SCHEDULE FOR THE FABRICATION AND ERECTION OF W

LENGTH - 36M
No. of Ferrules - 18

Shop circumferential joints completed for 18Nos of Ferrules

Sl No Item 1 2 3 4 5

1 AB1 fabrication, cutting, welding, backstrip welding and painting


2 (Joint of ferrule no 4,5) welding of back strip and painting
3 (Joint of ferrule no 1,9) welding of back strip and painting
4 (Joint of ferrule no 2,8) welding of back strip and painting
5 (Joint of ferrule no 3,13) welding of back strip and painting
6 (Joint of ferrule no 6,16) welding of back strip and painting
7 (Joint of ferrule no 7,18) welding of back strip and painting
8 (Joint of ferrule no 11,12) welding of back strip and painting
9 (Joint of ferrule no 17,10) welding of back strip and painting
10 (Joint of ferrule no 14,15) welding of back strip and painting

Workers available at site


4 labourer
1 welder
TION AND ERECTION OF WCS PIPE (INCLUDING AB1 AND AB2)
LENGTH - 36M
No. of Ferrules - 18

Jan-18
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
30 31
Sl No Item 1
1 AB1 fabrication, cutting, welding, backstrip welding and painting
2 Joint of pipe no 4,5 back strip ,painting
3 Joint of pipe no 1,9 back strip ,painting
4 Joint of pipe no 2,8 back strip ,painting
5 Joint of pipe no 3,13 back strip ,painting
6 Joint of pipe no 6,16 back strip ,painting
7 Joint of pipe no 7,18 back strip ,painting
8 Joint of pipe no 11,12 back strip ,painting
9 Joint of pipe no 17,10 back strip ,painting
10 Joint of pipe no 14,15 back strip ,painting
11
12
13
14
15
16
17
18
19
2 3 4 5 6 7 8 9

Welding of BS completed
10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29
30 31