Design Memorandum

Design Parameters for Storage Hydroelectric Project

Hydrology

The hydrology report should contain the following analysis for the design of the components of
the project.

Evaporation, Wind Speed, Humidity and Temperature Analysis

Mean Monthly Hydrograph Analysis

Annual Average Precipitation Analysis

Design Flood Analysis

Sedimentation Yield of the Catchment

Glof Risk Analysis

The report should contain the following parameters for the design:

Parameters Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total

Mean
Monthly Flow

Precipitaion

Evaporaion

Humidity

Temperature

Wind Speed:

Flood Frequency Analysis

Return Period (Years) Flood (Dam and Powerhouse)(m3/s)


5
20
50
100
1000
10000
PMF
Sediment data at each month of the year.

1
Design Memorandum

PMP Analysis

Reservoir Simulation

Design parameters for the simulation:

Input mean monthly flow

Evaporation

Storage Elevation curve

Area Elevation Curve

Sedimentation Yield

Operation Rule for Dry and Wet periods or for each individual month.

Environment release:

The output parameters from the simulation:

Energy Generation (GWh) Reservoir Level (masl) Power Flow (m3/s)


Month
Usuable Spill Beginning End Max Min
November
December
January
February
March
April
May
June
July
August
September
October
Total

Dam

2
Design Memorandum

Dam type selection

Design parameters

FSL of the project: ……………(defined after project optimization)

Crest Level of Dam=FSL + Free Board

Free Board Calculation: (As per code IS10635:1993)

Each parameter should be defined from the code.

Dam height=Crest level-river bed level

Dam type selection

Based on the topography of the project area and the site verification the type of dam is to de
defined.

Rock fill Dam

.Figure: Typical Section of Rockfill Dam

Upstream slope: 1:2

Downstream slope: 1:1.8

Seepage analysis:

Seepage Coefficient for the ingredients of dam

Impervious Core Materials:

3
Design Memorandum

Filter layer:

Random Fill:

Compacted Rock Fill:

Design of Drainage

River Diversion

Coffer Dam and Diversion tunnel

Design Parameters:

Design Flood

Type of coffer dam

Diversion tunnel limiting velocity:

Length of diversion tunnel

Output based on the diversion tunnel optimization

Cost of excavation:

Cost of concrete linings

Cost of Shortcrete linings:

Dimensions of Diversion tunnel:

Spillway

Main and Auxiliary Spillway

Main Spillway

Design parameters

Design Discharge:(PMF)????

Type of spillway as per the topography;

Chute Spillway

4
Design Memorandum

Considered in rockfill dam with easy expose of the rock for the energy dissipation

Designed based on Reservoir Routing (for best optimization)

Design the crest profile

Design the Chute carrier

Design the Flip Bucket

Design the Plunge Pool

Auxiliary Spillway

Design parameters

Design Discharge: ?????

Simple type Spillway

Intake Structure

Design parameters

Design Discharge: Based on the Simulation Studies

FSL:

MOL:

Invert Level of Intake:

Type of intake:?????????

Inclined Intake

Generally used for Storage type Project

Designed based on code IS 9761:1995

5
Design Memorandum

Limiting Velocity:

Inclination of intake with horizontal:

Output:

Height of intake:

Width of intake:

Water Conveyance:

Tunnel

Design Parameters

Design Discharge:

Length of tunnel:

Dimensions of Tunnel

In general Dimension of tunnel is determined after the tunnel optimization

6
Design Memorandum

Tunnel Optimization and Shaft Optimization

Design parameters based on the types of tunnel with their percentages on the total length

Parameters Length Thickness Dia of bolt Length of Spacing of ISBM


Bolt Bolt

Shortcrete Lining

Concrete Linings

Steel Ribs

Steel Lining

(All the above parameters are defined as per the geology and geotechnical reports)

The cost of each parameter

Unit Cost
Tunnel Excavation $ per m3
Concrete Lining M25 $ per m3
Concrete Lining M20 $ per m3
Reinforcement $ per ton
Shotcrete Lining $ per m3
Bolt $ per No.
ISMB 200*100 $ per kg.
Steel lining cost $ per ton

The cost of energy =??????

The revenue from the project at each month: From simulation