COMPANY MARSINA ENGINEERING


PROJECT DESCRIPTION SPRAY DRYING PLANT IRAQ
DRAWING N°
ORDER

PRODUCER MARSINA ENGINEERING

PATH
PROJECT NAME 177-SD5-IFC-14
SUPPLIER
TYPE
PLACE
PROJECT CHIEF

CREATED 02/05/2014
ELABORATED 11/10/2018 PAGE 775

REVISION 03/10/2018 00143 Data 03/10/2018 Title page / cover sheet = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

WIRING COLOR CABLE CONSTRUCTION NOTE

EXCEPT WHERE INDICATED ALL EQUIPMENTS IN THE WIRING DIAGRAMS ARE


SHOWN WITHOUT VOLTAGE, PRESSURE AND FLOW

BK - NERO
BLACK
OG ARANCIO 1- UNLESS OTHERWISE INDICATED THE WIRING SHALL BE AS FOLLOWS :
ORANGE
RD ROSSO
RED A) POWER CABLE CONNECTIONS SHALL BE WIRED WITH BLACK CONDUCTOR SIZE 2,5 mmq TYPE CEI 20-22

VI VIOLA
VIOLET
BU BLU B) PROGRAMMABLE CONTROLLER INPUTS/OUTPUTS
BLUE SHALL BE WIRED WITH CYAN CONDUCTOR WITH SIZE MIN 0,5 mmq EXCEPT COMMON (+ e -) SIZE MIN. 1 mmq BLUE
GY GRIGIO
GRAY
BN MARRONE C) AUXILIARY CIRCUITS 110Vac SHALL BE WIRED WITH RED CONDUCTOR (PHASE) / RED CONDUCTOR (PHASE TO GROUND) WITH SIZE MIN 1 mmq
BROWN
CI CIANO
CYAN
D) AUXILIARY CIRCUITS 220Vac SHALL BE WIRED WITH RED CONDUCTOR (PHASE) / RED CONDUCTOR (PHASE TO GROUND) WITH SIZE MIN 1,5 mmq
GN VERDE
GREEN
WH BIANCO
WHITE E) AUXILIARY CIRCUITS 24Vac SHALL BE WIRED WITH RED CONDUCTOR (PHASE) / RED CONDUCTOR (PHASE TO GROUND) WITH SIZE MIN 1,5 mmq

F) AUXILIARY CIRCUITS 24Vdc SHALL BE WIRED WITH BLUE CONDUCTOR (+) / BLUE CONDUCTOR (- TO GROUND) WITH SIZE MIN 1,5 mmq

G) PROGRAMMABLE CONTROLLER ANALOG INPUT AND OUTPUT AND TERMINAL STRIPS SHALL BE WIRED WITH CONDUCTOR SHIELDED SIZE MIN 0,5 mmq TYPE CEI 20-22 (WHITE - / BROWN +)

1 10

REVISION 03/10/2018 00143 Data 03/10/2018 GENERAL NOTES = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 5
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/1 Title page / cover sheet REVISION 03/10/2018


=CB_1/5 GENERAL NOTES REVISION 03/10/2018
=CB_1/10 PAGE INDEX REVISION 03/10/2018
=CB_1/10.a PAGE INDEX REVISION 03/10/2018
=CB_1/10.b PAGE INDEX REVISION 03/10/2018
=CB_1/10.c PAGE INDEX REVISION 03/10/2018
=CB_1/10.d PAGE INDEX REVISION 03/10/2018
=CB_1/10.e PAGE INDEX REVISION 03/10/2018
=CB_1/10.f PAGE INDEX REVISION 03/10/2018
=CB_1/10.g PAGE INDEX REVISION 03/10/2018
=CB_1/10.h PAGE INDEX REVISION 03/10/2018
=CB_1/10.i PAGE INDEX REVISION 03/10/2018
=CB_1/10.j PAGE INDEX REVISION 03/10/2018
=CB_1/10.k PAGE INDEX REVISION 03/10/2018
=CB_1/10.l PAGE INDEX REVISION 03/10/2018
=CB_1/10.m PAGE INDEX REVISION 03/10/2018
=CB_1/10.n PAGE INDEX REVISION 03/10/2018
=CB_1/10.o PAGE INDEX REVISION 03/10/2018
=CB_1/10.p PAGE INDEX REVISION 03/10/2018
=CB_1/10.q PAGE INDEX REVISION 03/10/2018
=CB_1/10.r PAGE INDEX REVISION 03/10/2018
=CB_1/10.s PAGE INDEX REVISION 03/10/2018
=CB_1/10.t PAGE INDEX REVISION 03/10/2018
=CB_1/10.u PAGE INDEX REVISION 03/10/2018
=CB_1/10.v PAGE INDEX REVISION 03/10/2018
=CB_1/10.w PAGE INDEX REVISION 03/10/2018
=CB_1/20 LAYOUT GLOBAL REVISION 03/10/2018
=CB_1/21 LAYOUT DOOR 1-2 REVISION 03/10/2018
=CB_1/22 LAYOUT DOOR 2-3 REVISION 03/10/2018
=CB_1/23 LAYOUT DOOR 4-5 REVISION 03/10/2018
=CB_1/24 LAYOUT DOOR 6-7 REVISION 03/10/2018
=CB_1/25 LAYOUT DOOR 8-9 REVISION 03/10/2018
=CB_1/30 LAYOUT INTERNAL REVISION 03/10/2018

5 10.a

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/40 GLOBAL REVISION 03/10/2018


=CB_1/41 DOOR 1 REVISION 03/10/2018
=CB_1/42 DOOR 2 REVISION 03/10/2018
=CB_1/43 DOOR 3 REVISION 03/10/2018
=CB_1/44 DOOR 4 REVISION 03/10/2018
=CB_1/45 DOOR 5 REVISION 03/10/2018
=CB_1/46 DOOR 6 REVISION 03/10/2018
=CB_1/47 DOOR 7 REVISION 03/10/2018
=CB_1/48 DOOR 8 REVISION 03/10/2018
=CB_1/49 DOOR 9 REVISION 03/10/2018
=CB_1/50 INCOMING LINE REVISION 03/10/2018
=CB_1/51 VOLTAGE MONITORING DEVICE REVISION 03/10/2018
=CB_1/52 AMMETER DEVICE REVISION 03/10/2018
=CB_1/70 AUXILIARY CIRCUIT 230VAC REVISION 03/10/2018
=CB_1/71 AUXILIARY CIRCUIT 110VAC REVISION 03/10/2018
=CB_1/72 AUXILIARY CIRCUIT 24VAC REVISION 03/10/2018
=CB_1/73 AUXILIARY CIRCUIT 24VDC REVISION 03/10/2018
=CB_1/74 AUXILIARY CIRCUIT 24VDC ALWAYS ON REVISION 03/10/2018
=CB_1/75 CABINET VENTILATION REVISION 03/10/2018
=CB_1/76 CABINET LIGHTING REVISION 03/10/2018
=CB_1/77 CABINET SERVICE SOCKET REVISION 03/10/2018
=CB_1/100 FS1 1,1kW 400/50 D FAN FOR FS. 1 REVISION 03/10/2018
=CB_1/101 FS1 1,1kW 400/50 D FAN FOR FS. 1 REVISION 03/10/2018
=CB_1/102 FS2 1,1kW 400/50 D FAN FOR FS. 2 REVISION 03/10/2018
=CB_1/103 FS2 1,1kW 400/50 D FAN FOR FS. 2 REVISION 03/10/2018
=CB_1/104 FS3 1,1kW 400/50 D FAN FOR FS. 3 REVISION 03/10/2018
=CB_1/105 FS3 1,1kW 400/50 D FAN FOR FS. 3 REVISION 03/10/2018
=CB_1/106 SC-1 3kW 400/50 SFC STPP DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/107 SC-1 3kW 400/50 SFC STPP DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/108 SC-2 3kW 400/50 SFC S.SULPHATE DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/109 SC-2 3kW 400/50 SFC S.SULPHATE DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/110 SC-3 3kW 400/50 SFC SODA ASH DOSING SCREW COONVEYOR REVISION 03/10/2018
=CB_1/111 SC-3 3kW 400/50 SFC SODA ASH DOSING SCREW COONVEYOR REVISION 03/10/2018

10 10.b

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.a
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/112 SC-4 1,5kW 400/50 SFC MINORS DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/113 SC-4 1,5kW 400/50 SFC MINORS DOSING SCREW CONVEYOR REVISION 03/10/2018
=CB_1/114 P2 5,5kW 400/50 4P D SLURRY TRANSFER PUMP REVISION 03/10/2018
=CB_1/115 P2 5,5kW 400/50 4P D SLURRY TRANSFER PUMP REVISION 03/10/2018
=CB_1/116 P6 4kW 400/50 D RECOVERED WATER TRANSFER PUMP REVISION 03/10/2018
=CB_1/117 P6 4kW 400/50 D RECOVERED WATER TRANSFER PUMP REVISION 03/10/2018
=CB_1/118 AGR-1 18,5kW 400/50 4P SFC STIRRER FOR R.1 REVISION 03/10/2018
=CB_1/119 AGR-1 18,5kW 400/50 4P SFC STIRRER FOR R.1 REVISION 03/10/2018
=CB_1/120 AGR-2 4kW 400/50 4P ST STIRRER FOR R.2 REVISION 03/10/2018
=CB_1/121 AGR-2 4kW 400/50 4P ST STIRRER FOR R.2 REVISION 03/10/2018
=CB_1/122 BL-4 1,5kW 400/50 D EXTRACTION VAPORS FAN REVISION 03/10/2018
=CB_1/123 BL-4 1,5kW 400/50 D EXTRACTION VAPORS FAN REVISION 03/10/2018
=CB_1/124 P-3 37kW 400/50 4P SFC HOMOGENIZER PUMP REVISION 03/10/2018
=CB_1/125 P-3 37kW 400/50 4P SFC HOMOGENIZER PUMP REVISION 03/10/2018
=CB_1/126 AGAF-1A 4kW 400/50 D SLURRY FEEDING FILTER REVISION 03/10/2018
=CB_1/127 AGAF-1A 4kW 400/50 D SLURRY FEEDING FILTER REVISION 03/10/2018
=CB_1/128 AGAF-1B 4kW 400/50 D SLURRY FEEDING FILTER REVISION 03/10/2018
=CB_1/129 AGAF-1B 4kW 400/50 D SLURRY FEEDING FILTER REVISION 03/10/2018
=CB_1/130 P4 37kW 400/50 4P SFC SLURRY FEEDING HIGH PRESSURE PUMP REVISION 03/10/2018
=CB_1/131 P4 37kW 400/50 4P SFC SLURRY FEEDING HIGH PRESSURE PUMP REVISION 03/10/2018
=CB_1/132 AGT-5 1,5kW 400/50 D STIRRER FOR T.5 REVISION 03/10/2018
=CB_1/133 AGT-5 1,5kW 400/50 D STIRRER FOR T.5 REVISION 03/10/2018
=CB_1/134 BL-1 45kW 400/690/50 ST DRYING AIR FEEDING FAN REVISION 03/10/2018
=CB_1/135 BL-1 45kW 400/690/50 ST DRYING AIR FEEDING FAN REVISION 03/10/2018
=CB_1/136 BL-2 15kW 400/50 ST COMBUSTION AIR FAN REVISION 03/10/2018
=CB_1/137 BL-2 15kW 400/50 ST COMBUSTION AIR FAN REVISION 03/10/2018
=CB_1/138 HST-1 1,1kW 400/50 TV HOIST FOR CLEANING RING REVISION 03/10/2018
=CB_1/139 HST-1 1,1kW 400/50 TV HOIST FOR CLEANING RING REVISION 03/10/2018
=CB_1/140 MC-3A 0,37kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR F.3 REVISION 03/10/2018
=CB_1/141 MC-3A 0,37kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR F.3 REVISION 03/10/2018
=CB_1/142 MC-3B 0,37kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR F.3 REVISION 03/10/2018
=CB_1/143 MC-3B 0,37kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR F.3 REVISION 03/10/2018
=CB_1/144 BL-6 5,5kW 400/50 D FINES RECOVERY FAN REVISION 03/10/2018

10.a 10.c

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.b
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/145 BL-6 5,5kW 400/50 D FINES RECOVERY FAN REVISION 03/10/2018


=CB_1/146 BL-3 75kW 400/690/50 ST DRYING AIR EXTRACTION FAN REVISION 03/10/2018
=CB_1/147 BL-3 75kW 400/690/50 ST DRYING AIR EXTRACTION FAN REVISION 03/10/2018
=CB_1/148 NT-1 1,1kW 400/50 TV AIR LIFT BELT CONVEYOR REVISION 03/10/2018
=CB_1/149 NT-1 1,1kW 400/50 TV AIR LIFT BELT CONVEYOR REVISION 03/10/2018
=CB_1/150 BL-5 30kW 400/690/50 ST AIR LIFT FAN REVISION 03/10/2018
=CB_1/151 BL-5 30kW 400/690/50 ST AIR LIFT FAN REVISION 03/10/2018
=CB_1/152 MC-1 0,55kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR AIR LIFT REVISION 03/10/2018
=CB_1/153 MC-1 0,55kW 400/50 4P D DOUBLE FLAP DISCHARGER FOR AIR LIFT REVISION 03/10/2018
=CB_1/154 VV-1A 1,8kW 400/690/50 4P D VIBRATING SIEVE RECTANGULAR TYPE REVISION 03/10/2018
=CB_1/155 VV-1A 1,8kW 400/690/50 4P D VIBRATING SIEVE RECTANGULAR TYPE REVISION 03/10/2018
=CB_1/156 VV-1B 1,8kW 400/690/50 4P D VIBRATING SIEVE RECTANGULAR TYPE REVISION 03/10/2018
=CB_1/157 VV-1B 1,8kW 400/690/50 4P D VIBRATING SIEVE RECTANGULAR TYPE REVISION 03/10/2018
=CB_1/158 P5 1,5kW 400/50 D RECOVERED SLURRY TRANSFER PUMP REVISION 03/10/2018
=CB_1/159 P5 1,5kW 400/50 D RECOVERED SLURRY TRANSFER PUMP REVISION 03/10/2018
=CB_1/160 VY1011A/B 0,1kW 400/50 D VIBRATING MOTOR S1 REVISION 03/10/2018
=CB_1/161 VY1011A/B 0,1kW 400/50 D VIBRATING MOTOR S1 REVISION 03/10/2018
=CB_1/164 VY1012A/B 0,1kW 400/50 D VIBRATING MOTOR S2 REVISION 03/10/2018
=CB_1/165 VY1012A/B 0,1kW 400/50 D VIBRATING MOTOR S2 REVISION 03/10/2018
=CB_1/168 VY1013A/B 0,08kW 400/50 D VIBRATING MOTOR S3 REVISION 03/10/2018
=CB_1/169 VY1013A/B 0,08kW 400/50 D VIBRATING MOTOR S3 REVISION 03/10/2018
=CB_1/172 VY1014A/B 0,08kW 400/50 D VIBRATING MOTOR S4 REVISION 03/10/2018
=CB_1/173 VY1014A/B 0,08kW 400/50 D VIBRATING MOTOR S4 REVISION 03/10/2018
=CB_1/176 NT-411 0,75kW 400/50 D FINISHED PRODUCT BELT CONVEYOR REVISION 03/10/2018
=CB_1/177 NT-411 0,75kW 400/50 D FINISHED PRODUCT BELT CONVEYOR REVISION 03/10/2018
=CB_1/178 FS-402A 1,1kW 400/50 D FAN FOR F402A REVISION 03/10/2018
=CB_1/179 FS-402A 1,1kW 400/50 D FAN FOR F402A REVISION 03/10/2018
=CB_1/180 FS-402B 1,1kW 400/50 D FAN FOR F402B REVISION 03/10/2018
=CB_1/181 FS-402B 1,1kW 400/50 D FAN FOR F402B REVISION 03/10/2018
=CB_1/182 NT-402 1,1kW 400/50 D EXTRACTION BELT CONVEYOR REVISION 03/10/2018
=CB_1/183 NT-402 1,1kW 400/50 D EXTRACTION BELT CONVEYOR REVISION 03/10/2018
=CB_1/184 ND-402 0,55kW 400/50 SFC ATOMIZED POWDER WEIGHING BELT REVISION 03/10/2018
=CB_1/185 ND-402 0,55kW 400/50 SFC ATOMIZED POWDER WEIGHING BELT REVISION 03/10/2018

10.b 10.d

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.c
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/186 ND-406 0,37kW 400/50 SFC S.PERBORATE WEIGHING BELT REVISION 03/10/2018
=CB_1/187 ND-406 0,37kW 400/50 SFC S.PERBORATE WEIGHING BELT REVISION 03/10/2018
=CB_1/188 ND-408 0,37kW 400/50 SFC ENZYMES WEIGHING BELT REVISION 03/10/2018
=CB_1/189 ND-408 0,37kW 400/50 SFC ENZYMES WEIGHING BELT REVISION 03/10/2018
=CB_1/190 ND-409 0,37kW 400/50 SFC PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT REVISION 03/10/2018
=CB_1/191 ND-409 0,37kW 400/50 SFC PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT REVISION 03/10/2018
=CB_1/192 FS-408 1,1kW 400/50 D FAN FOR F408 REVISION 03/10/2018
=CB_1/193 FS-408 1,1kW 400/50 D FAN FOR F408 REVISION 03/10/2018
=CB_1/194 FS-406 1,1kW 400/50 D FAN FOR F406 REVISION 03/10/2018
=CB_1/195 FS-406 1,1kW 400/50 D FAN FOR F406 REVISION 03/10/2018
=CB_1/196 FS-409 1,1kW 400/50 D FAN FOR F409 REVISION 03/10/2018
=CB_1/197 FS-409 1,1kW 400/50 D FAN FOR F409 REVISION 03/10/2018
=CB_1/198 NT-410 2,2kW 400/50 TV ADDITIVES FEEDING BELT CONVEYOR REVISION 03/10/2018
=CB_1/199 NT-410 2,2kW 400/50 TV ADDITIVES FEEDING BELT CONVEYOR REVISION 03/10/2018
=CB_1/200 MX-402 3,00kW 400/50 4P D FINAL ROTATING CONTINUOUS MIXER REVISION 03/10/2018
=CB_1/201 MX-402 3,00kW 400/50 4P D FINAL ROTATING CONTINUOUS MIXER REVISION 03/10/2018
=CB_1/202 DP-431 0,75kW 400/50 D NON IONIC DOSING PUMP REVISION 03/10/2018
=CB_1/203 DP-431 0,75kW 400/50 D NON IONIC DOSING PUMP REVISION 03/10/2018
=CB_1/204 DP-432 0,25kW 400/50 D PERFUME DOSING PUMP REVISION 03/10/2018
=CB_1/205 DP-432 0,25kW 400/50 D PERFUME DOSING PUMP REVISION 03/10/2018
=CB_1/206 ET-401 4kW 400/50 D ELEVATOR REVISION 03/10/2018
=CB_1/207 ET-401 4kW 400/50 D ELEVATOR REVISION 03/10/2018
=CB_1/208 VY-2A 0,5kW 400/50 D VIBRATING MOTOR ST1 REVISION 03/10/2018
=CB_1/209 VY-2A 0,5kW 400/50 D VIBRATING MOTOR ST1 REVISION 03/10/2018
=CB_1/210 VY-2B 0,5kW 400/50 D VIBRATING MOTOR ST1 REVISION 03/10/2018
=CB_1/211 VY-2B 0,5kW 400/50 D VIBRATING MOTOR ST1 REVISION 03/10/2018
=CB_1/212 VY-4021A 0,1kW 400/50 D VIBRATING MOTOR S402A REVISION 03/10/2018
=CB_1/213 VY-4021A 0,1kW 400/50 D VIBRATING MOTOR S402A REVISION 03/10/2018
=CB_1/214 VY-4021B 0,1kW 400/50 D VIBRATING MOTOR S402A REVISION 03/10/2018
=CB_1/215 VY-4021B 0,1kW 400/50 D VIBRATING MOTOR S402A REVISION 03/10/2018
=CB_1/216 VY-4022A 0,1kW 400/50 D VIBRATING MOTOR S402B REVISION 03/10/2018
=CB_1/217 VY-4022A 0,1kW 400/50 D VIBRATING MOTOR S402B REVISION 03/10/2018
=CB_1/218 VY-4022B 0,1kW 400/50 D VIBRATING MOTOR S402B REVISION 03/10/2018

10.c 10.e

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.d
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/219 VY-4022B 0,1kW 400/50 D VIBRATING MOTOR S402B REVISION 03/10/2018


=CB_1/220 NT-6 0,55kW 400/50 D BELT CONVEYOR REVISION 03/10/2018
=CB_1/221 NT-6 0,55kW 400/50 D BELT CONVEYOR REVISION 03/10/2018
=CB_1/222 P-801 4,00kW 400/50 D SULPHONIC ACID LOADING PUMP REVISION 03/10/2018
=CB_1/223 P-801 4,00kW 400/50 D SULPHONIC ACID LOADING PUMP REVISION 03/10/2018
=CB_1/224 P-802 11,00kW 400/50 SS SODIUM SILICATE LOADING PUMP REVISION 03/10/2018
=CB_1/225 P-802 11,00kW 400/50 SS SODIUM SILICATE LOADING PUMP REVISION 03/10/2018
=CB_1/226 P-803 5,50kW 400/50 D CAUSTIC SODA LOADING PUMP REVISION 03/10/2018
=CB_1/227 P-803 5,50kW 400/50 D CAUSTIC SODA LOADING PUMP REVISION 03/10/2018
=CB_1/228 P-804 2,20kW 400/50 D PROCESS WATER LOADING PUMP REVISION 03/10/2018
=CB_1/229 P-804 2,20kW 400/50 D PROCESS WATER LOADING PUMP REVISION 03/10/2018
=CB_1/230 P-805 0,75kW 400/50 D DIESEL OIL LOADING PUMP REVISION 03/10/2018
=CB_1/231 P-805 0,75kW 400/50 D DIESEL OIL LOADING PUMP REVISION 03/10/2018
=CB_1/232 P-7 5,5kW 400/50 D RECOVERY WATER CIRCULATION PUMP REVISION 03/10/2018
=CB_1/233 P-7 5,5kW 400/50 D RECOVERY WATER CIRCULATION PUMP REVISION 03/10/2018
=CB_1/234 ND-402FAN 0,12kW 400/50 D SERVOFAN FOR ND-402 REVISION 03/10/2018
=CB_1/235 ND-402FAN 0,12kW 400/50 D SERVOFAN FOR ND-402 REVISION 03/10/2018
=CB_1/236 ND-406FAN 0,12kW 400/50 D SERVOFAN FOR ND-406 REVISION 03/10/2018
=CB_1/237 ND-406FAN 0,12kW 400/50 D SERVOFAN FOR ND-406 REVISION 03/10/2018
=CB_1/238 ND-408FAN 0,12kW 400/50 D SERVOFAN FOR ND-408 REVISION 03/10/2018
=CB_1/239 ND-408FAN 0,12kW 400/50 D SERVOFAN FOR ND-408 REVISION 03/10/2018
=CB_1/240 ND-409FAN 0,12kW 400/50 D SERVOFAN FOR ND-409 REVISION 03/10/2018
=CB_1/241 ND-409FAN 0,12kW 400/50 D SERVOFAN FOR ND-409 REVISION 03/10/2018
=CB_1/350 SAFETY RELAY REVISION 03/10/2018
=CB_1/352 WT-1114-A WEIGHT REVISION 03/10/2018
=CB_1/400 KV-1113 REVISION 03/10/2018
=CB_1/401 KV-1201 REVISION 03/10/2018
=CB_1/402 KV-1202 REVISION 03/10/2018
=CB_1/403 SPARE VALVE REVISION 03/10/2018
=CB_1/404 KV-1309 REVISION 03/10/2018
=CB_1/405 KV-1310 REVISION 03/10/2018
=CB_1/406 KV-1316 REVISION 03/10/2018
=CB_1/407 KV-1320 REVISION 03/10/2018

10.d 10.f

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.e
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/408 SPARE VALVE REVISION 03/10/2018


=CB_1/409 SPARE VALVE REVISION 03/10/2018
=CB_1/410 SV-4120 REVISION 03/10/2018
=CB_1/411 KV-1115 REVISION 03/10/2018
=CB_1/412 KV-1108 REVISION 03/10/2018
=CB_1/413 SPARE VALVE REVISION 03/10/2018
=CB_1/414 KV-4120 REVISION 03/10/2018
=CB_1/415 KV-4102A REVISION 03/10/2018
=CB_1/416 KV-4102B REVISION 03/10/2018
=CB_1/432 MV-1301 REVISION 03/10/2018
=CB_1/433 MV-1302 REVISION 03/10/2018
=CB_1/434 MV-1303 REVISION 03/10/2018
=CB_1/435 MV-1304 REVISION 03/10/2018
=CB_1/436 MV-1305 REVISION 03/10/2018
=CB_1/437 MV-1306 REVISION 03/10/2018
=CB_1/438 MV-1307 REVISION 03/10/2018
=CB_1/439 MV-1308 REVISION 03/10/2018
=CB_1/440 MV-1309 REVISION 03/10/2018
=CB_1/441 MV-1310 REVISION 03/10/2018
=CB_1/450 KY-1 REVISION 03/10/2018
=CB_1/451 KY-2 REVISION 03/10/2018
=CB_1/452 KY-3 REVISION 03/10/2018
=CB_1/453 KY-4 REVISION 03/10/2018
=CB_1/454 KY-6 REVISION 03/10/2018
=CB_1/455 KY-7 REVISION 03/10/2018
=CB_1/456 KY-8 REVISION 03/10/2018
=CB_1/457 KY-9 REVISION 03/10/2018
=CB_1/458 KY-10 REVISION 03/10/2018
=CB_1/459 KY-11 REVISION 03/10/2018
=CB_1/460 FSH-1 REVISION 03/10/2018
=CB_1/470 LSH-1108 REVISION 03/10/2018
=CB_1/471 LSH-1318 REVISION 03/10/2018
=CB_1/472 LSH-1370 REVISION 03/10/2018

10.e 10.g

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.f
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/473 LSH-1371 REVISION 03/10/2018


=CB_1/474 LSH-4103A REVISION 03/10/2018
=CB_1/475 LSH-4103B REVISION 03/10/2018
=CB_1/476 LSH-4104 REVISION 03/10/2018
=CB_1/477 LSL-1104 REVISION 03/10/2018
=CB_1/478 LSL-1122 REVISION 03/10/2018
=CB_1/479 LSL-1123 REVISION 03/10/2018
=CB_1/480 LSL-1124 REVISION 03/10/2018
=CB_1/481 LSL-1125 REVISION 03/10/2018
=CB_1/482 LSL-4101A REVISION 03/10/2018
=CB_1/483 LSL-4101B REVISION 03/10/2018
=CB_1/484 LSL-4105 REVISION 03/10/2018
=CB_1/485 LSL-4109 REVISION 03/10/2018
=CB_1/486 LSL-4112 REVISION 03/10/2018
=CB_1/487 LSL-4113 REVISION 03/10/2018
=CB_1/488 SPARE LEVEL REVISION 03/10/2018
=CB_1/489 LSLL-1106 REVISION 03/10/2018
=CB_1/500 FIS-1209 REVISION 03/10/2018
=CB_1/501 FIS-1219 REVISION 03/10/2018
=CB_1/502 FIS-1279 REVISION 03/10/2018
=CB_1/503 FIS1289 REVISION 03/10/2018
=CB_1/504 PSL-8205 REVISION 03/10/2018
=CB_1/505 PSL-8305 REVISION 03/10/2018
=CB_1/520 AR-5 REVISION 03/10/2018
=CB_1/521 AR-6 REVISION 03/10/2018
=CB_1/522 AR-7 REVISION 03/10/2018
=CB_1/523 AR-8 REVISION 03/10/2018
=CB_1/540 F-3 REVISION 03/10/2018
=CB_1/541 F-4 REVISION 03/10/2018
=CB_1/542 BR-1 REVISION 03/10/2018
=CB_1/550 HV-1308 REVISION 03/10/2018
=CB_1/551 PV-1311 REVISION 03/10/2018
=CB_1/552 HV-1319 REVISION 03/10/2018

10.f 10.h

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.g
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/600 TEMPERATURE TRASMITTERS REVISION 03/10/2018


=CB_1/601 TEMPERATURE TRASMITTERS REVISION 03/10/2018
=CB_1/620 LEVEL TRASMITTERS REVISION 03/10/2018
=CB_1/621 LEVEL TRASMITTERS REVISION 03/10/2018
=CB_1/630 FLOW TRASMITTERS REVISION 03/10/2018
=CB_1/640 PRESSURE TRASMITTERS REVISION 03/10/2018
=CB_1/700 SYNOPTIC LED LOGO REVISION 03/10/2018
=CB_1/710 SYNOPTIC PANEL 1 CARD 1 REVISION 03/10/2018
=CB_1/711 SYNOPTIC PANEL 1 CARD 2 REVISION 03/10/2018
=CB_1/712 SYNOPTIC PANEL 1 CARD 3 REVISION 03/10/2018
=CB_1/713 SYNOPTIC PANEL 1 CARD 4 REVISION 03/10/2018
=CB_1/714 SYNOPTIC PANEL 1 CARD 5 REVISION 03/10/2018
=CB_1/715 SYNOPTIC PANEL 2 CARD 6 REVISION 03/10/2018
=CB_1/716 SYNOPTIC PANEL 2 CARD 7 REVISION 03/10/2018
=CB_1/717 SYNOPTIC PANEL 2 CARD 8 REVISION 03/10/2018
=CB_1/718 SYNOPTIC PANEL 2 CARD 9 REVISION 03/10/2018
=CB_1/719 SYNOPTIC PANEL 2 CARD 10 REVISION 03/10/2018
=CB_1/720 SYNOPTIC PANEL 2 CARD 11 REVISION 03/10/2018
=CB_1/721 SYNOPTIC PANEL 3 CARD 12 REVISION 03/10/2018
=CB_1/722 SYNOPTIC PANEL 3 CARD 13 REVISION 03/10/2018
=CB_1/723 SYNOPTIC PANEL 3 CARD 14 REVISION 03/10/2018
=CB_1/724 SYNOPTIC PANEL 3 CARD 15 REVISION 03/10/2018
=CB_1/725 SYNOPTIC PANEL 3 CARD 16 REVISION 03/10/2018
=CB_1/750 BUS_NETWORK REVISION 03/10/2018
=CB_1/751 PLC LAYOUT REVISION 03/10/2018
=CB_1/753 PLC LAYOUT REVISION 03/10/2018
=CB_1/754 PLC LAYOUT REVISION 03/10/2018
=CB_1/755 PLC LAYOUT REVISION 03/10/2018
=CB_1/756 PLC LAYOUT REVISION 03/10/2018
=CB_1/757 PLC LAYOUT REVISION 03/10/2018
=CB_1/780 PLC SPARE REVISION 03/10/2018
=CB_1/800 PLC SUPPLY REVISION 03/10/2018
=CB_1/801 SYNOPTIC LAYOUT REVISION 03/10/2018

10.g 10.i

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.h
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CB_1/802 SYNOPTIC LAYOUT REVISION 03/10/2018


=CB_1/803 SYNOPTIC LAYOUT REVISION 03/10/2018
=PLC/1000 PLC DIAGRAM : =CB_1+-AI0 - =CB_1+-AI0 REVISION 03/10/2018
=PLC/1001 PLC DIAGRAM : =CB_1+-AI1 - =CB_1+-AI1 REVISION 03/10/2018
=PLC/1002 PLC DIAGRAM : =CB_1+-AI2 - =CB_1+-AI2 REVISION 03/10/2018
=PLC/1003 PLC DIAGRAM : =CB_1+-AI3 - =CB_1+-AI3 REVISION 03/10/2018
=PLC/1004 PLC DIAGRAM : =CB_1+-AI4 - =CB_1+-AI4 REVISION 03/10/2018
=PLC/1005 PLC DIAGRAM : =CB_1+-AI5 - =CB_1+-AI5 REVISION 03/10/2018
=PLC/1006 PLC DIAGRAM : =CB_1+-AI6 - =CB_1+-AI6 REVISION 03/10/2018
=PLC/1007 PLC DIAGRAM : =CB_1+-AI7 - =CB_1+-AI7 REVISION 03/10/2018
=PLC/1008 PLC DIAGRAM : =CB_1+-AI8 - =CB_1+-AI8 REVISION 03/10/2018
=PLC/1009 PLC DIAGRAM : =CB_1+-AI9 - =CB_1+-AI9 REVISION 03/10/2018
=PLC/1010 PLC DIAGRAM : =CB_1+-AI10 - =CB_1+-AI10 REVISION 03/10/2018
=PLC/1011 PLC DIAGRAM : =CB_1+-AI11 - =CB_1+-AI11 REVISION 03/10/2018
=PLC/1012 PLC DIAGRAM : =CB_1+-AI12 - =CB_1+-AI12 REVISION 03/10/2018
=PLC/1013 PLC DIAGRAM : =CB_1+-AI13 - =CB_1+-AI13 REVISION 03/10/2018
=PLC/1014 PLC DIAGRAM : =CB_1+-AI14 - =CB_1+-AI14 REVISION 03/10/2018
=PLC/1015 PLC DIAGRAM : =CB_1+-AI15 - =CB_1+-AI15 REVISION 03/10/2018
=PLC/1016 PLC DIAGRAM : =CB_1+-AI16 - =CB_1+-AI16 REVISION 03/10/2018
=PLC/1017 PLC DIAGRAM : =CB_1+-AI17 - =CB_1+-AI17 REVISION 03/10/2018
=PLC/1018 PLC DIAGRAM : =CB_1+-AO0 - =CB_1+-AO0 REVISION 03/10/2018
=PLC/1019 PLC DIAGRAM : =CB_1+-AO1 - =CB_1+-AO1 REVISION 03/10/2018
=PLC/1020 PLC DIAGRAM : =CB_1+-AO2 - =CB_1+-AO2 REVISION 03/10/2018
=PLC/1021 PLC DIAGRAM : =CB_1+-AO3 - =CB_1+-AO3 REVISION 03/10/2018
=PLC/1022 PLC DIAGRAM : =CB_1+-AO4 - =CB_1+-AO4 REVISION 03/10/2018
=PLC/1023 PLC DIAGRAM : =CB_1+-AO5 - =CB_1+-AO5 REVISION 03/10/2018
=PLC/1024 PLC DIAGRAM : =CB_1+-AO6 - =CB_1+-AO6 REVISION 03/10/2018
=PLC/1025 PLC DIAGRAM : =CB_1+-AO7 - =CB_1+-AO7 REVISION 03/10/2018
=PLC/1026 PLC DIAGRAM : =CB_1+-AO8 - =CB_1+-AO8 REVISION 03/10/2018
=PLC/1027 PLC DIAGRAM : =CB_1+-AO9 - =CB_1+-AO9 REVISION 03/10/2018
=PLC/1028 PLC DIAGRAM : =CB_1+-DI0 - =CB_1+-DI0 REVISION 03/10/2018
=PLC/1029 PLC DIAGRAM : =CB_1+-DI1 - =CB_1+-DI1 REVISION 03/10/2018
=PLC/1030 PLC DIAGRAM : =CB_1+-DI2 - =CB_1+-DI2 REVISION 03/10/2018

10.h 10.j

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.i
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=PLC/1031 PLC DIAGRAM : =CB_1+-DI3 - =CB_1+-DI3 REVISION 03/10/2018


=PLC/1032 PLC DIAGRAM : =CB_1+-DI4 - =CB_1+-DI4 REVISION 03/10/2018
=PLC/1033 PLC DIAGRAM : =CB_1+-DI5 - =CB_1+-DI5 REVISION 03/10/2018
=PLC/1034 PLC DIAGRAM : =CB_1+-DI6 - =CB_1+-DI6 REVISION 03/10/2018
=PLC/1035 PLC DIAGRAM : =CB_1+-DI7 - =CB_1+-DI7 REVISION 03/10/2018
=PLC/1036 PLC DIAGRAM : =CB_1+-DI8 - =CB_1+-DI8 REVISION 03/10/2018
=PLC/1037 PLC DIAGRAM : =CB_1+-DI9 - =CB_1+-DI9 REVISION 03/10/2018
=PLC/1038 PLC DIAGRAM : =CB_1+-DI10 - =CB_1+-DI10 REVISION 03/10/2018
=PLC/1039 PLC DIAGRAM : =CB_1+-DI11 - =CB_1+-DI11 REVISION 03/10/2018
=PLC/1040 PLC DIAGRAM : =CB_1+-DI12 - =CB_1+-DI12 REVISION 03/10/2018
=PLC/1041 PLC DIAGRAM : =CB_1+-DI13 - =CB_1+-DI13 REVISION 03/10/2018
=PLC/1042 PLC DIAGRAM : =CB_1+-DI14 - =CB_1+-DI14 REVISION 03/10/2018
=PLC/1043 PLC DIAGRAM : =CB_1+-DI15 - =CB_1+-DI15 REVISION 03/10/2018
=PLC/1044 PLC DIAGRAM : =CB_1+-DI16 - =CB_1+-DI16 REVISION 03/10/2018
=PLC/1045 PLC DIAGRAM : =CB_1+-DI17 - =CB_1+-DI17 REVISION 03/10/2018
=PLC/1046 PLC DIAGRAM : =CB_1+-DI18 - =CB_1+-DI18 REVISION 03/10/2018
=PLC/1047 PLC DIAGRAM : =CB_1+-DI19 - =CB_1+-DI19 REVISION 03/10/2018
=PLC/1048 PLC DIAGRAM : =CB_1+-DI20 - =CB_1+-DI20 REVISION 03/10/2018
=PLC/1049 PLC DIAGRAM : =CB_1+-DI21 - =CB_1+-DI21 REVISION 03/10/2018
=PLC/1050 PLC DIAGRAM : =CB_1+-DI22 - =CB_1+-DI22 REVISION 03/10/2018
=PLC/1051 PLC DIAGRAM : =CB_1+-DI23 - =CB_1+-DI23 REVISION 03/10/2018
=PLC/1052 PLC DIAGRAM : =CB_1+-DI24 - =CB_1+-DI24 REVISION 03/10/2018
=PLC/1053 PLC DIAGRAM : =CB_1+-DI25 - =CB_1+-DI25 REVISION 03/10/2018
=PLC/1054 PLC DIAGRAM : =CB_1+-DI26 - =CB_1+-DI26 REVISION 03/10/2018
=PLC/1055 PLC DIAGRAM : =CB_1+-DI27 - =CB_1+-DI27 REVISION 03/10/2018
=PLC/1056 PLC DIAGRAM : =CB_1+-DI28 - =CB_1+-DI28 REVISION 03/10/2018
=PLC/1057 PLC DIAGRAM : =CB_1+-DI29 - =CB_1+-DI29 REVISION 03/10/2018
=PLC/1058 PLC DIAGRAM : =CB_1+-DI30 - =CB_1+-DI30 REVISION 03/10/2018
=PLC/1059 PLC DIAGRAM : =CB_1+-DO0 - =CB_1+-DO0 REVISION 03/10/2018
=PLC/1060 PLC DIAGRAM : =CB_1+-DO1 - =CB_1+-DO1 REVISION 03/10/2018
=PLC/1061 PLC DIAGRAM : =CB_1+-DO2 - =CB_1+-DO2 REVISION 03/10/2018
=PLC/1062 PLC DIAGRAM : =CB_1+-DO3 - =CB_1+-DO3 REVISION 03/10/2018
=PLC/1063 PLC DIAGRAM : =CB_1+-DO4 - =CB_1+-DO4 REVISION 03/10/2018

10.i 10.k

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.j
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=PLC/1064 PLC DIAGRAM : =CB_1+-DO5 - =CB_1+-DO5 REVISION 03/10/2018


=PLC/1065 PLC DIAGRAM : =CB_1+-DO6 - =CB_1+-DO6 REVISION 03/10/2018
=PLC/1066 PLC DIAGRAM : =CB_1+-DO7 - =CB_1+-DO7 REVISION 03/10/2018
=PLC/1067 PLC DIAGRAM : =CB_1+-DO8 - =CB_1+-DO8 REVISION 03/10/2018
=PLC/1068 PLC DIAGRAM : =CB_1+-DO9 - =CB_1+-DO9 REVISION 03/10/2018
=PLC/1069 PLC DIAGRAM : =CB_1+-DO10 - =CB_1+-DO10 REVISION 03/10/2018
=PLC/1070 PLC DIAGRAM : =CB_1+-DO11 - =CB_1+-DO11 REVISION 03/10/2018
=PLC/1071 PLC DIAGRAM : =CB_1+-DO12 - =CB_1+-DO12 REVISION 03/10/2018
=PLC/1072 PLC DIAGRAM : =CB_1+-DO13 - =CB_1+-DO13 REVISION 03/10/2018
=PLC/1073 PLC DIAGRAM : =CB_1+-DO14 - =CB_1+-DO14 REVISION 03/10/2018
=MATERIALS/1100 PARTS LIST : R1ZE851 - RPQ0985 REVISION 03/10/2018
=MATERIALS/1100.a PARTS LIST : 3SB3501-6BA60 - FR501 REVISION 03/10/2018
=MATERIALS/1100.b PARTS LIST : 021192 - 3SB3400-1A REVISION 03/10/2018
=MATERIALS/1100.c PARTS LIST : BA9S24 - 3SB3400-0B REVISION 03/10/2018
=MATERIALS/1100.d PARTS LIST : 3SB3400-1A - 3RV2901-1E REVISION 03/10/2018
=MATERIALS/1100.e PARTS LIST : 3SB3500-2DA11 - 3SB3400-0C REVISION 03/10/2018
=MATERIALS/1100.f PARTS LIST : 3SB3501-0AA41 - 3NP1133-1BC20 REVISION 03/10/2018
=MATERIALS/1100.g PARTS LIST : 3NA3832 - 3SB3400-0C REVISION 03/10/2018
=MATERIALS/1100.h PARTS LIST : 3SB3501-0AA41 - G2R2SND24VDC REVISION 03/10/2018
=MATERIALS/1100.i PARTS LIST : P2RF08E - P2RF08E REVISION 03/10/2018
=MATERIALS/1100.j PARTS LIST : 3RW4038-1BB04 - 3RT2016-1BB41 REVISION 03/10/2018
=MATERIALS/1100.k PARTS LIST : 3RH2911-1FA22 - 3SB3400-0B REVISION 03/10/2018
=MATERIALS/1100.l PARTS LIST : 3RT2016-1BB41 - G2R2SND24VDC REVISION 03/10/2018
=MATERIALS/1100.m PARTS LIST : P2RF08E - 6SE6400-2FA00-6AD0 REVISION 03/10/2018
=MATERIALS/1100.n PARTS LIST : 6SE6400-0BP00-0AA0 - G2R2SND24VDC REVISION 03/10/2018
=MATERIALS/1100.o PARTS LIST : P2RF08E - 3SB3400-0B REVISION 03/10/2018
=MATERIALS/1100.p PARTS LIST : G2R2SND24VDC - 3RV2011-1JA10 REVISION 03/10/2018
=MATERIALS/1100.q PARTS LIST : 3RV2901-1E - 3SB3400-0B REVISION 03/10/2018
=MATERIALS/1100.r PARTS LIST : 3RT2016-1BB41 - 3SB3400-0C REVISION 03/10/2018
=MATERIALS/1100.s PARTS LIST : 3SB3501-0AA41 - 3RT2017-1BB41 REVISION 03/10/2018
=MATERIALS/1100.t PARTS LIST : 3RH2911-1FA22 - 3RV2011-0FA10 REVISION 03/10/2018
=MATERIALS/1100.u PARTS LIST : 3RV2901-1E - G2R2SND24VDC REVISION 03/10/2018
=MATERIALS/1100.v PARTS LIST : P2RF08E - G2R2SND24VDC REVISION 03/10/2018

10.j 10.l

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.k
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=MATERIALS/1100.w PARTS LIST : P2RF08E - G2R2SND24VDC REVISION 03/10/2018


=MATERIALS/1100.x PARTS LIST : P2RF08E - G2R2SND24VDC REVISION 03/10/2018
=MATERIALS/1100.y PARTS LIST : P2RF08E - P2RF08E REVISION 03/10/2018
=MATERIALS/1100.z PARTS LIST : G2R2SND24VDC - P2RF08E REVISION 03/10/2018
=MATERIALS/1100.za PARTS LIST : G2R2SND24VDC - LED BICOLORE 5 REVISION 03/10/2018
=MATERIALS/1100.zb PARTS LIST : LED BICOLORE 5 - GERES16/2K2 1/2W REVISION 03/10/2018
=MATERIALS/1100.zc PARTS LIST : LED BICOLORE 5 - LED BICOLORE 5 REVISION 03/10/2018
=MATERIALS/1100.zd PARTS LIST : LED BICOLORE 5 - 6ES7193-4CB30-0AA0 REVISION 03/10/2018
=MATERIALS/1100.ze PARTS LIST : 6ES7131-4BF00-0AA0 - 6ES7193-4CB30-0AA0 REVISION 03/10/2018
=MATERIALS/1100.zf PARTS LIST : 6ES7132-4BF00-0AA0 - 6ES7193-4CB30-0AA0 REVISION 03/10/2018
=MATERIALS/1100.zg PARTS LIST : 6ES7135-4FB01-0AB0 - 6ES7193-4CA30-0AA0 REVISION 03/10/2018
=MATERIALS/1200 Summarized parts list : - XVE7535NB23CG REVISION 03/10/2018
=MATERIALS/1200.a Summarized parts list : 081074 - RS4607526 REVISION 03/10/2018
=MATERIALS/1200.b Summarized parts list : 6ES7134-4GD00-0AB0 - 3NA3832 REVISION 03/10/2018
=MATERIALS/1200.c Summarized parts list : 3NP1143-1BC20 - 6ES7151-3AA23-0AB0 REVISION 03/10/2018
=MATERIALS/1200.d Summarized parts list : 6ES7953-8LJ30-0AA0 - 3RW4047-1BB04 REVISION 03/10/2018
=MATERIALS/1200.e Summarized parts list : 3RT1946-4EA2 - SIE.3RW4027-1BB04 REVISION 03/10/2018
=MATERIALS/1200.f Summarized parts list : 3SB3500-4AD11 - 6AV6613-1FA51-3CA0 REVISION 03/10/2018
=MATERIALS/1200.g Summarized parts list : 6AV6618-7FD01-3AB0 - 6SE6400-2FA00-6AD0 REVISION 03/10/2018
=MATERIALS/1200.h Summarized parts list : 63050 - RPQ0985 REVISION 03/10/2018
=CABLE/1300 Cable diagram =CB_1+-100W1 REVISION 03/10/2018
=CABLE/1301 Cable diagram =CB_1+-102W1 REVISION 03/10/2018
=CABLE/1302 Cable diagram =CB_1+-104W1 REVISION 03/10/2018
=CABLE/1303 Cable diagram =CB_1+-106W1 REVISION 03/10/2018
=CABLE/1304 Cable diagram =CB_1+-106W2 REVISION 03/10/2018
=CABLE/1305 Cable diagram =CB_1+-108W1 REVISION 03/10/2018
=CABLE/1306 Cable diagram =CB_1+-108W2 REVISION 03/10/2018
=CABLE/1307 Cable diagram =CB_1+-110W1 REVISION 03/10/2018
=CABLE/1308 Cable diagram =CB_1+-110W2 REVISION 03/10/2018
=CABLE/1309 Cable diagram =CB_1+-114W1 REVISION 03/10/2018
=CABLE/1310 Cable diagram =CB_1+-116W1 REVISION 03/10/2018
=CABLE/1311 Cable diagram =CB_1+-118W1 REVISION 03/10/2018
=CABLE/1312 Cable diagram =CB_1+-118W2 REVISION 03/10/2018

10.k 10.m

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.l
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1313 Cable diagram =CB_1+-118W3 REVISION 03/10/2018


=CABLE/1314 Cable diagram =CB_1+-120W1 REVISION 03/10/2018
=CABLE/1315 Cable diagram =CB_1+-120W2 REVISION 03/10/2018
=CABLE/1316 Cable diagram =CB_1+-122W1 REVISION 03/10/2018
=CABLE/1317 Cable diagram =CB_1+-124W1 REVISION 03/10/2018
=CABLE/1318 Cable diagram =CB_1+-124W2 REVISION 03/10/2018
=CABLE/1319 Cable diagram =CB_1+-126W1 REVISION 03/10/2018
=CABLE/1320 Cable diagram =CB_1+-128W1 REVISION 03/10/2018
=CABLE/1321 Cable diagram =CB_1+-130W1 REVISION 03/10/2018
=CABLE/1322 Cable diagram =CB_1+-130W2 REVISION 03/10/2018
=CABLE/1323 Cable diagram =CB_1+-132W1 REVISION 03/10/2018
=CABLE/1324 Cable diagram =CB_1+-134W1 REVISION 03/10/2018
=CABLE/1325 Cable diagram =CB_1+-136W1 REVISION 03/10/2018
=CABLE/1326 Cable diagram =CB_1+-138W1 REVISION 03/10/2018
=CABLE/1327 Cable diagram =CB_1+-140W1 REVISION 03/10/2018
=CABLE/1328 Cable diagram =CB_1+-142W1 REVISION 03/10/2018
=CABLE/1329 Cable diagram =CB_1+-144W1 REVISION 03/10/2018
=CABLE/1330 Cable diagram =CB_1+-146W1 REVISION 03/10/2018
=CABLE/1331 Cable diagram =CB_1+-148W1 REVISION 03/10/2018
=CABLE/1332 Cable diagram =CB_1+-150W1 REVISION 03/10/2018
=CABLE/1333 Cable diagram =CB_1+-152W1 REVISION 03/10/2018
=CABLE/1334 Cable diagram =CB_1+-154W1 REVISION 03/10/2018
=CABLE/1335 Cable diagram =CB_1+-156W1 REVISION 03/10/2018
=CABLE/1336 Cable diagram =CB_1+-158W1 REVISION 03/10/2018
=CABLE/1337 Cable diagram =CB_1+-160W1 REVISION 03/10/2018
=CABLE/1338 Cable diagram =CB_1+-160W2 REVISION 03/10/2018
=CABLE/1339 Cable diagram =CB_1+-164W1 REVISION 03/10/2018
=CABLE/1340 Cable diagram =CB_1+-164W2 REVISION 03/10/2018
=CABLE/1341 Cable diagram =CB_1+-168W1 REVISION 03/10/2018
=CABLE/1342 Cable diagram =CB_1+-168W2 REVISION 03/10/2018
=CABLE/1343 Cable diagram =CB_1+-172W1 REVISION 03/10/2018
=CABLE/1344 Cable diagram =CB_1+-172W2 REVISION 03/10/2018
=CABLE/1345 Cable diagram =CB_1+-176W1 REVISION 03/10/2018

10.l 10.n

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.m
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1346 Cable diagram =CB_1+-178W1 REVISION 03/10/2018


=CABLE/1347 Cable diagram =CB_1+-180W1 REVISION 03/10/2018
=CABLE/1348 Cable diagram =CB_1+-182W1 REVISION 03/10/2018
=CABLE/1349 Cable diagram =CB_1+-184W1 REVISION 03/10/2018
=CABLE/1350 Cable diagram =CB_1+-184W2 REVISION 03/10/2018
=CABLE/1351 Cable diagram =CB_1+-186W1 REVISION 03/10/2018
=CABLE/1352 Cable diagram =CB_1+-186W2 REVISION 03/10/2018
=CABLE/1353 Cable diagram =CB_1+-188W1 REVISION 03/10/2018
=CABLE/1354 Cable diagram =CB_1+-188W2 REVISION 03/10/2018
=CABLE/1355 Cable diagram =CB_1+-190W1 REVISION 03/10/2018
=CABLE/1356 Cable diagram =CB_1+-190W2 REVISION 03/10/2018
=CABLE/1357 Cable diagram =CB_1+-192W1 REVISION 03/10/2018
=CABLE/1358 Cable diagram =CB_1+-194W1 REVISION 03/10/2018
=CABLE/1359 Cable diagram =CB_1+-196W1 REVISION 03/10/2018
=CABLE/1360 Cable diagram =CB_1+-198W1 REVISION 03/10/2018
=CABLE/1361 Cable diagram =CB_1+-200W1 REVISION 03/10/2018
=CABLE/1362 Cable diagram =CB_1+-202W1 REVISION 03/10/2018
=CABLE/1363 Cable diagram =CB_1+-204W1 REVISION 03/10/2018
=CABLE/1364 Cable diagram =CB_1+-206W1 REVISION 03/10/2018
=CABLE/1365 Cable diagram =CB_1+-208W1 REVISION 03/10/2018
=CABLE/1366 Cable diagram =CB_1+-210W1 REVISION 03/10/2018
=CABLE/1367 Cable diagram =CB_1+-212W1 REVISION 03/10/2018
=CABLE/1368 Cable diagram =CB_1+-214W1 REVISION 03/10/2018
=CABLE/1369 Cable diagram =CB_1+-216W1 REVISION 03/10/2018
=CABLE/1370 Cable diagram =CB_1+-218W1 REVISION 03/10/2018
=CABLE/1371 Cable diagram =CB_1+-220W1 REVISION 03/10/2018
=CABLE/1372 Cable diagram =CB_1+-222W1 REVISION 03/10/2018
=CABLE/1373 Cable diagram =CB_1+-224W1 REVISION 03/10/2018
=CABLE/1374 Cable diagram =CB_1+-226W1 REVISION 03/10/2018
=CABLE/1375 Cable diagram =CB_1+-228W1 REVISION 03/10/2018
=CABLE/1376 Cable diagram =CB_1+-230W1 REVISION 03/10/2018
=CABLE/1377 Cable diagram =CB_1+-232W1 REVISION 03/10/2018
=CABLE/1378 Cable diagram =CB_1+-234W1 REVISION 03/10/2018

10.m 10.o

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.n
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1379 Cable diagram =CB_1+-236W1 REVISION 03/10/2018


=CABLE/1380 Cable diagram =CB_1+-238W1 REVISION 03/10/2018
=CABLE/1381 Cable diagram =CB_1+-240W1 REVISION 03/10/2018
=CABLE/1382 Cable diagram =CB_1+-400W1 REVISION 03/10/2018
=CABLE/1383 Cable diagram =CB_1+-400W2 REVISION 03/10/2018
=CABLE/1384 Cable diagram =CB_1+-401W1 REVISION 03/10/2018
=CABLE/1385 Cable diagram =CB_1+-401W2 REVISION 03/10/2018
=CABLE/1386 Cable diagram =CB_1+-402W1 REVISION 03/10/2018
=CABLE/1387 Cable diagram =CB_1+-402W2 REVISION 03/10/2018
=CABLE/1388 Cable diagram =CB_1+-403W1 REVISION 03/10/2018
=CABLE/1389 Cable diagram =CB_1+-403W2 REVISION 03/10/2018
=CABLE/1390 Cable diagram =CB_1+-404W1 REVISION 03/10/2018
=CABLE/1391 Cable diagram =CB_1+-404W2 REVISION 03/10/2018
=CABLE/1392 Cable diagram =CB_1+-405W1 REVISION 03/10/2018
=CABLE/1393 Cable diagram =CB_1+-405W2 REVISION 03/10/2018
=CABLE/1394 Cable diagram =CB_1+-406W1 REVISION 03/10/2018
=CABLE/1395 Cable diagram =CB_1+-406W2 REVISION 03/10/2018
=CABLE/1396 Cable diagram =CB_1+-407W1 REVISION 03/10/2018
=CABLE/1397 Cable diagram =CB_1+-407W2 REVISION 03/10/2018
=CABLE/1398 Cable diagram =CB_1+-408W1 REVISION 03/10/2018
=CABLE/1399 Cable diagram =CB_1+-408W2 REVISION 03/10/2018
=CABLE/1400 Cable diagram =CB_1+-409W1 REVISION 03/10/2018
=CABLE/1401 Cable diagram =CB_1+-409W2 REVISION 03/10/2018
=CABLE/1402 Cable diagram =CB_1+-410W1 REVISION 03/10/2018
=CABLE/1403 Cable diagram =CB_1+-410W2 REVISION 03/10/2018
=CABLE/1404 Cable diagram =CB_1+-410W3 REVISION 03/10/2018
=CABLE/1405 Cable diagram =CB_1+-411W1 REVISION 03/10/2018
=CABLE/1406 Cable diagram =CB_1+-411W2 REVISION 03/10/2018
=CABLE/1407 Cable diagram =CB_1+-412W1 REVISION 03/10/2018
=CABLE/1408 Cable diagram =CB_1+-412W2 REVISION 03/10/2018
=CABLE/1409 Cable diagram =CB_1+-413W1 REVISION 03/10/2018
=CABLE/1410 Cable diagram =CB_1+-413W2 REVISION 03/10/2018
=CABLE/1411 Cable diagram =CB_1+-414W1 REVISION 03/10/2018

10.n 10.p

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.o
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1412 Cable diagram =CB_1+-414W2 REVISION 03/10/2018


=CABLE/1413 Cable diagram =CB_1+-415W1 REVISION 03/10/2018
=CABLE/1414 Cable diagram =CB_1+-415W2 REVISION 03/10/2018
=CABLE/1415 Cable diagram =CB_1+-416W1 REVISION 03/10/2018
=CABLE/1416 Cable diagram =CB_1+-416W2 REVISION 03/10/2018
=CABLE/1417 Cable diagram =CB_1+-432W1 REVISION 03/10/2018
=CABLE/1418 Cable diagram =CB_1+-433W1 REVISION 03/10/2018
=CABLE/1419 Cable diagram =CB_1+-434W1 REVISION 03/10/2018
=CABLE/1420 Cable diagram =CB_1+-435W1 REVISION 03/10/2018
=CABLE/1421 Cable diagram =CB_1+-436W1 REVISION 03/10/2018
=CABLE/1422 Cable diagram =CB_1+-437W1 REVISION 03/10/2018
=CABLE/1423 Cable diagram =CB_1+-438W1 REVISION 03/10/2018
=CABLE/1424 Cable diagram =CB_1+-439W1 REVISION 03/10/2018
=CABLE/1425 Cable diagram =CB_1+-440W1 REVISION 03/10/2018
=CABLE/1426 Cable diagram =CB_1+-441W1 REVISION 03/10/2018
=CABLE/1427 Cable diagram =CB_1+-450W1 REVISION 03/10/2018
=CABLE/1428 Cable diagram =CB_1+-451W1 REVISION 03/10/2018
=CABLE/1429 Cable diagram =CB_1+-452W1 REVISION 03/10/2018
=CABLE/1430 Cable diagram =CB_1+-453W1 REVISION 03/10/2018
=CABLE/1431 Cable diagram =CB_1+-454W1 REVISION 03/10/2018
=CABLE/1432 Cable diagram =CB_1+-455W1 REVISION 03/10/2018
=CABLE/1433 Cable diagram =CB_1+-456W1 REVISION 03/10/2018
=CABLE/1434 Cable diagram =CB_1+-457W1 REVISION 03/10/2018
=CABLE/1435 Cable diagram =CB_1+-458W1 REVISION 03/10/2018
=CABLE/1436 Cable diagram =CB_1+-459W1 REVISION 03/10/2018
=CABLE/1437 Cable diagram =CB_1+-470W1 REVISION 03/10/2018
=CABLE/1438 Cable diagram =CB_1+-471W1 REVISION 03/10/2018
=CABLE/1439 Cable diagram =CB_1+-472W1 REVISION 03/10/2018
=CABLE/1440 Cable diagram =CB_1+-473W1 REVISION 03/10/2018
=CABLE/1441 Cable diagram =CB_1+-474W1 REVISION 03/10/2018
=CABLE/1442 Cable diagram =CB_1+-475W1 REVISION 03/10/2018
=CABLE/1443 Cable diagram =CB_1+-476W1 REVISION 03/10/2018
=CABLE/1444 Cable diagram =CB_1+-477W1 REVISION 03/10/2018

10.o 10.q

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.p
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1445 Cable diagram =CB_1+-478W1 REVISION 03/10/2018


=CABLE/1446 Cable diagram =CB_1+-479W1 REVISION 03/10/2018
=CABLE/1447 Cable diagram =CB_1+-480W1 REVISION 03/10/2018
=CABLE/1448 Cable diagram =CB_1+-481W1 REVISION 03/10/2018
=CABLE/1449 Cable diagram =CB_1+-482W1 REVISION 03/10/2018
=CABLE/1450 Cable diagram =CB_1+-483W1 REVISION 03/10/2018
=CABLE/1451 Cable diagram =CB_1+-484W1 REVISION 03/10/2018
=CABLE/1452 Cable diagram =CB_1+-485W1 REVISION 03/10/2018
=CABLE/1453 Cable diagram =CB_1+-486W1 REVISION 03/10/2018
=CABLE/1454 Cable diagram =CB_1+-487W1 REVISION 03/10/2018
=CABLE/1455 Cable diagram =CB_1+-488W1 REVISION 03/10/2018
=CABLE/1456 Cable diagram =CB_1+-489W1 REVISION 03/10/2018
=CABLE/1457 Cable diagram =CB_1+-500W1 REVISION 03/10/2018
=CABLE/1458 Cable diagram =CB_1+-501W1 REVISION 03/10/2018
=CABLE/1459 Cable diagram =CB_1+-502W1 REVISION 03/10/2018
=CABLE/1460 Cable diagram =CB_1+-503W1 REVISION 03/10/2018
=CABLE/1461 Cable diagram =CB_1+-504W1 REVISION 03/10/2018
=CABLE/1462 Cable diagram =CB_1+-505W1 REVISION 03/10/2018
=CABLE/1463 Cable diagram =CB_1+-520W1 REVISION 03/10/2018
=CABLE/1464 Cable diagram =CB_1+-520W2 REVISION 03/10/2018
=CABLE/1465 Cable diagram =CB_1+-521W1 REVISION 03/10/2018
=CABLE/1466 Cable diagram =CB_1+-521W2 REVISION 03/10/2018
=CABLE/1467 Cable diagram =CB_1+-523W1 REVISION 03/10/2018
=CABLE/1468 Cable diagram =CB_1+-523W2 REVISION 03/10/2018
=CABLE/1469 Cable diagram =CB_1+-540W1 REVISION 03/10/2018
=CABLE/1470 Cable diagram =CB_1+-540W2 REVISION 03/10/2018
=CABLE/1471 Cable diagram =CB_1+-541W1 REVISION 03/10/2018
=CABLE/1472 Cable diagram =CB_1+-541W2 REVISION 03/10/2018
=CABLE/1473 Cable diagram =CB_1+-542W1 REVISION 03/10/2018
=CABLE/1474 Cable diagram =CB_1+-542W2 REVISION 03/10/2018
=CABLE/1475 Cable diagram =CB_1+-542W3 REVISION 03/10/2018
=CABLE/1476 Cable diagram =CB_1+-550W1 REVISION 03/10/2018
=CABLE/1477 Cable diagram =CB_1+-550W2 REVISION 03/10/2018

10.p 10.r

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.q
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=CABLE/1478 Cable diagram =CB_1+-551W1 REVISION 03/10/2018


=CABLE/1479 Cable diagram =CB_1+-551W2 REVISION 03/10/2018
=CABLE/1480 Cable diagram =CB_1+-552W1 REVISION 03/10/2018
=CABLE/1481 Cable diagram =CB_1+-552W2 REVISION 03/10/2018
=CABLE/1483 Cable diagram =CB_1+-600W2 REVISION 03/10/2018
=CABLE/1484 Cable diagram =CB_1+-600W3 REVISION 03/10/2018
=CABLE/1487 Cable diagram =CB_1+-600W6 REVISION 03/10/2018
=CABLE/1488 Cable diagram =CB_1+-600W7 REVISION 03/10/2018
=CABLE/1491 Cable diagram =CB_1+-601W2 REVISION 03/10/2018
=CABLE/1492 Cable diagram =CB_1+-601W3 REVISION 03/10/2018
=CABLE/1493 Cable diagram =CB_1+-601W4 REVISION 03/10/2018
=CABLE/1494 Cable diagram =CB_1+-601W5 REVISION 03/10/2018
=CABLE/1495 Cable diagram =CB_1+-601W6 REVISION 03/10/2018
=CABLE/1496 Cable diagram =CB_1+-601W7 REVISION 03/10/2018
=CABLE/1497 Cable diagram =CB_1+-601W8 REVISION 03/10/2018
=CABLE/1499 Cable diagram =CB_1+-620W2 REVISION 03/10/2018
=CABLE/1502 Cable diagram =CB_1+-620W5 REVISION 03/10/2018
=CABLE/1503 Cable diagram =CB_1+-620W6 REVISION 03/10/2018
=CABLE/1505 Cable diagram =CB_1+-620W8 REVISION 03/10/2018
=CABLE/1506 Cable diagram =CB_1+-621W1 REVISION 03/10/2018
=CABLE/1508 Cable diagram =CB_1+-640W1 REVISION 03/10/2018
=CABLE/1509 Cable diagram =CB_1+-640W2 REVISION 03/10/2018
=CABLE/1510 Cable diagram =CB_1+-640W3 REVISION 03/10/2018
=TERMINAL/1800 Terminal diagram =CB_1+-100X1 REVISION 03/10/2018
=TERMINAL/1801 Terminal diagram =CB_1+-101X1 REVISION 03/10/2018
=TERMINAL/1802 Terminal diagram =CB_1+-102X1 REVISION 03/10/2018
=TERMINAL/1803 Terminal diagram =CB_1+-103X1 REVISION 03/10/2018
=TERMINAL/1804 Terminal diagram =CB_1+-104X1 REVISION 03/10/2018
=TERMINAL/1805 Terminal diagram =CB_1+-105X1 REVISION 03/10/2018
=TERMINAL/1806 Terminal diagram =CB_1+-106X1 REVISION 03/10/2018
=TERMINAL/1807 Terminal diagram =CB_1+-108X1 REVISION 03/10/2018
=TERMINAL/1808 Terminal diagram =CB_1+-110X1 REVISION 03/10/2018
=TERMINAL/1809 Terminal diagram =CB_1+-112X1 REVISION 03/10/2018

10.q 10.s

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.r
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=TERMINAL/1810 Terminal diagram =CB_1+-114X1 REVISION 03/10/2018


=TERMINAL/1811 Terminal diagram =CB_1+-116X1 REVISION 03/10/2018
=TERMINAL/1812 Terminal diagram =CB_1+-118X1 REVISION 03/10/2018
=TERMINAL/1813 Terminal diagram =CB_1+-120X1 REVISION 03/10/2018
=TERMINAL/1814 Terminal diagram =CB_1+-122X1 REVISION 03/10/2018
=TERMINAL/1815 Terminal diagram =CB_1+-124X1 REVISION 03/10/2018
=TERMINAL/1816 Terminal diagram =CB_1+-126X1 REVISION 03/10/2018
=TERMINAL/1817 Terminal diagram =CB_1+-128X1 REVISION 03/10/2018
=TERMINAL/1818 Terminal diagram =CB_1+-130X1 REVISION 03/10/2018
=TERMINAL/1819 Terminal diagram =CB_1+-132X1 REVISION 03/10/2018
=TERMINAL/1820 Terminal diagram =CB_1+-134X1 REVISION 03/10/2018
=TERMINAL/1821 Terminal diagram =CB_1+-136X1 REVISION 03/10/2018
=TERMINAL/1822 Terminal diagram =CB_1+-138X1 REVISION 03/10/2018
=TERMINAL/1823 Terminal diagram =CB_1+-138X2 REVISION 03/10/2018
=TERMINAL/1824 Terminal diagram =CB_1+-140X1 REVISION 03/10/2018
=TERMINAL/1825 Terminal diagram =CB_1+-142X1 REVISION 03/10/2018
=TERMINAL/1826 Terminal diagram =CB_1+-144X1 REVISION 03/10/2018
=TERMINAL/1827 Terminal diagram =CB_1+-146X1 REVISION 03/10/2018
=TERMINAL/1828 Terminal diagram =CB_1+-148X1 REVISION 03/10/2018
=TERMINAL/1829 Terminal diagram =CB_1+-150X1 REVISION 03/10/2018
=TERMINAL/1830 Terminal diagram =CB_1+-152X1 REVISION 03/10/2018
=TERMINAL/1831 Terminal diagram =CB_1+-154X1 REVISION 03/10/2018
=TERMINAL/1832 Terminal diagram =CB_1+-156X1 REVISION 03/10/2018
=TERMINAL/1833 Terminal diagram =CB_1+-158X1 REVISION 03/10/2018
=TERMINAL/1834 Terminal diagram =CB_1+-160X1 REVISION 03/10/2018
=TERMINAL/1835 Terminal diagram =CB_1+-164X1 REVISION 03/10/2018
=TERMINAL/1836 Terminal diagram =CB_1+-168X1 REVISION 03/10/2018
=TERMINAL/1837 Terminal diagram =CB_1+-172X1 REVISION 03/10/2018
=TERMINAL/1838 Terminal diagram =CB_1+-176X1 REVISION 03/10/2018
=TERMINAL/1839 Terminal diagram =CB_1+-178X1 REVISION 03/10/2018
=TERMINAL/1840 Terminal diagram =CB_1+-180X1 REVISION 03/10/2018
=TERMINAL/1841 Terminal diagram =CB_1+-182X1 REVISION 03/10/2018
=TERMINAL/1842 Terminal diagram =CB_1+-184X1 REVISION 03/10/2018

10.r 10.t

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.s
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=TERMINAL/1843 Terminal diagram =CB_1+-186X1 REVISION 03/10/2018


=TERMINAL/1844 Terminal diagram =CB_1+-190X1 REVISION 03/10/2018
=TERMINAL/1845 Terminal diagram =CB_1+-192X1 REVISION 03/10/2018
=TERMINAL/1846 Terminal diagram =CB_1+-194X1 REVISION 03/10/2018
=TERMINAL/1847 Terminal diagram =CB_1+-196X1 REVISION 03/10/2018
=TERMINAL/1848 Terminal diagram =CB_1+-198X1 REVISION 03/10/2018
=TERMINAL/1849 Terminal diagram =CB_1+-200X1 REVISION 03/10/2018
=TERMINAL/1850 Terminal diagram =CB_1+-202X1 REVISION 03/10/2018
=TERMINAL/1851 Terminal diagram =CB_1+-204X1 REVISION 03/10/2018
=TERMINAL/1852 Terminal diagram =CB_1+-206X1 REVISION 03/10/2018
=TERMINAL/1853 Terminal diagram =CB_1+-208X1 REVISION 03/10/2018
=TERMINAL/1854 Terminal diagram =CB_1+-210X1 REVISION 03/10/2018
=TERMINAL/1855 Terminal diagram =CB_1+-212X1 REVISION 03/10/2018
=TERMINAL/1856 Terminal diagram =CB_1+-214X1 REVISION 03/10/2018
=TERMINAL/1857 Terminal diagram =CB_1+-216X1 REVISION 03/10/2018
=TERMINAL/1858 Terminal diagram =CB_1+-218X1 REVISION 03/10/2018
=TERMINAL/1859 Terminal diagram =CB_1+-220X1 REVISION 03/10/2018
=TERMINAL/1860 Terminal diagram =CB_1+-222X1 REVISION 03/10/2018
=TERMINAL/1861 Terminal diagram =CB_1+-224X1 REVISION 03/10/2018
=TERMINAL/1862 Terminal diagram =CB_1+-226X1 REVISION 03/10/2018
=TERMINAL/1863 Terminal diagram =CB_1+-228X1 REVISION 03/10/2018
=TERMINAL/1864 Terminal diagram =CB_1+-230X1 REVISION 03/10/2018
=TERMINAL/1865 Terminal diagram =CB_1+-232X1 REVISION 03/10/2018
=TERMINAL/1866 Terminal diagram =CB_1+-234X1 REVISION 03/10/2018
=TERMINAL/1867 Terminal diagram =CB_1+-236X1 REVISION 03/10/2018
=TERMINAL/1868 Terminal diagram =CB_1+-238X1 REVISION 03/10/2018
=TERMINAL/1869 Terminal diagram =CB_1+-240X1 REVISION 03/10/2018
=TERMINAL/1870 Terminal diagram =CB_1+-400X1 REVISION 03/10/2018
=TERMINAL/1871 Terminal diagram =CB_1+-401X1 REVISION 03/10/2018
=TERMINAL/1872 Terminal diagram =CB_1+-402X1 REVISION 03/10/2018
=TERMINAL/1873 Terminal diagram =CB_1+-403X1 REVISION 03/10/2018
=TERMINAL/1874 Terminal diagram =CB_1+-404X1 REVISION 03/10/2018
=TERMINAL/1875 Terminal diagram =CB_1+-405X1 REVISION 03/10/2018

10.s 10.u

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.t
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=TERMINAL/1876 Terminal diagram =CB_1+-406X1 REVISION 03/10/2018


=TERMINAL/1877 Terminal diagram =CB_1+-407X1 REVISION 03/10/2018
=TERMINAL/1878 Terminal diagram =CB_1+-408X1 REVISION 03/10/2018
=TERMINAL/1879 Terminal diagram =CB_1+-409X1 REVISION 03/10/2018
=TERMINAL/1880 Terminal diagram =CB_1+-410X1 REVISION 03/10/2018
=TERMINAL/1881 Terminal diagram =CB_1+-411X1 REVISION 03/10/2018
=TERMINAL/1882 Terminal diagram =CB_1+-412X1 REVISION 03/10/2018
=TERMINAL/1883 Terminal diagram =CB_1+-413X1 REVISION 03/10/2018
=TERMINAL/1884 Terminal diagram =CB_1+-414X1 REVISION 03/10/2018
=TERMINAL/1885 Terminal diagram =CB_1+-415X1 REVISION 03/10/2018
=TERMINAL/1886 Terminal diagram =CB_1+-416X1 REVISION 03/10/2018
=TERMINAL/1887 Terminal diagram =CB_1+-432X1 REVISION 03/10/2018
=TERMINAL/1888 Terminal diagram =CB_1+-433X1 REVISION 03/10/2018
=TERMINAL/1889 Terminal diagram =CB_1+-434X1 REVISION 03/10/2018
=TERMINAL/1890 Terminal diagram =CB_1+-435X1 REVISION 03/10/2018
=TERMINAL/1891 Terminal diagram =CB_1+-436X1 REVISION 03/10/2018
=TERMINAL/1892 Terminal diagram =CB_1+-437X1 REVISION 03/10/2018
=TERMINAL/1893 Terminal diagram =CB_1+-438X1 REVISION 03/10/2018
=TERMINAL/1894 Terminal diagram =CB_1+-439X1 REVISION 03/10/2018
=TERMINAL/1895 Terminal diagram =CB_1+-440X1 REVISION 03/10/2018
=TERMINAL/1896 Terminal diagram =CB_1+-441X1 REVISION 03/10/2018
=TERMINAL/1897 Terminal diagram =CB_1+-450X1 REVISION 03/10/2018
=TERMINAL/1898 Terminal diagram =CB_1+-451X1 REVISION 03/10/2018
=TERMINAL/1899 Terminal diagram =CB_1+-452X1 REVISION 03/10/2018
=TERMINAL/1900 Terminal diagram =CB_1+-453X1 REVISION 03/10/2018
=TERMINAL/1901 Terminal diagram =CB_1+-454X1 REVISION 03/10/2018
=TERMINAL/1902 Terminal diagram =CB_1+-455X1 REVISION 03/10/2018
=TERMINAL/1903 Terminal diagram =CB_1+-456X1 REVISION 03/10/2018
=TERMINAL/1904 Terminal diagram =CB_1+-457X1 REVISION 03/10/2018
=TERMINAL/1905 Terminal diagram =CB_1+-458X1 REVISION 03/10/2018
=TERMINAL/1906 Terminal diagram =CB_1+-459X1 REVISION 03/10/2018
=TERMINAL/1907 Terminal diagram =CB_1+-460X1 REVISION 03/10/2018
=TERMINAL/1908 Terminal diagram =CB_1+-470X1 REVISION 03/10/2018

10.t 10.v

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.u
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=TERMINAL/1909 Terminal diagram =CB_1+-471X1 REVISION 03/10/2018


=TERMINAL/1910 Terminal diagram =CB_1+-472X1 REVISION 03/10/2018
=TERMINAL/1911 Terminal diagram =CB_1+-473X1 REVISION 03/10/2018
=TERMINAL/1912 Terminal diagram =CB_1+-474X1 REVISION 03/10/2018
=TERMINAL/1913 Terminal diagram =CB_1+-475X1 REVISION 03/10/2018
=TERMINAL/1914 Terminal diagram =CB_1+-476X1 REVISION 03/10/2018
=TERMINAL/1915 Terminal diagram =CB_1+-477X1 REVISION 03/10/2018
=TERMINAL/1916 Terminal diagram =CB_1+-478X1 REVISION 03/10/2018
=TERMINAL/1917 Terminal diagram =CB_1+-479X1 REVISION 03/10/2018
=TERMINAL/1918 Terminal diagram =CB_1+-480X1 REVISION 03/10/2018
=TERMINAL/1919 Terminal diagram =CB_1+-481X1 REVISION 03/10/2018
=TERMINAL/1920 Terminal diagram =CB_1+-482X1 REVISION 03/10/2018
=TERMINAL/1921 Terminal diagram =CB_1+-483X1 REVISION 03/10/2018
=TERMINAL/1922 Terminal diagram =CB_1+-484X1 REVISION 03/10/2018
=TERMINAL/1923 Terminal diagram =CB_1+-485X1 REVISION 03/10/2018
=TERMINAL/1924 Terminal diagram =CB_1+-486X1 REVISION 03/10/2018
=TERMINAL/1925 Terminal diagram =CB_1+-487X1 REVISION 03/10/2018
=TERMINAL/1926 Terminal diagram =CB_1+-488X1 REVISION 03/10/2018
=TERMINAL/1927 Terminal diagram =CB_1+-489X1 REVISION 03/10/2018
=TERMINAL/1928 Terminal diagram =CB_1+-500X1 REVISION 03/10/2018
=TERMINAL/1929 Terminal diagram =CB_1+-501X1 REVISION 03/10/2018
=TERMINAL/1930 Terminal diagram =CB_1+-502X1 REVISION 03/10/2018
=TERMINAL/1931 Terminal diagram =CB_1+-503X1 REVISION 03/10/2018
=TERMINAL/1932 Terminal diagram =CB_1+-504X1 REVISION 03/10/2018
=TERMINAL/1933 Terminal diagram =CB_1+-505X1 REVISION 03/10/2018
=TERMINAL/1934 Terminal diagram =CB_1+-520X1 REVISION 03/10/2018
=TERMINAL/1935 Terminal diagram =CB_1+-521X1 REVISION 03/10/2018
=TERMINAL/1936 Terminal diagram =CB_1+-522X1 REVISION 03/10/2018
=TERMINAL/1937 Terminal diagram =CB_1+-523X1 REVISION 03/10/2018
=TERMINAL/1938 Terminal diagram =CB_1+-540X1 REVISION 03/10/2018
=TERMINAL/1939 Terminal diagram =CB_1+-540X2 REVISION 03/10/2018
=TERMINAL/1940 Terminal diagram =CB_1+-541X1 REVISION 03/10/2018
=TERMINAL/1941 Terminal diagram =CB_1+-541X2 REVISION 03/10/2018

10.u 10.w

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.v
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PAGE SUMMARY
PAGE DESCRIPTION REV DATE

=TERMINAL/1942 Terminal diagram =CB_1+-542X1 REVISION 03/10/2018


=TERMINAL/1943 Terminal diagram =CB_1+-542X2 REVISION 03/10/2018
=TERMINAL/1944 Terminal diagram =CB_1+-542X3 REVISION 03/10/2018
=TERMINAL/1945 Terminal diagram =CB_1+-550X1 REVISION 03/10/2018
=TERMINAL/1946 Terminal diagram =CB_1+-550X2 REVISION 03/10/2018
=TERMINAL/1947 Terminal diagram =CB_1+-551X1 REVISION 03/10/2018
=TERMINAL/1948 Terminal diagram =CB_1+-551X2 REVISION 03/10/2018
=TERMINAL/1949 Terminal diagram =CB_1+-552X1 REVISION 03/10/2018
=TERMINAL/1950 Terminal diagram =CB_1+-552X2 REVISION 03/10/2018
=TERMINAL/1951 Terminal diagram =CB_1+-600X1 REVISION 03/10/2018
=TERMINAL/1953 Terminal diagram =CB_1+-601X1 REVISION 03/10/2018
=TERMINAL/1953.a Terminal diagram =CB_1+-601X1 REVISION 03/10/2018
=TERMINAL/1955 Terminal diagram =CB_1+-620X1 REVISION 03/10/2018
=TERMINAL/1957 Terminal diagram =CB_1+-621X1 REVISION 03/10/2018
=TERMINAL/1958 Terminal diagram =CB_1+-640X1 REVISION 03/10/2018
=TERMINAL/1959 Terminal diagram =CB_1+-XEM1 REVISION 03/10/2018

