Вы находитесь на странице: 1из 37

Stormwater Overland Flow

TP108 CALCULATIONS

Site: 52 North Road, Clevedon


Project No. 1169
Prepared by : B Xiao
Checked :V Crang
Date: 19 August 2017
Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment A Checked V Crang Date 21/08/2017
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.36 27

* from Appendix B on TP 108 Totals = 0.36 27


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.16 km (along drainage path)
Catchment slope ……… Sc = 0.025 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.20.66 x 0.59-0.55 x 0.023-0.30 = 0.102 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.07 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao
Location: Catchment A Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.83 81

* from Appendix B Totals = 0.83 81


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.16 km (along drainage path)
Catchment slope ……… Sc = 0.025 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.200.66 x 0.96-0.55 x 0.023-0.30 = 0.077 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.05 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B XIAO Date 21/08/2017
Location: Catchment A V CRANG
Job No 1169
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0036 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.102 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus
16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.132


(from fig 5.1)
7. Peak Flow rate, qp(A) = q* A P24 (m3 / s) 0.103

2
8. Runoff depth,Q24 = (P24 - Ia) mm 149.20
(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 537
Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment A Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0083 km

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.077 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus
16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
* 3
7. Peak Flow rate, qp(A) = q A P24 (m / s) 0.319

2
8. Runoff depth,Q24 = (P24 - Ia) mm 211.94
(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 1759
Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment B Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.14 10

* from Appendix B on TP 108 Totals = 0.14 10


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.07 km (along drainage path)
Catchment slope ……… Sc = 0.006 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.150.66 x 0.59-0.55 x 0.045-0.30 = 0.090 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.06 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment B Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.32 31

* from Appendix B Totals = 0.32 31


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.07 km (along drainage path)
Catchment slope ……… Sc = 0.006 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.150.66 x 0.96-0.55 x 0.045-0.30 = 0.069 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.05 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment B Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0014 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.090 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus
16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(B) = q* A P24 (m3 / s) 0.044

2
8. Runoff depth,Q24 = (P24 - Ia) mm 149.20
(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 209
Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment B Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0032 km

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.069 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus
16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
* 3
7. Peak Flow rate, qp(B) = q A P24 (m / s) 0.123

2
8. Runoff depth,Q24 = (P24 - Ia) mm 211.94
(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 678
Worksheet 1: Runoff Parameters
and Time of Concentration

Project:52 North Road, Clevedon


By B Xiao Date 21/08/2014
Location: catchment C Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.07 5

* from Appendix B on TP 108 Totals = 0.07 5


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.07 km (along drainage path)
Catchment slope ……… Sc = 0.051 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.150.66 x 0.59-0.55 x 0.023-0.30 = 0.048 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.03 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment C Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.16 16

* from Appendix B Totals = 0.16 16


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.07 km (along drainage path)
Catchment slope ……… Sc = 0.051 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.150.66 x 0.96-0.55 x 0.023-0.30 = 0.036 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.02 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment C Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0007 km

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.090 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm plus
16.8% climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(C) = q* A P24 (m3 / s) 0.022

8. Runoff depth,Q24 = (P24 - Ia)2 mm 149.20


(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 104


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment C Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0016 km2

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.069 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus16.8%
4. 24 hour rainfalll depth, P24 (mm) climate change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
7. Peak Flow rate, qp(C) = q* A P24 (m3 / s) 0.061

8. Runoff depth,Q24 = (P24 - Ia)2 mm 211.94


(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 339


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment D Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.10 7

* from Appendix B on TP 108 Totals = 0.10 7


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.12 km (along drainage path)
Catchment slope ……… Sc = 0.007 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.59-0.55 x 0.0270.30 = 0.123 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.08 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment D Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.24 24

* from Appendix B Totals = 0.24 24


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.12 km (along drainage path)
Catchment slope ……… Sc = 0.007 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.96-0.55 x 0.027-0.30 = 0.094 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.06 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment D Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0010 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.123 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(D) = q* A P24 (m3 / s) 0.031

8. Runoff depth,Q24 = (P24 - Ia)2 mm 149.20


(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 149


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment D Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0024 km

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.094 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
* 3
7. Peak Flow rate, qp(D) = q A P24 (m / s) 0.092

8. Runoff depth,Q24 = (P24 - Ia)2 mm 211.94


(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 509
Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment E Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.12 9

* from Appendix B on TP 108 Totals = 0.12 9


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.10 km (along drainage path)
Catchment slope ……… Sc = 0.007 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.59-0.55 x 0.0270.30 = 0.109 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.07 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment E Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.29 28

