The extention of the soil waste stack above the highest Any public space. Public Park or thoroughfare less than
horizontal drain connected to the stack. The uppermost three (3) meters but not less than two (2) meters in width
end above the roof is called stack vent through roof dedicated or deeded for public use.
(SVTR) a. Yard
a. Main Vent / Vent Stack b. Alley
b. Vent / Vent c. Space
c. Stack Vent / Soil Stack d. Inlet
d. Stack / Stack
Devices or appliances supplied with water or received
An outhouse or structure used for the deposition of liquid or liquid-borne wastes and discharge such wastes
excrement into the drainage system to which they may be directly or
a. Privy indirectly connected.
b. STP a. Plumbing appliance
c. Septic Tank b. Plumbing appurtenance
d. Catch Basin c. Plumbing Fixture
d. Plumbing units fixture
Practical problem
A vent that does not carry liquid or water-borne wastes. 1. What would happen if there were no air supply from
a. Dry vent the vent on the roof?
b. Air vent a. Smells from the sewer would enter the system.
c. Single vent b. Waste water would not flow out.
d. No water vent c. Nothing, it is used mainly to add rainwater to the
system
Practical problem d. NOA
1. What seals the trap that prevents sewer gases from
entering the household drains? Practical Problem
a. water pressure 1. Are there major differences between sewer and septic
b. air admitted by vent stacks and vent pipes systems in your home?
c. the aerator a. They are very similar.
d. NOA b. The only difference is in the type of pipes used.
c. One uses pressure and the other uses gravity.
Practical problem d. NOA
1.What are the most common causes of sink blockages?
a.toilet paper and air freshener Practical problem
b.solidified detergents and toothpaste 1.Why would you use an adequate temperature instead
c.grease and hair of the highest possible?
d. NOA a. ensures a smoother flow of hot water
b. reduces wear on the pipes
Practical problem c. more economical
1.How does the drainage system work? d. NOA
a.water pressure
b.gravity Practical Problem
c.vacuum 1. Can there be overlapping of the two subsystems?
d.NOA a.There can be an underground overlap.
b. An overlap is recommended when the pipes are wider
Practical problem than two inches.
1. What basic laws of nature does plumbing follow? c. Because of pollution issues, there must be a
a. conductivity, acceleration and motion separation.
b. gravity, pressure and water seeking its own level. d. None of the Above
c. motion, elasticity and resilience.
d. none of the above 95. An 8-in, main line needs to be flushed. The length of
pipeline to be flushed is 250 ft. How many minutes will it
Practical Problem take to flush the line at 25 gpm?
1.What are the two sub-systems in your home a. 7 min
plumbing? b. 31 min
a. Incoming freshwater and outgoing wastewater c. 26 min
b. hot water and cold water d. 13 min
c. low pressure water and high pressure water
d. All of the above 9. Which has a greater runoff coefficient?
a. Grass
Practical problem b. Even ground
1.What degree of pressure is required to ensure smooth c. Loose dirt
drainage? d. Pavement
a. low pressure
b.high pressure 60. How many gallons would a semi-instantaneous
c. not a matter of pressure water heater store with a rating of 300 gpm.
d. NOA a. 100
b. 150
c. 200
d. 300
6. Approximately how may kilowatts are required to raise
99. A wet well is 12 feet by 6 feet by 15 deep and the 500 gallons of water from 50°F to 100°F?
influent rate is 600 GPM. With the 2 pumps running, the a. 64
level decreases 3' 9”. In 18 minutes. If pump “A” has a b. 66
pumping rate of 425 GPM, what is the pumping rate of c. 73
pump “B”? d. 86
a. 537 gpm
b. 175 gpm 1. Two separate water risers are side by side. One is a
c. 488 gpm 2-inch riser and the other is a 6-inch riser. Each riser is
d. 287 gpm 200 feet high. The pressure at the base of the 6-inch
riser is:
62. For Tondo National High School, the size of a a. 1/3 of the pressure of the 2-inch riser
storage type water heater supplying 8 showers, 3 break b. The same as the 2-inch riser
room sinks, 6 lavatories and one mop sink will most c. 3 times the pressure of the 2-inch riser
nearly be: d. 9 times the pressure of the 2-inch riser
a. 710
b. 591 A general term which refers to the process of removing
c. 788 contaminants from water. It involves several processes
d. 1970 that is intended to render raw water into potable and
safe water for consumption.