10.v 20

REVISION 03/10/2018 00143 Data 03/10/2018 PAGE INDEX = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 10.w
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

10.w 21

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT GLOBAL = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 20
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

20 22

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT DOOR 1-2 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 21
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

21 23

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT DOOR 2-3 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 22
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

22 24

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT DOOR 4-5 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 23
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

23 25

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT DOOR 6-7 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 24
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24 30

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT DOOR 8-9 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 25
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

100
1115

301 mm
PF PF PF PF PF PF PF PF PF 1015

153
185

185
‎Ω RESISTENZE LED ‎Ω ALIMENTATORI
BUSBAR 30 X 10 ‎Ω RELE G2R

210

210

210

210

210

210

40
306

306

306

90 105 105 105 105 105

40

40

152
‎Ω RESISTENZE LED

120

120
210 185 185 ‎Ω RELE G2R ‎Ω PRESA, RELE' SAFE,EWON

100

40

40

40
‎Ω RESISTENZE LED

120

120
‎Ω RELE G2R

303 mm

260
‎Ω ET200S

40

40
BUSBAR 30 X 10
‎Ω RESISTENZE LED

120

120
SS SS
SS ‎Ω RELE G2R
144
160

40

40

80
200

57
70

100

120
120
‎Ω RELE G2R
IG
1885

280

40

260
‎Ω ET200S

INV

INV

INV

INV

INV
INV INV INV INV INV INV
100 100 100

173

173

173

173

173

120
202

202

202
‎Ω RELE G2R

340
73 73 73 73 73
149 149 149

100
561

486

598 80 80 80 80 80 80 80 80 80
100

60 60 60 60 60 60 60 60 60
681
616

616

40

40
235 800

312

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4

BARRA DI TERRA 12X4


80 SS SS SS 690
251
341

300
144

144

235 235 144

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA

‎Ω MORSETTIERA
55 55 55

700
40 40 690
100

100
TR TR TR
80 80

202

202

202
‎Ω INCLINATA MORSETTIERA POTENZA
149 149 149

200
BARRA TERRA 30X5 SULLA CARPENTERIA
388 mm
130 130 130 130 130 130 130 130 130

800 800 800 800 800 800 800 800 800

25 40

REVISION 03/10/2018 00143 Data 03/10/2018 LAYOUT INTERNAL = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 30
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

DOOR 1 DOOR 2 DOOR 3 DOOR 4 DOOR 5 DOOR 6 DOOR 7 DOOR 8 DOOR 9

LAMP
SIREN

SYNOPTIC SYNOPTIC SYNOPTIC LOGO

PC

FAN FAN FAN FAN FAN FAN FAN

30 41

REVISION 03/10/2018 00143 Data 03/10/2018 GLOBAL = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 40
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

SC-1 SC-2 SC-3 SC-4


CONTROL PANEL CONTROL PANEL CONTROL PANEL CONTROL PANEL
-106U1 -108U1 -110U1 -112U1
/106.7 /108.7 /110.7 /112.7

SC-1 SC-2 SC-3 SC-4


SPEED SPEED SPEED SPEED
-106R1 -108R1 -110R1 -112R1
/106.4 /108.4 /110.4 /112.4

SC-1 SC-2 SC-3 SC-4


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-107S1 -109S1 -111S1 -113S1
/107.1 /109.1 /111.1 /113.1

SC-1 SC-1 SC-2 SC-2 SC-3 SC-3 SC-4 SC-4


START STOP START STOP START STOP START STOP
-107S3 -107S2 -109S3 -109S2 -111S3 -111S2 -113S3 -113S2
/107.3 /107.2 /109.3 /109.2 /111.3 /111.2 /113.3 /113.2

40 42

REVISION 03/10/2018 00143 Data 03/10/2018 DOOR 1 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 41
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

80 mm 80 mm 80 mm 80 mm

230VAC 110VAC 24VAC 24VDC -


PRESENCE PRESENCE PRESENCE PRESENCE -

70H1 71H1 72H1 73H1


/70.7 /71.7 /72.7 /73.6

80 mm
350S1 R G E N
RESET E -
EMERGENCY /350.2 M -

C
350S3
E

Y
/350.4

350S3 -
S
T O P

41 43

REVISION 03/10/2018 00143 Data 03/10/2018 DOOR 2 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 42
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

AGR-1 P-3 P-4


CONTROL PANEL CONTROL PANEL CONTROL PANEL
-118U1 -124U1 -130U1
/118.7 /124.7 /130.7

AGR-1 P-3 P-4


SPEED SPEED SPEED
118R1 -124R1 -130R1
/118.4 /124.4 /130.4

AGR-1 P-3 P-4


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-119S1 -125S1 -131S1
/119.1 /125.1 /131.1

AGR-1 AGR-1 P-3 P-3 P-4 P-4


START STOP START STOP START STOP
-119S3 -119S2 -125S3 -125S2 -131S3 -131S2
/119.3 /119.2 /125.3 /125.2 /131.3 /131.2

42 44

REVISION 03/10/2018 00143 Data 03/10/2018 DOOR 3 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 43
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

ND-402 ND-406 ND-408 ND-409


CONTROL PANEL CONTROL PANEL CONTROL PANEL CONTROL PANEL
-184U1 -186U1 -188U1 -190U1
/184.7 /186.7 /188.7 /190.7

43 45

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 4 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 44
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

FS1 FS2 FS3 SPARE AGT-5 BL-4


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-100S1 -102S1 -104S1 -132S1 -122S1
/100.3 /102.3 /104.3 /132.3 /122.3

FS1 FS1 FS2 FS2 FS3 FS3 SPARE SPARE AGT-5 AGT-5 BL-4 BL-4
START STOP START STOP START STOP START STOP START STOP START STOP
-100S3 -100S2 -102S3 -102S2 -104S3 -104S2 -132S3 -132S2 -122S3 -122S2
/100.5 /100.4 /102.5 /102.4 /104.5 /104.4 /132.5 /132.4 /122.5 /122.4

NT-6 P-2 P-6 P-7 P-801 P-802


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-220S1 -114S1 -116S1 -232S1 -222S1 -224S1
/220.3 /114.3 /116.3 /232.3 /222.3 /224.5

NT-6 NT-6 P-2 P-2 P-6 P-6 P-7 P-7 P-801 P-801 P-802 P-802
START STOP START STOP START STOP START STOP START STOP START STOP
-220S3 -220S2 -114S3 -114S2 -116S3 -116S2 -232S3 -232S2 -222S3 -222S2 -224S3 -224S2
/220.5 /220.4 /114.5 /114.4 /116.5 /116.4 /232.5 /232.4 /222.5 /222.4 /224.6 /224.6

P-803 P-804 SPARE SPARE SPARE SPARE


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-226S1 -228S1
/226.3 /228.3

P-803 P-803 P-804 P-804 SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
START STOP START STOP START STOP START STOP START STOP START STOP
-226S3 -226S2 -228S3 -228S2
/226.5 /226.4 /228.5 /228.4

KV-1108 KV-1113 KV-1201 KV-1202 KV-1205 FSH-1 KY-1 KY-2 KY-3 KY-4 SPARE KY-6
AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-412S1 -400S1 -401S1 -402S1 -403S1 -460S1 -450S1 -451S1 -452S1 -453S1 -454S1
/412.1 /400.1 /401.1 /402.1 /403.1 /460.1 /450.1 /451.1 /452.1 /453.1 /454.1

44 46

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 5 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 45
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

AGAF-1A AGAF-1B AGR-2 BL-1 BL-2 BL-3


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-126S1 -128S1 -120S1 -134S1 -136S1 -146S1
/126.3 /128.3 /120.5 /134.5 /136.5 /146.5

AGAF-1A AGAF-1A AGAF-1B AGAF-1B AGR-2 AGR-2 BL-1 BL-1 BL-2 BL-2 BL-3 BL-3
START STOP START STOP START STOP START STOP START STOP START STOP
-126S3 -126S2 -128S3 -128S2 -120S3 -120S2 -134S3 -134S2 -136S3 -136S2 -146S3 -146S2
/126.5 /126.4 /128.5 /128.4 /120.6 /120.6 /134.6 /134.6 /136.6 /136.6 /146.7 /146.6

BL-5 BL-6 SPARE MC-1 MC-3A MC-3B


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-150S1 -144S1 -152S1 -140S1 -142S1
/150.5 /144.3 /152.3 /140.3 /142.3

BL-5 BL-5 BL-6 BL-6 SPARE SPARE MC-1 MC-1 MC-3A MC-3A MC-3B MC-3B
START STOP START STOP START STOP START STOP START STOP START STOP
-150S3 -150S2 -144S3 -144S2 -152S3 -152S2 -140S3 -140S2 -142S3 -142S2
/150.6 /150.6 /144.5 /144.4 /152.5 /152.4 /140.5 /140.4 /142.5 /142.4

P-5 P-805 NT-1 NT-1 VV-1A SPARE HST-1


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN DIRECTION AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-158S1 -230S1 -148S1 -148S4 -154S1 -138S1
/158.3 /230.3 /148.3 /148.6 /154.3 /138.3

P-5 P-5 P-805 P-805 NT-1 NT-1 VV-1A VV-1A SPARE SPARE HST-1 HST-1
START STOP START STOP START STOP START STOP START STOP START STOP
-158S3 -158S2 -230S3 -230S2 -148S3 -148S2 -154S3 -154S2 -138S3 -138S2
/158.5 /158.4 /230.5 /230.4 /148.5 /148.4 /154.5 /154.4 /138.4 /138.4

VY-1011A/B VY-1012A/B VY-1013A/B VY-1014A/B SPARE SPARE


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-160S1 -164S1 -168S1 -172S1
/160.4 /164.4 /168.4 /172.4

VY-1011A/B VY-1011A/B VY-1012A/B VY-1012A/B VY-1013A/B VY-1013A/B VY-1014A/B VY-1014A/B SPARE SPARE SPARE SPARE
START STOP START STOP START STOP START STOP START STOP START STOP
-160S3 -160S2 -164S3 -164S2 -168S3 -168S2 -172S3 -172S2
/160.6 /160.5 /164.6 /164.5 /168.6 /168.5 /172.6 /172.5

KV-1101 KV-1115 KV-1309 KV-1310 KV-1316 KV-1320 AR-5 AR-6 SPARE SPARE SPARE SPARE
AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-413S1 -411S1 -404S1 -405S1 -406S1 -407S1 -520S1 -521S1
/413.1 /411.1 /404.1 /405.1 /406.1 /407.1 /520.1 /521.1

45 47

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 6 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 46
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

FS-402A FS-402B FS-406 FS-408 FS-409 MX-402


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-178S1 -180S1 -194S1 -192S1 -196S1 -200S1
/178.3 /180.3 /194.3 /192.3 /196.3 /200.3

FS-402A FS-402A FS-402B FS-402B FS-406 FS-406 FS-408 FS-408 FS-409 FS-409 MX-402 MX-402
START STOP START STOP START STOP START STOP START STOP START STOP
-178S3 -178S2 -180S3 -180S2 -194S3 -194S2 -192S3 -192S2 -196S3 -196S2 -200S3 -200S2
/178.5 /178.4 /180.5 /180.4 /194.5 /194.4 /192.5 /192.4 /196.5 /196.4 /200.5 /200.4

DP-431 DP-432 ET-401 NT-402 NT-410 NT-410 NT-411 NT-411


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN DIRECTION AUTO-0-MAN DIRECTION
-202S1 -204S1 -206S1 -182S1 -198S1 -198S4 -176S1 -176S4
/202.3 /204.3 /206.3 /182.3 /198.3 /198.6 /176.3 /176.6

DP-431 DP-431 DP-432 DP-432 ET-401 ET-401 NT-402 NT-402 NT-410 NT-410 NT-411 NT-411
START STOP START STOP START STOP START STOP START STOP START STOP
-202S3 -202S2 -204S3 -204S2 -206S3 -206S2 -182S3 -182S2 -198S3 -198S2 -176S3 -176S2
/202.4 /202.4 /204.4 /204.4 /206.5 /206.4 /182.5 /182.4 /198.5 /198.4 /176.5 /176.4

VY-4021A/B SPARE VY-4022A/B SPARE SPARE


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-212S1 -216S1
/212.3 /216.3

VY-4021A/B VY-4021A/B SPARE SPARE VY-4022A/B VY-4022A/B SPARE SPARE SPARE SPARE KY-7 KY-8
START STOP START STOP START STOP START STOP START STOP AUTO-0-MAN AUTO-0-MAN
-212S3 -212S2 -216S3 -216S2 -455S1 -456S1
/212.5 /212.4 /216.5 /216.4 /455.1 /456.1

ND-402FAN ND-406FAN ND-408FAN ND-409FAN SPARE KY-9 KY-10


AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN
-234S1 -236S1 -238S1 -240S1 -457S1 -458S1
/234.3 /236.3 /238.3 /240.3 /457.1 /458.1

ND-402FAN ND-402FAN ND-406FAN ND-406FAN ND-408FAN ND-408FAN ND-409FAN ND-409FAN SPARE SPARE KY-11 SPARE
START STOP START STOP START STOP START STOP START STOP AUTO-0-MAN STOP
-234S3 -234S2 -236S3 -236S2 -238S3 -238S2 -240S3 -240S2 -459S1
/234.5 /234.4 /236.5 /236.4 /238.5 /238.4 /240.5 /240.4 /459.1

SPARE SPARE KV-4102A KV-4102B SPARE SPARE KV-4120 AR-7 AR-8 VY-2A/B SPARE SPARE
AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN AUTO-0-MAN PLC-0-REMOTE AUTO-0-MAN AUTO-0-MAN
-408S1 -409S1 -415S1 -416S1 -414S1 -522S1 -523S1 -208S1
/408.1 /409.1 /415.1 /416.1 /414.1 /522.1 /523.1 /208.3

46 48

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 7 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 47
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

352U1

-185U1 -187U1
/185.1 /187.1

ND-402 ND-406
MAN - AUTO MAN - AUTO
-185S1 -187S1
/185.4 /187.4

-189U1 -191U1
/189.1 /191.1

ND-408 ND-409
MAN - AUTO MAN - AUTO
-189S1 -191S1
/189.4 /191.4

47 49

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 8 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 48
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-750T1
/750.6

UPS
ON /OFF

74S1
/74.4

ALARM
RESET

350S2
/350.9

48 50

REVISION 03/10/2018 00143 Data 08/10/2018 DOOR 9 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 49
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
L1 L1 /51.0
L1 / 51.1 /52.0
/70.0
L2 L2 /71.0
L2 / 51.1 /72.0
/73.0
L3 L3 /100.0
L3 / 51.1 /102.0
/104.0
/106.0
/108.0
/110.0
/112.0
/114.0
/116.0
/118.0
/120.0
/122.0
/124.0
/126.0
/128.0
/130.0
/132.0
05001
50.1 / 52.1 /134.0
/136.0
x1 /138.0
-50L1 /140.0
5TT6060-0Y /142.0
SIEMENS x2
/144.0
05002
50.2 / 52.1 /146.0
05003 /148.0
50.3 / 52.2 /150.0
x1 /152.0
/154.0
-50L2 /156.0
5TT6060-0Y
SIEMENS x2 /158.0
05004 /160.0
50.4 / 52.2 /164.0
05005
50.5 / 52.2 /168.0
/172.0
x1
/176.0
-50L3 /178.0
5TT6060-0Y
x2 /180.0
SIEMENS
05006 /182.0
50.6 / 52.2 /184.0
/186.0
30X10 30X10 30X10 /188.0
mm² mm² mm²
/190.0
/192.0
1 3 5 /194.0
/196.0
/198.0
/200.0
-50Q1 /202.0
630A I> I> I> /204.0
3VL5763-1SB36-0AA0 /206.0
3VL9500-4ED30
3VL9600-3HF05 2 4 6 /208.0
3VL9600-8CA30 /210.0
3VL9800-2AE00
SIEMENS
/212.0
/214.0
PE /216.0
/218.0
/220.0
/222.0
30X10 30X10 30X10 30X5
mm² mm² mm² mm² /224.0
/226.0
/228.0
PE /230.0
/232.0
/234.0
/236.0
/238.0
/240.0
POWER_CENTER

L1 L2 L3 PE

49 51

REVISION 03/10/2018 00143 Data 08/10/2018 INCOMING LINE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 50
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
50.7 / L1 L1 / 52.1

50.7 / L2 L2 / 52.1

50.7 / L3 L3 / 52.1

1 3 5
-51F1 -51H2
3NW7033 /51.2 L1 L2 L3
3NW6003-1 LAMPEGGIATORE
SIEMENS 2 4 6
FLASHING 400VAC
FUSE 10,3x38 10A gL/gG 3PH
DOOR 2
05101

05102

05103

EZM 5 6 3
021644
05101

05102

05103

-051X1

-51H2 -51H4 -51H6 -51H8


/51.3 L1 L2 L3 LAMPEGGIATORE L1 L2 L3 LAMPEGGIATORE L1 L2 L3 LAMPEGGIATORE L1 L2 L3
LAMPEGGIATORE FLASHING FLASHING FLASHING
FLASHING 400VAC 400VAC 400VAC 400VAC
3PH 3PH 3PH 3PH
DOOR 3 EZM DOOR 5 EZM DOOR 7 EZM DOOR 9
EZM 5 6 3 021644 5 6 3 021644 5 6 3 021644 5 6 3
021644

-51H1 -51H3 -51H5 -51H7


LAMPEGGIATORE L1 L2 L3 LAMPEGGIATORE L1 L2 L3 LAMPEGGIATORE L1 L2 L3 LAMPEGGIATORE L1 L2 L3
FLASHING FLASHING FLASHING FLASHING
400VAC 400VAC 400VAC 400VAC
3PH 3PH 3PH 3PH
EZM DOOR 1 EZM DOOR 4 EZM DOOR 6 EZM DOOR 8
021644 5 6 3 021644 5 6 3 021644 5 6 3 021644 5 6 3

50 52

REVISION 03/10/2018 00143 Data 08/10/2018 VOLTAGE MONITORING DEVICE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 51
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
51.9 / L1 L1 / 70.1

51.9 / L2 L2 / 70.1

51.9 / L3 L3 / 70.1

230VAC
230VAC / 70.8
0230VAC
0230VAC / 70.8
1 3 5
-52F1
3NW7033
3NW6003-1
SIEMENS 2 4 6
1 3
FUSE 10,3x38 10A gL/gG -52F2
3NW7023
3NW6003-1
SIEMENS 2 4
FUSE 10,3x38 10A gL/gG
05201

05202

05203

05204

05205

-52U1 -X2 -X4


V1 V2 V3 VN L/+ N/- FE DIC DI1 DI0 DOC DO1 DO0

-X3
Com
PAC3100
+/B
PAC3100 MANUAL
-/A

IL1/k IL1/l IL2/k IL2/l IL3/k IL3/l


-X1

50.1 50.3 50.5


50.6 50.6 50.6

PE PE PE

50.2 50.4 50.6


50.6 50.6 50.6

51 70

REVISION 03/10/2018 00143 Data 08/10/2018 AMMETER DEVICE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 52
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
52.9 / L1 L1 / 71.1

52.9 / L2 L2 / 71.1

52.9 / L3 L3 / 71.1

1 3
-70F1
3NW7023
3NW6003-1
SIEMENS 2 4
FUSE 10,3x38 10A gL/gG

-70U1
RPQ0985
TEKNOMEGA 230VAC 230VAC 52.5 74.0 75.0 76.0 77.0 146.2
1 1 230VAC / 352.0
07001

07004

2 2

0230VAC 0230VAC 52.5 74.0 75.0 76.0 77.0 146.2


3 3 0230VAC / 352.0

4 4
400

-70T1
3000VA
0-400 DISTRIBUTION SUPPLY 230VAC
0-230 230 0
TM3000400230
TRANSFORMER 3KVA 400/230V
CTA PE
07005
07002

mm² mm²
6 6
x1
-70H1
1 /42.0
3 x2
-70F2 3SB3501-6BA60
22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER
3NW7053 SIEMENS
3NW6005-1 4
SIEMENS 2
CYLINDRICAL FUSE GG 10X38MM 500V 16A

230VAC PRESENCE

1 PE
07006

PE
-70H2
07003

021192
EZM

LOGO LIGHT

52 71

REVISION 03/10/2018 00143 Data 08/10/2018 AUXILIARY CIRCUIT 230VAC = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 70
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
70.9 / L1 L1 / 72.1

70.9 / L2 L2 / 72.1

70.9 / L3 L3 / 72.1

1 3
-71F2
3NW7023
3NW6003-1
SIEMENS 2 4
FUSE 10,3x38 10A gL/gG

-71U4 101.3 103.3 105.3 179.2 181.2 193.2


RPQ0985 195.2 197.2 400.0 401.0 402.0 403.0
404.0 405.0 406.0 407.0 408.0 409.0
TEKNOMEGA 110VAC 110VAC 411.0 412.0 413.0 414.0 415.0 416.0
1 1 110VAC /
450.0 451.0 452.0 453.0 454.0 455.0
456.0 457.0 458.0 459.0 460.0 472.0
473.0 520.0 521.0 522.0 523.0 540.7
07101

07104

541.7
2 2
101.3 103.3 105.3 179.2 181.2 193.2
195.2 197.2 400.0 401.0 402.0 403.0
404.0 405.0 406.0 407.0 408.0 409.0
0110VAC 0110VAC 410.0 411.0 412.0 413.0 414.0 415.0
3 3 0110VAC /
416.0 450.0 451.0 452.0 453.0 454.0
455.0 456.0 457.0 458.0 459.0 460.0
472.0 473.0 520.0 521.0 522.0 523.0
540.7 541.7
4 4
400

-71T1
2000VA
0-400 DISTRIBUTION SUPPLY 24VAC
0-110 110 0
TM2000400110
TRANSFORMER 2KVA 400/110V
CTA PE
07105
07102

mm² mm²
6 6
x1
-71H1
1 /42.2
3 x2
-71F3 3SB3501-6BA60
22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER
3NW7053 SIEMENS
3NW6005-1 4
SIEMENS 2
CYLINDRICAL FUSE GG 10X38MM 500V 16A

110VAC PRESENCE
07106
07103

70 72

REVISION 03/10/2018 00143 Data 08/10/2018 AUXILIARY CIRCUIT 110VAC = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 71
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
71.9 / L1 L1 / 73.1

71.9 / L2 L2 / 73.1

71.9 / L3 L3 / 73.1

1 3
-72F1
3NW7023
3NW6003-1
SIEMENS 2 4
FUSE 10,3x38 10A gL/gG

-072U1
RPQ0985
TEKNOMEGA 24VAC 24VAC
1 1 24VAC / 138.5 148.5 176.5 198.5
07201

07204

2 2

024VAC 024VAC
3 3 024VAC / 138.5 148.5 176.5 198.5

4 4
400

-72T1
1000VA
0-400 DISTRIBUTION SUPPLY 24VAC
0-24 24 0
TM1000400024
TRANSFORMER 1KVA 400/24V
CTA PE
07205
07202

mm² mm²
6 6
x1
-72H1
1 /42.4
3 x2
-72F2 3SB3501-6BA60
22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER
3NW7053 SIEMENS
3NW6010-1 4
SIEMENS 2
FUSE 10,3x38 25A gG

24VAC PRESENCE
07206
07203

71 73

REVISION 03/10/2018 00143 Data 08/10/2018 AUXILIARY CIRCUIT 24VAC = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 72
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
72.9 / L1 L1 / 100.0

72.9 / L2 L2 / 100.0

72.9 / L3 L3 / 100.0

13 23 33
350K1 100.3 100.8 102.3 102.8 104.3 104.8
/350.4 106.3 107.2 108.3 109.2 110.3 111.2
14 24 34 112.3 113.2 114.3 114.8 116.3 116.8
1 3 5 118.3 119.2 120.2 120.2 122.3 122.8

07309

07310

07311
-73F1 124.3 125.2 126.3 126.8 128.3 128.8
3NW7033 130.3 131.2 132.3 132.8 134.2 134.2
3NW6003-1 136.2 136.2 138.2 138.8 140.3 140.8
SIEMENS 2 4 6 142.3 142.8 144.3 144.8 146.2 146.5
FUSE 10,3x38 10A gL/gG 13 23 33 148.3 149.1 150.2 150.2 152.3 152.8
350K2 154.3 154.8 158.3 158.8 160.4 160.8
/350.5 164.4 164.8 168.4 168.8 172.4 172.8
14 24 34
176.3 177.1 178.3 178.8 180.3 180.8
182.3 182.8 184.3 185.0 186.3 187.0

07312
-73U1 188.3 189.0 190.3 191.0 192.3 192.8

07308
RPQ0985 194.3 194.8 196.3 196.8 198.3 199.1
200.3 200.8 202.2 202.4 202.8 204.2
TEKNOMEGA 24VDC 24VDC 204.4 204.8 206.3 206.8 208.3 208.8
1 1 24VDC /
212.3 212.8 216.3 216.8 220.3 220.8
222.3 222.8 224.2 224.2 226.3 226.8
228.3 228.8 230.3 230.8 232.3 232.8
234.3 234.8 236.3 236.8 238.3 238.8
2 2 240.3 240.8 400.0 401.0 402.0 403.0
404.0 405.0 406.0 407.0 408.0 409.0
410.0 411.0 412.0 413.0 414.0 415.0
416.0 432.0 433.0 434.0 435.0 436.0
024VDC 437.0 438.0 439.0 440.0 441.0 450.2
3 3
07301

07304

07305

451.2 452.2 453.2 454.2 455.2 456.2


457.2 458.2 459.2 460.2 470.0 471.0
472.3 473.3 474.0 475.0 476.0 477.0
478.0 479.0 480.0 481.0 482.0 483.0
4 4 484.0 485.0 486.0 487.0 488.0 489.0
500.0 501.0 502.0 503.0 504.0 505.0
520.0 521.0 522.0 523.0 540.0 541.0
74.8 77.6 100.3 100.5 101.1 102.3
542.0 700.0 800.0
L1 L2 L3 102.5 103.1 104.3 104.5 105.1 106.8
107.1 108.8 109.1 110.8 111.1 112.8
DISTRIBUTION SUPPLY 24VDC 113.1 114.3 114.5 116.3 116.5 118.8
-73V1 3 119.1 120.1 120.4 120.7 122.3 122.5
9373.0 124.8 125.1 126.3 126.5 128.3 128.5
CONTA CLIP 130.8 131.1 132.3 132.5 134.1 134.4
134.7 136.1 136.4 136.7 138.3 138.6
24 0 140.3 140.5 142.3 142.5 144.3 144.5
146.3 146.4 146.7 148.3 148.8 150.1
PE 150.4 150.7 152.3 152.5 154.3 154.6
07302

07306

158.3 158.6 160.4 160.6 164.4 164.6


168.4 168.6 172.4 172.6 176.3 176.8
178.3 178.6 179.0 180.3 180.6 181.0
mm² mm² x1 182.3 182.6 184.5 185.0 186.5 187.0
6 6
-73H1 188.5 189.0 190.5 191.0 192.3 192.6
1 /42.6 193.1 194.3 194.6 195.0 196.3 196.6
3 x2
-73F2 3SB3501-6BA60
22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER
197.0 198.3 198.8 200.3 200.5 202.2
3NW7053 202.4 202.6 204.2 204.4 204.6 206.3
SIEMENS
3NW6005-1 024VDC 206.5 208.3 208.6 212.3 212.5 214.3
2
4 024VDC /
216.3 216.5 218.3 220.3 220.6 222.3
SIEMENS
CYLINDRICAL FUSE GG 10X38MM 500V 16A 222.5 224.1 224.4 224.7 226.3 226.5
228.3 228.5 230.3 230.5 232.3 232.5
24VDC PRESENCE 234.3 234.5 236.3 236.5 238.3 238.5
240.3 240.5 350.0 352.5 400.0 401.0
402.0 403.0 404.0 405.0 406.0 407.0
07307

408.0 409.0 410.0 411.0 412.0 413.0


414.0 415.0 416.0 432.0 433.0 434.0
435.0 436.0 437.0 438.0 439.0 440.0
07303

441.0 450.0 451.0 452.0 453.0 454.0


455.0 456.0 457.0 458.0 459.0 460.0
470.0 471.0 474.0 475.0 476.0 477.0
478.0 479.0 480.0 481.0 482.0 483.0
484.0 485.0 486.0 487.0 488.0 489.0
500.0 501.0 502.0 503.0 504.0 505.0
520.0 521.0 522.0 523.0 540.0 541.0
542.0 700.0 710.0 711.0 712.0 713.0
714.0 715.0 716.0 717.0 718.0 719.0
720.0 721.0 722.0 723.0 724.0 725.0
800.0 800.0 800.0

72 74

REVISION 03/10/2018 00143 Data 08/10/2018 AUXILIARY CIRCUIT 24VDC = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 73
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

230VAC
70.8 / 230VAC
0230VAC
70.8 / 0230VAC

1 3
-74F1
C10A
5SY42107
SIEMENS 2 4
07401

07405
PE

07410
-74U1 13
UPS 1000VA L1 N PE
-74S1
ON/OFF UPS 14
3SB3500-4AD11
350.0 710.0 711.0 712.0 713.0 714.0

07411
230 0 3SB3400-0B
SIEMENS 24VDCON 715.0 716.0 717.0 718.0 719.0 720.0
24VDCON / 721.0 722.0 723.0 724.0 725.0 800.0
800.0

024VDC
024VDC / 73.8
07402

07406

24VDCON

024VDC
1 3 N.B. -074X1
-74F2 FARE MODIFICA UPS
C10A
5SY42107 PER ACCENSIONE E
2 4
SIEMENS SPEGNIMENTO DA PORTELLA
07403

07407

L1 L2

-74V1
93850
CONTA CLIP

24 L3
07404

07405

PE

mm² mm²
4 4

1
3
-74F3
3NW7053
3NW6003-1 4
SIEMENS 2
FUSE 10,3x38 10A gL/gG

73 75

REVISION 03/10/2018 00143 Data 08/10/2018 AUXILIARY CIRCUIT 24VDC ALWAYS ON = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 74
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

230VAC
70.8 / 230VAC
0230VAC
70.8 / 0230VAC

1
3
-75F1
3NW7053
3NW6003-1 4
SIEMENS 2
FUSE 10,3x38 10A gL/gG
07501

07502
-075X1 07501

07502

1 1 1 1 1 1 1
2 2 2 2 2 2 2

-75M1 M -75M2 M -75M3 M -75M4 M -75M5 M -75M6 M -75M7 M


XVE7535NB23CG XVE7535NB23CG XVE7535NB23CG XVE7535NB23CG XVE7535NB23CG XVE7535NB23CG XVE7535NB23CG
EXOM 1~ 091246 1~ 091246 1~ 091246 1~ 091246 1~ 091246 1~ 091246 1~
091246 PE EXOM PE EXOM PE EXOM PE EXOM PE EXOM PE EXOM PE
EZM

PE PE PE PE PE PE PE

DOOR 1 DOOR 2 DOOR 3 DOOR 4 DOOR 5 DOOR 8 DOOR 9

74 76

REVISION 03/10/2018 00143 Data 08/10/2018 CABINET VENTILATION = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 75
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

70.8 / 230VAC

70.8 / 0230VAC

1
3
-76F1
3NW7053
3NW6003-1 4
SIEMENS 2
FUSE 10,3x38 10A gL/gG
07601

07602
-076X1

07601

07602

11 11 11 11 11 11 11 11 11
-76AS1 -76AS2 -76AS3 -76AS4 -76AS5 -76AS6 -76AS7 -76AS8 -76AS9
FR501 FR501 FR501 FR501 FR501 FR501 FR501 FR501 FR501
PIZZATO PIZZATO PIZZATO PIZZATO PIZZATO PIZZATO PIZZATO PIZZATO PIZZATO
12 12 12 12 12 12 12 12 12
07603

07604

07605

07606

07607

07608

07609

07610

07611
1 PE 1 PE 1 PE 1 PE 1 PE 1 PE 1 PE 1 PE 1 PE
PE PE PE PE PE PE PE PE PE
-76H1 -76H2 -76H3 -76H4 -76H5 -76H6 -76H7 -76H8 -76H9
021192 021192 021192 021192 021192 021192 021192 021192 021192
EZM EZM EZM EZM EZM EZM EZM EZM EZM

2 2 2 2 2 2 2 2 2

DOOR LIGHT 1 DOOR LIGHT 2 DOOR LIGHT 3 DOOR LIGHT 4 DOOR LIGHT 5 DOOR LIGHT 6 DOOR LIGHT 7 DOOR LIGHT 8 DOOR LIGHT 9

75 77

REVISION 03/10/2018 00143 Data 08/10/2018 CABINET LIGHTING = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 76
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

230VAC
70.8 / 230VAC
LAMP SIREN
0230VAC -LAMP -SIREN
70.8 / 0230VAC A14.7 A14.6

-DO14 -DO14

DO DO
8 4

1 3

-77Q1 1
3
5SM2322-0 -77F1
5SY4216-7 3NW7053
SIEMENS I ‎Δ 3NW6003-1 4
SIEMENS 2
2 4 FUSE 10,3x38 10A gL/gG

07703

07704
07701

07702

13 13

07707

07708
-77K1 -77K2
/77.7 14 /77.8 14
07705

07706
A1 A1
-77K1 -77K2
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E
OMRON OMRON

024VDC
73.8 / 024VDC

x1 x1
1 PE PE -77H1 -77H2
63050 53012
-77X1 2
SIRENA SIRENA
GW20246 x2 x2
PE
GW26410
GEWISS
13 14 /77.3 13 14 /77.4

LAMPALLARM SIREN
SERVICE SOCKET LAMPALLARM SIREN

76 100

REVISION 03/10/2018 00143 Data 08/10/2018 CABINET SERVICE SOCKET = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 77
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
73.9 / L1 L1 / 102.0

73.9 / L2 L2 / 102.0

73.9 / L3 L3 / 102.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR FS1 START COMMAND
1 3 5 11 13
FS1-COM
-100Q1 A0.1
2,2-3,2A 12 14 11
SIE.3RV2011-1DA10
/100.8

/100.3

3RV2901-1E I> I> I> -100K3 -DO0


SIEMENS /100.6 12 14
2 4 6
DO

10007
5

11 33
13 23 -100Q1 -100K2
10001

10003

10005

-100S1 /100.0 12 /100.3 34


/45.1 MAN
14 24
AUTO
3SB3500-2DA11

10010
3SB3400-0B
SIEMENS

1 3 5
-100K2 11 13
/100.3 2 4 6 -100S2 -100S3
10008
3SB3500-0AA21 12 3SB3501-0AA41 14

10012
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

10011

10013

10014
BA9S24
SIEMENS

23
-100K2
10002

10004

10006

/100.3 24

13
-100Q1
10009

/100.0 14
5 1
DI DI
-100W1 -100X1 1 2 3
-DI0 -DI0
FG7(O)R
A1 x1 A1
4G2,5
FS1 -100K2 -100S3 -100K3 E0.1 E0.0
BU BN BK 3RT2016-1BB41 /100.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FS1-IAL FS1-RUN
3RA1921-1DA00 OMRON FAN FOR FS1 FAULT FAN FOR FS1 RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

FS1 M 1 2 /100.0 14
3 4 /100.1 12 11 /100.3
3~ 5 6 /100.1
1,1kW 400/50 D
FAN FOR FS. 1 PE 11 12 /710.2
23 24 /100.4
PE 33 34 /100.9
43 44 /710.2

FAN FOR FS. 1

77 101

REVISION 03/10/2018 00143 Data 08/10/2018 FS1 1,1kW 400/50 D FAN FOR FS. 1 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 100
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS1 START
COMMAND 0110VAC
FS1-CA-COM
71.8 / 0110VAC
A0.0

-DO0

DO
1

21
-101K1
/101.1 22 24
10101

10102

-101X1 1 2

+FS1
A1 A1
-101K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14
12 11 /710.3
24
22 21 /101.3 COMPRESSED AIR OF FAN FS1 START COMMAND FILTER

100 102

REVISION 03/10/2018 00143 Data 08/10/2018 FS1 1,1kW 400/50 D FAN FOR FS. 1 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 101
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
100.9 / L1 L1 / 104.0

100.9 / L2 L2 / 104.0

100.9 / L3 L3 / 104.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR FS2 START COMMAND
1 3 5 11 13
FS2-COM
-102Q1 A0.3
2,2-3,2A 12 14 11
SIE.3RV2011-1DA10
/102.8

/102.3

3RV2901-1E I> I> I> -102K2 -DO0


SIEMENS /102.6 12 14
2 4 6
DO

10207
6

11 33
13 23 -102Q1 -102K1
10201

10203

10205

-102S1 /102.0 12 /102.3 34


/45.2 MAN
14 24
AUTO
3SB3500-2DA11

10210
3SB3400-0B
SIEMENS

1 3 5
-102K1 11 13
/102.3 2 4 6 -102S2 -102S3
10208
3SB3500-0AA21 12 3SB3501-0AA41 14

10212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

10211

10213

10214
BA9S24
SIEMENS

23
-102K1
10202

10204

10206

/102.3 24

13
-102Q1
10209

/102.0 14
6 2
DI DI
-102W1 -102X1 1 2 3
-DI0 -DI0
FG7(O)R
A1 x1 A1
4G2,5
FS2 -102K1 -102S3 -102K2 E0.3 E0.2
BU BN BK 3RT2016-1BB41 /102.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FS2-IAL FS2-RUN
3RA1921-1DA00 OMRON FAN FOR FS2 FAULT FAN FOR FS2 RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

FS2 M 1 2 /102.0 14
3 4 /102.1 12 11 /102.3
3~ 5 6 /102.1
1,1 kW 400/50 D
FAN FOR FS. 2 PE 23 24 /102.4
33 34 /102.9
PE

FAN FOR FS. 2

101 103

REVISION 03/10/2018 00143 Data 08/10/2018 FS2 1,1kW 400/50 D FAN FOR FS. 2 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 102
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS2 START
COMMAND 0110VAC
FS2-CA-COM
71.8 / 0110VAC
A0.2

-DO0

DO
2

21
-103K1
/103.1 22 24
10301

10302

-103X1 1 2

+FS2
A1 A1
-103K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

24
22 21 /103.3

COMPRESSED AIR OF FAN FS2 START COMMAND FILTER

102 104

REVISION 03/10/2018 00143 Data 08/10/2018 FS2 1,1kW 400/50 D FAN FOR FS. 2 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 103
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
102.9 / L1 L1 / 106.0

102.9 / L2 L2 / 106.0

102.9 / L3 L3 / 106.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR FS3 START COMMAND
1 3 5 11 13
FS3-COM
-104Q1 A0.5
2,2-3,2A 12 14 11
SIE.3RV2011-1DA10
/104.8

/104.3

3RV2901-1E I> I> I> -104K2 -DO0


SIEMENS /104.6 12 14
2 4 6
DO

10407
7

11 33
13 23 -104Q1 -104K1
10401

10403

10405

-104S1 /104.0 12 /104.3 34


/45.4 MAN
14 24
AUTO
3SB3500-2DA11

10410
3SB3400-0B
SIEMENS

1 3 5
-104K1 11 13
/104.3 2 4 6 -104S2 -104S3
10408
3SB3500-0AA21 12 3SB3501-0AA41 14

10412
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

10411

10413

10414
BA9S24
SIEMENS

23
-104K1
10402

10404

10406

/104.3 24

13
-104Q1
10409

/104.0 14
7 3
DI DI
-104W1 -104X1 1 2 3
-DI0 -DI0
FG7(O)R
A1 x1 A1
4G2,5
FS3 -104K1 -104S3 -104K2 E0.5 E0.4
BU BN BK 3RT2016-1BB41 /104.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FS3-IAL FS3-RUN
3RA1921-1DA00 OMRON FAN FOR FS3 FAULT FAN FOR FS3 RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

M 1 2 /104.0 14
FS3 3 4 /104.1 12 11 /104.3
1,1 kW 400/50 D 3~ 5 6 /104.1

FAN FOR FS. 3 PE 11 12 /710.5


23 24 /104.4
PE 33 34 /104.9
43 44 /710.5

FAN FOR FS. 3

103 105

REVISION 03/10/2018 00143 Data 08/10/2018 FS3 1,1kW 400/50 D FAN FOR FS. 3 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 104
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS3 START
COMMAND 0110VAC
FS3-CA-COM
71.8 / 0110VAC
A0.4

-DO0

DO
3

21
-105K1
/105.1 22 24
10501

10502

-105X1 1 2

+FS3
A1 A1
-105K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

24
22 21 /105.3

COMPRESSED AIR OF FAN FS3 START COMMAND FILTER

104 106

REVISION 03/10/2018 00143 Data 08/10/2018 FS3 1,1kW 400/50 D FAN FOR FS. 3 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 105
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
104.9 / L1 L1 / 108.0

104.9 / L2 L2 / 108.0

104.9 / L3 L3 / 108.0

STPP DOSING SCREW CONVEYOR


SPEED OUT

1 3 5 SC-1-OUT
-106F1 PAW256 6SE6400-0PM00-0AA0
3NW7033 SC1_2 / 107.3 /756.3
6SE6400-0BP00-0AA0
3NW6005-1 /41.1
2 4 6 -AO0
SIEMENS -106U1
DRICAL FUSE GG 10X38MM 500V 16A SC1_1 / 107.3
QV0 S0+ Mana S0-
1 2 3 4
21
-107K1 -106R1
x2
/107.1 24 RS4607526 Hz 75000
15AA031 x1
10601

10603

10605

RS
I FN

10611

10612

10610
0 JOG P

10608
BOP

10614

10616
6SE6400-0BP00-0AA0

-106T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-106W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 10619 10620 10621 10622

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6440-2AD23-0BA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
10602

10604

10606

-106W1

024VDC

024VDC
10619

10615

10618
FG7OH2R 24VDC
4G2,5SH -106X1 1 2 3 10607 73.7 / 24VDC
SC-1 BU BN BK PE

024VDC / 73.8
SC1_FAULT / 712.4
SC1_RUN / 712.4
PE 2 6 1 2 5 6
DI DI M0+ M0- M1+ M1-
U1 V1 W1
-DI1 -DI1 -AI0 -AI0

SC-1 M /755.2 /755.2


E1.2 E1.3 PEW256 PEW258
3~
3kW 400V 50Hz SC1-RUN SC1-IAL SC-1-AMP SC-1-FB
PE
STPP DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR
STPP dosing screw conveyor
RUNNING FAULT CURRENT SPEED

105 STPP DOSING SCREW CONVEYOR 107

REVISION 03/10/2018 00143 Data 08/10/2018 SC-1 3kW 400/50 SFC STPP DOSING SCREW = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 106
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

STPP DOSING SCREW CONVEYOR


START COMMAND
SC1-COM
A1.2

-DO1

DO
2

24VDC
73.7 / 24VDC
106.4 / SC1_2
10701

106.4 / SC1_1

13 23 33
-107S1
/41.2 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
10703

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-107S2 -107S3
10702

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
10704

BA9S24
SIEMENS

14
-107K1
/107.1 11

A1 x1
-107K1 -107S3
G2R2SND24VDC A2 /107.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14 11 /107.2
21 24 /106.2

106 108

REVISION 03/10/2018 00143 Data 08/10/2018 SC-1 3kW 400/50 SFC STPP DOSING SCREW = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 107
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
106.9 / L1 L1 / 110.0

106.9 / L2 L2 / 110.0

106.9 / L3 L3 / 110.0

STPP DOSING SCREW CONVEYOR


SPEED OUT

1 3 5 SC-2-OUT
-108F1 PAW258 6SE6400-0PM00-0AA0
3NW7033 SC2_1 / 109.3 /756.3
6SE6400-0BP00-0AA0
3NW6005-1 /41.3
2 4 6 -AO0
SIEMENS -108U1
DRICAL FUSE GG 10X38MM 500V 16A SC2_2 / 109.3
QV1 S1+ Mana S1-
5 6 7 8
21
-109K1 -108R1
x2
/109.1 24 RS4607526 Hz 75000
15AA031 x1
10801

10803

10805

RS
I FN

10812

10810
10808

10811
0 JOG P

BOP

10814

10816
6SE6400-0BP00-0AA0

-108T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-108W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 10819 10820 10821 10822

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6440-2AD23-0BA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
10802

10804

10806

-108W1

024VDC
10818
FG7OH2R 24VDC

024VDC
4G2,5SH -108X1 1 2 3 73.7 / 24VDC
10819

10815
10807
SC-1 BU BN BK PE

SC2_FAULT / 712.5 024VDC / 73.8

SC2_RUN / 712.5
PE
3 7 3 4 7 8
U1 V1 W1
DI DI M2+ M2- M3+ M3-

SC-2 M -DI1 -DI1 -AI0 -AI0


/755.2 /755.2
3~
3kW 400V 50Hz E1.4 E1.5 PEW260 PEW262
PE
SC2-RUN SC2-IAL SC-2-AMP SC-2-FB
S.Sulphate dosing screw conveyor
S. SULPHATE DOSING SCREW S. SULPHATE DOSING SCREW STPP DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR
CONVEYOR RUNNING CONVEYOR FAULT CURRENT SPEED
107 S.SULPHATE DOSING SCREW CONVEYOR 109

REVISION 03/10/2018 00143 Data 08/10/2018 SC-2 3kW 400/50 SFC S.SULPHATE DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 108
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

S. SULPHATE DOSING SCREW


CONVEYOR START COMMAND
SC2-COM
A1.3

-DO1

DO
6
24VDC
73.7 / 24VDC
10901 108.4 / SC2_2

108.4 / SC2_1

13 23 33
-109S1
/41.3 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
10903

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-109S2 -109S3
10902

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
10904

BA9S24
SIEMENS

14
-109K1
/109.1 11

A1 x1
-109K1 -109S3
G2R2SND24VDC A2 /109.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14 11 /109.2
21 24 /108.2

108 110

REVISION 03/10/2018 00143 Data 08/10/2018 SC-2 3kW 400/50 SFC S.SULPHATE DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 109
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
108.9 / L1 L1 / 112.0

108.9 / L2 L2 / 112.0

108.9 / L3 L3 / 112.0

STPP DOSING SCREW CONVEYOR


SPEED OUT

1 3 5 SC-3-OUT
-110F1 PAW260 6SE6400-0PM00-0AA0
3NW7033 SC3_1 / 111.3 /756.4
6SE6400-0BP00-0AA0
3NW6005-1 /41.5
2 4 6 -AO1
SIEMENS -110U1
DRICAL FUSE GG 10X38MM 500V 16A SC3_2 / 111.3
QV0 S0+ Mana S0-
1 2 3 4
21
-111K1 -110R1
x2
/111.1 24 RS4607526 Hz 75000
15AA031 x1
11001

11003

11005

RS
I FN

11012

11010
11008

11011
0 JOG P

BOP

11014

11016
6SE6400-0BP00-0AA0

-110T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-110W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 11019 11020 11021 11022

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6440-2AD23-0BA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
11002

11004

11006

-110W1
FG7OH2R

024VDC

024VDC
-110X1 1 2 3
11019

11015

11018
4G2,5SH 24VDC
SC-3 11007 73.7 / 24VDC
BU BN BK PE

SC3_FAULT / 712.6 024VDC / 73.8

SC3_RUN / 712.6
PE 4 8 1 2 5 6
DI DI M0+ M0- M1+ M1-
U1 V1 W1
-DI1 -DI1 -AI1 -AI1

SC-3 M /755.2 /755.2


E1.6 E1.7 PEW264 PEW266
3~
3kW 400V 50Hz SC3-RUN SC3-IAL SC-3-AMP SC-3-FB
PE
SODA ASH DOSING SCREW CONVEYOR SODA ASH DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR STPP DOSING SCREW CONVEYOR
Soda Ash dosing screw conveyor
RUNNING FAULT CURRENT SPEED

109 SODA ASH DOSING SCREW COONVEYOR 111

REVISION 03/10/2018 00143 Data 08/10/2018 SC-3 3kW 400/50 SFC SODA ASH DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW COONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 110
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

SODA ASH DOSING SCREW CONVEYOR


START COMMAND
SC3-COM
A1.4

-DO1

DO
3
24VDC
73.7 / 24VDC
110.4 / SC3_2

110.4 / SC3_1
11101

13 23 33
-111S1
/41.5 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
11103

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-111S2 -111S3
11102

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
11104

BA9S24
SIEMENS

14
-111K1
/111.1 11

A1 x1
-111K1 -111S3
G2R2SND24VDC A2 /111.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14 11 /111.2
21 24 /110.2

110 112

REVISION 03/10/2018 00143 Data 08/10/2018 SC-3 3kW 400/50 SFC SODA ASH DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW COONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 111
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
110.9 / L1 L1 / 114.0

110.9 / L2 L2 / 114.0

110.9 / L3 L3 / 114.0

MINORS DOSING SCREW CONVEYOR


SPEED OUT

1 3 5 SC-4-OUT
-112F1 PAW262 6SE6400-0PM00-0AA0
3NW7033 SC4_1 / 113.3 /756.4
6SE6400-0BP00-0AA0
3NW6005-1 /41.6
2 4 6 -AO1
SIEMENS -112U1
DRICAL FUSE GG 10X38MM 500V 16A SC4_2 / 113.3
QV1 S1+ Mana S1-
11201

11204

11207

5 6 7 8
21
-113K1 -112R1
x2
/113.1 24 RS4607526 Hz 75000
15AA031
-112V1 3
RS
x1
I

11213
6SE6400-2FA00-6AD0 FN

11214
SIEMENS

11215
11202

11205

11208

11211
0 JOG P

11217

11219
BOP
6SE6400-0BP00-0AA0

-112T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-112W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 11222 11223 11224 11225

AC A A
digital inputs
DC D D
1
2
n.c. 60Hz ADC1 ADC2
1 2 1 2
mA mA
3
4
V V
6SE6440-2UD21-5AA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
11203

11206

11209

-112W1
FG7OH2R

024VDC

024VDC
-112X1 1 2 3
11222

11218

11221
4G2,5SH 24VDC
SC-4 73.7 / 24VDC
BU BN BK PE

SC4_FAULT / 712.6 024VDC / 73.8

SC4_RUN / 712.7
PE 1 5 3 4 7 8
DI DI M2+ M2- M3+ M3-
U1 V1 W1
-DI2 -DI2 -AI1 -AI1

SC-4 M /755.2 /755.2


E2.0 E2.1 PEW268 PEW270
3~
1,5 kW 400/50 SFC SC4-RUN SC4-IAL SC-4-AMP SC-4-FB
PE
MINORS DOSING SCREW CONVEYOR MINORS DOSING SCREW CONVEYOR MINORS DOSING SCREW CONVEYOR MINORS DOSING SCREW CONVEYOR
MINORS DOSING
RUNNING FAULT CURRENT SPEED
SCREW CONVEYOR

111 MINORS DOSING SCREW CONVEYOR 113

REVISION 03/10/2018 00143 Data 08/10/2018 SC-4 1,5kW 400/50 SFC MINORS DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 112
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

MINORS DOSING SCREW CONVEYOR


START COMMAND
SC4-COM
A1.5

-DO1

DO
7
24VDC
73.7 / 24VDC
112.4 / SC4_2

112.4 / SC4_1
11301

13 23 33
-113S1
/41.7 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
11303

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-113S2 -113S3
11302

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
11304

BA9S24
SIEMENS

14
-113K1
/113.1 11

A1 x1
-113K1 -113S3
G2R2SND24VDC A2 /113.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14 11 /113.2
21 24 /112.2

112 114

REVISION 03/10/2018 00143 Data 08/10/2018 SC-4 1,5kW 400/50 SFC MINORS DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SCREW CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 113
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
112.9 / L1 L1 / 116.0

112.9 / L2 L2 / 116.0

112.9 / L3 L3 / 116.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SLURRY TRANSFER PUMP START
COMMAND
1 3 5 11 13
P2-COM
-114Q1 A2.4
7-10A 12 14 11
SIE.3RV2011-1JA10
/114.8

/114.3

3RV2901-1E I> I> I> -114K2 -DO2


SIEMENS /114.6 12 14
2 4 6
DO

11407
3

11 33
13 23 -114Q1 -114K1
11401

11403

11405

-114S1 /114.0 12 /114.3 34


/45.2 MAN
14 24
AUTO
3SB3500-2DA11

11410
3SB3400-0B
SIEMENS

1 3 5
-114K1 11 13
/114.3 2 4 6 -114S2 -114S3
11408
3SB3500-0AA21 12 3SB3501-0AA41 14

11412
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

11411

11413

11414
BA9S24
SIEMENS

13
-114K1
11402

11404

11406

/114.3 14

13
-114Q1
11409

/114.0 14
8 4
DI DI
-114W1 -114X1 1 2 3
-DI3 -DI3
FG7(O)R
A1 x1 A1
4G4
P-802 -114K1 -114S3 -114K2 E3.7 E3.6
BU BN BK SIE.3RT2016-1BB41 /114.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E P2-IAL P2-RUN
3RA1921-1DA00 OMRON SLURRY TRANSFER PUMP FAULT SLURRY TRANSFER PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P2 M 1 2 /114.0 14
3 4 /114.1 12 11 /114.3
3~ 5 6 /114.1
4 kW 400/50 4P D
PE 13 14 /114.4
SLURRY TRANSFER PUMP 11 12 /714.3
PE 33 34 /114.9
43 44 /714.3

SLURRY TRANSFER PUMP

113 115

REVISION 03/10/2018 00143 Data 08/10/2018 P2 5,5kW 400/50 4P D SLURRY TRANSFER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 114
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

114 116

REVISION 03/10/2018 00143 Data 03/10/2018 P2 5,5kW 400/50 4P D SLURRY TRANSFER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 115
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
114.9 / L1 L1 / 118.0

114.9 / L2 L2 / 118.0

114.9 / L3 L3 / 118.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SLURRY TRANSFER PUMP START
COMMAND
1 3 5 11 13
P6-COM
-116Q1 A2.6
3RV2011-1JA10 12 14 11
3RV2901-1E
/116.8

/116.3

SIEMENS I> I> I> -116K2 -DO2


A SCREW CONNECTION /116.6 12 14
2 4 6
DO

11607
4

11 33
13 23 -116Q1 -116K1
11601

11603

11605

-116S1 /116.0 12 /116.3 34


/45.4 MAN
14 24
AUTO
3SB3500-2DA11

11610
3SB3400-0B
SIEMENS

1 3 5
-116K1 11 13
/116.3 2 4 6 -116S2 -116S3
11608
3SB3500-0AA21 12 3SB3501-0AA41 14

11612
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

11611

11613

11614
BA9S24
SIEMENS

13
-116K1
11602

11604

11606

/116.3 14

13
-116Q1
11609

/116.0 14
6 2
DI DI
-116X1 1 2 3
-DI4 -DI4
-116W1
A1 x1 A1
FG7(O)R
4G2,5 -116K1 -116S3 -116K2 E4.3 E4.2
P-801 BU BN BK 3RT2016-1BB41 /116.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E P6-IAL P6-RUN
3RA1921-1DA00 OMRON SLURRY TRANSFER PUMP FAULT SLURRY TRANSFER PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P6 M 1 2 /116.0 14
3 4 /116.1 12 11 /116.3
3~ 5 6 /116.1
4 kW 400/50 D
PE 11 12 /714.3
RECOVERED WATER 13 14 /116.4
TRANSFER PUMP PE 33 34 /116.9
43 44 /714.4

RECOVERED WATER TRANSFER PUMP

115 117

REVISION 03/10/2018 00143 Data 08/10/2018 P6 4kW 400/50 D RECOVERED WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. TRANSFER PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 116
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

116 118

REVISION 03/10/2018 00143 Data 03/10/2018 P6 4kW 400/50 D RECOVERED WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. TRANSFER PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 117
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
116.9 / L1 L1 / 120.0

116.9 / L2 L2 / 120.0

116.9 / L3 L3 / 120.0

STIRRER FOR R1A SPEED OUT

1 3 5 AGR1-OUT
-118F1 PAW264 6SE6400-0PM00-0AA0
3NP1123-1BC20 AGR1_2 / 119.3 /756.4
6SE6400-0BE00-0AA0
3NA3822 /43.1
2 4 6 -AO2
SIEMENS -118U1
FUS.NH gL/gG GR.000 500Vca/440Vcc 63A
AGR1_1 / 119.3
QV0 S0+ Mana S0-
1 2 3 4
21
-119K1 -118R1
x2
/119.1 24 RS4607526 Hz 75000
15AA031 x1
11801

11803

11805

RS
I Hand FN

11813
0 Auto P

11814

11812
11810 BOP-2

11816

11818
6SE6400-0BE00-0AA0

-118T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-118W3
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 11821 11822 11823 11824

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6430-2AD31-8DA0
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
11802

11804

11806

11808

11809

-118W1 -118W2

024VDC

024VDC
11821

11817

11820
FG7OH2R FG7OH2R 24VDC
4G16SH -118X1 1 2 3 11807 2X2,5SH 4 5
11809
AGR-1 BU BN BK PE AGR-1 BU BN

AGR1_FAULT / 714.5
024VDC / 73.8
PE
24VDC AGR1_RUN / 714.5
x1 73.7
2 6 1 2 5 6
-170R2 DI DI M0+ M0- M1+ M1-
PE
x2 -DI3 -DI3 -AI2 -AI2
U1 V1 W1
/755.3 /755.3

AGR-1 M E3.2 E3.3 PEW272 PEW274


AGR1-RUN AGR1-IAL AGR1-AMP AGR1-FB
3~
18,5 kW 400/50 4P SFC STIRRER FOR R1A RUNNING STIRRER FOR R1A FAULT STIRRER FOR R1A CURRENT STIRRER FOR R1A SPEED
PE
STIRRER FOR R.1

117 STIRRER FOR R.1 THERMISTOR AGR-1A 119

REVISION 03/10/2018 00143 Data 08/10/2018 AGR-1 18,5kW 400/50 4P SFC STIRRER FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. R.1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 118
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

STIRRER FOR R1A START COMMAND


AGR1-COM
A2.2

-DO2

DO
2
24VDC
73.7 / 24VDC
118.4 / AGR1_2

118.4 / AGR1_1
11901

13 23 33
-119S1
/43.2 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
11903

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-119S2 -119S3
11902

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
11904

BA9S24
SIEMENS

14
-119K1
/119.1 11

A1 x1
-119K1 -119S3
G2R2SND24VDC A2 /119.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

14 11 /119.2
21 24 /118.2

118 120

REVISION 03/10/2018 00143 Data 08/10/2018 AGR-1 18,5kW 400/50 4P SFC STIRRER FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. R.1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 119
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
118.9 / L1 L1 / 122.0

118.9 / L2 L2 / 122.0

118.9 / L3 L3 / 122.0

73.7
24VDC
1 3 5
-120F1
3NP1123-1BC20 24VDC
3NA3820
SIEMENS 2 4 6
FUS.NH gL/gG GR.000 500Vca 50A 13
STIRRER FOR R2 START COMMAND
-120K2 AGR2-COM
/120.5 14
A2.7
11
12001

12003

12005

73.8 12009 AGR2_RUN / 120.9 -120K3 -DO2


024VDC /120.7 12 14
DO

12010
8

-120Q1 13 23
1L1 3L2 5L3 A2 A1 IN1 13 14/24 23
-120S1
/46.4 MAN
14 24 120.2 120.2
AUTO
Siemens 3SB3500-2DA11 AGR2_FAULT AGR2_RUN

12012
ON/ BY-
RUN PASSED 3SB3400-0B
SIEMENS

11 13
-120S2 -120S3

12011
3RW40 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

12013

12014
BA9S24
SIEMENS

13
FAILURE/OVERLOAD -120K2
/120.5 14

3RW4024-1TB04
2T1 4T2 6T3 T11/T21 T12 T22 95 96 98

7 3
12002

12004

12006

12007

12008

DI DI
-DI4 -DI4
A1 x1 A1
AGR2_FAULT / 120.8
4 5 -120K2 -120S3 -120K3 E4.5 E4.4
-120W1 3RT2016-1BB41 A2 /120.6 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E AGR2-IAL AGR2-RUN
FG7(O)R
4G4 -120X1 1 2 3 3RA1921-1DA00 OMRON STIRRER FOR R2 FAULT STIRRER FOR R2 RUNNING
PE
AGR-2/1 -120W2 SIEMENS
BU BN BKFG7(O)R
24VDC 024VDC 024VDC
2X1,5SH
73.7 73.8 / 024VDC 73.8 / 024VDC
AGR-2/2
BU BN

1 2 14
3 4 12 11 /120.5
5 6
x1 11 12 /716.3
-120R1 13 14 /120.2
U1 V1 W1
13 14 /120.6
x2
43 44 /716.4
AGR-2 M
3~
5,5kW 400V 50Hz
PE
Stirrer for R.2

119 STIRRER FOR R.2 THERMISTOR AGR-2 121

REVISION 03/10/2018 00143 Data 08/10/2018 AGR-2 4kW 400/50 4P ST STIRRER FOR R.2 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 120
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

120 122

REVISION 03/10/2018 00143 Data 03/10/2018 AGR-2 4kW 400/50 4P ST STIRRER FOR R.2 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 121
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
120.9 / L1 L1 / 124.0

120.9 / L2 L2 / 124.0

120.9 / L3 L3 / 124.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC EXTRACTION VAPORS FAN START
COMMAND
1 3 5 11 13
BL4-COM
-122Q1 A2.3
3RV2011-1FA10 12 14 11
3RV2901-1E
/122.8

/122.3

SIEMENS I> I> I> -122K2 -DO2


MCB .S00, 3.5-5A,VT /122.6 12 14
2 4 6
DO

12207
6

11 33
13 23 -122Q1 -122K1
12201

12203

12205

-122S1 /122.0 12 /122.3 34


/45.8 MAN
14 24
AUTO
3SB3500-2DA11

12210
3SB3400-0B
SIEMENS

1 3 5
-122K1 11 13
/122.3 2 4 6 -122S2 -122S3
12208
3SB3500-0AA21 12 3SB3501-0AA41 14

12212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

12211

12213

12214
BA9S24
SIEMENS

13
-122K1
12202

12204

12206

/122.3 14

13
-122Q1
12209

/122.0 14
7 3
DI DI
-122W1 -122X1 1 2 3
-DI3 -DI3
FG7(O)R
A1 x1 A1
4G2,5
BL-4 -122K1 -122S3 -122K2 E3.5 E3.4
BU BN BK 3RT2016-1BB41 /122.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E BL4-IAL BL4-RUN
3RA1921-1DA00 OMRON EXTRACTION VAPORS FAN FAULT EXTRACTION VAPORS FAN RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

BL-4 M 1 2 /122.0 14
3 4 /122.1 12 11 /122.3
3~ 5 6 /122.1
1,5 kW 400/50 D
PE 11 12 /713.7
EXTRACTION VAPORS FAN 13 14 /122.4
PE 33 34 /122.9
43 44 /713.8

EXTRACTION VAPORS FAN

121 123

REVISION 03/10/2018 00143 Data 08/10/2018 BL-4 1,5kW 400/50 D EXTRACTION VAPORS = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 122
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

122 124

REVISION 03/10/2018 00143 Data 03/10/2018 BL-4 1,5kW 400/50 D EXTRACTION VAPORS = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 123
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
122.9 / L1 L1 / 126.0

122.9 / L2 L2 / 126.0

122.9 / L3 L3 / 126.0

BOOSTER PUMP SPEED OUT

1 3 5 P3-OUT
-124F1 PAW266 6SE6400-0PM00-0AA0
3NP1133-1BC20 P3_2 / 125.3 /756.4
6SE6400-0BE00-0AA0
3NA3832 /43.3
2 4 6 -AO2
SIEMENS -124U1
FUS.NH gL/gG GR.00 500Vca 125A P3_1 / 125.3
QV1 S1+ Mana S1-
5 6 7 8
21
-125K1 -124R1
x2
24 RS4607526 Hz 75000
15AA031 x1
12401

12403

12405

RS
I Hand FN

12410
12411

12412
12408
0 Auto P

BOP-2

12414

12416
6SE6400-0BE00-0AA0

-124T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ 11

L1 L2 L3 PE DC- DC+ 5 6 7 8 16 17 9 28 1 2 3 4 10 10
-124W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 12419 12420 12421 12422

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6430-2AD33-7EA0
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
12402

-124W1
FG7(O)R

024VDC

024VDC
12419

12415

12418
3G35+1X25 24VDC
P-805 -124X1 1 2
12404 3
12406 12407
BU BN BK PE

P3_FAULT / 716.6 024VDC / 73.8


24VDC
73.7 P3_RUN / 716.6
PE 4 8 3 4 7 8
DI DI M2+ M2- M3+ M3-
U1 V1 W1
-DI4 -DI4 -AI2 -AI2

M /755.3 /755.3
P-3 E4.6 E4.7 PEW276 PEW278
37kW 400V 50Hz 3~
P3-RUN P3-IAL P3-AMP P3-FB
Homogenizer pump PE
BOOSTER PUMP RUNNING BOOSTER PUMP FAULT BOOSTER PUMP CURRENT BOOSTER PUMP SPEED

123 HOMOGENIZER PUMP 125

REVISION 03/10/2018 00143 Data 08/10/2018 P-3 37kW 400/50 4P SFC HOMOGENIZER PUMP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 124
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

BOOSTER PUMP START COMMAND


P3-COM
A3.0

-DO3

DO
1
24VDC
73.7 / 24VDC
124.4 / P3_2

124.4 / P3_1
12501

13 23 33
-125S1
/43.3 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
12503

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-125S2 -125S3
12502

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
12504

BA9S24
SIEMENS

13
-125K3
/125.1 14

A1 x1
-125K3 -125S3
G2R2SND24VDC A2 /125.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

13 14 /125.2

124 126

REVISION 03/10/2018 00143 Data 08/10/2018 P-3 37kW 400/50 4P SFC HOMOGENIZER PUMP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 125
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
124.9 / L1 L1 / 128.0

124.9 / L2 L2 / 128.0

124.9 / L3 L3 / 128.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SLURRY FEEDING FILTER START
COMMAND
1 3 5 11 13
AGAF1A-COM
-126Q1 A3.1
0,9-1,25A 12 14 11
SIE.3RV2011-0KA10
/126.8

/126.3

3RV2901-1E I> I> I> -126K2 -DO3


SIEMENS /126.6 12 14
2 4 6
DO

12607
5

11 33
13 23 -126Q1 -126K1
12601

12603

12605

-126S1 /126.0 12 /126.3 34


/46.1 MAN
14 24
AUTO
3SB3500-2DA11

12610
3SB3400-0B
SIEMENS

1 3 5
-126K1 11 13
/126.3 2 4 6 -126S2 -126S3
12608
3SB3500-0AA21 12 3SB3501-0AA41 14

12612
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

12611

12613

12614
BA9S24
SIEMENS

13
-126K1
12602

12604

12606

/126.3 14

13
-126Q1
12609

/126.0 14

5 1
-126W1 -126X1 1 2 3
FG7(O)R DI DI
A1 x1 A1
4G2,5 -DI5 -DI5
AG/AF-1A -126K1 -126S3 -126K2
BU BN BK 3RT2016-1BB41 /126.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E E5.1 E5.0
3RA1921-1DA00 OMRON AGAF1A-IAL AGAF1A-RUN
SIEMENS
024VDC 024VDC SLURRY FEEDING FILTER FAULT SLURRY FEEDING FILTER RUNNING
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

AGAF-1A M 1 2 /126.0 14
3 4 /126.1 12 11 /126.3
3~ 5 6 /126.1
4kW 400V 50Hz
PE 11 12 /716.4
Slurry feeding filter 13 14 /126.4
PE 33 34 /126.9
43 44 /716.4

SLURRY FEEDING FILTER

125 127

REVISION 03/10/2018 00143 Data 08/10/2018 AGAF-1A 4kW 400/50 D SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FILTER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 126
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

126 128

REVISION 03/10/2018 00143 Data 03/10/2018 AGAF-1A 4kW 400/50 D SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FILTER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 127
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
126.9 / L1 L1 / 130.0

126.9 / L2 L2 / 130.0

126.9 / L3 L3 / 130.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SLURRY FEEDING FILTER START
COMMAND
1 3 5 13 21
AGAF1B-COM
-128Q1 A3.2
9-12,5A 14 22 11
SIE.3RV2011-1KA10
/128.3

/128.8

3RV2901-1E I> I> I> -128K2 -DO3


SIEMENS /128.6 12 14
2 4 6
DO

12807
2

21 33
13 23 -128Q1 -128K1
12801

12803

12805

-128S1 /128.0 22 /128.3 34


/46.3 MAN
14 24
AUTO
3SB3500-2DA11

12810
3SB3400-0B
SIEMENS

1 3 5
-128K1 11 13
/128.3 2 4 6 -128S2 -128S3
12808
3SB3500-0AA21 12 3SB3501-0AA41 14

12812
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

12811

12813

12814
BA9S24
SIEMENS

13
-128K1
12802

12804

12806

/128.3 14

13
-128Q1
12809

/128.0 14
6 2
DI DI
-128W1 -128X1 1 2 3
-DI5 -DI5
FG7(O)R
A1 x1 A1
4G2,5
AG/AF-1B -128K1 -128S3 -128K2 E5.3 E5.2
BU BN BK 3RT2016-1BB41 /128.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E AGAF1B-IAL AGAF1B-RUN
3RA1921-1DA00 OMRON SLURRY FEEDING FILTER FAULT SLURRY FEEDING FILTER RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

AGAF-1B M 1 2 /128.0 14
3 4 /128.1 12 11 /128.3
3~ 5 6 /128.1
4kW 400V 50Hz
PE 11 12 /716.5
Slurry feeding filter 13 14 /128.4
PE 33 34 /128.9
43 44 /716.5

SLURRY FEEDING FILTER

127 129

REVISION 03/10/2018 00143 Data 08/10/2018 AGAF-1B 4kW 400/50 D SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FILTER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 128
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

128 130

REVISION 03/10/2018 00143 Data 03/10/2018 AGAF-1B 4kW 400/50 D SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FILTER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 129
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
128.9 / L1 L1 / 132.0

128.9 / L2 L2 / 132.0

128.9 / L3 L3 / 132.0

SLURRY FEEDING HIGH PRESSURE


PUMP SPEED SET-POINT

1 3 5 P4-OUT
-130F1 PAW268 6SE6400-0PM00-0AA0
3NP1133-1BC20 P4_2 / 131.3 /756.4
6SE6400-0BE00-0AA0
3NA3832 /43.5
2 4 6 -AO3
SIEMENS -130U1
FUS.NH gL/gG GR.00 500Vca 125A P4_1 / 131.3
QV0 S0+ Mana S0-
1 2 3 4
21
-131K1 -130R1
x2
/131.1 24 RS4607526 Hz 75000
15AA031 x1
13001

13003

13005

RS
I Hand FN

13008

13011
0 Auto P

13012

13010
BOP-2

13014

13016
6SE6400-0BE00-0AA0

-130T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ 5 6 7 8 16 17 9 26 1 2 3 4 10 11
-130W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 13019 13020 13021 13022

AC A A
digital inputs
DC D D
1
WHITE
2
YELLOW
n.c. 60Hz ADC1 ADC2
1 2 1 2
3
GREEN
mA mA
4
BROWN
BN BN
6SE6430-2AD33-7EA0
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
13002

13004

13006

-130W1
FG7(O)R

024VDC

024VDC
13019

13015

13018
3G35+1X25 24VDC
P4 -130X1 1 2 3
BU BN BK PE

P4_FAULT / 716.6 024VDC / 73.8


24VDC
73.7 P4_RUN / 716.7
PE 4 8 1 2 5 6
DI DI M0+ M0- M1+ M1-
U1 V1 W1
-DI5 -DI5 -AI3 -AI3

P4 M /755.3 /755.3
E5.6 E5.7 PEW280 PEW282
3~
37 kW 400/50 4P SFC P4-RUN P4-IAL P4-AMP P4-FB
PE
SLURRY FEEDING HIGH PRESSURE SLURRY FEEDING HIGH PRESSURE SLURRY FEEDING HIGH PRESSURE SLURRY FEEDING HIGH PRESSURE
SLURRY FEEDING HIGH PRESSURE PUMP
PUMP RUNNING PUMP FAULT PUMP CURRENT PUMP SPEED

129 SLURRY FEEDING HIGH PRESSURE PUMP 131

REVISION 03/10/2018 00143 Data 08/10/2018 P4 37kW 400/50 4P SFC SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. HIGH PRESSURE PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 130
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

SLURRY FEEDING HIGH PRESSURE


PUMP START COMMAND
P4-COM
A3.4

-DO3

DO
3
24VDC
73.7 / 24VDC
130.4 / P4_2

130.4 / P4_1
13101

13 23 33
-131S1
/43.5 MAN AUT
14 24 34
AUTO
3SB3500-2DA11
13103

3SB3400-0B
3SB3400-0D
SIEMENS

11 13
-131S2 -131S3
13102

3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
13104

BA9S24
SIEMENS

13
-131K1
/131.1 14

A1 x1
-131K1 -131S3
G2R2SND24VDC A2 /131.3 x2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

13 14 /131.2
21 24 /130.2

130 132

REVISION 03/10/2018 00143 Data 08/10/2018 P4 37kW 400/50 4P SFC SLURRY FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. HIGH PRESSURE PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 131
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
130.9 / L1 L1 / 134.0

130.9 / L2 L2 / 134.0

130.9 / L3 L3 / 134.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
STIRRER FOR T5 START COMMAND
1 3 5 11 13
AGT5-COM
-132Q1 A3.3
3RV2011-1FA10 12 14 11
3RV2901-1E
/132.8

/132.3

SIEMENS I> I> I> -132K2 -DO3


MCB .S00, 3.5-5A,VT /132.6 12 14
2 4 6
DO

13207
6

11 33
13 23 -132Q1 -132K1
13201

13203

13205

-132S1 /132.0 12 /132.3 34


/45.7 MAN
14 24
AUTO
3SB3500-2DA11

13210
3SB3400-0B
SIEMENS

1 3 5
-132K1 11 13
/132.3 2 4 6 -132S2 -132S3
13208
3SB3500-0AA21 12 3SB3501-0AA41 14

13212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

13211

13213

13214
BA9S24
SIEMENS

23
-132K1
13202

13204

13206

/132.3 24

13
-132Q1
13209

/132.0 14
7 3
DI DI
-132W1 -132X1 1 2 3
-DI5 -DI5
FG7(O)R
A1 x1 A1
4G2,5
AGT-5 -132K1 -132S3 -132K2 E5.5 E5.4
BU BN BK 3RT2016-1BB41 /132.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E AGT5-IAL AGT5-RUN
3RA1921-1DA00 OMRON STIRRER FOR T5 FAULT STIRRER FOR T5 RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

AGT-5 M 1 2 /132.0 14
3 4 /132.1 12 11 /132.3
3~ 5 6 /132.1
1,5kW 400V 50Hz
PE 11 12 /711.2
Stirrer for T.5 23 24 /132.4
PE 33 34 /132.9
43 44 /711.2

STIRRER FOR T.5

131 133

REVISION 03/10/2018 00143 Data 08/10/2018 AGT-5 1,5kW 400/50 D STIRRER FOR T.5 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 132
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

132 134

REVISION 03/10/2018 00143 Data 03/10/2018 AGT-5 1,5kW 400/50 D STIRRER FOR T.5 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 133
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
132.9 / L1 L1 / 136.0

132.9 / L2 L2 / 136.0

132.9 / L3 L3 / 136.0

73.7
24VDC
1 3 5
-134F1
3NP1143-1BC20 24VDC
3NA3136
SIEMENS 2 4 6
FUS.NH gL/gG GR.1 500Vca 160A 13 DRYING AIR FEEDING FAN START
COMMAND
-134K2 BL1-COM
/134.5 14
A3.5
11
13401

13403

13405

73.8 13407 BL1_RUN / 134.9 -134K3 -DO3


024VDC /134.7 12 14
DO

13408
7

-134Q1 13 23
Siemens 1L1 3L2 5L3 A2 A1 IN1 13 14/24 23
-134S1
3RW4047-1BB04 /46.5 MAN
14 24 134.2 134.2
3RW4047-1BB04 AUTO
3SB3500-2DA11 BL1_FAULT BL1_RUN

13410
3RT1946-4EA2 ON/ BY-
RUN PASSED 3SB3400-0B
SIEMENS SIEMENS

11 13
-134S2 -134S3

13409
3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

13411

13412
BA9S24
SIEMENS

13
FAILURE/OVERLOAD -134K2
/134.5 14

2T1 4T2 6T3 95 96 98

5 1
13402

13404

13406

DI DI
-DI6 -DI6
A1 x1 A1
BL1_FAULT / 134.8
-134K2 -134S3 -134K3 E6.1 E6.0
-134W1 3RT2016-1BB41 A2 /134.6 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E BL1-IAL BL1-RUN
FG7(O)R
4G50 -134X1 1 2 3 SIEMENS OMRON DRYING AIR FEEDING FAN FAULT DRYING AIR FEEDING FAN RUNNING
AGR-2/1
BU BN BK
24VDC 024VDC 024VDC
73.7 73.8 / 024VDC 73.8 / 024VDC

1 2 14
3 4 12 11 /134.5
5 6
11 12 /717.3
13 14 /134.2
U1 V1 W1
13 14 /134.6
43 44 /717.4
M
BL-1
45 kW 400/690/50 ST 3~
DRYING AIR FEEDING FAN PE

133 DRYING AIR FEEDING FAN 135

REVISION 03/10/2018 00143 Data 08/10/2018 BL-1 45kW 400/690/50 ST DRYING AIR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FEEDING FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 134
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

134 136

REVISION 03/10/2018 00143 Data 03/10/2018 BL-1 45kW 400/690/50 ST DRYING AIR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. FEEDING FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 135
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
134.9 / L1 L1 / 138.0

134.9 / L2 L2 / 138.0

134.9 / L3 L3 / 138.0

73.7
24VDC
1 3 5
-136F1
3NP1123-1BC20 24VDC
3NA3824
SIEMENS 2 4 6
FUS.NH Gr.000 gL/gG 500Vca/440Vcc 80A 13 COMBUSTION AIR FAN START
COMMAND
-136K2 BL2-COM
/136.5 14
A3.6
11
13601

13603

13605

73.8 13607 BL2_RUN / 136.9 -136K3 -DO3


024VDC /136.7 12 14
DO

13608
4

-136Q1 13 23
1L1 3L2 5L3 A2 A1 IN1 13 14/24 23
-136S1
/46.6 MAN
14 24 136.2 136.2
AUTO
Siemens 3SB3500-2DA11 BL2_FAULT BL2_RUN

13610
ON/ BY-
RUN PASSED 3SB3400-0B
SIEMENS

11 13
-136S2 -136S3

13609
3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

13611

13612
BA9S24
SIEMENS

13
FAILURE/OVERLOAD -136K2
/136.5 14

3RW4028-1BB04
2T1 4T2 6T3 95 96 98

6 2
13602

13604

13606

DI DI
-DI6 -DI6
A1 x1 A1
BL2_FAULT / 136.8
-136K2 -136S3 -136K3 E6.3 E6.2
3RT2016-1BB41 A2 /136.6 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E BL2-IAL BL2-RUN
-136W1
FG7(O)R -136X1 1 2 3 SIEMENS OMRON COMBUSTION AIR FAN FAULT COMBUSTION AIR FAN RUNNING
4G16
BL-1 BU BN BK
24VDC 024VDC 024VDC
73.7 73.8 / 024VDC 73.8 / 024VDC

1 2 14
3 4 12 11 /136.5
5 6
11 12 /717.3
13 14 /136.2
U1 V1 W1
13 14 /136.6
43 44 /717.3
M
BL-2
15 kW 400/50 ST 3~
COMBUSTION AIR FAN PE

135 COMBUSTION AIR FAN 137

REVISION 03/10/2018 00143 Data 08/10/2018 BL-2 15kW 400/50 ST COMBUSTION AIR FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 136
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

136 138

REVISION 03/10/2018 00143 Data 03/10/2018 BL-2 15kW 400/50 ST COMBUSTION AIR FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 137
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
136.9 / L1 L1 / 140.0

136.9 / L2 L2 / 140.0

136.9 / L3 L3 / 140.0

24VDC 24VAC 24VDC


73.7 / 24VDC 72.8 / 24VAC 73.7 / 24VDC
HOIST FOR CLEANING RING START
COMMAND
HST1-COM
1 3 5 13 21 11
A3.7
-138Q1 -138K4
3RV2011-1DA10 14 22 /138.7 12 14
3RV2901-1E -DO3
/138.3

