Subject:

NDZ G
Reference: 1) / DateNGD d: January 18, 2014369

2); Dated: NFNG Covember 26, 201HET348

Reference is made to letter at ref-1, tFNGhrough which Contractor submitted the following:

 Revised design and addition of sNVB tiffener rings in cones aGFHnd increasing size of
bolts in expansion joint.

 Revised design and shop to EVNBVBNngineer’s comments isGFNsued vide letter at ref-
1, regarding the change in penstock profile.

Engineer have r2Eeviewed the revisVNBBVed drawings and submitted drFNGawings are
generally acceptable. However, tests FBdoeVBNBVWsn’t have any provisions for NFG inlet
valve, air vent pipe and water drainage QEQvalve. Please revised submission.

Therefore, the subject submission Except as Noted”.

Regards,