Sl.No. Description Quantity factor Load (KW) load(KW)
Air compressor for Engine driven 3 0.7 7.5 22.5
1
Air compressor for Motor driven 1 0.7 2.2 2.2
2
Compressor main motor 1 0.7 160 160
3
Exhaust fan motor 1 0.7 7.5 7.5
4
1 0.8 5 5
5 5 KVA UPS
1 0.75 3 3
6 Air compressor for inflator
1 0.75 3.7 3.7
7 Borewell pump
1 0.8 2 2
8 Signage tower
1 0.6 5.2 5.2
9 Lighting -Extra Conidered
2 1 2.5 5
10 High mast
50 1 0.07 3.5
11 Canopy lighting
30 1 0.04 1.2
12 Building+refreshment area lighting
4 1 0.1 0.4
13 Street light pole
Add 20 % cushion
Total load in KW
28.08.2018
Working
load in KW Load in KVA
15.75 19.69
1.54 1.93
112 140.00
5.25 6.56
4 5.00
2.25 2.81
2.775 3.47
1.6 2.00
3.12 3.90
5 6.25
3.5 4.38
1.2 1.50
0.4 0.50
148.285 185.36
37.07
222.43
KVA
189.06
KW
Load calculation for CNG station ( Software Park) 28.08.2018
Emergency load details:
Working
Utilisation Connected load in Load in
Sl.No. Description Quantity factor Load (KW) load(KW) KW KVA
1 Air compressor 2 0.7 7.5 15 10.5 18.75
2 5 KVA UPS 1 0.8 5 4.25 3.4 5.31
3 Exhaust fan inside gas compressor 2 0.7 0.55 1.1 0.77 1.38
4 Lighting (Building+ Area) 1 0.6 2.59 2.59 1.554 3.24
5 Gas compressor illumination 2 0.7 0.1 0.2 0.14 0.25
7W 7 1 7
4x24W 96 13 1248
72W 72 10 720
39W 39 1 39
6W 6 4 24
36W 36 12 432
300mm 50 1 50
1200mm 70 1 70
2590
UPS LOAD