/138.8

I> I> I>

13807
SIEMENS
DO
MCB S00,2.2-3.2A,VT 2 4 6
8
-138X2 1 -138X2 3
13 23
13801
-138S1 21 33 33
/46.7 MAN
13803 AUTO
14 24 -138Q1 -138K1 -138K2
/138.0 22 /138.3 34 /138.4 34
3SB3500-2DA11

13810
3SB3400-0B
13805 SIEMENS
13 13

-138H1 -138H2
11 13 14 14
1 3 5 1 3 5 -138S2 -138S3
3SB3500-0AA21 3SB3501-0AA41
-138K1 -138K2 12 14

13811
3SB3400-0C 3SB3400-0B
/138.3 2 4 6 /138.4 2 4 6 3SB3400-1A
SIEMENS
BA9S24
13820

SIEMENS
13 13
13802
-138K1 -138K2 -138X2 2 -138X2 4

13814
/138.3 14 /138.4 14

13815

13816
13804

13806

13813
13
-138Q1
13808

/138.0 14

1 1

-138X1 1 2 3 -138K3 -138K3


-138W1 /138.5 /138.5
4 3
FG7(O)R
4G2,5
13809

13812

HST-1 BU BN BK

7 3
DI DI
A1 A1 x1 2 A1
-DI6 -DI6
-138K1 -138K2 -138S3 -138K3 -138K4
3RT2016-1BB41 A2 3RT2016-1BB41 A2 /138.4 x2 G4Q212S24VAC 7 G2R2SND24VDC A2
3RH2911-1FA22 3RH2911-1FA22 PF083A P2RF08E E6.5 E6.4
U1 V1 W1 3RA1921-1DA00 3RA1921-1DA00 OMRON OMRON HST1-IAL HST1-RUN
3RA2913-2AA1 SIEMENS
HST-1 M SIEMENS 024VDC 24VAC 024VDC HOIST FOR CLEANING RING FAULT HOIST FOR CLEANING RING RUNNING
73.8 / 024VDC 72.8 / 024VAC 73.8 / 024VDC
3~
1,1 kW 400/50 TV 1 2 /138.0 1 2 /138.1 1 3 /138.4 14
PE 3 4 /138.1 3 4 /138.2 1 4 /138.3 12 11 /138.2
Hoist for cleaning ring
5 6 /138.1 5 6 /138.2
PE
11 12 /717.5 11 12 /717.5
13 14 /138.4 13 14 /138.4
HOIST FOR CLEANING RING 13 14 /717.5 13 14 /717.6
33 34 /138.9 33 34 /138.9

137 139

REVISION 03/10/2018 00143 Data 08/10/2018 HST-1 1,1kW 400/50 TV HOIST FOR CLEANING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. RING +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 138
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

138 140

REVISION 03/10/2018 00143 Data 03/10/2018 HST-1 1,1kW 400/50 TV HOIST FOR CLEANING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. RING +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 139
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
138.9 / L1 L1 / 142.0

138.9 / L2 L2 / 142.0

138.9 / L3 L3 / 142.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC DOUBLE FLAP DISCHARGER FOR F3
START COMMAND
1 3 5 11 13
MC3A-COM
-140Q1 A4.0
0,9-1,25A 12 14 11
SIE.3RV2011-0KA10
/140.8

/140.3

3RV2901-1E I> I> I> -140K4 -DO4


SIEMENS /140.6 12 14
2 4 6
DO

14007
1

11 33
13 23 -140Q1 -140K3
14001

14003

14005

-140S1 /140.0 12 /140.3 34


/46.6 MAN
14 24
AUTO
3SB3500-2DA11

14010
3SB3400-0B
SIEMENS

1 3 5
-140K3 11 13
/140.3 2 4 6 -140S2 -140S3
14008
3SB3500-0AA21 12 3SB3501-0AA41 14

14012
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

14011

14013

14014
BA9S24
SIEMENS

13
-140K3
14002

14004

14006

/140.3 14

13
-140Q1
14009

/140.0 14

8 4
-140X1 1 2 3
DI DI
-140W1
A1 x1 A1
FG7(O)R -DI6 -DI6
4G2,5 -140K3 -140S3 -140K4
MC-3A BU BN BK 3RT2016-1BB41 /140.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E E6.7 E6.6
3RA1921-1DA00 OMRON MC3A-IAL MC3A-RUN
SIEMENS
024VDC 024VDC DOUBLE FLAP DISCHARGER FOR F3 DOUBLE FLAP DISCHARGER FOR F3
73.8 / 024VDC 73.8 / 024VDC FAULT RUNNING

U1 V1 W1

MC-3A M 1 2 /140.0 14
3 4 /140.1 12 11 /140.3
3~ 5 6 /140.1
0,37 kW 400/50 4P D
PE 11 12 /718.4
DOUBLE FLAP 13 14 /140.4
DISCHARGER FOR F.3 PE 33 34 /140.9
43 44 /718.4

DOUBLE FLAP DISCHARGER FOR F.3

139 141

REVISION 03/10/2018 00143 Data 11/10/2018 MC-3A 0,37kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR F.3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 140
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

140 142

REVISION 03/10/2018 00143 Data 03/10/2018 MC-3A 0,37kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR F.3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 141
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
140.9 / L1 L1 / 144.0

140.9 / L2 L2 / 144.0

140.9 / L3 L3 / 144.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC DOUBLE FLAP DIACHARGER FOR F3
START COMMAND
1 3 5 11 13
MC3B-COM
-142Q1 A4.1
0,9-1,25A 12 14 11
SIE.3RV2011-0KA10
/142.8

/142.3

3RV2901-1E I> I> I> -142K2 -DO4


SIEMENS /142.6 12 14
2 4 6
DO

14207
5

11 33
13 23 -142Q1 -142K1
14201

14203

14205

-142S1 /142.0 12 /142.3 34


/46.7 MAN
14 24
AUTO
3SB3500-2DA11

14210
3SB3400-0B
SIEMENS

1 3 5
-142K1 11 13
/142.3 2 4 6 -142S2 -142S3
14208
3SB3500-0AA21 12 3SB3501-0AA41 14

14212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

14211

14213

14214
BA9S24
SIEMENS

13
-142K1
14202

14204

14206

/142.3 14

13
-142Q1
14209

/142.0 14
5 1
DI DI
-142X1 1 2 3
-DI7 -DI7
-142W1
A1 x1 A1
FG7(O)R
4G2,5 -142K1 -142S3 -142K2 E7.1 E7.0
MC-3B BU BN BK 3RT2016-1BB41 /142.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E MC3B-IAL MC3B-RUN
3RA1921-1DA00 OMRON DOUBLE FLAP DISCHARGER FOR F3 DOUBLE FLAP DISCHARGER FOR F3
SIEMENS FAULT RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

MC-3B M 1 2 /142.0 14
3 4 /142.1 12 11 /142.3
3~ 5 6 /142.1
0,37 kW 400/50 4P D
PE 11 12 /718.5
DOUBLE FLAP 13 14 /142.4
DISCHARGER FOR F.3 PE 33 34 /142.9
43 44 /718.5

DOUBLE FLAP DISCHARGER FOR F.3

141 143

REVISION 03/10/2018 00143 Data 11/10/2018 MC-3B 0,37kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR F.3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 142
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

142 144

REVISION 03/10/2018 00143 Data 03/10/2018 MC-3B 0,37kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR F.3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 143
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
142.9 / L1 L1 / 146.0

142.9 / L2 L2 / 146.0

142.9 / L3 L3 / 146.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC FINES RECOVERY FAN START
COMMAND
1 3 5 11 13
BL6-COM
-144Q1 A4.2
3RV2011-1KA10 12 14 11
3RV2901-1E
/144.8

/144.3

SIEMENS I> I> I> -144K2 -DO4


MCB .S00, 9..12.5A,VT /144.6 12 14
2 4 6
DO

14407
2

11 33
13 23 -144Q1 -144K1
14401

14403

14405

-144S1 /144.0 12 /144.3 34


/46.3 MAN
14 24
AUTO
3SB3500-2DA11

14410
3SB3400-0B
SIEMENS

1 3 5
-144K1 11 13
/144.3 2 4 6 -144S2 -144S3
14408
3SB3500-0AA21 12 3SB3501-0AA41 14

14412
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

14411

14413

14414
BA9S24
SIEMENS

13
-144K1
14402

14404

14406

/144.3 14

13
-144Q1
14409

/144.0 14
6 2
DI DI
-144W1 -144X1 1 2 3
-DI7 -DI7
FG7(O)R
A1 x1 A1
4G4
P-802 -144K1 -144S3 -144K2 E7.3 E7.2
BU BN BK 3RT2017-1BB41 /144.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E BL6-IAL BL6-RUN
3RA1921-1DA00 OMRON FINES RECOVERY FAN FAULT FINES RECOVERY FAN RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

BL-6 M 1 2 /144.0 14
3 4 /144.1 12 11 /144.3
3~ 5 6 /144.1 12 /717.7
5,5 kW 400/50 D 11
PE 13 14 /144.4
FINES RECOVERY FAN 33 34 /144.9
PE

FINES RECOVERY FAN

143 145

REVISION 03/10/2018 00143 Data 08/10/2018 BL-6 5,5kW 400/50 D FINES RECOVERY FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 144
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

144 146

REVISION 03/10/2018 00143 Data 03/10/2018 BL-6 5,5kW 400/50 D FINES RECOVERY FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 145
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
144.9 / L1 L1 / 148.0

144.9 / L2 L2 / 148.0

144.9 / L3 L3 / 148.0

73.7
24VDC
73.7 / 24VDC
1 3 5 DRYING AIR FEEDING FAN START
COMMAND
-146F1 BL3-COM
3NP1153-1BC20 13
2 4 6 A4.3
3NA3244

BL3_FAULT / 146.8
SIEMENS -146K1

BL3_RUN / 146.9
0230VAC / 70.8
FUS.NH gL/gG GR.2 500Vca 250A /146.5 14

230VAC / 70.8
-DO4

DO
11
6
73.8 -146K2
14601

14603

14605

024VDC /146.7 12 14

14608
14607
13 23
-146S1
-146Q1 /46.7 14
MAN
24 146.4 146.3
AUTO
Siemens 1L1 3L2 5L3 A2 A1 1 2 3 13 14/24 23 95 96 98
3SB3500-2DA11 BL3_FAULT BL3_RUN
3RW4056-2BB44 + -
IN 3SB3400-0B

14610
3RW4056-2BB44 24V DC SIEMENS
3RT1956-4EA2 ON/ BY-
RUN PASSED FAILURE/OVERLOAD
SIEMENS
11 13

14609
-146S2 -146S3
3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

14611
BA9S24

14612
SIEMENS

13
-146K1
/146.5 14

2T1 4T2 6T3 PE

7 3
DI DI
14602

14604

14606

-DI7 -DI7
A1 x1 A1
-146K1 -146S3 -146K2 E7.5 E7.4
3RT2016-1BB41 A2 /146.7 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E BL3-IAL BL3-RUN
-146X1 1 2 3 SIEMENS OMRON DRYING AIR FEEDING FAN FAULT DRYING AIR FEEDING FAN RUNNING
-146W1
FG7(O)R
4G95 73.8 / 024VDC 73.8 / 024VDC
BL-3 BU BN BK

U1 V1 W1
1 2 14
3 4 12 11 /146.5
BL-3 M 5 6
3~ 11 12 /717.6
75 kW 400/690/50 ST
13 14 /146.3
PE
DRYING AIR EXTRACTION FAN 13 14 /146.6
43 44 /717.6

DRYING AIR EXTRACTION FAN

145 147

REVISION 03/10/2018 00143 Data 08/10/2018 BL-3 75kW 400/690/50 ST DRYING AIR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. EXTRACTION FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 146
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

146 148

REVISION 03/10/2018 00143 Data 03/10/2018 BL-3 75kW 400/690/50 ST DRYING AIR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. EXTRACTION FAN +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 147
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
146.9 / L1 L1 / 150.0

146.9 / L2 L2 / 150.0

146.9 / L3 L3 / 150.0

24VDC 24VAC
73.7 / 24VDC 72.8 / 24VAC
1 3 5 11 13 AIR LIFT BELT CONVEYOR START AIR LIFT BELT CONVEYOR REVERSE
COMMAND COMMAND
-148Q1 NT1-COM NT1-REV
3RV2011-1DA10 12 14 11 21
3RV2901-1E A4.4 A4.5
/149.1

/148.3

SIEMENS I> I> I> -148K3 -148K4


MCB S00,2.2-3.2A,VT /148.8 12 14 /148.9 12 24
2 4 6 -DO4 -DO4

14807
DO DO
14801 3 7

13 23 23
14803
-148S1
/46.3 MAN MAN
14 24 24
14805 AUTO
3SB3500-2DA11

14811

14814
3SB3400-0B

14817
SIEMENS

1 3 5 1 3 5
-148K1 -148K2 11 13 13
/148.3 /148.4 -148S2 -148S3
2 4 6 2 4 6 14808 -148S4
3SB3500-0AA21 12 3SB3501-0AA41 14 /46.4 14

14812
3SB3400-0C 3SB3400-0B 3SB3500-0AA31
SIEMENS 3SB3400-1A 3SB3400-0B
14802 BA9S24
SIEMENS
SIEMENS
13 13

14818

14819
14804
-148K1 -148K2
/148.3 14 /148.4 14
14806
11
-148K1
/148.3 12
13

14815
-148Q1
14809

/148.0 14 11
-148K2
/148.4
-148X1 1 2 3 12
-148W1 1 1
FG7(O)R
4G2,5 -148K5 -148K5

14816
NT-1 BU BN BK /148.6 /148.6
4 3
14810

14813

A1 A1 x1 2 A1 A1
-148K1 -148K2 -148S3 -148K5 -148K3 -148K4
U1 V1 W1 3RT2016-1BB41 A2 3RT2016-1BB41 A2 /148.5 x2 G4Q212S24VAC 7 G2R2SND24VDC A2 G2R2SND24VDC A2
3RH2911-1FA22 3RH2911-1FA22 PF083A P2RF08E P2RF08E
3RA1921-1DA00 SIEMENS OMRON OMRON OMRON
NT-1 M 3RA2913-2AA1
3~ SIEMENS 024VDC 024VAC 024VDC
1,1kW 400V 50Hz 73.8 / 024VDC 72.8 / 024VAC 73.8 / 024VDC
PE
1 2 /148.0 1 2 /148.1 1 3 /148.4 14 24
Air lift belt conveyor
3 4 /148.1 3 4 /148.2 1 4 /148.3 12 11 /148.3 12 21 /148.6
PE
5 6 /148.1 5 6 /148.2 6 33 34 /149.2
11 12 /148.6 11 12 /148.6 5 8 /719.3
AIR LIFT BELT CONVEYOR 11 12 /719.3 11 12 /719.3
13 14 /148.4 13 14 /148.4
13 14 /719.4 13 14 /719.4
33 34 /149.3 33 34 /149.4

147 149

REVISION 03/10/2018 00143 Data 08/10/2018 NT-1 1,1kW 400/50 TV AIR LIFT BELT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 148
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

E28.7 / 719.3
11 33 33 33
-148Q1 -148K3 -148K1 -148K2
/148.0 12 /148.8 34 /148.3 34 /148.4 34
14901

14902

14903

14904

71906

8 4 1 5 8
DI DI DI DI DI
-DI7 -DI7 -DI8 -DI8 -DI28

E7.7 E7.6 E8.0 E8.1 E28.7


NT1-IAL NT1-RUN NT1-FW NT1-RW NT-1_FW
AIR LIFT BELT CONVEYOR FAULT AIR LIFT BELT CONVEYOR RUNNING AIR LIFT BELT CONVEYOR FORWARD AIR LIFT BELT CONVEYOR REVERSE NT-1_FORWARD
MODE MODE

148 150

REVISION 03/10/2018 00143 Data 08/10/2018 NT-1 1,1kW 400/50 TV AIR LIFT BELT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 149
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
148.9 / L1 L1 / 152.0

148.9 / L2 L2 / 152.0

148.9 / L3 L3 / 152.0

73.7
24VDC
1 3 5
-150F1
3NP1143-1BC20 24VDC
3NA3132
SIEMENS 2 4 6
FUS.NH gL/gG GR.1 500Vca 125A 13
AIR LIFT FAN START COMMAND
-150K1 BL5-COM
/150.5 14
A4.6
11
15001

15003

15005

73.8 15007 BL5_RUN / 150.9 -150K2 -DO4


024VDC /150.7 12 14
DO

15008
4

-150Q1 13 23
Siemens 1L1 3L2 5L3 A2 A1 IN1 13 14/24 23
-150S1
3RW4038-1BB04 /46.1 MAN
14 24 150.2 150.2
3RW4038-1BB04 AUTO
3SB3500-2DA11 BL5_FAULT BL5_RUN

15010
3RT1936-4EA2 ON/ BY-
RUN PASSED 3SB3400-0B
SIEMENS SIEMENS

11 13
-150S2 -150S3

15009
3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

15011

15012
BA9S24
SIEMENS

13
FAILURE/OVERLOAD -150K1
/150.5 14

2T1 4T2 6T3 95 96 98

6 2
15002

15004

15006

BL5_FAULT / 150.8 DI DI
-DI8 -DI8
A1 x1 A1
-150K1 -150S3 -150K2 E8.3 E8.2
3RT2016-1BB41 A2 /150.6 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E BL5-IAL BL5-RUN
-150W1
FG7(O)R -150X1
1 2 3 SIEMENS OMRON AIR LIFT FAN FAULT AIR LIFT FAN RUNNING
4G25
BL-5 BU BN BK
24VDC 024VDC
73.7 73.8 / 024VDC 73.8 / 024VDC

1 2 14
3 4 12 11 /150.5
5 6
11 12 /717.7
13 14 /150.2
U1 V1 W1
13 14 /150.6
43 44 /717.7
M
BL-5
30 kW 400/690/50 ST 3~
AIR LIFT FAN PE

149 AIR LIFT FAN 151

REVISION 03/10/2018 00143 Data 08/10/2018 BL-5 30kW 400/690/50 ST AIR LIFT FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 150
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

150 152

REVISION 03/10/2018 00143 Data 03/10/2018 BL-5 30kW 400/690/50 ST AIR LIFT FAN = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 151
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
150.9 / L1 L1 / 154.0

150.9 / L2 L2 / 154.0

150.9 / L3 L3 / 154.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC DOUBLE FLAP DISCHARGER FOR AIR
LIFT START COMMAND
1 3 5 11 13
MC1-COM
-152Q1 A4.7
3RV2011-1AA10 12 14 11
3RV2901-1E
/152.8

/152.3

SIEMENS I> I> I> -152K2 -DO4


MCB S00, 1,1-1,6A,VT /152.6 12 14
2 4 6
DO

15207
8

11 33
13 23 -152Q1 -152K1
15201

15203

15205

-152S1 /152.0 12 /152.3 34


/46.5 MAN
14 24
AUTO
3SB3500-2DA11

15210
3SB3400-0B
SIEMENS

1 3 5
-152K1 11 13
/152.3 2 4 6 -152S2 -152S3
15208
3SB3500-0AA21 12 3SB3501-0AA41 14

15212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

15211

15213

15214
BA9S24
SIEMENS

13
-152K1
15202

15204

15206

/152.3 14

13
-152Q1
15209

/152.0 14
7 3
DI DI
-152W1 -152X1 1 2 3
-DI8 -DI8
FG7(O)R
A1 x1 A1
4G2,5
MC-1 -152K1 -152S3 -152K2 E8.5 E8.4
BU BN BK 3RT2016-1BB41 /152.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E MC1-IAL MC1-RUN
3RA1921-1DA00 OMRON DOUBLE FLAP DISCHARGER FOR AIR DOUBLE FLAP DISCHARGER FOR AIR
SIEMENS LIFT FAULT LIFT RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

MC-1 M 1 2 /152.0 14
3 4 /152.1 12 11 /152.3
3~ 5 6 /152.1
0,55 kW 400/50 4P D
PE 11 12 /718.3
DOUBLE FLAP 13 14 /152.4
DISCHARGER FOR AIR LIFT PE 33 34 /152.9
43 44 /718.4

DOUBLE FLAP DISCHARGER FOR AIR LIFT

151 153

REVISION 03/10/2018 00143 Data 08/10/2018 MC-1 0,55kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR AIR LIFT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 152
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

152 154

REVISION 03/10/2018 00143 Data 03/10/2018 MC-1 0,55kW 400/50 4P D DOUBLE FLAP = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. DISCHARGER FOR AIR LIFT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 153
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
152.9 / L1 L1 / 156.0

152.9 / L2 L2 / 156.0

152.9 / L3 L3 / 156.0

24VDC
73.7 / 24VDC

11
24VDC
-154K2 73.7 / 24VDC
/154.6 12 14 VIBRATING SIEVE RECTANGULAR TYPE
START COMMAND
1 3 5 13 21

15407
VV1A-COM
-154Q1 A5.0
3RV2011-1GA10 14 22
3RV2901-1E
/154.3

/154.8

SIEMENS I> I> I> 13 23


-DO5
MCB .S00, 4.5-6.3A,VT 2 4 6 -154S1
/46.5 MAN DO
14 24
AUTO 1
3SB3500-2DA11
3SB3400-0B
15410
21 33
SIEMENS
-154Q1 -154K1
15401

15403

15405

11 13 /154.0 22 /154.3 34
-154S2 -154S3
3SB3500-0AA21 12 3SB3501-0AA41 14 21
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A -156Q1

15408

15411
BA9S24 /156.0 22
SIEMENS
1 3 5

15414
-154K1 13
/154.3 2 4 6 -154K1
/154.3 14

15412
15415

15413
33
13 -156K1
/154.4
-156K1 34
15402

15404

15406

/154.4 14

15417
13
-154Q1
/154.0 8 4
14
DI DI
-154W1 -154X1 1 2 3
15416

-DI8 -DI8
FG7(O)R
A1
4G2,5
VV-1A -154K2 E8.7 E8.6
BU BN BK G2R2SND24VDC
13 A2
P2RF08E VV1A-IAL VV1B-RUN
-156Q1 OMRON VIBRATING SIEVE RECTANGULAR TYPE VIBRATING SIEVE RECTANGULAR TYPE
/156.0 14 FAULT RUNNING
15409 024VDC
73.8 / 024VDC

U1 V1 W1 A1 A1 x1
-154K1 -156K1 -154S3
VV-1A M 3RT2016-1BB41 A2 3RT2016-1BB41 A2 /154.5 x2
14
12 11 /154.3
3~ 3RH2911-1FA22
3RA1921-1DA00
3RH2911-1FA22
3RA1921-1DA00
1,8 kW 400/690/50 4P D
PE SIEMENS SIEMENS
VIBRATING SIEVE 024VDC
RECTANGULAR TYPE
73.8 / 024VDC
PE
1 2 /154.0 1 2 /156.0
3 4 /154.1 3 4 /156.1
5 6 /154.1 5 6 /156.1
VIBRATING SIEVE RECTANGULAR TYPE 11 12 /718.7 11 12 /718.7
13 14 /154.4 13 14 /154.4
13 14 /718.8 33 34 /154.9
153
33 34 /154.9 155

REVISION 03/10/2018 00143 Data 08/10/2018 VV-1A 1,8kW 400/690/50 4P D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SIEVE RECTANGULAR TYPE +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 154
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

154 156

REVISION 03/10/2018 00143 Data 03/10/2018 VV-1A 1,8kW 400/690/50 4P D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SIEVE RECTANGULAR TYPE +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 155
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
154.9 / L1 L1 / 158.0

154.9 / L2 L2 / 158.0

154.9 / L3 L3 / 158.0

1 3 5 13 21
-156Q1
3RV2011-1GA10 14 22
3RV2901-1E
/154.3

/154.8

SIEMENS I> I> I>


MCB .S00, 4.5-6.3A,VT 2 4 6
10001

10003

10005

1 3 5
-156K1
/154.4 2 4 6
10002

10004

10006

-156W1 -156X1 1 2 3
FG7(O)R
4G2,5
VV-1B
BU BN BK

U1 V1 W1

VV-1B M
3~
1,8 kW 400/690/50 4P D
PE
VIBRATING SIEVE
RECTANGULAR TYPE PE

VIBRATING SIEVE RECTANGULAR TYPE

155 157

REVISION 03/10/2018 00143 Data 08/10/2018 VV-1B 1,8kW 400/690/50 4P D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SIEVE RECTANGULAR TYPE +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 156
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

156 158

REVISION 03/10/2018 00143 Data 03/10/2018 VV-1B 1,8kW 400/690/50 4P D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SIEVE RECTANGULAR TYPE +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 157
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
156.9 / L1 L1 / 160.0

156.9 / L2 L2 / 160.0

156.9 / L3 L3 / 160.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SLURRY TRANSFER PUMP START
COMMAND
1 3 5 13 21
P5-COM
-158Q1 A2.5
3RV2011-1FA10 14 22 11
3RV2901-1E
/158.3

/158.8

SIEMENS I> I> I> -158K2 -DO2


MCB .S00, 3.5-5A,VT /158.6 12 14
2 4 6
DO

15807
7

21 33
13 23 -158Q1 -158K1
15801

15803

15805

-158S1 /158.0 22 /158.3 34


/46.1 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
15810
SIEMENS

1 3 5 11 13
-158K1 -158S2 -158S3
/158.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
15808

15811

15812
BA9S24

15813

15814
SIEMENS

13
-158K1
/158.3 14
15802

15804

15806

13
-158Q1
/158.0 5 1
14
15809 DI DI
-158W1 -158X1 1 2 3
-DI4 -DI4
FG7(O)R
A1
4G2,5
P5 A1 x1 -158K2 E4.1 E4.0
BU BN BK G2R2SND24VDC
-158K1 -158S3 A2
P5-IAL P5-RUN
P2RF08E
3RT2016-1BB41 A2 /158.5 x2 OMRON SLURRY TRANSFER PUMP FAULT SLURRY TRANSFER PUMP RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

P5 M 1 2 /158.0 14
3 4 /158.1 12 11 /158.3
3~ 5 6 /158.1
1,5 kW 400/50 D
PE 11 12 /717.2
RECOVERED SLURRY 13 14 /158.4
TRANSFER PUMP PE 33 34 /158.9
43 44 /717.2

RECOVERED SLURRY TRANSFER PUMP

157 159

REVISION 03/10/2018 00143 Data 08/10/2018 P5 1,5kW 400/50 D RECOVERED SLURRY = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. TRANSFER PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 158
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

158 160

REVISION 03/10/2018 00143 Data 03/10/2018 P5 1,5kW 400/50 D RECOVERED SLURRY = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. TRANSFER PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 159
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
158.9 / L1 L1 / 164.0

158.9 / L2 L2 / 164.0

158.9 / L3 L3 / 164.0

24VDC 24VDC
73.7 / 24VDC 73.7 / 24VDC
STPP VIBRATORS MOTOR START
COMMAND
11
VY1011 AB-COM
1 3 5 1 3 5 -160K3 A1.6
-160Q1 -160Q2 /160.7 12 14
13 14 /160.4 13 14 /160.4
3RV2011-0FA10 3RV2011-0FA10

16013
3RV2901-1E 3RV2901-1E -DO1
SIEMENS I> I> I> 21 22 /160.8 SIEMENS I> I> I> 21 22 /160.9
DO
MCB .S00, 0.35-0.5A,VT 2 4 6 MCB .S00, 0.35-0.5A,VT 2 4 6 13 23
4
-160S1
/46.1 MAN
14 24
AUTO 16017
3SB3500-2DA11
3SB3400-0B
16001

16003

16005

16007

16009

16011
SIEMENS
11 13 21 21
-160S2 -160S3 -160Q1 -160Q2
3SB3500-0AA21 12 3SB3501-0AA41 14 /160.0 22 /160.2 22

16021
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

16018
BA9S24
SIEMENS
1 3 5 1 3 5 13
-160K1 -160K2 -160K1
/160.4 2 4 6 /160.5 2 4 6 /160.4 14
33

16019
-160K1
13 /160.4 34

16020
-160K2

16022
/160.5 14
16002

16004

16006

16008

16010

16012

33
16014
-160K2
13 /160.5 34
-160Q1
/160.0 14
16015

16023
-160W1 -160X1 1 2 3 4 5 6 13
FG7(O)R -160W2
4G2,5 FG7(O)R -160Q2
/160.2 6 2
VY-1011A 4G2,5 14
BU BN BK VY-1011B BU BN BK 16016 DI DI
-DI2 -DI2
A1
A1 A1 x1 -160K3 E2.3 E2.2
G2R2SND24VDC
-160K1 -160K2 -160S3 A2
VY1011 AB-IAL VY1011 AB-RUN
P2RF08E
3RT2016-1BB41 A2 3RT2016-1BB41 A2 /160.6 x2 OMRON STPPVIBRATORS MOTOR FAULT STPP VIBRATORS MOTOR RUNNING
3RH2911-1FA22 3RH2911-1FA22
U1 V1 W1 U1 V1 W1 3RA1921-1DA00 3RA1921-1DA00
SIEMENS SIEMENS
024VDC
024VDC
73.8 / 024VDC
M M 14
VY-1011 A VY-1011 B 73.8 / 024VDC 12 11 /160.4
0,1 kW 400/50 D 3~ 0,1 kW 400/50 D 3~
1 2 /160.0 1 2 /160.2
VIBRATING MOTOR S1 PE VIBRATING MOTOR S1 PE 3 4 /160.1 3 4 /160.2
5 6 /160.1 5 6 /160.3
PE PE
11 12 /711.6 11 12 /711.6
13 14 /160.5 13 14 /160.5
13 14 /711.7 13 14 /711.7
33 34 /160.9 33 34 /160.9
VIBRATING MOTOR S1 VIBRATING MOTOR S1

159 161

REVISION 03/10/2018 00143 Data 08/10/2018 VY1011A/B 0,1kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 160
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

160 164

REVISION 03/10/2018 00143 Data 03/10/2018 VY1011A/B 0,1kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 161
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
160.9 / L1 L1 / 168.0

160.9 / L2 L2 / 168.0

160.9 / L3 L3 / 168.0

24VDC 24VDC
73.7 / 24VDC 73.7 / 24VDC
S. SULPHATEVIBRATORS MOTOR
START COMMAND
11
VY1012 AB-COM
1 3 5 1 3 5 -164K3 A1.7
-164Q1 -164Q2 /164.7 12 14
13 14 /164.4 13 14 /164.4
3RV2011-0FA10 3RV2011-0FA10

16436
3RV2901-1E 3RV2901-1E -DO1
SIEMENS I> I> I> 21 22 /164.8 SIEMENS I> I> I> 21 22 /164.9
DO
MCB .S00, 0.35-0.5A,VT 2 4 6 MCB .S00, 0.35-0.5A,VT 2 4 6 13 23
8
-164S1
/46.3 MAN
14 24
AUTO 16440
3SB3500-2DA11
3SB3400-0B
16424

16426

16428

16430

16432

16434
SIEMENS
11 13 21 21
-164S2 -164S3 -164Q1 -164Q2
3SB3500-0AA21 12 3SB3501-0AA41 14 /164.0 22 /164.2 22

16444
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

16441
BA9S24
SIEMENS
1 3 5 1 3 5 13
-164K1 -164K2 -164K1
/164.4 2 4 6 /164.5 2 4 6 /164.4 14
33

16442
-164K1
13 /164.4 34

16443
-164K2

16445
/164.5 14
16425

16427

16429

16431

16433

16435

33
16437
-164K2
13 /164.5 34
-164Q1
/164.0 14
16438

16446
-164W1 -164X1 1 2 3 4 5 6 13
FG7(O)R -164W2
4G2,5 FG7(O)R -164Q2
/164.2 7 3
VY-1012A 4G2,5 14
BU BN BK VY-1012B BU BN BK 16439 DI DI
-DI2 -DI2
A1
A1 A1 x1 -164K3 E2.5 E2.4
G2R2SND24VDC
-164K1 -164K2 -164S3 A2
VY1012 AB-IAL VY1012 AB-RUN
P2RF08E
3RT2016-1BB41 A2 3RT2016-1BB41 A2 /164.6 x2 OMRON S. SULPHATE VIBRATORS MOTOR S. SULPHATE VIBRATORS MOTOR
3RH2911-1FA22 3RH2911-1FA22
U1 V1 W1 U1 V1 W1 3RA1921-1DA00 3RA1921-1DA00 FAULT RUNNING
SIEMENS SIEMENS
024VDC
024VDC
73.8 / 024VDC
M M 14
VY-1012 A VY-1012 B 73.8 / 024VDC 12 11 /164.4
0,1 kW 400/50 D 3~ 0,1 kW 400/50 D 3~
1 2 /164.0 1 2 /164.2
VIBRATING MOTOR S2 PE VIBRATING MOTOR S2 PE 3 4 /164.1 3 4 /164.2
5 6 /164.1 5 6 /164.3
PE PE
11 12 /711.7 11 12 /711.7
13 14 /164.5 13 14 /164.5
13 14 /711.8 13 14 /711.8
33 34 /164.9 33 34 /164.9
VIBRATING MOTOR S2 VIBRATING MOTOR S2

161 165

REVISION 03/10/2018 00143 Data 08/10/2018 VY1012A/B 0,1kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S2 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 164
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

164 168

REVISION 03/10/2018 00143 Data 03/10/2018 VY1012A/B 0,1kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S2 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 165
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
164.9 / L1 L1 / 172.0

164.9 / L2 L2 / 172.0

164.9 / L3 L3 / 172.0

24VDC 24VDC
73.7 / 24VDC 73.7 / 24VDC
SODA ASH VIBRATORS MOTOR START
COMMAND
11
VY1013 AB-COM
1 3 5 1 3 5 -168K3 A2.0
-168Q1 -168Q2 /168.7 12 14
13 14 /168.4 13 14 /168.4
3RV2011-0DA10 3RV2011-0DA10

16859
3RV2901-1E 3RV2901-1E -DO2
SIEMENS I> I> I> 21 22 /168.8 SIEMENS I> I> I> 21 22 /168.9
DO
MCB S00,0.22-0.32A,VT 2 4 6 MCB S00,0.22-0.32A,VT 2 4 6 13 23
1
-168S1
/46.4 MAN
14 24
AUTO 16863
3SB3500-2DA11
3SB3400-0B
16847

16849

16851

16853

16855

16857
SIEMENS
11 13 21 21
-168S2 -168S3 -168Q1 -168Q2
3SB3500-0AA21 12 3SB3501-0AA41 14 /168.0 22 /168.2 22

16867
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

16864
BA9S24
SIEMENS
1 3 5 1 3 5 13
-168K1 -168K2 -168K1
/168.4 2 4 6 /168.5 2 4 6 /168.4 14
33

16865
-168K1
13 /168.4 34

16866
-168K2

16868
/168.5 14
16848

16850

16852

16854

16856

16858

33
16860
-168K2
13 /168.5 34
-168Q1
/168.0 14
16861

16869
-168W1 -168X1 1 2 3 4 5 6 13
FG7(O)R -168W2
4G2,5 FG7(O)R -168Q2
/168.2 8 4
VY-1013A 4G2,5 14
BU BN BK VY-1013B BU BN BK 16862 DI DI
-DI2 -DI2
A1
A1 A1 x1 -168K3 E2.7 E2.6
G2R2SND24VDC
-168K1 -168K2 -168S3 A2
VY1013 AB-IAL VY1013 AB-RUN
P2RF08E
3RT2016-1BB41 A2 3RT2016-1BB41 A2 /168.6 x2 OMRON SODA ASH VIBRATORS MOTOR FAULT SODA ASH VIBRATORS MOTOR
3RH2911-1FA22 3RH2911-1FA22
U1 V1 W1 U1 V1 W1 3RA1921-1DA00 3RA1921-1DA00 RUNNING
SIEMENS SIEMENS
024VDC
024VDC
73.8 / 024VDC
M M 14
VY-1013 A VY-1013 B 73.8 / 024VDC 12 11 /168.4
0,08 kW 400/50 D 3~ 0,08 kW 400/50 D 3~
1 2 /168.0 1 2 /168.2
VIBRATING MOTOR S3 PE VIBRATING MOTOR S3 PE 3 4 /168.1 3 4 /168.2
5 6 /168.1 5 6 /168.3
PE PE
11 12 /712.2 11 12 /712.2
13 14 /168.5 13 14 /168.5
13 14 /712.2 13 14 /712.2
33 34 /168.9 33 34 /168.9
VIBRATING MOTOR S3 VIBRATING MOTOR S3

165 169

REVISION 03/10/2018 00143 Data 08/10/2018 VY1013A/B 0,08kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 168
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

168 172

REVISION 03/10/2018 00143 Data 03/10/2018 VY1013A/B 0,08kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S3 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 169
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
168.9 / L1 L1 / 176.0

168.9 / L2 L2 / 176.0

168.9 / L3 L3 / 176.0

24VDC 24VDC
73.7 / 24VDC 73.7 / 24VDC
ZEOLYTE VIBRATORS MOTOR START
COMMAND
11
VY1014 AB-COM
1 3 5 1 3 5 -172K3 A2.1
-172Q1 -172Q2 /172.7 12 14
13 14 /172.4 13 14 /172.4
0.18-0.25A 0.18-0.25A

17282
SIE.3RV2011-0CA10 SIE.3RV2011-0CA10 -DO2
3RV2901-1E I> I> I> 21 22 /172.8 3RV2901-1E I> I> I> 21 22 /172.9
DO
SIEMENS 2 4 6 SIEMENS 2 4 6 13 23
5
-172S1
/46.5 MAN
14 24
AUTO 17286
3SB3500-2DA11
3SB3400-0B
17270

17272

17274

17276

17278

17280
SIEMENS
11 13 21 21
-172S2 -172S3 -172Q1 -172Q2
3SB3500-0AA21 12 3SB3501-0AA41 14 /172.0 22 /172.2 22

17290
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

17287
BA9S24
SIEMENS
1 3 5 1 3 5 13
-172K1 -172K2 -172K1
/172.4 2 4 6 /172.5 2 4 6 /172.4 14
33

17288
-172K1
13 /172.4 34

17289
-172K2

17291
/172.5 14
17271

17273

17275

17277

17279

17281

33
17283
-172K2
13 /172.5 34
-172Q1
/172.0 14
17284

17292
-172W1 -172X1 1 2 3 4 5 6 13
FG7(O)R -172W2
4G2,5 FG7(O)R -172Q2
/172.2 5 1
VY-1014A 4G2,5 14
BU BN BK VY-1014B BU BN BK 17285 DI DI
-DI3 -DI3
A1
A1 A1 x1 -172K3 E3.1 E3.0
G2R2SND24VDC
-172K1 -172K2 -172S3 A2
VY1014 AB-IAL VY1014 AB-RUN
P2RF08E
3RT2016-1BB41 A2 3RT2016-1BB41 A2 /172.6 x2 OMRON ZEOLYTE VIBRATORS MOTOR FAULT ZEOLYTE VIBRATORS MOTOR
3RH2911-1FA22 3RH2911-1FA22
U1 V1 W1 U1 V1 W1 3RA1921-1DA00 3RA1921-1DA00 RUNNING
SIEMENS SIEMENS
024VDC
024VDC
73.8 / 024VDC
M M 14
VY-1014 A VY-1014 B 73.8 / 024VDC 12 11 /172.4
0,08kW 400V 50Hz 3~ 0,08kW 400V 50Hz 3~
1 2 /172.0 1 2 /172.2
VIBRATING MOTOR S4 PE VIBRATING MOTOR S4 PE 3 4 /172.1 3 4 /172.2
5 6 /172.1 5 6 /172.3
PE PE
11 12 /712.3 11 12 /712.3
13 14 /172.5 13 14 /172.5
13 14 /712.3 13 14 /712.3
33 34 /172.9 33 34 /172.9
VIBRATING MOTOR S4 VIBRATING MOTOR S4

169 173

REVISION 03/10/2018 00143 Data 08/10/2018 VY1014A/B 0,08kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S4 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 172
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

172 176

REVISION 03/10/2018 00143 Data 03/10/2018 VY1014A/B 0,08kW 400/50 D VIBRATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. MOTOR S4 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 173
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
172.9 / L1 L1 / 178.0

172.9 / L2 L2 / 178.0

172.9 / L3 L3 / 178.0

24VDC 24VAC
73.7 / 24VDC 72.8 / 24VAC
1 3 5 11 13 FINISHED PRODUCT BELT CONVEYOR
COM NT-411_REVERSE
-176Q1 NT-411_COM NT-411_RW
3RV2011-1BA10 12 14 11 21
3RV2901-1E A12.3 A12.4
/177.1

/176.3

SIEMENS I> I> I> -176K2 -176K3


MCB .S00,1.4-2A,ML /176.8 12 14 /176.9 12 24
2 4 6 -DO12 -DO12

17607
DO DO
17601 6 3

13 23 23
17604
-176S1
/47.7 MAN MAN
14 24 24
17607 AUTO
3SB3500-2DA11

17611

17614

17630
3SB3400-0B
SIEMENS

1 3 5 1 3 5 11 13 13
-176K1 -176K4 -176S2 -176S3 -176S4
/176.3 2 4 6 /176.4 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14 /47.8 14
17608 3SB3400-0C 3SB3400-0B 3SB3500-0AA31
SIEMENS 3SB3400-1A

17612
3SB3400-0B
BA9S24
SIEMENS
17602 SIEMENS

13 13

17618

17619
17605
-176K1 -176K4
/176.3 14 /176.4 14
17608
11
-176K1
/176.3 12
13

17623
-176Q1
17609

/176.0 14 11
-176K4
-176W1 -176X1 1 2 3 /176.4 12
FG7(O)R 1 1
4G2,5
NT-411 -176K5 -176K5

17624
BU BN BK /176.6 /176.6
4 3
17620

17613

A1 A1 x1 2 A1 A1
-176K1 -176K4 -176S3 -176K5 -176K2 -176K3
U1 V1 W1 3RT2016-1BB41 A2 3RT2016-1BB41 A2 /176.5 x2 G4Q212S24VAC 7 G2R2SND24VDC A2 G2R2SND24VDC A2
3RH2911-1FA22 3RH2911-1FA22 PF083A P2RF08E P2RF08E
3RA1921-1DA00 3RA1921-1DA00 OMRON OMRON OMRON
NT-411 M 3RA2913-2AA1 SIEMENS
3~ SIEMENS 024VDC 024VAC 024VDC
0,75 kW 400/50 D 73.8 / 024VDC 72.8 / 024VAC 73.8 / 024VDC
PE
1 2 /176.0 1 2 /176.1 1 3 /176.4 14 14
FINISHED PRODUCT
BELT CONVEYOR 3 4 /176.1 3 4 /176.2 1 4 /176.3 12 11 /176.3 12 11 /719.8
PE
5 6 /176.1 5 6 /176.2 33 34 /177.3 24
11 12 /176.6 11 12 /176.6 12 21 /176.6
FINISHED PRODUCT BELT CONVEYOR 11 12 /724.7 11 12 /724.7
13 14 /176.4 13 14 /176.4
33 34 /177.2 33 34 /177.4
43 44 /724.8 43 44 /724.8

173 177

REVISION 03/10/2018 00143 Data 08/10/2018 NT-411 0,75kW 400/50 D FINISHED PRODUCT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. BELT CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 176
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

11 33 33 33 719.7
-176Q1 -176K1 -176K2 -176K4 E29.1
/176.0 12 /176.3 34 /176.8 34 /176.4 34
17618

17619

17701

17702

71930
8 5 1 2 5
DI DI DI DI DI
-DI26 -DI27 -DI27 -DI27 -DI29

E26.7 E27.1 E27.0 E27.2 E29.1


NT-411_IAL NT-411_FW NT-411_RUN NT-411_REV NT-411_FW
FINISHED PRODUCT BELT CONVEYOR NT-411_FORWARD FINISHED PRODUCT BELT CONVEYOR NT-411_REVERSE NT-411_FORWARD
FAULT RUNNING

176 178

REVISION 03/10/2018 00143 Data 08/10/2018 NT-411 0,75kW 400/50 D FINISHED PRODUCT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. BELT CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 177
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
176.9 / L1 L1 / 180.0

176.9 / L2 L2 / 180.0

176.9 / L3 L3 / 180.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR F-402A START COMMAND
1 3 5 13 21
FS-402A-COM
-178Q1 A7.3
3RV2011-1DA10 14 22 11
3RV2901-1E
/178.3

/178.8

SIEMENS I> I> I> -178K2 -DO7


MCB S00,2.2-3.2A,VT /178.6 12 14
2 4 6
DO

17807
6

21 33
13 23 -178Q1 -178K1
17801

17803

17805

-178S1 /178.0 22 /178.3 34


/47.1 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
17810
SIEMENS

1 3 5 11 13
-178K1 -178S2 -178S3
/178.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
17808

17811

17812
BA9S24

17813

17814
SIEMENS

13
-178K1
/178.3 14
17802

17804

17806

13
-178Q1
/178.0 6 2
14
17809 DI DI
-178W1 -178X1 1 2 3
-DI18 -DI18
FG7(O)R
A1
4G2,5
FS-402A A1 x1 -178K2 E18.3 E18.2
BU BN BK G2R2SND24VDC
-178K1 -178S3 A2
FS-402A-IAL FS-402A-RUN
P2RF08E
3RT2016-1BB41 A2 /178.5 x2 OMRON FAN FOR F-402A FAULT FAN FOR F-402A RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

FS-402A M 1 2 /178.0 14
3 4 /178.1 12 11 /178.3
3~ 5 6 /178.1
1,1 kW 400/50 D
PE 11 12 /721.3
FAN FOR F402A 13 14 /178.4
PE 33 34 /178.9
43 44 /721.3

FAN FOR F402A

177 179

REVISION 03/10/2018 00143 Data 08/10/2018 FS-402A 1,1kW 400/50 D FAN FOR F402A = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 178
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
DO COMPRESSED AIR OF FAN FS-402A
START COMMAND 0110VAC
FS3-CA-COM
71.8 / 0110VAC
A13.3

-DO13

DO
3

21
-179K1
/179.0 22 24
17901

17902

-179X1 1 2

+FS402A
A1 A1
-179K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

DO COMPRESSED FS-402A START COMMAND

24
22 21 /179.2

178 180

REVISION 03/10/2018 00143 Data 08/10/2018 FS-402A 1,1kW 400/50 D FAN FOR F402A = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 179
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
178.9 / L1 L1 / 182.0

178.9 / L2 L2 / 182.0

178.9 / L3 L3 / 182.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
1 3 5 13 21
FAN FOR F-402B START COMMAND
-180Q1 FS-402B-COM
3RV2011-1DA10 14 22 11
3RV2901-1E A7.4
/180.3

/180.8

SIEMENS I> I> I> -180K2


MCB S00,2.2-3.2A,VT /180.6 12 14
2 4 6 -DO7

18007
DO
3
21 33
13 23 -180Q1 -180K1
18001

18003

18005

-180S1 /180.0 22 /180.3 34


/47.3 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
18010
SIEMENS

1 3 5 11 13
-180K1 -180S2 -180S3
/180.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
18008

18011

18012
BA9S24

18013

18014
SIEMENS

13
-180K1
/180.3 14
18002

18004

18006

13
-180Q1
/180.0 7 3
14
18009 DI DI
-180W1 -180X1 1 2 3
-DI18 -DI18
FG7(O)R
A1
4G2,5
FS-402B A1 x1 -180K2 E18.5 E18.4
BU BN BK G2R2SND24VDC
-180K1 -180S3 A2
FS-402B-IAL FS-402B-RUN
P2RF08E
3RT2016-1BB41 A2 /180.5 x2 OMRON FAN FOR F-402B FAULT FAN FOR F-402B RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

FS-402B M 1 2 /180.0 14
3 4 /180.1 12 11 /180.3
3~ 5 6 /180.1
1,1 kW 400/50 D
PE 11 12 /721.3
FAN FOR F402B 13 14 /180.4
PE 33 34 /180.9
43 44 /721.4

FAN FOR F402B

179 181

REVISION 03/10/2018 00143 Data 08/10/2018 FS-402B 1,1kW 400/50 D FAN FOR F402B = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 180
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
DO COMPRESSED AIR OF FAN FS-402B
START COMMAND 0110VAC
FS3-CA-COM
71.8 / 0110VAC
A13.4

-DO13

DO
4

21
-181K1
/181.0 22 24
18101

18102

-181X1 1 2

+FS402B
A1 A1
-181K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

DO COMPRESSED FS-402B START COMMAND

24
22 21 /181.2

180 182

REVISION 03/10/2018 00143 Data 08/10/2018 FS-402B 1,1kW 400/50 D FAN FOR F402B = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 181
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
180.9 / L1 L1 / 184.0

180.9 / L2 L2 / 184.0

180.9 / L3 L3 / 184.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC EXTRACTION BELT CONVEYOR START
COMMAND
1 3 5 13 21
NT-402-COM
-182Q1 A7.5
3RV2011-1DA10 14 22 11
3RV2901-1E
/182.3

/182.8

SIEMENS I> I> I> -182K2 -DO7


MCB S00,2.2-3.2A,VT /182.6 12 14 41 23
2 4 6
DO
-182K1

18207
7
/182.3 42 24
21 33
13 23 -182Q1 -182K1
18201

18203

18205

-182S1 /182.0 22 /182.3 34


/47.5 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
18210
SIEMENS

1 3 5 11 13
-182K1 -182S2 -182S3
/182.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
18208

18211

72530

72531

18212
BA9S24

18213

18214
SIEMENS

13
-182K1
/182.3 14
18202

18204

18206

72530

72531
13

719.8 /

/
-182Q1
/182.0 8 4
14
18209 DI DI
-182W1 -182X1 1 2 3
-DI18 -DI18
FG7(O)R
A1
4G2,5
NT-402 A1 x1 -182K2 E18.7 E18.6
BU BN BK G2R2SND24VDC
-182K1 -182S3 A2
NT-402-IAL NT-402-RUN
P2RF08E
3RT2016-1BB41 A2 /182.5 x2 OMRON EXTRACTION BELT CONVEYOR FAULT EXTRACTION BELT CONVEYOR
3RH2911-1FA22
3RA1921-1DA00 RUNNING
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

NT-402 M 1 2 /182.0 14
3 4 /182.1 12 11 /182.3
3~ 5 6 /182.1
1,1 kW 400/50 D
PE 6
EXTRACTION BELT CONVEYOR 5 8 /725.7
PE 13 14 /182.4
23 24 /182.5
33 34 /182.9
41 42 /182.5
EXTRACTION BELT CONVEYOR

181 183

REVISION 03/10/2018 00143 Data 08/10/2018 NT-402 1,1kW 400/50 D EXTRACTION BELT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 182
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

182 184

REVISION 03/10/2018 00143 Data 03/10/2018 NT-402 1,1kW 400/50 D EXTRACTION BELT = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 183
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
182.9 / L1 L1 / 186.0

182.9 / L2 L2 / 186.0

182.9 / L3 L3 / 186.0

1 3 5
-184F1

18418 / 185.5

18413 / 185.6
6SE6400-0PM00-0AA0
3NW7033 6SE6400-0BP00-0AA0
3NW6003-1 /44.1
2 4 6
SIEMENS -184U1
FUSE 10,3x38 10A gL/gG
18401

18404

18407

21
-185K2
/185.5 24 Hz 75000
-184V1 I FN
6SE6400-2FA00-6AD0 3
SIEMENS
0 JOG P

18411

18414

18418

18413
BOP
18402

18405

18408

6SE6400-0BP00-0AA0

-184T1 18443 18444 18445 18446


L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-184W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 18420 18421 18422 18423

AC A A
digital inputs
DC D D
1
2
n.c. 60Hz ADC1 ADC2
1 2 1 2
mA mA
3
4
V V
6SE6440-2UD15-5AA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
18403

18406

18409

18415

-184W1
FG7OH2R
4G2,5SH 24VDC 024VDC
ND-402 -184X1 1 2 3 18410 73.7 / 24VDC 73.8 / 024VDC
BU BN BK PE

ND402_FAULT / 723.3

ND402_RUN / 723.4
PE 1 5
DI DI
U1 V1 W1
-DI19 -DI19

ND-402 M
E19.0 E19.1
3~
0,55 kW 400/50 SFC ND-402-RUN ND-402-IAL
PE
ATOMIZED POWDER WEIGHING BELT ATOMIZED POWDER WEIGHING BELT
ATOMIZED POWDER WEIGHING BELT
RUNNING FAULT

183 ATOMIZED POWDER WEIGHING BELT 185

REVISION 03/10/2018 00143 Data 08/10/2018 ND-402 0,55kW 400/50 SFC ATOMIZED = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. POWDER WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 184
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

ATOMIZED POWDER WEIGHING BELT


OUT CONTROL

ND-402-OUT
PAW292
/757.5
184.5 184.5
1 2 -AO9
18418 18413
M0+ M0- QI0 Mana
-AI13 1 3 +EXT
/755.6
PEW360
ND-402-FB G
ATOMIZED POWDER WEIGHING BELT
FEEDBACK

18519

18522

18418

18413

18524

18525

18526

18527

18528
TXD RXD S_GND TXD CTS RX/TX+ RX/TX- TX+ TX- RX+ RX- I_OUT+ V_OUT+ A_GND I_OUT+ V_OUT+ A_GND IN+ IN_GND E_VDC+ E_GND PH_A PH_B
-185U1
/48.3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ANALOG ANALOG ANALOG
COM 2 RS232 COM 3 RS232 COM 3 RS485 COM 1 RS422 OUTPUT 1 OUTPUT 2 INPUT ENCODER

COBRA 365 STAD

POWER SUPPLY
LOAD CELL 1 LOAD CELL 2 NR 6 INPUT NR 6 OUTPUT 24VDC 8W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
EXC- EXC+ SENSE+ SENSE- SIGN- SIGN+ SIGN2+ SIGN2- IN1 IN2 IN3 IN4 IN5 IN6 COM OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 COM +VDC GND
18517

18515

18515

18517

18518

18516

18520

18521

18523

18530

18531
ATOMIZED POWDER WEIGHING BELT
START COMMAND
ND-402-COM
A7.6
+EXT
12 14
-DO7
-185K1
/185.9 DO
11
4
-185R1
3 7

18529
DI DI
-DI29 -DI29
A1

1 2
13 -185K2 E29.4 E29.5
A1
-185S1 A2
ND-402-TOL ND-402-ZERO -185K1
/48.3 14 A2
ATOMIZED POWDER WEIGHING BELT ATOMIZED POWDER WEIGHING BELT
TOLERANCE ALARM ZERO FLOW ALARM

24VDC
73.7 / 24VDC

024VDC
73.8 / 024VDC

21 24 /184.2
14 11 /185.3
12

184 186

REVISION 03/10/2018 00143 Data 04/10/2018 ND-402 0,55kW 400/50 SFC ATOMIZED = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. POWDER WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 185
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
184.9 / L1 L1 / 188.0

184.9 / L2 L2 / 188.0

184.9 / L3 L3 / 188.0

1 3 5
-186F1

18618 / 187.5

18613 / 187.6
6SE6400-0PM00-0AA0
3NW7033 6SE6400-0BP00-0AA0
3NW6003-1 /44.3
2 4 6
SIEMENS -186U1
FUSE 10,3x38 10A gL/gG
18601

18604

18607

21
-187K2
/187.5 24 Hz 75000
-186V1 I FN
6SE6400-2FA00-6AD0 3
SIEMENS
0 JOG P

18611

18614

18618

18613
BOP
18602

18605

18608

6SE6400-0BP00-0AA0

-186T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-186W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 18620 18621 18622 18623

AC A A
digital inputs
DC D D
1
2
n.c. 60Hz ADC1 ADC2
1 2 1 2
mA mA
3
4
V V
6SE6440-2UD13-7AA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
18603

18606

18609

18619

-186W1
FG7OH2R
4G2,5SH 24VDC 024VDC
ND-406 -186X1 1 2 3 18610 73.7 / 24VDC 73.8 / 024VDC
BU BN BK PE

ND406_FAULT / 723.4

ND406_RUN / 723.4
PE 2 6
DI DI
U1 V1 W1
-DI19 -DI19

ND-406 M
E19.2 E19.3
3~
0,37 kW 400/50 SFC ND-406-RUN ND-406-IAL
PE
S. PERBORATE WEIGHING BELT S. PERBORATE WEIGHING BELT FAULT
S.PERBORATE WEIGHING BELT
RUNNING

185 S.PERBORATE WEIGHING BELT 187

REVISION 03/10/2018 00143 Data 08/10/2018 ND-406 0,37kW 400/50 SFC S.PERBORATE = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 186
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

S.PERBORATE WEIGHING BELT OUT


CONTROL

ND-406-OUT
PAW294
186.5 186.5
5 6 /757.5
18618 18613
M1+ M1- -AO9
-AI13 QI1 Mana +EXT
/755.6 5 7
PEW362
ND-406-FB G
S. PERBORATE WEIGHING BELT
FEEDBACK

18705

18708

18618

18613

18710

18711

18712

18713

18714
TXD RXD S_GND TXD CTS RX/TX+ RX/TX- TX+ TX- RX+ RX- I_OUT+ V_OUT+ A_GND I_OUT+ V_OUT+ A_GND IN+ IN_GND E_VDC+ E_GND PH_A PH_B
-187U1
/48.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ANALOG ANALOG ANALOG
COM 2 RS232 COM 3 RS232 COM 3 RS485 COM 1 RS422 OUTPUT 1 OUTPUT 2 INPUT ENCODER

COBRA 365 STAD

POWER SUPPLY
LOAD CELL 1 LOAD CELL 2 NR 6 INPUT NR 6 OUTPUT 24VDC 8W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
EXC- EXC+ SENSE+ SENSE- SIGN- SIGN+ SIGN2+ SIGN2- IN1 IN2 IN3 IN4 IN5 IN6 COM OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 COM +VDC GND
18703

18701

18701

18703

18704

18702

18706

18707

18709

18716

18717
S. PERBORATE WEIGHING BELT START
COMMAND
ND-406-COM
A7.7
+EXT
12 14
-DO7
-187K1
/187.9 DO
11
8
-187R1

18715
3 7
DI DI
-DI24 -DI24
1 2
13 A1 A1
-187S1 -187K2 E24.4 E24.5 -187K1
/48.6 14 A2 A2
ND-406-TOL ND-406-ZERO
ATOMIZED POWDER WEIGHING BELT ATOMIZED POWDER WEIGHING BELT
TOLERANCE ALARM ZERO FLOW ALARM

24VDC
73.7 / 24VDC

024VDC
73.8 / 024VDC

21 24 /186.2 14 11 /187.3
12

186 188

REVISION 03/10/2018 00143 Data 04/10/2018 ND-406 0,37kW 400/50 SFC S.PERBORATE = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 187
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
186.9 / L1 L1 / 190.0

186.9 / L2 L2 / 190.0

186.9 / L3 L3 / 190.0

1 3 5
-188F1

18818 / 189.5

18813 / 189.6
6SE6400-0PM00-0AA0
3NW7033 6SE6400-0BP00-0AA0
3NW6003-1 /44.5
2 4 6
SIEMENS -188U1
FUSE 10,3x38 10A gL/gG
18801

18804

18807

21
-189K2
/189.5 24 Hz 75000
-188V1 I FN
6SE6400-2FA00-6AD0 3
SIEMENS
0 JOG P

18811

18814

18818

18813
BOP
18802

18805

18808

6SE6400-0BP00-0AA0

-188T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-188W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 18816 18817 18818 18819

AC A A
digital inputs
DC D D
1
2
n.c. 60Hz ADC1 ADC2
1 2 1 2
mA mA
3
4
V V
6SE6440-2UD13-7AA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
18803

18806

18809

18819

-188W1
FG7OH2R
4G2,5SH 24VDC 024VDC
ND-408 -184X1 1 2 3 18813 73.7 / 24VDC 73.8 / 024VDC
BU BN BK PE

ND408_FAULT / 723.5

ND408_RUN / 723.5
PE 3 7
DI DI
U1 V1 W1
-DI19 -DI19

ND-408 M
E19.4 E19.5
3~
0,37 kW 400/50 SFC ND-408-RUN ND-408-IAL
PE
ENZYMES WEIGHING BELT RUNNING ENZYMES WEIGHING BELT FAULT
ENZYMES WEIGHING BELT

187 ENZYMES WEIGHING BELT 189

REVISION 03/10/2018 00143 Data 08/10/2018 ND-408 0,37kW 400/50 SFC ENZYMES = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 188
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

ENZYMES WEIGHING BELT OUT


CONTROL

ND-408-OUT
PAW296
188.5 188.5
3 4 /757.5
18818 18813
M2+ M2- -AO10
-AI13 QI0 Mana +EXT
/755.6 1 3
PEW364
ND-408-FB G
ENZYMES WEIGHING BELT FEEDBACK

18905

18908

18818

18813

18910

18911

18912

18913

18914
TXD RXD S_GND TXD CTS RX/TX+ RX/TX- TX+ TX- RX+ RX- I_OUT+ V_OUT+ A_GND I_OUT+ V_OUT+ A_GND IN+ IN_GND E_VDC+ E_GND PH_A PH_B
-189U1
/48.3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ANALOG ANALOG ANALOG
COM 2 RS232 COM 3 RS232 COM 3 RS485 COM 1 RS422 OUTPUT 1 OUTPUT 2 INPUT ENCODER

COBRA 365 STAD

POWER SUPPLY
LOAD CELL 1 LOAD CELL 2 NR 6 INPUT NR 6 OUTPUT 24VDC 8W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
EXC- EXC+ SENSE+ SENSE- SIGN- SIGN+ SIGN2+ SIGN2- IN1 IN2 IN3 IN4 IN5 IN6 COM OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 COM +VDC GND
18903

18901

18901

18903

18904

18902

18906

18907

18909

18916

18917
ENZYMES WEIGHING BELT START
COMMAND
ND-408-COM
A8.0
+EXT
12 14
-DO8
-189K1
/189.9 DO
11
1
-189R1

18915
1 5
DI DI
A1
-DI25 -DI25
1 2
13 -189K2 A1
-189S1 A2
E25.0 E25.1 -189K1
/48.3 14 A2
ND-408-TOL ND-408-ZERO
ATOMIZED POWDER WEIGHING BELT ATOMIZED POWDER WEIGHING BELT
TOLERANCE ALARM ZERO FLOW ALARM

24VDC
73.7 / 24VDC

024VDC
73.8 / 024VDC

21 24 /188.2
14 11 /189.3
12

188 190

REVISION 03/10/2018 00143 Data 04/10/2018 ND-408 0,37kW 400/50 SFC ENZYMES = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 189
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
188.9 / L1 L1 / 192.0

188.9 / L2 L2 / 192.0

188.9 / L3 L3 / 192.0

1 3 5
-190F1 6SE6400-0PM00-0AA0
3NW7033 6SE6400-0BP00-0AA0

19018 / 191.5

19013 / 191.6
3NW6003-1 /44.6
2 4 6
SIEMENS -190U1
FUSE 10,3x38 10A gL/gG
19001

19004

19007

21
-191K2
/191.5 24 Hz 75000
-190V1 I FN
6SE6400-2FA00-6AD0 3
SIEMENS
0 JOG P

19011

19014

19018

19013
BOP
19002

19005

19008

6SE6400-0BP00-0AA0

-190T1 1 2 3 4
L N B+ DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 +24V 0V +10V OV ADC1+ ADC1- ADC2+ ADC2-

L1 L2 L3 PE DC- DC+ B- 5 6 7 8 16 17 9 28 1 2 3 4 10 11
-190W2
(max. 100mA) ANALOG / 0V until +10V / 0-20mA
4X0,5xSCH
DC-link BOP CABLE 19020 19021 19022 19023

AC A A
digital inputs
DC D D
1
2
n.c. 60Hz ADC1 ADC2
1 2 1 2
mA mA
3
4
V V
6SE6440-2UD13-7AA1
50Hz
SIEMENS
DIP on Control-Board DIP on I/O Board
30VDC / 5A (non-inductive)
250VAC / 2A (inductive)

DC D D D
AC A A A (USS-protocol)
RS-485
0-20mA max. 500Ohm
RL1 RL2 RL3

U V W PE 14 15 20 19 18 22 21 25 24 23 12 13 26 27 29 30
PTCA PTCB COM NO NC COM NO COM NO NC DAC1+ DAC1- DAC2+ DAC2- P+ N-
19003

19006

19009

19019

-190W1
FG7OH2R
4G2,5SH 24VDC 024VDC
ND-409 -190X1 1 2 3 19010 73.7 / 24VDC 73.8 / 024VDC
BU BN BK PE

ND409_FAULT / 723.6

ND409_RUN / 723.6
PE 4 8
DI DI
U1 V1 W1
-DI19 -DI19

ND-409 M
E19.6 E19.7
3~
0,37 kW 400/50 SFC ND-409-RUN ND-409-IAL
PE
PREMIXED OPTICAL BRIGHTNESS PREMIXED OPTICAL BRIGHTNESS
PREMIXED OPTICAL
WEIGHING BELT RUNNING WEIGHING BELT FAULT
BRIGHTNESS WEIGHING BELT

189 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT 191

REVISION 03/10/2018 00143 Data 08/10/2018 ND-409 0,37kW 400/50 SFC PREMIXED = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. OPTICAL BRIGHTNESS WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 190
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PREMIXED OPTICAL BRIGHTNESS


WEIGHING BELT OUT CONTROL

ND-409-OUT
PAW298
190.5 190.5
7 8 /757.5
19018 19013
M3+ M3- -AO10
-AI13 QI1 Mana +EXT
/755.6 5 7
PEW366
ND-409-FB G
PREMIXED OPTICAL BRIGHTNESS
WEIGHING BELT FEEDBACK

19108

19111

19018

19013

19113

19114

19115

19116

19117
TXD RXD S_GND TXD CTS RX/TX+ RX/TX- TX+ TX- RX+ RX- I_OUT+ V_OUT+ A_GND I_OUT+ V_OUT+ A_GND IN+ IN_GND E_VDC+ E_GND PH_A PH_B
-191U1
/48.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
ANALOG ANALOG ANALOG
COM 2 RS232 COM 3 RS232 COM 3 RS485 COM 1 RS422 OUTPUT 1 OUTPUT 2 INPUT ENCODER

COBRA 365 STAD

POWER SUPPLY
LOAD CELL 1 LOAD CELL 2 NR 6 INPUT NR 6 OUTPUT 24VDC 8W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
EXC- EXC+ SENSE+ SENSE- SIGN- SIGN+ SIGN2+ SIGN2- IN1 IN2 IN3 IN4 IN5 IN6 COM OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 COM +VDC GND
19106

19101

19101

19106

19107

19105

19109

19110

19112

19119

19120
PREMIXED OPTICAL BRIGHTNESS
WEIGHING BELT START COMMAND
ND-409-COM
A8.1
+EXT
12 14
-DO8
-191K1
/191.9 DO
11
5
-191R1

19118
2 6
DI DI
13 A1 A1
1 2 -DI29 -DI29
-191S1 -191K2 -191K1
/48.6 14 A2 A2
E29.2 E29.3
ND-402-TOL ND-402-ZERO
ATOMIZED POWDER WEIGHING BELT ATOMIZED POWDER WEIGHING BELT
TOLERANCE ALARM ZERO FLOW ALARM

24VDC
73.7 / 24VDC

024VDC
73.8 / 024VDC

21 24 /190.2 14 11 /191.3
12

190 192

REVISION 03/10/2018 00143 Data 04/10/2018 ND-409 0,37kW 400/50 SFC PREMIXED = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. OPTICAL BRIGHTNESS WEIGHING BELT +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 191
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
190.9 / L1 L1 / 194.0

190.9 / L2 L2 / 194.0

190.9 / L3 L3 / 194.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR F-408 START COMMAND
1 3 5 13 21
FS-408-COM
-192Q1 A8.2
3RV2011-1DA10 14 22 11
3RV2901-1E
/192.3

/192.8

SIEMENS I> I> I> -192K2 -DO8


MCB S00,2.2-3.2A,VT /192.6 12 14
2 4 6
DO

19207
2

21 33
13 23 -192Q1 -192K1
19201

19203

19205

-192S1 /192.0 22 /192.3 34


/47.5 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
19210
SIEMENS

1 3 5 11 13
-192K1 -192S2 -192S3
/192.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
19208

19211

19212
BA9S24

19213

19214
SIEMENS

13
-192K1
/192.3 14
19202

19204

19206

13
-192Q1
/192.0 5 1
14
19209 DI DI
-192W1 -192X1 1 2 3
-DI20 -DI20
FG7(O)R
A1
4G2,5
FS-408 A1 x1 -192K2 E20.1 E20.0
BU BN BK G2R2SND24VDC
-192K1 -192S3 A2
FS-408-IAL FS-408-RUN
P2RF08E
3RT2016-1BB41 A2 /192.5 x2 OMRON FAN FOR F-408 FAULT FAN FOR F-408 RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

FS-408 M 1 2 /192.0 14
3 4 /192.1 12 11 /192.3
3~ 5 6 /192.1
1,1 kW 400/50 D
PE 11 12 /724.2
FAN FOR F408 13 14 /192.4
PE 33 34 /192.9
43 44 /724.2

FAN FOR F408

191 193

REVISION 03/10/2018 00143 Data 04/10/2018 FS-408 1,1kW 400/50 D FAN FOR F408 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 192
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS-408
START COMMAND 0110VAC
-193K1:A1
71.8 / 0110VAC
A13.5

-DO13

DO
5

21
-193K1
/193.1 22 24
19301

19302

-193X1 1 2

+FS408
A1 A1
-193K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

COMPRESSED AIR OF FAN FS-408 START COMMAND

24
22 21 /193.3

192 194

REVISION 03/10/2018 00143 Data 04/10/2018 FS-408 1,1kW 400/50 D FAN FOR F408 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 193
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
192.9 / L1 L1 / 196.0

192.9 / L2 L2 / 196.0

192.9 / L3 L3 / 196.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR F-406 START COMMAND
1 3 5 13 21
FS-406-COM
-194Q1 A8.3
3RV2011-1DA10 14 22 11
3RV2901-1E
/194.3

/194.8

SIEMENS I> I> I> -194K2 -DO8


MCB S00,2.2-3.2A,VT /194.6 12 14
2 4 6
DO

19407
6

21 33
13 23 -194Q1 -194K1
19401

19403

19405

-194S1 /194.0 22 /194.3 34


/47.4 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
19410
SIEMENS

1 3 5 11 13
-194K1 -194S2 -194S3
/194.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
19408

19411

19412
BA9S24

19413

19414
SIEMENS

13
-194K1
/194.3 14
19402

19404

19406

13
-194Q1
/194.0 6 2
14
19409 DI DI
-194W1 -194X1 1 2 3
-DI20 -DI20
FG7(O)R
A1
4G2,5
FS-406 A1 x1 -194K2 E20.3 E20.2
BU BN BK G2R2SND24VDC
-194K1 -194S3 A2
FS-406-IAL FS-406-RUN
P2RF08E
3RT2016-1BB41 A2 /194.5 x2 OMRON FAN FOR F-406 FAULT FAN FOR F-406 RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

FS-406 M 1 2 /194.0 14
3 4 /194.1 12 11 /194.3
3~ 5 6 /194.1
1,1 kW 400/50 D
PE 11 12 /723.6
FAN FOR F406 13 14 /194.4
PE 33 34 /194.9
43 44 /723.7

FAN FOR F406

193 195

REVISION 03/10/2018 00143 Data 04/10/2018 FS-406 1,1kW 400/50 D FAN FOR F406 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 194
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS-406
START COMMAND 0110VAC
-195K1:A1
71.8 / 0110VAC
A13.6

-DO13

DO
6

21
-195K1
/195.0 22 24
19501

19502

-195X1 1 2

+FS406
A1 A1
-195K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

COMPRESSED AIR OF FAN FS-406 START COMMAND

24
22 21 /195.2

194 196

REVISION 03/10/2018 00143 Data 08/10/2018 FS-406 1,1kW 400/50 D FAN FOR F406 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 195
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
194.9 / L1 L1 / 198.0

194.9 / L2 L2 / 198.0

194.9 / L3 L3 / 198.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN FOR F-409 START COMMAND
1 3 5 13 21
FS-409-COM
-196Q1 A8.4
3RV2011-1DA10 14 22 11
3RV2901-1E
/196.3

/196.8

SIEMENS I> I> I> -196K2 -DO8


MCB S00,2.2-3.2A,VT /196.6 12 14
2 4 6
DO

19607
3

21 33
13 23 -196Q1 -196K1
19601

19603

19605

-196S1 /196.0 22 /196.3 34


/47.6 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
19610
SIEMENS

1 3 5 11 13
-196K1 -196S2 -196S3
/196.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
19608

19611

19612
BA9S24

19613

19614
SIEMENS

13
-196K1
/196.3 14
19602

19604

19606

13
-196Q1
/196.0 7 3
14
19609 DI DI
-196W1 -196X1 1 2 3
-DI20 -DI20
FG7(O)R
A1
4G2,5
FS-409 A1 x1 -196K2 E20.5 E20.4
BU BN BK G2R2SND24VDC
-196K1 -196S3 A2
FS-409-IAL FS-409-RUN
P2RF08E
3RT2016-1BB41 A2 /196.5 x2 OMRON FAN FOR F-409 FAULT FAN FOR F-409 RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

FS-409 M 1 2 /196.0 14
3 4 /196.1 12 11 /196.3
3~ 5 6 /196.1
1,1 kW 400/50 D
PE 11 12 /724.3
FAN FOR F409 13 14 /196.4
PE 33 34 /196.9
43 44 /724.4

FAN FOR F409

195 197

REVISION 03/10/2018 00143 Data 08/10/2018 FS-409 1,1kW 400/50 D FAN FOR F409 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 196
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
COMPRESSED AIR OF FAN FS-406
START COMMAND 0110VAC
-197K1:A1
71.8 / 0110VAC
A13.7

-DO13

DO
7

21
-197K1
/197.0 22 24
19701

19702

-197X1 1 2

+FS409
A1 A1
-197K1 CA
G2R2SND24VDC A2 A2
P2RF08E
OMRON

024VDC
73.8 / 024VDC

COMPRESSED AIR OF FAN FS-409 START COMMAND

24
22 21 /197.2

196 198

REVISION 03/10/2018 00143 Data 08/10/2018 FS-409 1,1kW 400/50 D FAN FOR F409 = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 197
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
196.9 / L1 L1 / 200.0

196.9 / L2 L2 / 200.0

196.9 / L3 L3 / 200.0

24VDC 24VAC
73.7 / 24VDC 72.8 / 24VAC
1 3 5 11 13 ADDITIVES FEEDING BELT CONVEYOR ADDITIVES FEEDING BELT CONVEYOR
START COMMAND REVERSE COMMAND
-198Q1 NT-410-COM NT-410-REV
3RV2011-1GA10 12 14 11 21
3RV2901-1E A9.0 A9.1
/199.1

/198.3

SIEMENS I> I> I> -198K3 -198K4


MCB .S00, 4.5-6.3A,VT /198.8 12 14 /198.9 12 24
2 4 6 -DO9 -DO9

19807
DO DO
19801 1 5

13 23 23
19803
-198S1
/47.6 MAN MAN
14 24 24
19805 AUTO
3SB3500-2DA11

19811

19814
3SB3400-0B

19817
SIEMENS

1 3 5 1 3 5
-198K1 -198K2 11 13 13
/198.3 /198.4 -198S2 -198S3
2 4 6 2 4 6 19808 -198S4
3SB3500-0AA21 12 3SB3501-0AA41 14 /47.6 14

19812
3SB3400-0C 3SB3400-0B 3SB3500-0AA31
SIEMENS 3SB3400-1A 3SB3400-0B
19802 BA9S24
SIEMENS
SIEMENS
13 13

19818

19819
19804
-198K1 -198K2
/198.3 14 /198.4 14
19806
11
-198K1
/198.3 12
13

19815
-198Q1
19809

/198.0 14 11
-198K2
-198W1 -198X1 1 2 3 /198.4 12
FG7(O)R 1 1
4G2,5
NT-410 -198K5 -198K5

19816
BU BN BK /198.6 /198.6
4 3
19810

19813

A1 A1 x1 2 A1 A1
-198K1 -198K2 -198S3 -198K5 -198K3 -198K4
U1 V1 W1 3RT2016-1BB41 A2 3RT2016-1BB41 A2 /198.5 x2 G4Q212S24VAC 7 G2R2SND24VDC A2 G2R2SND24VDC A2
3RH2911-1FA22 3RH2911-1FA22 PF083A P2RF08E P2RF08E
3RA1921-1DA00 3RA1921-1DA00 OMRON OMRON OMRON
NT-410 M 3RA2913-2AA1 SIEMENS
3~ SIEMENS 024VDC 024VAC 024VDC
2,2 kW 400/50 TV 73.8 / 024VDC 72.8 / 024VAC 73.8 / 024VDC
PE
1 2 /198.0 1 2 /198.1 1 3 /198.4 14 24
ADDITIVES FEEDING
BELT CONVEYOR 3 4 /198.1 3 4 /198.2 1 4 /198.3 12 11 /198.3 12 21 /198.6
PE
5 6 /198.1 5 6 /198.2 6 33 34 /199.2
11 12 /198.6 11 12 /198.6 5 8 /725.2
ADDITIVES FEEDING BELT CONVEYOR 11 12 /725.3 11 12 /725.3
13 14 /198.4 13 14 /198.4
13 14 /725.3 13 14 /725.3
33 34 /199.3 33 34 /199.4

197 199

REVISION 03/10/2018 00143 Data 08/10/2018 NT-410 2,2kW 400/50 TV ADDITIVES FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. BELT CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 198
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

E29.0 / 725.2
11 33 33 33
-198Q1 -198K3 -198K1 -198K2
/198.0 12 /198.8 34 /198.3 34 /198.4 34
19901

19902

19903

19904

72502
7 3 4 8 1
DI DI DI DI DI
-DI21 -DI21 -DI21 -DI21 -DI29

E21.5 E21.4 E21.6 E21.7 E29.0


NT-410-IAL NT-410-RUN NT-410-FW NT-410-RW NT-410_FW
ADDITIVES FEEDING BELT CONVEYOR ADDITIVES FEEDING BELT CONVEYOR ADDITIVES FEEDING BELT CONVEYOR ADDITIVES FEEDING BELT CONVEYOR NT-410_FORWARD
FAULT RUNNING FORWARD MODE REVERSE MODE

198 200

REVISION 03/10/2018 00143 Data 08/10/2018 NT-410 2,2kW 400/50 TV ADDITIVES FEEDING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. BELT CONVEYOR +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 199
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
198.9 / L1 L1 / 202.0

198.9 / L2 L2 / 202.0

198.9 / L3 L3 / 202.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC FINAL ROTATING CONTINUOUS MIXER
START COMMAND
1 3 5 11 13
MX-402-COM
-200Q1 A8.5
3RV2011-1HA10 12 14 11
3RV2901-1E
/200.8

/200.3

SIEMENS I> I> I> -200K3 -DO8


A SCREW CONNECTION /200.6 12 14
2 4 6
DO

20007
7

11 33
13 23 -200Q1 -200K2
20001

20003

20005

-200S1 /200.0 12 /200.3 34


/47.7 MAN
14 24
AUTO
3SB3500-2DA11

20010
3SB3400-0B
SIEMENS

1 3 5
-200K2 11 13
/200.3 2 4 6 -200S2 -200S3
20008
3SB3500-0AA21 12 3SB3501-0AA41 14

20012
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

20011

20013

20014
BA9S24
SIEMENS

13
-200K2
20002

20004

20006

/200.3 14

13
-200Q1
20009

/200.0 14
8 4
DI DI
-200W1 -200X1 1 2 3
-DI20 -DI20
FG7(O)R
A1 x1 A1
4G2,5
MX-402 -200K2 -200S3 -200K3 E20.7 E20.6
BU BN BK 3RT2016-1BB41 /200.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E MX-402-IAL MX-402-RUN
3RA1921-1DA00 OMRON FINAL ROTATING CONTINUOUS MIXER FINAL ROTATING CONTINUOUS MIXER
SIEMENS FAULT RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

MX-402 M 1 2 /200.0 14
3 4 /200.1 12 11 /200.3
3~ 5 6 /200.1
3,00 kW 400/50 4P D
PE 11 12 /721.7
FINAL ROTATING 13 14 /200.4
CONTINUOUS MIXER PE 33 34 /200.9
43 44 /721.8

FINAL ROTATING CONTINUOUS MIXER

199 201

REVISION 03/10/2018 00143 Data 08/10/2018 MX-402 3,00kW 400/50 4P D FINAL ROTATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONTINUOUS MIXER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 200
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

