-000525 00 Structural 000525 Details POUR (47, 49 & 50)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
33 YSD-P01-0505-ST-HIL-AB-000526 00
Structural 000526 Details POUR (47, 49 & 50)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
34 YSD-P01-0505-ST-HIL-AB-000527 00 Structural
000527
YSD-P01-0505-ST-HIL-DG- Details
Car ParkPOUR (47, 49(Basement-2)
Foundation & 50) Starter Reinforcement
35 YSD-P01-0505-ST-HIL-AB-000528 00 Structural
000528 Details POUR (47, 49 & 50)

Page 2 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
Retaining Wall Reinforcement Details at Basement-2 to
YSD-P01-0505-ST-HIL-DG-
36 YSD-P01-0505-ST-HIL-AB-000536 00 Structural Basement-1 POUR (47.1, 47.2, 49,50) Column and Wall
000536 Car Park Foundation Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- Layout at Foundation Basement-2
37 YSD-P01-0505-ST-HIL-AB-000537 00 Structural &
CarRC WallFoundation
Park Reinforcement Details POUR
Basement-2 (47.1,47.2,
to Basement-1 49 &
Column
000537
YSD-P01-0505-ST-HIL-DG-
38 YSD-P01-0505-ST-HIL-AB-000538 00 50)
& RC WallFoundation
Reinforcement Details POUR (47.1,47.2, 49 &
Structural 000538 Car Park Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- 50)
39 YSD-P01-0505-ST-HIL-AB-000539 00 Structural & RC Wall Reinforcement Details POUR (47.1,47.2,
Car Park Foundation Basement-2 to Basement-1 Column 49 &
000539
YSD-P01-0505-ST-HIL-DG-
40 YSD-P01-0505-ST-HIL-AB-000540 00 Structural 50)
& RC WallFoundation
Reinforcement Details POUR (47.1,47.2, 49 &
000540 Car Park Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- 50)
41 YSD-P01-0505-ST-HIL-AB-000541 00 Structural &
IDRRCCar
Wall Reinforcement
Park Details POURRaft
Foundation (Basement-2) (47.1,47.2, 49 &
Thickening
000541
YSD-P01-0505-ST-HIL-DG-
42 YSD-P01-0505-ST-HIL-AB-000562 00 50)
Bottom
Structural 000562 IDR Car- Park
B1 Layer Reinforcement
Foundation DetailsRaft
(Basement-2) [POUR
Thickening
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
43 YSD-P01-0505-ST-HIL-AB-000563 00 Structural Bottom - B2 Layer Reinforcement Details [POUR
000563
YSD-P01-0505-ST-HIL-DG- IDR Car Park Foundation (Basement-2) Raft Thickening
44 YSD-P01-0505-ST-HIL-AB-000564 00 Structural 5,6,7,8,9&10]
000564
YSD-P01-0505-ST-HIL-DG- Side Bar Park
IDR Car Reinforcement
FoundationDetails [POUR 5,6,7,8,9&10]
(Basement-2) Raft Trench
45 YSD-P01-0505-ST-HIL-AB-000565 00 Structural 000565
YSD-P01-0505-ST-HIL-DG- Reinforcement Details [POUR 5,6,7,8,9&10]
IDR Car Park Foundation (Basement-2) Raft Section
46 YSD-P01-0505-ST-HIL-AB-000566 00 Structural IDR Car[POUR
Park Foundation (Basement-2) Raft Additional
000566
YSD-P01-0505-ST-HIL-DG- Details 5,6,7,8,9&10]
47 YSD-P01-0505-ST-HIL-AB-000590 00 Structural Bottom - B1 Layer Reinforcement Details [POUR
000590 IDR Car Park Foundation (Basement-2) Raft Additional
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
48 YSD-P01-0505-ST-HIL-AB-000591 00 Bottom - B2 Layer Reinforcement Details [POUR
Structural 000591
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
IDR Car Park Foundation (Basement-2) Raft Additional Top
49 YSD-P01-0505-ST-HIL-AB-000592 00 Structural 000592
YSD-P01-0505-ST-HIL-DG- -IDR
T1&T2
Car Layer Reinforcement
Park Foundation Details [POUR
(Basement-2) 5,6,7,8,9&10]
Raft Additional
50 YSD-P01-0505-ST-HIL-AB-000593 00 Structural 000593 Sectiondetails [POUR 5,6,7,8,9&10]

