PROJECT CODE P-614

PLANT ULTRA FILTRATION


CLIENT ARS ENERGY
DATE 28.02.2017
DOC NO AEC/P614/CI/901
REV 0

CONTROL PHILOSOPHY
Ultra Filtration: (Fully Automated)

Cycle Duratio UF Feed UF UF Organic UF Feed Permea Reject Back


n Pump Backwash Dosing Disinfect Valve te Valve Valve Wash
W/S Pump W/S Dosing Inlet
Valve

Filtration 30 Min ON OFF OFF OFF O O C C


Forward 45 Sec ON OFF OFF OFF O C O C
Flush
Backwash 60 Sec OFF ON ON ON C C O O
(Every (Every
Alternate Alternate
Cycle) Cycle)
Fast Flush 45 Sec ON OFF OFF OFF O C O C
Filtration:

• When Filter Feed Tank is not in Low Level & UF Permeate Tank is in High Level
and UF Cycle Start is Pressed, UF Feed Valve and Permeate Valve will OPEN.
• After 5sec, UF Feed Pump will go ON.
• After 30min, UF Feed Pump will go OFF.
• After 5sec, UF Reject Valve will OPEN and Permeate Valve will CLOSE.
• Whenever UF Permeate Tank attains HIGH in between, Sequence will resume to
complete the service time after attaining Not in HIGH Level.

Flushing:

• After 5sec, When Filter Feed Tank is not in Low Level, UF Feed Pump will go ON.
• After 45sec, UF Feed Pump will go OFF.
• After 5sec, UF Feed Valve will CLOSE and Backwash Inlet Valve will OPEN.

Backwash:

• After 5sec, When UF Backwash Tank is not in Low Level, UF Backwash Pump A/B
will go ON.
• After 60sec, UF Backwash Pump will go OFF.
• After 5sec, Backwash Inlet Valve will CLOSE and UF Feed Valve will OPEN.
• In every alternate backwash cycle , UF Disinfectant and Organic Dosing will
switch ON alternately to perform CEB.
• During Backwash if the Backwash Tank attains Low Level, whole process will stop
and cycle should be started again to fill the Backwash Tank in service mode.

Flushing:

• After 5sec, When Filter Feed Tank is not in Low Level, UF Feed Pump will go ON.
• After 45sec, UF Feed Pump will go OFF.
• After 5sec, UF Permeate Valve will OPEN and UF Reject Valve will CLOSE.
• Again the Filtration process will continue.