200 202

REVISION 03/10/2018 00143 Data 03/10/2018 MX-402 3,00kW 400/50 4P D FINAL ROTATING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CONTINUOUS MIXER +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 201
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
200.9 / L1 L1 / 204.0

200.9 / L2 L2 / 204.0

200.9 / L3 L3 / 204.0

24VDC
24VDC 24VDC
73.7 / 24VDC
73.7 / 24VDC 73.7 / 24VDC NON IONIC DOSING PUMP START
COMMAND
1 3 5 11 13
024VDC DP-431-COM
-202Q1 73.8 / 024VDC A8.6
1.1-1.6A 12 14 11
SIE.3RV2011-1AA10
/202.8

/202.3

3RV2901-1E I> I> I> -202K2 -DO8


SIEMENS /202.7 12 14
2 4 6
DO

20207
4

11 33
13 23 -202Q1 -202K1
20201

20203

20205

-202S1 /202.0 12 /202.3 34


/47.1 MAN
14 24
AUTO
3SB3500-2DA11

20210
3SB3400-0B
SIEMENS

1 3 5
-202K1 11 13
/202.3 2 4 6 -202S2 -202S3
20208

3SB3500-0AA21 12 3SB3501-0AA41 14

20212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

20211

20213

20214
BA9S24
SIEMENS

13
1
-202K1 3
20202

20204

20206

/202.3
-202F1
14 3NW7053
SIE.3NW6011-1 4
SIEMENS 2

13
-202Q1

20215

20216
20209

/202.0 14
5 1
DI DI
-202W1 -202X1 1 2 3 -202X1 4 5
-DI21 -DI21
FG7(O)R
A1 x1 A1
4G2,5
DP-431 -202K1 -202S3 -202K2 E21.1 E21.0
BU BN BK 3RT2016-1BB41 A2 /202.4 x2
-DP431 G2R2SND24VDC A2
3RH2911-1FA22 /550.5 P2RF08E DP-431-IAL DP-431-RUN
3RA1921-1DA00
L1 LN OMRON NON IONIC DOSING PUMP FAULT NON IONIC DOSING PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

DP-431 M 1 2 /202.0 14
3 4 /202.1 12 11 /202.2
3~ 5 6 /202.1
0,55 kW 400/50 D
PE 11 12 /725.4
NON IONIC DOSING PUMP 13 14 /202.4
PE 33 34 /202.9
43 44 /725.4

NON IONIC DOSING PUMP

201 203

REVISION 03/10/2018 00143 Data 08/10/2018 DP-431 0,75kW 400/50 D NON IONIC DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 202
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

202 204

REVISION 03/10/2018 00143 Data 03/10/2018 DP-431 0,75kW 400/50 D NON IONIC DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 203
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
202.9 / L1 L1 / 206.0

202.9 / L2 L2 / 206.0

202.9 / L3 L3 / 206.0

24VDC
24VDC 24VDC
73.7 / 24VDC
73.7 / 24VDC 73.7 / 24VDC PERFUME DOSING PUMP START
COMMAND
1 3 5 11 13
024VDC DP-432-COM
-204Q1 73.8 / 024VDC A8.7
0,35-0,5A 12 14 11
SIE.3RV2011-0FA10
/204.8

/204.3

3RV2901-1E I> I> I> -204K2 -DO8


SIEMENS /204.7 12 14
2 4 6
DO

20407
8

11 33
13 23 -204Q1 -204K1
20401

20403

20405

-204S1 /204.0 12 /204.3 34


/47.3 MAN
14 24
AUTO
3SB3500-2DA11

20410
3SB3400-0B
SIEMENS

1 3 5
-204K1 11 13
/204.3 2 4 6 -204S2 -204S3
20408

3SB3500-0AA21 12 3SB3501-0AA41 14

20412
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

20411

20413

20414
BA9S24
SIEMENS

13
1
-204K1 3
20402

20404

20406

/204.3
-204F1
14 3NW7053
SIE.3NW6011-1 4
SIEMENS 2

13
-204Q1

20415

20416
20409

/204.0 14
6 2
DI DI
-204W1 -204X1 1 2 3 -204X1 4 5
-DI21 -DI21
FG7(O)R
A1 x1 A1
4G2,5
DP-432 -204K1 -204S3 -204K2 E21.3 E21.2
BU BN BK 3RT2016-1BB41 A2 /204.4 x2
-DP432 G2R2SND24VDC A2
3RH2911-1FA22 /550.7 P2RF08E DP-432-IAL DP-432-RUN
3RA1921-1DA00
L1 LN OMRON PERFUME DOSING PUMP FAULT PERFUME DOSING PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

DP-432 M 1 2 /204.0 14
3 4 /204.1 12 11 /204.2
3~ 5 6 /204.1
0,18 kW 400/50 D
PE 11 12 /725.5
PERFUME DOSING PUMP 13 14 /204.4
PE 33 34 /204.9
43 44 /725.5

PERFUME DOSING PUMP

203 205

REVISION 03/10/2018 00143 Data 08/10/2018 DP-432 0,25kW 400/50 D PERFUME DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 204
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

204 206

REVISION 03/10/2018 00143 Data 03/10/2018 DP-432 0,25kW 400/50 D PERFUME DOSING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 205
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
204.9 / L1 L1 / 208.0

204.9 / L2 L2 / 208.0

204.9 / L3 L3 / 208.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC DISTRIBUTOR CONVEYOR BELT START
COMMAND (ET-401)
1 3 5 11 13
NT-404-COM(ET-401)
-206Q1 A7.2
3RV2011-1JA10 12 14 11
3RV2901-1E
/206.8

/206.3

SIEMENS I> I> I> -206K2 -DO7


A SCREW CONNECTION /206.6 12 14
2 4 6
DO

20607
2

11 33
13 23 -206Q1 -206K1
20601

20603

20605

-206S1 /206.0 12 /206.3 34


/47.4 MAN
14 24
AUTO
3SB3500-2DA11

20610
3SB3400-0B
SIEMENS

1 3 5
-206K1 11 13
/206.3 2 4 6 -206S2 -206S3
20608
3SB3500-0AA21 12 3SB3501-0AA41 14

20612
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

20611

20613

20614
BA9S24
SIEMENS

13
-206K1
20602

20604

20606

/206.3 14

13
-206Q1
20609

/206.0 14
5 1
DI DI
-206X1 1 2 3
-DI18 -DI18
-206W1 A1 x1 A1
FG7(O)R
4G2,5 -206K1 -206S3 -206K2 E18.1 E18.0
ET-401 3RT2016-1BB41 A2 /206.5 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E NT-404-IAL(ET-401) NT-404-RUN(ET-401)
BU BN BK
3RA1921-1DA00 OMRON DISTRIBUTOR CONVEYOR BELT FAULT DISTRIBUTOR CONVEYOR BELT
SIEMENS (ET-401) RUNNING (ET-401)
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

ET-401 M 1 2 /206.0 14
3 4 /206.1 12 11 /206.3
3~ 5 6 /206.1
4 kW 400/50 D
PE 11 12 /721.2
ELEVATOR 13 14 /206.4
PE 33 34 /206.9
43 44 /721.2

ELEVATOR

205 207

REVISION 03/10/2018 00143 Data 08/10/2018 ET-401 4kW 400/50 D ELEVATOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 206
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

206 208

REVISION 03/10/2018 00143 Data 03/10/2018 ET-401 4kW 400/50 D ELEVATOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 207
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
206.9 / L1 L1 / 210.0

206.9 / L2 L2 / 210.0

206.9 / L3 L3 / 210.0

24VDC
73.7 / 24VDC

11
24VDC
-208K2 73.7 / 24VDC
/208.6 12 14 VIBRATOR MOTOR FOR ST-1 TYPE
START COMMAND
1 3 5 11 13

20807
VVY2A-COM
-208Q1 A5.1
3RV2011-1AA10 12 14
3RV2901-1E
/208.8

/208.3

SIEMENS I> I> I> 13 23


-DO5
MCB S00, 1,1-1,6A,VT 2 4 6 -208S1
/47.6 REM DO
14 24
PLC 5
3SB3500-2DA11

20810
3SB3400-0B 11 33
SIEMENS
-208Q1 -208K1
20801

20803

20805

/208.0 12 /208.3 34
-208X2 1

LOCAL 11
-210Q1
13 /210.0 12
1 3 5 -208S2
VY2A/B
-208K1 PLC-0-REM
14
/208.3 2 4 6 3SB3501-0AA41
20808
3SB3400-0B

20811
3SB3400-1A
BA9S24

20812

20813
SIEMENS

-208X2 2 33
-210K2
20802

20804

20806

13 /208.4 34
-208Q1

20814
/208.0 14
20809

13
5 1
-210Q1 DI DI
/210.0
-208X1 1 2 3 14
-DI9 -DI9
-208W1
A1
FG7(O)R
20810

VY-2A -208X3 1 -208K2 E9.1 E9.0


BU BN BK G2R2SND24VDC A2
P2RF08E VVY2A-IAL VVY2A-RUN
LOCAL
OMRON VIBRATOR MOTOR FOR ST-1 TYPE VIBRATOR MOTOR FOR ST-1 TYPE
x1 FAULT RUNNING
024VDC
A1 A1 -208S2 73.8 / 024VDC
/208.4
-208K1 -210K2 x2
U1 V1 W1 3RT2016-1BB41 A2 3RT2016-1BB41 A2
3RH2911-1FA22 3RH2911-1FA22
3RA1921-1DA00 3RA1921-1DA00
M SIEMENS SIEMENS
14
VY-2 A 024VDC -208X3 2 12 11 /208.3
0,5 kW 400/50 D 3~ 73.8 / 024VDC
VIBRATING MOTOR ST1 PE
1 2 /208.0 1 2 /210.0
3 4 /208.1 3 4 /210.1
PE
5 6 /208.1 5 6 /210.1
33 34 /208.9 33 34 /208.9
VIBRATING MOTOR ST1

207 209

REVISION 03/10/2018 00143 Data 08/10/2018 VY-2A 0,5kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ST1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 208
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

208 210

REVISION 03/10/2018 00143 Data 03/10/2018 VY-2A 0,5kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ST1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 209
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
208.9 / L1 L1 / 212.0

208.9 / L2 L2 / 212.0

208.9 / L3 L3 / 212.0

1 3 5 11 13
-210Q1
3RV2011-1AA10 12 14
3RV2901-1E
/208.8

/208.3

SIEMENS I> I> I>


MCB S00, 1,1-1,6A,VT 2 4 6
21014

21016

21018

1 3 5
-210K2
/208.4 2 4 6
21015

21017

21019

-210X1 1 2 3
-210W1
FG7(O)R
VY-2B
BU BN BK

U1 V1 W1

M
VY-2 B
0,5 kW 400/50 D 3~
VIBRATING MOTOR ST1 PE

PE

VIBRATING MOTOR ST1

209 211

REVISION 03/10/2018 00143 Data 08/10/2018 VY-2B 0,5kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ST1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 210
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

210 212

REVISION 03/10/2018 00143 Data 03/10/2018 VY-2B 0,5kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ST1 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 211
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
210.9 / L1 L1 / 214.0

210.9 / L2 L2 / 214.0

210.9 / L3 L3 / 214.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC S. SULPHATEVIBRATORS MOTOR
START COMMAND
1 3 5 11 13
VY4021 A-COM
-212Q1 A10.0
3RV2011-0FA10 12 14 11
3RV2901-1E
/212.8

/212.3

SIEMENS I> I> I> -212K2 -DO10


MCB .S00, 0.35-0.5A,VT /212.6 12 14
2 4 6
DO

21207
1

11 33
13 23 -212Q1 -212K1
21201

21203

21205

-212S1 /212.0 12 /212.3 34


/47.1 MAN
14 24
AUTO
3SB3500-2DA11

21210
3SB3400-0B 11
SIEMENS
-214Q1
1 3 5 /214.0 12
-212K1 11 13
/212.3 2 4 6 -212S2 -212S3
21208
3SB3500-0AA21 12 3SB3501-0AA41 14

21212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

21211

21213

21216
BA9S24
SIEMENS
13
-214K1 33
/214.3 14 -214K1
21202

21204

21206

21216
/214.3 34

13

21214
-212K1
/212.3 14

2 6
21208 / 214.3 DI DI
-212W1 -212X1 1 2 3
-DI24 -DI24
FG7(O)R
13 A1
4G2,5
VY-4021A -212Q1 -212K2 E24.2 E24.3
21209

BU BN BK /212.0 G2R2SND24VDC
14 A2
P2RF08E VY4021 A-RUN VY4021 A-IAL
OMRON S. SULPHATE VIBRATORS MOTOR S. SULPHATE VIBRATORS MOTOR
RUNNING FAULT
024VDC
A1 x1 73.8 / 024VDC
-212K1 -212S3
U1 V1 W1 3RT2016-1BB41 A2 /212.5 x2
3RH2911-1FA22
3RA1921-1DA00
VY-4021A M SIEMENS
14
12 11 /212.3
3~ 024VDC
0,1 kW 400/50 D 73.8 / 024VDC
PE
VIBRATING MOTOR S4021A
PE 1 2 /212.0
3 4 /212.1
5 6 /212.1
VIBRATING MOTOR S4021A
11 12 /722.3
13 14 /212.4
33 34 /212.9
43 44 /722.4
211 213

REVISION 03/10/2018 00143 Data 08/10/2018 VY-4021A 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402A +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 212
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

212 214

REVISION 03/10/2018 00143 Data 03/10/2018 VY-4021A 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402A +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 213
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
212.9 / L1 L1 / 216.0

212.9 / L2 L2 / 216.0

212.9 / L3 L3 / 216.0

1 3 5 11 13
-214Q1
3RV2011-0FA10 12 14
3RV2901-1E
/212.8

/214.3

SIEMENS I> I> I>


MCB .S00, 0.35-0.5A,VT 2 4 6
21415

21417

21419

21208 / 212.5
1 3 5
-214K1
/214.3 2 4 6 21208
21416

21418

21420

13
-214Q1
/214.0 14
21423

-214W1 -214X1 1 2 3
FG7(O)R
A1 x1
4G2,5
VY-4021B -214K1 -214S3
BU BN BK 3RT2016-1BB41 A2 x2
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
73.8 / 024VDC

U1 V1 W1

VY-4021B M 1 2 /214.0
3 4 /214.1
3~ 5 6 /214.1
0,1 kW 400/50 D
PE 11 12 /722.3
VIBRATING MOTOR S4021B 13 14 /212.4
PE 33 34 /212.9
43 44 /722.4

VIBRATING MOTOR S4021B

213 215

REVISION 03/10/2018 00143 Data 08/10/2018 VY-4021B 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402A +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 214
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

214 216

REVISION 03/10/2018 00143 Data 03/10/2018 VY-4021B 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402A +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 215
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
214.9 / L1 L1 / 218.0

214.9 / L2 L2 / 218.0

214.9 / L3 L3 / 218.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC S. SULPHATEVIBRATORS MOTOR
START COMMAND
1 3 5 11 13
VY4022 A-COM
-216Q1 A10.2
3RV2011-0FA10 12 14 11
3RV2901-1E
/216.8

/216.3

SIEMENS I> I> I> -216K2 -DO10


MCB .S00, 0.35-0.5A,VT /216.6 12 14
2 4 6
DO

21635
2

11 33
13 23 -216Q1 -216K1
21629

21631

21633

-216S1 /216.0 12 /216.3 34


/47.4 MAN
14 24
AUTO
3SB3500-2DA11

21638
3SB3400-0B
SIEMENS
11
1 3 5 -218Q1
/218.0
-216K1 11 13 12
/216.3 2 4 6 -216S2 -216S3
21636
3SB3500-0AA21 12 3SB3501-0AA41 14

21640
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

21639

21641

21644
BA9S24
SIEMENS

13
-218K1 33
21630

21632

21634

/218.3 14 -218K1

21643
/218.3 34

21642
13
-216K1
/216.3 14
8 4
21636 / 218.3 DI DI
-216W1 -216X1 1 2 3
-DI24 -DI24
FG7(O)R
13 A1
4G2,5
VY-4022A -216Q1 -216K2 E24.7 E24.6
21637

BU BN BK /216.0 G2R2SND24VDC
14 A2
P2RF08E VY4022 A-IAL VY4022 A-RUN
OMRON S. SULPHATE VIBRATORS MOTOR S. SULPHATE VIBRATORS MOTOR
FAULT RUNNING
024VDC
A1 x1 73.8 / 024VDC
-216K1 -216S3
U1 V1 W1 3RT2016-1BB41 A2 /216.5 x2
3RH2911-1FA22
3RA1921-1DA00
VY-4022A M SIEMENS
14
12 11 /216.3
3~ 024VDC
0,1 kW 400/50 D 73.8 / 024VDC
PE
VIBRATING MOTOR S4022A
PE 1 2 /216.0
3 4 /216.1
5 6 /216.1
VIBRATING MOTOR S4022A
11 12 /722.4
13 14 /216.4
33 34 /216.9
43 44 /722.4
215 217

REVISION 03/10/2018 00143 Data 08/10/2018 VY-4022A 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402B +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 216
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

216 218

REVISION 03/10/2018 00143 Data 03/10/2018 VY-4022A 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402B +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 217
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
216.9 / L1 L1 / 220.0

216.9 / L2 L2 / 220.0

216.9 / L3 L3 / 220.0

1 3 5 11 13
-218Q1
3RV2011-0FA10 12 14
3RV2901-1E
/216.8

/218.3

SIEMENS I> I> I>


MCB .S00, 0.35-0.5A,VT 2 4 6
21843

21845

21847

21636 / 216.5
1 3 5
-218K1
/218.3 2 4 6 21636
21844

21846

21848

13
-218Q1
21851

/218.0 14

-218W1 -218X1 1 2 3
FG7(O)R
A1 x1
4G2,5
VY-4022B -218K1 -218S3
BU BN BK 3RT2016-1BB41 A2 x2
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
73.8 / 024VDC

U1 V1 W1

VY-4022B M 1 2 /218.0
3 4 /218.1
3~ 5 6 /218.1
0,1 kW 400/50 D
PE 11 12 /722.4
VIBRATING MOTOR S4022B 13 14 /216.4
PE 33 34 /216.9
43 44 /722.4

VIBRATING MOTOR S4022B

217 219

REVISION 03/10/2018 00143 Data 08/10/2018 VY-4022B 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402B +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 218
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

218 220

REVISION 03/10/2018 00143 Data 03/10/2018 VY-4022B 0,1kW 400/50 D VIBRATING MOTOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. S402B +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 219
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
218.9 / L1 L1 / 222.0

218.9 / L2 L2 / 222.0

218.9 / L3 L3 / 222.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC BELT CONVEYOR MOTOR START
COMMAND
1 3 5 13 21
NT6-COM
-220Q1 A1.0
3RV2011-1AA10 14 22 11
3RV2901-1E
/220.3

/220.8

SIEMENS I> I> I> -220K2 -DO1


MCB S00, 1,1-1,6A,VT /220.6 12 14
2 4 6
DO

22063
1

21 33
13 23 -220Q1 -220K1
22057

22059

22061

-220S1 /220.0 22 /220.3 34


/45.1 MAN
14 24
AUTO
3SB3500-2DA11
3SB3400-0B
22066
SIEMENS

1 3 5 11 13
-220K1 -220S2 -220S3
/220.3 2 4 6 3SB3500-0AA21 12 3SB3501-0AA41 14
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A
22064

22067

22068
BA9S24

22069

22070
SIEMENS

23
-220K1
/220.3 24
22058

22060

22062

13
-220Q1
/220.0 5 1
14
22065 DI DI
-220W1 -220X1 1 2 3
-DI1 -DI1
FG7(O)R
A1
4G2,5
NT-6 A1 x1 -220K2 E1.1 E1.0
BU BN BK G2R2SND24VDC
-220K1 -220S3 A2
NT6-IAL NT6-RUN
P2RF08E
3RT2016-1BB41 A2 /220.5 x2 OMRON BELT CONVEYOR FAULT BELT CONVEYOR RUNNING
3RH2911-1FA22
3RA1921-1DA00
SIEMENS
024VDC
024VDC
73.8 / 024VDC
73.8 / 024VDC
U1 V1 W1

NT-6 M 1 2 /220.0 14
3 4 /220.1 12 11 /220.3
3~ 5 6 /220.1
0,55 kW 400/50 D
PE 11 12 /712.7
BELT CONVEYOR 23 24 /220.4
PE 33 34 /220.9
43 44 /712.8

BELT CONVEYOR

219 221

REVISION 03/10/2018 00143 Data 08/10/2018 NT-6 0,55kW 400/50 D BELT CONVEYOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 220
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

220 222

REVISION 03/10/2018 00143 Data 03/10/2018 NT-6 0,55kW 400/50 D BELT CONVEYOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 221
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
220.9 / L1 L1 / 224.0

220.9 / L2 L2 / 224.0

220.9 / L3 L3 / 224.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC SULPHONIC ACID TRANSFER START
COMMAND
1 3 5 11 13
P801-COM
-222Q1 A5.3
3RV2011-1JA10 12 14 11
3RV2901-1E
/222.8

/222.3

SIEMENS I> I> I> -222K2 -DO5


A SCREW CONNECTION /222.6 12 14
2 4 6
DO

22207
6

11 33
13 23 -222Q1 -222K1
22201

22203

22205

-222S1 /222.0 12 /222.3 34


/45.7 MAN
14 24
AUTO
3SB3500-2DA11

22210
3SB3400-0B
SIEMENS

1 3 5
-222K1 11 13
/222.3 2 4 6 -222S2 -222S3
22208
3SB3500-0AA21 12 3SB3501-0AA41 14

22212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

22211

22213

22214
BA9S24
SIEMENS

13
-222K1
22202

22204

22206

/222.3 14

13
-222Q1
22209

/222.0 14
7 3
DI DI
-222W1 -222X1 1 2 3
-DI9 -DI9
FG7(O)R
A1 x1 A1
4G2,5
P-801 -222K1 -222S3 -222K2 E9.5 E9.4
BU BN BK 3RT2016-1BB41 /222.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E P801-IAL P801-RUN
3RA1921-1DA00 OMRON SULPHONIC ACID TRANSFER FAULT SULPHONIC ACID TRANSFER PUMP
SIEMENS RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P-801 M 1 2 /222.0 14
3 4 /222.1 12 11 /222.3
3~ 5 6 /222.1
4,00 kW 400/50 D
PE 11 12 /713.3
SULPHONIC ACID 13 14 /222.4
LOADING PUMP PE 33 34 /222.9
43 44 /713.3

SULPHONIC ACID LOADING PUMP

221 223

REVISION 03/10/2018 00143 Data 08/10/2018 P-801 4,00kW 400/50 D SULPHONIC ACID = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 222
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

222 224

REVISION 03/10/2018 00143 Data 03/10/2018 P-801 4,00kW 400/50 D SULPHONIC ACID = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 223
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
222.9 / L1 L1 / 226.0

222.9 / L2 L2 / 226.0

222.9 / L3 L3 / 226.0

73.7
24VDC
1 3 5
-224F1
3NP1123-1BC20 24VDC
3NA3824
SIEMENS 2 4 6
13 SODIUM SILICATE TRANSFER START
FUS.NH Gr.000 gL/gG 500Vca/440Vcc 80A COMMAND
-224K1 P802-COM
/224.5 14
A5.4
11
22415

22417

22419

73.8 22421 P-802_RUN / 224.9 -224K2 -DO5


024VDC /224.7 12 14
DO

22422
3

-224Q1 13 23
1L1 3L2 5L3 A2 A1 IN1 13 14/24 23
-224S1
/45.8 MAN
14 24 224.2 224.2
AUTO
Siemens 3SB3500-2DA11 P-802_FAULT P-802_RUN

22424
ON/ BY-
RUN PASSED 3SB3400-0B
SIEMENS

11 13
-224S2 -224S3

22423
3SB3500-0AA21 12 3SB3501-0AA41 14

22426
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

22425
BA9S24
SIEMENS

13
FAILURE/OVERLOAD -224K1
/224.5 14

3RW4027-1BB04
2T1 4T2 6T3 95 96 98

8 4
22416

22418

22420

P-802_FAULT / 224.8 DI DI
-DI9 -DI9
A1 x1 A1
-224K1 -224S3 -224K2 E9.7 E9.6
3RT2016-1BB41 A2 /224.6 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E P802-IAL P802-RUN
-224X1 1 2 3 3RA1921-1DA00 OMRON SODIUM SILICATE TRANSFER FAULT SODIUM SILICATE TRANSFER PUMP
SIEMENS RUNNING
24VDC 024VDC 024VDC
-224W1 73.7 73.8 / 024VDC 73.8 / 024VDC
FG7OH2R
4G10
P-802
BU BN BK
1 2 14
3 4 12 11 /224.5
5 6
11 12 /713.3
13 14 /224.2
U1 V1 W1
13 14 /224.6
43 44 /713.4
P-802 M
3~
11,00 kW 400/50 SS
PE
SODIUM SILICATE
LOADING PUMP

223 SODIUM SILICATE LOADING PUMP 225

REVISION 03/10/2018 00143 Data 08/10/2018 P-802 11,00kW 400/50 SS SODIUM SILICATE = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 224
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

224 226

REVISION 03/10/2018 00143 Data 03/10/2018 P-802 11,00kW 400/50 SS SODIUM SILICATE = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 225
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
224.9 / L1 L1 / 228.0

224.9 / L2 L2 / 228.0

224.9 / L3 L3 / 228.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC CAUSTRIC SODA TRANSFER START
COMMAND
1 3 5 11 13
P803-COM
-226Q1 A5.5
3RV2011-1KA10 12 14 11
3RV2901-1E
/226.8

/226.3

SIEMENS I> I> I> -226K2 -DO5


MCB .S00, 9..12.5A,VT /226.6 12 14
2 4 6
DO

22607
7

11 33
13 23 -226Q1 -226K1
22601

22603

22605

-226S1 /226.0 12 /226.3 34


/45.1 MAN
14 24
AUTO
3SB3500-2DA11

22610
3SB3400-0B
SIEMENS

1 3 5
-226K1 11 13
/226.3 2 4 6 -226S2 -226S3
22608
3SB3500-0AA21 12 3SB3501-0AA41 14

22612
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

22611

22613

22614
BA9S24
SIEMENS

13
-226K1
22602

22604

22606

/226.3 14

13
-226Q1
22609

/226.0 14
5 1
DI DI
-226X1 1 2 3
-DI10 -DI10
-226W1 A1 x1 A1
FG7(O)R
4G4 -226K1 -226S3 -226K2 E10.1 E10.0
P-803 3RT2017-1BB41 A2 /226.5 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E P803-IAL P803-RUN
BU BN BK
3RA1921-1DA00 OMRON CAUSTRIC SODA TRANSFER FAULT CAUSTRIC SODA TRANSFER PUMP
SIEMENS RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P-803 M 1 2 /226.0 14
3 4 /226.1 12 11 /226.3
3~ 5 6 /226.1
5,50 kW 400/50 D
PE 11 12 /713.4
CAUSTIC SODA 13 14 /226.4
LOADING PUMP PE 33 34 /226.9
43 44 /713.4

CAUSTIC SODA LOADING PUMP

225 227

REVISION 03/10/2018 00143 Data 08/10/2018 P-803 5,50kW 400/50 D CAUSTIC SODA = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 226
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

226 228

REVISION 03/10/2018 00143 Data 03/10/2018 P-803 5,50kW 400/50 D CAUSTIC SODA = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 227
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
226.9 / L1 L1 / 230.0

226.9 / L2 L2 / 230.0

226.9 / L3 L3 / 230.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
WATER TRANSFER START COMMAND
1 3 5 11 13
P804-COM
-228Q1 A5.6
3RV2011-1GA10 12 14 11
3RV2901-1E
/228.8

/228.3

SIEMENS I> I> I> -228K2 -DO5


MCB .S00, 4.5-6.3A,VT /228.6 12 14
2 4 6
DO

22807
4

11 33
13 23 -228Q1 -228K1
22801

22803

22805

-228S1 /228.0 12 /228.3 34


/45.2 MAN
14 24
AUTO
3SB3500-2DA11

22810
3SB3400-0B
SIEMENS

1 3 5
-228K1 11 13
/228.3 2 4 6 -228S2 -228S3
22808
3SB3500-0AA21 12 3SB3501-0AA41 14

22812
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

22811

22813

22814
BA9S24
SIEMENS

13
-228K1
22802

22804

22806

/228.3 14

13
-228Q1
22809

/228.0 14
6 2
DI DI
-228X1 1 2 3
-DI10 -DI10
-228W1 A1 x1 A1
FG7(O)R
4x2,5 -228K1 -228S3 -228K2 E10.3 E10.2
P-804 3RT2016-1BB41 A2 /228.5 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E P804-IAL P804-RUN
BU BN BK
3RA1921-1DA00 OMRON WATER TRANSFER FAULT WATER TRANSFER PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P-804 M 1 2 /228.0 14
3 4 /228.1 12 11 /228.3
3~ 5 6 /228.1
2,20 kW 400/50 D
PE 11 12 /713.5
PROCESS WATER 13 14 /228.4
LOADING PUMP PE 33 34 /228.9
43 44 /713.5

PROCESS WATER LOADING PUMP

227 229

REVISION 03/10/2018 00143 Data 08/10/2018 P-804 2,20kW 400/50 D PROCESS WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 228
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

228 230

REVISION 03/10/2018 00143 Data 03/10/2018 P-804 2,20kW 400/50 D PROCESS WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. LOADING PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 229
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
228.9 / L1 L1 / 232.0

228.9 / L2 L2 / 232.0

228.9 / L3 L3 / 232.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
GASOIL TRANSFER START COMMAND
1 3 5 11 13
P805-COM
-230Q1 A5.7
3RV2011-1BA10 12 14 11
3RV2901-1E
/230.8

/230.3

SIEMENS I> I> I> -230K3 -DO5


MCB .S00,1.4-2A,ML /230.6 12 14
2 4 6
DO

23007
8

11 33
13 23 -230Q1 -230K2
23001

23003

23005

-230S1 /230.0 12 /230.3 34


/46.3 MAN
14 24
AUTO
3SB3500-2DA11

23010
3SB3400-0B
SIEMENS

1 3 5
-230K2 11 13
/230.3 2 4 6 -230S2 -230S3
23008
3SB3500-0AA21 12 3SB3501-0AA41 14

23012
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

23011

23013

23014
BA9S24
SIEMENS

13
-230K2
23002

23004

23006

/230.3 14

13
-230Q1
23009

/230.0 14
7 3
DI DI
-230X1 1 2 3
-DI10 -DI10
-230W1 A1 x1 A1
FG7(O)R
4G2,5 -230K2 -230S3 -230K3 E10.5 E10.4
P-805 3RT2016-1BB41 A2 /230.5 x2 G2R2SND24VDC A2
3RH2911-1FA22 P2RF08E P805-IAL P805-RUN
BU BN BK
3RA1921-1DA00 OMRON GASOIL TRANSFER FAULT GASOIL TRANSFER PUMP RUNNING
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P-805 M 1 2 /230.0 14
3 4 /230.1 12 11 /230.3
3~ 5 6 /230.1
0,75 kW 400/50 D
PE 11 12 /717.4
DIESEL OIL LOADING PUMP 13 14 /230.4
PE 33 34 /230.9
43 44 /717.4

DIESEL OIL LOADING PUMP

229 231

REVISION 03/10/2018 00143 Data 08/10/2018 P-805 0,75kW 400/50 D DIESEL OIL LOADING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 230
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

230 232

REVISION 03/10/2018 00143 Data 03/10/2018 P-805 0,75kW 400/50 D DIESEL OIL LOADING = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 231
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
230.9 / L1 L1 / 234.0

230.9 / L2 L2 / 234.0

230.9 / L3 L3 / 234.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC RECOVERY WATER CIRCULATION
PUMP START COMMAND
1 3 5 11 13
P-210-COM
-232Q1 A11.6
3RV2011-1KA10 12 14 11
3RV2901-1E
/232.8

/232.3

SIEMENS I> I> I> -232K2 -DO11


MCB .S00, 9..12.5A,VT /232.6 12 14
2 4 6
DO

23207
4

11 33
13 23 -232Q1 -232K1
23201

23203

23205

-232S1 /232.0 12 /232.3 34


/45.5 MAN
14 24
AUTO
3SB3500-2DA11

23210
3SB3400-0B
SIEMENS

1 3 5
-232K1 11 13
/232.3 2 4 6 -232S2 -232S3
23208
3SB3500-0AA21 12 3SB3501-0AA41 14

23212
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

23211

23213

23214
BA9S24
SIEMENS

13
-232K1
23202

23204

23206

/232.3 14

13
-232Q1
23209

/232.0 14
6 2
DI DI
-232X1 1 2 3
-DI25 -DI25
-232W1
A1 x1 A1
FG7(O)R
4G4 -232K1 -232S3 -232K2 E25.3 E25.2
P-7 BU BN BK 3RT2017-1BB41 /232.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E P-210-IAL P-210-RUN
3RA1921-1DA00 OMRON RECOVERY WATER CIRCULATION RECOVERY WATER CIRCULATION
SIEMENS PUMP FAULT PUMP RUNNING
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

P-7 M 1 2 /232.0 14
3 4 /232.1 12 11 /232.3
3~ 5 6 /232.1
5,5 kW 400/50 D
PE 11 12 /714.4
RECOVERY WATER 13 14 /232.4
CIRCULATION PUMP PE 33 34 /232.9
43 44 /714.4

RECOVERY WATER CIRCULATION PUMP

231 233

REVISION 03/10/2018 00143 Data 08/10/2018 P-7 5,5kW 400/50 D RECOVERY WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CIRCULATION PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 232
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

232 234

REVISION 03/10/2018 00143 Data 03/10/2018 P-7 5,5kW 400/50 D RECOVERY WATER = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. CIRCULATION PUMP +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 233
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
232.9 / L1 L1 / 236.0

232.9 / L2 L2 / 236.0

232.9 / L3 L3 / 236.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN ND-402 COMMAND
1 3 5 11 13
FAN ND-402COM
-234Q1 A11.7
3RV2011-0FA10 12 14 11
3RV2901-1E
/234.8

/234.3

SIEMENS I> I> I> -234K2 -DO11


MCB .S00, 0.35-0.5A,VT /234.6 12 14
2 4 6
DO

23407
8

11 33
13 23 -234Q1 -234K1
23401

23403

23405

-234S1 /234.0 12 /234.3 34


/47.1 MAN
14 24
AUTO
3SB3500-2DA11

23410
3SB3400-0B
SIEMENS

1 3 5
-234K1 11 13
/234.3 2 4 6 -234S2 -234S3
23408
3SB3500-0AA21 12 3SB3501-0AA41 14

23412
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

23411

23413

23414
BA9S24
SIEMENS

13
-234K1
23402

23404

23406

/234.3 14

13
-234Q1
23409

/234.0 14
1 8
DI DI
-234W1 -234X1 1 2 3
-DI26 -DI25
FG7(O)R
A1 x1 A1
4G2,5
ND-402FAN -234K1 -234S3 -234K2 E26.0 E25.7
BU BN BK 3RT2016-1BB41 /234.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FAN ND-402FAULT FAN ND-402RUN
3RA1921-1DA00 OMRON FAN ND-402 FAULT FAN ND-402 RUN
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

ND-402FAN M 1 2 /234.0 14
3 4 /234.1 12 11 /234.3
3~ 5 6 /234.1
0,12kW 400/50 D
PE 13 14 /234.4
SERVOFAN FOR ND-402 33 34 /234.9
PE

SERVOFAN FOR ND-402

233 235

REVISION 03/10/2018 00143 Data 08/10/2018 ND-402FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-402 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 234
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

234 236

REVISION 03/10/2018 00143 Data 03/10/2018 ND-402FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-402 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 235
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
234.9 / L1 L1 / 238.0

234.9 / L2 L2 / 238.0

234.9 / L3 L3 / 238.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN ND-406 COMMAND
1 3 5 11 13
FAN ND-406COM
-236Q1 A12.0
3RV2011-0FA10 12 14 11
3RV2901-1E
/236.8

/236.3

SIEMENS I> I> I> -236K2 -DO12


MCB .S00, 0.35-0.5A,VT /236.6 12 14
2 4 6
DO

23621
1

11 33
13 23 -236Q1 -236K1
23615

23617

23619

-236S1 /236.0 12 /236.3 34


/47.3 MAN
14 24
AUTO
3SB3500-2DA11

23624
3SB3400-0B
SIEMENS

1 3 5
-236K1 11 13
/236.3 2 4 6 -236S2 -236S3
23622
3SB3500-0AA21 12 3SB3501-0AA41 14

23626
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

23625

23627

23628
BA9S24
SIEMENS

13
-236K1
23616

23618

23620

/236.3 14

13
-236Q1
23623

/236.0 14
2 5
DI DI
-236W1 -236X1 1 2 3
-DI26 -DI26
FG7(O)R
A1 x1 A1
4G2,5
ND-406FAN -236K1 -236S3 -236K2 E26.2 E26.1
BU BN BK 3RT2016-1BB41 /236.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FAN ND-406FAULT FAN ND-406RUN
3RA1921-1DA00 OMRON FAN ND-406 FAULT FAN ND-406 RUN
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

ND-406FAN M 1 2 /236.0 14
3 4 /236.1 12 11 /236.3
3~ 5 6 /236.1
0,12kW 400/50 D
PE 13 14 /236.4
SERVOFAN FOR ND-406 33 34 /236.9
PE

SERVOFAN FOR ND-406

235 237

REVISION 03/10/2018 00143 Data 08/10/2018 ND-406FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-406 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 236
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

236 238

REVISION 03/10/2018 00143 Data 03/10/2018 ND-406FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-406 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 237
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
236.9 / L1 L1 / 240.0

236.9 / L2 L2 / 240.0

236.9 / L3 L3 / 240.0

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN ND-408 COMMAND
1 3 5 11 13
FAN ND-408COM
-238Q1 A12.1
3RV2011-0FA10 12 14 11
3RV2901-1E
/238.8

/238.3

SIEMENS I> I> I> -238K2 -DO12


MCB .S00, 0.35-0.5A,VT /238.6 12 14
2 4 6
DO

23835
5

11 33
13 23 -238Q1 -238K1
23829

23831

23833

-238S1 /238.0 12 /238.3 34


/47.4 MAN
14 24
AUTO
3SB3500-2DA11

23838
3SB3400-0B
SIEMENS

1 3 5
-238K1 11 13
/238.3 2 4 6 -238S2 -238S3
23836
3SB3500-0AA21 12 3SB3501-0AA41 14

23840
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

23839

23841

23842
BA9S24
SIEMENS

13
-238K1
23830

23832

23834

/238.3 14

13
-238Q1
23837

/238.0 14
3 6
DI DI
-238W1 -238X1 1 2 3
-DI26 -DI26
FG7(O)R
A1 x1 A1
4G2,5
ND-408FAN -238K1 -238S3 -238K2 E26.4 E26.3
BU BN BK 3RT2016-1BB41 /238.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FAN ND-408FAULT FAN ND-408RUN
3RA1921-1DA00 OMRON FAN ND-408 FAULT FAN ND-408 RUN
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

ND-408FAN M 1 2 /238.0 14
3 4 /238.1 12 11 /238.3
3~ 5 6 /238.1
0,12kW 400/50 D
PE 13 14 /238.4
SERVOFAN FOR ND-408 33 34 /238.9
PE

SERVOFAN FOR ND-408

237 239

REVISION 03/10/2018 00143 Data 08/10/2018 ND-408FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-408 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 238
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

238 240

REVISION 03/10/2018 00143 Data 03/10/2018 ND-408FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-408 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 239
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-50U1
/50.5
238.9 / L1 L1 /

238.9 / L2 L2 /

238.9 / L3 L3 /

24VDC
24VDC
73.7 / 24VDC
73.7 / 24VDC
FAN ND-409 COMMAND
1 3 5 11 13
FAN ND-409COM
-240Q1 A12.2
3RV2011-0FA10 12 14 11
3RV2901-1E
/240.8

/240.3

SIEMENS I> I> I> -240K3 -DO12


MCB .S00, 0.35-0.5A,VT /240.6 12 14
2 4 6
DO

24049
2

11 33
13 23 -240Q1 -240K2
24043

24045

24047

-240S1 /240.0 12 /240.3 34


/47.5 MAN
14 24
AUTO
3SB3500-2DA11

24052
3SB3400-0B
SIEMENS

1 3 5
-240K2 11 13
/240.3 2 4 6 -240S2 -240S3
24050
3SB3500-0AA21 12 3SB3501-0AA41 14

24054
3SB3400-0C 3SB3400-0B
SIEMENS 3SB3400-1A

24053

24055

24056
BA9S24
SIEMENS

13
-240K2
24044

24046

24048

/240.3 14

13
-240Q1
24051

/240.0 14
4 7
DI DI
-240W1 -240X1 1 2 3
-DI26 -DI26
FG7(O)R
A1 x1 A1
4G2,5
ND-409FAN -240K2 -240S3 -240K3 E26.6 E26.5
BU BN BK 3RT2016-1BB41 /240.5 G2R2SND24VDC
A2 x2 A2
3RH2911-1FA22 P2RF08E FAN ND-409FAULT FAN ND-409RUN
3RA1921-1DA00 OMRON FAN ND-409 FAULT FAN ND-409 RUN
SIEMENS
024VDC 024VDC
73.8 / 024VDC 73.8 / 024VDC

U1 V1 W1

ND-409FAN M 1 2 /240.0 14
3 4 /240.1 12 11 /240.3
3~ 5 6 /240.1
0,12kW 400/50 D
PE 13 14 /240.4
SERVOFAN FOR ND-409 33 34 /240.9
PE

SERVOFAN FOR ND-409

239 241

REVISION 03/10/2018 00143 Data 08/10/2018 ND-409FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-409 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 240
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

240 350

REVISION 03/10/2018 00143 Data 03/10/2018 ND-409FAN 0,12kW 400/50 D SERVOFAN FOR = CB_1
AS BUILT AFTER FAT 27/12/2014 00143 Elab. ND-409 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 241
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

35006
11 21 11 13 13
-350S1 -350K1 -350S3 -350S2
/42.4 12 22 /350.4 12 3SB3501-0AA51 14 /49.1 14

35004

35005
3SB3500-1HA20 3SB3400-0B 3SB3500-0AA31
22MM MUSHROOM EMERGENCY PUSHBUTTON RED 40 MM ROUND METAL YELLOW PUSHBUTTON
SIEMENS
3SB3400-1A
BA9S24 SIEMENS

35007
SIEMENS
-XEM1 1 2 5

11
-350K2
/350.5
-XEM1 3 4 12 6

35004

35005

35008

35010

35014
-350U1 A1 A2 Y1 Y2 13 23 33 41
3TK2821-1CB30
SIEMENS

manual_safety_relay_3TK28_it-IT

14 24 34 42

35009

35011

35012

35013
35001

13
-350K1
/350.4 14
4 8
35002

DI DI
-DI30 -DI30

13
E30.6 E30.7
-350K2 -EM_STS -RST_ALM
/350.5 14
EMERGENCY_STATUS RESET_ALARM
35003

-XEM1 7 8 A1 A1 x1
-350K1 -350K2 -350S3
3RH1122-1BB40 3RH1122-1BB40 /350.4
CONTACTOR S00 2L+2R 24VCC A2 CONTACTOR S00 2L+2R 24VCC A2 x2

SIEMENS SIEMENS

11 12 /350.3 11 12 /350.3
13 14 /73.3 13 14 /73.3
13 14 /350.2 13 14 /350.2
23 24 /73.3 23 24 /73.3
33 24VDC
34 /73.4 3324VDC
34 /73.4
EMERGENCY EMERGENCY

241 352

REVISION 03/10/2018 00143 Data 08/10/2018 SAFETY RELAY = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 350
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

230VAC
70.8 / 230VAC
0230VAC
70.8 / 0230VAC

1
-352F1
3NW7013
FUSEBOX 10,3x38 FOR CYLINDRICAL FUSE 1 POLE 2
SIEMENS

35201

PE

-352U1 L N PE 1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
35202

35203

35205

35204

PE

-352R1
35206

35207

PE

7 8
M3+ M3-
-AI6
/755.4 024VDC / 73.8
PEW310
WT-1114
SCALE

350 400

REVISION 03/10/2018 00143 Data 08/10/2018 WT-1114-A WEIGHT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 352
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1113-COM
A6.0

-DO6

DO
1
12 14
-400K3
/400.5 11
40001

-400X1 3 -400X1 5
-400W2
/400.2 1 3

13 23 13 13 12 14 12 14
-400S1 KV-1113 KV-1113 -400K1 -400K2
AUTO MAN OPEN CLOSE /400.3 /400.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-400W2
40002

/400.2 2 4

-400X1 4 -400X1 6

40007

40008

40009
-400X1 1
40005

40006
-400W1
/400.1 1

KV-1113
2 6
-400W1
/400.1 2
DI DI
-DI13 -DI13
-400X1 2 A1 A1 A1
-400K1 -400K2 -400K3 E13.2 E13.3
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1113-OPN KV-1113-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /400.2 14 11 /400.6 14 11 /400.7 14 11 /400.1


12 12 12
13 14 /713.7 13 14 /713.6

KV-1113
KV-1113 OPEN KV-1113 CLOSE KV-1113 COMMAND

352 401

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1113 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 400
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1201-COM
A6.1

-DO6

DO
5
12 14
-401K3
/401.5 11
40101

-401X1 3 -401X1 5
-401W2
/401.2 1 3

13 23 13 13 12 14 12 14
-401S1 KV-1201 KV-1201 -401K1 -401K2
AUTO MAN OPEN CLOSE /401.3 /401.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-401W2
40102

/401.2 2 4

-401X1 4 -401X1 6

40105

40106

40107
-401X1 1
40103

40104
-401W1
/401.1 1

KV-1201
3 7
-401W1
/401.1 2
DI DI
-DI13 -DI13
-401X1 2 A1 A1 A1
-401K1 -401K2 -401K3 E13.4 E13.5
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1201-OPN KV-1201-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /401.2 14 11 /401.6 14 11 /401.7 14 11 /401.1


12 12 12

KV-1201
KV-1201 OPEN KV-1201 CLOSE KV-1201 COMMAND

400 402

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1201 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 401
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1202-COM
A6.2

-DO6

DO
2
12 14
-402K3
/402.5 11
40201

402X1 3 402X1 5
-402W2
/402.2 1 3

13 23 13 13 12 14 12 14
-402S1 KV-1202 KV-1202 -402K1 -402K2
AUTO MAN OPEN CLOSE /402.3 /402.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-402W2
40202

/402.2 2 4

402X1 4 402X1 6

40205

40206

40207
402X1 1
40203

40204
-402W1
/402.1 1

KV-1202
4 8
-402W1
/402.1 2
DI DI
-DI13 -DI13
402X1 2 A1 A1 A1
-402K1 -402K2 -402K3 E13.6 E13.7
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1202-OPN KV-1202-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /402.2 14 11 /402.6 14 11 /402.7 14 11 /402.1


12 12 12

KV-1202
KV-1202 OPEN KV-1202 CLOSE KV-1202 COMMAND

401 403

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1202 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 402
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

SPARE
-SPARE
A6.3

SPARE
-DO6

DO
6
12 14
-403K3
/403.5 11
40301

403X1 3 403X1 5
-403W2
/403.2 1 3

13 23 13 13 12 14 12 14
-403S1 SPARE SPARE -403K1 -403K2
AUTO MAN OPEN CLOSE /403.3 /403.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-403W2
40302

/403.2 2 4

403X1 4 403X1 6

40305

40306

40307
403X1 1
40303

40304
-403W1
/403.1 1

SPARE
1 5
-403W1
/403.1 2
DI DI
-DI14 -DI14
403X1 2 A1 A1 A1
-403K1 -403K2 -403K3 E14.0 E14.1
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E -SPARE -SPARE
71.8 / 0110VAC OMRON OMRON OMRON SPARE SPARE

024VDC
73.8 / 024VDC

23 24 /403.2 14 11 /403.6 14 11 /403.7 14 11 /403.1


12 12 12

SPARE
SPARE SPARE SPARE

402 404

REVISION 03/10/2018 00143 Data 08/10/2018 SPARE VALVE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 403
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1309-COM
A6.4

-DO6

DO
3
12 14
-404K3
/404.5 11
40401

404X1 3 404X1 5
-404W2
/404.2 1 3

13 23 13 13 12 14 12 14
-404S1 KV-1309 KV-1309 -404K1 -404K2
AUTO MAN OPEN CLOSE /404.3 /404.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-404W2
40402

/404.2 2 4

404X1 4 404X1 6

40405

40406

40407
404X1 1
40403

40404
-404W1
/404.1 1

KV-1309
2 6
-404W1
/404.1 2
DI DI
-DI14 -DI14
404X1 2 A1 A1 A1
-404K1 -404K2 -404K3 E14.2 E14.3
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1309-OPN KV-1309-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /404.2 14 11 /404.6 14 11 /404.7 14 11 /404.1


12 12 12
13 14 /715.4 13 14 /715.3

KV-1309
KV-1309 OPEN KV-1309 CLOSE KV-1309 COMMAND

403 405

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1309 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 404
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1310-COM
A6.5

-DO6

DO
7
12 14
-405K3
/405.5 11
40501

405X1 3 405X1 5
-405W2
/405.2 1 3

13 23 13 13 12 14 12 14
-405S1 KV-1310 KV-1310 -405K1 -405K2
AUTO MAN OPEN CLOSE /405.3 /405.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-405W2
40502

/405.2 2 4

405X1 4 405X1 6

40505

40506

40507
405X1 1
40503

40504
-405W1
/405.1 1

KV-1310
3 7
-405W1
/405.1 2
DI DI
-DI14 -DI14
405X1 2 A1 A1 A1
-405K1 -405K2 -405K3 E14.4 E14.5
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1310-OPN KV-1310-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /405.2 14 11 /405.6 14 11 /405.7 14 11 /405.1


12 12 12
13 14 /715.4 13 14 /715.4

KV-1310
KV-1310 OPEN KV-1310 CLOSE KV-1310 COMMAND

404 406

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1310 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 405
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1316-COM
A6.6

-DO6

DO
4
12 14
-406K3
/406.5 11
40601

406X1 3 406X1 5
-406W2
/406.2 1 3

13 23 13 13 12 14 12 14
-406S1 KV-1316 KV-1316 -406K1 -406K2
AUTO MAN OPEN CLOSE /406.3 /406.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-406W2
40602

/406.2 2 4

406X1 4 406X1 6

40605

40606

40607
406X1 1
40603

40604
-406W1
/406.1 1

KV-1316
4 8
-406W1
/406.1 2
DI DI
-DI14 -DI14
406X1 2 A1 A1 A1
-406K1 -406K2 -406K3 E14.6 E14.7
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1316-OPN KV-1316-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /406.2 14 11 /406.6 14 11 /406.7 14 11 /406.1


12 12 12
13 14 /715.5 13 14 /715.5

KV-1316
KV-1316 OPEN KV-1316 CLOSE KV-1316 COMMAND

405 407

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1316 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 406
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1320-COM
A6.7

-DO6

DO
8
12 14
-407K3
/407.5 11
40701

407X1 3 407X1 5
-407W2
/407.2 1 3

13 23 13 13 12 14 12 14
-407S1 KV-1320 KV-1320 -407K1 -407K2
AUTO MAN OPEN CLOSE /407.3 /407.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-407W2
40702

/407.2 2 4

407X1 4 407X1 6

40705

40706

40707
407X1 1
40703

40704
-407W1
/407.1 1

KV-1320
1 5
-407W1
/407.1 2
DI DI
-DI15 -DI15
407X1 2 A1 A1 A1
-407K1 -407K2 -407K3 E15.0 E15.1
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1320-OPN KV-1320-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

23 24 /407.2 14 11 /407.6 14 11 /407.7 14 11 /407.1


12 12 12
13 14 /716.8 13 14 /716.7

KV-1320
KV-1320 OPEN KV-1320 CLOSE KV-1320 COMMAND

406 408

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1320 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 407
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

SPARE
-SPARE
A9.6

SPARE
-DO9

DO
4
12 14
-408K3
/408.5 11
40801

408X1 3 408X1 5
-408W2
/408.2 1 3

13 23 13 13 12 14 12 14
-408S1 SPARE SPARE -408K1 -408K2
AUTO MAN OPEN CLOSE /408.3 /408.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-408W2
40802

/408.2 2 4

408X1 4 408X1 6

40805

40806

40807
408X1 1
40803

40804
-408W1
/408.1 1

SPARE
4 8
-408W1
/408.1 2
DI DI
-DI23 -DI23
408X1 2 A1 A1 A1
-408K1 -408K2 -408K3 E23.6 E23.7
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E -SPARE -SPARE
71.8 / 0110VAC OMRON OMRON OMRON SPARE SPARE

024VDC
73.8 / 024VDC

23 24 /408.2 14 11 /408.6 14 11 /408.7 14 11 /408.1


12 12 12
13 14 /722.7 13 14 /722.6

SPARE
SPARE SPARE SPARE

407 409

REVISION 03/10/2018 00143 Data 08/10/2018 SPARE VALVE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 408
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

SPARE
-SPARE
A9.7

SPARE
SPARE

DO
8
12 14
-409K3
/409.5 11
40901

409X1 3 409X1 5
-409W2
/409.2 1 3

13 23 13 13 12 14 12 14
-409S1 SPARE SPARE -409K1 -409K2
AUTO MAN OPEN CLOSE /409.3 /409.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-409W2
40902

/409.2 2 4

409X1 4 409X1 6

40905

40906

40907
409X1 1
40903

40904
-409W1
/409.1 1

SPARE
1 5
-409W1
/409.1 2
DI DI
DI24 DI24
409X1 2 A1 A1 A1
-409K1 -409K2 -409K3 E24.0 E24.1
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E -SPARE -SPARE
71.8 / 0110VAC OMRON OMRON OMRON SPARE SPARE

024VDC
73.8 / 024VDC

23 24 /409.2 14 11 /409.6 14 11 /409.7 14 11 /409.1


12 12 12
13 14 /722.8 13 14 /722.7

SPARE
SPARE SPARE SPARE

408 410

REVISION 03/10/2018 00143 Data 08/10/2018 SPARE VALVE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 409
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

SPARE SPARE
-SPARE -SPARE
A9.4 A9.5

-DO9 -DO9

DO DO
3 7

1 2 3 4
410X1 3 410X1 5
-410X2 -410W2
/410.4 1 3

13 13 12 14 12 14
SPARE SPARE -410K1 -410K2
POS A 14 POS B 14 /410.4 11 /410.5 11

12 14 12 14 -410W2
/410.4 2 4
-410K3 -410K4
/410.6 11 /410.7 11
410X1 4 410X1 6

41015

41016
41002

41006

41017

41018
410X1 1 410X1 7

41011

41014
-410W1 -410W3
/410.1 1 /410.1 1

SPARE SPARE
3 7
-410W1 -410W3
/410.1 2 /410.1 2
DI DI
-DI23 -DI23
410X1 2 410X1 8 A1 A1 A1 A1
-410K1 -410K2 -410K3 -410K4 E23.4 E23.5
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E P2RF08E -SPARE -SPARE
71.8 / 0110VAC OMRON OMRON OMRON OMRON SPARE SPARE

024VDC
73.8 / 024VDC

14 11 /410.8 14 11 /410.9 14 11 /410.1 14 11 /410.2


12 12 12 12

SPARE SPARE
SPARE SPARE SPARE SPARE

409 411

REVISION 03/10/2018 00143 Data 08/10/2018 SV-4120 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 410
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
KV-1115-COM
A0.6

-DO0

DO
4
12 14
-411K3
/411.5 11
41101

-411X1 3 -411X1 5
-411W2
/411.2 1 3

13 23 13 13 12 14 12 14
-411S1 KV-1115 KV-1115 -411K1 -411K2
AUTO MAN OPEN CLOSE /411.3 /411.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-411W2
41102

/411.2 2 4

-411X1 4 -411X1 6

41105

41106

41107
-411X1 1
41103

41104
-411W1
/411.1 1

KV-1115
6 3
-411W1
/411.1 2
DI DI
-DI27 -DI27
-411X1 2 A1 A1 A1
-411K1 -411K2 -411K3 E27.3 E27.4
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1115-OPN KV-1115-CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN_VALVE CLOSED_VALVE

024VDC
73.8 / 024VDC

23 24 /411.2 14 11 /411.6 14 11 /411.7 14 11 /411.1


12 12 12
13 14 /715.3 13 14 /715.3

KV-1115
KV-1115 OPEN KV-1115 CLOSE KV-1115 COMMAND

410 412

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1115 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 411
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE_COMMAND
KV-1108_CMD
A12.5

-DO12

DO
7
12 14
-412K3
/412.5 11
41201

-412X1 3 -412X1 5
-412W2
/412.2 1 3

13 23 13 13 12 14 12 14
-412S1 KV-1108 KV-1108 -412K1 -412K2
AUTO MAN OPEN CLOSE /412.3 /412.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-412W2
41202

/412.2 2 4

-412X1 4 -412X1 6

41205

41206

41207
-412X1 1
41203

41204
-412W1
/412.1 1

KV-1108
7 4
-412W1
/412.1 2
DI DI
-DI27 -DI27
-412X1 2 A1 A1 A1
-412K1 -412K2 -412K3 E27.5 E27.6
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-1108_OPN KV-1108_CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN_VALVE CLOSED_VALVE

024VDC
73.8 / 024VDC

23 24 /412.2 14 11 /412.6 14 11 /412.7 14 11 /412.1


12 12 12
13 14 /713.6 13 14 /713.6

KV-1108
KV-1108 OPEN KV-1108 CLOSE KV-1108 COMMAND

411 413

REVISION 03/10/2018 00143 Data 08/10/2018 KV-1108 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 412
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

SPARE
-SPARE
A12.6

SPARE
-DO12

DO
4
12 14
-413K3
/413.5 11
41301

-413X1 3 -413X1 5
-413W2
/413.2 1 3

13 23 13 13 12 14 12 14
-413S1 SPARE SPARE -413K1 -413K2
AUTO MAN OPEN CLOSE /413.3 /413.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-413W2
41302

/413.2 2 4

-413X1 4 -413X1 6

41305

41306

41307
-413X1 1
41303

41304
-413W1
/413.1 1

SPARE
8 1
-413W1
/413.1 2
DI DI
-DI27 -DI28
-413X1 2 A1 A1 A1
-413K1 -413K2 -413K3 E27.7 E28.0
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E -SPARE -SPARE
71.8 / 0110VAC OMRON OMRON OMRON SPARE SPARE

024VDC
73.8 / 024VDC

23 24 /413.2 14 11 /413.6 14 11 /413.7 14 11 /413.1


12 12 12
13 14 /715.2 13 14 /715.2

SPARE
SPARE SPARE SPARE

412 414

REVISION 03/10/2018 00143 Data 08/10/2018 SPARE VALVE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 413
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE_COMMAND
KV-4120_CMD
A12.7

-DO12

DO
8
12 14
-414K5
/414.5 11
41401

-414X1 3 -414X1 5
-414W2
/414.2 1 3

13 23 13 13 12 14 12 14
-414S1 KV-4120 KV-4120 -414K3 -414K4
AUTO MAN OPEN CLOSE /414.3 /414.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-414W2
41402

/414.2 2 4

-414X1 4 -414X1 6

41405

41406

41407
-414X1 1
41403

41404
-414W1
/414.1 1

KV-4120
5 2
-414W1
/414.1 2
DI DI
-DI28 -DI28
-414X1 2 A1 A1 A1
-414K3 -414K4 -414K5 E28.1 E28.2
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-4120_OPN KV-4120_CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN_VALVE CLOSED_VALVE

024VDC
73.8 / 024VDC

23 24 /414.2 6 6 14 11 /414.1
5 8 /721.6 5 8 /721.6 12
14 11 /414.6 14 11 /414.7
12 12

KV-4120
KV-4120 OPEN KV-4120 CLOSE KV-4120 COMMAND

413 415

REVISION 03/10/2018 00143 Data 08/10/2018 KV-4120 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 414
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE_COMMAND
KV-4102A_CMD
A13.0

-DO13

DO
1
12 14
-415K5
/415.5 11
41501

-415X1 3 -415X1 5
-415W2
/415.2 1 3

13 23 13 13 12 14 12 14
-415S1 KV-4102A KV-4102A -415K3 -415K4
AUTO MAN OPEN CLOSE /415.3 /415.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-415W2
41502

/415.2 2 4

-415X1 4 -415X1 6

41505

41506

41507
-415X1 1
41503

41504
-415W1
/415.1 1

KV-4102A
6 3
-415W1
/415.1 2
DI DI
-DI28 -DI28
-415X1 2 A1 A1 A1
-415K3 -415K4 -415K5 E28.3 E28.4
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-4102A_OPN KV-4102A_CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN_VALVE CLOSED_VALVE

024VDC
73.8 / 024VDC

23 24 /415.2 14 11 /415.6 14 11 /415.7 14 11 /415.1


12 12 12

KV-4102A
KV-4102A OPEN KV-4102A CLOSE KV-4102A COMMAND

414 416

REVISION 03/10/2018 00143 Data 08/10/2018 KV-4102A = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 415
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE_COMMAND
KV-4102B_CMD
A13.1

-DO13

DO
5
12 14
-416K5
/416.5 11
41601

-416X1 3 -416X1 5
-416W2
/416.2 1 3

13 23 13 13 12 14 12 14
-416S1 KV-4102B KV-4102B -416K3 -416K4
AUTO MAN OPEN CLOSE /416.3 /416.4
14 24 14 14 11 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-416W2
41602

/416.2 2 4

-416X1 4 -416X1 6

41605

41606

41607
-416X1 1
41603

41604
-416W1
/416.1 1

KV-4102B
7 4
-416W1
/416.1 2
DI DI
-DI28 -DI28
-416X1 2 A1 A1 A1
-416K3 -416K4 -416K5 E28.5 E28.6
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E P2RF08E KV-4102B_OPN KV-4102B_CLS
71.8 / 0110VAC OMRON OMRON OMRON OPEN_VALVE CLOSED_VALVE

024VDC
73.8 / 024VDC

23 24 /416.2 14 11 /416.6 14 11 /416.7 14 11 /416.1


12 12 12

KV-4102B
KV-4102B OPEN KV-4102B CLOSE KV-4102B COMMAND

415 432

REVISION 03/10/2018 00143 Data 08/10/2018 KV-4102B = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 416
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

432X1 1 432X1 3
-432W1
/432.2 1 3

13 13 12 14 12 14
MV-1301 MV-1301 -432K1 -432K2
OPEN 14 CLOSE 14 /432.3 11 /432.4 11

-432W1
/432.2 2 4

432X1 2 432X1 4

43203

43204
43201

43202

3 7
DI DI
-DI15 -DI15
A1 A1
-432K1 -432K2 E15.4 E15.5
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1301-OPN MV-1301-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /432.6 14 11 /432.7
12 12
13 14 /719.6 13 14 /719.6

MV-1301 OPEN MV-1301 CLOSE

416 433

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1301 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 432
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

433X1 1 433X1 2
-433W1
/433.2 1 3

13 13 12 14 12 14
MV-1302 MV-1302 -433K1 -433K2
OPEN 14 CLOSE 14 /433.3 11 /433.4 11

-433W1
/433.2 2 4

433X1 1 433X1 2

43303

43304
43301

43302

4 8
DI DI
-DI15 -DI15
A1 A1
-433K1 -433K2 E15.6 E15.7
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1302-OPN MV-1302-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /433.6 14 11 /433.7
12 12
13 14 /719.7 13 14 /719.6

MV-1302 OPEN MV-1302 CLOSE

432 434

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1302 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 433
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

434X1 1 434X1 3
-434W1
/434.2 1 3

13 13 12 14 12 14
MV-1303 MV-1303 -434K1 -434K2
OPEN 14 CLOSE 14 /434.3 11 /434.4 11

-434W1
/434.2 2 4

434X1 2 434X1 4

43403

43404
43401

43402

1 5
DI DI
-DI16 -DI16
A1 A1
-434K1 -434K2 E16.0 E16.1
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1303-OPN MV-1303-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /434.6 14 11 /434.7
12 12
13 14 /720.2 13 14 /720.2

MV-1303 OPEN MV-1303 CLOSE

433 435

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1303 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 434
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

435X1 1 435X1 3
-435W1
/435.2 1 3

13 13 12 14 12 14
MV-1304 MV-1304 -435K1 -435K2
OPEN 14 CLOSE 14 /435.3 11 /435.4 11

-435W1
/435.2 2 4

435X1 2 435X1 4

43503

43504
43501

43502

2 6
DI DI
-DI16 -DI16
A1 A1
-435K1 -435K2 E16.2 E16.3
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1304-OPN MV-1304-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /435.6 14 11 /435.7
12 12
13 14 /720.3 13 14 /720.3

MV-1304 OPEN MV-1304 CLOSE

434 436

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1304 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 435
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

436X1 1 436X1 3
-436W1
/436.2 1 3

13 13 12 14 12 14
MV-1305 MV-1305 -436K1 -436K2
OPEN 14 CLOSE 14 /436.3 11 /436.4 11

-436W1
/436.2 2 4

436X1 2 436X1 4

43603

43604
43601

43602

3 7
DI DI
-DI16 -DI16
A1 A1
-436K1 -436K2 E16.4 E16.5
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1305-OPN MV-1305-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /436.6 14 11 /436.7
12 12
13 14 /720.4 13 14 /720.3

MV-1305 OPEN MV-1305 CLOSE

435 437

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1305 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 436
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

437X1 1 437X1 3
-437W1
/437.2 1 3

13 13 12 14 12 14
MV-1306 MV-1306 -437K1 -437K2
OPEN 14 CLOSE 14 /437.3 11 /437.4 11

-437W1
/437.2 2 4

437X1 2 437X1 4

43703

43704
43701

43702

4 8
DI DI
-DI16 -DI16
A1 A1
-437K1 -437K2 E16.6 E16.7
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1306-OPN MV-1306-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /437.6 14 11 /437.7
12 12
13 14 /720.4 13 14 /720.4

MV-1306 OPEN MV-1306 CLOSE

436 438

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1306 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 437
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

438X1 1 438X1 3
-438W1
/438.2 1 3

13 13 12 14 12 14
MV-1307 MV-1307 -438K1 -438K2
OPEN 14 CLOSE 14 /438.3 11 /438.4 11

-438W1
/438.2 2 4

438X1 2 438X1 4

43803

43804
43801

43802

1 5
DI DI
-DI17 -DI17
A1 A1
-438K1 -438K2 E17.0 E17.1
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1307-OPN MV-1307-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /438.6 14 11 /438.7
12 12
13 14 /720.5 13 14 /720.5

MV-1307 OPEN MV-1307 CLOSE

437 439

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1307 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 438
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

439X1 1 439X1 3
-439W1
/439.2 1 3

13 13 12 14 12 14
MV-1308 MV-1308 -439K1 -439K2
OPEN 14 CLOSE 14 /439.3 11 /439.4 11

-439W1
/439.2 2 4

439X1 2 439X1 4

43903

43904
43901

43902

2 6
DI DI
-DI17 -DI17
A1 A1
-439K1 -439K2 E17.2 E17.3
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1308-OPN MV-1308-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /439.6 14 11 /439.7
12 12
13 14 /720.6 13 14 /720.6

MV-1308 OPEN MV-1308 CLOSE

438 440

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1308 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 439
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

440X1 1 440X1 3
-440W1
/440.2 1 3

13 13 12 14 12 14
MV-1309 MV-1309 -440K1 -440K2
OPEN 14 CLOSE 14 /440.3 11 /440.4 11

-440W1
/440.2 2 4

440X1 2 440X1 4

44003

44004
44001

44002

3 7
DI DI
-DI17 -DI17
A1 A1
-440K1 -440K2 E17.4 E17.5
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1309-OPN MV-1309-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /440.6 14 11 /440.7
12 12
13 14 /720.7 13 14 /720.6

MV-1309 OPEN MV-1309 CLOSE

439 441

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1309 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 440
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

441X1 1 441X1 3
-441W1
/441.2 1 3

13 13 12 14 12 14
MV-1310 MV-1310 -441K1 -441K2
OPEN 14 CLOSE 14 /441.3 11 /441.4 11

-441W1
/441.2 2 4

441X1 2 441X1 4

44103

44104
44101

44102

4 8
DI DI
-DI17 -DI17
A1 A1
-441K1 -441K2 E17.6 E17.7
G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E MV-1310-OPN MV-1310-CLS
OMRON OMRON OPEN VALVE CLOSED VALVE

024VDC
73.8 / 024VDC

14 11 /441.6 14 11 /441.7
12 12
13 14 /720.8 13 14 /720.7

MV-1310 OPEN MV-1310 CLOSE

440 450

REVISION 03/10/2018 00143 Data 08/10/2018 MV-1310 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 441
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-1COM
A10.4

-DO10

DO
3
12 14
-450K1
/450.5 11

x1
45001

-450V1
x2

13 23 33
-450S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45002

45004
-450X1 1
-450W1
/450.1 1

KY-1

-450W1 45003
/450.1 2

-450X1 2 A1
-450K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /450.2 14 11 /450.1
33 34 /450.3 12
14
12 11 /710.3

COMPRESSED AIR OF FAN FS1 COMMAND


KY-1 COM

441 451

REVISION 03/10/2018 00143 Data 08/10/2018 KY-1 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 450
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-2COM
A10.5

-DO10

DO
7
12 14
-451K1
/451.5 11

x1
45105

-451V1
x2

13 23 33
-451S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45106

45108
-451X1 1
-451W1
/451.1 1

KY-2

-451W1 45107
/451.1 2

-451X1 2 A1
-451K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /451.2 14 11 /451.1
33 34 /451.3 12
14
12 11 /710.4

COMPRESSED AIR OF FAN FS2 COMMAND


KY-2 COM

450 452

REVISION 03/10/2018 00143 Data 08/10/2018 KY-2 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 451
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-3COM
A10.6

-DO10

DO
4
12 14
-452K1
/452.5 11

x1
45208

-452V1
x2

13 23 33
-452S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45209

45210
-452X1 1
-452W1
/452.1 1

KY-3

-452W1 45207
/452.1 2

-452X1 2 A1
-452K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /452.2 14 11 /452.1
33 34 /452.3 12
14
12 11 /710.6

COMPRESSED AIR OF FAN FS3 COMMAND


KY-3 COM

451 453

REVISION 03/10/2018 00143 Data 08/10/2018 KY-3 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 452
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-4COM
A10.7

-DO10

DO
8
12 14
-453K1
/453.5 11

x1
45311

-453V1
x2

13 23 33
-453S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45312

45314
-453X1 1
-453W1
/453.1 1

KY-4

-453W1 45313
/453.1 2

-453X1 2 A1
-453K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /453.2 14 11 /453.1
33 34 /453.3 12
14
12 11 /714.6

COMPRESSED AIR OF FAN FSH COMMAND


KY-4 COM

452 454

REVISION 03/10/2018 00143 Data 08/10/2018 KY-4 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 453
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC
OPEN VALVE
KY-6COM
A11.0

-DO11

DO
1

12 14
-454K1
/454.5 11

x1
45415

-454V1
x2

13 23 33
-454S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45416

45417
-454X1 1
-454W1
/454.1 1

KY-6

-454W1 45413
/454.1 2

-454X1 2 A1
-454K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /454.2 14 11 /454.1
33 34 /454.3 12
14
12 11 /714.2

COMPRESSED AIR OF FAN BL4 COMMAND


KY-6 COM

453 455

REVISION 03/10/2018 00143 Data 08/10/2018 KY-6 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 454
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-7COM
A11.1

-DO11

DO
5
12 14
-455K1
/455.5 11

x1
45518

-455V1
x2

13 23 33
-455S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45519

45521
-455X1 1
-455W1
/455.1 1

KY-7

-455W1 45520
/455.1 2

-455X1 2 A1
-455K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /455.2 6
33 34 /455.3 5 8 /721.4
14 11 /455.1
12

COMPRESSED AIR OF FAN FS402A COMMAND


KY-7 COM

454 456

REVISION 03/10/2018 00143 Data 08/10/2018 KY-7 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 455
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-8COM
A11.2

-DO11

DO
2
12 14
-456K1
/456.5 11

x1
45622

-456V1
x2

13 23 33
-456S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45623

45624
-456X1 1
-456W1
/456.1 1

KY-8

-456W1 45620
/456.1 2

-456X1 2 A1
-456K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /456.2 6
33 34 /456.3 5 8 /721.5
14 11 /456.1
12

COMPRESSED AIR OF FAN FS402B COMMAND


KY-8 COM

455 457

REVISION 03/10/2018 00143 Data 08/10/2018 KY-8 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 456
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-9COM
A11.3

-DO11

DO
6
12 14
-457K1
/457.5 11

x1
45725

-457V1
x2

13 23 33
-457S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45726

45728
-457X1 1
-457W1
/457.1 1

KY-9

-457W1 45727
/457.1 2

-457X1 2 A1
-457K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /457.2 6
33 34 /457.3 5 8 /723.7
14 11 /457.1
12

COMPRESSED AIR OF FAN FS406 COMMAND


KY-9 COM

456 458

REVISION 03/10/2018 00143 Data 08/10/2018 KY-9 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 457
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC
OPEN VALVE
KY-10COM
A11.4

-DO11

DO
3

12 14
-458K1
/458.5 11

x1
45829

-458V1
x2

13 23 33
-458S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45830

45831
-458X1 1
-458W1
/458.1 1

KY-10

-458W1 45827
/458.1 2

-458X1 2 A1
-458K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /458.2 6
33 34 /458.3 5 8 /724.3
14 11 /458.1
12

COMPRESSED AIR OF FAN FS408 COMMAND


KY-10 COM

457 459

REVISION 03/10/2018 00143 Data 08/10/2018 KY-10 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 458
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

OPEN VALVE
KY-11COM
A11.5

-DO11

DO
7
12 14
-459K1
/459.5 11

x1
45932

-459V1
x2

13 23 33
-459S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
45933

45935
-459W1
/460.1 -459X1 1
/459.1
/460.1 1

KY-11

-459W1 45934
/459.1 2

-459X1 2 A1
-459K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /459.2 6
33 34 /459.3 5 8 /724.4
14 11 /459.1
12

COMPRESSED AIR OF FAN FS409 COMMAND


KY-11 COM

458 460

REVISION 03/10/2018 00143 Data 08/10/2018 KY-11 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 459
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

FAN FOR FH1 START COMMAND


FSH1-COM
A1.1

-DO1

DO
5
22 24
-460K1
/460.5 21

x1
46001

-460V1
x2

13 23 33
-460S1
AUTO MAN MAN
14 24 34
3SB3500-2DA11
3SB3400-0B
SIEMENS
46002

46004
-459W1
/459.1 -460X1 1
/459.1
/460.1 1

FSH-1

-459W1 46003
/459.1 2

-460X1 2 A1
-460K1
G2R2SND24VDC A2
0110VAC P2RF08E
71.8 / 0110VAC OMRON

024VDC
73.8 / 024VDC

23 24 /460.2 14
33 34 /460.3 12 11 /713.2
24 21 /460.1
22

FSH-1
FSH-1 FILTER COM

459 470

REVISION 03/10/2018 00143 Data 08/10/2018 FSH-1 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 460
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-470X1 1 2
-470W1
/470.1 1 2

13
1 2
+ -
-470K1
/470.2
LSH-1108 14

-470W1
/470.1 3

-470X1 3

47004
47002

3
DI
-DI11
A1
-470K1 E11.4
G2R2SND24VDC A2
P2RF08E LSH-1108
OMRON LEVEL SWITCH HIGH

024VDC
73.8 / 024VDC

14
12 11 /715.6
14 /470.3
13

LSH-1108
LEVEL SWITCH HIGH

460 471

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-1108 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 470
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-471X1 1 2
-471W1
/471.1 1 2

13
1 2
+ -
-471K2
/471.2
LSH-1318 14

-471W1
/471.1 3

-471X1 3

47102
47101

8
DI
-DI11
A1
-471K2 E11.7
G2R2SND24VDC A2
P2RF08E LSH-1318
OMRON LEVEL SWITCH HIGH

024VDC
73.8 / 024VDC

6
5 8 /719.5
14 /471.3
13

LSH-1318
LEVEL SWITCH HIGH

470 472

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-1318 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 471
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

-472X1 1 2
-472W1
/472.1 1 2

22 24
1 2
+ -
-472K2
/472.2
LSH-1370 21

-472W1
/472.1 3

-472X1 3

47202
47201

1
DI
-DI12
1
-472K2 E12.0
OMR.G2R-2-SN-110AC(S) 8
P2RF08E LSH-1370
OMR LEVEL SWITCH HIGH

0110VAC
71.8 / 0110VAC

14
12 11 /718.6
24 21 /472.3
22

LSH-1370
LEVEL SWITCH HIGH

471 473

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-1370 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 472
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC 24VDC
71.8 / 110VAC 73.7 / 24VDC

-473X1 1 2 22 24
-473W1 -473K2
/473.1 1 2 /473.2 21

1 2
+ -
LSH-1371
3

-473W1
/473.1 3

-473X1 3

47302
47301

5
DI
-DI12
1
-473K2 E12.1
OMR.G2R-2-SN-110AC(S) 8
P2RF08E LSH-1371
OMR LEVEL SWITCH HIGH

0110VAC
71.8 / 0110VAC

14
12 11 /718.6
24 21 /473.4
22

LSH-1371
LEVEL SWITCH HIGH

472 474

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-1371 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 473
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-474X1 1 2
-474W1
/474.1 1 2

13
1 2
+ -
-474K2
/474.2
LSH-4103A 14

-474W1
/474.1 3

-474X1 3

47402
47401

1
DI
-DI22
A1
-474K2 E22.0
G2R2SND24VDC A2
P2RF08E LSH-4103A
OMRON LEVEL SWITCH HIGH

024VDC
73.8 / 024VDC

14
12 11 /722.2
14 /474.3
13

LSH-4103A
LEVEL SWITCH HIGH

473 475

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-4103A = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 474
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-475X1 1 2
-475W1
/475.1 1 2

13
1 2
+ -
-475K2
/475.2
LSH-4103B 14

-475W1
/475.1 3

-475X1 3

47502
47501

2
DI
-DI22
A1
-475K2 E22.2
G2R2SND24VDC A2
P2RF08E LSH-4103B
OMRON LEVEL SWITCH HIGH

024VDC
73.8 / 024VDC

14
12 11 /722.3
14 /475.3
13

LSH-4103B
LEVEL SWITCH HIGH

474 476

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-4103B = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 475
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-476X1 1 2
-476W1
/476.1 1 2

13
1 2
+ -
-476K1
/476.2
LSH-4104 14

-476W1
/476.1 3

-476X1 3

47602
47601

3
DI
-DI22
A1
-476K1 E22.4
G2R2SND24VDC A2
P2RF08E LSH-4104
OMRON LEVEL SWITCH HIGH

024VDC
73.8 / 024VDC

14
12 11 /723.2
14 /476.3
13

LSH-4104
LEVEL SWITCH HIGH

475 477

REVISION 03/10/2018 00143 Data 08/10/2018 LSH-4104 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 476
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-477X1 1 2
-477W1
/477.1 1 2

13
1 2
+ -
-477K1
/477.2
LSL-1104 14

-477W1
/477.1 3

-477X1 3

47702
47701

2
DI
-DI11
A1
-477K1 E11.2
G2R2SND24VDC A2
P2RF08E LSL-1104
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /715.6
14 /477.3
13

LSL-1104
LEVEL SWITCH LOW

476 478

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-1104 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 477
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-478X1 1 2
-478W1 21
/478.1 1 2
-478K2
/478.2 22 24
1 2
+ -
LSL-1122
3

-478W1
/478.1 3

-478X1 3

47802
47801

4
DI
-DI10
A1
-478K2 E10.6
G2R2SND24VDC A2
P2RF08E LSL-1122
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /711.3
24
22 21 /478.3

LSL-1122
LEVEL SWITCH LOW

477 479

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-1122 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 478
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-479X1 1 2
-479W1
/479.1 1 2

21
1 2
+ -
-479K2
/479.2
LSL-1123 22 24

-479W1
/479.1 3

-479X1 3

47902
47901

8
DI
-DI10
A1
-479K2 E10.7
G2R2SND24VDC A2
P2RF08E LSL-1123
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /711.3
24
22 21 /479.3

LSL-1123
LEVEL SWITCH LOW

478 480

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-1123 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 479
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-480X1 1 2
-480W1
/480.1 1 2

1 2
21
+ -
LSL-1124 -480K2
/480.2 22 24
3

-480W1
/480.1 3

-480X1 3

48002
48001

1
DI
-DI11
A1
-480K2 E11.0
G2R2SND24VDC A2
P2RF08E LSL-1124
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /711.4
24
22 21 /480.3

