PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
Car Park Foundation (Basement-2) Raft Thickening
YSD-P01-0505-ST-HIL-DG-
1 YSD-P01-0505-ST-HIL-AB-000501 00 Structural Bottom (B1 Layer) Reinforcement Details [POUR 1, 2, 3 &
000501
4] Park Foundation (Basement-2) Raft Thickening
Car
YSD-P01-0505-ST-HIL-DG-
2 YSD-P01-0505-ST-HIL-AB-000502 00 Bottom (B1 Layer) Reinforcement Details [POUR 1, 2, 3 &
Structural 000502
4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Thickening Side
3 YSD-P01-0505-ST-HIL-AB-000503 00 Structural 000503 Bars & Trench Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom - B1
4 YSD-P01-0505-ST-HIL-AB-000504 00 Structural 000504 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom - B1
5 YSD-P01-0505-ST-HIL-AB-000505 00
Structural 000505 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top - T2
6 YSD-P01-0505-ST-HIL-AB-000506 00
Structural 000506 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top - T1
7 YSD-P01-0505-ST-HIL-AB-000507 00 Structural 000507 Layer) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Bottom -
8 YSD-P01-0505-ST-HIL-AB-000508 00 Structural 000508 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top -
9 YSD-P01-0505-ST-HIL-AB-000509 00 Structural 000509 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Raft Slab (Top -
10 YSD-P01-0505-ST-HIL-AB-000510 00 Structural 000510 Additional) Reinforcement Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
11 YSD-P01-0505-ST-HIL-AB-000511 00 Structural 000511 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
12 YSD-P01-0505-ST-HIL-AB-000512 00 Structural 000512 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation (Basement-2) Starter Reinforcement
13 YSD-P01-0505-ST-HIL-AB-000513 00 Structural 000513 Details [POUR 1, 2, 3 & 4]
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
14 YSD-P01-0505-ST-HIL-AB-000529 00 Structural 000529 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
15 YSD-P01-0505-ST-HIL-AB-000530 00
Structural 000530 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
16 YSD-P01-0505-ST-HIL-AB-000531 00 Structural 000531 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
17 YSD-P01-0505-ST-HIL-AB-000532 00 Structural 000532 Reinforcement Details Pour (1, 2, 3 & 4)
YSD-P01-0505-ST-HIL-DG- Car Park Foundation Basement-2 to Basement-1
18 YSD-P01-0505-ST-HIL-AB-000533 00
000533 Reinforcement Details Pour (1, 2, 3 & 4)
Structural
Page 1 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
Page 2 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
Retaining Wall Reinforcement Details at Basement-2 to
YSD-P01-0505-ST-HIL-DG-
36 YSD-P01-0505-ST-HIL-AB-000536 00 Structural Basement-1 POUR (47.1, 47.2, 49,50) Column and Wall
000536 Car Park Foundation Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- Layout at Foundation Basement-2
37 YSD-P01-0505-ST-HIL-AB-000537 00 Structural &
CarRC WallFoundation
Park Reinforcement Details POUR
Basement-2 (47.1,47.2,
to Basement-1 49 &
Column
000537
YSD-P01-0505-ST-HIL-DG-
38 YSD-P01-0505-ST-HIL-AB-000538 00 50)
& RC WallFoundation
Reinforcement Details POUR (47.1,47.2, 49 &
Structural 000538 Car Park Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- 50)
39 YSD-P01-0505-ST-HIL-AB-000539 00 Structural & RC Wall Reinforcement Details POUR (47.1,47.2,
Car Park Foundation Basement-2 to Basement-1 Column 49 &
000539
YSD-P01-0505-ST-HIL-DG-
40 YSD-P01-0505-ST-HIL-AB-000540 00 Structural 50)
& RC WallFoundation
Reinforcement Details POUR (47.1,47.2, 49 &
000540 Car Park Basement-2 to Basement-1 Column
YSD-P01-0505-ST-HIL-DG- 50)
41 YSD-P01-0505-ST-HIL-AB-000541 00 Structural &
IDRRCCar
Wall Reinforcement
Park Details POURRaft
Foundation (Basement-2) (47.1,47.2, 49 &
Thickening
000541
YSD-P01-0505-ST-HIL-DG-
42 YSD-P01-0505-ST-HIL-AB-000562 00 50)
Bottom
Structural 000562 IDR Car- Park
B1 Layer Reinforcement
Foundation DetailsRaft
(Basement-2) [POUR
Thickening
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
43 YSD-P01-0505-ST-HIL-AB-000563 00 Structural Bottom - B2 Layer Reinforcement Details [POUR
000563
YSD-P01-0505-ST-HIL-DG- IDR Car Park Foundation (Basement-2) Raft Thickening
