CRANE DAILY INSPECTION by OPERATOR and ASSIGNED

RIGGERS
Operator’s Name: Signature Badge No.
Crane Body No. : Crane Capacity & Model:
1. Signatures 1.
Rigger /s Name 2. 2.

Project/Facility
DATE OF INSPECTION REMARKS

No. Item To Check

ENGINE
Water level in radiator and reserve tank
01 Oil level and condition.
Oil, water and fuel leakage.
Fan belt tension
HYDRAULIC SYSTEM
Hydraulic level in reservoir.
Operation of control lever / joy stick for different sequence
02
of operation of the hoist, boom and outriggers.
Hydraulic leaks on boom cylinders, out riggers and winch
/drum side
ELECTRICAL /ELECTRONICS/SAFETY DEVICE
LMI –load moment indicator for accuracy of operation.
Check for wind speed indicator operation.
03 Anti-two block for proper operation
Reversing alarm
Side mirrors
Signal / blinker light /horn
Attachment & Accessories and Set-up , etc.
Outrigger mats
Sight obstruction in the operator cabin (Curtain, Cartoon,
etc.
Out rigger fully extended.
Out riggers set on stable ground.
Lifting Area and counter weight barricaded
Safety Signboards Installed.
04 Tire/track shoe condition, wheel brake and swing brake.
Crane manual, load chart and hand signals available in the
cabin.
Fire Extinguisher,
Third Party Inspection Certificate, Company Monthly Color-
coding Inspection Sticker and Project Client Equipment
Sticker.
Note: OK – satisfactory / good X – not OK /defective N/A – Not applicable
Report to ESD and have the mechanic fix noted defect/s on your crane.
Inspection witnessed by: (Safety Officer) Name: Signature:

LPD (Checklist) – 4 – 030 Crane Daily Inspection by Operator and Assigned Rigger/s
Revision 01, Aug 14, 2006