LSH-1124
LEVEL SWITCH LOW

479 481

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-1124 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 480
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-481X1 1 2
-481W1
/481.1 1 2

21
1 2
+ -
-481K2
/481.2
LSL-1125 22 24

-481W1
/481.1 3

-481X1 3

48102
48101

5
DI
-DI11
A1
-481K2 E11.1
G2R2SND24VDC A2
P2RF08E LSL-1125
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /711.5
24
22 21 /481.3

LSL-1125
LEVEL SWITCH LOW

480 482

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-1125 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 481
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-482X1 1 2
-482W1
/482.1 1 2

21
1 2
+ -
-482K1
/482.2
LSL-4101A 22 24

-482W1
/482.1 3

-482X1 3

48202
48201

5
DI
-DI22
A1
-482K1 E22.1
G2R2SND24VDC A2
P2RF08E LSL-4101A
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /722.5
24
22 21 /482.3

LSL-4101A
LEVEL SWITCH LOW

481 483

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4101A = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 482
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-483X1 1 2
-483W1
/483.1 1 2

13
1 2
+ -
-483K1
/483.2
LSL-4101B 14

-483W1
/483.1 3

-483X1 3

48302
48301

6
DI
-DI22
A1
-483K1 E22.3
G2R2SND24VDC A2
P2RF08E LSL-4101B
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /722.6
14 /483.3
13

LSL-4101B
LEVEL SWITCH LOW

482 484

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4101B = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 483
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-484X1 1 2
-484W1
/484.1 1 2

13
1 2
+ -
-484K1
/484.2
LSL-4105 14

-484W1
/484.1 3

-484X1 3

48402
48401

7
DI
-DI22
A1
-484K1 E22.5
G2R2SND24VDC A2
P2RF08E LSL-4105
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /723.3
14 /484.3
13

LSL-4105
LEVEL SWITCH LOW

483 485

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4105 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 484
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-485X1 1 2
-485W1
/485.1 1 2

13
1 2
+ -
-485K1
/485.2
LSL-4109 14

-485W1
/485.1 3

-485X1 3

48502
48501

4
DI
-DI22
A1
-485K1 E22.6
G2R2SND24VDC A2
P2RF08E LSL-4109
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /724.5
14 /485.3
13

LSL-4109
LEVEL SWITCH LOW

484 486

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4109 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 485
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-486X1 1 2
-486W1
/486.1 1 2

13
1 2
+ -
-486K1
/486.2
LSL-4112 14

-486W1
/486.1 3

-486X1 3

48602
48601

8
DI
-DI22
A1
-486K1 E22.7
G2R2SND24VDC A2
P2RF08E LSL-4112
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /724.6
14 /486.3
13

LSL-4112
LEVEL SWITCH LOW

485 487

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4112 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 486
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-487X1 1 2
-487W1
/487.1 1 2

13
1 2
+ -
-487K1
/487.2
LSL-4113 14

-487W1
/487.1 3

-487X1 3

48702
48701

1
DI
-DI23
A1
-487K1 E23.0
G2R2SND24VDC A2
P2RF08E LSL-4113
OMRON LEVEL SWITCH LOW

024VDC
73.8 / 024VDC

14
12 11 /724.6
14 /487.3
13

LSL-4113
LEVEL SWITCH LOW

486 488

REVISION 03/10/2018 00143 Data 08/10/2018 LSL-4113 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 487
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

SPARE
-488X1 1 2
-488W1
/488.1 1 2

13
1 2
+ -
-488K1
/488.2
SPARE 14

-488W1
/488.1 3

-488X1 3

48802
48801

5
DI
-DI23
A1
-488K1 E23.1
G2R2SND24VDC A2
P2RF08E -SPARE
OMRON SPARE

024VDC
73.8 / 024VDC

14 /488.3
13

SPARE

487 489

REVISION 03/10/2018 00143 Data 08/10/2018 SPARE LEVEL = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 488
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-489X1 1 2
-489W1
/489.1 1 2

13
1 2
+ -
-489K1
/489.2
LSLL-1106 14

-489W1
/489.1 3

-489X1 3

48902
48901

6
DI
-DI11
A1
-489K1 E11.3
G2R2SND24VDC A2
P2RF08E LSLL-1106
OMRON LEVEL SWITCH LOW LOW

024VDC
73.8 / 024VDC

14
12 11 /715.7
14 /489.3
13

LSLL-1106
LEVEL SWITCH LOW LOW

488 500

REVISION 03/10/2018 00143 Data 08/10/2018 LSLL-1106 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 489
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-500X1 1
-500W1
/500.1 1

13
1 -500K1
/500.2
FIS-1209 14
3

-500W1
/500.1 2

-500X1 2

50003
50002

7
DI
-DI11
A1
-500K1 E11.5
G2R2SND24VDC A2
P2RF08E FIS-1209
OMRON FLOW SWITCH

024VDC
73.8 / 024VDC

14
12 11 /716.2
14 /500.3
13

FIS-1209
FLOW SWITCH

489 501

REVISION 03/10/2018 00143 Data 08/10/2018 FIS-1209 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 500
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-501X1 1
-501W1
/501.1 1

13
1 -501K1
/501.2
FIS-1219 14
3

50105
-501W1
/501.1 2

-501X1 2
50104

4
DI
-DI11
A1
-501K1 E11.6
G2R2SND24VDC A2
P2RF08E FIS-1219
OMRON FLOW SWITCH

024VDC
73.8 / 024VDC

14
12 11 /716.3
14 /501.3
13

FIS-1219
FLOW SWITCH

500 502

REVISION 03/10/2018 00143 Data 08/10/2018 FIS-1219 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 501
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-502X1 1
-502W1
/502.1 1

13
1 -502K1
/502.2
FIS-1279 14
3

-502W1
/502.1 2

-502X1 2

50202
50201

1
DI
-DI13
A1
-502K1 E13.0
G2R2SND24VDC A2
P2RF08E FIS-1279
OMRON FLOW SWITCH

024VDC
73.8 / 024VDC

14 /502.3
13

FIS-1279
FLOW SWITCH

501 503

REVISION 03/10/2018 00143 Data 08/10/2018 FIS-1279 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 502
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-503X1 1
-503W1
/503.1 1

13
1 -503K1
/503.2
FIS-1299 14
3

-503W1
/503.1 2

-503X1 2

50302
50301

5
DI
-DI13
A1
-503K1 E13.1
G2R2SND24VDC A2
P2RF08E FIS-1299
OMRON FLOW SWITCH

024VDC
73.8 / 024VDC

14 /503.3
13

FIS-1299
FLOW SWITCH

502 504

REVISION 03/10/2018 00143 Data 08/10/2018 FIS1289 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 503
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-504X1 1
-504W1
/504.1 1

13
1 -504K1
/504.2
PSL-8205 14
3

-504W1
/504.1 2

-504X1 2

50403
50402

3
DI
-DI25
A1
-504K1 E25.4
G2R2SND24VDC A2
P2RF08E PSL-8205
OMRON PRESSURE SWITCH LOW

024VDC
73.8 / 024VDC

14 /504.3
13

PSL-8205
PRESSURE SWITCH

503 505

REVISION 03/10/2018 00143 Data 08/10/2018 PSL-8205 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 504
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC

-505X1 1
-505W1
/505.1 1

13
1 -505K1
/505.2
PSL-8305 14
3

-505W1
/505.1 2

-505X1 2

50503
50502

7
DI
-DI25
A1
-505K1 E25.5
G2R2SND24VDC A2
P2RF08E PSL-8305
OMRON PRESSURE SWITCH LOW

024VDC
73.8 / 024VDC

14 /505.3
13

PSL-8305
PRESSURE SWITCH

504 520

REVISION 03/10/2018 00143 Data 08/10/2018 PSL-8305 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 505
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE FOR F3 COMMAND


AR5-COM
A7.0

-DO7

DO
1
12 14
-520K3
/520.5 11
52001

-520X1 3
-520W2
/520.2 1

13 23 13 12 14
-520S1 AR-5 -520K1
AUTO MAN OPEN /520.3
14 24 14 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-520W2
52002

/520.2 2

52006
-520X1 4

52007
-520X1 1
52005

-520W1
/520.1 1

AR-5
2
-520W1
/520.1 2
DI
-DI15
-520X1 2 A1 A1
-520K1 -520K3 E15.2
G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E AR5-OPN
71.8 / 0110VAC OMRON OMRON VALVE FOR F3 STATUS

024VDC
73.8 / 024VDC

23 24 /520.2 14 11 /520.6 14 11 /520.1


12 12
14
12 11 /718.2

VALVE FOR F3 AR-5 OPEN AR-5 COMMAND

505 521

REVISION 03/10/2018 00143 Data 08/10/2018 AR-5 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 520
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE FOR F4 COMMAND


AR6-COM
A7.1

-DO7

DO
5
12 14
-521K2
/521.5 11
52101

-521W2
/522.2 -521X1 3
/521.2
/522.2 1

13 23 13 12 14
-521S1 AR-6 -521K1
AUTO MAN OPEN /521.3
14 24 14 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-521W2
52102

/521.2 2

52106
-521X1 4

52107
-521W1
-521X1 1
52105

/522.1
/521.1
/522.1 1

AR-6
6
-521W1
/521.1 2
DI
-DI15
-521X1 2 A1 A1
-521K1 -521K2 E15.3
G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E AR6-OPN
71.8 / 0110VAC OMRON OMRON VALVE FOR F4 STATUS

024VDC
73.8 / 024VDC

23 24 /521.2 14 11 /521.6 14 11 /521.1


12 12
14
12 11 /718.3

AIR REDUCING FOR F-4 AR-6 OPEN AR-6 COMMAND

520 522

REVISION 03/10/2018 00143 Data 08/10/2018 AR-6 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 521
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
AR7-COM
A9.2

-DO9

DO
2
12 14
-522K2
/522.5 11
52201

-521W2
/521.2 -522X1 3
/521.2
/522.2 1

13 23 13 12 14
-522S1 AR-7 -522K1
AUTO MAN OPEN /522.3
14 24 14 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-521W2
52202

/521.2 2

52206
-522X1 4

52207
-521W1
-522X1 1
52205

/521.1
/521.1
/522.1 1

AR-7
2
-521W1
/521.1 2
DI
-DI23
-522X1 2 A1 A1
-522K1 -522K2 E23.2
G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E AR7-OPN
71.8 / 0110VAC OMRON OMRON VALVE STATUS

024VDC
73.8 / 024VDC

23 24 /522.2 6 14 11 /522.1
5 8 /725.6 12
14 11 /522.6
12

AR-7
AR-7 OPEN AR-7 COMMAND

521 523

REVISION 03/10/2018 00143 Data 08/10/2018 AR-7 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 522
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
110VAC
71.8 / 110VAC

VALVE COMMAND
AR8-COM
A9.3

-DO9

DO
6
12 14
-523K2
/523.5 11
52301

-523X1 3
-523W2
/523.2 1

13 23 13 12 14
-523S1 AR-8 -523K1
AUTO MAN OPEN /523.3
14 24 14 11
3SB3500-2DA11
3SB3400-0B
SIEMENS
-523W2
52302

/523.2 2

52306
-523X1 4

52307
-523X1 1
52305

-523W1
/523.1 1

AR-8
6
-523W1
/523.1 2
DI
-DI23
-523X1 2 A1 A1
-523K1 -523K2 E23.3
G2R2SND24VDC A2 G2R2SND24VDC A2
0110VAC P2RF08E P2RF08E AR8-OPN
71.8 / 0110VAC OMRON OMRON VALVE STATUS

024VDC
73.8 / 024VDC

23 24 /523.2 6 14 11 /523.1
5 8 /725.6 12
14 11 /523.6
12

AR-8
AR-8 OPEN AR-8 COMMAND

522 540

REVISION 03/10/2018 00143 Data 08/10/2018 AR-8 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 523
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
0110VAC
71.8 / 0110VAC

73.7 / 24VDC 12 14
-540K3
/540.4 11

54009
-540X1 5 6

F-4
1 2

11 10
+ -

-540X1 1 -540X1 3
-540W1
/540.1 1 3

54006 54007

5 7 13 12 14 12 14
F-3 F-3 -540S1 -540K1 -540K2
4 6 ON/OFF F3 14 /540.2 11 /540.3 11
3SB3500-4AD11
-540W1 3SB3400-0B
/540.1 2 4 SIEMENS

-540X1 2 -540X1 4
PE

-540W2 1 2

54004

54005
-540X2 1 -540X2 2
54002

54003

54008

54006

54007
2 6 5 6
DI DI M1+ M1-
-DI12 -DI12 -AI9
A1 A1 A1
/755.5
-540K1 -540K2 -540K3 E12.2 E12.3 PEW330
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E P2RF08E F3-STATUS F3-FAILURE -F3_DP
OMRON OMRON OMRON STATUS F3 FAILURE F3 DELTA P FILTER F3

024VDC
73.8 / 024VDC

14 11 /540.4 14 11 /540.5 14 11 /540.8


12 12 12

F-3 F-3 F-3 F-3


STATUS FAILURE ON-OFF

523 541

REVISION 03/10/2018 00143 Data 08/10/2018 F-3 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 540
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

110VAC
71.8 / 110VAC
0110VAC
71.8 / 0110VAC

24VDC
73.7 / 24VDC 12 14
-541K3
/541.4 11

54109
-541X1 5 6

F-4
1 2

11 10
+ -

-541X1 1 -541X1 3
-541W1
/541.1 1 3

54106 54107

5 7 13 12 14 12 14
F-4 F-4 -541S1 -541K1 -541K2
4 6 ON/OFF F4 14 /541.2 11 /541.3 11
3SB3500-4AD11
-541W1 3SB3400-0B
/541.1 2 4 SIEMENS

-541X1 2 -541X1 4
PE

-541W2 1 2

54104

54105
-541X2 1 -541X2 2
54102

54103

54108

54106

54107
3 7 3 4
DI DI M2+ M2-
-DI12 -DI12 -AI9
A1 A1 A1
/755.5
-541K1 -541K2 -541K3 E12.4 E12.5 PEW332
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E P2RF08E F4-STATUS F4-FAILURE -F4_DP
OMRON OMRON OMRON STATUS F4 FAILURE F4 DELAT P FILTER F4

024VDC
73.8 / 024VDC

14 11 /541.4 14 11 /541.5 14 11 /541.8


12 12 12

F-4 F-4 F-4 F-4


STATUS FAILURE ON-OFF

540 542

REVISION 03/10/2018 00143 Data 08/10/2018 F-4 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 541
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC BURNER OUT CONTROL

BR1-OUT
PAW290
/757.4
BR-1
1 4 -AO8

QI1 Mana
5 7

BR1_COMMAND
-BR1_COM
2+ 3-
A13.2

-DO13

DO
2

54206 54209 54210 54211

-542X1 1 -542X1 3
-542W1
/542.1 1 3

12 14 12 14
13 13 -542K1 -542K2
/542.1 /542.2
BR-1 BR-1 11 11
14 14
PE PE
-542W1
/542.1 2 4

-542W2 1 2 -542W3 1 2
-542X1 2 -542X1 4

542X2 1 542X2 2 542X3 1 542X3 2

54204

54205

54206

54209

54207

54208
54202

54203

54209

12 14
-542K3
/542.3 11

4 8 7 8
DI DI M3+ M3-
54210

54211

-DI12 -DI12 -AI9 BURNER


A1 A1 A1
/755.5
-542K1 -542K2 -542K3 E12.6 E12.7 PEW334
G2R2SND24VDC A2 G2R2SND24VDC A2 G2R2SND24VDC A2
P2RF08E P2RF08E P2RF08E -BR1_STATUS -BR1_FAILURE BR1-FB
OMRON OMRON OMRON STATUS BURNER ALARM BURNER BURNER FEEDBACK

024VDC
73.8 / 024VDC -542X4 1 2

14 11 /542.5 14 11 /542.6 14 11 /542.3


12 12 12
13 14 /719.2 13 14 /719.2

BR-1 BR-1 BR-1 BR-1 BR-1


STATUS FAILURE COMMAND COMMAND

541 550

REVISION 03/10/2018 00143 Data 08/10/2018 BR-1 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 542
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

CONTROL VALVE OF DRYING AIR DP431_CONTROL DP432_CONTROL


HV-1308 FEEDING FAN OUT CONTROL
1 4
HV-1308-OUT -DP_431_CTL -DP_432_CTL
PAW284 PAW300 PAW302
/757.4 /757.4 /757.4
-AO7 -AO8 -AO8
2+ 3-
QI0 Mana QI0 Mana QI1 Mana
1 3 1 3 2 5

55003 55004

PE PE PE PE

-550W1 1 2 -550W2 1 2 -690W1 -690W2

-550X1 1 -550X1 2 -550X2 1 -550X2 2 -690X1 1 -690X1 2 -690X2 1 -690X2 2


55001

55002

55003

55004

69001

69002

69003

69004
3 4
M2+ M2-
-DP431 -DP432
-AI3 HV-1308 /202.5 /204.5
Y M Y M
/755.3 + - + -
PEW284
HV-1308-FB
CONTROL VALVE OF DRYING AIR HV-1308 CONTROL
FEEDING FAN FEEDBACK

HV-1308 FEEDBACK HV-1308 CONTROL DP431 CONTROL DP432 CONTROL

542 551

REVISION 03/10/2018 00143 Data 08/10/2018 HV-1308 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 550
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

CONTROL VALVE OF DRYING AIR


PV-1311 FEEDING FAN OUT CONTROL
1 4
PV-1311-OUT
PAW286
/757.4
-AO7
2+ 3-
QI1 Mana
5 7

55101 55102 55103 55104

PE PE

-551W1 1 2 -551W2 1 2

-551X1 1 -551X1 2 -551X2 1 -551X2 2


55101

55102

55103

55104

7 8
M3+ M3-
-AI3 PV-1311
/755.3
PEW286
PV-1311-FB
CONTROL VALVE OF DRYING AIR PV-1311 CONTROL
FEEDING FAN FEEDBACK

PV-1311 FEEDBACK PV-1311 CONTROL

550 552

REVISION 03/10/2018 00143 Data 08/10/2018 PV-1311 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 551
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

CONTROL VALVE OF AIR LIFT FAN


HV-1319 OUT CONTROL
1 4
HV-1319-OUT
PAW288
/757.4
-AO8
2+ 3-
QI0 Mana
1 3

55201 55202 55203 55206

PE PE

-552W1 1 2 -552W2 1 2

-552X1 1 -552X1 2 -552X2 1 -552X2 2


55201

55202

55203

55206

1 2
M0+ M0-
-AI4 HV-1319
/755.3
PEW288
HV-1319-FB
CONTROL VALVE OF AIR LIFT FAN HV-1319 CONTROL
FEEDBACK

HV-1319 FEEDBACK HV-1319 CONTROL

551 600

REVISION 03/10/2018 00143 Data 08/10/2018 HV-1319 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 552
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

TT-1109 TT-1112 TT-1128 TT-1124


1 4 1 4 1 4 1 4

2+ 3- 2+ 3- 2+ 3- 2+ 3-

60003 60004 60005 60006 60011 60012 60013 60014

PE PE PE PE

-600W2 1 2 -600W3 1 2 -600W6 1 2 -600W7 1 2

-600X1 1 -600X1 2 -600X1 3 -600X1 4 -600X1 5 -600X1 6 -600X1 7 -600X1 8 -600X1 9 -600X1 10 11 -600X1 12 -600X1 13 -600X1 14 -600X1 15 -600X1 16
60001

60002

60003

60004

60005

60006

60007

60008

60009

60010

60011

60012

60013

60014

60015

60016
5 6 3 4 7 8 1 2 5 6 3 4 1 2 7 8
M1+ M1- M2+ M2- M3+ M3- M0+ M0- M1+ M1- M2+ M2- M0+ M0- M3+ M3-
-AI5 -AI5 -AI5 -AI6 -AI6 -AI6 -AI7 -AI7
/755.4 /755.4 /755.4 /755.4 /755.4 /755.4 /755.4 /755.4
PEW298 PEW300 PEW302 PEW304 PEW306 PEW308 PEW312 PEW318
-SPARE TT-1109 TT-1112 -SPARE -SPARE TT-1128 TT-1124 -SPARE
SPARE TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER SPARE SPARE TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER SPARE

SPARE TT-1109 TT-1112 SPARE SPARE TT-1128 TT-1124 SPARE

552 601

REVISION 03/10/2018 00143 Data 08/10/2018 TEMPERATURE TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 600
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

TT-1106 TT-1312 TT-1314 TT-8101 TT-8202 TT-8301 TT-8302


1 4 1 4 1 4 1 4 1 4 1 4 1 4

2+ 3- 2+ 3- 2+ 3- 2+ 3- 2+ 3- 2+ 3- 2+ 3-

60103 60104 60105 60106 60107 60108 60109 60110 60111 60112 60113 60114 60115 60116

PE PE PE PE PE PE PE

-601W2 1 2 -601W3 1 2 -601W4 1 2 -601W5 1 2 -601W6 1 2 -601W7 1 2 -601W8 1 2

-601X1 1 -601X1 2 -601X1 3 -601X1 4 -601X1 5 -601X1 6 -601X1 7 -601X1 8 -601X1 9 -601X1 10 -601X1 11 -601X1 12 -601X1 13 -601X1 14 -601X1 15 -601X1 16
60101

60102

60103

60104

60105

60106

60107

60108

60109

60110

60111

60112

60113

60114

60115

60116
1 2 5 6 3 4 7 8 1 2 7 8 3 4 7 8
M0+ M0- M1+ M1- M2+ M2- M3+ M3- M0+ M0- M3+ M3- M2+ M2- M3+ M3-
-AI8 -AI8 -AI8 -AI8 -AI10 -AI10 -AI11 -AI11
/755.5 /755.5 /755.5 /755.5 /755.5 /755.5 /755.6 /755.6
PEW320 PEW322 PEW324 PEW326 PEW336 PEW342 PEW348 PEW350
-SPARE TT-1306 TT-1312 TT-1314 TT-8101 TT-8202 TT-8301 TT-8302
SPARE TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER TEMPERATURE TRANSMITTER

SPARE TT-1306 TT-1312 TT-1314 TT-8101 TT-8202 TT-8301 TT-8302

600 620

REVISION 03/10/2018 00143 Data 08/10/2018 TEMPERATURE TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 601
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

LT-1110 LT-4114 LT-8102 LT-8201


1 4 1 4 1 4 1 4

2+ 2+ 2+ 2+

3- 3- 3- 3-

62003 62004 62009 62010 62011 62012 62015 62016

PE PE PE PE

-620W2 1 2 -620W5 1 2 -620W6 1 2 -620W8 1 2

-620X1 1 -620X1 2 -620X1 3 -620X1 4 -620X1 5 -620X1 6 -620X1 7 -620X1 8 -620X1 9 -620X1 10 -620X1 11 -620X1 12 -620X1 13 -620X1 14 -620X1 15 -620X1 16
62001

62002

62003

62004

62005

62006

62007

62008

62009

62010

62011

62012

62013

62014

62015

62016
5 6 3 4 7 8 1 2 1 2 5 6 3 4 1 2
M1+ M1- M2+ M2- M3+ M3- M0+ M0- M0+ M0- M1+ M1- M2+ M2- M0+ M0-
-AI4 -AI4 -AI4 -AI5 -AI14 -AI10 -AI10 -AI11
/755.3 /755.3 /755.3 /755.4 /755.6 /755.5 /755.5 /755.6
PEW290 PEW292 PEW294 PEW296 PEW368 PEW338 PEW340 PEW344
-SPARE LT-1110 -SPARE -SPARE LT-4114 LT-8102 -SPARE LT-8201
SPARE LEVEL TRANSMITTER SPARE SPARE LEVEL TRANSMITTER LEVEL TRANSMITTER SPARE LEVEL TRANSMITTER

SPARE LT-1110 SPARE SPARE LT-4114 LT-8102 SPARE LT-8201

601 621

REVISION 03/10/2018 00143 Data 08/10/2018 LEVEL TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 620
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

LT-8211 LT-8304 LT-8302 LT-1102


1 4 1 4 1 4 1 4

2+ 2+ 2+ 2+

3- 3- 3- 3-

62101 62102 62105 62106 62107 62108 62109 62110

PE PE PE PE

-621W1 1 2 -621W3 1 2 -621W4 1 2 -621W5 1 2

-621X1 1 -621X1 2 -621X1 3 -621X1 4 -621X1 5 -621X1 6 -621X1 7 -621X1 8 -621X1 9 -621X1 10
62101

62102

62103

62104

62105

62106

62107

62108

62109

62110
5 6 1 2 5 6 5 6 3 4
M1+ M1- M0+ M0- M1+ M1- M1+ M1- M2+ M2-
-AI11 -AI12 -AI12 -AI14 -AI14
/755.6 /755.6 /755.6 /755.6 /755.6
PEW346 PEW352 PEW354 PEW370 PEW372
LT-8211 -SPARE LT-8304 LT-8302 LT-1102
LEVEL TRANSMITTER SPARE LEVEL TRANSMITTER LEVEL TRANSMITTER LEVEL_TRANSMITTER

LT-8211 SPARE LT-8304 LT-8302 LT-1102

620 630

REVISION 03/10/2018 00143 Data 08/10/2018 LEVEL TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 621
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

FT-4121 FT-4122
1 4 1 4

2+ 2+

3- 3-

63001 63002 63003 63004

PE PE

-640W1 -640W2
/640.0 1 2 /640.1 1 2

-630X1 1 -630X1 2 -630X1 3 -630X1 4


63001

63002

63003

63004

3 4 7 8
M2+ M2- M3+ M3-
-AI12 -AI12
/755.6 /755.6
PEW356 PEW358
FT-4121 FT-4122
FLOW TRANSMITTER FLOW TRANSMITTER

FT-4121 FT-4122

621 640

REVISION 03/10/2018 00143 Data 08/10/2018 FLOW TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 630
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

PT-1211 PT-1213 PT-1311


1 4 1 4 1 4

2+ 2+ 2+

3- 3- 3-

64001 64002 64003 64004 64005 64006

PE PE PE

-640W1 -640W2
/630.0 1 2 /630.1 1 2 -640W3 1 2

-640X1 1 -640X1 2 -640X1 3 -640X1 4 -640X1 5 -640X1 6


64001

64002

64003

64004

64005

64006

5 6 3 4 1 2
M1+ M1- M2+ M2- M0+ M0-
-AI7 -AI7 -AI9
/755.4 /755.4 /755.5
PEW314 PEW316 PEW328
PT-1211 PT-1213 PT-1311
PRESSURE TRANSMITTER PRESSURE TRANSMITTER PRESSURE TRANSMITTER

PT-1211 PT-1213 PT-1311

630 700

REVISION 03/10/2018 00143 Data 08/10/2018 PRESSURE TRASMITTERS = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 640
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDC
73.7 / 24VDC
024VDC
73.8 / 024VDC

1
-700F1
3NW7013
FUSEBOX 10,3x38 FOR CYLINDRICAL FUSE 1 POLE 2
SIEMENS

70001

RED

COMMON

GREEN
-700U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
16 RESISTOR. 2K2 1/2W 24VDC 10mA

GENESI x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
70002

70003

70004

70005

70006

70007

70008

70009

70010

70011

70012

70013

70014

70015
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
-700V1 -700V2 -700V3 -700V4 -700V5 -700V6 -700V7 -700V8 -700V9 -700V10 -700V11 -700V12 -700V13 -700V14
GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

640 710

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC LED LOGO = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 700
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

43 43
-100K2 -104K1
/100.3 44 /104.3 44

11 11 11 11 11 11
-100K2 -450K1 -101K1 451K1 -104K1 452K1
/100.3 12 /450.5 12 14 /101.1 12 14 /451.5 12 14 /104.3 12 /452.5 12 14

71001

71003

71005

71007

71009

71011

71013

71015

71017

71019

71021

71023
-710U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71002

71004

71006

71008

71010

71012

71014

71016

71018

71020

71022

71024

71025

71026

71027

71028
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-710V1 -710V3 -710V5 -710V7 -710V9 -710V11 -710V13 -710V15
/801.2 x2 /801.3 x2 /801.3 x2 /801.4 x2 /801.4 x2 /801.5 x2 /801.7 x2 /801.7 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-710V2 -710V4 -710V6 -710V8 -710V10 -710V12 -710V14 -710V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

FS-5 FS-5 CA
FS-1 KY-1 FS-2 KY-2 FS-3 KY-3
RUN RUN
RUN OPEN RUN OPEN RUN OPEN
(FUTURE) (FUTURE)

FS-5 FS-5 CA
FS-1 KY-1 FS-2 KY-2 FS-3 KY-3
STOP STOP
STOP CLOSE STOP CLOSE STOP CLOSE
(FUTURE) (FUTURE)

700 711

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 1 CARD 1 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 710
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC 13 13
160K1 -164K1
/160.4 14 /164.4 14

43 11 11

71126

71132
-132K1 160K1 -164K1
/132.3 44 /160.4 12 /164.4 12

13 13

71123

71129
160K2 -164K2
/160.5 14 /164.5 14

11 11 11 11 11 11 11
-132K1 -478K2 -479K2 -480K2 -481K2 160K2 -164K2
/132.3 12 /478.2 12 14 /479.2 12 14 /480.2 12 14 /481.2 12 14 /160.5 12 /164.5 12

71101

71103

71105

71107

71109

71111

71113

71115

71117

71119

71124

71127

71130

71133
-711U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71102

71104

71106

71108

71110

71112

71114

71116

71118

71120

71121

71122

71125

71128

71131

71134
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-711V1 -711V3 -711V5 -711V7 -711V9 -711V11 -711V13 -711V15
/801.7 x2 /801.2 x2 /801.3 x2 /801.4 x2 /801.5 x2 /801.7 x2 /801.2 x2 /801.3 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-711V2 -711V4 -711V6 -711V8 -711V10 -711V12 -711V14 -711V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

LSL1126
AGT-5 LSL-1122 LSL-1123 LSL-1124 LSL-1125 VY-1011A/B VY-1012A/B
HIGH
RUN HIGH HIGH HIGH HIGH RUN RUN
(FUTURE)

LSL1126
AGT-5 LSL-1122 LSL-1123 LSL-1124 LSL-1124 VY-1011A/B VY-1012A/B
LOW
STOP LOW LOW LOW LOW RUN RUN
(FUTURE)

710 712

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 1 CARD 2 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 711
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC 13 13
168K1 172K1
/168.4 14 /172.4 14

SC1_RUN / 106.3

SC2_RUN / 108.3

SC3_RUN / 110.3

SC4_RUN / 112.3
11 11 43

71204

71210
168K1 172K1 -220K1

SC1_FAULT / 106.4

SC2_FAULT / 108.4

SC3_FAULT / 110.4

SC4_FAULT / 112.4
/168.4 12 /172.4 12 /220.3 44

13 13

71201

71207
168K2 172K2
/168.5 14 /172.5 14

11 11 11
168K2 172K2 -220K1
/168.5 12 /172.5 12 /220.3 12

71202

71205

71208

71211

71223

71225
-712U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71203

71206

71209

71212

71213

71214

71215

71216

71217

71218

71219

71220

71221

71222

71224

71226
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-712V1 -712V3 -712V5 -712V7 -712V9 -712V11 -712V13 -712V15
/801.4 x2 /801.5 x2 /801.6 x2 /801.2 x2 /801.3 x2 /801.4 x2 /801.5 x2 /801.7 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-712V2 -712V4 -712V6 -712V8 -712V10 -712V12 -712V14 -712V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

VY-1015A/B
VY-1013A/B VY-1014A/B SC-1 SC-2 SC-3 SC-4 NT-6
RUN
RUN RUN RUN RUN RUN RUN RUN
(FUTURE)

VY-1015A/B
VY-1013A/B VY-1014A/B SC-1 SC-2 SC-3 SC-4 NT-6
STOP
STOP STOP FAULT FAULT FAULT FAULT STOP
(FUTURE)

711 713

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 1 CARD 3 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 712
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

43 43 43 43 13 13 43
222K1 224K1 226K1 228K1 412K1 400K1 122K1
/222.3 44 /224.5 44 /226.3 44 /228.3 44 /412.3 14 /400.3 14 /122.3 44

11 11 11 11 11 13 13 11
-460K1 222K1 224K1 226K1 228K1 412K2 400K2 122K1
/460.5 12 14 /222.3 12 /224.5 12 /226.3 12 /228.3 12 /412.4 14 /400.4 14 /122.3 12

71301

71303

71305

71307

71309

71311

71313

71315

71317

71319

71321

71323

71325

71327

71329

71331
-713U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71302

71304

71306

71308

71310

71312

71314

71316

71318

71320

71322

71324

71326

71328

71330

71332
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-713V1 -713V3 -713V5 -713V7 -713V9 -713V11 -713V13 -713V15
RED x2 /801.3 x2 /801.3 x2 /801.3 x2 /801.3 x2 /801.4 x2 /801.6 x2 /801.5 x2
RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-713V2 -713V4 -713V6 -713V8 -713V10 -713V12 -713V14 -713V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

FSH-1 P-801 P-802 P-803 P-804 KV-1108 KV-1113 BL-4


RUN RUN RUN RUN RUN OPEN OPEN RUN

FSH-1 P-801 P-802 P-803 P-804 KV-1108 KV-1113 BL-4


STOP STOP STOP STOP STOP CLOSE CLOSE STOP

712 714

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 1 CARD 4 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 713
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

AGR1_RUN / 118.3
43 43 43
114K1 116K1 232K1

AGR1_FAULT / 118.3
/114.3 44 /116.3 44 /232.3 44

11 11 11 11 11
-454K1 114K1 116K1 232K1 -453K1
/454.5 12 14 /114.3 12 /116.3 12 /232.3 12 /453.5 12 14

71403

71405

71407

71409

71411

71413
-714U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71401

71402

71404

71406

71408

71410

71412

71414

71415

71416

71417

71418

71419

71420

71421

71422
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-714V1 -714V3 -714V5 -714V7 -714V9 -714V11 -714V13 -714V15
/801.5 x2 /801.7 x2 /801.6 x2 /801.5 x2 /801.6 x2 /801.5 x2 RED x2 RED x2
RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-714V2 -714V4 -714V6 -714V8 -714V10 -714V12 -714V14 -714V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

KY-6 P-2 P-6 P-7 AGR-1 KY-4


SPARE SPARE
OPEN RUN RUN RUN RUN OPEN

KY-6 P-2 P-6 P-7 AGR-1 KY-4


SPARE SPARE
CLOSE STOP STOP STOP STOP CLOSE

713 715

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 1 CARD 5 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 714
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

13 13 13 13 13
413K1 411K1 404K1 405K1 406K1
/413.3 14 /411.3 14 /404.3 14 /405.3 14 /406.3 14

13 13 13 13 13 11 11 11
413K2 411K2 404K2 405K2 406K2 470K1 477K1 489K1
/413.4 14 /411.4 14 /404.4 14 /405.4 14 /406.4 14 /470.2 12 14 /477.2 12 14 /489.2 12 14

71501

71503

71505

71507

71509

71511

71513

71515

71517

71519

71521

71523

71525

71527

71529

71531
-715U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71502

71504

71506

71508

71510

71512

71514

71516

71518

71520

71522

71524

71526

71528

71530

71532
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-715V1 -715V3 -715V5 -715V7 -715V9 -715V11 -715V13 -715V15
/802.2 x2 /802.2 x2 /802.4 x2 /802.3 x2 /802.5 x2 /802.3 x2 /802.3 x2 /802.3 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-715V2 -715V4 -715V6 -715V8 -715V10 -715V12 -715V14 -715V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

KV-1101 KV-1115 KV-1309 KV-1310 KV-1316 LSH-1108 LSH-1104 LSLL-1106


OPEN OPEN OPEN OPEN OPEN HIGH HIGH HIGH

KV-1101 KV-1115 KV-1309 KV-1310 KV-1316 LSH-1108 LSH-1108 LSLL-1106


CLOSE CLOSE CLOSE CLOSE CLOSE LOW LOW LOW

714 716

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 6 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 715
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

P3_RUN / 124.3

P4_RUN / 130.3
11 11 43 43 43 13
500K1 501K1 120K2 126K1 128K1 407K1
/500.2 12 14 /501.2 12 14 /120.5 44 /126.3 44 /128.3 44 /407.3 14

P3_FAULT / 124.3

P4_FAULT / 130.3
11 11 11 13
120K2 126K1 128K1 407K2
/120.5 12 /126.3 12 /128.3 12 /407.4 14

71601

71603

71605

71607

71609

71611

71613

71615

71617

71619

71625

71627
-716U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71602

71604

71606

71608

71610

71612

71614

71616

71618

71620

71621

71622

71623

71624

71626

71628
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-716V1 -716V3 -716V5 -716V7 -716V9 -716V11 -716V13 -716V15
/802.2 x2 /802.3 x2 /802.3 x2 /802.2 x2 /802.3 x2 /802.2 x2 /802.3 x2 /802.4 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-716V2 -716V4 -716V6 -716V8 -716V10 -716V12 -716V14 -716V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

FIS-1209 FIS-1219 AGR-2 AGAF-1A AGAF-1B P-3 P-4 KV-1320


HIGH HIGH RUN RUN RUN RUN RUN OPEN

FIS-1209 FIS-1219 AGR-2 AGAF-1A AGAF-1B P-3 P-4 KV-1320


LOW LOW STOP STOP STOP FAULT FAULT CLOSE

715 717

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 7 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 716
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC 13
138K1
/138.3 14
43 43 43 43 13 43 43
158K1 136K2 134K2 230K2 138K2 146K1 150K1
/158.3 44 /136.5 44 /134.5 44 /230.3 44 /138.4 14 /146.5 44 /150.5 44
11
138K1
/138.3 12

71717
11 11 11 11 11 11 11
158K1 136K2 134K2 230K2 146K1 150K1 144K2
/158.3 12 /136.5 12 /134.5 12 /230.3 12 11 /146.5 12 /150.5 12 /144.6 12
138K2
/138.4 12
71701

71703

71705

71707

71709

71711

71713

71715

71718

71720

71722

71724

71726

71728

71730

71732
-717U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71702

71704

71706

71708

71710

71712

71714

71716

71719

71721

71723

71725

71727

71729

71731

71733
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-717V1 -717V3 -717V5 -717V7 -717V9 -717V11 -717V13 -717V15
/802.3 x2 /802.4 x2 /802.4 x2 /802.5 x2 /802.4 x2 /802.6 x2 /802.7 x2 /802.6 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-717V2 -717V4 -717V6 -717V8 -717V10 -717V12 -717V14 -717V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

P-5 BL-2 BL-1 P-805 HST-1 BL-3 BL-5 BL-6


RUN RUN RUN RUN RUN RUN RUN RUN

P-5 BL-2 BL-1 P-805 HST-1 BL-3 BL-5 BL-6


STOP STOP STOP STOP STOP STOP STOP STOP

716 718

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 8 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 717
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC 13
154K1
/154.3 14
11 11 43 43 43
520K1 521K1 152K1 140K3 142K1 11

71832
/520.3 /521.3 /152.3 /140.3 /142.3
12 14 12 14 44 44 44 154K1
/154.3 12

13

71829
1561K
14

11 11 11 11 11 11
152K1 140K3 142K1 472K2 473K2 156K1
/152.3 12 /140.3 12 /142.3 12 /472.2 12 14 /473.2 12 14 /154.4 12

71801

71803

71805

71807

71809

71811

71813

71815

71817

71819

71821

71823

71825

71827

71830

71833
-718U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71802

71804

71806

71808

71810

71812

71814

71816

71818

71820

71822

71824

71826

71828

71831

71834
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-718V1 -718V3 -718V5 -718V7 -718V9 -718V11 -718V13 -718V15
/802.5 x2 /802.6 x2 /802.7 x2 /802.5 x2 /802.6 x2 /802.5 x2 /802.6 x2 /802.7 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-718V2 -718V4 -718V6 -718V8 -718V10 -718V12 -718V14 -718V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

AR-5 AR-6 MC-1 MC-3A MC-3A LSH-1370 LSH-1371 VV-1


OPEN OPEN RUN RUN RUN HIGH HIGH RUN

AR-5 AR-6 MC-1 MC-3A MC-3B LSH-1370 LSH-1371 VV-1


CLOSE CLOSE STOP STOP STOP LOW LOW STOP

717 719

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 9 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 718
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

13 8 13 13 8 13 13
11
542K1 148K5 148K1 148K2 471K2 432K1 433K1
/542.1 /148.6 /148.3 /148.4 /471.2 /432.3 /433.3 -176K3
14 5 6 14 14 5 6 14 14
/176.9 12 14

72530
72530 / 182.5

149.5 / E28.7 177.5 / E29.1


13 11 13 13
542K2 148K1 432K2 433K2
/542.2 14 /148.3 12 /432.4 14 /433.4 14

71909
11
148K2
/148.4 12
71901

71903

71922

71906

71910

71912

71908

71916

71918

71920

71922

71924

71926

71930
-719U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
71902

71904

71905

71907

71911

71913

71914

71915

71917

71919

71921

71923

71925

71927

71928

71929
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-719V1 -719V3 -719V5 -719V7 -719V9 -719V11 -719V13 -719V15
/802.4 x2 RED x2 /802.5 x2 RED x2 /802.6 x2 /802.7 x2 /802.6 x2 RED x2
RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-719V2 -719V4 -719V6 -719V8 -719V10 -719V12 -719V14 -719V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

BR-1 NT-1 NT-1 NT-1 LSH-1318 MV-1301 MV-1302 NT-411


STATUS FOR RUN REW HIGH OPEN OPEN FORWARD

BR-1 NT-1 LSH-1318 MV-1301 MV-1302


- - SPARE
FAILURE STOP LOW CLOSE CLOSE

718 720

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 10 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 719
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

13 13 13 13 13 13 13 13
434K1 435K1 436K1 437K1 438K1 439K1 440K1 441K1
/434.3 14 /435.3 14 /436.3 14 /437.3 14 /438.3 14 /439.3 14 /440.3 14 /441.3 14

13 13 13 13 13 13 13 13
434K2 435K2 436K2 437K2 438K2 439K2 440K2 441K2
/434.4 14 /435.4 14 /436.4 14 /437.4 14 /438.4 14 /439.4 14 /440.4 14 /441.4 14

72001

72003

72005

72007

72009

72011

72013

72015

72017

72019

72021

72023

72025

72027

72029

72031
-720U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72002

72004

72006

72008

72010

72012

72014

72016

72018

72020

72022

72024

72026

72028

72030

72032
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-720V1 -720V3 -720V5 -720V7 -720V9 -720V11 -720V13 -720V15
/802.6 x2 /802.6 x2 /802.7 x2 /802.7 x2 /802.8 x2 /802.8 x2 /802.8 x2 /802.7 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-720V2 -720V4 -720V6 -720V8 -720V10 -720V12 -720V14 -720V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

MV-1303 MV-1304 MV-1305 MV-1306 MV-1307 MV-1308 MV-1309 MV-1301


OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN

MV-1303 MV-1304 MV-1305 MV-1306 MV-1307 MV-1308 MV-1309 MV-1301


CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE

719 721

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 2 CARD 11 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 720
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

43 43 43 43
206K1 178K1 180K1 200K2
/206.3 44 /178.3 44 /180.3 44 /200.3 44

11 11 11 8 8 8 8 11
206K1 178K1 180K1 455K1 456K1 -414K3 -414K4 200K2
/206.3 12 /178.3 12 /180.3 12 /455.5 5 6 /456.5 5 6 /414.3 5 6 /414.4 5 6 /200.3 12

72101

72103

72105

72107

72109

72111

72113

72115

72117

72119

72121

72123

72125

72127

72129

72131
-721U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72102

72104

72106

72108

72110

72112

72114

72116

72118

72120

72122

72124

72126

72128

72130

72132
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-721V1 -721V3 -721V5 -721V7 -721V9 -721V11 -721V13 -721V15
/803.3 x2 /803.3 x2 /803.4 x2 /803.2 x2 /803.4 x2 /803.3 x2 /803.4 x2 /803.5 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-721V2 -721V4 -721V6 -721V8 -721V10 -721V12 -721V14 -721V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

DV-401 DV-401
ET-401 FS-402A FS-402B KY-7 KY-8 MX-402
TO SV402A TO SV402B
RUN RUN RUN OPEN OPEN RUN
OPEN OPEN

DV-401 DV-401
ET-401 FS-402A FS-402B KY-7 KY-8 MX-402
TO SV402A TO SV402B
STOP STOP STOP CLOSE CLOSE STOP
CLOSE CLOSE

720 722

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 3 CARD 12 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 721
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC 43 43
212K1 216K1
/212.3 44 /216.3 44

72218
72212
13 13
408K1 409K1
43 43 /408.3 14 /409.3 14
214K1 218K1
/214.3 44 /218.3 44

11 11
214K1 218K1
/214.3 12 /218.3 12

72209

72215
11 11 11 11 13 13
474K2 475K2 482K1 483K1 408K2 409K2
/474.2 12 14 /475.2 12 14 11 11 /482.2 12 14 /483.2 12 14 /408.4 14 /409.4 14
212K1 216K1
/212.3 12 /216.3 12
72201

72203

72205

72207

72210

72213

72216

72219

72221

72223

72225

72227

72229

72231

72233

72235
-722U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72202

72204

72206

72208

72211

72214

72217

72220

72222

72224

72226

72228

72230

72232

72234

72236
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-722V1 -722V3 -722V5 -722V7 -722V9 -722V11 -722V13 -722V15
/803.2 x2 /803.4 x2 /803.2 x2 /803.3 x2 /803.3 x2 /803.4 x2 /803.3 x2 /803.4 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-722V2 -722V4 -722V6 -722V8 -722V10 -722V12 -722V14 -722V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

LSH-4103A LSH-4103B VY-4021A/B VY-4022A/B LSL-4101A LSL-4101B SV-4102A SV-4102B


HIGH HIGH RUN RUN HIGH HIGH OPEN OPEN

LSH-4103A LSH-4103B VY-4021A/B VY-4022A/B LSL-4101A LSL-4101B SV-4102A SV-4102B


LOW LOW STOP STOP LOW LOW CLOSE CLOSE

721 723

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 3 CARD 13 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 722
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

43
194K1

ND402_FAULT / 184.4

ND406_FAULT / 186.4

ND408_FAULT / 188.4

ND409_FAULT / 190.4
/194.3 44

ND402_RUN / 184.3

ND406_RUN / 186.3

ND408_RUN / 188.3

ND409_RUN / 190.3
11 11 11 8
476K1 484K1 194K1 457K1
/476.2 12 14 /484.2 12 14 /194.3 12 /457.5 5 6

72301

72303

72305

72307

72317

72319

72321

72323
-723U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72302

72304

72306

72308

72309

72310

72311

72312

72313

72314

72315

72316

72318

72320

72322

72324
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-723V1 -723V3 -723V5 -723V7 -723V9 -723V11 -723V13 -723V15
/803.4 x2 /803.4 x2 /803.4 x2 /803.5 x2 /803.6 x2 /803.7 x2 /803.5 x2 /803.6 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-723V2 -723V4 -723V6 -723V8 -723V10 -723V12 -723V14 -723V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

LSH-4104 LSH-4105 ND-402 ND-406 ND-408 ND-409 FBL-406 KY-9


HIGH HIGH RUN RUN RUN RUN RUN OPEN

LSH-4104 LSH-4105 ND-402 ND-406 ND-408 ND-409 FBL-406 KY-9


LOW LOW FAULT FAULT FAULT FAULT STOP CLOSE

722 724

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 3 CARD 14 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 723
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

43 43 43 43
192K1 196K1 176K1 176K4
/192.3 44 /196.3 44 /176.3 44 /176.4 44

11
176K1
/176.3 12

72433
11 8 11 8 11 11 11
192K1 458K1 196K1 459K1 485K1 486K1 487K1
/192.3 12 /458.5 5 6 /196.3 12 /459.5 5 6 /485.2 12 14 /486.2 12 14 /487.2 12 14 11
176K4
/176.4 12
72401

72403

72405

72407

72409

72411

72413

72415

72417

72419

72421

72423

72425

72427

72431

72432
-724U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72402

72404

72406

72408

72410

72412

72414

72416

72418

72420

72422

72424

72426

72428

72429

72430
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-724V1 -724V3 -724V5 -724V7 -724V9 -724V11 -724V13 -724V15
/803.6 x2 /803.7 x2 /803.7 x2 /803.8 x2 /803.6 x2 /803.7 x2 /803.8 x2 /803.7 x2
RED RED RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-724V2 -724V4 -724V6 -724V8 -724V10 -724V12 -724V14 -724V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

FBL-408 KY-10 FBL-409 KY-11 LSL-4109 LSL-4112 LSL-4113 NT-411


RUN OPEN RUN OPEN HIGH HIGH HIGH RUN

FBL-408 KY-10 FBL-409 KY-11 LSL-4109 LSL-4112 LSL-4113 NT-411


STOP CLOSE STOP CLOSE LOW LOW LOW STOP

723 725

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 3 CARD 15 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 724
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

24VDCON
74.8 / 24VDCON
024VDC
73.8 / 024VDC

8 13 13 43 43
198K5 198K1 198K2 202K1 204K1
/198.6 5 6 /198.3 14 /198.4 14 /202.3 44 /204.3 44

199.5 / E29.0
11
198K1
/198.3 12 11 11 8 8 8

72505
202K1 204K1 522K1 523K1 182K1
/202.3 12 /204.3 12 /522.3 5 6 /523.3 5 6 /182.3 5 6
11
198K2
/198.4 12

72502

72506

72508

72504

72512

72514

72516

72518

72520

72522

72524

72526

72530

72531
-725U1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1

x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
72501

72503

72507

72509

72510

72511

72513

72515

72517

72519

72521

72523

72525

72527

72528

72529
SYNOPTIC
x1 x1 x1 x1 x1 x1 x1 x1
-725V1 -725V3 -725V5 -725V7 -725V9 -725V11 -725V13 -725V15
RED x2 /803.6 x2 RED x2 /803.4 x2 /803.6 x2 /803.4 x2 /803.4 x2 /803.3 x2
RED RED RED RED RED RED

x1 x1 x1 x1 x1 x1 x1 x1
-725V2 -725V4 -725V6 -725V8 -725V10 -725V12 -725V14 -725V16
GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2 GREEN x2

NT-410 NT-410 NT-410 DP-431 DP-432 AR-7 AR-8 NT-402


FOR RUN REW RUN RUN OPEN OPEN RUN

NT-410 DP-431 DP-432 AR-7 AR-8 NT-402


- -
STOP STOP STOP CLOSE CLOSE STOP

724 750

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC PANEL 3 CARD 16 = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 725
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-750PLC1
/751.0

-750T1
/49.2
/800.7

-750SC1
/800.5

PROFINET
CABLE CABLE
CAT.5

CABLE
CAT.5

-750PLC2
/751.6

725 751

REVISION 03/10/2018 00143 Data 08/10/2018 BUS_NETWORK = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 750
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

6ES7151-3AA23-0AB0

6ES7151-8AB01-0AB0
6ES7953-8LJ30-0AA0
SIEMENS

SIEMENS
-750PLC1 -750PLC2
/750.0 DIGITAL INPUT&OUTPUT /750.0 ANALOG INPUT&OUTPUT
/800.1 /800.2

+ SHEET 755
+ SHEET 753 + SHEET 756
+ SHEET 754 + SHEET 757

750 753

REVISION 03/10/2018 00143 Data 08/10/2018 PLC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 751
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

6ES7193-4CD30-0AA0
6ES7138-4CA01-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0
6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0

6ES7131-4BF00-0AA0
SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS
-DI0 -DI1 -DI2 -DI3 -DI4 -DI5 -DI6 -DI7 -DI8 -DI9 -DI10 -DI11 -DI12 -DI13 -DI14 -DI15 -DI16 -DI17 -DI18 -DI19 -DI20 -DI21 -DI22 -DI23 -DI24 -DI25 -DI26 -DI27 -DI28 -DI29 -DI30 -DI31
/100.9 /220.9 /112.3 /172.9 /158.9 /126.9 /134.9 /142.9 /149.3 /208.9 /226.9 /480.3 /472.3 /502.3 /403.6 /407.6 /434.6 /438.6 /206.9 /184.3 /192.9 /202.9 /474.3 /487.3 /409.6 /189.6 /234.8 /177.3 /413.7 /199.5 /780.5 /780.1
/102.9 /106.3 /160.9 /118.3 /116.9 /128.9 /136.9 /144.9 /150.9 /780.5 /228.9 /477.3 /540.4 /400.6 /404.6 /520.6 /435.6 /439.6 /178.9 /186.3 /194.9 /204.9 /475.3 /522.6 /212.8 /232.9 /236.8 /177.4 /414.7 /191.6 /780.7 /780.3
/104.9 /108.3 /164.9 /122.9 /120.9 /132.9 /138.9 /146.9 /152.9 /222.9 /230.9 /470.3 /541.4 /401.6 /405.6 /432.6 /436.6 /440.6 /180.9 /188.3 /196.9 /199.2 /476.3 /410.8 /187.6 /504.3 /238.8 /411.7 /415.7 /185.6 /780.9 /780.5
/780.3 /110.3 /168.9 /114.9 /124.3 /130.3 /140.9 /149.2 /154.9 /224.9 /478.3 /501.3 /542.5 /402.6 /406.6 /433.6 /437.6 /441.6 /182.9 /190.3 /200.9 /199.3 /485.3 /408.6 /216.9 /780.0 /240.8 /412.7 /416.7 /780.3 /350.6 /780.7
/100.8 /220.8 /112.4 /172.8 /158.8 /126.8 /134.8 /142.8 /149.4 /208.8 /226.8 /481.3 /473.4 /503.3 /403.7 /407.7 /434.7 /438.7 /206.8 /184.4 /192.8 /202.8 /482.3 /488.3 /409.7 /189.7 /236.9 /177.2 /414.6 /177.5 /780.6 /780.2
/102.8 /106.4 /160.8 /118.4 /116.8 /128.8 /136.8 /144.8 /150.8 /780.4 /228.8 /489.3 /540.5 /400.7 /404.7 /521.6 /435.7 /439.7 /178.8 /186.4 /194.8 /204.8 /483.3 /523.6 /212.9 /232.8 /238.9 /411.6 /415.6 /191.7 /780.8 /780.4
-PM1 /104.8 /108.4 /164.8 /122.8 /120.8 /132.8 /138.8 /146.8 /152.8 /222.8 /230.8 /500.3 /541.5 /401.7 /405.7 /432.7 /436.7 /440.7 /180.8 /188.4 /196.8 /199.1 /484.3 /410.9 /187.7 /505.3 /240.9 /412.6 /416.6 /185.7 /780.0 /780.6
/800.1 /780.2 /110.4 /168.8 /114.8 /124.4 /130.4 /140.8 /149.1 /154.8 /224.8 /479.3 /471.3 /542.6 /402.7 /406.7 /433.7 /437.7 /441.7 /182.8 /190.4 /200.8 /199.4 /486.3 /408.7 /216.8 /234.9 /177.1 /413.6 /149.5 /780.4 /350.9 /780.8

751 754

REVISION 03/10/2018 00143 Data 08/10/2018 PLC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 753
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

6ES7193-4CD30-0AA0

6ES7193-4CD30-0AA0

6ES7193-4CD30-0AA0
6ES7138-4CA01-0AA0

6ES7138-4CA01-0AA0

6ES7138-4CA01-0AA0
6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0

6ES7193-4CB30-0AA0
6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0

6ES7132-4BF00-0AA0
SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS
-DO0 -DO1 -DO2 -DO3 -DO4 -DO5 -DO6 -DO7 -DO8 -DO9 -DO10 -DO11 -DO12 -DO13 -DO14
/101.1 /220.6 /168.7 /125.1 /140.6 /154.6 /400.5 /520.5 /189.9 /198.8 /212.6 /454.5 /236.6 /415.5 /780.4
/103.1 /107.1 /119.1 /128.6 /144.6 /780.7 /402.5 /206.6 /192.6 /522.5 /216.6 /456.5 /240.6 /542.3 /780.6
/105.1 /111.1 /114.6 /131.1 /148.8 /224.7 /404.5 /180.6 /196.6 /410.6 /450.5 /458.5 /176.9 /179.0 /780.8
/411.5 /160.7 /116.6 /136.7 /150.7 /228.6 /406.5 /185.9 /202.7 /408.5 /452.5 /232.6 /413.5 /181.0 /77.8
/100.6 /460.5 /172.7 /126.6 /142.6 /208.6 /401.5 /521.5 /191.9 /198.9 /780.5 /455.5 /238.6 /193.1 /780.5
/102.6 /109.1 /122.6 /132.6 /146.7 /222.6 /403.5 /178.6 /194.6 /523.5 /780.4 /457.5 /176.8 /416.5 /780.7
-PM2 /104.6 /113.1 /158.6 /134.7 /148.9 -PM3 /226.6 /405.5 /182.6 /200.6 /410.7 -PM4 /451.5 /459.5 /412.5 /195.0 /780.9
/800.1 /780.6 /164.7 /120.7 /138.7 /152.6 /800.2 /230.6 /407.5 /187.9 /204.7 /780.8 /800.4 /453.5 /234.6 /414.5 /197.0 /77.7

753 755

REVISION 03/10/2018 00143 Data 08/10/2018 PLC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 754
Modify Date Edit Tot page 775
754

Modify
REVISION
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Date
15/10/2014
27/12/2014
03/10/2018

Edit
00143
00143
00143
1

Data
Elab.
Verify
08/10/2018
SIEMENS
6ES7193-4CD30-0AA0
2

6ES7138-4CA01-0AA0
/800.2
-PM5

SIEMENS
6ES7193-4CB30-0AA0
-AI0

6ES7134-4GD00-0AB0
/108.6
/106.6
/108.5
/106.5

SIEMENS
6ES7193-4CB30-0AA0
-AI1

6ES7134-4GD00-0AB0
/112.6
/110.6
/112.5
/110.5

SPRAY DRYING PLANT IRAQ


SIEMENS
6ES7193-4CB30-0AA0
-AI2

6ES7134-4GD00-0AB0
/124.6
/118.6
/124.5
/118.5
3

SIEMENS
6ES7193-4CB30-0AA0
-AI3

6ES7134-4GD00-0AB0
/551.1
/130.6
/550.1
/130.5

SIEMENS
6ES7193-4CB30-0AA0
-AI4

6ES7134-4GD00-0AB0
/620.3
/620.0
/620.2
/552.1

SIEMENS
6ES7193-4CB30-0AA0
-AI5

6ES7134-4GD00-0AB0
/600.3
/600.0
/600.2
/620.4
4

SIEMENS
6ES7193-4CB30-0AA0
-AI6

6ES7134-4GD00-0AB0
/352.3
/600.5
/600.6
/600.4

SIEMENS
6ES7193-4CB30-0AA0
-AI7

6ES7134-4GD00-0AB0
/600.8
/640.0
/640.2
/600.7

SIEMENS
6ES7193-4CB30-0AA0
-AI8

6ES7134-4GD00-0AB0
/601.4
/601.2
/601.3
/601.0

SIEMENS
6ES7193-4CB30-0AA0
5

-AI9

6ES7134-4GD00-0AB0
/542.7
/540.8
/541.8
/640.3

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/601.6
/620.6
/620.7
/601.5
-AI10

PLC LAYOUT
SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/601.8
/621.0
/601.7
/620.8
-AI11

SIEMENS
6ES7193-4CB30-0AA0
6

6ES7134-4GD00-0AB0
/630.2
/621.3
/630.0
/621.2
-AI12

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/191.3
/187.3
/189.3
/185.3
-AI13

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/780.0
/621.4
/621.5
/620.5
-AI14

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/780.4
/780.2
/780.3
/780.1
-AI15
7

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/780.8
/780.6
/780.7
/780.5
-AI16

SIEMENS
6ES7193-4CB30-0AA0
6ES7134-4GD00-0AB0
/780.2
/780.0
/780.1
/780.9
-AI17
8

+
= CB_1
9

Page
Tot page
775
755
756
755

Modify
REVISION
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Date
15/10/2014
27/12/2014
03/10/2018

Edit
00143
00143
00143
1

Data
Elab.
Verify
08/10/2018
2

SPRAY DRYING PLANT IRAQ


3

SIEMENS
6ES7193-4CD30-0AA0
6ES7138-4CA01-0AA0
/800.4
-PM6

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/108.5
/106.5
-AO0

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/112.5
/110.5
-AO1
4

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/124.5
/118.5
-AO2

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/780.6
/130.5
-AO3

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/780.8
/780.7
-AO4
5

SIEMENS
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/780.3
/780.9
-AO5

SIEMENS

PLC LAYOUT
6ES7193-4CB30-0AA0
6ES7135-4FB01-0AB0
/780.5
/780.4
-AO6
6
7
8

+
= CB_1
9

Page
Tot page
775
756
757
0 1 2 3 4 5 6 7 8 9

6ES7193-4CD30-0AA0

6ES7135-4GB01-0AB0

6ES7135-4GB01-0AB0

6ES7135-4GB01-0AB0

6ES7135-4GB01-0AB0
6ES7138-4CA01-0AA0

6ES7193-4CA30-0AA0

6ES7193-4CA30-0AA0

6ES7193-4CA30-0AA0

6ES7193-4CA30-0AA0
SIEMENS

SIEMENS

SIEMENS

SIEMENS

SIEMENS
-AO8
/550.5
-AO7 /552.3 -AO9 -AO10
-PM7 /550.3 /542.8 /185.6 /189.6
/800.5 /551.3 /550.7 /187.6 /191.6

756 780

REVISION 03/10/2018 00143 Data 03/10/2018 PLC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 757
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

4 8 4 6 2
DI DI DI DI DI
-DI25 -DI0 -DI0 -DI9 -DI9

E25.6 E0.7 E0.6 E9.3 E9.2


-Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI
Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI

4 8 1 5 2 6 3
DI DI DI DI DI DI DI
-DI29 -DI29 -DI30 -DI30 -DI30 -DI30 -DI30

E29.6 E29.7 E30.0 E30.1 E30.2 E30.3 E30.4


-Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI
Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI

7 1 5 2 6 3 7 4 8
DI DI DI DI DI DI DI DI DI
-DI30 -DI31 -DI31 -DI31 -DI31 -DI31 -DI31 -DI31 -DI31

E30.5 E31.0 E31.1 E31.2 E31.3 E31.4 E31.5 E31.6 E31.7


-Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI -Spare_DI
Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI Spare_DI

Spare_DO Spare_DO Spare_DO Spare_DO Spare_DO


-Spare_DO -Spare_DO -Spare_DO -Spare_DO -Spare_DO
A10.3 A10.1 A0.7 A5.2 A9.7

-DO10 -DO10 -DO0 -DO5 -DO9

DO DO DO DO DO
6 5 8 2 8

Spare_DO Spare_DO Spare_DO Spare_DO Spare_DO Spare_DO


-Spare_DO -Spare_DO -Spare_DO -Spare_DO -Spare_DO -Spare_DO
A14.0 A14.1 A14.2 A14.3 A14.4 A14.5

-DO14 -DO14 -DO14 -DO14 -DO14 -DO14

DO DO DO DO DO DO
1 5 2 6 3 7

7 8 1 2 5 6 3 4 7 8 1 2 5 6 3 4 7 8 1 2
M3+ M3- M0+ M0- M1+ M1- M2+ M2- M3+ M3- M0+ M0- M1+ M1- M2+ M2- M3+ M3- M0+ M0-
-AI14 -AI15 -AI15 -AI15 -AI15 -AI16 -AI16 -AI16 -AI16 -AI17
/755.6 /755.7 /755.7 /755.7 /755.7 /755.7 /755.7 /755.7 /755.7 /755.7
PEW374 PEW376 PEW378 PEW380 PEW382 PEW384 PEW386 PEW388 PEW390 PEW392
-Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI -Spare_AI
Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI Spare_AI

5 6 3 4 7 8
M1+ M1- M2+ M2- M3+ M3- Spare_AO Spare_AO Spare_AO SPARE AO SPARE AO SPARE AO SPARE AO
-AI17 -AI17 -AI17
/755.7 /755.7 /755.7 -Spare_AO -Spare_AO -Spare_AO -SPARE AO -SPARE AO -SPARE AO -SPARE AO
PEW394 PEW396 PEW398 PAW278 PAW280 PAW282 PAW270 PAW272 PAW274 PAW276
-Spare_AI -Spare_AI -Spare_AI /756.5 /756.5 /756.5 /756.4 /756.5 /756.5 /756.5
Spare_AI Spare_AI Spare_AI -AO5 -AO6 -AO6 -AO3 -AO4 -AO4 -AO5

QV1 S1+ Mana S1- QV0 S0+ Mana S0- QV1 S1+ Mana S1- QV1 S1+ Mana S1- QV0 S0+ Mana S0- QV1 S1+ Mana S1- QV0 S0+ Mana S0-
5 6 7 8 1 2 3 4 5 6 7 8 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4

757 800

REVISION 03/10/2018 00143 Data 08/10/2018 PLC SPARE = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 780
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-750PLC1 -750PLC2 -750SC1 -750T1


/751.0 /751.6 /750.3 /750.6

+24V 0V +24V 0V +24V 0V +24V 0V

74.8 / 24VDCON

73.8 / 024VDC

PM1 PM5 PM6 PM7


/753.0 /755.2 /756.3 /757.4

+24V 0V +24V 0V +24V 0V +24V 0V

74.8 / 24VDCON

73.8 / 024VDC

PM2 PM3 PM4


/754.2 /754.4 /754.6

+24V 0V +24V 0V +24V 0V

73.7 / 24VDC

73.8 / 024VDC
780 801

REVISION 03/10/2018 00143 Data 08/10/2018 PLC SUPPLY = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 800
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

CA CA CA CA

SODIUM SOLPHATE
-710V1 -710V3 -710V5 -710V7 -710V9 -710V11 -710V13 -710V15
/710.2 /710.3 /710.3 /710.4 /710.5 /710.6 /710.6 /710.7
-710V2 -710V4 -710V6 -710V8 -710V10 -710V12 ZEOLITE -710V14 -710V16
-711V1

SODA ASH
/711.2 FROM P-5
-711V2

STPP
LIGHT BLUE LIGHT BLUE LIGHT BLUE LIGHT BLUE
MINORS
AGT-5
FS-1 FS-2 FS-3 FS-5
MANUAL
CHARGE

LIGHT BROWN
S-1 S-2 S-3 S-4 S-5 T-5

YELLOW YELLOW YELLOW YELLOW YELLOW

LSL-1122 LSL-1123 LSL-1124 LSL-1125 LSL-1126


-711V3
/711.3 -711V5 -711V7
/711.3 /711.4 -711V9 -711V11
VY-1011 A/B -711V4 VY-1012 A/B VY-1013 A/B VY-1014 A/B /711.5
VY-1015 A/B /711.6
-711V6 -711V8
-711V10 -712V5 -711V12
-711V13 -711V15 -712V1 /712.3
/711.6 /711.7 /712.2 -712V3
/712.3 -712V6
-711V14 M
-711V16 M
-712V2 M M
-712V4
M
YELLOW YELLOW YELLOW YELLOW
-712V9 -712V11 -712V13 -712V15 TO R-2
SC-1 SC-2 /712.5 SC-3 /712.6 SC-4 /712.6 /712.7
-712V10 -712V12 -712V14
NT-6 -712V16
-712V7
/712.4
-712V8

CA

-714V11
/714.6
-714V12

FHS-1
TO R2
LIGHT BLUE

-713V3 -713V4
SULPHONIC ACID FROM P-801 /713.3

-713V5 -713V6
SODIUM SILICATE FROM P-802 /713.3

-713V8 -713V7
CAUSTIC SODA FROM P-803 /713.4
-714V9
/714.5
-713V9 -713V10
PROCESS WATER FROM P-804 /713.5 -713V15 CA -714V10
/713.7
-713V16
AGR-1
RECOVERY WATER
BL4
-714V1
/714.2
-714V2

STEAM
R-1
HOT WATER

KV-1108
T-6

-713V11
/713.6
Green
-713V12

CONDENSE
LIGHT BROWN

Green
HOT WATER

P-6
-714V5
/714.3
-714V6 KV-1113
TO P3 & P4
-713V13 P-2
-714V7 /713.6
/714.4 -713V14 -714V3
-714V8 /714.3
-714V4
Green
P-7

INJAZAAT AL FAYHAA - PREPARATION OF SLURRY

800 802

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 801
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

TO T-5 KV-1316

COMPRESSED AIR
AGR2
FROM R-1 -716V5
/716.3

COMPRESSED AIR
AR-6
-716V6 F-4
-715V9
/715.5
-715V10 -718V3
/718.3
-718V4

STEAM
R-2 LSH-1108 AR-5 AL-1
KV-1320
F-3
-715V11
/715.6
-718V1
-715V12 /718.2
-718V2

-716V15 LSH-1318
LSL-1104 /716.7
-719V9
-715V13 -716V16
/715.6 BL-3 /719.5
BL-5
-719V10
-715V14
-717V11 MC-1 -717V13
/717.6 /717.6
-718V5
-717V12 /718.3 -717V14
LSH-1370 LSH-1371 -718V6
LSLL-1106
LIGHT BROWN ST-1 -718V11 -718V13
-715V15 /718.6 /718.6 VV1
/715.7 -718V12 -718V14
-715V16 ATM

CR-1
MC-3A MC-3B
-718V15
CONDENSE -718V7 -718V9 /718.7
KV-1115 /718.4 /718.5 -718V16
-715V3 -718V8 -718V10
/715.3
KV-1101
FILTERED WATER -715V4
-715V7 KV-1310
-715V1 /715.4
/715.2
-715V8
-715V2 KV-1309 TO ET-401
J-1
AF-1A AF-1B
-716V7 -716V9 BL-6
/716.4 /716.5
-715V5 -717V15
-716V8 -716V10 /715.3 /717.7
-715V6 -717V16

REV NT-1 FW

HAL1

HST-1
-717V9 -719V8 -719V5 -719V4
/717.5 /719.3
FROM P-7
-717V10 -719V6
-720V5 -720V7
/720.3 SN-1 /720.4
-720V6 -720V8

-720V3
/720.3 05 -720V9
/720.5
P-4 -720V4 06 -720V10
-716V13
P-3 /716.6 04
-716V11 -716V14
/716.6
DIESEL OIL 07
FIS -716V12 FIS
1209 1219
03
TO T-6 BR-1 -720V1 MV-13XX -720V11
/720.2 /720.6
-716V1
/716.2
-716V3
/716.3 -720V2 08 -720V12
-719V1
-716V2 -716V4 /719.2
02
-719V2

01 09
RED -719V13 -720V13
/719.6 /720.6
10
BR1A D-805 -719V14 -720V14

-720V15
-719V11

SLURRY OUT
/720.7

SLURRY IN
/719.6
-720V16
-719V12

P-5
P-805
-717V1
/717.2 -717V7
-717V2
-717V3
/717.3
BL-2 -717V5
/717.3
BL-1 /717.4
-717V8
-717V4 -717V6

INJAZAAT AL FAYHAA - ATOMIZATION UNIT

801 803

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 802
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

-721V1 M ET-401
/721.2
-721V2
-721V3
/721.3 -721V5
/721.3
-721V4
-721V6 -723V15 -724V3
FBL-406 CA /723.7 FBL-408 CA /724.3 FBL-409 CA
CA DV-401 CA
-721V11 -721V13 -723V16 -724V1 -724V4 -724V5
/721.6 /721.6 -723V13 /724.2 /724.3
M M /723.6
-721V12 -721V14 M -724V2 M -724V6 M
-721V7 -721V9 -723V14
/721.4 /721.5
-721V8 -721V10
-724V7
PERBORATE CHARGE ENZIMES CHARGE GRAIN BLUE CHARGE /724.4
-724V8
MANUAL MANUAL MANUAL
F-402A F-402B
F-406 F-408 F-409
LSH-4103A LSH-4103B
-722V1 -722V3
/722.2 S-402A S-402B /722.3 S-406 S-408 S-409
-722V2 -722V4
-722V9
/722.5
-722V10
VY-4021 A/B VY-4022 A/B LSL-4101B -722V11 -722V12 LSL-4109 LSL-4112 LSL-4113
LSL-4101A -724V11
-722V5 -722V7 -722V8 /722.6 -724V9 -724V13
/724.6
/722.3 /722.4 /724.5 /724.6
SV-4102A SV-4102B -722V15 -722V16 -724V12
-722V6 /722.7 -724V10 -724V14
M M M M

-722V13 ND-406 ND-408 ND-409


/722.6
-723V7 -723V9 -723V11
NT-402 -722V14 LSH-4104 -723V1 -723V2
/723.4 /723.5 /723.6
/723.2
-725V15 H-402 -723V8 -723V10 -723V12
/725.7 LSL-4105
-725V16 -723V3 -723V4
/723.3

ND402
FROM VV-1
-723V5
/723.3
FW NT-410 REV
-723V6
M

-725V2 -725V3 -725V6


COMPRESSED AIR /725.3
COMPRESSED AIR
-725V4
AR-7 AR-8
-725V11 -725V13
/725.6 /725.6
-725V12 -725V14

NT-411
M

-721V15 OD UCT
/721.7 ED PR
MX-402 -721V16 F INISH -724V15
/724.7
-724V16

STEAM
M
PERFUME

CONDENSE DP-432
-725V9
/725.5
-725V10

NON IONIC DRUM


T-432

T-431 M

DP-431
-725V7
/725.4
-725V8

INJAZAAT AL FAYHAA - POST ADDICTION

802 =PLC/1000

REVISION 03/10/2018 00143 Data 08/10/2018 SYNOPTIC LAYOUT = CB_1


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 803
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI0 PEW256 /106.5 STPP DOSING SCREW CONVEYOR CURRENT SC-1-AMP 1;2

PEW260 /108.5 = SC-2-AMP 3;4

PEW258 /106.6 STPP DOSING SCREW CONVEYOR SPEED SC-1-FB 5;6

PEW262 /108.6 = SC-2-FB 7;8

=CB_1/803 1001

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI0 - =CB_1+-AI0 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1000
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI1 PEW264 /110.5 STPP DOSING SCREW CONVEYOR CURRENT SC-3-AMP 1;2

PEW268 /112.5 MINORS DOSING SCREW CONVEYOR CURRENT SC-4-AMP 3;4

PEW266 /110.6 STPP DOSING SCREW CONVEYOR SPEED SC-3-FB 5;6

PEW270 /112.6 MINORS DOSING SCREW CONVEYOR SPEED SC-4-FB 7;8

1000 1002

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI1 - =CB_1+-AI1 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1001
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI2 PEW272 /118.5 STIRRER FOR R1A CURRENT AGR1-AMP 1;2

PEW276 /124.5 BOOSTER PUMP CURRENT P3-AMP 3;4

PEW274 /118.6 STIRRER FOR R1A SPEED AGR1-FB 5;6

PEW278 /124.6 BOOSTER PUMP SPEED P3-FB 7;8

1001 1003

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI2 - =CB_1+-AI2 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1002
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI3 PEW280 /130.5 SLURRY FEEDING HIGH PRESSURE PUMP CURRENT P4-AMP 1;2

PEW284 /550.1 CONTROL VALVE OF DRYING AIR FEEDING FAN FEEDBACK HV-1308-FB 3;4

PEW282 /130.6 SLURRY FEEDING HIGH PRESSURE PUMP SPEED P4-FB 5;6

PEW286 /551.1 CONTROL VALVE OF DRYING AIR FEEDING FAN FEEDBACK PV-1311-FB 7;8

1002 1004

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI3 - =CB_1+-AI3 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1003
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI4 PEW288 /552.1 CONTROL VALVE OF AIR LIFT FAN FEEDBACK HV-1319-FB 1;2

PEW292 /620.2 LEVEL TRANSMITTER LT-1110 3;4

PEW290 /620.0 SPARE SPARE 5;6

PEW294 /620.3 = SPARE 7;8

1003 1005

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI4 - =CB_1+-AI4 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1004
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI5 PEW296 /620.4 SPARE SPARE 1;2

PEW300 /600.2 TEMPERATURE TRANSMITTER TT-1109 3;4

PEW298 /600.0 SPARE SPARE 5;6

PEW302 /600.3 TEMPERATURE TRANSMITTER TT-1112 7;8

1004 1006

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI5 - =CB_1+-AI5 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1005
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI6 PEW304 /600.4 SPARE SPARE 1;2

PEW308 /600.6 TEMPERATURE TRANSMITTER TT-1128 3;4

PEW306 /600.5 SPARE SPARE 5;6

PEW310 /352.3 SCALE WT-1114 7;8

1005 1007

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI6 - =CB_1+-AI6 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1006
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI7 PEW312 /600.7 TEMPERATURE TRANSMITTER TT-1124 1;2

PEW316 /640.2 PRESSURE TRANSMITTER PT-1213 3;4

PEW314 /640.0 = PT-1211 5;6

PEW318 /600.8 SPARE SPARE 7;8

1006 1008

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI7 - =CB_1+-AI7 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1007
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI8 PEW320 /601.0 SPARE SPARE 1;2

PEW324 /601.3 TEMPERATURE TRANSMITTER TT-1312 3;4

PEW322 /601.2 = TT-1306 5;6

PEW326 /601.4 = TT-1314 7;8

1007 1009

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI8 - =CB_1+-AI8 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1008
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI9 PEW328 /640.3 PRESSURE TRANSMITTER PT-1311 1;2

PEW332 /541.8 DELAT P FILTER F4 F4_DP 3;4

PEW330 /540.8 DELTA P FILTER F3 F3_DP 5;6

PEW334 /542.7 BURNER FEEDBACK BR1-FB 7;8

1008 1010

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI9 - =CB_1+-AI9 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1009
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI10 PEW336 /601.5 TEMPERATURE TRANSMITTER TT-8101 1;2

PEW340 /620.7 SPARE SPARE 3;4

PEW338 /620.6 LEVEL TRANSMITTER LT-8102 5;6

PEW342 /601.6 TEMPERATURE TRANSMITTER TT-8202 7;8

1009 1011

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI10 - =CB_1+-AI10 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1010
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI11 PEW344 /620.8 LEVEL TRANSMITTER LT-8201 1;2

PEW348 /601.7 TEMPERATURE TRANSMITTER TT-8301 3;4

PEW346 /621.0 LEVEL TRANSMITTER LT-8211 5;6

PEW350 /601.8 TEMPERATURE TRANSMITTER TT-8302 7;8

1010 1012

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI11 - =CB_1+-AI11 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1011
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI12 PEW352 /621.2 SPARE SPARE 1;2

PEW356 /630.0 FLOW TRANSMITTER FT-4121 3;4

PEW354 /621.3 LEVEL TRANSMITTER LT-8304 5;6

PEW358 /630.2 FLOW TRANSMITTER FT-4122 7;8

1011 1013

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI12 - =CB_1+-AI12 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1012
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI13 PEW360 /185.3 ATOMIZED POWDER WEIGHING BELT FEEDBACK ND-402-FB 1;2

PEW364 /189.3 ENZYMES WEIGHING BELT FEEDBACK ND-408-FB 3;4

PEW362 /187.3 S. PERBORATE WEIGHING BELT FEEDBACK ND-406-FB 5;6

PEW366 /191.3 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT FEEDBACK ND-409-FB 7;8

1012 1014

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI13 - =CB_1+-AI13 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1013
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI14 PEW368 /620.5 LEVEL TRANSMITTER LT-4114 1;2

PEW372 /621.5 LEVEL_TRANSMITTER LT-1102 3;4

PEW370 /621.4 LEVEL TRANSMITTER LT-8302 5;6

PEW374 /780.0 Spare_AI Spare_AI 7;8

1013 1015

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI14 - =CB_1+-AI14 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1014
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI15 PEW376 /780.1 Spare_AI Spare_AI 1;2

PEW380 /780.3 = Spare_AI 3;4

PEW378 /780.2 = Spare_AI 5;6

PEW382 /780.4 = Spare_AI 7;8

1014 1016

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI15 - =CB_1+-AI15 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1015
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI16 PEW384 /780.5 Spare_AI Spare_AI 1;2

PEW388 /780.7 = Spare_AI 3;4

PEW386 /780.6 = Spare_AI 5;6

PEW390 /780.8 = Spare_AI 7;8

1015 1017

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI16 - =CB_1+-AI16 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1016
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AI17 PEW392 /780.9 Spare_AI Spare_AI 1;2

PEW396 /780.1 = Spare_AI 3;4

PEW394 /780.0 = Spare_AI 5;6

PEW398 /780.2 = Spare_AI 7;8

1016 1018

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AI17 - =CB_1+-AI17 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1017
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO0 PAW256 /106.5 STPP DOSING SCREW CONVEYOR SPEED OUT SC-1-OUT QV0;S0+;Mana;S0-