Page 3 of 23
ENGINEER: CONTRACTOR:

RY STACK (BOAT STORAGE FACILITY)


STATUS As on 6-Feb-19
Date No. of
Date
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted
Consultant Response

Sheet 1 of 3 18-Jul-18 26-Jul-18 C 8

Sheet 2 of 3 18-Jul-18 26-Jul-18 C 8

Sheet 3 of 3 HILALCO-WTRAN-008090 18-Jul-18 26-Jul-18 C 8

Sheet 1 of 4 18-Jul-18 26-Jul-18 C 8

Sheet 2 of 4 18-Jul-18 26-Jul-18 C 8

Sheet 3 of 4 18-Jul-18 26-Jul-18 C 8

Sheet 4 of 4 HILALCO-WTRAN-008094 18-Jul-18 26-Jul-18 C 8


Sheet 1 of 2 18-Jul-18 26-Jul-18 C 8
Sheet 2 of 2 HILALCO-WTRAN-008096 18-Jul-18 26-Jul-18 C 8
Sheet 1 of 4 18-Jul-18 26-Jul-18 C 8
Sheet 2 of 4 18-Jul-18 26-Jul-18 C 8
Sheet 3 of 4 18-Jul-18 26-Jul-18 C 8
Sheet 4 of 4 HILALCO-WTRAN-008097 18-Jul-18 26-Jul-18 C 8
Sheet 1 of 7 18-Jul-18 26-Jul-18 C 8

Sheet 2 of 7 18-Jul-18 26-Jul-18 C 8

Sheet 3 of 7 18-Jul-18 26-Jul-18 C 8


Sheet 4 of 7 18-Jul-18 26-Jul-18 C 8

Sheet 5 of 7 18-Jul-18 26-Jul-18 C 8

Page 4 of 23
Date No. of
Date
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted
Consultant Response

Sheet 6 of 7 18-Jul-18 26-Jul-18 C 8

Sheet 7 of 7 18-Jul-18 26-Jul-18 C 8


HILALCO-WTRAN-008098

Sheet 1 of 3 20-Jul-18 27-Aug-18 C 38

Sheet 2 of 3 20-Jul-18 27-Aug-18 C 38

Sheet 3 of 3 HILALCO-WTRAN-008181 20-Jul-18 27-Aug-18 C 38

Sheet 1 of 4 20-Jul-18 27-Aug-18 C 38


Sheet 2 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 3 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 4 of 4 HILALCO-WTRAN-008180 20-Jul-18 27-Aug-18 C 38
Sheet 1 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 2 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 3 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 4 of 4 HILALCO-WTRAN-008182 20-Jul-18 27-Aug-18 C 38
Sheet 1 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 2 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 3 of 4 20-Jul-18 27-Aug-18 C 38
Sheet 4 of 4 HILALCO-WTRAN-008183 20-Jul-18 27-Aug-18 C 38

Page 5 of 23
Date No. of
Date
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted
Consultant Response