* from Appendix B Totals = 0.29 28


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.10 km (along drainage path)
Catchment slope ……… Sc = 0.007 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.96-0.55 x 0.027-0.30 = 0.083 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.06 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment E Checked V Crang
Job No 1158
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0012 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.123 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(E) = q* A P24 (m3 / s) 0.038

2
8. Runoff depth,Q24 = (P24 - Ia) mm 149.20
(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 179


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment E Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0029 km

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.094 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
* 3
7. Peak Flow rate, qp(E) = q A P24 (m / s) 0.111

8. Runoff depth,Q24 = (P24 - Ia)2 mm 211.94


(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 615
Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment F Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.23 17

* from Appendix B on TP 108 Totals = 0.23 17


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.14 km (along drainage path)
Catchment slope ……… Sc = 0.080 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.59-0.55 x 0.0270.30 = 0.066 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.04 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment F Checked V Crang
Job No 1158
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.54 53

* from Appendix B Totals = 0.54 53


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.14 km (along drainage path)
Catchment slope ……… Sc = 0.080 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.96-0.55 x 0.027-0.30 = 0.050 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.03 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment F Checked V Crang
Job No 1158
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0023 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.123 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(F) = q* A P24 (m3 / s) 0.072

2
8. Runoff depth,Q24 = (P24 - Ia) mm 149.20
(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 343


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment F Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

2
Catchment area A = 0.0054 km

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.094 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm
plus 16.8%
climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
* 3
7. Peak Flow rate, qp(F) = q A P24 (m / s) 0.207

8. Runoff depth,Q24 = (P24 - Ia)2 mm 211.94


(P24 - Ia) + S

3
9. Runoff volume, V24 = 1000 x Q24 A (m ) 1144
Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: catchment G Checked V Crang
Job No 1169
Circle one: Present Developed (Pervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

C urban lawn 74 0.13 10

* from Appendix B on TP 108 Totals = 0.13 10


Pervious area 30% of Catchment

CN (weighted) = total product / total area = 74.0

Ia (weighted) = 5 x pervious area / total area = 5.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.14 km (along drainage path)
Catchment slope ……… Sc = 0.080 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 74.0 / (200-74.0) = 0.59

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.59-0.55 x 0.0270.30 = 0.066 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.04 hrs


Worksheet 1: Runoff Parameters
and Time of Concentration

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment G Checked V Crang
Job No 1158
Circle one: Present Developed (impervious)

1. Runoff Curve Number (CN) and Initial Abstraction (Ia)

Soil name Cover description Curve Area Product


and (cover type, treatment & Number (ha) of CN x
classification hydrologic condition) CN* area

Building, Roads etc 98 0.30 29

* from Appendix B Totals = 0.30 29


impervious area 65%

CN (weighted) = total product / total area = 98.0

Ia (weighted) = 5 x pervious area / total area = 0.00 mm

2. Time of Concerntration

Channelisation factor ……… C= 0.60 (from Table 4.2)


Catchment length ……… L= 0.14 km (along drainage path)
Catchment slope ……… Sc = 0.080 m/m (by equal area method)

Runoff factor, CN / (200 - CN) = 98.0 / (200-98.0) = 0.96

tc = 0.14 C L0.66 (CN / (200 - CN))-0.55 Sc-0.30


= 0.14 x 0.6 x 0.110.66 x 0.96-0.55 x 0.027-0.30 = 0.050 hrs

SCS Lag for HEC-HMS ………. Tp = 2 / 3 tc = 0.03 hrs


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment G Checked V Crang
Job No 1158
Circle one: Present Developed (Pervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0013 km2

Runoff Curve No CN = 74.0

Initial abstraction Ia = 5.00 mm

Time of concentration tc = 0.123 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 89.2 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm plus
16.8% climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.54


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.145


(from fig 5.1)
7. Peak Flow rate, qp(F) = q* A P24 (m3 / s) 0.041

8. Runoff depth,Q24 = (P24 - Ia)2 mm 149.20


(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 194


Worksheet 2: Graphical Peak Flow rate

Project: 52 North Road, Clevedon


By B Xiao Date 21/08/2017
Location: Catchment G Checked V Crang
Job No 1169
Circle one: Present Developed (impervious)

1. Data (from Worksheet 1)

Catchment area A = 0.0030 km2

Runoff Curve No CN = 98.0

Initial abstraction Ia = 0.00 mm

Time of concentration tc = 0.094 hrs

2.Calculate Storage, S = (1000 / CN - 10) x 25.4 = 5.18 mm


Storm# #1
3. Average recurrence Interval, ARI (yr) 100 Year

185mm plus
16.8% climate
4. 24 hour rainfalll depth, P24 (mm) change 217

5. Compute C*= P24 - 2Ia 0.95


P24 - 2Ia + 2S

6. Specific peak flow rate q* 0.177


(from fig 5.1)
7. Peak Flow rate, qp(F) = q* A P24 (m3 / s) 0.115

8. Runoff depth,Q24 = (P24 - Ia)2 mm 211.94


(P24 - Ia) + S

9. Runoff volume, V24 = 1000 x Q24 A (m3) 636


OVERLAND FLOWPATH CALCULATION
SECTION A-A

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.103 m³/s

Qd (100)impervious = 0.319 m³/s

Qd (100) = 0.422 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.013 concrete
S= 1.90% longitudinal grade