PAW258 /108.5 = SC-2-OUT QV1;S1+;Mana;S1-

1017 1019

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO0 - =CB_1+-AO0 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1018
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO1 PAW260 /110.5 STPP DOSING SCREW CONVEYOR SPEED OUT SC-3-OUT QV0;S0+;Mana;S0-

PAW262 /112.5 MINORS DOSING SCREW CONVEYOR SPEED OUT SC-4-OUT QV1;S1+;Mana;S1-

1018 1020

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO1 - =CB_1+-AO1 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1019
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO2 PAW264 /118.5 STIRRER FOR R1A SPEED OUT AGR1-OUT QV0;S0+;Mana;S0-

PAW266 /124.5 BOOSTER PUMP SPEED OUT P3-OUT QV1;S1+;Mana;S1-

1019 1021

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO2 - =CB_1+-AO2 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1020
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO3 PAW268 /130.5 SLURRY FEEDING HIGH PRESSURE PUMP SPEED SET-POINT P4-OUT QV0;S0+;Mana;S0-

PAW270 /780.6 SPARE AO SPARE AO QV1;S1+;Mana;S1-

1020 1022

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO3 - =CB_1+-AO3 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1021
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO4 PAW272 /780.7 SPARE AO SPARE AO QV0;S0+;Mana;S0-

PAW274 /780.8 = SPARE AO QV1;S1+;Mana;S1-

1021 1023

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO4 - =CB_1+-AO4 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1022
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO5 PAW276 /780.9 SPARE AO SPARE AO QV0;S0+;Mana;S0-

PAW278 /780.3 Spare_AO Spare_AO QV1;S1+;Mana;S1-

1022 1024

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO5 - =CB_1+-AO5 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1023
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO6 PAW280 /780.4 Spare_AO Spare_AO QV0;S0+;Mana;S0-

PAW282 /780.5 = Spare_AO QV1;S1+;Mana;S1-

1023 1025

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO6 - =CB_1+-AO6 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1024
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO7 PAW284 /550.3 CONTROL VALVE OF DRYING AIR FEEDING FAN OUT CONTROL HV-1308-OUT QI0;Mana

PAW286 /551.3 = PV-1311-OUT QI1;Mana

1024 1026

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO7 - =CB_1+-AO7 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1025
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO8 PAW300 /550.5 DP431_CONTROL DP_431_CTL QI0;Mana

PAW288 /552.3 CONTROL VALVE OF AIR LIFT FAN OUT CONTROL HV-1319-OUT QI0;Mana

PAW290 /542.8 BURNER OUT CONTROL BR1-OUT QI1;Mana

PAW302 /550.7 DP432_CONTROL DP_432_CTL QI1;Mana

1025 1027

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO8 - =CB_1+-AO8 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1026
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-AO9 PAW292 /185.6 ATOMIZED POWDER WEIGHING BELT OUT CONTROL ND-402-OUT QI0;Mana

PAW294 /187.6 S.PERBORATE WEIGHING BELT OUT CONTROL ND-406-OUT QI1;Mana

1026 1028

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-AO9 - =CB_1+-AO9 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1027
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI0 E0.0 /100.9 FAN FOR FS1 RUNNING FS1-RUN 1

E0.2 /102.9 FAN FOR FS2 RUNNING FS2-RUN 2

E0.4 /104.9 FAN FOR FS3 RUNNING FS3-RUN 3

E0.6 /780.3 Spare_DI Spare_DI 4

E0.1 /100.8 FAN FOR FS1 FAULT FS1-IAL 5

E0.3 /102.8 FAN FOR FS2 FAULT FS2-IAL 6

E0.5 /104.8 FAN FOR FS3 FAULT FS3-IAL 7

E0.7 /780.2 Spare_DI Spare_DI 8

1027 1029

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI0 - =CB_1+-DI0 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1028
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI1 E1.0 /220.9 BELT CONVEYOR RUNNING NT6-RUN 1

E1.2 /106.3 STPP DOSING SCREW CONVEYOR RUNNING SC1-RUN 2

E1.4 /108.3 S. SULPHATE DOSING SCREW CONVEYOR RUNNING SC2-RUN 3

E1.6 /110.3 SODA ASH DOSING SCREW CONVEYOR RUNNING SC3-RUN 4

E1.1 /220.8 BELT CONVEYOR FAULT NT6-IAL 5

E1.3 /106.4 STPP DOSING SCREW CONVEYOR FAULT SC1-IAL 6

E1.5 /108.4 S. SULPHATE DOSING SCREW CONVEYOR FAULT SC2-IAL 7

E1.7 /110.4 SODA ASH DOSING SCREW CONVEYOR FAULT SC3-IAL 8

1028 1030

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI1 - =CB_1+-DI1 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1029
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI2 E2.0 /112.3 MINORS DOSING SCREW CONVEYOR RUNNING SC4-RUN 1

E2.2 /160.9 STPP VIBRATORS MOTOR RUNNING VY1011 AB -RUN 2

E2.4 /164.9 S. SULPHATE VIBRATORS MOTOR RUNNING VY1012 AB-RUN 3

E2.6 /168.9 SODA ASH VIBRATORS MOTOR RUNNING VY1013 AB-RUN 4

E2.1 /112.4 MINORS DOSING SCREW CONVEYOR FAULT SC4-IAL 5

E2.3 /160.8 STPPVIBRATORS MOTOR FAULT VY1011 AB -IAL 6

E2.5 /164.8 S. SULPHATE VIBRATORS MOTOR FAULT VY1012 AB-IAL 7

E2.7 /168.8 SODA ASH VIBRATORS MOTOR FAULT VY1013 AB-IAL 8

1029 1031

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI2 - =CB_1+-DI2 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1030
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI3 E3.0 /172.9 ZEOLYTE VIBRATORS MOTOR RUNNING VY1014 AB-RUN 1

E3.2 /118.3 STIRRER FOR R1A RUNNING AGR1-RUN 2

E3.4 /122.9 EXTRACTION VAPORS FAN RUNNING BL4-RUN 3

E3.6 /114.9 SLURRY TRANSFER PUMP RUNNING P2-RUN 4

E3.1 /172.8 ZEOLYTE VIBRATORS MOTOR FAULT VY1014 AB-IAL 5

E3.3 /118.4 STIRRER FOR R1A FAULT AGR1-IAL 6

E3.5 /122.8 EXTRACTION VAPORS FAN FAULT BL4-IAL 7

E3.7 /114.8 SLURRY TRANSFER PUMP FAULT P2-IAL 8

1030 1032

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI3 - =CB_1+-DI3 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1031
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI4 E4.0 /158.9 SLURRY TRANSFER PUMP RUNNING P5-RUN 1

E4.2 /116.9 = P6-RUN 2

E4.4 /120.9 STIRRER FOR R2 RUNNING AGR2-RUN 3

E4.6 /124.3 BOOSTER PUMP RUNNING P3-RUN 4

E4.1 /158.8 SLURRY TRANSFER PUMP FAULT P5-IAL 5

E4.3 /116.8 = P6-IAL 6

E4.5 /120.8 STIRRER FOR R2 FAULT AGR2-IAL 7

E4.7 /124.4 BOOSTER PUMP FAULT P3-IAL 8

1031 1033

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI4 - =CB_1+-DI4 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1032
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI5 E5.0 /126.9 SLURRY FEEDING FILTER RUNNING AGAF1A-RUN 1

E5.2 /128.9 = AGAF1B-RUN 2

E5.4 /132.9 STIRRER FOR T5 RUNNING AGT5-RUN 3

E5.6 /130.3 SLURRY FEEDING HIGH PRESSURE PUMP RUNNING P4-RUN 4

E5.1 /126.8 SLURRY FEEDING FILTER FAULT AGAF1A-IAL 5

E5.3 /128.8 = AGAF1B-IAL 6

E5.5 /132.8 STIRRER FOR T5 FAULT AGT5-IAL 7

E5.7 /130.4 SLURRY FEEDING HIGH PRESSURE PUMP FAULT P4-IAL 8

1032 1034

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI5 - =CB_1+-DI5 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1033
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI6 E6.0 /134.9 DRYING AIR FEEDING FAN RUNNING BL1-RUN 1

E6.2 /136.9 COMBUSTION AIR FAN RUNNING BL2-RUN 2

E6.4 /138.9 HOIST FOR CLEANING RING RUNNING HST1-RUN 3

E6.6 /140.9 DOUBLE FLAP DISCHARGER FOR F3 RUNNING MC3A-RUN 4

E6.1 /134.8 DRYING AIR FEEDING FAN FAULT BL1-IAL 5

E6.3 /136.8 COMBUSTION AIR FAN FAULT BL2-IAL 6

E6.5 /138.8 HOIST FOR CLEANING RING FAULT HST1-IAL 7

E6.7 /140.8 DOUBLE FLAP DISCHARGER FOR F3 FAULT MC3A-IAL 8

1033 1035

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI6 - =CB_1+-DI6 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1034
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI7 E7.0 /142.9 DOUBLE FLAP DISCHARGER FOR F3 RUNNING MC3B-RUN 1

E7.2 /144.9 FINES RECOVERY FAN RUNNING BL6-RUN 2

E7.4 /146.9 DRYING AIR FEEDING FAN RUNNING BL3-RUN 3

E7.6 /149.2 AIR LIFT BELT CONVEYOR RUNNING NT1-RUN 4

E7.1 /142.8 DOUBLE FLAP DISCHARGER FOR F3 FAULT MC3B-IAL 5

E7.3 /144.8 FINES RECOVERY FAN FAULT BL6-IAL 6

E7.5 /146.8 DRYING AIR FEEDING FAN FAULT BL3-IAL 7

E7.7 /149.1 AIR LIFT BELT CONVEYOR FAULT NT1-IAL 8

1034 1036

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI7 - =CB_1+-DI7 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1035
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI8 E8.0 /149.3 AIR LIFT BELT CONVEYOR FORWARD MODE NT1-FW 1

E8.2 /150.9 AIR LIFT FAN RUNNING BL5-RUN 2

E8.4 /152.9 DOUBLE FLAP DISCHARGER FOR AIR LIFT RUNNING MC1-RUN 3

E8.6 /154.9 VIBRATING SIEVE RECTANGULAR TYPE RUNNING VV1B-RUN 4

E8.1 /149.4 AIR LIFT BELT CONVEYOR REVERSE MODE NT1-RW 5

E8.3 /150.8 AIR LIFT FAN FAULT BL5-IAL 6

E8.5 /152.8 DOUBLE FLAP DISCHARGER FOR AIR LIFT FAULT MC1-IAL 7

E8.7 /154.8 VIBRATING SIEVE RECTANGULAR TYPE FAULT VV1A-IAL 8

1035 1037

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI8 - =CB_1+-DI8 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1036
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI9 E9.0 /208.9 VIBRATOR MOTOR FOR ST-1 TYPE RUNNING VVY2A-RUN 1

E9.2 /780.5 Spare_DI Spare_DI 2

E9.4 /222.9 SULPHONIC ACID TRANSFER PUMP RUNNING P801-RUN 3

E9.6 /224.9 SODIUM SILICATE TRANSFER PUMP RUNNING P802-RUN 4

E9.1 /208.8 VIBRATOR MOTOR FOR ST-1 TYPE FAULT VVY2A-IAL 5

E9.3 /780.4 Spare_DI Spare_DI 6

E9.5 /222.8 SULPHONIC ACID TRANSFER FAULT P801-IAL 7

E9.7 /224.8 SODIUM SILICATE TRANSFER FAULT P802-IAL 8

1036 1038

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI9 - =CB_1+-DI9 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1037
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI10 E10.0 /226.9 CAUSTRIC SODA TRANSFER PUMP RUNNING P803-RUN 1

E10.2 /228.9 WATER TRANSFER PUMP RUNNING P804-RUN 2

E10.4 /230.9 GASOIL TRANSFER PUMP RUNNING P805-RUN 3

E10.6 /478.3 LEVEL SWITCH LOW LSL-1122 4

E10.1 /226.8 CAUSTRIC SODA TRANSFER FAULT P803-IAL 5

E10.3 /228.8 WATER TRANSFER FAULT P804-IAL 6

E10.5 /230.8 GASOIL TRANSFER FAULT P805-IAL 7

E10.7 /479.3 LEVEL SWITCH LOW LSL-1123 8

1037 1039

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI10 - =CB_1+-DI10 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1038
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI11 E11.0 /480.3 LEVEL SWITCH LOW LSL-1124 1

E11.2 /477.3 = LSL-1104 2

E11.4 /470.3 LEVEL SWITCH HIGH LSH-1108 3

E11.6 /501.3 FLOW SWITCH FIS-1219 4

E11.1 /481.3 LEVEL SWITCH LOW LSL-1125 5

E11.3 /489.3 LEVEL SWITCH LOW LOW LSLL-1106 6

E11.5 /500.3 FLOW SWITCH FIS-1209 7

E11.7 /471.3 LEVEL SWITCH HIGH LSH-1318 8

1038 1040

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI11 - =CB_1+-DI11 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1039
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI12 E12.0 /472.3 LEVEL SWITCH HIGH LSH-1370 1

E12.2 /540.4 STATUS F3 F3-STATUS 2

E12.4 /541.4 STATUS F4 F4-STATUS 3

E12.6 /542.5 STATUS BURNER BR1_STATUS 4

E12.1 /473.4 LEVEL SWITCH HIGH LSH-1371 5

E12.3 /540.5 FAILURE F3 F3-FAILURE 6

E12.5 /541.5 FAILURE F4 F4-FAILURE 7

E12.7 /542.6 ALARM BURNER BR1_FAILURE 8

1039 1041

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI12 - =CB_1+-DI12 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1040
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI13 E13.0 /502.3 FLOW SWITCH FIS-1279 1

E13.2 /400.6 OPEN VALVE KV-1113-OPN 2

E13.4 /401.6 = KV-1201-OPN 3

E13.6 /402.6 = KV-1202-OPN 4

E13.1 /503.3 FLOW SWITCH FIS-1299 5

E13.3 /400.7 CLOSED VALVE KV-1113-CLS 6

E13.5 /401.7 = KV-1201-CLS 7

E13.7 /402.7 = KV-1202-CLS 8

1040 1042

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI13 - =CB_1+-DI13 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1041
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI14 E14.0 /403.6 SPARE SPARE 1

E14.2 /404.6 OPEN VALVE KV-1309-OPN 2

E14.4 /405.6 = KV-1310-OPN 3

E14.6 /406.6 = KV-1316-OPN 4

E14.1 /403.7 SPARE SPARE 5

E14.3 /404.7 CLOSED VALVE KV-1309-CLS 6

E14.5 /405.7 = KV-1310-CLS 7

E14.7 /406.7 = KV-1316-CLS 8

1041 1043

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI14 - =CB_1+-DI14 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1042
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI15 E15.0 /407.6 OPEN VALVE KV-1320-OPN 1

E15.2 /520.6 VALVE FOR F3 STATUS AR5-OPN 2

E15.4 /432.6 OPEN VALVE MV-1301-OPN 3

E15.6 /433.6 = MV-1302-OPN 4

E15.1 /407.7 CLOSED VALVE KV-1320-CLS 5

E15.3 /521.6 VALVE FOR F4 STATUS AR6-OPN 6

E15.5 /432.7 CLOSED VALVE MV-1301-CLS 7

E15.7 /433.7 = MV-1302-CLS 8

1042 1044

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI15 - =CB_1+-DI15 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1043
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI16 E16.0 /434.6 OPEN VALVE MV-1303-OPN 1

E16.2 /435.6 = MV-1304-OPN 2

E16.4 /436.6 = MV-1305-OPN 3

E16.6 /437.6 = MV-1306-OPN 4

E16.1 /434.7 CLOSED VALVE MV-1303-CLS 5

E16.3 /435.7 = MV-1304-CLS 6

E16.5 /436.7 = MV-1305-CLS 7

E16.7 /437.7 = MV-1306-CLS 8

1043 1045

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI16 - =CB_1+-DI16 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1044
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI17 E17.0 /438.6 OPEN VALVE MV-1307-OPN 1

E17.2 /439.6 = MV-1308-OPN 2

E17.4 /440.6 = MV-1309-OPN 3

E17.6 /441.6 = MV-1310-OPN 4

E17.1 /438.7 CLOSED VALVE MV-1307-CLS 5

E17.3 /439.7 = MV-1308-CLS 6

E17.5 /440.7 = MV-1309-CLS 7

E17.7 /441.7 = MV-1310-CLS 8

1044 1046

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI17 - =CB_1+-DI17 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1045
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI18 E18.0 /206.9 DISTRIBUTOR CONVEYOR BELT RUNNING (ET-401) NT-404-RUN (ET-401) 1

E18.2 /178.9 FAN FOR F-402A RUNNING FS-402A-RUN 2

E18.4 /180.9 FAN FOR F-402B RUNNING FS-402B-RUN 3

E18.6 /182.9 EXTRACTION BELT CONVEYOR RUNNING NT-402-RUN 4

E18.1 /206.8 DISTRIBUTOR CONVEYOR BELT FAULT (ET-401) NT-404-IAL (ET-401) 5

E18.3 /178.8 FAN FOR F-402A FAULT FS-402A-IAL 6

E18.5 /180.8 FAN FOR F-402B FAULT FS-402B-IAL 7

E18.7 /182.8 EXTRACTION BELT CONVEYOR FAULT NT-402-IAL 8

1045 1047

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI18 - =CB_1+-DI18 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1046
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI19 E19.0 /184.3 ATOMIZED POWDER WEIGHING BELT RUNNING ND-402-RUN 1

E19.2 /186.3 S. PERBORATE WEIGHING BELT RUNNING ND-406-RUN 2

E19.4 /188.3 ENZYMES WEIGHING BELT RUNNING ND-408-RUN 3

E19.6 /190.3 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT RUNNING ND-409-RUN 4

E19.1 /184.4 ATOMIZED POWDER WEIGHING BELT FAULT ND-402-IAL 5

E19.3 /186.4 S. PERBORATE WEIGHING BELT FAULT ND-406-IAL 6

E19.5 /188.4 ENZYMES WEIGHING BELT FAULT ND-408-IAL 7

E19.7 /190.4 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT FAULT ND-409-IAL 8

1046 1048

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI19 - =CB_1+-DI19 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1047
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI20 E20.0 /192.9 FAN FOR F-408 RUNNING FS-408-RUN 1

E20.2 /194.9 FAN FOR F-406 RUNNING FS-406-RUN 2

E20.4 /196.9 FAN FOR F-409 RUNNING FS-409-RUN 3

E20.6 /200.9 FINAL ROTATING CONTINUOUS MIXER RUNNING MX-402-RUN 4

E20.1 /192.8 FAN FOR F-408 FAULT FS-408-IAL 5

E20.3 /194.8 FAN FOR F-406 FAULT FS-406-IAL 6

E20.5 /196.8 FAN FOR F-409 FAULT FS-409-IAL 7

E20.7 /200.8 FINAL ROTATING CONTINUOUS MIXER FAULT MX-402-IAL 8

1047 1049

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI20 - =CB_1+-DI20 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1048
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI21 E21.0 /202.9 NON IONIC DOSING PUMP RUNNING DP-431-RUN 1

E21.2 /204.9 PERFUME DOSING PUMP RUNNING DP-432-RUN 2

E21.4 /199.2 ADDITIVES FEEDING BELT CONVEYOR RUNNING NT-410-RUN 3

E21.6 /199.3 ADDITIVES FEEDING BELT CONVEYOR FORWARD MODE NT-410-FW 4

E21.1 /202.8 NON IONIC DOSING PUMP FAULT DP-431-IAL 5

E21.3 /204.8 PERFUME DOSING PUMP FAULT DP-432-IAL 6

E21.5 /199.1 ADDITIVES FEEDING BELT CONVEYOR FAULT NT-410-IAL 7

E21.7 /199.4 ADDITIVES FEEDING BELT CONVEYOR REVERSE MODE NT-410-RW 8

1048 1050

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI21 - =CB_1+-DI21 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1049
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI22 E22.0 /474.3 LEVEL SWITCH HIGH LSH-4103A 1

E22.2 /475.3 = LSH-4103B 2

E22.4 /476.3 = LSH-4104 3

E22.6 /485.3 LEVEL SWITCH LOW LSL-4109 4

E22.1 /482.3 = LSL-4101A 5

E22.3 /483.3 = LSL-4101B 6

E22.5 /484.3 = LSL-4105 7

E22.7 /486.3 = LSL-4112 8

1049 1051

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI22 - =CB_1+-DI22 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1050
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI23 E23.0 /487.3 LEVEL SWITCH LOW LSL-4113 1

E23.2 /522.6 VALVE STATUS AR7-OPN 2

E23.4 /410.8 SPARE SPARE 3

E23.6 /408.6 = SPARE 4

E23.1 /488.3 = SPARE 5

E23.3 /523.6 VALVE STATUS AR8-OPN 6

E23.5 /410.9 SPARE SPARE 7

E23.7 /408.7 = SPARE 8

1050 1052

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI23 - =CB_1+-DI23 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1051
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI24 E24.0 /409.6 SPARE SPARE 1

E24.2 /212.8 S. SULPHATE VIBRATORS MOTOR RUNNING VY4021 A-RUN 2

E24.4 /187.6 ATOMIZED POWDER WEIGHING BELT TOLERANCE ALARM ND-406-TOL 3

E24.6 /216.9 S. SULPHATE VIBRATORS MOTOR RUNNING VY4022 A-RUN 4

E24.1 /409.7 SPARE SPARE 5

E24.3 /212.9 S. SULPHATE VIBRATORS MOTOR FAULT VY4021 A-IAL 6

E24.5 /187.7 ATOMIZED POWDER WEIGHING BELT ZERO FLOW ALARM ND-406-ZERO 7

E24.7 /216.8 S. SULPHATE VIBRATORS MOTOR FAULT VY4022 A-IAL 8

1051 1053

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI24 - =CB_1+-DI24 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1052
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI25 E25.0 /189.6 ATOMIZED POWDER WEIGHING BELT TOLERANCE ALARM ND-408-TOL 1

E25.2 /232.9 RECOVERY WATER CIRCULATION PUMP RUNNING P-210-RUN 2

E25.4 /504.3 PRESSURE SWITCH LOW PSL-8205 3

E25.6 /780.0 Spare_DI Spare_DI 4

E25.1 /189.7 ATOMIZED POWDER WEIGHING BELT ZERO FLOW ALARM ND-408-ZERO 5

E25.3 /232.8 RECOVERY WATER CIRCULATION PUMP FAULT P-210-IAL 6

E25.5 /505.3 PRESSURE SWITCH LOW PSL-8305 7

E25.7 /234.9 FAN ND-402 RUN FAN ND-402 RUN 8

1052 1054

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI25 - =CB_1+-DI25 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1053
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI26 E26.0 /234.8 FAN ND-402 FAULT FAN ND-402 FAULT 1

E26.2 /236.8 FAN ND-406 FAULT FAN ND-406 FAULT 2

E26.4 /238.8 FAN ND-408 FAULT FAN ND-408 FAULT 3

E26.6 /240.8 FAN ND-409 FAULT FAN ND-409 FAULT 4

E26.1 /236.9 FAN ND-406 RUN FAN ND-406 RUN 5

E26.3 /238.9 FAN ND-408 RUN FAN ND-408 RUN 6

E26.5 /240.9 FAN ND-409 RUN FAN ND-409 RUN 7

E26.7 /177.1 FINISHED PRODUCT BELT CONVEYOR FAULT NT-411_IAL 8

1053 1055

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI26 - =CB_1+-DI26 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1054
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI27 E27.0 /177.3 FINISHED PRODUCT BELT CONVEYOR RUNNING NT-411_RUN 1

E27.2 /177.4 NT-411_REVERSE NT-411_REV 2

E27.4 /411.7 CLOSED_VALVE KV-1115-CLS 3

E27.6 /412.7 = KV-1108_CLS 4

E27.1 /177.2 NT-411_FORWARD NT-411_FW 5

E27.3 /411.6 OPEN_VALVE KV-1115-OPN 6

E27.5 /412.6 = KV-1108_OPN 7

E27.7 /413.6 SPARE SPARE 8

1054 1056

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI27 - =CB_1+-DI27 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1055
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI28 E28.0 /413.7 SPARE SPARE 1

E28.2 /414.7 CLOSED_VALVE KV-4120_CLS 2

E28.4 /415.7 = KV-4102A_CLS 3

E28.6 /416.7 = KV-4102B_CLS 4

E28.1 /414.6 OPEN_VALVE KV-4120_OPN 5

E28.3 /415.6 = KV-4102A_OPN 6

E28.5 /416.6 = KV-4102B_OPN 7

E28.7 /149.5 NT-1_FORWARD NT-1_FW 8

1055 1057

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI28 - =CB_1+-DI28 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1056
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI29 E29.0 /199.5 NT-410_FORWARD NT-410_FW 1

E29.2 /191.6 ATOMIZED POWDER WEIGHING BELT TOLERANCE ALARM ND-402-TOL 2

E29.4 /185.6 = ND-402-TOL 3

E29.6 /780.3 Spare_DI Spare_DI 4

E29.1 /177.5 NT-411_FORWARD NT-411_FW 5

E29.3 /191.7 ATOMIZED POWDER WEIGHING BELT ZERO FLOW ALARM ND-402-ZERO 6

E29.5 /185.7 = ND-402-ZERO 7

E29.7 /780.4 Spare_DI Spare_DI 8

1056 1058

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI29 - =CB_1+-DI29 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1057
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DI30 E30.0 /780.5 Spare_DI Spare_DI 1

E30.2 /780.7 = Spare_DI 2

E30.4 /780.9 = Spare_DI 3

E30.6 /350.6 EMERGENCY_STATUS EM_STS 4

E30.1 /780.6 Spare_DI Spare_DI 5

E30.3 /780.8 = Spare_DI 6

E30.5 /780.0 = Spare_DI 7

E30.7 /350.9 RESET_ALARM RST_ALM 8

1057 1059

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DI30 - =CB_1+-DI30 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1058
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO0 A0.0 /101.1 COMPRESSED AIR OF FAN FS1 START COMMAND FS1-CA-COM 1

A0.2 /103.1 COMPRESSED AIR OF FAN FS2 START COMMAND FS2-CA-COM 2

A0.4 /105.1 COMPRESSED AIR OF FAN FS3 START COMMAND FS3-CA-COM 3

A0.6 /411.5 VALVE COMMAND KV-1115-COM 4

A0.1 /100.6 FAN FOR FS1 START COMMAND FS1-COM 5

A0.3 /102.6 FAN FOR FS2 START COMMAND FS2-COM 6

A0.5 /104.6 FAN FOR FS3 START COMMAND FS3-COM 7

A0.7 /780.6 Spare_DO Spare_DO 8

1058 1060

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO0 - =CB_1+-DO0 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1059
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO1 A1.0 /220.6 BELT CONVEYOR MOTOR START COMMAND NT6-COM 1

A1.2 /107.1 STPP DOSING SCREW CONVEYOR START COMMAND SC1-COM 2

A1.4 /111.1 SODA ASH DOSING SCREW CONVEYOR START COMMAND SC3-COM 3

A1.6 /160.7 STPP VIBRATORS MOTOR START COMMAND VY1011 AB-COM 4

A1.1 /460.5 FAN FOR FH1 START COMMAND FSH1-COM 5

A1.3 /109.1 S. SULPHATE DOSING SCREW CONVEYOR START COMMAND SC2-COM 6

A1.5 /113.1 MINORS DOSING SCREW CONVEYOR START COMMAND SC4-COM 7

A1.7 /164.7 S. SULPHATEVIBRATORS MOTOR START COMMAND VY1012 AB-COM 8

1059 1061

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO1 - =CB_1+-DO1 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1060
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO2 A2.0 /168.7 SODA ASH VIBRATORS MOTOR START COMMAND VY1013 AB-COM 1

A2.2 /119.1 STIRRER FOR R1A START COMMAND AGR1-COM 2

A2.4 /114.6 SLURRY TRANSFER PUMP START COMMAND P2-COM 3

A2.6 /116.6 = P6-COM 4

A2.1 /172.7 ZEOLYTE VIBRATORS MOTOR START COMMAND VY1014 AB-COM 5

A2.3 /122.6 EXTRACTION VAPORS FAN START COMMAND BL4-COM 6

A2.5 /158.6 SLURRY TRANSFER PUMP START COMMAND P5-COM 7

A2.7 /120.7 STIRRER FOR R2 START COMMAND AGR2-COM 8

1060 1062

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO2 - =CB_1+-DO2 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1061
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO3 A3.0 /125.1 BOOSTER PUMP START COMMAND P3-COM 1

A3.2 /128.6 SLURRY FEEDING FILTER START COMMAND AGAF1B-COM 2

A3.4 /131.1 SLURRY FEEDING HIGH PRESSURE PUMP START COMMAND P4-COM 3

A3.6 /136.7 COMBUSTION AIR FAN START COMMAND BL2-COM 4

A3.1 /126.6 SLURRY FEEDING FILTER START COMMAND AGAF1A-COM 5

A3.3 /132.6 STIRRER FOR T5 START COMMAND AGT5-COM 6

A3.5 /134.7 DRYING AIR FEEDING FAN START COMMAND BL1-COM 7

A3.7 /138.7 HOIST FOR CLEANING RING START COMMAND HST1-COM 8

1061 1063

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO3 - =CB_1+-DO3 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1062
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO4 A4.0 /140.6 DOUBLE FLAP DISCHARGER FOR F3 START COMMAND MC3A-COM 1

A4.2 /144.6 FINES RECOVERY FAN START COMMAND BL6-COM 2

A4.4 /148.8 AIR LIFT BELT CONVEYOR START COMMAND NT1-COM 3

A4.6 /150.7 AIR LIFT FAN START COMMAND BL5-COM 4

A4.1 /142.6 DOUBLE FLAP DIACHARGER FOR F3 START COMMAND MC3B-COM 5

A4.3 /146.7 DRYING AIR FEEDING FAN START COMMAND BL3-COM 6

A4.5 /148.9 AIR LIFT BELT CONVEYOR REVERSE COMMAND NT1-REV 7

A4.7 /152.6 DOUBLE FLAP DISCHARGER FOR AIR LIFT START COMMAND MC1-COM 8

1062 1064

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO4 - =CB_1+-DO4 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1063
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO5 A5.0 /154.6 VIBRATING SIEVE RECTANGULAR TYPE START COMMAND VV1A-COM 1

A5.2 /780.7 Spare_DO Spare_DO 2

A5.4 /224.7 SODIUM SILICATE TRANSFER START COMMAND P802-COM 3

A5.6 /228.6 WATER TRANSFER START COMMAND P804-COM 4

A5.1 /208.6 VIBRATOR MOTOR FOR ST-1 TYPE START COMMAND VVY2A-COM 5

A5.3 /222.6 SULPHONIC ACID TRANSFER START COMMAND P801-COM 6

A5.5 /226.6 CAUSTRIC SODA TRANSFER START COMMAND P803-COM 7

A5.7 /230.6 GASOIL TRANSFER START COMMAND P805-COM 8

1063 1065

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO5 - =CB_1+-DO5 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1064
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO6 A6.0 /400.5 VALVE COMMAND KV-1113-COM 1

A6.2 /402.5 = KV-1202-COM 2

A6.4 /404.5 = KV-1309-COM 3

A6.6 /406.5 = KV-1316-COM 4

A6.1 /401.5 = KV-1201-COM 5

A6.3 /403.5 SPARE SPARE 6

A6.5 /405.5 VALVE COMMAND KV-1310-COM 7

A6.7 /407.5 = KV-1320-COM 8

1064 1066

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO6 - =CB_1+-DO6 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1065
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO7 A7.0 /520.5 VALVE FOR F3 COMMAND AR5-COM 1

A7.2 /206.6 DISTRIBUTOR CONVEYOR BELT START COMMAND (ET-401) NT-404-COM (ET-401) 2

A7.4 /180.6 FAN FOR F-402B START COMMAND FS-402B-COM 3

A7.6 /185.9 ATOMIZED POWDER WEIGHING BELT START COMMAND ND-402-COM 4

A7.1 /521.5 VALVE FOR F4 COMMAND AR6-COM 5

A7.3 /178.6 FAN FOR F-402A START COMMAND FS-402A-COM 6

A7.5 /182.6 EXTRACTION BELT CONVEYOR START COMMAND NT-402-COM 7

A7.7 /187.9 S. PERBORATE WEIGHING BELT START COMMAND ND-406-COM 8

1065 1067

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO7 - =CB_1+-DO7 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1066
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO8 A8.0 /189.9 ENZYMES WEIGHING BELT START COMMAND ND-408-COM 1

A8.2 /192.6 FAN FOR F-408 START COMMAND FS-408-COM 2

A8.4 /196.6 FAN FOR F-409 START COMMAND FS-409-COM 3

A8.6 /202.7 NON IONIC DOSING PUMP START COMMAND DP-431-COM 4

A8.1 /191.9 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT START COMMAND ND-409-COM 5

A8.3 /194.6 FAN FOR F-406 START COMMAND FS-406-COM 6

A8.5 /200.6 FINAL ROTATING CONTINUOUS MIXER START COMMAND MX-402-COM 7

A8.7 /204.7 PERFUME DOSING PUMP START COMMAND DP-432-COM 8

1066 1068

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO8 - =CB_1+-DO8 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1067
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO9 A9.0 /198.8 ADDITIVES FEEDING BELT CONVEYOR START COMMAND NT-410-COM 1

A9.2 /522.5 VALVE COMMAND AR7-COM 2

A9.4 /410.6 SPARE SPARE 3

A9.6 /408.5 = SPARE 4

A9.1 /198.9 ADDITIVES FEEDING BELT CONVEYOR REVERSE COMMAND NT-410-REV 5

A9.3 /523.5 VALVE COMMAND AR8-COM 6

A9.5 /410.7 SPARE SPARE 7

A9.7 /780.8 Spare_DO Spare_DO 8

1067 1069

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO9 - =CB_1+-DO9 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1068
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO10 A10.0 /212.6 S. SULPHATEVIBRATORS MOTOR START COMMAND VY4021 A-COM 1

A10.2 /216.6 = VY4022 A-COM 2

A10.4 /450.5 OPEN VALVE KY-1 COM 3

A10.6 /452.5 = KY-3 COM 4

A10.1 /780.5 Spare_DO Spare_DO 5

A10.3 /780.4 = Spare_DO 6

A10.5 /451.5 OPEN VALVE KY-2 COM 7

A10.7 /453.5 = KY-4 COM 8

1068 1070

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO10 - =CB_1+-DO10 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1069
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO11 A11.0 /454.5 OPEN VALVE KY-6 COM 1

A11.2 /456.5 = KY-8 COM 2

A11.4 /458.5 = KY-10COM 3

A11.6 /232.6 RECOVERY WATER CIRCULATION PUMP START COMMAND P-210-COM 4

A11.1 /455.5 OPEN VALVE KY-7 COM 5

A11.3 /457.5 = KY-9 COM 6

A11.5 /459.5 = KY-11 COM 7

A11.7 /234.6 FAN ND-402 COMMAND FAN ND-402 COM 8

1069 1071

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO11 - =CB_1+-DO11 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1070
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO12 A12.0 /236.6 FAN ND-406 COMMAND FAN ND-406 COM 1

A12.2 /240.6 FAN ND-409 COMMAND FAN ND-409 COM 2

A12.4 /176.9 NT-411_REVERSE NT-411_RW 3

A12.6 /413.5 SPARE SPARE 4

A12.1 /238.6 FAN ND-408 COMMAND FAN ND-408 COM 5

A12.3 /176.8 FINISHED PRODUCT BELT CONVEYOR COM NT-411_COM 6

A12.5 /412.5 VALVE_COMMAND KV-1108_CMD 7

A12.7 /414.5 = KV-4120_CMD 8

1070 1072

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO12 - =CB_1+-DO12 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1071
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO13 A13.0 /415.5 VALVE_COMMAND KV-4102A_CMD 1

A13.2 /542.3 BR1_COMMAND BR1_COM 2

A13.3 /179.0 DO COMPRESSED AIR OF FAN FS-402A START COMMAND FS3-CA-COM 3

A13.4 /181.0 DO COMPRESSED AIR OF FAN FS-402B START COMMAND FS3-CA-COM 4

A13.5 /193.1 COMPRESSED AIR OF FAN FS-408 START COMMAND =CB_1+-193K1:A1 5

A13.1 /416.5 VALVE_COMMAND KV-4102B_CMD 5

A13.6 /195.0 COMPRESSED AIR OF FAN FS-406 START COMMAND =CB_1+-195K1:A1 6

A13.7 /197.0 = =CB_1+-197K1:A1 7

1071 1073

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO13 - =CB_1+-DO13 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1072
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Diagramma PLC F19_001

Nome progetto 177-SD5-IFC-14

Sigla elemento funzionale PLC Indirizzo Posizionamento Testo funzionale Rack Modulo Indirizzo simbolico Morsetto
=CB_1+-DO14 A14.0 /780.4 Spare_DO Spare_DO 1

A14.2 /780.6 = Spare_DO 2

A14.4 /780.8 = Spare_DO 3

A14.6 /77.8 SIREN SIREN 4

A14.1 /780.5 Spare_DO Spare_DO 5

A14.3 /780.7 = Spare_DO 6

A14.5 /780.9 = Spare_DO 7

A14.7 /77.7 LAMP LAMP 8

1072 =MATERIALS/1100

REVISION 03/10/2018 00143 Data 03/10/2018 PLC DIAGRAM : =CB_1+-DO14 - =CB_1+-DO14 = PLC
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1073
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-ELECTRICAL_BOX =CB_1/50.0 9 CABINET SOCKET H:100 800X500 DKC R1ZE851


=CB_1-ELECTRICAL_BOX =CB_1/50.0 9 CABINET 2000X800X500 DKC R5CQE2085
=CB_1-ELECTRICAL_BOX =CB_1/50.0 1 LATERAL PANEL 2000X500 DKC R5LE2052
=CB_1-ELECTRICAL_BOX =CB_1/50.0 1 INTERMEDIATE PANEL DKC RZDVE2050
=CB_1-ELECTRICAL_BOX =CB_1/50.0 8 ASSEMBLING KIT DKC RZKE65
=CB_1-ELECTRICAL_BOX =CB_1/50.0 9 INTERNAL PANEL 2000X800 DKC RZPCSE2080
=CB_1-ELECTRICAL_BOX =CB_1/50.0 1 SCHEMES HOLDER A4 NYLON RAL 7032 EZM 081074
=CB_1-50L1 =CB_1/50.4 1 CURRENT TRANSFORMER 600/5A SIEMENS 5TT6060-0Y
=CB_1-50Q1 =CB_1/50.4 1 MCB VL630 N 3X630A TM SIEMENS 3VL5763-1SB36-0AA0
=CB_1-50Q1 =CB_1/50.4 2 INCREASED POLES SPACING FOR VL630 SIEMENS 3VL9500-4ED30
=CB_1-50Q1 =CB_1/50.4 1 DOOR COUPLING MECH. FOR VL630 SIEMENS 3VL9600-3HF05
=CB_1-50Q1 =CB_1/50.4 1 3 POLE COVER FOR VL630 SIEMENS 3VL9600-8CA30
=CB_1-50Q1 =CB_1/50.4 1 AUX CONTACT FOR VL630..VL1600 SIEMENS 3VL9800-2AE00
=CB_1-50L2 =CB_1/50.4 1 CURRENT TRANSFORMER 600/5A SIEMENS 5TT6060-0Y
=CB_1-50L3 =CB_1/50.4 1 CURRENT TRANSFORMER 600/5A SIEMENS 5TT6060-0Y
=CB_1-50U1 =CB_1/50.5 65 DEVICE ADAPTER S00/S0, 25A SIEMENS 8US12 51-5DS10
=CB_1-50U1 =CB_1/50.5 5 BUSBAR SUPPORT S00/S0 L45MM H200MM SIEMENS 8US1250-5AS10
=CB_1-50U1 =CB_1/50.5 2 FEED BUSBAR MODULE 3POLE 6/50MMQ SIEMENS 8US1921-1BA00
=CB_1-50U1 =CB_1/50.5 4 COVER FOR BUS BAR SUPPORT SIEMENS 8US1922-1AC00
=CB_1-50U1 =CB_1/50.5 1 BUSBAR CONNECTION KIT COVER FOR 8US1941-2AA03/04 SIEMENS 8US1922-1GC00
=CB_1-50U1 =CB_1/50.5 10 COVER FOR BUSBAR.30X5MM SIEMENS 8US1922-2BA00
=CB_1-50U1 =CB_1/50.5 4 HOLDER FOR UN.PANEL/BUSBAR COVER SIEMENS 8US1922-2EA00
=CB_1-50U1 =CB_1/50.5 1 COVER FOR BUSBAR SYSTEM195*700*63 SIEMENS 8US1922-2EB00
=CB_1-50U1 =CB_1/50.5 16 BUSBAR SYSTEM, ACCESSORIES CENTER-CENTER DISTANCE 60 MM 8US1923-2AA01
=CB_1-50U1 =CB_1/50.5 1 TERMINAL SET FOR BUSBAR 32X20 SIEMENS 8US1941-2AA04
=CB_1-50U1 =CB_1/50.5 3 SINGLE TERMINAL FOR 30X10 BUSBAR SIEMENS 8US1941-2BB00
=CB_1-50U1 =CB_1/50.5 50 BUSBAR ADAPTER SYSTEM 35mm SIEMENS 8US1998-7CB45
=CB_1-51H1 =CB_1/51.1 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H1 =CB_1/51.1 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51F1 =CB_1/51.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-51F1 =CB_1/51.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-51H2 =CB_1/51.2;=CB_1/51.3 2 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H2 =CB_1/51.2;=CB_1/51.3 2 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H3 =CB_1/51.3 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H3 =CB_1/51.3 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H4 =CB_1/51.4 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H4 =CB_1/51.4 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H5 =CB_1/51.5 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H5 =CB_1/51.5 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H6 =CB_1/51.6 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H6 =CB_1/51.6 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H7 =CB_1/51.7 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H7 =CB_1/51.7 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-51H8 =CB_1/51.8 1 POWER MONITORING DEV.220/550 VAC EZM 021644
=CB_1-51H8 =CB_1/51.8 1 NO CONTACT FOR 021644 EZM 021340
=CB_1-52U1 =CB_1/52.1 1 PMD SENTRON PAC3100 96 LCD PM ACDC TEK SIEMENS 7KM3133-0BA00-3AA0
=CB_1-52F1 =CB_1/52.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-52F1 =CB_1/52.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-52F2 =CB_1/52.4 1 FUSE DISCONNECTOR 10x38 32A 2P 2UM SIEMENS 3NW7023
=CB_1-52F2 =CB_1/52.4 2 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-70F1 =CB_1/70.1 1 FUSE DISCONNECTOR 10x38 32A 2P 2UM SIEMENS 3NW7023
=CB_1-70F1 =CB_1/70.1 2 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-70T1 =CB_1/70.1 1 TRANSFORMER 3KVA 400/230V CTA TM3000400230
=CB_1-70F2 =CB_1/70.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-70F2 =CB_1/70.1 1 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-70U1 =CB_1/70.5 1 POWER DISTRIBUTOR 40A 3PH+N TEKNOMEGA RPQ0985

=PLC/1073 1100.a

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : R1ZE851 - RPQ0985 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-70H1 =CB_1/70.7 1 22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER 3SB3501-6BA60 SIEMENS 3SB3501-6BA60
=CB_1-70H1 =CB_1/70.7 1 LAMP BA9s 220V 3W OSRAM BA9S220
=CB_1-70H2 =CB_1/70.8 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-71F2 =CB_1/71.1 1 FUSE DISCONNECTOR 10x38 32A 2P 2UM SIEMENS 3NW7023
=CB_1-71F2 =CB_1/71.1 2 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-71T1 =CB_1/71.1 1 TRANSFORMER 2KVA 400/110V CTA TM2000400110
=CB_1-71F3 =CB_1/71.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-71F3 =CB_1/71.1 1 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-71U4 =CB_1/71.5 1 POWER DISTRIBUTOR 40A 3PH+N TEKNOMEGA RPQ0985
=CB_1-71H1 =CB_1/71.7 1 22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER 3SB3501-6BA60 SIEMENS 3SB3501-6BA60
=CB_1-71H1 =CB_1/71.7 1 LAMP BA9s 110V 3W OSRAM BA9S110
=CB_1-72F1 =CB_1/72.1 1 FUSE DISCONNECTOR 10x38 32A 2P 2UM SIEMENS 3NW7023
=CB_1-72F1 =CB_1/72.1 2 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-72T1 =CB_1/72.1 1 TRANSFORMER 1KVA 400/24V CTA TM1000400024
=CB_1-72F2 =CB_1/72.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-72F2 =CB_1/72.1 1 FUSE 10,3x38 25A gG SIEMENS 3NW6010-1
=CB_1-072U1 =CB_1/72.5 1 POWER DISTRIBUTOR 40A 3PH+N TEKNOMEGA RPQ0985
=CB_1-72H1 =CB_1/72.7 1 22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER 3SB3501-6BA60 SIEMENS 3SB3501-6BA60
=CB_1-72H1 =CB_1/72.7 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-73F1 =CB_1/73.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-73F1 =CB_1/73.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-73V1 =CB_1/73.1 1 POWER SUPPLY PSDT20 340-575VAC/24VDC 20A CONTA CLIP 9373.0
=CB_1-73F2 =CB_1/73.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-73F2 =CB_1/73.1 1 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-73U1 =CB_1/73.4 1 POWER DISTRIBUTOR 40A 3PH+N TEKNOMEGA RPQ0985
=CB_1-73H1 =CB_1/73.6 1 22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER 3SB3501-6BA60 SIEMENS 3SB3501-6BA60
=CB_1-73H1 =CB_1/73.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-74U1 =CB_1/74.1 1 UPS 230V 1000VA POWEL PERSONAL1000
=CB_1-74F1 =CB_1/74.1 1 MAIN CIRCUIT BREAKER 2P C 10A 10000A SIEMENS 5SY42107
=CB_1-74F2 =CB_1/74.1 1 MAIN CIRCUIT BREAKER 2P C 10A 10000A SIEMENS 5SY42107
=CB_1-74V1 =CB_1/74.1 1 POWER SUPPLY PSD10 115-230VAC/24V DC 10A CONTA CLIP 93850
=CB_1-74F3 =CB_1/74.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-74F3 =CB_1/74.1 1 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-74S1 =CB_1/74.4 1 2 POSITION STABLE KEY SELECTOR SIEMENS 3SB3500-4AD11
=CB_1-74S1 =CB_1/74.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-75F1 =CB_1/75.1 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-75F1 =CB_1/75.1 1 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-75M1 =CB_1/75.1 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M1 =CB_1/75.1 1 AIR EXTRACTOR EZM 091246
=CB_1-75M2 =CB_1/75.2 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M2 =CB_1/75.2 1 AIR EXTRACTOR EZM 091246
=CB_1-75M3 =CB_1/75.4 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M3 =CB_1/75.4 1 AIR EXTRACTOR EZM 091246
=CB_1-75M4 =CB_1/75.5 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M4 =CB_1/75.5 1 AIR EXTRACTOR EZM 091246
=CB_1-75M5 =CB_1/75.6 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M5 =CB_1/75.6 1 AIR EXTRACTOR EZM 091246
=CB_1-75M6 =CB_1/75.7 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M6 =CB_1/75.7 1 AIR EXTRACTOR EZM 091246
=CB_1-75M7 =CB_1/75.9 1 FAN 250X250 230V RAL7035 250MC/H EXOM XVE7535NB23CG
=CB_1-75M7 =CB_1/75.9 1 AIR EXTRACTOR EZM 091246
=CB_1-76AS1 =CB_1/76.0 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H1 =CB_1/76.0 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76F1 =CB_1/76.0 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-76F1 =CB_1/76.0 1 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-76AS2 =CB_1/76.1 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501

1100 1100.b

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3SB3501-6BA60 - FR501 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.a
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-76H2 =CB_1/76.1 1 NEON 13W 230V 50HZ EZM 021192


=CB_1-76AS3 =CB_1/76.2 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H3 =CB_1/76.2 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS4 =CB_1/76.3 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H4 =CB_1/76.3 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS5 =CB_1/76.4 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H5 =CB_1/76.4 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS6 =CB_1/76.5 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H6 =CB_1/76.5 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS7 =CB_1/76.6 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H7 =CB_1/76.6 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS8 =CB_1/76.8 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H8 =CB_1/76.8 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-76AS9 =CB_1/76.9 1 LIMIT SWITCH 1NO+1NC PIZZATO FR501
=CB_1-76H9 =CB_1/76.9 1 NEON 13W 230V 50HZ EZM 021192
=CB_1-77Q1 =CB_1/77.1 1 EARTH LEAKAGE RELAY 2P 40A 30mA TIPOAC X 5SY SIEMENS 5SM2322-0
=CB_1-77Q1 =CB_1/77.1 1 MCB 2P C 16A 10000A SIEMENS 5SY4216-7
=CB_1-77X1 =CB_1/77.1 1 SOCKET 2P+T 230VAC 10/16A SCHUKO GW20246 GEWISS GW20246
=CB_1-77X1 =CB_1/77.1 1 SUPPORT FOR POWER SOCKET 2 PLACES GW26410 GEWISS GW26410
=CB_1-77F1 =CB_1/77.3 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-77F1 =CB_1/77.3 1 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-77H1 =CB_1/77.3 1 ROTALLARM PB 240VAC ORANGE SIRENA 63050
=CB_1-77H2 =CB_1/77.4 1 SIREN MS230A SIRENA 53012
=CB_1-77K1 =CB_1/77.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-77K1 =CB_1/77.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-77K2 =CB_1/77.8 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-77K2 =CB_1/77.8 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-100Q1 =CB_1/100.0 1 CIRCUIT-BREAKER SCREW CONNECTION 3.2A 3RV2011-1DA10 SIEMENS SIE.3RV2011-1DA10
=CB_1-100Q1 =CB_1/100.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-100S1 =CB_1/100.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-100S1 =CB_1/100.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-100K2 =CB_1/100.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-100K2 =CB_1/100.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-100K2 =CB_1/100.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-100S2 =CB_1/100.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-100S2 =CB_1/100.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-100S3 =CB_1/100.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-100S3 =CB_1/100.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-100S3 =CB_1/100.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-100S3 =CB_1/100.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-100K3 =CB_1/100.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-100K3 =CB_1/100.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-101K1 =CB_1/101.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-101K1 =CB_1/101.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-102Q1 =CB_1/102.0 1 CIRCUIT-BREAKER SCREW CONNECTION 3.2A 3RV2011-1DA10 SIEMENS SIE.3RV2011-1DA10
=CB_1-102Q1 =CB_1/102.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-102S1 =CB_1/102.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-102S1 =CB_1/102.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-102K1 =CB_1/102.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-102K1 =CB_1/102.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-102K1 =CB_1/102.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-102S2 =CB_1/102.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-102S2 =CB_1/102.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-102S3 =CB_1/102.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-102S3 =CB_1/102.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-102S3 =CB_1/102.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A

1100.a 1100.c

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 021192 - 3SB3400-1A = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.b
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-102S3 =CB_1/102.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24


=CB_1-102K2 =CB_1/102.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-102K2 =CB_1/102.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-103K1 =CB_1/103.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-103K1 =CB_1/103.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-104Q1 =CB_1/104.0 1 CIRCUIT-BREAKER SCREW CONNECTION 3.2A 3RV2011-1DA10 SIEMENS SIE.3RV2011-1DA10
=CB_1-104Q1 =CB_1/104.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-104S1 =CB_1/104.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-104S1 =CB_1/104.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-104K1 =CB_1/104.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-104K1 =CB_1/104.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-104K1 =CB_1/104.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-104S2 =CB_1/104.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-104S2 =CB_1/104.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-104S3 =CB_1/104.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-104S3 =CB_1/104.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-104S3 =CB_1/104.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-104S3 =CB_1/104.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-104K2 =CB_1/104.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-104K2 =CB_1/104.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-105K1 =CB_1/105.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-105K1 =CB_1/105.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-106T1 =CB_1/106.0 1 DRIVE MM440 3AC 380/480V 3 KW FILTRO CL.A SIEMENS 6SE6440-2AD23-0BA1
=CB_1-106F1 =CB_1/106.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-106F1 =CB_1/106.1 3 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-106R1 =CB_1/106.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-106R1 =CB_1/106.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-106U1 =CB_1/106.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-106U1 =CB_1/106.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-107S1 =CB_1/107.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-107S1 =CB_1/107.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-107S1 =CB_1/107.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-107K1 =CB_1/107.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-107K1 =CB_1/107.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-107S2 =CB_1/107.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-107S2 =CB_1/107.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-107S3 =CB_1/107.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-107S3 =CB_1/107.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-107S3 =CB_1/107.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-107S3 =CB_1/107.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-108T1 =CB_1/108.0 1 DRIVE MM440 3AC 380/480V 3 KW FILTRO CL.A SIEMENS 6SE6440-2AD23-0BA1
=CB_1-108F1 =CB_1/108.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-108F1 =CB_1/108.1 3 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-108R1 =CB_1/108.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-108R1 =CB_1/108.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-108U1 =CB_1/108.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-108U1 =CB_1/108.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-109S1 =CB_1/109.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-109S1 =CB_1/109.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-109S1 =CB_1/109.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-109K1 =CB_1/109.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-109K1 =CB_1/109.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-109S2 =CB_1/109.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-109S2 =CB_1/109.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-109S3 =CB_1/109.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-109S3 =CB_1/109.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B

1100.b 1100.d

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : BA9S24 - 3SB3400-0B = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.c
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-109S3 =CB_1/109.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-109S3 =CB_1/109.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-110T1 =CB_1/110.0 1 DRIVE MM440 3AC 380/480V 3 KW FILTRO CL.A SIEMENS 6SE6440-2AD23-0BA1
=CB_1-110F1 =CB_1/110.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-110F1 =CB_1/110.1 3 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-110R1 =CB_1/110.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-110R1 =CB_1/110.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-110U1 =CB_1/110.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-110U1 =CB_1/110.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-111S1 =CB_1/111.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-111S1 =CB_1/111.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-111S1 =CB_1/111.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-111K1 =CB_1/111.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-111K1 =CB_1/111.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-111S2 =CB_1/111.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-111S2 =CB_1/111.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-111S3 =CB_1/111.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-111S3 =CB_1/111.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-111S3 =CB_1/111.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-111S3 =CB_1/111.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-112T1 =CB_1/112.0 1 DRIVE MM440 3AC 380/480V 1,5 KW 3PH SIEMENS 6SE6440-2UD21-5AA1
=CB_1-112F1 =CB_1/112.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-112F1 =CB_1/112.1 3 CYLINDRICAL FUSE GG 10X38MM 500V 16A SIEMENS 3NW6005-1
=CB_1-112V1 =CB_1/112.1 1 SINAMICS FILTER CL.2 SIEMENS 6SE6400-2FA00-6AD0
=CB_1-112R1 =CB_1/112.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-112R1 =CB_1/112.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-112U1 =CB_1/112.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-112U1 =CB_1/112.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-113S1 =CB_1/113.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-113S1 =CB_1/113.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-113S1 =CB_1/113.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-113K1 =CB_1/113.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-113K1 =CB_1/113.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-113S2 =CB_1/113.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-113S2 =CB_1/113.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-113S3 =CB_1/113.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-113S3 =CB_1/113.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-113S3 =CB_1/113.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-113S3 =CB_1/113.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-114Q1 =CB_1/114.0 1 CIRCUIT-BREAKER SCREW CONNECTION 10A 3RV2011-1JA10 SIEMENS SIE.3RV2011-1JA10
=CB_1-114Q1 =CB_1/114.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-114S1 =CB_1/114.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-114S1 =CB_1/114.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-114K1 =CB_1/114.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS SIE.3RT2016-1BB41
=CB_1-114K1 =CB_1/114.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-114K1 =CB_1/114.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-114S2 =CB_1/114.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-114S2 =CB_1/114.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-114S3 =CB_1/114.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-114S3 =CB_1/114.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-114S3 =CB_1/114.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-114S3 =CB_1/114.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-114K2 =CB_1/114.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-114K2 =CB_1/114.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-116Q1 =CB_1/116.0 1 CIRCUIT-BREAKER SIZE S00 7-10A SCREW CONNECTION 3RV2011-1JA10 SIEMENS 3RV2011-1JA10
=CB_1-116Q1 =CB_1/116.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E

1100.c 1100.e

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3SB3400-1A - 3RV2901-1E = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.d
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-116S1 =CB_1/116.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11


=CB_1-116S1 =CB_1/116.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-116K1 =CB_1/116.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-116K1 =CB_1/116.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-116K1 =CB_1/116.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-116S2 =CB_1/116.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-116S2 =CB_1/116.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-116S3 =CB_1/116.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-116S3 =CB_1/116.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-116S3 =CB_1/116.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-116S3 =CB_1/116.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-116K2 =CB_1/116.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-116K2 =CB_1/116.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-118T1 =CB_1/118.0 1 DRIVE MM430 18,5KW 3AC 400V FIL.CL.A SIEMENS 6SE6430-2AD31-8DA0
=CB_1-118F1 =CB_1/118.1 1 FUSE DISCONNECTOR NH000 160A 60MM SIEMENS 3NP1123-1BC20
=CB_1-118F1 =CB_1/118.1 3 FUS.NH gL/gG GR.000 500Vca/440Vcc 63A SIEMENS 3NA3822
=CB_1-118R1 =CB_1/118.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-118R1 =CB_1/118.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-118U1 =CB_1/118.7 1 OPERATOR INTERFACE PANEL BOP2 SIEMENS 6SE6400-0BE00-0AA0
=CB_1-118U1 =CB_1/118.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-119S1 =CB_1/119.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-119S1 =CB_1/119.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-119S1 =CB_1/119.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-119K1 =CB_1/119.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-119K1 =CB_1/119.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-119S2 =CB_1/119.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-119S2 =CB_1/119.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-119S3 =CB_1/119.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-119S3 =CB_1/119.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-119S3 =CB_1/119.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-119S3 =CB_1/119.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-120Q1 =CB_1/120.0 1 SOFTSTART 400VAC 5,5KW S0 SIEMENS 3RW4024-1TB04
=CB_1-120F1 =CB_1/120.1 1 FUSE DISCONNECTOR NH000 160A 60MM SIEMENS 3NP1123-1BC20
=CB_1-120F1 =CB_1/120.1 3 FUS.NH gL/gG GR.000 500Vca 50A SIEMENS 3NA3820
=CB_1-120S1 =CB_1/120.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-120S1 =CB_1/120.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-120K2 =CB_1/120.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-120K2 =CB_1/120.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-120K2 =CB_1/120.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-120S2 =CB_1/120.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-120S2 =CB_1/120.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-120S3 =CB_1/120.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-120S3 =CB_1/120.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-120S3 =CB_1/120.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-120S3 =CB_1/120.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-120K3 =CB_1/120.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-120K3 =CB_1/120.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-122Q1 =CB_1/122.0 1 MCB .S00, 3.5-5A,VT SIEMENS 3RV2011-1FA10
=CB_1-122Q1 =CB_1/122.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-122S1 =CB_1/122.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-122S1 =CB_1/122.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-122K1 =CB_1/122.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-122K1 =CB_1/122.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-122K1 =CB_1/122.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-122S2 =CB_1/122.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-122S2 =CB_1/122.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C

1100.d 1100.f

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3SB3500-2DA11 - 3SB3400-0C = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.e
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-122S3 =CB_1/122.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41


=CB_1-122S3 =CB_1/122.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-122S3 =CB_1/122.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-122S3 =CB_1/122.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-122K2 =CB_1/122.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-122K2 =CB_1/122.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-124T1 =CB_1/124.0 1 DRIVE MM430 3AC 380-480 37KW FIL.CL.A SIEMENS 6SE6430-2AD33-7EA0
=CB_1-124F1 =CB_1/124.1 1 FUSE DISCONNECTOR NH00 160A 60MM INC.32/70MM MORS SIEMENS 3NP1133-1BC20
=CB_1-124F1 =CB_1/124.1 3 FUS.NH gL/gG GR.00 500Vca 125A SIEMENS 3NA3832
=CB_1-124R1 =CB_1/124.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-124R1 =CB_1/124.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-124U1 =CB_1/124.7 1 OPERATOR INTERFACE PANEL BOP2 SIEMENS 6SE6400-0BE00-0AA0
=CB_1-124U1 =CB_1/124.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-125S1 =CB_1/125.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-125S1 =CB_1/125.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-125S1 =CB_1/125.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-125K3 =CB_1/125.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-125K3 =CB_1/125.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-125S2 =CB_1/125.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-125S2 =CB_1/125.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-125S3 =CB_1/125.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-125S3 =CB_1/125.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-125S3 =CB_1/125.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-125S3 =CB_1/125.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-126Q1 =CB_1/126.0 1 CIRCUIT-BREAKER SCREW CONNECTION 1.25A 3RV2011-0KA10 SIEMENS SIE.3RV2011-0KA10
=CB_1-126Q1 =CB_1/126.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-126S1 =CB_1/126.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-126S1 =CB_1/126.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-126K1 =CB_1/126.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-126K1 =CB_1/126.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-126K1 =CB_1/126.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-126S2 =CB_1/126.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-126S2 =CB_1/126.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-126S3 =CB_1/126.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-126S3 =CB_1/126.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-126S3 =CB_1/126.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-126S3 =CB_1/126.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-126K2 =CB_1/126.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-126K2 =CB_1/126.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-128Q1 =CB_1/128.0 1 INT.AUT.S00, 9..12.5A,VT 3RV2011-1KA10 SIEMENS SIE.3RV2011-1KA10
=CB_1-128Q1 =CB_1/128.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-128S1 =CB_1/128.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-128S1 =CB_1/128.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-128K1 =CB_1/128.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-128K1 =CB_1/128.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-128K1 =CB_1/128.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-128S2 =CB_1/128.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-128S2 =CB_1/128.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-128S3 =CB_1/128.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-128S3 =CB_1/128.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-128S3 =CB_1/128.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-128S3 =CB_1/128.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-128K2 =CB_1/128.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-128K2 =CB_1/128.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-130T1 =CB_1/130.0 1 DRIVE MM430 3AC 380-480 37KW FIL.CL.A SIEMENS 6SE6430-2AD33-7EA0
=CB_1-130F1 =CB_1/130.1 1 FUSE DISCONNECTOR NH00 160A 60MM INC.32/70MM MORS SIEMENS 3NP1133-1BC20

1100.e 1100.g

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3SB3501-0AA41 - 3NP1133-1BC20 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.f
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-130F1 =CB_1/130.1 3 FUS.NH gL/gG GR.00 500Vca 125A SIEMENS 3NA3832


=CB_1-130R1 =CB_1/130.4 1 POTENTIOMETER 10 TURN 10KOHM RS RS4607526
=CB_1-130R1 =CB_1/130.4 1 HANDLE FOR POTENTIOMETER ELEKTRONIKS COMPONENTS 15AA031
=CB_1-130U1 =CB_1/130.7 1 OPERATOR INTERFACE PANEL BOP2 SIEMENS 6SE6400-0BE00-0AA0
=CB_1-130U1 =CB_1/130.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1-131S1 =CB_1/131.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-131S1 =CB_1/131.1 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-131S1 =CB_1/131.1 1 2 NO CONTACT SIEMENS 3SB3400-0D
=CB_1-131K1 =CB_1/131.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-131K1 =CB_1/131.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-131S2 =CB_1/131.2 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-131S2 =CB_1/131.2 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-131S3 =CB_1/131.3 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-131S3 =CB_1/131.3 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-131S3 =CB_1/131.3 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-131S3 =CB_1/131.3 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-132Q1 =CB_1/132.0 1 MCB .S00, 3.5-5A,VT SIEMENS 3RV2011-1FA10
=CB_1-132Q1 =CB_1/132.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-132S1 =CB_1/132.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-132S1 =CB_1/132.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-132K1 =CB_1/132.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-132K1 =CB_1/132.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-132K1 =CB_1/132.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-132S2 =CB_1/132.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-132S2 =CB_1/132.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-132S3 =CB_1/132.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-132S3 =CB_1/132.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-132S3 =CB_1/132.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-132S3 =CB_1/132.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-132K2 =CB_1/132.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-132K2 =CB_1/132.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-134Q1 =CB_1/134.0 1 SOFTSTART 400VAC 55KW S3 SIEMENS 3RW4047-1BB04
=CB_1-134Q1 =CB_1/134.0 2 S3 COVER SIEMENS 3RT1946-4EA2
=CB_1-134F1 =CB_1/134.1 1 FUSE DISCONNECTOR FUS.NH1 3P 250A SBARRE 60mm SIEMENS 3NP1143-1BC20
=CB_1-134F1 =CB_1/134.1 3 FUS.NH gL/gG GR.1 500Vca 160A SIEMENS 3NA3136
=CB_1-134S1 =CB_1/134.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-134S1 =CB_1/134.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-134K2 =CB_1/134.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-134K2 =CB_1/134.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-134S2 =CB_1/134.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-134S2 =CB_1/134.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-134S3 =CB_1/134.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-134S3 =CB_1/134.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-134S3 =CB_1/134.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-134S3 =CB_1/134.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-134K3 =CB_1/134.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-134K3 =CB_1/134.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-136Q1 =CB_1/136.0 1 SOFTSTART 400VAC 18,5KW S0 SIEMENS 3RW4028-1BB04
=CB_1-136F1 =CB_1/136.1 1 FUSE DISCONNECTOR NH000 160A 60MM SIEMENS 3NP1123-1BC20
=CB_1-136F1 =CB_1/136.1 3 FUS.NH Gr.000 gL/gG 500Vca/440Vcc 80A SIEMENS 3NA3824
=CB_1-136S1 =CB_1/136.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-136S1 =CB_1/136.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-136K2 =CB_1/136.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-136K2 =CB_1/136.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-136S2 =CB_1/136.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-136S2 =CB_1/136.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C

1100.f 1100.h

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3NA3832 - 3SB3400-0C = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.g
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-136S3 =CB_1/136.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41


=CB_1-136S3 =CB_1/136.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-136S3 =CB_1/136.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-136S3 =CB_1/136.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-136K3 =CB_1/136.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-136K3 =CB_1/136.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-138Q1 =CB_1/138.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-138Q1 =CB_1/138.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-138S1 =CB_1/138.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-138S1 =CB_1/138.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-138K1 =CB_1/138.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-138K1 =CB_1/138.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-138K1 =CB_1/138.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-138K1 =CB_1/138.3 1 ELECTRICAL AND MECHANICAL INTERLOCK KIT FOR CONTACTORS S00 3RA2913-2AA1 SIEMENS 3RA2913-2AA1
=CB_1-138S2 =CB_1/138.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-138S2 =CB_1/138.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-138K2 =CB_1/138.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-138K2 =CB_1/138.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-138K2 =CB_1/138.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-138S3 =CB_1/138.4 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-138S3 =CB_1/138.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-138S3 =CB_1/138.4 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-138S3 =CB_1/138.4 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-138K3 =CB_1/138.5 1 STEP RELAY 24VAC 3EX CONTACT OMRON G4Q212S24VAC
=CB_1-138K3 =CB_1/138.5 1 SOCKET FOR OCTAL RELAY OMRON PF083A
=CB_1-138K4 =CB_1/138.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-138K4 =CB_1/138.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-140Q1 =CB_1/140.0 1 CIRCUIT-BREAKER SCREW CONNECTION 1.25A 3RV2011-0KA10 SIEMENS SIE.3RV2011-0KA10
=CB_1-140Q1 =CB_1/140.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-140S1 =CB_1/140.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-140S1 =CB_1/140.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-140K3 =CB_1/140.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-140K3 =CB_1/140.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-140K3 =CB_1/140.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-140S2 =CB_1/140.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-140S2 =CB_1/140.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-140S3 =CB_1/140.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-140S3 =CB_1/140.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-140S3 =CB_1/140.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-140S3 =CB_1/140.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-140K4 =CB_1/140.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-140K4 =CB_1/140.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-142Q1 =CB_1/142.0 1 CIRCUIT-BREAKER SCREW CONNECTION 1.25A 3RV2011-0KA10 SIEMENS SIE.3RV2011-0KA10
=CB_1-142Q1 =CB_1/142.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-142S1 =CB_1/142.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-142S1 =CB_1/142.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-142K1 =CB_1/142.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-142K1 =CB_1/142.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-142K1 =CB_1/142.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-142S2 =CB_1/142.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-142S2 =CB_1/142.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-142S3 =CB_1/142.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-142S3 =CB_1/142.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-142S3 =CB_1/142.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-142S3 =CB_1/142.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-142K2 =CB_1/142.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.g 1100.i

REVISION 03/10/2018 00143 Data 11/10/2018 PARTS LIST : 3SB3501-0AA41 - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.h
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-142K2 =CB_1/142.6 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-144Q1 =CB_1/144.0 1 MCB .S00, 9..12.5A,VT SIEMENS 3RV2011-1KA10
=CB_1-144Q1 =CB_1/144.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-144S1 =CB_1/144.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-144S1 =CB_1/144.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-144K1 =CB_1/144.3 1 CONTACTOR, AC-3, 5.5KW/400V, 1NO DC 24V, 3-POLE, SIZE S00 3RT2017-1BB41 SIEMENS 3RT2017-1BB41
=CB_1-144K1 =CB_1/144.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-144K1 =CB_1/144.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-144S2 =CB_1/144.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-144S2 =CB_1/144.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-144S3 =CB_1/144.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-144S3 =CB_1/144.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-144S3 =CB_1/144.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-144S3 =CB_1/144.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-144K2 =CB_1/144.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-144K2 =CB_1/144.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-146Q1 =CB_1/146.0 1 SOFTSTART 400VAC 90KW S6 SIEMENS 3RW4056-2BB44
=CB_1-146Q1 =CB_1/146.0 2 S6 COVER SIEMENS 3RT1956-4EA2
=CB_1-146F1 =CB_1/146.1 1 FUSE DISCONNECTOR FUS.NH2 3P 400A SIEMENS 3NP1153-1BC20
=CB_1-146F1 =CB_1/146.1 3 FUS.NH gL/gG GR.2 500Vca 250A SIEMENS 3NA3244
=CB_1-146S1 =CB_1/146.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-146S1 =CB_1/146.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-146K1 =CB_1/146.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-146K1 =CB_1/146.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-146S2 =CB_1/146.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-146S2 =CB_1/146.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-146S3 =CB_1/146.7 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-146S3 =CB_1/146.7 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-146S3 =CB_1/146.7 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-146S3 =CB_1/146.7 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-146K2 =CB_1/146.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-146K2 =CB_1/146.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-148Q1 =CB_1/148.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-148Q1 =CB_1/148.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-148S1 =CB_1/148.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-148S1 =CB_1/148.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-148K1 =CB_1/148.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-148K1 =CB_1/148.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-148K1 =CB_1/148.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-148K1 =CB_1/148.3 1 ELECTRICAL AND MECHANICAL INTERLOCK KIT FOR CONTACTORS S00 3RA2913-2AA1 SIEMENS 3RA2913-2AA1
=CB_1-148S2 =CB_1/148.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-148S2 =CB_1/148.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-148K2 =CB_1/148.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-148K2 =CB_1/148.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-148S3 =CB_1/148.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-148S3 =CB_1/148.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-148S3 =CB_1/148.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-148S3 =CB_1/148.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-148K5 =CB_1/148.6 1 STEP RELAY 24VAC 3EX CONTACT OMRON G4Q212S24VAC
=CB_1-148K5 =CB_1/148.6 1 SOCKET FOR OCTAL RELAY OMRON PF083A
=CB_1-148S4 =CB_1/148.6 1 YELLOW PUSHBUTTON SIEMENS 3SB3500-0AA31
=CB_1-148S4 =CB_1/148.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-148K3 =CB_1/148.8 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-148K3 =CB_1/148.8 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-148K4 =CB_1/148.9 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-148K4 =CB_1/148.9 1 SOCKET RELAY G2R OMRON P2RF08E

1100.h 1100.j

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - P2RF08E = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.i
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-150Q1 =CB_1/150.0 1 SOFTSTART 400VAC 37KW S2 SIEMENS 3RW4038-1BB04


=CB_1-150Q1 =CB_1/150.0 2 S2 COVER SIEMENS 3RT1936-4EA2
=CB_1-150F1 =CB_1/150.1 1 FUSE DISCONNECTOR FUS.NH1 3P 250A SBARRE 60mm SIEMENS 3NP1143-1BC20
=CB_1-150F1 =CB_1/150.1 3 FUS.NH gL/gG GR.1 500Vca 125A SIEMENS 3NA3132
=CB_1-150S1 =CB_1/150.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-150S1 =CB_1/150.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-150K1 =CB_1/150.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-150K1 =CB_1/150.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-150S2 =CB_1/150.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-150S2 =CB_1/150.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-150S3 =CB_1/150.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-150S3 =CB_1/150.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-150S3 =CB_1/150.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-150S3 =CB_1/150.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-150K2 =CB_1/150.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-150K2 =CB_1/150.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-152Q1 =CB_1/152.0 1 MCB S00, 1,1-1,6A,VT SIEMENS 3RV2011-1AA10
=CB_1-152Q1 =CB_1/152.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-152S1 =CB_1/152.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-152S1 =CB_1/152.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-152K1 =CB_1/152.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-152K1 =CB_1/152.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-152K1 =CB_1/152.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-152S2 =CB_1/152.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-152S2 =CB_1/152.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-152S3 =CB_1/152.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-152S3 =CB_1/152.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-152S3 =CB_1/152.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-152S3 =CB_1/152.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-152K2 =CB_1/152.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-152K2 =CB_1/152.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-154Q1 =CB_1/154.0 1 MCB .S00, 4.5-6.3A,VT SIEMENS 3RV2011-1GA10
=CB_1-154Q1 =CB_1/154.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-154S1 =CB_1/154.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-154S1 =CB_1/154.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-154K1 =CB_1/154.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-154K1 =CB_1/154.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-154K1 =CB_1/154.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-156K1 =CB_1/154.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-156K1 =CB_1/154.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-156K1 =CB_1/154.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-154S2 =CB_1/154.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-154S2 =CB_1/154.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-154S3 =CB_1/154.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-154S3 =CB_1/154.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-154S3 =CB_1/154.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-154S3 =CB_1/154.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-154K2 =CB_1/154.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-154K2 =CB_1/154.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-156Q1 =CB_1/156.0 1 MCB .S00, 4.5-6.3A,VT SIEMENS 3RV2011-1GA10
=CB_1-156Q1 =CB_1/156.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-158Q1 =CB_1/158.0 1 MCB .S00, 3.5-5A,VT SIEMENS 3RV2011-1FA10
=CB_1-158Q1 =CB_1/158.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-158S1 =CB_1/158.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-158S1 =CB_1/158.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-158K1 =CB_1/158.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41

1100.i 1100.k

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RW4038-1BB04 - 3RT2016-1BB41 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.j
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-158K1 =CB_1/158.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22


=CB_1-158K1 =CB_1/158.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-158S2 =CB_1/158.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-158S2 =CB_1/158.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-158S3 =CB_1/158.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-158S3 =CB_1/158.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-158S3 =CB_1/158.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-158S3 =CB_1/158.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-158K2 =CB_1/158.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-158K2 =CB_1/158.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-160Q1 =CB_1/160.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-160Q1 =CB_1/160.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-160Q2 =CB_1/160.2 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-160Q2 =CB_1/160.2 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-160S1 =CB_1/160.4 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-160S1 =CB_1/160.4 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-160K1 =CB_1/160.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-160K1 =CB_1/160.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-160K1 =CB_1/160.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-160S2 =CB_1/160.5 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-160S2 =CB_1/160.5 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-160K2 =CB_1/160.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-160K2 =CB_1/160.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-160K2 =CB_1/160.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-160S3 =CB_1/160.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-160S3 =CB_1/160.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-160S3 =CB_1/160.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-160S3 =CB_1/160.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-160K3 =CB_1/160.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-160K3 =CB_1/160.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-164Q1 =CB_1/164.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-164Q1 =CB_1/164.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-164Q2 =CB_1/164.2 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-164Q2 =CB_1/164.2 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-164S1 =CB_1/164.4 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-164S1 =CB_1/164.4 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-164K1 =CB_1/164.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-164K1 =CB_1/164.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-164K1 =CB_1/164.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-164S2 =CB_1/164.5 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-164S2 =CB_1/164.5 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-164K2 =CB_1/164.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-164K2 =CB_1/164.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-164K2 =CB_1/164.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-164S3 =CB_1/164.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-164S3 =CB_1/164.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-164S3 =CB_1/164.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-164S3 =CB_1/164.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-164K3 =CB_1/164.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-164K3 =CB_1/164.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-168Q1 =CB_1/168.0 1 MCB S00,0.22-0.32A,VT SIEMENS 3RV2011-0DA10
=CB_1-168Q1 =CB_1/168.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-168Q2 =CB_1/168.2 1 MCB S00,0.22-0.32A,VT SIEMENS 3RV2011-0DA10
=CB_1-168Q2 =CB_1/168.2 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-168S1 =CB_1/168.4 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-168S1 =CB_1/168.4 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B

1100.j 1100.l

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RH2911-1FA22 - 3SB3400-0B = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.k
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-168K1 =CB_1/168.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-168K1 =CB_1/168.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-168K1 =CB_1/168.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-168S2 =CB_1/168.5 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-168S2 =CB_1/168.5 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-168K2 =CB_1/168.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-168K2 =CB_1/168.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-168K2 =CB_1/168.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-168S3 =CB_1/168.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-168S3 =CB_1/168.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-168S3 =CB_1/168.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-168S3 =CB_1/168.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-168K3 =CB_1/168.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-168K3 =CB_1/168.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-172Q1 =CB_1/172.0 1 CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 3RV2011-0CA10 SIEMENS
SIE SIE.3RV2011-0CA10
=CB_1-172Q1 =CB_1/172.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-172Q2 =CB_1/172.2 1 CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 3RV2011-0CA10 SIEMENS
SIE SIE.3RV2011-0CA10
=CB_1-172Q2 =CB_1/172.2 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-172S1 =CB_1/172.4 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-172S1 =CB_1/172.4 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-172K1 =CB_1/172.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-172K1 =CB_1/172.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-172K1 =CB_1/172.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-172S2 =CB_1/172.5 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-172S2 =CB_1/172.5 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-172K2 =CB_1/172.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-172K2 =CB_1/172.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-172K2 =CB_1/172.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-172S3 =CB_1/172.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-172S3 =CB_1/172.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-172S3 =CB_1/172.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-172S3 =CB_1/172.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-172K3 =CB_1/172.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-172K3 =CB_1/172.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-176Q1 =CB_1/176.0 1 MCB .S00,1.4-2A,ML SIEMENS 3RV2011-1BA10
=CB_1-176Q1 =CB_1/176.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-176S1 =CB_1/176.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-176S1 =CB_1/176.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-176K1 =CB_1/176.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-176K1 =CB_1/176.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-176K1 =CB_1/176.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-176K1 =CB_1/176.3 1 ELECTRICAL AND MECHANICAL INTERLOCK KIT FOR CONTACTORS S00 3RA2913-2AA1 SIEMENS 3RA2913-2AA1
=CB_1-176S2 =CB_1/176.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-176S2 =CB_1/176.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-176K4 =CB_1/176.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-176K4 =CB_1/176.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-176K4 =CB_1/176.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-176S3 =CB_1/176.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-176S3 =CB_1/176.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-176S3 =CB_1/176.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-176S3 =CB_1/176.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-176K5 =CB_1/176.6 1 STEP RELAY 24VAC 3EX CONTACT OMRON G4Q212S24VAC
=CB_1-176K5 =CB_1/176.6 1 SOCKET FOR OCTAL RELAY OMRON PF083A
=CB_1-176S4 =CB_1/176.6 1 YELLOW PUSHBUTTON SIEMENS 3SB3500-0AA31
=CB_1-176S4 =CB_1/176.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-176K2 =CB_1/176.8 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.k 1100.m