Sheet 1 of 6 20-Jul-18 27-Aug-18 C 38


Sheet 2 of 6 20-Jul-18 27-Aug-18 C 38
Sheet 3 of 6 20-Jul-18 27-Aug-18 C 38
Sheet 4 of 6 20-Jul-18 27-Aug-18 C 38
Sheet 5 of 6 20-Jul-18 27-Aug-18 C 38
Sheet 6 of 6 HILALCO-WTRAN-008184 20-Jul-18 27-Aug-18 C 38
Sheet 1 of 5 20-Jul-18 31-Jul-18 C 11
Sheet 2 of 5 20-Jul-18 31-Jul-18 C 11
Sheet 3 of 5 20-Jul-18 31-Jul-18 C 11
Sheet 4 of 5 20-Jul-18 31-Jul-18 C 11
Sheet 5 of 5 HILALCO-WTRAN-008185 20-Jul-18 31-Jul-18 C 11
Sheet 1 of 4 21-Jul-18 31-Jul-18 C 10
Sheet 2 of 4 21-Jul-18 31-Jul-18 C 10

Sheet 3 of 4 21-Jul-18 31-Jul-18 C 10


Sheet 4 of 4 HILALCO-WTRAN-008191 21-Jul-18 31-Jul-18 C 10

Page 6 of 23
EMPLOYER: PMC: ENGINEER:

PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on

S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description

00 Civil Vibro Replacement (Stone Column) Layout Plan


YSD-P01-0505-CW-HIL-DG-000005
1 YSD-P01-0505-CW-HIL-AB-000001
01 Civil Vibro Replacement (Stone Column) Layout Plan
YSD-P01-0505-CW-HIL-DG-000005
00 Civil Vibro Replacement (Stone Column) ZONE-A Layout
YSD-P01-0505-CW-HIL-DG-000006
2 YSD-P01-0505-CW-HIL-AB-000002
01 Civil Vibro Replacement (Stone Column) ZONE-A Layout
YSD-P01-0505-CW-HIL-DG-000006
00 Civil Vibro Replacement (Stone Column) ZONE-B Layout
YSD-P01-0505-CW-HIL-DG-000007
3 YSD-P01-0505-CW-HIL-AB-000003
01 Civil Vibro Replacement (Stone Column) ZONE-B Layout
YSD-P01-0505-CW-HIL-DG-000007
00 Civil Vibro Replacement (Stone Column) ZONE-C Layout
YSD-P01-0505-CW-HIL-DG-000008
4 YSD-P01-0505-CW-HIL-AB-000004
01 Civil Vibro Replacement (Stone Column) ZONE-C Layout
YSD-P01-0505-CW-HIL-DG-000008
00 Civil Vibro Replacement (Stone Column) ZONE-D Layout
YSD-P01-0505-CW-HIL-DG-000009
5 YSD-P01-0505-CW-HIL-AB-000005
01 Civil Vibro Replacement (Stone Column) ZONE-D Layout
YSD-P01-0505-CW-HIL-DG-000009
00 Civil Vibro Replacement (Stone Column) ZONE-E Layout
YSD-P01-0505-CW-HIL-DG-000010
6 YSD-P01-0505-CW-HIL-AB-000006
01 Civil Vibro Replacement (Stone Column) ZONE-E Layout
YSD-P01-0505-CW-HIL-DG-000010
00 Civil Vibro Replacement (Stone Column) ZONE-F Layout
YSD-P01-0505-CW-HIL-DG-000011
7 YSD-P01-0505-CW-HIL-AB-000007
01 Civil Vibro Replacement (Stone Column) ZONE-F Layout
YSD-P01-0505-CW-HIL-DG-000011

