Академический Документы
Профессиональный Документы
Культура Документы
The table below shows a pavement condition survey for sample unit 07, section JPB-
KM2 of Jalan Parit Botak. Determine the Pavement Condition Index for this sample
unit.
7.8 4.1
03 M
6.3
01 H
3.1 0.4
11 M
100*(1/600
1 1 45
13 M ) = 0.17
m = 1 + (9/98)(100 – HDV)
= 1 + (9/98)(100 – 45)
= 6.05
Since the maximum allowable number of deducts is 6.05, therefore only the first 6
and 0.05 of the 7th deduct value are selected, i.e. 45, 32, 13, 7, 6, 6 and 0.05*2 = 0.1.
10
Maximum CDV = 60
Based on the rating for PCI value of 40, this section of pavement is in poor condition.
So??????