44 YSD-P01-0505-ST-HIL-AB-000564 00 Structural 5,6,7,8,9&10]
000564
YSD-P01-0505-ST-HIL-DG- Side Bar Park
IDR Car Reinforcement
FoundationDetails [POUR 5,6,7,8,9&10]
(Basement-2) Raft Trench
45 YSD-P01-0505-ST-HIL-AB-000565 00 Structural 000565
YSD-P01-0505-ST-HIL-DG- Reinforcement Details [POUR 5,6,7,8,9&10]
IDR Car Park Foundation (Basement-2) Raft Section
46 YSD-P01-0505-ST-HIL-AB-000566 00 Structural IDR Car[POUR
Park Foundation (Basement-2) Raft Additional
000566
YSD-P01-0505-ST-HIL-DG- Details 5,6,7,8,9&10]
47 YSD-P01-0505-ST-HIL-AB-000590 00 Structural Bottom - B1 Layer Reinforcement Details [POUR
000590 IDR Car Park Foundation (Basement-2) Raft Additional
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
48 YSD-P01-0505-ST-HIL-AB-000591 00 Bottom - B2 Layer Reinforcement Details [POUR
Structural 000591
YSD-P01-0505-ST-HIL-DG- 5,6,7,8,9&10]
IDR Car Park Foundation (Basement-2) Raft Additional Top
49 YSD-P01-0505-ST-HIL-AB-000592 00 Structural 000592
YSD-P01-0505-ST-HIL-DG- -IDR
T1&T2
Car Layer Reinforcement
Park Foundation Details [POUR
(Basement-2) 5,6,7,8,9&10]
Raft Additional
50 YSD-P01-0505-ST-HIL-AB-000593 00 Structural 000593 Sectiondetails [POUR 5,6,7,8,9&10]
Page 3 of 23
ENGINEER: CONTRACTOR:
Page 4 of 23
Date No. of
Date
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted
Consultant Response
Page 5 of 23
Date No. of
Date
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted
Consultant Response
Page 6 of 23
EMPLOYER: PMC: ENGINEER:
PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on
S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description
Page 7 of 23
S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description
Page 8 of 23
S.N Submittal Reference No. Rev. No. Discipline Shop Drawing Reference No. Description
17 YSD-P01-0505-CW-HIL-AB-000017
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000021 Table ZONE-F
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000022 Table ZONE-G
18 YSD-P01-0505-CW-HIL-AB-000018
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000022 Table ZONE-G
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000023 Table ZONE-H
19 YSD-P01-0505-CW-HIL-AB-000019
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000023 Table ZONE-H
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000024 Table ZONE-J
20 YSD-P01-0505-CW-HIL-AB-000020
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000024 Table ZONE-J
Vibro Replacement (Stone Column) Point Setting-Out
00 Civil
YSD-P01-0505-CW-HIL-DG-000025 Table ZONE-K
21 YSD-P01-0505-CW-HIL-AB-000021
Vibro Replacement (Stone Column) Point Setting-Out
01 Civil
YSD-P01-0505-CW-HIL-DG-000025 Table ZONE-K
Page 9 of 23
GINEER: CONTRACTOR:
Page 10 of 23
Pending
Date No. of
Drawing Sheet Date Days
Transmittal Ref. No. Returned by Status Remarks Days of
No. Submitted with
Consultant Response
Engineer
Page 11 of 23
Pending
Date No. of
Drawing Sheet Date Days
Transmittal Ref. No. Returned by Status Remarks Days of
No. Submitted with
Consultant Response
Engineer
Page 12 of 23
EMPLOYER: PMC: ENGINEER:
PROJECT NAME: YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, PUBLIC REALM, CAR PARK “SHELL AND CORE” AND DRY STACK (BOAT STO
AS-BUILT DRAWING LOG /STATUS As on
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
7
8
9
10
11
12
13
14
15
16
17
18
Page 13 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Page 14 of 23
Shop Drawing Reference
S.N Submittal Reference No. Rev. No. Discipline Description
No.
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Page 15 of 23
GINEER: CONTRACTOR:
Page 16 of 23
Pending
Date No. of
Date Days
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted with
Consultant Response
Engineer
Page 17 of 23
Pending
Date No. of
Date Days
Drawing Sheet No Transmittal Ref. No. Returned by Status Remarks Days of
Submitted with
Consultant Response
Engineer
Page 18 of 23
SUMMARY AND TABULATION OF AS BUILT DRAWINGS As of 28.01.16
Accepted
Rejected
With Hyder
(Under
Review)
PLANNED SUBMISSION
Architectural
Civil
Electrical
Mechanical
Structural
Telecom
Fuelling
Total
As of 28.01.16
Total
Total