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RT2016-1BB41 - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.l
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-176K2 =CB_1/176.8 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-176K3 =CB_1/176.9 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-176K3 =CB_1/176.9 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-178Q1 =CB_1/178.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-178Q1 =CB_1/178.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-178S1 =CB_1/178.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-178S1 =CB_1/178.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-178K1 =CB_1/178.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-178K1 =CB_1/178.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-178K1 =CB_1/178.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-178S2 =CB_1/178.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-178S2 =CB_1/178.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-178S3 =CB_1/178.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-178S3 =CB_1/178.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-178S3 =CB_1/178.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-178S3 =CB_1/178.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-178K2 =CB_1/178.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-178K2 =CB_1/178.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-179K1 =CB_1/179.0 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-179K1 =CB_1/179.0 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-180Q1 =CB_1/180.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-180Q1 =CB_1/180.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-180S1 =CB_1/180.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-180S1 =CB_1/180.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-180K1 =CB_1/180.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-180K1 =CB_1/180.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-180K1 =CB_1/180.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-180S2 =CB_1/180.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-180S2 =CB_1/180.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-180S3 =CB_1/180.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-180S3 =CB_1/180.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-180S3 =CB_1/180.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-180S3 =CB_1/180.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-180K2 =CB_1/180.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-180K2 =CB_1/180.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-181K1 =CB_1/181.0 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-181K1 =CB_1/181.0 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-182Q1 =CB_1/182.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-182Q1 =CB_1/182.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-182S1 =CB_1/182.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-182S1 =CB_1/182.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-182K1 =CB_1/182.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-182K1 =CB_1/182.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-182K1 =CB_1/182.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-182S2 =CB_1/182.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-182S2 =CB_1/182.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-182S3 =CB_1/182.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-182S3 =CB_1/182.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-182S3 =CB_1/182.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-182S3 =CB_1/182.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-182K2 =CB_1/182.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-182K2 =CB_1/182.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-184T1 =CB_1/184.0 1 DRIVE MM440 3AC 380/480V 0,55 KW 3PH SIEMENS 6SE6440-2UD15-5AA1
=CB_1-184F1 =CB_1/184.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-184F1 =CB_1/184.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-184V1 =CB_1/184.1 1 SINAMICS FILTER CL.2 SIEMENS 6SE6400-2FA00-6AD0

1100.l 1100.n

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - 6SE6400-2FA00-6AD0 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.m
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-184U1 =CB_1/184.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0


=CB_1-184U1 =CB_1/184.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1+EXT-185R1 =CB_1/185.1 0
=CB_1-185U1 =CB_1/185.1 0
=CB_1-185S1 =CB_1/185.4 0
=CB_1-185K2 =CB_1/185.5 0
=CB_1-185K1 =CB_1/185.9 0
=CB_1-186T1 =CB_1/186.0 1 DRIVE MM440 3AC 380/480V 0,37 KW 3PH SIEMENS 6SE6440-2UD13-7AA1
=CB_1-186F1 =CB_1/186.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-186F1 =CB_1/186.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-186V1 =CB_1/186.1 1 SINAMICS FILTER CL.2 SIEMENS 6SE6400-2FA00-6AD0
=CB_1-186U1 =CB_1/186.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-186U1 =CB_1/186.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1+EXT-187R1 =CB_1/187.1 0
=CB_1-187U1 =CB_1/187.1 0
=CB_1-187S1 =CB_1/187.4 0
=CB_1-187K2 =CB_1/187.5 0
=CB_1-187K1 =CB_1/187.9 0
=CB_1-188T1 =CB_1/188.0 1 DRIVE MM440 3AC 380/480V 0,37 KW 3PH SIEMENS 6SE6440-2UD13-7AA1
=CB_1-188F1 =CB_1/188.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-188F1 =CB_1/188.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-188V1 =CB_1/188.1 1 SINAMICS FILTER CL.2 SIEMENS 6SE6400-2FA00-6AD0
=CB_1-188U1 =CB_1/188.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-188U1 =CB_1/188.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1+EXT-189R1 =CB_1/189.1 0
=CB_1-189U1 =CB_1/189.1 0
=CB_1-189S1 =CB_1/189.4 0
=CB_1-189K2 =CB_1/189.5 0
=CB_1-189K1 =CB_1/189.9 0
=CB_1-190T1 =CB_1/190.0 1 DRIVE MM440 3AC 380/480V 0,37 KW 3PH SIEMENS 6SE6440-2UD13-7AA1
=CB_1-190F1 =CB_1/190.1 1 FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS 3NW7033
=CB_1-190F1 =CB_1/190.1 3 FUSE 10,3x38 10A gL/gG SIEMENS 3NW6003-1
=CB_1-190V1 =CB_1/190.1 1 SINAMICS FILTER CL.2 SIEMENS 6SE6400-2FA00-6AD0
=CB_1-190U1 =CB_1/190.7 1 OPERATOR INTERFACE PANEL SIEMENS 6SE6400-0BP00-0AA0
=CB_1-190U1 =CB_1/190.7 1 KIT MONT.BOP/AOP A QUADRO SINGOLO SIEMENS 6SE6400-0PM00-0AA0
=CB_1+EXT-191R1 =CB_1/191.1 0
=CB_1-191U1 =CB_1/191.1 0
=CB_1-191S1 =CB_1/191.4 0
=CB_1-191K2 =CB_1/191.5 0
=CB_1-191K1 =CB_1/191.9 0
=CB_1-192Q1 =CB_1/192.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-192Q1 =CB_1/192.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-192S1 =CB_1/192.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-192S1 =CB_1/192.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-192K1 =CB_1/192.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-192K1 =CB_1/192.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-192K1 =CB_1/192.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-192S2 =CB_1/192.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-192S2 =CB_1/192.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-192S3 =CB_1/192.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-192S3 =CB_1/192.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-192S3 =CB_1/192.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-192S3 =CB_1/192.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-192K2 =CB_1/192.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-192K2 =CB_1/192.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-193K1 =CB_1/193.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.m 1100.o

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 6SE6400-0BP00-0AA0 - = MATERIALS


AS BUILT AFTER FAT 27/12/2014 00143 Elab. G2R2SND24VDC +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.n
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-193K1 =CB_1/193.1 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-194Q1 =CB_1/194.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-194Q1 =CB_1/194.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-194S1 =CB_1/194.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-194S1 =CB_1/194.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-194K1 =CB_1/194.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-194K1 =CB_1/194.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-194K1 =CB_1/194.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-194S2 =CB_1/194.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-194S2 =CB_1/194.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-194S3 =CB_1/194.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-194S3 =CB_1/194.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-194S3 =CB_1/194.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-194S3 =CB_1/194.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-194K2 =CB_1/194.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-194K2 =CB_1/194.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-195K1 =CB_1/195.0 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-195K1 =CB_1/195.0 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-196Q1 =CB_1/196.0 1 MCB S00,2.2-3.2A,VT SIEMENS 3RV2011-1DA10
=CB_1-196Q1 =CB_1/196.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-196S1 =CB_1/196.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-196S1 =CB_1/196.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-196K1 =CB_1/196.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-196K1 =CB_1/196.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-196K1 =CB_1/196.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-196S2 =CB_1/196.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-196S2 =CB_1/196.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-196S3 =CB_1/196.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-196S3 =CB_1/196.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-196S3 =CB_1/196.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-196S3 =CB_1/196.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-196K2 =CB_1/196.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-196K2 =CB_1/196.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-197K1 =CB_1/197.0 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-197K1 =CB_1/197.0 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-198Q1 =CB_1/198.0 1 MCB .S00, 4.5-6.3A,VT SIEMENS 3RV2011-1GA10
=CB_1-198Q1 =CB_1/198.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-198S1 =CB_1/198.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-198S1 =CB_1/198.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-198K1 =CB_1/198.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-198K1 =CB_1/198.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-198K1 =CB_1/198.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-198K1 =CB_1/198.3 1 ELECTRICAL AND MECHANICAL INTERLOCK KIT FOR CONTACTORS S00 3RA2913-2AA1 SIEMENS 3RA2913-2AA1
=CB_1-198S2 =CB_1/198.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-198S2 =CB_1/198.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-198K2 =CB_1/198.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-198K2 =CB_1/198.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-198K2 =CB_1/198.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-198S3 =CB_1/198.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-198S3 =CB_1/198.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-198S3 =CB_1/198.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-198S3 =CB_1/198.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-198K5 =CB_1/198.6 1 STEP RELAY 24VAC 3EX CONTACT OMRON G4Q212S24VAC
=CB_1-198K5 =CB_1/198.6 1 SOCKET FOR OCTAL RELAY OMRON PF083A
=CB_1-198S4 =CB_1/198.6 1 YELLOW PUSHBUTTON SIEMENS 3SB3500-0AA31
=CB_1-198S4 =CB_1/198.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B

1100.n 1100.p

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - 3SB3400-0B = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.o
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-198K3 =CB_1/198.8 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC


=CB_1-198K3 =CB_1/198.8 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-198K4 =CB_1/198.9 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-198K4 =CB_1/198.9 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-200Q1 =CB_1/200.0 1 CIRCUIT-BREAKER SIZE S00 5.5-8A SCREW CONNECTION 3RV2011-1HA10 SIEMENS 3RV2011-1HA10
=CB_1-200Q1 =CB_1/200.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-200S1 =CB_1/200.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-200S1 =CB_1/200.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-200K2 =CB_1/200.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-200K2 =CB_1/200.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-200K2 =CB_1/200.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-200S2 =CB_1/200.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-200S2 =CB_1/200.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-200S3 =CB_1/200.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-200S3 =CB_1/200.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-200S3 =CB_1/200.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-200S3 =CB_1/200.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-200K3 =CB_1/200.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-200K3 =CB_1/200.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-202Q1 =CB_1/202.0 1 CIRCUIT BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 3RV2011-1AA10 SIEMENS SIE.3RV2011-1AA10
=CB_1-202Q1 =CB_1/202.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-202S1 =CB_1/202.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-202S1 =CB_1/202.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-202K1 =CB_1/202.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-202K1 =CB_1/202.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-202K1 =CB_1/202.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-202S2 =CB_1/202.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-202S2 =CB_1/202.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-202S3 =CB_1/202.4 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-202S3 =CB_1/202.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-202S3 =CB_1/202.4 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-202S3 =CB_1/202.4 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-DP431 =CB_1/202.5 0
=CB_1-202F1 =CB_1/202.5 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-202F1 =CB_1/202.5 1 CYLINDRICAL FUSE GG ACC. TO FRENCH STANDARD (NFC) 3NW6011-1 SIEMENS
SIE SIE.3NW6011-1
=CB_1-202K2 =CB_1/202.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-202K2 =CB_1/202.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-204Q1 =CB_1/204.0 1 CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 3RV2011-0FA10 SIEMENS SIE.3RV2011-0FA10
=CB_1-204Q1 =CB_1/204.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-204S1 =CB_1/204.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-204S1 =CB_1/204.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-204K1 =CB_1/204.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-204K1 =CB_1/204.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-204K1 =CB_1/204.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-204S2 =CB_1/204.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-204S2 =CB_1/204.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-204S3 =CB_1/204.4 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-204S3 =CB_1/204.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-204S3 =CB_1/204.4 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-204S3 =CB_1/204.4 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-DP432 =CB_1/204.5 0
=CB_1-204F1 =CB_1/204.5 1 FUSE DISCONNECTOR .10x38 32A 1P+N 2UM SIEMENS 3NW7053
=CB_1-204F1 =CB_1/204.5 1 CYLINDRICAL FUSE GG ACC. TO FRENCH STANDARD (NFC) 3NW6011-1 SIEMENS
SIE SIE.3NW6011-1
=CB_1-204K2 =CB_1/204.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-204K2 =CB_1/204.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-206Q1 =CB_1/206.0 1 CIRCUIT-BREAKER SIZE S00 7-10A SCREW CONNECTION 3RV2011-1JA10 SIEMENS 3RV2011-1JA10

1100.o 1100.q

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : G2R2SND24VDC - 3RV2011-1JA10 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.p
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-206Q1 =CB_1/206.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E


=CB_1-206S1 =CB_1/206.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-206S1 =CB_1/206.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-206K1 =CB_1/206.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-206K1 =CB_1/206.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-206K1 =CB_1/206.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-206S2 =CB_1/206.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-206S2 =CB_1/206.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-206S3 =CB_1/206.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-206S3 =CB_1/206.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-206S3 =CB_1/206.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-206S3 =CB_1/206.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-206K2 =CB_1/206.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-206K2 =CB_1/206.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-208Q1 =CB_1/208.0 1 MCB S00, 1,1-1,6A,VT SIEMENS 3RV2011-1AA10
=CB_1-208Q1 =CB_1/208.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-208S1 =CB_1/208.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-208S1 =CB_1/208.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-208K1 =CB_1/208.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-208K1 =CB_1/208.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-208K1 =CB_1/208.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-210K2 =CB_1/208.4 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-210K2 =CB_1/208.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-210K2 =CB_1/208.4 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-208S2 =CB_1/208.4 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-208S2 =CB_1/208.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-208S2 =CB_1/208.4 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-208S2 =CB_1/208.4 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-208K2 =CB_1/208.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-208K2 =CB_1/208.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-210Q1 =CB_1/210.0 1 MCB S00, 1,1-1,6A,VT SIEMENS 3RV2011-1AA10
=CB_1-210Q1 =CB_1/210.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-212Q1 =CB_1/212.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-212Q1 =CB_1/212.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-212S1 =CB_1/212.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-212S1 =CB_1/212.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-212K1 =CB_1/212.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-212K1 =CB_1/212.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-212K1 =CB_1/212.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-212S2 =CB_1/212.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-212S2 =CB_1/212.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-212S3 =CB_1/212.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-212S3 =CB_1/212.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-212S3 =CB_1/212.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-212S3 =CB_1/212.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-212K2 =CB_1/212.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-212K2 =CB_1/212.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-214Q1 =CB_1/214.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-214Q1 =CB_1/214.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-214K1 =CB_1/214.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-214K1 =CB_1/214.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-214K1 =CB_1/214.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-216Q1 =CB_1/216.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-216Q1 =CB_1/216.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-216S1 =CB_1/216.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-216S1 =CB_1/216.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B

1100.p 1100.r

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RV2901-1E - 3SB3400-0B = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.q
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-216K1 =CB_1/216.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-216K1 =CB_1/216.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-216K1 =CB_1/216.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-216S2 =CB_1/216.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-216S2 =CB_1/216.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-216S3 =CB_1/216.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-216S3 =CB_1/216.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-216S3 =CB_1/216.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-216S3 =CB_1/216.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-216K2 =CB_1/216.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-216K2 =CB_1/216.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-218Q1 =CB_1/218.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-218Q1 =CB_1/218.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-218K1 =CB_1/218.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-218K1 =CB_1/218.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-218K1 =CB_1/218.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-220Q1 =CB_1/220.0 1 MCB S00, 1,1-1,6A,VT SIEMENS 3RV2011-1AA10
=CB_1-220Q1 =CB_1/220.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-220S1 =CB_1/220.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-220S1 =CB_1/220.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-220K1 =CB_1/220.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-220K1 =CB_1/220.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-220K1 =CB_1/220.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-220S2 =CB_1/220.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-220S2 =CB_1/220.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-220S3 =CB_1/220.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-220S3 =CB_1/220.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-220S3 =CB_1/220.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-220S3 =CB_1/220.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-220K2 =CB_1/220.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-220K2 =CB_1/220.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-222Q1 =CB_1/222.0 1 CIRCUIT-BREAKER SIZE S00 7-10A SCREW CONNECTION 3RV2011-1JA10 SIEMENS 3RV2011-1JA10
=CB_1-222Q1 =CB_1/222.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-222S1 =CB_1/222.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-222S1 =CB_1/222.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-222K1 =CB_1/222.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-222K1 =CB_1/222.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-222K1 =CB_1/222.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-222S2 =CB_1/222.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-222S2 =CB_1/222.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-222S3 =CB_1/222.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-222S3 =CB_1/222.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-222S3 =CB_1/222.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-222S3 =CB_1/222.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-222K2 =CB_1/222.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-222K2 =CB_1/222.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-224Q1 =CB_1/224.0 1 SOFTSTART 400VAC 15KW SIEMENS SIE.3RW4027-1BB04
=CB_1-224F1 =CB_1/224.1 1 FUSE DISCONNECTOR NH000 160A 60MM SIEMENS 3NP1123-1BC20
=CB_1-224F1 =CB_1/224.1 3 FUS.NH Gr.000 gL/gG 500Vca/440Vcc 80A SIEMENS 3NA3824
=CB_1-224S1 =CB_1/224.5 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-224S1 =CB_1/224.5 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-224K1 =CB_1/224.5 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-224K1 =CB_1/224.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-224K1 =CB_1/224.5 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-224S2 =CB_1/224.6 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-224S2 =CB_1/224.6 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C

1100.q 1100.s

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RT2016-1BB41 - 3SB3400-0C = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.r
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-224S3 =CB_1/224.6 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41


=CB_1-224S3 =CB_1/224.6 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-224S3 =CB_1/224.6 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-224S3 =CB_1/224.6 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-224K2 =CB_1/224.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-224K2 =CB_1/224.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-226Q1 =CB_1/226.0 1 MCB .S00, 9..12.5A,VT SIEMENS 3RV2011-1KA10
=CB_1-226Q1 =CB_1/226.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-226S1 =CB_1/226.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-226S1 =CB_1/226.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-226K1 =CB_1/226.3 1 CONTACTOR, AC-3, 5.5KW/400V, 1NO DC 24V, 3-POLE, SIZE S00 3RT2017-1BB41 SIEMENS 3RT2017-1BB41
=CB_1-226K1 =CB_1/226.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-226K1 =CB_1/226.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-226S2 =CB_1/226.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-226S2 =CB_1/226.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-226S3 =CB_1/226.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-226S3 =CB_1/226.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-226S3 =CB_1/226.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-226S3 =CB_1/226.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-226K2 =CB_1/226.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-226K2 =CB_1/226.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-228Q1 =CB_1/228.0 1 MCB .S00, 4.5-6.3A,VT SIEMENS 3RV2011-1GA10
=CB_1-228Q1 =CB_1/228.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-228S1 =CB_1/228.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-228S1 =CB_1/228.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-228K1 =CB_1/228.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-228K1 =CB_1/228.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-228K1 =CB_1/228.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-228S2 =CB_1/228.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-228S2 =CB_1/228.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-228S3 =CB_1/228.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-228S3 =CB_1/228.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-228S3 =CB_1/228.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-228S3 =CB_1/228.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-228K2 =CB_1/228.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-228K2 =CB_1/228.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-230Q1 =CB_1/230.0 1 MCB .S00,1.4-2A,ML SIEMENS 3RV2011-1BA10
=CB_1-230Q1 =CB_1/230.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-230S1 =CB_1/230.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-230S1 =CB_1/230.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-230K2 =CB_1/230.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-230K2 =CB_1/230.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-230K2 =CB_1/230.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-230S2 =CB_1/230.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-230S2 =CB_1/230.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-230S3 =CB_1/230.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-230S3 =CB_1/230.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-230S3 =CB_1/230.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-230S3 =CB_1/230.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-230K3 =CB_1/230.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-230K3 =CB_1/230.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-232Q1 =CB_1/232.0 1 MCB .S00, 9..12.5A,VT SIEMENS 3RV2011-1KA10
=CB_1-232Q1 =CB_1/232.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-232S1 =CB_1/232.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-232S1 =CB_1/232.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-232K1 =CB_1/232.3 1 CONTACTOR, AC-3, 5.5KW/400V, 1NO DC 24V, 3-POLE, SIZE S00 3RT2017-1BB41 SIEMENS 3RT2017-1BB41

1100.r 1100.t

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3SB3501-0AA41 - 3RT2017-1BB41 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.s
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-232K1 =CB_1/232.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22


=CB_1-232K1 =CB_1/232.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-232S2 =CB_1/232.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-232S2 =CB_1/232.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-232S3 =CB_1/232.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-232S3 =CB_1/232.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-232S3 =CB_1/232.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-232S3 =CB_1/232.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-232K2 =CB_1/232.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-232K2 =CB_1/232.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-234Q1 =CB_1/234.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-234Q1 =CB_1/234.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-234S1 =CB_1/234.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-234S1 =CB_1/234.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-234K1 =CB_1/234.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-234K1 =CB_1/234.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-234K1 =CB_1/234.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-234S2 =CB_1/234.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-234S2 =CB_1/234.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-234S3 =CB_1/234.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-234S3 =CB_1/234.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-234S3 =CB_1/234.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-234S3 =CB_1/234.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-234K2 =CB_1/234.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-234K2 =CB_1/234.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-236Q1 =CB_1/236.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-236Q1 =CB_1/236.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-236S1 =CB_1/236.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-236S1 =CB_1/236.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-236K1 =CB_1/236.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-236K1 =CB_1/236.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-236K1 =CB_1/236.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-236S2 =CB_1/236.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-236S2 =CB_1/236.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-236S3 =CB_1/236.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-236S3 =CB_1/236.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-236S3 =CB_1/236.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-236S3 =CB_1/236.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-236K2 =CB_1/236.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-236K2 =CB_1/236.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-238Q1 =CB_1/238.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10
=CB_1-238Q1 =CB_1/238.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E
=CB_1-238S1 =CB_1/238.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-238S1 =CB_1/238.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-238K1 =CB_1/238.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-238K1 =CB_1/238.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-238K1 =CB_1/238.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-238S2 =CB_1/238.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-238S2 =CB_1/238.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-238S3 =CB_1/238.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-238S3 =CB_1/238.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-238S3 =CB_1/238.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-238S3 =CB_1/238.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-238K2 =CB_1/238.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-238K2 =CB_1/238.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-240Q1 =CB_1/240.0 1 MCB .S00, 0.35-0.5A,VT SIEMENS 3RV2011-0FA10

1100.s 1100.u

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RH2911-1FA22 - 3RV2011-0FA10 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.t
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-240Q1 =CB_1/240.0 1 FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens 3RV2901-1E


=CB_1-240S1 =CB_1/240.3 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-240S1 =CB_1/240.3 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-240K2 =CB_1/240.3 1 CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL 3RT2016-1BB41 SIEMENS 3RT2016-1BB41
=CB_1-240K2 =CB_1/240.3 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-240K2 =CB_1/240.3 1 S00/S0 MOUNTING DEVICE SIEMENS 3RA1921-1DA00
=CB_1-240S2 =CB_1/240.4 1 RED PUSHBUTTON, FLUSH SIEMENS 3SB3500-0AA21
=CB_1-240S2 =CB_1/240.4 1 ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS 3SB3400-0C
=CB_1-240S3 =CB_1/240.5 1 GREEN LIGHTED PUSHBUTTON, FLUSH SIEMENS 3SB3501-0AA41
=CB_1-240S3 =CB_1/240.5 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-240S3 =CB_1/240.5 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-240S3 =CB_1/240.5 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-240K3 =CB_1/240.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-240K3 =CB_1/240.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-350U1 =CB_1/350.2 1 SAFETY RELAY WITH RELAY ENABLING CIRCUITS 24VAC/DC 3TK2821-1CB30 SIEMENS 3TK2821-1CB30
=CB_1-350S1 =CB_1/350.2 1 22MM MUSHROOM EMERGENCY PUSHBUTTON RED 40 MM ROUND METAL 3SB3500-1HA20 SIEMENS 3SB3500-1HA20
=CB_1-350S1 =CB_1/350.2 2 NC SAFETY CONTACT SIEMENS 3SB3400-0M
=CB_1-350K1 =CB_1/350.4 1 CONTACTOR S00 2L+2R 24VCC SIEMENS 3RH1122-1BB40
=CB_1-350K1 =CB_1/350.4 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-350S3 =CB_1/350.4 1 22MM METAL ILLUMINATED PUSHBUTTON WITH FLAT BUTTON BLUE 3SB3501-0AA51 SIEMENS 3SB3501-0AA51
=CB_1-350S3 =CB_1/350.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-350S3 =CB_1/350.4 1 LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO LAMP 3SB3400-1A SIEMENS 3SB3400-1A
=CB_1-350S3 =CB_1/350.4 1 LAMP BA9S 24V 3W BA9S24 OSRAM BA9S24
=CB_1-350K2 =CB_1/350.5 1 CONTACTOR S00 2L+2R 24VCC SIEMENS 3RH1122-1BB40
=CB_1-350K2 =CB_1/350.5 1 AUX CONTACT 2L + 2R S00/S0 SIEMENS 3RH2911-1FA22
=CB_1-350S2 =CB_1/350.9 1 YELLOW PUSHBUTTON SIEMENS 3SB3500-0AA31
=CB_1-350S2 =CB_1/350.9 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-352F1 =CB_1/352.1 1 FUSEBOX 10,3x38 FOR CYLINDRICAL FUSE 1 POLE 3NW7013 SIEMENS 3NW7013
=CB_1-352F1 =CB_1/352.1 1 FUSE 10,3x38 4A gL/gG SIEMENS 3NW60041
=CB_1-400S1 =CB_1/400.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-400S1 =CB_1/400.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-400K1 =CB_1/400.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-400K1 =CB_1/400.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-400K2 =CB_1/400.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-400K2 =CB_1/400.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-400K3 =CB_1/400.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-400K3 =CB_1/400.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-401S1 =CB_1/401.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-401S1 =CB_1/401.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-401K1 =CB_1/401.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-401K1 =CB_1/401.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-401K2 =CB_1/401.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-401K2 =CB_1/401.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-401K3 =CB_1/401.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-401K3 =CB_1/401.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-402S1 =CB_1/402.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-402S1 =CB_1/402.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-402K1 =CB_1/402.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-402K1 =CB_1/402.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-402K2 =CB_1/402.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-402K2 =CB_1/402.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-402K3 =CB_1/402.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-402K3 =CB_1/402.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-403S1 =CB_1/403.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-403S1 =CB_1/403.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-403K1 =CB_1/403.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.t 1100.v

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 3RV2901-1E - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.u
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-403K1 =CB_1/403.3 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-403K2 =CB_1/403.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-403K2 =CB_1/403.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-403K3 =CB_1/403.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-403K3 =CB_1/403.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-404S1 =CB_1/404.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-404S1 =CB_1/404.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-404K1 =CB_1/404.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-404K1 =CB_1/404.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-404K2 =CB_1/404.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-404K2 =CB_1/404.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-404K3 =CB_1/404.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-404K3 =CB_1/404.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-405S1 =CB_1/405.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-405S1 =CB_1/405.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-405K1 =CB_1/405.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-405K1 =CB_1/405.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-405K2 =CB_1/405.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-405K2 =CB_1/405.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-405K3 =CB_1/405.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-405K3 =CB_1/405.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-406S1 =CB_1/406.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-406S1 =CB_1/406.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-406K1 =CB_1/406.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-406K1 =CB_1/406.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-406K2 =CB_1/406.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-406K2 =CB_1/406.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-406K3 =CB_1/406.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-406K3 =CB_1/406.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-407S1 =CB_1/407.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-407S1 =CB_1/407.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-407K1 =CB_1/407.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-407K1 =CB_1/407.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-407K2 =CB_1/407.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-407K2 =CB_1/407.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-407K3 =CB_1/407.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-407K3 =CB_1/407.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-408S1 =CB_1/408.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-408S1 =CB_1/408.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-408K1 =CB_1/408.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-408K1 =CB_1/408.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-408K2 =CB_1/408.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-408K2 =CB_1/408.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-408K3 =CB_1/408.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-408K3 =CB_1/408.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-409S1 =CB_1/409.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-409S1 =CB_1/409.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-409K1 =CB_1/409.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-409K1 =CB_1/409.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-409K2 =CB_1/409.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-409K2 =CB_1/409.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-409K3 =CB_1/409.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-409K3 =CB_1/409.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-410K1 =CB_1/410.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-410K1 =CB_1/410.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-410K2 =CB_1/410.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.u 1100.w

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.v
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-410K2 =CB_1/410.5 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-410K3 =CB_1/410.6 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-410K3 =CB_1/410.6 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-410K4 =CB_1/410.7 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-410K4 =CB_1/410.7 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-411S1 =CB_1/411.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-411S1 =CB_1/411.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-411K1 =CB_1/411.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-411K1 =CB_1/411.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-411K2 =CB_1/411.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-411K2 =CB_1/411.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-411K3 =CB_1/411.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-411K3 =CB_1/411.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-412S1 =CB_1/412.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-412S1 =CB_1/412.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-412K1 =CB_1/412.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-412K1 =CB_1/412.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-412K2 =CB_1/412.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-412K2 =CB_1/412.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-412K3 =CB_1/412.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-412K3 =CB_1/412.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-413S1 =CB_1/413.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-413S1 =CB_1/413.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-413K1 =CB_1/413.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-413K1 =CB_1/413.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-413K2 =CB_1/413.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-413K2 =CB_1/413.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-413K3 =CB_1/413.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-413K3 =CB_1/413.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-414S1 =CB_1/414.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-414S1 =CB_1/414.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-414K3 =CB_1/414.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-414K3 =CB_1/414.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-414K4 =CB_1/414.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-414K4 =CB_1/414.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-414K5 =CB_1/414.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-414K5 =CB_1/414.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-415S1 =CB_1/415.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-415S1 =CB_1/415.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-415K3 =CB_1/415.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-415K3 =CB_1/415.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-415K4 =CB_1/415.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-415K4 =CB_1/415.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-415K5 =CB_1/415.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-415K5 =CB_1/415.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-416S1 =CB_1/416.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-416S1 =CB_1/416.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-416K3 =CB_1/416.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-416K3 =CB_1/416.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-416K4 =CB_1/416.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-416K4 =CB_1/416.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-416K5 =CB_1/416.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-416K5 =CB_1/416.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-432K1 =CB_1/432.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-432K1 =CB_1/432.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-432K2 =CB_1/432.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.v 1100.x

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.w
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-432K2 =CB_1/432.4 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-433K1 =CB_1/433.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-433K1 =CB_1/433.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-433K2 =CB_1/433.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-433K2 =CB_1/433.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-434K1 =CB_1/434.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-434K1 =CB_1/434.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-434K2 =CB_1/434.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-434K2 =CB_1/434.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-435K1 =CB_1/435.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-435K1 =CB_1/435.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-435K2 =CB_1/435.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-435K2 =CB_1/435.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-436K1 =CB_1/436.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-436K1 =CB_1/436.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-436K2 =CB_1/436.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-436K2 =CB_1/436.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-437K1 =CB_1/437.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-437K1 =CB_1/437.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-437K2 =CB_1/437.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-437K2 =CB_1/437.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-438K1 =CB_1/438.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-438K1 =CB_1/438.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-438K2 =CB_1/438.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-438K2 =CB_1/438.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-439K1 =CB_1/439.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-439K1 =CB_1/439.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-439K2 =CB_1/439.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-439K2 =CB_1/439.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-440K1 =CB_1/440.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-440K1 =CB_1/440.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-440K2 =CB_1/440.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-440K2 =CB_1/440.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-441K1 =CB_1/441.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-441K1 =CB_1/441.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-441K2 =CB_1/441.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-441K2 =CB_1/441.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-450S1 =CB_1/450.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-450S1 =CB_1/450.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-450V1 =CB_1/450.5 0
=CB_1-450K1 =CB_1/450.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-450K1 =CB_1/450.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-451S1 =CB_1/451.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-451S1 =CB_1/451.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-451V1 =CB_1/451.5 0
=CB_1-451K1 =CB_1/451.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-451K1 =CB_1/451.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-452S1 =CB_1/452.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-452S1 =CB_1/452.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-452V1 =CB_1/452.5 0
=CB_1-452K1 =CB_1/452.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-452K1 =CB_1/452.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-453S1 =CB_1/453.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-453S1 =CB_1/453.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-453V1 =CB_1/453.5 0
=CB_1-453K1 =CB_1/453.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC

1100.w 1100.y

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - G2R2SND24VDC = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.x
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-453K1 =CB_1/453.5 1 SOCKET RELAY G2R OMRON P2RF08E


=CB_1-454S1 =CB_1/454.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-454S1 =CB_1/454.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-454V1 =CB_1/454.5 0
=CB_1-454K1 =CB_1/454.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-454K1 =CB_1/454.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-455S1 =CB_1/455.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-455S1 =CB_1/455.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-455V1 =CB_1/455.5 0
=CB_1-455K1 =CB_1/455.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-455K1 =CB_1/455.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-456S1 =CB_1/456.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-456S1 =CB_1/456.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-456V1 =CB_1/456.5 0
=CB_1-456K1 =CB_1/456.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-456K1 =CB_1/456.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-457S1 =CB_1/457.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-457S1 =CB_1/457.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-457V1 =CB_1/457.5 0
=CB_1-457K1 =CB_1/457.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-457K1 =CB_1/457.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-458S1 =CB_1/458.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-458S1 =CB_1/458.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-458V1 =CB_1/458.5 0
=CB_1-458K1 =CB_1/458.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-458K1 =CB_1/458.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-459S1 =CB_1/459.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-459S1 =CB_1/459.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-459V1 =CB_1/459.5 0
=CB_1-459K1 =CB_1/459.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-459K1 =CB_1/459.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-460S1 =CB_1/460.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-460S1 =CB_1/460.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-460V1 =CB_1/460.5 0
=CB_1-460K1 =CB_1/460.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-460K1 =CB_1/460.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-470K1 =CB_1/470.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-470K1 =CB_1/470.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-471K2 =CB_1/471.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-471K2 =CB_1/471.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-472K2 =CB_1/472.2 1 Electromechanical relays, Industrial plug-in relays, G2R-_-S G2R-2-SN AC110(S) OMR OMR.G2R-2-SN-110AC(S)
=CB_1-472K2 =CB_1/472.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-473K2 =CB_1/473.2 1 Electromechanical relays, Industrial plug-in relays, G2R-_-S G2R-2-SN AC110(S) OMR OMR.G2R-2-SN-110AC(S)
=CB_1-473K2 =CB_1/473.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-474K2 =CB_1/474.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-474K2 =CB_1/474.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-475K2 =CB_1/475.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-475K2 =CB_1/475.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-476K1 =CB_1/476.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-476K1 =CB_1/476.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-477K1 =CB_1/477.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-477K1 =CB_1/477.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-478K2 =CB_1/478.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-478K2 =CB_1/478.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-479K2 =CB_1/479.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-479K2 =CB_1/479.2 1 SOCKET RELAY G2R OMRON P2RF08E

1100.x 1100.z

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : P2RF08E - P2RF08E = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.y
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-480K2 =CB_1/480.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC


=CB_1-480K2 =CB_1/480.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-481K2 =CB_1/481.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-481K2 =CB_1/481.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-482K1 =CB_1/482.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-482K1 =CB_1/482.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-483K1 =CB_1/483.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-483K1 =CB_1/483.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-484K1 =CB_1/484.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-484K1 =CB_1/484.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-485K1 =CB_1/485.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-485K1 =CB_1/485.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-486K1 =CB_1/486.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-486K1 =CB_1/486.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-487K1 =CB_1/487.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-487K1 =CB_1/487.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-488K1 =CB_1/488.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-488K1 =CB_1/488.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-489K1 =CB_1/489.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-489K1 =CB_1/489.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-500K1 =CB_1/500.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-500K1 =CB_1/500.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-501K1 =CB_1/501.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-501K1 =CB_1/501.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-502K1 =CB_1/502.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-502K1 =CB_1/502.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-503K1 =CB_1/503.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-503K1 =CB_1/503.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-504K1 =CB_1/504.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-504K1 =CB_1/504.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-505K1 =CB_1/505.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-505K1 =CB_1/505.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-520S1 =CB_1/520.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-520S1 =CB_1/520.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-520K1 =CB_1/520.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-520K1 =CB_1/520.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-520K3 =CB_1/520.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-520K3 =CB_1/520.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-521S1 =CB_1/521.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-521S1 =CB_1/521.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-521K1 =CB_1/521.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-521K1 =CB_1/521.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-521K2 =CB_1/521.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-521K2 =CB_1/521.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-522S1 =CB_1/522.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-522S1 =CB_1/522.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-522K1 =CB_1/522.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-522K1 =CB_1/522.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-522K2 =CB_1/522.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-522K2 =CB_1/522.5 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-523S1 =CB_1/523.1 1 3 POSITION STABLE SELECTOR SIEMENS 3SB3500-2DA11
=CB_1-523S1 =CB_1/523.1 2 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-523K1 =CB_1/523.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-523K1 =CB_1/523.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-523K2 =CB_1/523.5 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-523K2 =CB_1/523.5 1 SOCKET RELAY G2R OMRON P2RF08E

1100.y 1100.za

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : G2R2SND24VDC - P2RF08E = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.z
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-540K1 =CB_1/540.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC


=CB_1-540K1 =CB_1/540.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-540K2 =CB_1/540.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-540K2 =CB_1/540.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-540S1 =CB_1/540.4 1 2 POSITION STABLE KEY SELECTOR SIEMENS 3SB3500-4AD11
=CB_1-540S1 =CB_1/540.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-540K3 =CB_1/540.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-540K3 =CB_1/540.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-541K1 =CB_1/541.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-541K1 =CB_1/541.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-541K2 =CB_1/541.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-541K2 =CB_1/541.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-541S1 =CB_1/541.4 1 2 POSITION STABLE KEY SELECTOR SIEMENS 3SB3500-4AD11
=CB_1-541S1 =CB_1/541.4 1 ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS 3SB3400-0B
=CB_1-541K3 =CB_1/541.4 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-541K3 =CB_1/541.4 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-542K1 =CB_1/542.1 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-542K1 =CB_1/542.1 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-542K2 =CB_1/542.2 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-542K2 =CB_1/542.2 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-542K3 =CB_1/542.3 1 RELAY 24VDC 2 EXCHANGE CONTACT OMRON G2R2SND24VDC
=CB_1-542K3 =CB_1/542.3 1 SOCKET RELAY G2R OMRON P2RF08E
=CB_1-700U1 =CB_1/700.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-700F1 =CB_1/700.2 1 FUSEBOX 10,3x38 FOR CYLINDRICAL FUSE 1 POLE 3NW7013 SIEMENS 3NW7013
=CB_1-700F1 =CB_1/700.2 1 FUSE 10,3x38 4A gL/gG SIEMENS 3NW60041
=CB_1-700V1 =CB_1/700.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V2 =CB_1/700.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V3 =CB_1/700.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V4 =CB_1/700.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V5 =CB_1/700.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V6 =CB_1/700.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V7 =CB_1/700.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V8 =CB_1/700.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V9 =CB_1/700.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V10 =CB_1/700.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V11 =CB_1/700.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V12 =CB_1/700.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V13 =CB_1/700.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-700V14 =CB_1/700.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710U1 =CB_1/710.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-710V1 =CB_1/710.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V3 =CB_1/710.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V5 =CB_1/710.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V7 =CB_1/710.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V9 =CB_1/710.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V11 =CB_1/710.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V13 =CB_1/710.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-710V15 =CB_1/710.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711U1 =CB_1/711.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-711V1 =CB_1/711.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V3 =CB_1/711.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V5 =CB_1/711.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V7 =CB_1/711.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V9 =CB_1/711.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V11 =CB_1/711.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-711V13 =CB_1/711.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5

1100.z 1100.zb

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : G2R2SND24VDC - LED BICOLORE = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 5 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.za
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-711V15 =CB_1/711.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5


=CB_1-712U1 =CB_1/712.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-712V1 =CB_1/712.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V3 =CB_1/712.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V5 =CB_1/712.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V7 =CB_1/712.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V9 =CB_1/712.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V11 =CB_1/712.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V13 =CB_1/712.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-712V15 =CB_1/712.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713U1 =CB_1/713.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-713V1 =CB_1/713.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V3 =CB_1/713.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V5 =CB_1/713.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V7 =CB_1/713.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V9 =CB_1/713.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V11 =CB_1/713.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V13 =CB_1/713.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-713V15 =CB_1/713.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714U1 =CB_1/714.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-714V1 =CB_1/714.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V3 =CB_1/714.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V5 =CB_1/714.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V7 =CB_1/714.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V9 =CB_1/714.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V11 =CB_1/714.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V13 =CB_1/714.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-714V15 =CB_1/714.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715U1 =CB_1/715.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-715V1 =CB_1/715.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V3 =CB_1/715.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V5 =CB_1/715.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V7 =CB_1/715.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V9 =CB_1/715.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V11 =CB_1/715.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V13 =CB_1/715.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-715V15 =CB_1/715.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716U1 =CB_1/716.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-716V1 =CB_1/716.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V3 =CB_1/716.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V5 =CB_1/716.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V7 =CB_1/716.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V9 =CB_1/716.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V11 =CB_1/716.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V13 =CB_1/716.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-716V15 =CB_1/716.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717U1 =CB_1/717.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-717V1 =CB_1/717.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V3 =CB_1/717.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V5 =CB_1/717.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V7 =CB_1/717.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V9 =CB_1/717.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V11 =CB_1/717.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V13 =CB_1/717.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-717V15 =CB_1/717.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718U1 =CB_1/718.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W

1100.za 1100.zc

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : LED BICOLORE 5 - GERES16/2K2 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 1/2W +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.zb
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-718V1 =CB_1/718.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5


=CB_1-718V3 =CB_1/718.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V5 =CB_1/718.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V7 =CB_1/718.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V9 =CB_1/718.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V11 =CB_1/718.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V13 =CB_1/718.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-718V15 =CB_1/718.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719U1 =CB_1/719.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-719V1 =CB_1/719.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V3 =CB_1/719.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V5 =CB_1/719.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V7 =CB_1/719.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V9 =CB_1/719.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V11 =CB_1/719.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V13 =CB_1/719.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-719V15 =CB_1/719.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720U1 =CB_1/720.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-720V1 =CB_1/720.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V3 =CB_1/720.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V5 =CB_1/720.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V7 =CB_1/720.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V9 =CB_1/720.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V11 =CB_1/720.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V13 =CB_1/720.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-720V15 =CB_1/720.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721U1 =CB_1/721.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-721V1 =CB_1/721.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V3 =CB_1/721.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V5 =CB_1/721.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V7 =CB_1/721.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V9 =CB_1/721.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V11 =CB_1/721.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V13 =CB_1/721.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-721V15 =CB_1/721.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722U1 =CB_1/722.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-722V1 =CB_1/722.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V3 =CB_1/722.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V5 =CB_1/722.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V7 =CB_1/722.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V9 =CB_1/722.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V11 =CB_1/722.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V13 =CB_1/722.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-722V15 =CB_1/722.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723U1 =CB_1/723.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-723V1 =CB_1/723.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V3 =CB_1/723.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V5 =CB_1/723.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V7 =CB_1/723.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V9 =CB_1/723.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V11 =CB_1/723.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V13 =CB_1/723.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-723V15 =CB_1/723.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724U1 =CB_1/724.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-724V1 =CB_1/724.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724V3 =CB_1/724.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5

1100.zb 1100.zd

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : LED BICOLORE 5 - LED BICOLORE = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 5 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.zc
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-724V5 =CB_1/724.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5


=CB_1-724V7 =CB_1/724.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724V9 =CB_1/724.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724V11 =CB_1/724.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724V13 =CB_1/724.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-724V15 =CB_1/724.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725U1 =CB_1/725.1 1 16 RESISTOR. 2K2 1/2W 24VDC 10mA GENESI GERES16/2K2 1/2W
=CB_1-725V1 =CB_1/725.2 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V3 =CB_1/725.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V5 =CB_1/725.3 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V7 =CB_1/725.4 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V9 =CB_1/725.5 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V11 =CB_1/725.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V13 =CB_1/725.6 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-725V15 =CB_1/725.7 1 LED GREEN/RED 10mA ELETTRONICA FERRETTI LED BICOLORE 5
=CB_1-750SC1 =CB_1/750.3 1 EWON COSY 141 MODEM EWON EC51410
=CB_1-750T1 =CB_1/750.6 1 PC PANEL COP 117 PC17" TOUCH ELMAK ELMAK COP 117 0-02030000-1
=CB_1-750T1 =CB_1/750.6 1 OS.WINDOWS7 PROFESSIONAL E ELMAK COP117WIN7PRO
=CB_1-750T1 =CB_1/750.6 1 LICENSE WINCC FLEXIBLE 2008 RUNTIME 2048 SIEMENS 6AV6613-1FA51-3CA0
=CB_1-750T1 =CB_1/750.6 1 WINCC FLEXIBLE /RECIPES X FLEXIB RUNTIM SIEMENS 6AV6618-7FD01-3AB0
=CB_1-750T1 =CB_1/750.6 1 WINCC V7.0 2048 RUNTIME SIEMENS 6AV6381-2BE07-0AX0
=CB_1-750PLC1 =CB_1/751.0 1 IM 151-3 PN ST 6ES7151-3AA23-0AB0 SIEMENS 6ES7151-3AA23-0AB0
=CB_1-750PLC1 =CB_1/751.0 1 MICRO MEMORY CARD S7-300/C7/ET200 512 KBYTE SIEMENS 6ES7953-8LJ30-0AA0
=CB_1-750PLC2 =CB_1/751.6 1 ET200S, IM151-8CPU PROFINET, 192KB SIEMENS 6ES7151-8AB01-0AB0
=CB_1-PM1 =CB_1/753.0 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM1 =CB_1/753.0 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-DI0 =CB_1/753.0 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI0 =CB_1/753.0 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI1 =CB_1/753.0 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI1 =CB_1/753.0 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI2 =CB_1/753.1 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI2 =CB_1/753.1 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI3 =CB_1/753.1 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI3 =CB_1/753.1 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI4 =CB_1/753.1 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI4 =CB_1/753.1 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI5 =CB_1/753.2 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI5 =CB_1/753.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI6 =CB_1/753.2 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI6 =CB_1/753.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI7 =CB_1/753.2 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI7 =CB_1/753.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI8 =CB_1/753.2 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI8 =CB_1/753.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI9 =CB_1/753.3 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI9 =CB_1/753.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI10 =CB_1/753.3 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI10 =CB_1/753.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI11 =CB_1/753.3 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI11 =CB_1/753.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI12 =CB_1/753.3 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI12 =CB_1/753.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI13 =CB_1/753.4 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI13 =CB_1/753.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI14 =CB_1/753.4 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI14 =CB_1/753.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0

1100.zc 1100.ze

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : LED BICOLORE 5 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6ES7193-4CB30-0AA0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.zd
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-DI15 =CB_1/753.4 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0


=CB_1-DI15 =CB_1/753.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI16 =CB_1/753.5 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI16 =CB_1/753.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI17 =CB_1/753.5 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI17 =CB_1/753.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI18 =CB_1/753.5 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI18 =CB_1/753.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI19 =CB_1/753.6 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI19 =CB_1/753.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI20 =CB_1/753.6 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI20 =CB_1/753.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI21 =CB_1/753.6 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI21 =CB_1/753.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI22 =CB_1/753.6 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI22 =CB_1/753.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI23 =CB_1/753.7 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI23 =CB_1/753.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI24 =CB_1/753.7 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI24 =CB_1/753.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI25 =CB_1/753.7 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI25 =CB_1/753.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI26 =CB_1/753.8 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI26 =CB_1/753.8 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI27 =CB_1/753.8 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI27 =CB_1/753.8 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI28 =CB_1/753.8 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI28 =CB_1/753.8 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI29 =CB_1/753.9 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI29 =CB_1/753.9 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI30 =CB_1/753.9 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI30 =CB_1/753.9 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DI31 =CB_1/753.9 1 8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS 6ES7131-4BF00-0AA0
=CB_1-DI31 =CB_1/753.9 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM2 =CB_1/754.2 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM2 =CB_1/754.2 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-DO0 =CB_1/754.2 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO0 =CB_1/754.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO1 =CB_1/754.2 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO1 =CB_1/754.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO2 =CB_1/754.3 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO2 =CB_1/754.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO3 =CB_1/754.3 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO3 =CB_1/754.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO4 =CB_1/754.3 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO4 =CB_1/754.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM3 =CB_1/754.4 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM3 =CB_1/754.4 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-DO5 =CB_1/754.4 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO5 =CB_1/754.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO6 =CB_1/754.4 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO6 =CB_1/754.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO7 =CB_1/754.5 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO7 =CB_1/754.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO8 =CB_1/754.5 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO8 =CB_1/754.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0

1100.zd 1100.zf

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 6ES7131-4BF00-0AA0 - = MATERIALS


AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6ES7193-4CB30-0AA0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.ze
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-DO9 =CB_1/754.5 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0


=CB_1-DO9 =CB_1/754.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM4 =CB_1/754.6 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM4 =CB_1/754.6 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-DO10 =CB_1/754.6 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO10 =CB_1/754.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO11 =CB_1/754.6 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO11 =CB_1/754.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO12 =CB_1/754.6 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO12 =CB_1/754.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO13 =CB_1/754.7 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO13 =CB_1/754.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-DO14 =CB_1/754.7 1 8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS 6ES7132-4BF00-0AA0
=CB_1-DO14 =CB_1/754.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM5 =CB_1/755.2 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM5 =CB_1/755.2 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-AI0 =CB_1/755.2 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI0 =CB_1/755.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI1 =CB_1/755.2 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI1 =CB_1/755.2 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI2 =CB_1/755.3 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI2 =CB_1/755.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI3 =CB_1/755.3 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI3 =CB_1/755.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI4 =CB_1/755.3 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI4 =CB_1/755.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI5 =CB_1/755.4 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI5 =CB_1/755.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI6 =CB_1/755.4 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI6 =CB_1/755.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI7 =CB_1/755.4 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI7 =CB_1/755.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI8 =CB_1/755.5 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI8 =CB_1/755.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI9 =CB_1/755.5 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI9 =CB_1/755.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI10 =CB_1/755.5 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI10 =CB_1/755.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI11 =CB_1/755.6 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI11 =CB_1/755.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI12 =CB_1/755.6 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI12 =CB_1/755.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI13 =CB_1/755.6 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI13 =CB_1/755.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI14 =CB_1/755.6 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI14 =CB_1/755.6 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI15 =CB_1/755.7 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI15 =CB_1/755.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI16 =CB_1/755.7 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI16 =CB_1/755.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AI17 =CB_1/755.7 1 ET200S 4AI 4-20mA 2WIRE SIEMENS 6ES7134-4GD00-0AB0
=CB_1-AI17 =CB_1/755.7 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM6 =CB_1/756.3 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM6 =CB_1/756.3 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-AO0 =CB_1/756.3 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO0 =CB_1/756.3 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0

1100.ze 1100.zg

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 6ES7132-4BF00-0AA0 - = MATERIALS


AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6ES7193-4CB30-0AA0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.zf
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli F01_001 - MARSINA

Sigla elemento funzionale Quantità Designazione Numero tipo Fornitore Numero articolo

=CB_1-AO1 =CB_1/756.4 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0


=CB_1-AO1 =CB_1/756.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AO2 =CB_1/756.4 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO2 =CB_1/756.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AO3 =CB_1/756.4 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO3 =CB_1/756.4 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AO4 =CB_1/756.5 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO4 =CB_1/756.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AO5 =CB_1/756.5 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO5 =CB_1/756.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-AO6 =CB_1/756.5 1 ET200S 2 AO +/-10V 13BIT+S 1..5V SIEMENS 6ES7135-4FB01-0AB0
=CB_1-AO6 =CB_1/756.5 1 ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS 6ES7193-4CB30-0AA0
=CB_1-PM7 =CB_1/757.4 1 PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS 6ES7138-4CA01-0AA0
=CB_1-PM7 =CB_1/757.4 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CD30-0AA0
=CB_1-AO7 =CB_1/757.4 1 ET200S 2AO 13BIT 0-4-20mA 2 WIRE SIEMENS 6ES7135-4GB01-0AB0
=CB_1-AO7 =CB_1/757.4 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CA30-0AA0
=CB_1-AO8 =CB_1/757.4 1 ET200S 2AO 13BIT 0-4-20mA 2 WIRE SIEMENS 6ES7135-4GB01-0AB0
=CB_1-AO8 =CB_1/757.4 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CA30-0AA0
=CB_1-AO9 =CB_1/757.5 1 ET200S 2AO 13BIT 0-4-20mA 2 WIRE SIEMENS 6ES7135-4GB01-0AB0
=CB_1-AO9 =CB_1/757.5 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CA30-0AA0
=CB_1-AO10 =CB_1/757.5 1 ET200S 2AO 13BIT 0-4-20mA 2 WIRE SIEMENS 6ES7135-4GB01-0AB0
=CB_1-AO10 =CB_1/757.5 1 ET200S TERMINAL MODULE SIEMENS 6ES7193-4CA30-0AA0

1100.zf 1200

REVISION 03/10/2018 00143 Data 03/10/2018 PARTS LIST : 6ES7135-4FB01-0AB0 - = MATERIALS


AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6ES7193-4CA30-0AA0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1100.zg
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

0 0
0,00

16 16
0,00 0,00
BUSBAR SYSTEM, ACCESSORIES CENTER-CENTER DISTANCE 60 MM 8US1923-2AA01

1 1 CONTA CLIP
0,00 0,00
POWER SUPPLY PSDT20 340-575VAC/24VDC 20A 9373.0 CONTA CLIP

1 1 CONTA CLIP
0,00 0,00
POWER SUPPLY PSD10 115-230VAC/24V DC 10A 93850 CONTA CLIP

1 1 CTA
0,00 0,00
TRANSFORMER 3KVA 400/230V TM3000400230 CTA

1 1 CTA
0,00 0,00
TRANSFORMER 2KVA 400/110V TM2000400110 CTA

1 1 CTA
0,00 0,00
TRANSFORMER 1KVA 400/24V TM1000400024 CTA

9 9 DKC
0,00 0,00
CABINET SOCKET H:100 800X500 R1ZE851 DKC

9 9 DKC
0,00 0,00
CABINET 2000X800X500 R5CQE2085 DKC

1 1 DKC
0,00 0,00
LATERAL PANEL 2000X500 R5LE2052 DKC

1 1 DKC
0,00 0,00
INTERMEDIATE PANEL RZDVE2050 DKC

8 8 DKC
0,00 0,00
ASSEMBLING KIT RZKE65 DKC

9 9 DKC
0,00 0,00
INTERNAL PANEL 2000X800 RZPCSE2080 DKC

7 7 ELEKTRONIKS COMPONENTS
0,00 0,00
HANDLE FOR POTENTIOMETER 15AA031 ELEKTRONIKS COMPONENTS

142 142 ELETTRONICA FERRETTI


0,00 0,00
LED GREEN/RED 10mA LED BICOLORE 5 ELETTRONICA FERRETTI

1 1 ELMAK
0,00 0,00
PC PANEL COP 117 PC17" TOUCH ELMAK COP 117 0-02030000-1 ELMAK

1 1 ELMAK
0,00 0,00
OS.WINDOWS7 PROFESSIONAL E COP117WIN7PRO ELMAK

1 1 EWON
0,00 0,00
EWON COSY 141 MODEM EC51410 EWON

7 7 EXOM
0,00 0,00
FAN 250X250 230V RAL7035 250MC/H XVE7535NB23CG EXOM

1100.zg 1200.a

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : - XVE7535NB23CG = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

1 1 EZM
0,00 0,00
SCHEMES HOLDER A4 NYLON RAL 7032 081074 EZM

9 9 EZM
0,00 0,00
POWER MONITORING DEV.220/550 VAC 021644 EZM

9 9 EZM
0,00 0,00
NO CONTACT FOR 021644 021340 EZM

10 10 EZM
0,00 0,00
NEON 13W 230V 50HZ 021192 EZM

7 7 EZM
0,00 0,00
AIR EXTRACTOR 091246 EZM

17 17 GENESI
0,00 0,00
16 RESISTOR. 2K2 1/2W 24VDC 10mA GERES16/2K2 1/2W GENESI

1 1 GW20246 GEWISS
GW20246 0,00 0,00
SOCKET 2P+T 230VAC 10/16A SCHUKO GW20246 GEWISS

1 1 GW26410 GEWISS
GW26410 0,00 0,00
SUPPORT FOR POWER SOCKET 2 PLACES GW26410 GEWISS

2 2 G2R-2-SN AC110(S) OMR


G2R-2-SN AC110(S) 0,00 0,00
Electromechanical relays, Industrial plug-in relays, G2R-_-S OMR.G2R-2-SN-110AC(S) OMR

196 196 OMRON


0,00 0,00
RELAY 24VDC 2 EXCHANGE CONTACT G2R2SND24VDC OMRON

198 198 OMRON


0,00 0,00
SOCKET RELAY G2R P2RF08E OMRON

4 4 OMRON
0,00 0,00
STEP RELAY 24VAC 3EX CONTACT G4Q212S24VAC OMRON

4 4 OMRON
0,00 0,00
SOCKET FOR OCTAL RELAY PF083A OMRON

1 1 OSRAM
0,00 0,00
LAMP BA9s 220V 3W BA9S220 OSRAM

1 1 OSRAM
0,00 0,00
LAMP BA9s 110V 3W BA9S110 OSRAM

62 62 BA9S24 OSRAM
BA9S24 0,00 0,00
LAMP BA9S 24V 3W BA9S24 OSRAM

9 9 PIZZATO
0,00 0,00
LIMIT SWITCH 1NO+1NC FR501 PIZZATO

1 1 POWEL
0,00 0,00
UPS 230V 1000VA PERSONAL1000 POWEL

7 7 RS
0,00 0,00
POTENTIOMETER 10 TURN 10KOHM RS4607526 RS

1200 1200.b

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 081074 - RS4607526 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.a
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

18 18 SIEMENS
0,00 0,00
ET200S 4AI 4-20mA 2WIRE 6ES7134-4GD00-0AB0 SIEMENS

72 72 6ES7193-4CB30-0AA0 SIEMENS
0,00 0,00
ET200S, MOD. TERM. TM-E15C24-01, 5P. 6ES7193-4CB30-0AA0 SIEMENS

7 7 SIEMENS
0,00 0,00
ET200S 2 AO +/-10V 13BIT+S 1..5V 6ES7135-4FB01-0AB0 SIEMENS

4 4 SIEMENS
0,00 0,00
ET200S 2AO 13BIT 0-4-20mA 2 WIRE 6ES7135-4GB01-0AB0 SIEMENS

4 4 SIEMENS
0,00 0,00
ET200S TERMINAL MODULE 6ES7193-4CA30-0AA0 SIEMENS

32 32 6ES7131-4BF00-0AA0 SIEMENS
6ES7131-4BF00-0AA0 0,00 0,00
8DI, 24V DC 6ES7131-4BF00-0AA0 SIEMENS

15 15 6ES7132-4BF00-0AA0 SIEMENS
6ES7132-4BF00-0AA0 0,00 0,00
8DO, 24V DC, 0.5A 6ES7132-4BF00-0AA0 SIEMENS

11 11 3NW7033 SIEMENS
0,00 0,00
FUSEHOLDER 10,3X38 FOR CYLINDRICAL FUSE 3 POLE 3NW7033 SIEMENS

33 33 SIEMENS
0,00 0,00
FUSE 10,3x38 10A gL/gG 3NW6003-1 SIEMENS

4 4 SIEMENS
0,00 0,00
FUSE DISCONNECTOR 10x38 32A 2P 2UM 3NW7023 SIEMENS

10 10 SIEMENS
0,00 0,00
FUSE DISCONNECTOR .10x38 32A 1P+N 2UM 3NW7053 SIEMENS

15 15 SIEMENS
0,00 0,00
CYLINDRICAL FUSE GG 10X38MM 500V 16A 3NW6005-1

1 1 SIEMENS
0,00 0,00
FUSE 10,3x38 25A gG 3NW6010-1 SIEMENS

2 2 SIEMENS
0,00 0,00
MAIN CIRCUIT BREAKER 2P C 10A 10000A 5SY42107 SIEMENS

4 4 SIEMENS
0,00 0,00
FUSE DISCONNECTOR NH000 160A 60MM 3NP1123-1BC20 SIEMENS

3 3 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.000 500Vca/440Vcc 63A 3NA3822 SIEMENS

3 3 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.000 500Vca 50A 3NA3820 SIEMENS

2 2 SIEMENS
0,00 0,00
FUSE DISCONNECTOR NH00 160A 60MM INC.32/70MM MORS 3NP1133-1BC20 SIEMENS

6 6 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.00 500Vca 125A 3NA3832 SIEMENS

1200.a 1200.c

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 6ES7134-4GD00-0AB0 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 3NA3832 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.b
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

2 2 SIEMENS
0,00 0,00
FUSE DISCONNECTOR FUS.NH1 3P 250A SBARRE 60mm 3NP1143-1BC20 SIEMENS

3 3 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.1 500Vca 160A 3NA3136 SIEMENS

6 6 SIEMENS
0,00 0,00
FUS.NH Gr.000 gL/gG 500Vca/440Vcc 80A 3NA3824 SIEMENS

1 1 SIEMENS
0,00 0,00
FUSE DISCONNECTOR FUS.NH2 3P 400A 3NP1153-1BC20 SIEMENS

3 3 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.2 500Vca 250A 3NA3244 SIEMENS

3 3 SIEMENS
0,00 0,00
FUS.NH gL/gG GR.1 500Vca 125A 3NA3132 SIEMENS

2 2 3NW6011-1 SIEMENS
3NW6011-1 0,00 0,00
CYLINDRICAL FUSE GG ACC. TO FRENCH STANDARD (NFC) SIE.3NW6011-1 SIE

2 2 3NW7013 SIEMENS
0,00 0,00
FUSEBOX 10,3x38 FOR CYLINDRICAL FUSE 1 POLE 3NW7013 SIEMENS

2 2 SIEMENS
0,00 0,00
FUSE 10,3x38 4A gL/gG 3NW60041 SIEMENS

4 4 3SB3501-6BA60 SIEMENS
3SB35016BA60 0,00 0,00
22MM METAL ROUND INDICATOR LIGHT ILLUMINABLE WITH HOLDER 3SB3501-6BA60 SIEMENS

60 60 3RT2016-1BB41 SIEMENS
3RT2016-1BB41 0,00 0,00
CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL
3RT2016-1BB41 SIEMENS

66 66 SIEMENS
0,00 0,00
AUX CONTACT 2L + 2R S00/S0 3RH2911-1FA22 SIEMENS

59 59 SIEMENS
0,00 0,00
S00/S0 MOUNTING DEVICE 3RA1921-1DA00 SIEMENS

1 1 3RT2016-1BB41 SIEMENS
3RT20161BB41 0,00 0,00
CONTACTOR, AC-3, 4KW/400V, 1NO, DC 24V, 3-POLE, SZ S00 SCREW TERMINAL
SIE.3RT2016-1BB41 SIEMENS

4 4 3RA2913-2AA1 SIEMENS
3RA2913-2AA1 0,00 0,00
ELECTRICAL AND MECHANICAL INTERLOCK KIT FOR CONTACTORS S00 3RA2913-2AA1 SIEMENS

3 3 3RT2017-1BB41 SIEMENS
3RT2017-1BB41 0,00 0,00
CONTACTOR, AC-3, 5.5KW/400V, 1NO DC 24V, 3-POLE, SIZE S00 3RT2017-1BB41 SIEMENS

2 2 SIEMENS
0,00 0,00
CONTACTOR S00 2L+2R 24VCC 3RH1122-1BB40 SIEMENS

3 3 SIEMENS
0,00 0,00
CURRENT TRANSFORMER 600/5A 5TT6060-0Y

1 1 6ES7151-3AA23-0AB0 SIEMENS
6ES7151-3AA23-0AB0 0,00 0,00
IM 151-3 PN ST 6ES7151-3AA23-0AB0 SIEMENS

1200.b 1200.d

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 3NP1143-1BC20 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6ES7151-3AA23-0AB0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.c
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

1 1 SIEMENS
0,00 0,00
MICRO MEMORY CARD S7-300/C7/ET200 512 KBYTE 6ES7953-8LJ30-0AA0 SIEMENS

1 1 SIEMENS
0,00 0,00
ET200S, IM151-8CPU PROFINET, 192KB 6ES7151-8AB01-0AB0 SIEMENS

7 7 6ES7138-4CA01-0AA0 SIEMENS
6ES7138-4CA01-0AA0 0,00 0,00
PM-E, DC 24V 6ES7138-4CA01-0AA0 SIEMENS

7 7 SIEMENS
0,00 0,00
ET200S TERMINAL MODULE 6ES7193-4CD30-0AA0 SIEMENS

1 1 SIEMENS
0,00 0,00
MCB VL630 N 3X630A TM 3VL5763-1SB36-0AA0 SIEMENS

2 2 SIEMENS
0,00 0,00
INCREASED POLES SPACING FOR VL630 3VL9500-4ED30 SIEMENS

1 1 SIEMENS
0,00 0,00
DOOR COUPLING MECH. FOR VL630 3VL9600-3HF05 SIEMENS

1 1 SIEMENS
0,00 0,00
3 POLE COVER FOR VL630 3VL9600-8CA30 SIEMENS

1 1 SIEMENS
0,00 0,00
AUX CONTACT FOR VL630..VL1600 3VL9800-2AE00 SIEMENS

1 1 SIEMENS
0,00 0,00
EARTH LEAKAGE RELAY 2P 40A 30mA TIPOAC X 5SY 5SM2322-0 SIEMENS

1 1 SIEMENS
0,00 0,00
MCB 2P C 16A 10000A 5SY4216-7 SIEMENS

3 3 3RV2011-1DA10 SIEMENS
3RV2011-1DA10 0,00 0,00
CIRCUIT-BREAKER SCREW CONNECTION 3.2A SIE.3RV2011-1DA10 SIEMENS

1 1 3RV2011-1JA10 SIEMENS
3RV20111JA10 0,00 0,00
CIRCUIT-BREAKER SCREW CONNECTION 10A SIE.3RV2011-1JA10 SIEMENS

3 3 3RV2011-1JA10 SIEMENS
3RV20111JA10 0,00 0,00
CIRCUIT-BREAKER SIZE S00 7-10A SCREW CONNECTION 3RV2011-1JA10 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 5,5KW S0 3RW4024-1TB04 SIEMENS

3 3 SIEMENS
0,00 0,00
MCB .S00, 3.5-5A,VT 3RV2011-1FA10 SIEMENS

1 1 3RV2011-0KA10 SIEMENS
3RV20110KA10 0,00 0,00
CIRCUIT-BREAKER SCREW CONNECTION 1.25A SIE.3RV2011-0KA10 SIEMENS

1 1 3RV2011-1KA10 SIEMENS
3RV2011-1KA10 0,00 0,00
INT.AUT.S00, 9..12.5A,VT SIE.3RV2011-1KA10 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 55KW S3 3RW4047-1BB04 SIEMENS

1200.c 1200.e

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 6ES7953-8LJ30-0AA0 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 3RW4047-1BB04 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.d
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

2 2 SIEMENS
0,00 0,00
S3 COVER 3RT1946-4EA2 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 18,5KW S0 3RW4028-1BB04 SIEMENS

8 8 SIEMENS
0,00 0,00
MCB S00,2.2-3.2A,VT 3RV2011-1DA10 SIEMENS

2 2 SIEMENS
0,00 0,00
CIRCUIT-BREAKER SCREW CONNECTION 1A 3RV2011-0JA10

3 3 SIEMENS
0,00 0,00
MCB .S00, 9..12.5A,VT 3RV2011-1KA10 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 90KW S6 3RW4056-2BB44 SIEMENS

2 2 SIEMENS
0,00 0,00
S6 COVER 3RT1956-4EA2 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 37KW S2 3RW4038-1BB04 SIEMENS

2 2 SIEMENS
0,00 0,00
S2 COVER 3RT1936-4EA2 SIEMENS

4 4 SIEMENS
0,00 0,00
MCB S00, 1,1-1,6A,VT 3RV2011-1AA10 SIEMENS

4 4 SIEMENS
0,00 0,00
MCB .S00, 4.5-6.3A,VT 3RV2011-1GA10 SIEMENS

12 12 SIEMENS
0,00 0,00
MCB .S00, 0.35-0.5A,VT 3RV2011-0FA10 SIEMENS

2 2 SIEMENS
0,00 0,00
MCB S00,0.22-0.32A,VT 3RV2011-0DA10 SIEMENS

2 2 3RV2011-0CA10 SIEMENS
3RV20110CA10 0,00 0,00
CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 SIE.3RV2011-0CA10 SIE

2 2 SIEMENS
0,00 0,00
MCB .S00,1.4-2A,ML 3RV2011-1BA10 SIEMENS

1 1 3RV2011-1HA10 SIEMENS
3RV20111HA10 0,00 0,00
CIRCUIT-BREAKER SIZE S00 5.5-8A SCREW CONNECTION 3RV2011-1HA10 SIEMENS

1 1 3RV2011-1AA10 SIEMENS
3RV20111AA10 0,00 0,00
CIRCUIT BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 SIE.3RV2011-1AA10 SIEMENS

1 1 3RV2011-0FA10 SIEMENS
3RV20110FA10 0,00 0,00
CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10 SIE.3RV2011-0FA10 SIEMENS

1 1 SIEMENS
0,00 0,00
SOFTSTART 400VAC 15KW SIE.3RW4027-1BB04 SIEMENS

1200.d 1200.f

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 3RT1946-4EA2 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. SIE.3RW4027-1BB04 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.e
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

3 3 SIEMENS
0,00 0,00
2 POSITION STABLE KEY SELECTOR 3SB3500-4AD11 SIEMENS

240 240 3SB3400-0B SIEMENS


3SB34000B 0,00 0,00
ACTUATOR WITH ONE CONTACT NO 3SB3400-0B SIEMENS

90 90 SIEMENS
0,00 0,00
3 POSITION STABLE SELECTOR 3SB3500-2DA11 SIEMENS

58 58 SIEMENS
0,00 0,00
RED PUSHBUTTON, FLUSH 3SB3500-0AA21 SIEMENS

58 58 3SB3400-0C SIEMENS
3SB34000C 0,00 0,00
ACTUATOR WITH ONE CONTACT NC 3SB3400-0C SIEMENS

59 59 SIEMENS
0,00 0,00
GREEN LIGHTED PUSHBUTTON, FLUSH 3SB3501-0AA41 SIEMENS

60 60 3SB3400-1A SIEMENS
3SB34001A 0,00 0,00
LAMP HOLDER BA 9S WITHOUT LAMP SCREW TERMINAL RATED VOLTAGE ACC.TO
3SB3400-1A
LAMP SIEMENS

7 7 SIEMENS
0,00 0,00
2 NO CONTACT 3SB3400-0D SIEMENS

4 4 SIEMENS
0,00 0,00
YELLOW PUSHBUTTON 3SB3500-0AA31 SIEMENS

1 1 3SB3500-1HA20 SIEMENS
3SB3500-1HA20 0,00 0,00
22MM MUSHROOM EMERGENCY PUSHBUTTON RED 40 MM ROUND METAL 3SB3500-1HA20 SIEMENS

2 2 SIEMENS
0,00 0,00
NC SAFETY CONTACT 3SB3400-0M SIEMENS

1 1 3SB3501-0AA51 SIEMENS
3SB3501-0AA51 0,00 0,00
22MM METAL ILLUMINATED PUSHBUTTON WITH FLAT BUTTON BLUE 3SB3501-0AA51 SIEMENS

3 3 SIEMENS
0,00 0,00
DRIVE MM440 3AC 380/480V 3 KW FILTRO CL.A 6SE6440-2AD23-0BA1 SIEMENS

1 1 SIEMENS
0,00 0,00
DRIVE MM440 3AC 380/480V 1,5 KW 3PH 6SE6440-2UD21-5AA1 SIEMENS

1 1 SIEMENS
0,00 0,00
DRIVE MM430 18,5KW 3AC 400V FIL.CL.A 6SE6430-2AD31-8DA0 SIEMENS

2 2 SIEMENS
0,00 0,00
DRIVE MM430 3AC 380-480 37KW FIL.CL.A 6SE6430-2AD33-7EA0 SIEMENS

1 1 SIEMENS
0,00 0,00
DRIVE MM440 3AC 380/480V 0,55 KW 3PH 6SE6440-2UD15-5AA1 SIEMENS

3 3 SIEMENS
0,00 0,00
DRIVE MM440 3AC 380/480V 0,37 KW 3PH 6SE6440-2UD13-7AA1 SIEMENS

1 1 SIEMENS
0,00 0,00
LICENSE WINCC FLEXIBLE 2008 RUNTIME 2048 6AV6613-1FA51-3CA0 SIEMENS

1200.e 1200.g

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 3SB3500-4AD11 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6AV6613-1FA51-3CA0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.f
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

1 1 SIEMENS
0,00 0,00
WINCC FLEXIBLE /RECIPES X FLEXIB RUNTIM 6AV6618-7FD01-3AB0 SIEMENS

1 1 SIEMENS
0,00 0,00
WINCC V7.0 2048 RUNTIME 6AV6381-2BE07-0AX0 SIEMENS

65 65 SIEMENS
0,00 0,00
DEVICE ADAPTER S00/S0, 25A 8US12 51-5DS10

5 5 SIEMENS
0,00 0,00
BUSBAR SUPPORT S00/S0 L45MM H200MM 8US1250-5AS10 SIEMENS

2 2 SIEMENS
0,00 0,00
FEED BUSBAR MODULE 3POLE 6/50MMQ 8US1921-1BA00 SIEMENS

4 4 SIEMENS
0,00 0,00
COVER FOR BUS BAR SUPPORT 8US1922-1AC00 SIEMENS

1 1 SIEMENS
0,00 0,00
BUSBAR CONNECTION KIT COVER FOR 8US1941-2AA03/04 8US1922-1GC00 SIEMENS

10 10 SIEMENS
0,00 0,00
COVER FOR BUSBAR.30X5MM 8US1922-2BA00 SIEMENS

4 4 SIEMENS
0,00 0,00
HOLDER FOR UN.PANEL/BUSBAR COVER 8US1922-2EA00 SIEMENS

1 1 SIEMENS
0,00 0,00
COVER FOR BUSBAR SYSTEM195*700*63 8US1922-2EB00 SIEMENS

1 1 SIEMENS
0,00 0,00
TERMINAL SET FOR BUSBAR 32X20 8US1941-2AA04 SIEMENS

3 3 SIEMENS
0,00 0,00
SINGLE TERMINAL FOR 30X10 BUSBAR 8US1941-2BB00 SIEMENS

50 50 SIEMENS
0,00 0,00
BUSBAR ADAPTER SYSTEM 35mm 8US1998-7CB45 SIEMENS

1 1 SIEMENS
0,00 0,00
PMD SENTRON PAC3100 96 LCD PM ACDC TEK 7KM3133-0BA00-3AA0

8 8 SIEMENS
0,00 0,00
OPERATOR INTERFACE PANEL 6SE6400-0BP00-0AA0 SIEMENS

11 11 SIEMENS
0,00 0,00
KIT MONT.BOP/AOP A QUADRO SINGOLO 6SE6400-0PM00-0AA0 SIEMENS

3 3 SIEMENS
0,00 0,00
OPERATOR INTERFACE PANEL BOP2 6SE6400-0BE00-0AA0 SIEMENS

1 1 3TK2821-1CB30 SIEMENS
3TK28211CB30 0,00 0,00
SAFETY RELAY WITH RELAY ENABLING CIRCUITS 24VAC/DC 3TK2821-1CB30 SIEMENS

5 5 SIEMENS
0,00 0,00
SINAMICS FILTER CL.2 6SE6400-2FA00-6AD0 SIEMENS

1200.f 1200.h

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 6AV6618-7FD01-3AB0 - = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. 6SE6400-2FA00-6AD0 +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.g
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Distinta articoli riepilogata/Ricambi start up & Commissioning F02_001

Start up/ Commissioning Descrizione Numero tipo Produttore


Quantità Prezzo unitario Prezzo totale Pos.
NR Designazione Numero articolo Fornitore

1 1 SIRENA
0,00 0,00
ROTALLARM PB 240VAC ORANGE 63050 SIRENA

1 1 SIRENA
0,00 0,00
SIREN MS230A 53012 SIRENA

54 54 3RV2901-1E Siemens
3RV2901-1E 0,00 0,00
FRONT AUXILIAR CONTACT, 1NO+1NC 3RV2901-1E Siemens

4 4 TEKNOMEGA
0,00 0,00
POWER DISTRIBUTOR 40A 3PH+N RPQ0985 TEKNOMEGA

1200.g =CABLE/1300

REVISION 03/10/2018 00143 Data 03/10/2018 Summarized parts list : 63050 - RPQ0985 = MATERIALS
AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1200.h
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-100W1 FG7(O)R 4G 2,5 FS1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR FS. 1 /100.1 -100X1 3 BK -FS1 W1 /100.0 FAN FOR FS. 1

= /100.1 -100X1 2 BN -FS1 V1 /100.0 =

= /100.0 -100X1 1 BU -FS1 U1 /100.0 =

=MATERIALS/1200.h 1301

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-100W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1300
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-102W1 FG7(O)R 4G 2,5 FS2

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR FS. 2 /102.1 -102X1 3 BK -FS2 W1 /102.0 FAN FOR FS. 2

= /102.1 -102X1 2 BN -FS2 V1 /102.0 =

= /102.0 -102X1 1 BU -FS2 U1 /102.0 =

1300 1302

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-102W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1301
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-104W1 FG7(O)R 4G 2,5 FS3

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR FS. 3 /104.1 -104X1 3 BK -FS3 W1 /104.0 FAN FOR FS. 3

= /104.1 -104X1 2 BN -FS3 V1 /104.0 =

= /104.0 -104X1 1 BU -FS3 U1 /104.0 =

1301 1303

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-104W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1302
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-106W1 FG7OH2R 4G 2,5SH SC-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

STPP DOSING SCREW CONVEYOR /106.1 -106X1 3 BK -SC-1 W1 /106.1 STPP dosing screw conveyor

= /106.1 -106X1 2 BN -SC-1 V1 /106.1 =

= /106.1 -106X1 1 BU -SC-1 U1 /106.1 =

/106.1 PE PE -106T1 PE /106.1

1302 1304

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-106W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1303
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-106W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/106.6 -106T1 1 -106T1 1 /106.7

/106.6 -106T1 2 -106T1 2 /106.8

/106.6 -106T1 3 -106T1 3 /106.8

/106.6 -106T1 4 -106T1 4 /106.8

1303 1305

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-106W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1304
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-108W1 FG7OH2R 4G 2,5SH SC-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

S.SULPHATE DOSING SCREW CONVEYOR /108.1 -108X1 3 BK -SC-2 W1 /108.1 S.Sulphate dosing screw conveyor

= /108.1 -108X1 2 BN -SC-2 V1 /108.1 =

= /108.1 -108X1 1 BU -SC-2 U1 /108.1 =

/108.1 PE PE -108T1 PE /108.1

1304 1306

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-108W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1305
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-108W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/108.6 -108T1 1 -108T1 1 /108.7

/108.6 -108T1 2 -108T1 2 /108.8

/108.6 -108T1 3 -108T1 3 /108.8

/108.6 -108T1 4 -108T1 4 /108.8

1305 1307

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-108W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1306
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-110W1 FG7OH2R 4G 2,5SH SC-3

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SODA ASH DOSING SCREW COONVEYOR /110.1 -110X1 3 BK -SC-3 W1 /110.1 Soda Ash dosing screw conveyor

= /110.1 -110X1 2 BN -SC-3 V1 /110.1 =

= /110.1 -110X1 1 BU -SC-3 U1 /110.1 =

/110.1 PE PE -110T1 PE /110.1

1306 1308

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-110W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1307
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-110W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/110.6 -110T1 1 -110T1 1 /110.7

/110.6 -110T1 2 -110T1 2 /110.8

/110.6 -110T1 3 -110T1 3 /110.8

/110.6 -110T1 4 -110T1 4 /110.8

1307 1309

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-110W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1308
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-114W1 FG7(O)R 4G 4 P-802

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SLURRY TRANSFER PUMP /114.1 -114X1 3 BK -P2 W1 /114.0 SLURRY TRANSFER PUMP

= /114.1 -114X1 2 BN -P2 V1 /114.0 =

= /114.0 -114X1 1 BU -P2 U1 /114.0 =

1308 1310

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-114W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1309
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-116W1 FG7(O)R 4G 2,5 P-801

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

RECOVERED WATER TRANSFER PUMP /116.1 -116X1 3 BK -P6 W1 /116.0 RECOVERED WATER TRANSFER PUMP

= /116.1 -116X1 2 BN -P6 V1 /116.0 =

= /116.0 -116X1 1 BU -P6 U1 /116.0 =

1309 1311

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-116W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1310
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-118W1 FG7OH2R 4G 16SH AGR-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

STIRRER FOR R.1 /118.1 -118X1 3 BK -AGR-1 W1 /118.1 STIRRER FOR R.1

= /118.1 -118X1 2 BN -AGR-1 V1 /118.1 =

= /118.1 -118X1 1 BU -AGR-1 U1 /118.1 =

/118.1 PE PE -118T1 PE /118.1

1310 1312

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-118W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1311
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-118W2 FG7OH2R 2X 2,5SH AGR-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

THERMISTOR AGR-1A /118.2 -118X1 5 BN -170R2 x2 /118.2 THERMISTOR AGR-1A

= /118.2 -118X1 4 BU -170R2 x1 /118.2 =

1311 1313

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-118W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1312
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-118W3 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/118.6 -118T1 1 -118T1 1 /118.7

/118.6 -118T1 2 -118T1 2 /118.7

/118.6 -118T1 3 -118T1 3 /118.8

/118.6 -118T1 4 -118T1 4 /118.8

1312 1314

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-118W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1313
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-120W1 FG7(O)R 4G 4 AGR-2/1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

