EXHAUST GAS SCRUBBER

Retrofit
Why Cybermarine ?

 Strong Team of Marine Engineers, Mechanical Engineers, Naval


Architects, Electrical/Instrumentation Engineers, 3D Scanning
Engineers, Draftsmen etc.

 Experience of 250 man-years with complex design & major retrofit


projects

 Optimised cost effective solution

 Flexibility to work with all Scrubber manufacturers Customized


equipment evaluation
What Cybermarine offers
 Feasibility Study/ Evaluation
 Pre-Engineering (Preliminary conceptual design)
 Onboard Survey/ 3D Scanning / Risk Assessment
 Equipment Selection
 Basic Engineering & Layout (schematic piping & electrical & structure)
 Documentation & Approval
 Detail Engineering (shop-floor drawings for structural & piping spool
drawings)
 Fabrication Supervision
 Installation & Commissioning Supervision
 After Sales Services
Time line for Project Execution
 Pre-Engineering (Approx. 8 days)
 3D scanning (Approx. 2-4 days)
 Basic Engineering & layout (Approx. 15 days)
 Identification of solution & Manufacturer (Approx. 10 days)
 Detail Engineering & Class approval (Approx. 30 days)
 Lead time for delivery of equipment (Approx. 3 months)
 Prefabrication (Approx. 30 days)
 Docking/layby period & installation (Approx. 8 days)
 Commissioning and testing (Approx. 12 days)
 Training (Approx. 2 days)
Projects Completed with Class Approval

Scrubber m
# Vessel name Client Class
aker
1 Berge Tai Shan Berge Bulk PureteQ LR
2 Berge Heng Shan Berge Bulk PureteQ LR
Projects In Progress
# Vessel name Client Scrubber maker Class
1 Berge Grossglockner Berge Bulk PureteQ DNV
2 Berge Olympus Berge Bulk PureteQ DNV
3 Berge Zugspitze Berge Bulk PureteQ DNV
4 Berge Mulhacen Berge Bulk PureteQ DNV
5 Berge Toubkal Berge Bulk PureteQ DNV
6 Berge Aconcagua Berge Bulk Yara Marine DNV
7 Berge Neblina Berge Bulk Yara Marine DNV
8 Berge Everest Berge Bulk Yara Marine DNV
9 Berge Jaya Berge Bulk Yara Marine DNV
10 Berge Cho Oyu Berge Bulk Yara Marine LR
11 Berge K2 Berge Bulk Yara Marine LR
12 Berge Makalu Berge Bulk Yara Marine LR
13 Berge Annapurna Berge Bulk Yara Marine LR
14 Berge Mafadi Berge Bulk Yara Marine LR
15 Berge Loghan Berge Bulk Yara Marine LR
16 Berge Kosciuszko Berge Bulk PureteQ LR
17 Berge Matterhorn Berge Bulk Yara Marine LR
18 Berge Song Shan Berge Bulk Yara Marine LR
19 Berge Rosa Berge Bulk Yara Marine LR
20 Cape Arnauti Easter Pacific TBD ClassNK
21 Challenge Prime NYK TBD ClassNK
22 Hull No. S453 Fleet Ship ViswaLab ClassNK
23 Eagle Verona Eagle Star (AET) TBD ABS
24 Eagle Versailles Eagle Star (AET) TBD ABS
Class Approvals for Past Projects
Class Approvals for Past Projects
Scrubber Installation Photos for Past Projects
Cybermarine Past Experience with Scrubber Vendors
 PureteQ, Denmark

 Yara Marine, Oslo

 CROcean, USA

 Ecospray, Italy

 Fuji Electric, Japan

 KangRim, KOREA

 ContiOcean, China
3D Layout samples form Past Projects
Laser Scanning Images from Past Projects
Cybermarine Technologies Pte. Ltd.
10 Bukit Batok Crescent,
#12-01, The Spire building
Singapore 658079.

Tel : +65 6316 6513


Fax : +65 6316 6514

www.cybermarine.net

Вам также может понравиться