H= 0.11 m
W= 6.0 m
P= 6.27
R= A/P
A= 0.31 m2
R= 0.049 m

Qc (capacity)= 0.444 m3/s > Qd (net) = 0.422 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION B-B

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.147 m³/s from TP108 calcls(CATCHMENT A+B)

Qd (100)impervious = 0.442 m³/s from TP108 calcls(CATCHMENT A+B)

Qd (100) = 0.589 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+berm grass


S= 0.60% longitudinal grade

H= 0.19 m
W= 10.14 m
P= 10.41
R= A/P
A= 0.84 m2
R= 0.081 m

Qc (capacity)= 0.609 m3/s > Qd (net) = 0.59 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION C-C

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.169 m³/s from TP108 calcls(CATCHMENT A+B+C)

Qd (100)impervious = 0.503 m³/s from TP108 calcls(CATCHMENT A+B+C)

Qd (100) = 0.672 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+grass
S= 5.10% longitudinal grade

H= 0.17 m
W= 6.3 m
P= 6.43
R= A/P
A= 0.39 m2
R= 0.060 m

Qc (capacity)= 0.672 m3/s > Qd (net) = 0.67 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION D-D

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.116 m³/s from TP108 calcls CATCHMENT D+1/2 (A+B+C)

Qd (100)impervious = 0.344 m³/s from TP108 calcls CATCHMENT D+1/2 (A+B+C)

Qd (100) = 0.460 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+grass
S= 0.70% longitudinal grade

H= 0.21 m
W= 8.53 m
P= 8.66
R= A/P
A= 0.63 m2
R= 0.073 m

Qc (capacity)= 0.464 m3/s > Qd (net) = 0.46 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION E-E

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.154 m³/s from TP108 calcls CATCHMENT D+E+1/2 (A+B+C)

Qd (100)impervious = 0.455 m³/s from TP108 calcls CATCHMENT D+E+1/2 (A+B+C)

Qd (100) = 0.609 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+grass
S= 0.70% longitudinal grade

H= 0.15 m
W= 15.00 m
P= 15.10
R= A/P
A= 0.94 m2
R= 0.062 m

Qc (capacity)= 0.619 m3/s > Qd (net) = 0.61 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION F-F

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.072 m³/s from TP108 calcls

Qd (100)impervious = 0.207 m³/s from TP108 calcls

Qd (100) = 0.279 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+ grass


S= 5.80% longitudinal grade

H= 0.09 m
W= 3.86 m
P= 3.86
R= A/P
A= 0.18 m2
R= 0.047 m

Qc (capacity)= 0.284 m3/s > Qd (net) = 0.28 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION G-G

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.126 m³/s from TP108 calcls CATCHMENT G+1/2 (A+B+C)

Qd (100)impervious = 0.368 m³/s from TP108 calcls CATCHMENT G+1/2 (A+B+C)

Qd (100) = 0.494 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.020 concrete+grass
S= 2.80% longitudinal grade

H= 0.18 m
W= 5.08 m
P= 6.56
R= A/P
A= 0.39 m2
R= 0.059 m

Qc (capacity)= 0.498 m3/s > Qd (net) = 0.49 m³/s OK


OVERLAND FLOWPATH CALCULATION
SECTION H-H

PROJECT : 52 North Road, Clevedon


Job No. : 1169 Calculation by : B Xiao
Date : August 2017 Checked by: V Crang

Qd (100) 1 in 100 year storm, use TP108

Qd(100) = Qd(100)pervious+Qd(100)impervious

Qd (100)pervious = 0.241 m³/s from TP108 calcls CATCHMENT A+B+C+D+E

Qd (100)impervious = 0.710 m³/s from TP108 calcls CATCHMENT A+B+C+D+E

Qd (100) = 0.951 m³/s

Qc = A*R^(2/3)*S^(1/2)/n

n= 0.032 grass
S= 4.30% longitudinal grade

H= 0.18 m
W= 3.87 m
P= 3.91
R= A/P
A= 0.55 m2
R= 0.140 m

Qc (capacity)= 0.956 m3/s > Qd (net) = 0.95 m³/s OK