STIRRER FOR R.2 /120.1 -120X1 3 BK -AGR-2 W1 /120.1 Stirrer for R.2

= /120.1 -120X1 2 BN -AGR-2 V1 /120.1 =

= /120.1 -120X1 1 BU -AGR-2 U1 /120.1 =

1313 1315

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-120W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1314
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-120W2 FG7(O)R 2X 1,5SH AGR-2/2

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

THERMISTOR AGR-2 /120.2 5 BN -120R1 x1 /120.2

= /120.1 4 BU -120R1 x2 /120.2

1314 1316

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-120W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1315
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-122W1 FG7(O)R 4G 2,5 BL-4

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

EXTRACTION VAPORS FAN /122.1 -122X1 3 BK -BL-4 W1 /122.0 EXTRACTION VAPORS FAN

= /122.1 -122X1 2 BN -BL-4 V1 /122.0 =

= /122.0 -122X1 1 BU -BL-4 U1 /122.0 =

1315 1317

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-122W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1316
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-124W1 FG7(O)R 3G 35+1X25 P-805

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HOMOGENIZER PUMP /124.1 -124X1 3 BK -P-3 W1 /124.1 Homogenizer pump

= /124.1 -124X1 2 BN -P-3 V1 /124.1 =

= /124.1 -124X1 1 BU -P-3 U1 /124.1 =

/124.1 PE PE -124T1 PE /124.1

1316 1318

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-124W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1317
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-124W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/124.6 -124T1 1 -124T1 1 /124.7

/124.6 -124T1 2 -124T1 2 /124.7

/124.6 -124T1 3 -124T1 3 /124.8

/124.6 -124T1 4 -124T1 4 /124.8

1317 1319

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-124W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1318
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-126W1 FG7(O)R 4G 2,5 AG/AF-1A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SLURRY FEEDING FILTER /126.1 -126X1 3 BK -AGAF-1A W1 /126.0 Slurry feeding filter

= /126.1 -126X1 2 BN -AGAF-1A V1 /126.0 =

= /126.0 -126X1 1 BU -AGAF-1A U1 /126.0 =

1318 1320

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-126W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1319
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-128W1 FG7(O)R 4G 2,5 AG/AF-1B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SLURRY FEEDING FILTER /128.1 -128X1 3 BK -AGAF-1B W1 /128.0 Slurry feeding filter

= /128.1 -128X1 2 BN -AGAF-1B V1 /128.0 =

= /128.0 -128X1 1 BU -AGAF-1B U1 /128.0 =

1319 1321

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-128W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1320
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-130W1 FG7(O)R 3G 35+1X25 P4

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SLURRY FEEDING HIGH PRESSURE PUMP /130.1 -130X1 3 BK -P4 W1 /130.1 SLURRY FEEDING HIGH PRESSURE PUMP

= /130.1 -130X1 2 BN -P4 V1 /130.1 =

= /130.1 -130X1 1 BU -P4 U1 /130.1 =

/130.1 PE PE -130T1 PE /130.1

1320 1322

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-130W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1321
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-130W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/130.6 -130T1 1 -130T1 1 /130.7

/130.6 -130T1 2 -130T1 2 /130.7

/130.6 -130T1 3 -130T1 3 /130.8

/130.6 -130T1 4 -130T1 4 /130.8

1321 1323

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-130W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1322
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-132W1 FG7(O)R 4G 2,5 AGT-5

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

STIRRER FOR T.5 /132.1 -132X1 3 BK -AGT-5 W1 /132.0 Stirrer for T.5

= /132.1 -132X1 2 BN -AGT-5 V1 /132.0 =

= /132.0 -132X1 1 BU -AGT-5 U1 /132.0 =

1322 1324

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-132W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1323
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-134W1 FG7(O)R 4G 50 AGR-2/1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DRYING AIR FEEDING FAN /134.1 -134X1 3 BK -BL-1 W1 /134.1 DRYING AIR FEEDING FAN

= /134.1 -134X1 2 BN -BL-1 V1 /134.1 =

= /134.1 -134X1 1 BU -BL-1 U1 /134.1 =

1323 1325

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-134W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1324
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-136W1 FG7(O)R 4G 16 BL-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMBUSTION AIR FAN /136.1 -136X1 3 BK -BL-2 W1 /136.1 COMBUSTION AIR FAN

= /136.1 -136X1 2 BN -BL-2 V1 /136.1 =

= /136.1 -136X1 1 BU -BL-2 U1 /136.1 =

1324 1326

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-136W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1325
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-138W1 FG7(O)R 4G 2,5 HST-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HOIST FOR CLEANING RING /138.1 -138X1 3 BK -HST-1 W1 /138.0 Hoist for cleaning ring

= /138.1 -138X1 2 BN -HST-1 V1 /138.0 =

= /138.0 -138X1 1 BU -HST-1 U1 /138.0 =

1325 1327

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-138W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1326
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-140W1 FG7(O)R 4G 2,5 MC-3A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DOUBLE FLAP DISCHARGER FOR F.3 /140.1 -140X1 3 BK -MC-3A W1 /140.0 DOUBLE FLAP DISCHARGER FOR F.3

= /140.1 -140X1 2 BN -MC-3A V1 /140.0 =

= /140.0 -140X1 1 BU -MC-3A U1 /140.0 =

1326 1328

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-140W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1327
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-142W1 FG7(O)R 4G 2,5 MC-3B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DOUBLE FLAP DISCHARGER FOR F.3 /142.1 -142X1 3 BK -MC-3B W1 /142.0 DOUBLE FLAP DISCHARGER FOR F.3

= /142.1 -142X1 2 BN -MC-3B V1 /142.0 =

= /142.0 -142X1 1 BU -MC-3B U1 /142.0 =

1327 1329

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-142W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1328
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-144W1 FG7(O)R 4G 4 P-802

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FINES RECOVERY FAN /144.1 -144X1 3 BK -BL-6 W1 /144.0 FINES RECOVERY FAN

= /144.1 -144X1 2 BN -BL-6 V1 /144.0 =

= /144.0 -144X1 1 BU -BL-6 U1 /144.0 =

1328 1330

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-144W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1329
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-146W1 FG7(O)R 4G 95 BL-3

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DRYING AIR EXTRACTION FAN /146.1 -146X1 3 BK -BL-3 W1 /146.1 DRYING AIR EXTRACTION FAN

= /146.1 -146X1 2 BN -BL-3 V1 /146.1 =

= /146.1 -146X1 1 BU -BL-3 U1 /146.1 =

1329 1331

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-146W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1330
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-148W1 FG7(O)R 4G 2,5 NT-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AIR LIFT BELT CONVEYOR /148.1 -148X1 3 BK -NT-1 W1 /148.0 Air lift belt conveyor

= /148.1 -148X1 2 BN -NT-1 V1 /148.0 =

= /148.0 -148X1 1 BU -NT-1 U1 /148.0 =

1330 1332

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-148W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1331
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-150W1 FG7(O)R 4G 25 BL-5

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AIR LIFT FAN /150.1 -150X1 3 BK -BL-5 W1 /150.1 AIR LIFT FAN

= /150.1 -150X1 2 BN -BL-5 V1 /150.1 =

= /150.1 -150X1 1 BU -BL-5 U1 /150.1 =

1331 1333

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-150W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1332
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-152W1 FG7(O)R 4G 2,5 MC-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DOUBLE FLAP DISCHARGER FOR AIR LIFT /152.1 -152X1 3 BK -MC-1 W1 /152.0 DOUBLE FLAP DISCHARGER FOR AIR LIFT

= /152.1 -152X1 2 BN -MC-1 V1 /152.0 =

= /152.0 -152X1 1 BU -MC-1 U1 /152.0 =

1332 1334

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-152W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1333
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-154W1 FG7(O)R 4G 2,5 VV-1A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING SIEVE RECTANGULAR TYPE /154.1 -154X1 3 BK -VV-1A W1 /154.0 VIBRATING SIEVE RECTANGULAR TYPE

= /154.1 -154X1 2 BN -VV-1A V1 /154.0 =

= /154.0 -154X1 1 BU -VV-1A U1 /154.0 =

1333 1335

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-154W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1334
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-156W1 FG7(O)R 4G 2,5 VV-1B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING SIEVE RECTANGULAR TYPE /156.1 -156X1 3 BK -VV-1B W1 /156.0 VIBRATING SIEVE RECTANGULAR TYPE

= /156.1 -156X1 2 BN -VV-1B V1 /156.0 =

= /156.0 -156X1 1 BU -VV-1B U1 /156.0 =

1334 1336

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-156W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1335
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-158W1 FG7(O)R 4G 2,5 P5

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

RECOVERED SLURRY TRANSFER PUMP /158.1 -158X1 3 BK -P5 W1 /158.0 RECOVERED SLURRY TRANSFER PUMP

= /158.1 -158X1 2 BN -P5 V1 /158.0 =

= /158.0 -158X1 1 BU -P5 U1 /158.0 =

1335 1337

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-158W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1336
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-160W1 FG7(O)R 4G 2,5 VY-1011A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S1 /160.1 -160X1 3 BK -VY-1011A W1 /160.0 VIBRATING MOTOR S1

= /160.1 -160X1 2 BN -VY-1011A V1 /160.0 =

= /160.0 -160X1 1 BU -VY-1011A U1 /160.0 =

1336 1338

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-160W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1337
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-160W2 FG7(O)R 4G 2,5 VY-1011B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S1 /160.3 -160X1 6 BK -VY-1011B W1 /160.2 VIBRATING MOTOR S1

= /160.2 -160X1 5 BN -VY-1011B V1 /160.2 =

= /160.2 -160X1 4 BU -VY-1011B U1 /160.2 =

1337 1339

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-160W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1338
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-164W1 FG7(O)R 4G 2,5 VY-1012A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S2 /164.1 -164X1 3 BK -VY-1012A W1 /164.0 VIBRATING MOTOR S2

= /164.1 -164X1 2 BN -VY-1012A V1 /164.0 =

= /164.0 -164X1 1 BU -VY-1012A U1 /164.0 =

1338 1340

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-164W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1339
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-164W2 FG7(O)R 4G 2,5 VY-1012B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S2 /164.3 -164X1 6 BK -VY-1012B W1 /164.2 VIBRATING MOTOR S2

= /164.2 -164X1 5 BN -VY-1012B V1 /164.2 =

= /164.2 -164X1 4 BU -VY-1012B U1 /164.2 =

1339 1341

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-164W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1340
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-168W1 FG7(O)R 4G 2,5 VY-1013A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S3 /168.1 -168X1 3 BK -VY-1013A W1 /168.0 VIBRATING MOTOR S3

= /168.1 -168X1 2 BN -VY-1013A V1 /168.0 =

= /168.0 -168X1 1 BU -VY-1013A U1 /168.0 =

1340 1342

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-168W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1341
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-168W2 FG7(O)R 4G 2,5 VY-1013B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S3 /168.3 -168X1 6 BK -VY-1013B W1 /168.2 VIBRATING MOTOR S3

= /168.2 -168X1 5 BN -VY-1013B V1 /168.2 =

= /168.2 -168X1 4 BU -VY-1013B U1 /168.2 =

1341 1343

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-168W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1342
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-172W1 FG7(O)R 4G 2,5 VY-1014A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4 /172.1 -172X1 3 BK -VY-1014A W1 /172.0 VIBRATING MOTOR S4

= /172.1 -172X1 2 BN -VY-1014A V1 /172.0 =

= /172.0 -172X1 1 BU -VY-1014A U1 /172.0 =

1342 1344

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-172W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1343
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-172W2 FG7(O)R 4G 2,5 VY-1014B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4 /172.3 -172X1 6 BK -VY-1014B W1 /172.2 VIBRATING MOTOR S4

= /172.2 -172X1 5 BN -VY-1014B V1 /172.2 =

= /172.2 -172X1 4 BU -VY-1014B U1 /172.2 =

1343 1345

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-172W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1344
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-176W1 FG7(O)R 4G 2,5 NT-411

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FINISHED PRODUCT BELT CONVEYOR /176.1 -176X1 3 BK -NT-411 W1 /176.0 FINISHED PRODUCT BELT CONVEYOR

= /176.1 -176X1 2 BN -NT-411 V1 /176.0 =

= /176.0 -176X1 1 BU -NT-411 U1 /176.0 =

1344 1346

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-176W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1345
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-178W1 FG7(O)R 4G 2,5 FS-402A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR F402A /178.1 -178X1 3 BK -FS-402A W1 /178.0 FAN FOR F402A

= /178.1 -178X1 2 BN -FS-402A V1 /178.0 =

= /178.0 -178X1 1 BU -FS-402A U1 /178.0 =

1345 1347

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-178W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1346
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-180W1 FG7(O)R 4G 2,5 FS-402B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR F402B /180.1 -180X1 3 BK -FS-402B W1 /180.0 FAN FOR F402B

= /180.1 -180X1 2 BN -FS-402B V1 /180.0 =

= /180.0 -180X1 1 BU -FS-402B U1 /180.0 =

1346 1348

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-180W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1347
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-182W1 FG7(O)R 4G 2,5 NT-402

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

EXTRACTION BELT CONVEYOR /182.1 -182X1 3 BK -NT-402 W1 /182.0 EXTRACTION BELT CONVEYOR

= /182.1 -182X1 2 BN -NT-402 V1 /182.0 =

= /182.0 -182X1 1 BU -NT-402 U1 /182.0 =

1347 1349

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-182W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1348
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-184W1 FG7OH2R 4G 2,5SH ND-402

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

ATOMIZED POWDER WEIGHING BELT /184.1 -184X1 3 BK -ND-402 W1 /184.1 ATOMIZED POWDER WEIGHING BELT

= /184.1 -184X1 2 BN -ND-402 V1 /184.1 =

= /184.1 -184X1 1 BU -ND-402 U1 /184.1 =

/184.1 PE PE -184T1 PE /184.1

1348 1350

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-184W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1349
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-184W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/184.6 -184T1 1 -184T1 18443 /184.7

/184.6 -184T1 2 -184T1 18444 /184.8

/184.6 -184T1 3 -184T1 18445 /184.8

/184.6 -184T1 4 -184T1 18446 /184.8

1349 1351

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-184W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1350
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-186W1 FG7OH2R 4G 2,5SH ND-406

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

S.PERBORATE WEIGHING BELT /186.1 -186X1 3 BK -ND-406 W1 /186.1 S.PERBORATE WEIGHING BELT

= /186.1 -186X1 2 BN -ND-406 V1 /186.1 =

= /186.1 -186X1 1 BU -ND-406 U1 /186.1 =

/186.1 PE PE -186T1 PE /186.1

1350 1352

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-186W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1351
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-186W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/186.6 -186T1 1 -186T1 1 /186.7

/186.6 -186T1 2 -186T1 2 /186.8

/186.6 -186T1 3 -186T1 3 /186.8

/186.6 -186T1 4 -186T1 4 /186.8

1351 1353

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-186W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1352
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-188W1 FG7OH2R 4G 2,5SH ND-408

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

ENZYMES WEIGHING BELT /188.1 -184X1 3 BK -ND-408 W1 /188.1 ENZYMES WEIGHING BELT

= /188.1 -184X1 2 BN -ND-408 V1 /188.1 =

= /188.1 -184X1 1 BU -ND-408 U1 /188.1 =

/188.1 PE PE -188T1 PE /188.1

1352 1354

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-188W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1353
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-188W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/188.6 -188T1 1 -188T1 1 /188.7

/188.6 -188T1 2 -188T1 2 /188.8

/188.6 -188T1 3 -188T1 3 /188.8

/188.6 -188T1 4 -188T1 4 /188.8

1353 1355

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-188W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1354
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-190W1 FG7OH2R 4G 2,5SH ND-409

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT /190.1 -190X1 3 BK -ND-409 W1 /190.1 PREMIXED OPTICAL BRIGHTNESS WEIGHING BELT

= /190.1 -190X1 2 BN -ND-409 V1 /190.1 =

= /190.1 -190X1 1 BU -ND-409 U1 /190.1 =

/190.1 PE PE -190T1 PE /190.1

1354 1356

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-190W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1355
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-190W2 4X0,5 SCH BOP CABLE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

/190.6 -190T1 1 -190T1 1 /190.7

/190.6 -190T1 2 -190T1 2 /190.8

/190.6 -190T1 3 -190T1 3 /190.8

/190.6 -190T1 4 -190T1 4 /190.8

1355 1357

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-190W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1356
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-192W1 FG7(O)R 4G 2,5 FS-408

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR F408 /192.1 -192X1 3 BK -FS-408 W1 /192.0 FAN FOR F408

= /192.1 -192X1 2 BN -FS-408 V1 /192.0 =

= /192.0 -192X1 1 BU -FS-408 U1 /192.0 =

1356 1358

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-192W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1357
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-194W1 FG7(O)R 4G 2,5 FS-406

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR F406 /194.1 -194X1 3 BK -FS-406 W1 /194.0 FAN FOR F406

= /194.1 -194X1 2 BN -FS-406 V1 /194.0 =

= /194.0 -194X1 1 BU -FS-406 U1 /194.0 =

1357 1359

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-194W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1358
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-196W1 FG7(O)R 4G 2,5 FS-409

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FAN FOR F409 /196.1 -196X1 3 BK -FS-409 W1 /196.0 FAN FOR F409

= /196.1 -196X1 2 BN -FS-409 V1 /196.0 =

= /196.0 -196X1 1 BU -FS-409 U1 /196.0 =

1358 1360

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-196W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1359
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-198W1 FG7(O)R 4G 2,5 NT-410

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

ADDITIVES FEEDING BELT CONVEYOR /198.1 -198X1 3 BK -NT-410 W1 /198.0 ADDITIVES FEEDING BELT CONVEYOR

= /198.1 -198X1 2 BN -NT-410 V1 /198.0 =

= /198.0 -198X1 1 BU -NT-410 U1 /198.0 =

1359 1361

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-198W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1360
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-200W1 FG7(O)R 4G 2,5 MX-402

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FINAL ROTATING CONTINUOUS MIXER /200.1 -200X1 3 BK -MX-402 W1 /200.0 FINAL ROTATING CONTINUOUS MIXER

= /200.1 -200X1 2 BN -MX-402 V1 /200.0 =

= /200.0 -200X1 1 BU -MX-402 U1 /200.0 =

1360 1362

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-200W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1361
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-202W1 FG7(O)R 4G 2,5 DP-431

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

NON IONIC DOSING PUMP /202.1 -202X1 3 BK -DP-431 W1 /202.0 NON IONIC DOSING PUMP

= /202.1 -202X1 2 BN -DP-431 V1 /202.0 =

= /202.0 -202X1 1 BU -DP-431 U1 /202.0 =

1361 1363

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-202W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1362
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-204W1 FG7(O)R 4G 2,5 DP-432

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PERFUME DOSING PUMP /204.1 -204X1 3 BK -DP-432 W1 /204.0 PERFUME DOSING PUMP

= /204.1 -204X1 2 BN -DP-432 V1 /204.0 =

= /204.0 -204X1 1 BU -DP-432 U1 /204.0 =

1362 1364

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-204W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1363
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-206W1 FG7(O)R 4G 2,5 ET-401

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

ELEVATOR /206.1 -206X1 3 BK -ET-401 W1 /206.0 ELEVATOR

= /206.1 -206X1 2 BN -ET-401 V1 /206.0 =

= /206.0 -206X1 1 BU -ET-401 U1 /206.0 =

1363 1365

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-206W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1364
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-208W1 FG7(O)R VY-2A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR ST1 /208.1 -208X1 3 BK -VY-2A W1 /208.0 VIBRATING MOTOR ST1

= /208.1 -208X1 2 BN -VY-2A V1 /208.0 =

= /208.0 -208X1 1 BU -VY-2A U1 /208.0 =

1364 1366

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-208W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1365
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-210W1 FG7(O)R VY-2B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR ST1 /210.1 -210X1 3 BK -VY-2B W1 /210.0 VIBRATING MOTOR ST1

= /210.1 -210X1 2 BN -VY-2B V1 /210.0 =

= /210.0 -210X1 1 BU -VY-2B U1 /210.0 =

1365 1367

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-210W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1366
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-212W1 FG7(O)R 4G 2,5 VY-4021A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4021A /212.1 -212X1 3 BK -VY-4021A W1 /212.0 VIBRATING MOTOR S4021A

= /212.1 -212X1 2 BN -VY-4021A V1 /212.0 =

= /212.0 -212X1 1 BU -VY-4021A U1 /212.0 =

1366 1368

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-212W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1367
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-214W1 FG7(O)R 4G 2,5 VY-4021B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4021B /214.1 -214X1 3 BK -VY-4021B W1 /214.0 VIBRATING MOTOR S4021B

= /214.1 -214X1 2 BN -VY-4021B V1 /214.0 =

= /214.0 -214X1 1 BU -VY-4021B U1 /214.0 =

1367 1369

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-214W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1368
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-216W1 FG7(O)R 4G 2,5 VY-4022A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4022A /216.1 -216X1 3 BK -VY-4022A W1 /216.0 VIBRATING MOTOR S4022A

= /216.1 -216X1 2 BN -VY-4022A V1 /216.0 =

= /216.0 -216X1 1 BU -VY-4022A U1 /216.0 =

1368 1370

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-216W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1369
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-218W1 FG7(O)R 4G 2,5 VY-4022B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VIBRATING MOTOR S4022B /218.1 -218X1 3 BK -VY-4022B W1 /218.0 VIBRATING MOTOR S4022B

= /218.1 -218X1 2 BN -VY-4022B V1 /218.0 =

= /218.0 -218X1 1 BU -VY-4022B U1 /218.0 =

1369 1371

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-218W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1370
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-220W1 FG7(O)R 4G 2,5 NT-6

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

BELT CONVEYOR /220.1 -220X1 3 BK -NT-6 W1 /220.0 BELT CONVEYOR

= /220.1 -220X1 2 BN -NT-6 V1 /220.0 =

= /220.0 -220X1 1 BU -NT-6 U1 /220.0 =

1370 1372

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-220W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1371
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-222W1 FG7(O)R 4G 2,5 P-801

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SULPHONIC ACID LOADING PUMP /222.1 -222X1 3 BK -P-801 W1 /222.0 SULPHONIC ACID LOADING PUMP

= /222.1 -222X1 2 BN -P-801 V1 /222.0 =

= /222.0 -222X1 1 BU -P-801 U1 /222.0 =

1371 1373

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-222W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1372
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-224W1 FG7OH2R 4G 10 P-802

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SODIUM SILICATE LOADING PUMP /224.1 -224X1 3 BK -P-802 W1 /224.1 SODIUM SILICATE LOADING PUMP

= /224.1 -224X1 2 BN -P-802 V1 /224.1 =

= /224.1 -224X1 1 BU -P-802 U1 /224.1 =

1372 1374

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-224W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1373
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-226W1 FG7(O)R 4G 4 P-803

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

CAUSTIC SODA LOADING PUMP /226.1 -226X1 3 BK -P-803 W1 /226.0 CAUSTIC SODA LOADING PUMP

= /226.1 -226X1 2 BN -P-803 V1 /226.0 =

= /226.0 -226X1 1 BU -P-803 U1 /226.0 =

1373 1375

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-226W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1374
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-228W1 FG7(O)R 4 2,5 P-804

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PROCESS WATER LOADING PUMP /228.1 -228X1 3 BK -P-804 W1 /228.0 PROCESS WATER LOADING PUMP

= /228.1 -228X1 2 BN -P-804 V1 /228.0 =

= /228.0 -228X1 1 BU -P-804 U1 /228.0 =

1374 1376

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-228W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1375
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-230W1 FG7(O)R 4G 2,5 P-805

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

DIESEL OIL LOADING PUMP /230.1 -230X1 3 BK -P-805 W1 /230.0 DIESEL OIL LOADING PUMP

= /230.1 -230X1 2 BN -P-805 V1 /230.0 =

= /230.0 -230X1 1 BU -P-805 U1 /230.0 =

1375 1377

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-230W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1376
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-232W1 FG7(O)R 4G 4 P-7

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

RECOVERY WATER CIRCULATION PUMP /232.1 -232X1 3 BK -P-7 W1 /232.0 RECOVERY WATER CIRCULATION PUMP

= /232.1 -232X1 2 BN -P-7 V1 /232.0 =

= /232.0 -232X1 1 BU -P-7 U1 /232.0 =

1376 1378

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-232W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1377
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-234W1 FG7(O)R 4G 2,5 ND-402FAN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SERVOFAN FOR ND-402 /234.1 -234X1 3 BK -ND-402FAN W1 /234.0 SERVOFAN FOR ND-402

= /234.1 -234X1 2 BN -ND-402FAN V1 /234.0 =

= /234.0 -234X1 1 BU -ND-402FAN U1 /234.0 =

1377 1379

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-234W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1378
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-236W1 FG7(O)R 4G 2,5 ND-406FAN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SERVOFAN FOR ND-406 /236.1 -236X1 3 BK -ND-406FAN W1 /236.0 SERVOFAN FOR ND-406

= /236.1 -236X1 2 BN -ND-406FAN V1 /236.0 =

= /236.0 -236X1 1 BU -ND-406FAN U1 /236.0 =

1378 1380

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-236W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1379
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-238W1 FG7(O)R 4G 2,5 ND-408FAN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SERVOFAN FOR ND-408 /238.1 -238X1 3 BK -ND-408FAN W1 /238.0 SERVOFAN FOR ND-408

= /238.1 -238X1 2 BN -ND-408FAN V1 /238.0 =

= /238.0 -238X1 1 BU -ND-408FAN U1 /238.0 =

1379 1381

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-238W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1380
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-240W1 FG7(O)R 4G 2,5 ND-409FAN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SERVOFAN FOR ND-409 /240.1 -240X1 3 BK -ND-409FAN W1 /240.0 SERVOFAN FOR ND-409

= /240.1 -240X1 2 BN -ND-409FAN V1 /240.0 =

= /240.0 -240X1 1 BU -ND-409FAN U1 /240.0 =

1380 1382

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-240W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1381
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-400W1 KV-1113

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1113 /400.1 -400X1 1 1 -KV-1113 /400.1 KV-1113

= /400.1 -400X1 2 2 -KV-1113 /400.1 =

1381 1383

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-400W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1382
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-400W2 KV-1113 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1113 OPEN /400.3 -400X1 3 1 -KV-1113 13 /400.3 KV-1113 OPEN

= /400.3 -400X1 4 2 -KV-1113 14 /400.3 =

KV-1113 CLOSE /400.4 -400X1 5 3 -KV-1113 13 /400.4 KV-1113 CLOSE

= /400.4 -400X1 6 4 -KV-1113 14 /400.4 =

1382 1384

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-400W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1383
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-401W1 KV-1201

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1201 /401.1 -401X1 1 1 -KV-1201 /401.1 KV-1201

= /401.1 -401X1 2 2 -KV-1201 /401.1 =

1383 1385

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-401W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1384
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-401W2 KV-1201 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1201 OPEN /401.3 -401X1 3 1 -KV-1201 13 /401.3 KV-1201 OPEN

= /401.3 -401X1 4 2 -KV-1201 14 /401.3 =

KV-1201 CLOSE /401.4 -401X1 5 3 -KV-1201 13 /401.4 KV-1201 CLOSE

= /401.4 -401X1 6 4 -KV-1201 14 /401.4 =

1384 1386

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-401W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1385
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-402W1 KV-1202

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1202 /402.1 -402X1 1 1 -KV-1202 /402.1 KV-1202

= /402.1 -402X1 2 2 -KV-1202 /402.1 =

1385 1387

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-402W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1386
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-402W2 KV-1202 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1202 OPEN /402.3 -402X1 3 1 -KV-1202 13 /402.3 KV-1202 OPEN

= /402.3 -402X1 4 2 -KV-1202 14 /402.3 =

KV-1202 CLOSE /402.4 -402X1 5 3 -KV-1202 13 /402.4 KV-1202 CLOSE

= /402.4 -402X1 6 4 -KV-1202 14 /402.4 =

1386 1388

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-402W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1387
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-403W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /403.1 -403X1 1 1 -SPARE /403.1 SPARE

= /403.1 -403X1 2 2 -SPARE /403.1 =

1387 1389

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-403W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1388
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-403W2 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /403.3 -403X1 3 1 -SPARE 13 /403.3 SPARE

= /403.3 -403X1 4 2 -SPARE 14 /403.3 =

= /403.4 -403X1 5 3 -SPARE 13 /403.4 =

= /403.4 -403X1 6 4 -SPARE 14 /403.4 =

1388 1390

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-403W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1389
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-404W1 KV-1309

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1309 /404.1 -404X1 1 1 -KV-1309 /404.1 KV-1309

= /404.1 -404X1 2 2 -KV-1309 /404.1 =

1389 1391

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-404W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1390
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-404W2 KV-1309 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1309 OPEN /404.3 -404X1 3 1 -KV-1309 13 /404.3 KV-1309 OPEN

= /404.3 -404X1 4 2 -KV-1309 14 /404.3 =

KV-1309 CLOSE /404.4 -404X1 5 3 -KV-1309 13 /404.4 KV-1309 CLOSE

= /404.4 -404X1 6 4 -KV-1309 14 /404.4 =

1390 1392

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-404W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1391
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-405W1 KV-1310

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1310 /405.1 -405X1 1 1 -KV-1310 /405.1 KV-1310

= /405.1 -405X1 2 2 -KV-1310 /405.1 =

1391 1393

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-405W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1392
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-405W2 KV-1310 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1310 OPEN /405.3 -405X1 3 1 -KV-1310 13 /405.3 KV-1310 OPEN

= /405.3 -405X1 4 2 -KV-1310 14 /405.3 =

KV-1310 CLOSE /405.4 -405X1 5 3 -KV-1310 13 /405.4 KV-1310 CLOSE

= /405.4 -405X1 6 4 -KV-1310 14 /405.4 =

1392 1394

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-405W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1393
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-406W1 KV-1316

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1316 /406.1 -406X1 1 1 -KV-1316 /406.1 KV-1316

= /406.1 -406X1 2 2 -KV-1316 /406.1 =

1393 1395

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-406W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1394
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-406W2 KV-1316 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1316 OPEN /406.3 -406X1 3 1 -KV-1316 13 /406.3 KV-1316 OPEN

= /406.3 -406X1 4 2 -KV-1316 14 /406.3 =

KV-1316 CLOSE /406.4 -406X1 5 3 -KV-1316 13 /406.4 KV-1316 CLOSE

= /406.4 -406X1 6 4 -KV-1316 14 /406.4 =

1394 1396

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-406W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1395
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-407W1 KV-1320

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1320 /407.1 -407X1 1 1 -KV-1320 /407.1 KV-1320

= /407.1 -407X1 2 2 -KV-1320 /407.1 =

1395 1397

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-407W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1396
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-407W2 KV-1320 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1320 OPEN /407.3 -407X1 3 1 -KV-1320 13 /407.3 KV-1320 OPEN

= /407.3 -407X1 4 2 -KV-1320 14 /407.3 =

KV-1320 CLOSE /407.4 -407X1 5 3 -KV-1320 13 /407.4 KV-1320 CLOSE

= /407.4 -407X1 6 4 -KV-1320 14 /407.4 =

1396 1398

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-407W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1397
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-408W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /408.1 -408X1 1 1 -SPARE /408.1 SPARE

= /408.1 -408X1 2 2 -SPARE /408.1 =

1397 1399

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-408W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1398
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-408W2 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /408.3 -408X1 3 1 -SPARE 13 /408.3 SPARE

= /408.3 -408X1 4 2 -SPARE 14 /408.3 =

= /408.4 -408X1 5 3 -SPARE 13 /408.4 =

= /408.4 -408X1 6 4 -SPARE 14 /408.4 =

1398 1400

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-408W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1399
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-409W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /409.1 -409X1 1 1 -SPARE /409.1 SPARE

= /409.1 -409X1 2 2 -SPARE /409.1 =

1399 1401

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-409W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1400
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-409W2 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /409.3 -409X1 3 1 -SPARE 13 /409.3 SPARE

= /409.3 -409X1 4 2 -SPARE 14 /409.3 =

= /409.4 -409X1 5 3 -SPARE 13 /409.4 =

= /409.4 -409X1 6 4 -SPARE 14 /409.4 =

1400 1402

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-409W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1401
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-410W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /410.1 -410X1 1 1 -SPARE /410.1 SPARE

= /410.1 -410X1 2 2 -SPARE /410.1 =

1401 1403

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-410W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1402
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-410W2 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /410.4 -410X1 3 1 -SPARE 13 /410.4 SPARE

= /410.4 -410X1 4 2 -SPARE 14 /410.4 =

= /410.5 -410X1 5 3 -SPARE 13 /410.5 =

= /410.5 -410X1 6 4 -SPARE 14 /410.5 =

1402 1404

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-410W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1403
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-410W3 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /410.2 -410X1 7 1 -SPARE /410.2 SPARE

= /410.2 -410X1 8 2 -SPARE /410.2 =

1403 1405

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-410W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1404
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-411W1 KV-1115

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1115 /411.1 -411X1 1 1 -KV-1115 /411.1 KV-1115

= /411.1 -411X1 2 2 -KV-1115 /411.1 =

1404 1406

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-411W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1405
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-411W2 KV-1115 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1115 OPEN /411.3 -411X1 3 1 -KV-1115 13 /411.3 KV-1115 OPEN

= /411.3 -411X1 4 2 -KV-1115 14 /411.3 =

KV-1115 CLOSE /411.4 -411X1 5 3 -KV-1115 13 /411.4 KV-1115 CLOSE

= /411.4 -411X1 6 4 -KV-1115 14 /411.4 =

1405 1407

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-411W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1406
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-412W1 KV-1108

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1108 /412.1 -412X1 1 1 -KV-1108 /412.1 KV-1108

= /412.1 -412X1 2 2 -KV-1108 /412.1 =

1406 1408

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-412W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1407
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-412W2 KV-1108 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-1108 OPEN /412.3 -412X1 3 1 -KV-1108 13 /412.3 KV-1108 OPEN

= /412.3 -412X1 4 2 -KV-1108 14 /412.3 =

KV-1108 CLOSE /412.4 -412X1 5 3 -KV-1108 13 /412.4 KV-1108 CLOSE

= /412.4 -412X1 6 4 -KV-1108 14 /412.4 =

1407 1409

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-412W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1408
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-413W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /413.1 -413X1 1 1 -SPARE /413.1 SPARE

= /413.1 -413X1 2 2 -SPARE /413.1 =

1408 1410

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-413W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1409
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-413W2 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /413.3 -413X1 3 1 -SPARE 13 /413.3 SPARE

= /413.3 -413X1 4 2 -SPARE 14 /413.3 =

= /413.4 -413X1 5 3 -SPARE 13 /413.4 =

= /413.4 -413X1 6 4 -SPARE 14 /413.4 =

1409 1411

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-413W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1410
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-414W1 KV-4120

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4120 /414.1 -414X1 1 1 -KV-4120 /414.1 KV-4120

= /414.1 -414X1 2 2 -KV-4120 /414.1 =

1410 1412

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-414W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1411
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-414W2 KV-4120 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4120 OPEN /414.3 -414X1 3 1 -KV-4120 13 /414.3 KV-4120 OPEN

= /414.3 -414X1 4 2 -KV-4120 14 /414.3 =

KV-4120 CLOSE /414.4 -414X1 5 3 -KV-4120 13 /414.4 KV-4120 CLOSE

= /414.4 -414X1 6 4 -KV-4120 14 /414.4 =

1411 1413

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-414W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1412
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-415W1 KV-4102A

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4102A /415.1 -415X1 1 1 -KV-4102A /415.1 KV-4102A

= /415.1 -415X1 2 2 -KV-4102A /415.1 =

1412 1414

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-415W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1413
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-415W2 KV-4102A OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4102A OPEN /415.3 -415X1 3 1 -KV-4102A 13 /415.3 KV-4102A OPEN

= /415.3 -415X1 4 2 -KV-4102A 14 /415.3 =

KV-4102A CLOSE /415.4 -415X1 5 3 -KV-4102A 13 /415.4 KV-4102A CLOSE

= /415.4 -415X1 6 4 -KV-4102A 14 /415.4 =

1413 1415

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-415W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1414
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-416W1 KV-4102B

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4102B /416.1 -416X1 1 1 -KV-4102B /416.1 KV-4102B

= /416.1 -416X1 2 2 -KV-4102B /416.1 =

1414 1416

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-416W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1415
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-416W2 KV-4102B OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

KV-4102B OPEN /416.3 -416X1 3 1 -KV-4102B 13 /416.3 KV-4102B OPEN

= /416.3 -416X1 4 2 -KV-4102B 14 /416.3 =

KV-4102B CLOSE /416.4 -416X1 5 3 -KV-4102B 13 /416.4 KV-4102B CLOSE

= /416.4 -416X1 6 4 -KV-4102B 14 /416.4 =

1415 1417

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-416W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1416
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-432W1 MV-1301 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1301 OPEN /432.3 -432X1 1 1 -MV-1301 13 /432.3 MV-1301 OPEN

= /432.3 -432X1 2 2 -MV-1301 14 /432.3 =

MV-1301 CLOSE /432.4 -432X1 3 3 -MV-1301 13 /432.4 MV-1301 CLOSE

= /432.4 -432X1 4 4 -MV-1301 14 /432.4 =

1416 1418

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-432W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1417
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-433W1 MV-1302 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1302 OPEN /433.3 -433X1 1 1 -MV-1302 13 /433.3 MV-1302 OPEN

= /433.3 -433X1 1 2 -MV-1302 14 /433.3 =

MV-1302 CLOSE /433.4 -433X1 2 3 -MV-1302 13 /433.4 MV-1302 CLOSE

= /433.4 -433X1 2 4 -MV-1302 14 /433.4 =

1417 1419

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-433W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1418
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-434W1 MV-1303 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1303 OPEN /434.3 -434X1 1 1 -MV-1303 13 /434.3 MV-1303 OPEN

= /434.3 -434X1 2 2 -MV-1303 14 /434.3 =

MV-1303 CLOSE /434.4 -434X1 3 3 -MV-1303 13 /434.4 MV-1303 CLOSE

= /434.4 -434X1 4 4 -MV-1303 14 /434.4 =

1418 1420

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-434W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1419
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-435W1 MV-1304 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1304 OPEN /435.3 -435X1 1 1 -MV-1304 13 /435.3 MV-1304 OPEN

= /435.3 -435X1 2 2 -MV-1304 14 /435.3 =

MV-1304 CLOSE /435.4 -435X1 3 3 -MV-1304 13 /435.4 MV-1304 CLOSE

= /435.4 -435X1 4 4 -MV-1304 14 /435.4 =

1419 1421

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-435W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1420
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-436W1 MV-1305 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1305 OPEN /436.3 -436X1 1 1 -MV-1305 13 /436.3 MV-1305 OPEN

= /436.3 -436X1 2 2 -MV-1305 14 /436.3 =

MV-1305 CLOSE /436.4 -436X1 3 3 -MV-1305 13 /436.4 MV-1305 CLOSE

= /436.4 -436X1 4 4 -MV-1305 14 /436.4 =

1420 1422

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-436W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1421
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-437W1 MV-1306 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1306 OPEN /437.3 -437X1 1 1 -MV-1306 13 /437.3 MV-1306 OPEN

= /437.3 -437X1 2 2 -MV-1306 14 /437.3 =

MV-1306 CLOSE /437.4 -437X1 3 3 -MV-1306 13 /437.4 MV-1306 CLOSE

= /437.4 -437X1 4 4 -MV-1306 14 /437.4 =

1421 1423

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-437W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1422
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-438W1 MV-1307 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1307 OPEN /438.3 -438X1 1 1 -MV-1307 13 /438.3 MV-1307 OPEN

= /438.3 -438X1 2 2 -MV-1307 14 /438.3 =

MV-1307 CLOSE /438.4 -438X1 3 3 -MV-1307 13 /438.4 MV-1307 CLOSE

= /438.4 -438X1 4 4 -MV-1307 14 /438.4 =

1422 1424

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-438W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1423
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-439W1 MV-1308 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1308 OPEN /439.3 -439X1 1 1 -MV-1308 13 /439.3 MV-1308 OPEN

= /439.3 -439X1 2 2 -MV-1308 14 /439.3 =

MV-1308 CLOSE /439.4 -439X1 3 3 -MV-1308 13 /439.4 MV-1308 CLOSE

= /439.4 -439X1 4 4 -MV-1308 14 /439.4 =

1423 1425

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-439W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1424
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-440W1 MV-1309 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1309 OPEN /440.3 -440X1 1 1 -MV-1309 13 /440.3 MV-1309 OPEN

= /440.3 -440X1 2 2 -MV-1309 14 /440.3 =

MV-1309 CLOSE /440.4 -440X1 3 3 -MV-1309 13 /440.4 MV-1309 CLOSE

= /440.4 -440X1 4 4 -MV-1309 14 /440.4 =

1424 1426

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-440W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1425
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-441W1 MV-1310 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

MV-1310 OPEN /441.3 -441X1 1 1 -MV-1310 13 /441.3 MV-1310 OPEN

= /441.3 -441X1 2 2 -MV-1310 14 /441.3 =

MV-1310 CLOSE /441.4 -441X1 3 3 -MV-1310 13 /441.4 MV-1310 CLOSE

= /441.4 -441X1 4 4 -MV-1310 14 /441.4 =

1425 1427

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-441W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1426
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-450W1 COMPRESSED AIR OF FAN FS1 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS1 COMMAND /450.1 -450X1 1 1 -KY-1 /450.1 COMPRESSED AIR OF FAN FS1 COMMAND

= /450.1 -450X1 2 2 -KY-1 /450.1 =

1426 1428

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-450W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1427
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-451W1 COMPRESSED AIR OF FAN FS2 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS2 COMMAND /451.1 -451X1 1 1 -KY-2 /451.1 COMPRESSED AIR OF FAN FS2 COMMAND

= /451.1 -451X1 2 2 -KY-2 /451.1 =

1427 1429

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-451W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1428
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-452W1 COMPRESSED AIR OF FAN FS3 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS3 COMMAND /452.1 -452X1 1 1 -KY-3 /452.1 COMPRESSED AIR OF FAN FS3 COMMAND

= /452.1 -452X1 2 2 -KY-3 /452.1 =

1428 1430

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-452W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1429
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-453W1 COMPRESSED AIR OF FAN FSH COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FSH COMMAND /453.1 -453X1 1 1 -KY-4 /453.1 COMPRESSED AIR OF FAN FSH COMMAND

= /453.1 -453X1 2 2 -KY-4 /453.1 =

1429 1431

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-453W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1430
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-454W1 COMPRESSED AIR OF FAN BL4 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN BL4 COMMAND /454.1 -454X1 1 1 -KY-6 /454.1 COMPRESSED AIR OF FAN BL4 COMMAND

= /454.1 -454X1 2 2 -KY-6 /454.1 =

1430 1432

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-454W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1431
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-455W1 COMPRESSED AIR OF FAN FS402A COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS402A COMMAND /455.1 -455X1 1 1 -KY-7 /455.1 COMPRESSED AIR OF FAN FS402A COMMAND

= /455.1 -455X1 2 2 -KY-7 /455.1 =

1431 1433

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-455W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1432
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-456W1 COMPRESSED AIR OF FAN FS402B COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS402B COMMAND /456.1 -456X1 1 1 -KY-8 /456.1 COMPRESSED AIR OF FAN FS402B COMMAND

= /456.1 -456X1 2 2 -KY-8 /456.1 =

1432 1434

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-456W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1433
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-457W1 COMPRESSED AIR OF FAN FS406 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS406 COMMAND /457.1 -457X1 1 1 -KY-9 /457.1 COMPRESSED AIR OF FAN FS406 COMMAND

= /457.1 -457X1 2 2 -KY-9 /457.1 =

1433 1435

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-457W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1434
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-458W1 COMPRESSED AIR OF FAN FS408 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS408 COMMAND /458.1 -458X1 1 1 -KY-10 /458.1 COMPRESSED AIR OF FAN FS408 COMMAND

= /458.1 -458X1 2 2 -KY-10 /458.1 =

1434 1436

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-458W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1435
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-459W1 COMPRESSED AIR OF FAN FS409 COMMAND

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

COMPRESSED AIR OF FAN FS409 COMMAND /459.1 -459X1 1 1 -KY-11 /459.1 COMPRESSED AIR OF FAN FS409 COMMAND

FSH-1 /460.1 -460X1 1 1 -FSH-1 /460.1 FSH-1

COMPRESSED AIR OF FAN FS409 COMMAND /459.1 -459X1 2 2 -KY-11 /459.1 COMPRESSED AIR OF FAN FS409 COMMAND

FSH-1 /460.1 -460X1 2 2 -FSH-1 /460.1 FSH-1

1435 1437

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-459W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1436
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-470W1 LSH-1108 LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-1108 LEVEL SWITCH HIGH /470.2 -470X1 1 1 -LSH-1108 1 /470.2 LSH-1108 LEVEL SWITCH HIGH

= /470.2 -470X1 2 2 -LSH-1108 2 /470.2 =

= /470.2 -470X1 3 3 -LSH-1108 3 /470.2 =

1436 1438

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-470W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1437
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-471W1 LSH-1318 LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-1318 LEVEL SWITCH HIGH /471.2 -471X1 1 1 -LSH-1318 1 /471.2 LSH-1318 LEVEL SWITCH HIGH

= /471.2 -471X1 2 2 -LSH-1318 2 /471.2 =

= /471.2 -471X1 3 3 -LSH-1318 3 /471.2 =

1437 1439

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-471W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1438
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-472W1 LSH-1370 LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-1370 LEVEL SWITCH HIGH /472.2 -472X1 1 1 -LSH-1370 1 /472.2 LSH-1370 LEVEL SWITCH HIGH

= /472.2 -472X1 2 2 -LSH-1370 2 /472.2 =

= /472.2 -472X1 3 3 -LSH-1370 3 /472.2 =

1438 1440

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-472W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1439
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-473W1 LSH-1371 LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-1371 LEVEL SWITCH HIGH /473.2 -473X1 1 1 -LSH-1371 1 /473.2 LSH-1371 LEVEL SWITCH HIGH

= /473.2 -473X1 2 2 -LSH-1371 2 /473.2 =

= /473.2 -473X1 3 3 -LSH-1371 3 /473.2 =

1439 1441

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-473W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1440
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-474W1 LSH-4103A LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-4103A LEVEL SWITCH HIGH /474.2 -474X1 1 1 -LSH-4103A 1 /474.2 LSH-4103A LEVEL SWITCH HIGH

= /474.2 -474X1 2 2 -LSH-4103A 2 /474.2 =

= /474.2 -474X1 3 3 -LSH-4103A 3 /474.2 =

1440 1442

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-474W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1441
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-475W1 LSH-4103B LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-4103B LEVEL SWITCH HIGH /475.2 -475X1 1 1 -LSH-4103B 1 /475.2 LSH-4103B LEVEL SWITCH HIGH

= /475.2 -475X1 2 2 -LSH-4103B 2 /475.2 =

= /475.2 -475X1 3 3 -LSH-4103B 3 /475.2 =

1441 1443

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-475W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1442
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-476W1 LSH-4104 LEVEL SWITCH HIGH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-4104 LEVEL SWITCH HIGH /476.2 -476X1 1 1 -LSH-4104 1 /476.2 LSH-4104 LEVEL SWITCH HIGH

= /476.2 -476X1 2 2 -LSH-4104 2 /476.2 =

= /476.2 -476X1 3 3 -LSH-4104 3 /476.2 =

1442 1444

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-476W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1443
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-477W1 LSL-1104 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-1104 LEVEL SWITCH LOW /477.2 -477X1 1 1 -LSL-1104 1 /477.2 LSL-1104 LEVEL SWITCH LOW

= /477.2 -477X1 2 2 -LSL-1104 2 /477.2 =

= /477.2 -477X1 3 3 -LSL-1104 3 /477.2 =

1443 1445

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-477W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1444
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-478W1 LSL-1122 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-1122 LEVEL SWITCH LOW /478.2 -478X1 1 1 -LSL-1122 1 /478.2 LSL-1122 LEVEL SWITCH LOW

= /478.2 -478X1 2 2 -LSL-1122 2 /478.2 =

= /478.2 -478X1 3 3 -LSL-1122 3 /478.2 =

1444 1446

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-478W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1445
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-479W1 LSL-1123 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-1123 LEVEL SWITCH LOW /479.2 -479X1 1 1 -LSL-1123 1 /479.2 LSL-1123 LEVEL SWITCH LOW

= /479.2 -479X1 2 2 -LSL-1123 2 /479.2 =

= /479.2 -479X1 3 3 -LSL-1123 3 /479.2 =

1445 1447

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-479W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1446
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-480W1 LSH-1124 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSH-1124 LEVEL SWITCH LOW /480.2 -480X1 1 1 -LSL-1124 1 /480.2 LSH-1124 LEVEL SWITCH LOW

= /480.2 -480X1 2 2 -LSL-1124 2 /480.2 =

= /480.2 -480X1 3 3 -LSL-1124 3 /480.2 =

1446 1448

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-480W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1447
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-481W1 LSL-1125 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-1125 LEVEL SWITCH LOW /481.2 -481X1 1 1 -LSL-1125 1 /481.2 LSL-1125 LEVEL SWITCH LOW

= /481.2 -481X1 2 2 -LSL-1125 2 /481.2 =

= /481.2 -481X1 3 3 -LSL-1125 3 /481.2 =

1447 1449

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-481W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1448
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-482W1 LSL-4101A LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4101A LEVEL SWITCH LOW /482.2 -482X1 1 1 -LSL-4101A 1 /482.2 LSL-4101A LEVEL SWITCH LOW

= /482.2 -482X1 2 2 -LSL-4101A 2 /482.2 =

= /482.2 -482X1 3 3 -LSL-4101A 3 /482.2 =

1448 1450

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-482W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1449
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-483W1 LSL-4101B LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4101B LEVEL SWITCH LOW /483.2 -483X1 1 1 -LSL-4101B 1 /483.2 LSL-4101B LEVEL SWITCH LOW

= /483.2 -483X1 2 2 -LSL-4101B 2 /483.2 =

= /483.2 -483X1 3 3 -LSL-4101B 3 /483.2 =

1449 1451

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-483W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1450
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-484W1 LSL-4105 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4105 LEVEL SWITCH LOW /484.2 -484X1 1 1 -LSL-4105 1 /484.2 LSL-4105 LEVEL SWITCH LOW

= /484.2 -484X1 2 2 -LSL-4105 2 /484.2 =

= /484.2 -484X1 3 3 -LSL-4105 3 /484.2 =

1450 1452

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-484W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1451
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-485W1 LSL-4109 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4109 LEVEL SWITCH LOW /485.2 -485X1 1 1 -LSL-4109 1 /485.2 LSL-4109 LEVEL SWITCH LOW

= /485.2 -485X1 2 2 -LSL-4109 2 /485.2 =

= /485.2 -485X1 3 3 -LSL-4109 3 /485.2 =

1451 1453

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-485W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1452
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-486W1 LSL-4112 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4112 LEVEL SWITCH LOW /486.2 -486X1 1 1 -LSL-4112 1 /486.2 LSL-4112 LEVEL SWITCH LOW

= /486.2 -486X1 2 2 -LSL-4112 2 /486.2 =

= /486.2 -486X1 3 3 -LSL-4112 3 /486.2 =

1452 1454

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-486W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1453
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-487W1 LSL-4113 LEVEL SWITCH LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSL-4113 LEVEL SWITCH LOW /487.2 -487X1 1 1 -LSL-4113 1 /487.2 LSL-4113 LEVEL SWITCH LOW

= /487.2 -487X1 2 2 -LSL-4113 2 /487.2 =

= /487.2 -487X1 3 3 -LSL-4113 3 /487.2 =

1453 1455

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-487W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1454
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-488W1 SPARE

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

SPARE /488.2 -488X1 1 1 -SPARE 1 /488.2 SPARE

= /488.2 -488X1 2 2 -SPARE 2 /488.2 =

= /488.2 -488X1 3 3 -SPARE 3 /488.2 =

1454 1456

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-488W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1455
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-489W1 LSLL-1106 LEVEL SWITCH LOW LOW

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LSLL-1106 LEVEL SWITCH LOW LOW /489.2 -489X1 1 1 -LSLL-1106 1 /489.2 LSLL-1106 LEVEL SWITCH LOW LOW

= /489.2 -489X1 2 2 -LSLL-1106 2 /489.2 =

= /489.2 -489X1 3 3 -LSLL-1106 3 /489.2 =

1455 1457

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-489W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1456
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-500W1 FIS-1209 FLOW SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FIS-1209 FLOW SWITCH /500.2 -500X1 1 1 -FIS-1209 1 /500.2 FIS-1209 FLOW SWITCH

= /500.2 -500X1 2 2 -FIS-1209 3 /500.2 =

1456 1458

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-500W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1457
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-501W1 FIS-1219 FLOW SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FIS-1219 FLOW SWITCH /501.2 -501X1 1 1 -FIS-1219 1 /501.2 FIS-1219 FLOW SWITCH

= /501.2 -501X1 2 2 -FIS-1219 3 /501.2 =

1457 1459

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-501W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1458
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-502W1 FIS-1279 FLOW SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FIS-1279 FLOW SWITCH /502.2 -502X1 1 1 -FIS-1279 1 /502.2 FIS-1279 FLOW SWITCH

= /502.2 -502X1 2 2 -FIS-1279 3 /502.2 =

1458 1460

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-502W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1459
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-503W1 FIS-1299 FLOW SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FIS-1299 FLOW SWITCH /503.2 -503X1 1 1 -FIS-1299 1 /503.2 FIS-1299 FLOW SWITCH

= /503.2 -503X1 2 2 -FIS-1299 3 /503.2 =

1459 1461

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-503W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1460
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-504W1 PSL-8205 PRESSURE SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PSL-8205 PRESSURE SWITCH /504.2 -504X1 1 1 -PSL-8205 1 /504.2 PSL-8205 PRESSURE SWITCH

= /504.2 -504X1 2 2 -PSL-8205 3 /504.2 =

1460 1462

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-504W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1461
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-505W1 PSL-8305 PRESSURE SWITCH

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PSL-8305 PRESSURE SWITCH /505.2 -505X1 1 1 -PSL-8305 1 /505.2 PSL-8305 PRESSURE SWITCH

= /505.2 -505X1 2 2 -PSL-8305 3 /505.2 =

1461 1463

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-505W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1462
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-520W1 VALVE FOR F3

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

VALVE FOR F3 /520.1 -520X1 1 1 -AR-5 /520.1 VALVE FOR F3

= /520.1 -520X1 2 2 -AR-5 /520.1 =

1462 1464

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-520W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1463
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-520W2 AR-5 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AR-5 OPEN /520.3 -520X1 3 1 -AR-5 13 /520.3 AR-5 OPEN

= /520.3 -520X1 4 2 -AR-5 14 /520.3 =

1463 1465

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-520W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1464
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-521W1 AIR REDUCING FOR F-4

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AIR REDUCING FOR F-4 /521.1 -521X1 1 1 -AR-6 /521.1 AIR REDUCING FOR F-4

AR-7 /522.1 -522X1 1 1 -AR-7 /522.1 AR-7

AIR REDUCING FOR F-4 /521.1 -521X1 2 2 -AR-6 /521.1 AIR REDUCING FOR F-4

AR-7 /522.1 -522X1 2 2 -AR-7 /522.1 AR-7

1464 1466

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-521W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1465
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-521W2 AR-6 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AR-6 OPEN /521.3 -521X1 3 1 -AR-6 13 /521.3 AR-6 OPEN

AR-7 OPEN /522.3 -522X1 3 1 -AR-7 13 /522.3 AR-7 OPEN

AR-6 OPEN /521.3 -521X1 4 2 -AR-6 14 /521.3 AR-6 OPEN

AR-7 OPEN /522.3 -522X1 4 2 -AR-7 14 /522.3 AR-7 OPEN

1465 1467

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-521W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1466
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-523W1 AR-8

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AR-8 /523.1 -523X1 1 1 -AR-8 /523.1 AR-8

= /523.1 -523X1 2 2 -AR-8 /523.1 =

1466 1468

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-523W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1467
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-523W2 AR-8 OPEN

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

AR-8 OPEN /523.3 -523X1 3 1 -AR-8 13 /523.3 AR-8 OPEN

= /523.3 -523X1 4 2 -AR-8 14 /523.3 =

1467 1469

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-523W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1468
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-540W1 F-3 STATUS

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

F-3 STATUS /540.2 -540X1 1 1 -F-3 5 /540.2 F-3 STATUS

= /540.2 -540X1 2 2 -F-3 4 /540.2 =

F-3 FAILURE /540.3 -540X1 3 3 -F-3 7 /540.3 F-3 FAILURE

= /540.3 -540X1 4 4 -F-3 6 /540.3 =

1468 1470

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-540W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1469
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-540W2 F-3 ON-OFF

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

F-3 ON-OFF /540.8 -540X2 1 1 -F-3 2+ /540.8

F-3 /540.9 -540X2 2 2 -F-3 3- /540.8

1469 1471

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-540W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1470
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-541W1 F-4 STATUS

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

F-4 STATUS /541.2 -541X1 1 1 -F-4 5 /541.2 F-4 STATUS

= /541.2 -541X1 2 2 -F-4 4 /541.2 =

F-4 FAILURE /541.3 -541X1 3 3 -F-4 7 /541.3 F-4 FAILURE

= /541.3 -541X1 4 4 -F-4 6 /541.3 =

1470 1472

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-541W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1471
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-541W2 F-4 ON-OFF

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

F-4 ON-OFF /541.8 -541X2 1 1 -F-4 2+ /541.8

F-4 /541.9 -541X2 2 2 -F-4 3- /541.8

1471 1473

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-541W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1472
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-542W1 BR-1 STATUS

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

BR-1 STATUS /542.1 -542X1 1 1 -BR-1 13 /542.1 BR-1 STATUS

= /542.1 -542X1 2 2 -BR-1 14 /542.1 =

BR-1 FAILURE /542.2 -542X1 3 3 -BR-1 13 /542.2 BR-1 FAILURE

= /542.2 -542X1 4 4 -BR-1 14 /542.2 =

1472 1474

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-542W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1473
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-542W2 BR-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

BR-1 /542.7 -542X2 1 1 -BR-1 2+ /542.7 BR-1

= /542.7 -542X2 2 2 -BR-1 3- /542.7 =

1473 1475

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-542W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1474
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-542W3 BR-1

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

BR-1 /542.8 -542X3 1 1 -AO8 QI1 /542.8 BURNER OUT CONTROL

= /542.8 -542X3 2 2 -AO8 Mana /542.8 =

1474 1476

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-542W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1475
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-550W1 HV-1308 FEEDBACK

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HV-1308 FEEDBACK /550.1 -550X1 1 1 -HV-1308 2+ /550.1 HV-1308 FEEDBACK

= /550.2 -550X1 2 2 -HV-1308 3- /550.1 =

1475 1477

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-550W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1476
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-550W2 HV-1308 CONTROL

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HV-1308 CONTROL /550.3 -550X2 1 1 -AO7 QI0 /550.3 CONTROL VALVE OF DRYING AIR FEEDING FAN OUT CONTROL

= /550.4 -550X2 2 2 -AO7 Mana /550.3 =

1476 1478

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-550W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1477
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-551W1 PV-1311 FEEDBACK

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PV-1311 FEEDBACK /551.1 -551X1 1 1 -PV-1311 2+ /551.1 PV-1311 FEEDBACK

= /551.2 -551X1 2 2 -PV-1311 3- /551.1 =

1477 1479

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-551W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1478
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-551W2 PV-1311 CONTROL

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PV-1311 CONTROL /551.3 -551X2 1 1 -AO7 QI1 /551.3 CONTROL VALVE OF DRYING AIR FEEDING FAN OUT CONTROL

= /551.4 -551X2 2 2 -AO7 Mana /551.3 =

1478 1480

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-551W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1479
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-552W1 HV-1319 FEEDBACK

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HV-1319 FEEDBACK /552.1 -552X1 1 1 -HV-1319 2+ /552.1 HV-1319 FEEDBACK

= /552.2 -552X1 2 2 -HV-1319 3- /552.1 =

1479 1481

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-552W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1480
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-552W2 HV-1319 CONTROL

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

HV-1319 CONTROL /552.3 -552X2 1 1 -AO8 QI0 /552.3 CONTROL VALVE OF AIR LIFT FAN OUT CONTROL

= /552.4 -552X2 2 2 -AO8 Mana /552.3 =

1480 1483

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-552W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1481
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-600W2 TT-1109

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1109 /600.2 -600X1 3 1 -TT-1109 2+ /600.2 TT-1109

= /600.2 -600X1 4 2 -TT-1109 3- /600.2 =

1481 1484

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-600W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1483
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-600W3 TT-1112

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1112 /600.3 -600X1 5 1 -TT-1112 2+ /600.3 TT-1112

= /600.3 -600X1 6 2 -TT-1112 3- /600.3 =

1483 1487

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-600W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1484
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-600W6 TT-1128

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1128 /600.6 -600X1 11 1 -TT-1128 2+ /600.6 TT-1128

= /600.6 -600X1 12 2 -TT-1128 3- /600.6 =

1484 1488

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-600W6 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1487
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-600W7 TT-1124

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1124 /600.7 -600X1 13 1 -TT-1124 2+ /600.7 TT-1124

= /600.7 -600X1 14 2 -TT-1124 3- /600.7 =

1487 1491

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-600W7 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1488
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W2 TT-1306

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1306 /601.2 -601X1 3 1 -TT-1106 2+ /601.2 TT-1306

= /601.2 -601X1 4 2 -TT-1106 3- /601.2 =

1488 1492

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1491
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W3 TT-1312

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1312 /601.3 -601X1 5 1 -TT-1312 2+ /601.3 TT-1312

= /601.3 -601X1 6 2 -TT-1312 3- /601.3 =

1491 1493

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1492
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W4 TT-1314

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-1314 /601.4 -601X1 7 1 -TT-1314 2+ /601.4 TT-1314

= /601.4 -601X1 8 2 -TT-1314 3- /601.4 =

1492 1494

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W4 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1493
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W5 TT-8101

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-8101 /601.5 -601X1 9 1 -TT-8101 2+ /601.5 TT-8101

= /601.5 -601X1 10 2 -TT-8101 3- /601.5 =

1493 1495

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W5 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1494
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W6 TT-8202

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-8202 /601.6 -601X1 11 1 -TT-8202 2+ /601.6 TT-8202

= /601.6 -601X1 12 2 -TT-8202 3- /601.6 =

1494 1496

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W6 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1495
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W7 TT-8301

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-8301 /601.7 -601X1 13 1 -TT-8301 2+ /601.7 TT-8301

= /601.7 -601X1 14 2 -TT-8301 3- /601.7 =

1495 1497

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W7 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1496
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-601W8 TT-8302

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

TT-8302 /601.8 -601X1 15 1 -TT-8302 2+ /601.8 TT-8302

= /601.8 -601X1 16 2 -TT-8302 3- /601.8 =

1496 1499

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-601W8 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1497
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-620W2 LT-1110

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LT-1110 /620.2 -620X1 3 1 -LT-1110 2+ /620.2

= /620.2 -620X1 4 2 -LT-1110 3- /620.2

1497 1502

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-620W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1499
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-620W5 LT-4114

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LT-4114 /620.5 -620X1 9 1 -LT-4114 2+ /620.5

= /620.5 -620X1 10 2 -LT-4114 3- /620.5

1499 1503

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-620W5 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1502
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-620W6 LT-8102

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LT-8102 /620.6 -620X1 11 1 -LT-8102 2+ /620.6

= /620.6 -620X1 12 2 -LT-8102 3- /620.6

1502 1505

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-620W6 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1503
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-620W8 LT-8201

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LT-8201 /620.8 -620X1 15 1 -LT-8201 2+ /620.8

= /620.8 -620X1 16 2 -LT-8201 3- /620.8

1503 1506

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-620W8 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1505
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-621W1 LT-8211

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

LT-8211 /621.0 -621X1 1 1 -LT-8211 2+ /621.1

= /621.1 -621X1 2 2 -LT-8211 3- /621.1

1505 1508

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-621W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1506
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-640W1 FT-4121

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FT-4121 /630.0 -630X1 1 1 -FT-4121 2+ /630.1

PT-1211 /640.0 -640X1 1 1 -PT-1211 2+ /640.1

FT-4121 /630.1 -630X1 2 2 -FT-4121 3- /630.1

PT-1211 /640.1 -640X1 2 2 -PT-1211 3- /640.1

1506 1509

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-640W1 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1508
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-640W2 FT-4122

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

FT-4122 /630.2 -630X1 3 1 -FT-4122 2+ /630.2

PT-1213 /640.2 -640X1 3 1 -PT-1213 2+ /640.2

FT-4122 /630.2 -630X1 4 2 -FT-4122 3- /630.2

PT-1213 /640.2 -640X1 4 2 -PT-1213 3- /640.2

1508 1510

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-640W2 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1509
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

Schema cablaggio F09_001

Nome cavo Tipo cavo Numero conduttori Sezione Lunghezza cavo Testo funzionale
=CB_1+-640W3 PT-1311

Designazione destinazione in
Testo funzionale Rif.incr. Designazione destinazione da Attacco Conduttore Attacco Rif.incr. Testo funzionale
direzione di

PT-1311 /640.3 -640X1 5 1 -PT-1311 2+ /640.3

= /640.3 -640X1 6 2 -PT-1311 3- /640.3

1509 =TERMINAL/1800

REVISION 03/10/2018 00143 Data 03/10/2018 Cable diagram =CB_1+-640W3 = CABLE


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1510
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10002

10004

10006
Attacco

6
Designazione destinazione

-100K2

-100K2

-100K2
=CB_1+-100X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-FS1

-FS1

-FS1
Nome cavo

BN
BU

BK

-100W1 FS1

=CABLE/1510 1801

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-100X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1800
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

0110VAC
10102
24

x2
Attacco

Designazione destinazione

-101K1

-71H1
=CB_1+-101X1
Striscia di prese

Ponticello

Morsetto
1

2
A1

A2

Attacco
Designazione destinazione
Schema morsetti

+FS1-CA

+FS1-CA
Nome cavo

1800 1802

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-101X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1801
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10202

10204

10206
Attacco

6
Designazione destinazione

-102K1

-102K1

-102K1
=CB_1+-102X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-FS2

-FS2

-FS2
Nome cavo

BN
BU

BK

-102W1 FS2

1801 1803

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-102X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1802
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

0110VAC
10302
24

x2
Attacco

Designazione destinazione

-103K1

-71H1
=CB_1+-103X1
Striscia di prese

Ponticello

Morsetto
1

2
A1

A2

Attacco
Designazione destinazione
Schema morsetti

+FS2-CA

+FS2-CA
Nome cavo

1802 1804

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-103X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1803
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10402

10404

10406
Attacco

6
Designazione destinazione

-104K1

-104K1

-104K1
=CB_1+-104X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-FS3

-FS3

-FS3
Nome cavo

BN
BU

BK

-104W1 FS3

1803 1805

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-104X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1804
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

0110VAC
10502
24

x2
Attacco

Designazione destinazione

-105K1

-71H1
=CB_1+-105X1
Striscia di prese

Ponticello

Morsetto
1

2
A1

A2

Attacco
Designazione destinazione
Schema morsetti

+FS3-CA

+FS3-CA
Nome cavo

1804 1806

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-105X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1805
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10602

10604

10606
W
Attacco

V
Designazione destinazione

-106T1

-106T1

-106T1
=CB_1+-106X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-SC-1

-SC-1

-SC-1
Nome cavo

BN
BU

BK

-106W1 SC-1

1805 1807

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-106X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1806
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10802

10804

10806
W
Attacco

V
Designazione destinazione

-108T1

-108T1

-108T1
=CB_1+-108X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-SC-2

-SC-2

-SC-2
Nome cavo

BN
BU

BK

-108W1 SC-1

1806 1808

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-108X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1807
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

11002

11004

11006
W
Attacco

V
Designazione destinazione

-110T1

-110T1

-110T1
=CB_1+-110X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-SC-3

-SC-3

-SC-3
Nome cavo

BN
BU

BK

-110W1 SC-3

1807 1809

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-110X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1808
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

11203

11206

11209
W
Attacco

V
Designazione destinazione

-112T1

-112T1

-112T1
=CB_1+-112X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-SC-4

-SC-4

-SC-4
Nome cavo

BN
BU

BK

-112W1 SC-4

1808 1810

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-112X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1809
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

11402

11404

11406
Attacco

6
Designazione destinazione

-114K1

-114K1

-114K1
=CB_1+-114X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-P2

-P2

-P2
Nome cavo

BN
BU

BK

-114W1 P-802

1809 1811

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-114X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1810
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

11602

11604

11606
Attacco

6
Designazione destinazione

-116K1

-116K1

-116K1
=CB_1+-116X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-P6

-P6

-P6
Nome cavo

BN
BU

BK

-116W1 P-801

1810 1812

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-116X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1811
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

11802

11804

11806

11808

11809
14

15
W
Attacco

V
Designazione destinazione

-118T1

-118T1

-118T1

-118T1

-118T1
=CB_1+-118X1
Striscia di prese

Ponticello

Morsetto
1

5
W1
U1

V1

x1

x2

Attacco
Designazione destinazione
Schema morsetti

-170R2

-170R2
-AGR-1

-AGR-1

-AGR-1
Nome cavo

BN
BU

-118W2 AGR-1
BN
BU

BK

-118W1 AGR-1

1811 1813

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-118X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1812
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

12002

12004

12006
2T1

4T2

6T3
Attacco

Designazione destinazione

-120Q1

-120Q1

-120Q1
=CB_1+-120X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-AGR-2

-AGR-2

-AGR-2
Nome cavo

BN
BU

BK

-120W1 AGR-2/1

1812 1814

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-120X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1813
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

12202

12204

12206
Attacco

6
Designazione destinazione

-122K1

-122K1

-122K1
=CB_1+-122X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-4

-BL-4

-BL-4
Nome cavo

BN
BU

BK

-122W1 BL-4

1813 1815

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-122X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1814
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

12402

12404

12406
W
Attacco

V
Designazione destinazione

-124T1

-124T1

-124T1
=CB_1+-124X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-P-3

-P-3

-P-3
Nome cavo

BN
BU

BK

-124W1 P-805

1814 1816

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-124X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1815
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

12602

12604

12606
Attacco

6
Designazione destinazione

-126K1

-126K1

-126K1
=CB_1+-126X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione

-AGAF-1A

-AGAF-1A

-AGAF-1A
Schema morsetti
Nome cavo

BN
BU

BK

-126W1 AG/AF-1A

1815 1817

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-126X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1816
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

12802

12804

12806
Attacco

6
Designazione destinazione

-128K1

-128K1

-128K1
=CB_1+-128X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione

-AGAF-1B

-AGAF-1B

-AGAF-1B
Schema morsetti
Nome cavo

BN
BU

BK

-128W1 AG/AF-1B

1816 1818

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-128X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1817
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

13002

13004

13006
W
Attacco

V
Designazione destinazione

-130T1

-130T1

-130T1
=CB_1+-130X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-P4

-P4

-P4
Nome cavo

BN
BU

BK

-130W1 P4

1817 1819

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-130X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1818
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

13202

13204

13206
Attacco

6
Designazione destinazione

-132K1

-132K1

-132K1
=CB_1+-132X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-AGT-5

-AGT-5

-AGT-5
Nome cavo

BN
BU

BK

-132W1 AGT-5

1818 1820

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-132X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1819
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

13402

13404

13406
2T1

4T2

6T3
Attacco

Designazione destinazione

-134Q1

-134Q1

-134Q1
=CB_1+-134X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-1

-BL-1

-BL-1
Nome cavo

BN
BU

BK

-134W1 AGR-2/1

1819 1821

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-134X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1820
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

13602

13604

13606
2T1

4T2

6T3
Attacco

Designazione destinazione

-136Q1

-136Q1

-136Q1
=CB_1+-136X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-2

-BL-2

-BL-2
Nome cavo

BN
BU

BK

-136W1 BL-1

1820 1822

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-136X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1821
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

13802

13804

13806
Attacco

6
Designazione destinazione

-138K1

-138K2

-138K1

-138K2

-138K1

-138K2
=CB_1+-138X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-HST-1

-HST-1

-HST-1
Nome cavo

BN
BU

BK

-138W1 HST-1

1821 1823

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-138X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1822
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

24VAC

14

14
x1
Attacco

Designazione destinazione

-138H1

-138H2
-72H1
=CB_1+-138X2
Striscia di prese

Ponticello

Morsetto
1

4
13

13

Attacco
2

2
Designazione destinazione
Schema morsetti

-138H1

-138H2
-138K3

-138K3
Nome cavo

1822 1824

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-138X2 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1823
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

14002

14004

14006
Attacco

6
Designazione destinazione

-140K3

-140K3

-140K3
=CB_1+-140X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-MC-3A

-MC-3A

-MC-3A
Nome cavo

BN
BU

BK

-140W1 MC-3A

1823 1825

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-140X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1824
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

14202

14204

14206
Attacco

6
Designazione destinazione

-142K1

-142K1

-142K1
=CB_1+-142X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-MC-3B

-MC-3B

-MC-3B
Nome cavo

BN
BU

BK

-142W1 MC-3B

1824 1826

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-142X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1825
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

14402

14404

14406
Attacco

6
Designazione destinazione

-144K1

-144K1

-144K1
=CB_1+-144X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-6

-BL-6

-BL-6
Nome cavo

BN
BU

BK

-144W1 P-802

1825 1827

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-144X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1826
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

14602

14604

14606
2T1

4T2

6T3
Attacco

Designazione destinazione

-146Q1

-146Q1

-146Q1
=CB_1+-146X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-3

-BL-3

-BL-3
Nome cavo

BN
BU

BK

-146W1 BL-3

1826 1828

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-146X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1827
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

14802

14804

14806
Attacco

6
Designazione destinazione

-148K1

-148K2

-148K1

-148K2

-148K1

-148K2
=CB_1+-148X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-NT-1

-NT-1

-NT-1
Nome cavo

BN
BU

BK

-148W1 NT-1

1827 1829

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-148X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1828
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

15002

15004

15006
2T1

4T2

6T3
Attacco

Designazione destinazione

-150Q1

-150Q1

-150Q1
=CB_1+-150X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-BL-5

-BL-5

-BL-5
Nome cavo

BN
BU

BK

-150W1 BL-5

1828 1830

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-150X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1829
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

15202

15204

15206
Attacco

6
Designazione destinazione

-152K1

-152K1

-152K1
=CB_1+-152X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-MC-1

-MC-1

-MC-1
Nome cavo

BN
BU

BK

-152W1 MC-1

1829 1831

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-152X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1830
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

15402

15404

15406
Attacco

6
Designazione destinazione

-154K1

-154K1

-154K1
=CB_1+-154X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-VV-1A

-VV-1A

-VV-1A
Nome cavo

BN
BU

BK

-154W1 VV-1A

1830 1832

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-154X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1831
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

10002

10004

10006
Attacco

6
Designazione destinazione

-156K1

-156K1

-156K1
=CB_1+-156X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-VV-1B

-VV-1B

-VV-1B
Nome cavo

BN
BU

BK

-156W1 VV-1B

1831 1833

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-156X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1832
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

15802

15804

15806
Attacco

6
Designazione destinazione

-158K1

-158K1

-158K1
=CB_1+-158X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-P5

-P5

-P5
Nome cavo

BN
BU

BK

-158W1 P5

1832 1834

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-158X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1833
Modify Date Edit Tot page 775
1833

Modify
REVISION
Schema morsetti F13_004 MARSINA
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Nome cavo Nome filo

Date
Striscia di prese

15/10/2014
27/12/2014
03/10/2018
-160W1
-160W2
=CB_1+-160X1

Edit
00143
00143
00143
1

VY-1011B

VY-1011A

Data
Elab.
Verify
Designazione destinazione Ponticello Designazione destinazione

Attacco
Attacco

Morsetto

03/10/2018
BU -VY-1011A U1 1 -160K1 2 16002

BN -VY-1011A V1 2 -160K1 4 16004

BK 16006
2

-VY-1011A W1 3 -160K1 6

BU -VY-1011B U1 4 -160K2 2 16008

BN -VY-1011B V1 5 -160K2 4 16010

BK -VY-1011B W1 6 -160K2 6 16012

SPRAY DRYING PLANT IRAQ


3
4
5
6

Terminal diagram =CB_1+-160X1


7
8

+
= TERMINAL
9

Page
Tot page
775
1834
1835
1834

Modify
REVISION
Schema morsetti F13_004 MARSINA
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Nome cavo Nome filo

Date
Striscia di prese

15/10/2014
27/12/2014
03/10/2018
-164W1
-164W2
=CB_1+-164X1

Edit
00143
00143
00143
1

VY-1012B

VY-1012A

Data
Elab.
Verify
Designazione destinazione Ponticello Designazione destinazione

Attacco
Attacco

Morsetto

03/10/2018
BU -VY-1012A U1 1 -164K1 2 16425

BN -VY-1012A V1 2 -164K1 4 16427

BK 16429
2

-VY-1012A W1 3 -164K1 6

BU -VY-1012B U1 4 -164K2 2 16431

BN -VY-1012B V1 5 -164K2 4 16433

BK -VY-1012B W1 6 -164K2 6 16435

SPRAY DRYING PLANT IRAQ


3
4
5
6

Terminal diagram =CB_1+-164X1


7
8

+
= TERMINAL
9

Page
Tot page
775
1835
1836
1835

Modify
REVISION
Schema morsetti F13_004 MARSINA
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Nome cavo Nome filo

Date
Striscia di prese

15/10/2014
27/12/2014
03/10/2018
-168W1
-168W2
=CB_1+-168X1

Edit
00143
00143
00143
1

VY-1013B

VY-1013A

Data
Elab.
Verify
Designazione destinazione Ponticello Designazione destinazione

Attacco
Attacco

Morsetto

03/10/2018
BU -VY-1013A U1 1 -168K1 2 16848

BN -VY-1013A V1 2 -168K1 4 16850

BK 16852
2

-VY-1013A W1 3 -168K1 6

BU -VY-1013B U1 4 -168K2 2 16854

BN -VY-1013B V1 5 -168K2 4 16856

BK -VY-1013B W1 6 -168K2 6 16858

SPRAY DRYING PLANT IRAQ


3
4
5
6

Terminal diagram =CB_1+-168X1


7
8

+
= TERMINAL
9

Page
Tot page
775
1836
1837
1836

Modify
REVISION
Schema morsetti F13_004 MARSINA
0

AS BUILT AFTER FAT


FOR CONSTRUCTION
Nome cavo Nome filo

Date
Striscia di prese

15/10/2014
27/12/2014
03/10/2018
-172W1
-172W2
=CB_1+-172X1

Edit
00143
00143
00143
1

VY-1014B

VY-1014A

Data
Elab.
Verify
Designazione destinazione Ponticello Designazione destinazione

Attacco
Attacco

Morsetto

03/10/2018
BU -VY-1014A U1 1 -172K1 2 17271

BN -VY-1014A V1 2 -172K1 4 17273

BK 17275
2

-VY-1014A W1 3 -172K1 6

BU -VY-1014B U1 4 -172K2 2 17277

BN -VY-1014B V1 5 -172K2 4 17279

BK -VY-1014B W1 6 -172K2 6 17281

SPRAY DRYING PLANT IRAQ


3
4
5
6

Terminal diagram =CB_1+-172X1


7
8

+
= TERMINAL
9

Page
Tot page
775
1837
1838
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

17602

17605

17608
Attacco

6
Designazione destinazione

-176K1

-176K4

-176K1

-176K4

-176K1

-176K4
=CB_1+-176X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-NT-411

-NT-411

-NT-411
Nome cavo

BN
BU

BK

-176W1 NT-411

1837 1839

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-176X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1838
Modify Date Edit Tot page 775
0 1 2 3 4 5 6 7 8 9

F13_004 MARSINA

Nome filo

17802

17804

17806
Attacco

6
Designazione destinazione

-178K1

-178K1

-178K1
=CB_1+-178X1
Striscia di prese

Ponticello

Morsetto
1

3
W1
U1

V1

Attacco
Designazione destinazione
Schema morsetti

-FS-402A

-FS-402A

-FS-402A
Nome cavo

BN
BU

BK

-178W1 FS-402A

1838 1840

REVISION 03/10/2018 00143 Data 03/10/2018 Terminal diagram =CB_1+-178X1 = TERMINAL


AS BUILT AFTER FAT 27/12/2014 00143 Elab. +
FOR CONSTRUCTION 15/10/2014 00143 Verify SPRAY DRYING PLANT IRAQ Page 1839
Modify Date Edit Tot page 775