61. If you have a storage water heater that is 72 inches A. water purification
tall at a diameter of 42 inches, approximately how many B. water filtration
KW’s will be required to heat the water to 140 degrees C. water softening
from 45 degrees incoming temperature if 80% of the D. water desalination
water is usable?
a. 273,364 15. The pressure in the water supply pipe near the
b. 100 faucet or water outlet while the faucet or water outlet is
c. 80 wide open and flowing.
d. 341705 a. Low pressure
b. Flow/residual pressure
59. How many BTU’s would be required to provide 140 c. Static pressure
degree water to a 2.5 gpm mop sink supplied from an d. Design pressure
instantaneous water heater if the incoming water
temperature is 40 degrees? 17. At a given point below the surface of water, at rest
a. 62,500 and open to the atmosphere, pressure is produced by
b. 125,000 the weight of water above that point.
c. 1,040 a. Velocity head
d. 2,080 b. Friction head
c. Static head
4. When checking the size of the water distribution d. Cavitation
system, all of the following should be considered except:
a. Number and type of fixtures 19. If you were asked to estimate a set of 95% plumbing
b. Initial water pressure construction documents, what method would be best
c. Static and friction head loss requirements suited?
d. Alkalinity of the water a. A percentage of the budget
b. Cost per fixture
7. Approximately how may BTU’s are required to raise c. Square foot pricing
500 gallons of water from 40°F to 120°F? d. A detailed material & labor take-off
a. 92,500
b. 200,000
c. 333,200
d. 416,300
20. The location of the following can be determined from 16. How are fiber pipe and fittings joined together?
a new project’s civil utility survey except: a. A standard plastic pipe coupling is used
a. Sanitary sewer b. A coupling with a 2-degree internal taper is used
b. Water main c. Portland cement and straight-wall couplings are used
c. Building drain d. Threaded couplings are used
d. Storm sewer
17. How are small changes in direction made in the pipe
11. What kind of information does the health department wrench?
want to know when you apply for a water well permit? a. Shoring jacks are used to bend the pipeline
a. hardness b. The pipe may be pried over with a shovel and then
b. pH level held in place with rocks
c. bacteria c. 5-degree couplings are used to make small changes
d. color in direction
d. The pipe is bent with heat
16. Horizontal sanitary drains should be designed to flow
a. Full 18. Another name for bituminized-fiber fittings is
b. ¼ full a. ABS fittings
c. ½ full b. Orangeburg fittings
d. ¾ full c. Tar fittings
d. Terra-cotta fittings
11. Hangers for plastic pipe should
a. Allow the plastic slide through 19. What is used to join bituminized-fiber pipe to other
b. Be the wire type pipe material?
c. Restrict the movement of the pipe a. Adapter
d. Be grounded b. Coupling
c. Wye
12. What should be used to join PVC or CPVC to a high- d. Stretcher
pressure metal pipe?
a. Adapter 20. The purpose of the knobs on the fittings is to
b. Coupling a. Align the fitting when it was being molded
c. Transition fitting b. Provide a safe place to strike the fitting when driving it
d. 90-degree elbow on
c. Provide a spot to place stone under when leveling
13. Bituminized-fiber pipe is made from d. Provide a handhold
a. Wood fibers and tar
b. Tar-coated clay 4. When cementing ABS pipe, how long should the
c. ABS plastic plumber wait before handling joints after initial
d. Vitrified clay assembly?
a. 2 hours
14. Which of the following bituminized-fiber pipe sizes b. 1 hour
and lengths is not correct? c. 30 minutes
a. 2” diameter by 5’ long d. 3 minutes
b. 3” diameter by 5’ long
c. 4” diameter by 8’ long 5. After assembly, how long should the plumber wait
d. 5” diameter by 5’ long before water testing ABS pipe?
a. 30 minutes
15. A length of 4-inch bituminized-fiber pipe sizes and b. 2 hours
lengths is not correct? c. 12 hours
a. 6.6 pounds d. 24 hours
b. 11.6 pounds
c. 14.6 pounds
d. 21.6 pounds
7. The ______ of all plastic pipe materials is much
greater than comparable metal pipe.
a. Corrosion rate
b. Friction loss
c. Expansion rate
d. Weight