Page 7 of 23
S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description

00 Civil Vibro Replacement (Stone Column) ZONE-G Layout


YSD-P01-0505-CW-HIL-DG-000012
8 YSD-P01-0505-CW-HIL-AB-000008
01 Civil Vibro Replacement (Stone Column) ZONE-G Layout
YSD-P01-0505-CW-HIL-DG-000012
00 Civil Vibro Replacement (Stone Column) ZONE-H Layout
YSD-P01-0505-CW-HIL-DG-000013
9 YSD-P01-0505-CW-HIL-AB-000009
01 Civil Vibro Replacement (Stone Column) ZONE-H Layout
YSD-P01-0505-CW-HIL-DG-000013
00 Civil Vibro Replacement (Stone Column) ZONE-J Layout
YSD-P01-0505-CW-HIL-DG-000014
10 YSD-P01-0505-CW-HIL-AB-000010
01 Civil Vibro Replacement (Stone Column) ZONE-J Layout
YSD-P01-0505-CW-HIL-DG-000014
00 Civil Vibro Replacement (Stone Column) ZONE-K Layout
YSD-P01-0505-CW-HIL-DG-000015
11 YSD-P01-0505-CW-HIL-AB-000011
01 Civil Vibro Replacement (Stone Column) ZONE-K Layout
YSD-P01-0505-CW-HIL-DG-000015
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000016 Table ZONE-A
12 YSD-P01-0505-CW-HIL-AB-000012
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000016 Table ZONE-A
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000017 Table ZONE-B
13 YSD-P01-0505-CW-HIL-AB-000013
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000017 Table ZONE-B
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000018 Table ZONE-C
14 YSD-P01-0505-CW-HIL-AB-000014
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000018 Table ZONE-C
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000019 Table ZONE-D
15 YSD-P01-0505-CW-HIL-AB-000015
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000019 Table ZONE-D
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000020 Table ZONE-E
16 YSD-P01-0505-CW-HIL-AB-000016
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000020 Table ZONE-E
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000021 Table ZONE-F
17 YSD-P01-0505-CW-HIL-AB-000017

Page 8 of 23
S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description

17 YSD-P01-0505-CW-HIL-AB-000017
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000021 Table ZONE-F
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000022 Table ZONE-G
18 YSD-P01-0505-CW-HIL-AB-000018
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000022 Table ZONE-G
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000023 Table ZONE-H
19 YSD-P01-0505-CW-HIL-AB-000019
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000023 Table ZONE-H
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000024 Table ZONE-J
20 YSD-P01-0505-CW-HIL-AB-000020
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000024 Table ZONE-J
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000025 Table ZONE-K
21 YSD-P01-0505-CW-HIL-AB-000021
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000025 Table ZONE-K

Page 9 of 23
GINEER: CONTRACTOR:

Y STACK (BOAT STORAGE FACILITY)


STATUS As on 6-Feb-19
Pending
Date No. of
Drawing Sheet Date Days
Transmittal Ref. No. Returned by Status Remarks Days of
No. Submitted with
Consultant Response
Engineer

Sheet 1 of 21 HILALCO-WTRAN-004486 31-Jan-18 15-Feb-18 15

Sheet 1 of 21 30-Apr-18 21-Jun-18


B
Sheet 2 of 21 31-Jan-18 15-Feb-18 15

Sheet 2 of 21 30-Apr-18 21-Jun-18


B
Sheet 3 of 21 31-Jan-18 15-Feb-18 15

Sheet 3 of 21 30-Apr-18 21-Jun-18


B
Sheet 4 of 21 31-Jan-18 15-Feb-18 15

Sheet 4 of 21 30-Apr-18 21-Jun-18


B
Sheet 5 of 21 31-Jan-18 15-Feb-18 15

Sheet 5 of 21 30-Apr-18 21-Jun-18


B
Sheet 6 of 21 31-Jan-18 15-Feb-18 15

Sheet 6 of 21 30-Apr-18 21-Jun-18


B
Sheet 7 of 21 31-Jan-18 15-Feb-18 15

Sheet 7 of 21 30-Apr-18 21-Jun-18


B

Page 10 of 23
Pending
Date No. of
Drawing Sheet Date Days
Transmittal Ref. No. Returned by Status Remarks Days of
No. Submitted with
Consultant Response
Engineer

Sheet 8 of 21 31-Jan-18 15-Feb-18 15

Sheet 8 of 21 30-Apr-18 21-Jun-18


B
Sheet 9 of 21 31-Jan-18 15-Feb-18 15

Sheet 9 of 21 30-Apr-18 21-Jun-18


B
Sheet 10 of 21 31-Jan-18 15-Feb-18 15

Sheet 10 of 21 30-Apr-18 21-Jun-18


B
Sheet 11 of 21 31-Jan-18 15-Feb-18 15

Sheet 11 of 21 30-Apr-18 21-Jun-18


B
Sheet 12 of 21 31-Jan-18 15-Feb-18 15

Sheet 12 of 21 30-Apr-18 21-Jun-18


B
Sheet 13 of 21 31-Jan-18 15-Feb-18 15

Sheet 13 of 21 30-Apr-18 21-Jun-18


B
Sheet 14 of 21 31-Jan-18 15-Feb-18 15

Sheet 14 of 21 30-Apr-18 21-Jun-18


B
Sheet 15 of 21 31-Jan-18 15-Feb-18 15

Sheet 15 of 21 30-Apr-18 21-Jun-18


B
Sheet 16 of 21 31-Jan-18 15-Feb-18 15

Sheet 16 of 21 30-Apr-18 21-Jun-18


B
Sheet 17 of 21 31-Jan-18 15-Feb-18 15

Page 11 of 23
Pending
Date No. of
Drawing Sheet Date Days
Transmittal Ref. No. Returned by Status Remarks Days of
No. Submitted with
Consultant Response
Engineer

Sheet 17 of 21 30-Apr-18 21-Jun-18


B
Sheet 18 of 21 31-Jan-18 15-Feb-18 15
C
Sheet 18 of 21

Sheet 19 of 21 31-Jan-18 15-Feb-18 15


C
Sheet 19 of 21

Sheet 20 of 21 31-Jan-18 15-Feb-18 15


C
Sheet 20 of 21

Sheet 21 of 21 31-Jan-18 15-Feb-18 15


C
Sheet 21 of 21

Page 12 of 23
EMPLOYER: PMC: ENGINEER:

PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.

7
8
9
10
11
12
13
14

15

16
17

18

Page 13 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.

19

20

21

22

23

24
25
26
27
28
29
30
31
32
33
34
35

Page 14 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.

36
37
38
39
40
41
42
43
44
45
46
47
48

49
50
51

52

Page 15 of 23
GINEER: CONTRACTOR:

RY STACK (BOAT STORAGE FACILITY)


STATUS As on 6-Feb-19
Pending
Date No. of
Date Days
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted with
Consultant Response
Engineer

Page 16 of 23
Pending
Date No. of
Date Days
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted with
Consultant Response
Engineer

Page 17 of 23
Pending
Date No. of
Date Days
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted with
Consultant Response
Engineer

Page 18 of 23
SUMMARY AND TABULATION OF AS BUILT DRAWINGS As of 28.01.16

Status Architectural Civil Electrical Mechanical Structural Telecom Fuelling


Accepted
Rejected

Accepted
Rejected
With Hyder
(Under
Review)

Summary Architectural Civil Electrical Mechanical Structural Telecom Fuelling


Submitted
Not Submitted

PLANNED SUBMISSION
Architectural
Civil
Electrical
Mechanical
Structural
Telecom
Fuelling
Total
As of 28.01.16

Total

Total
PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHEL

Submittal Shop Drawing


S.N Rev. No. Discipline
Reference No. Reference No.
YSD-P01-0005-UT-
1 00 Utilities NA
HIL-AB-000001
STRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STORAGE FACILITY)
AS-BUILT DRAWING LOG /STATUS As on6-Feb-19
Description Drawing Sheet No Transmittal Ref. No.
Combined Layout For Utilities Services
Sheet 1 of 1 HILALCO-WTRAN-006770
Connection To Arena
CONTRACTOR:

OAT STORAGE FACILITY)

Date Returned Pending Days No. of Days of


Date Submitted Status Remarks
by Consultant with Engineer Response
31-May-18 19-Jul-18 49
B