Вы находитесь на странице: 1из 33

LABORATORIUM KONSTRUKSI BETON

JURUSAN TEKNIK SIPIL


POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

BAB I
PERHITUNGAN PANJANG TULANGAN
1. Kolom ( C1 )
a. Denah Kolom Lt.1

Denah Kolom Lantai 1

KOLOM C1

DIMENSI 400X1000
TULAGAN 16D16
SENGKANG SK. D10-150

Detail Kolom

b. Perhitungan Kolom C1
Tulangan Utama Kolom C1
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Diameter Tulangan (d) = 16 mm


L o = 3500 mm = 350 cm

L = Lo + (2*1/2Lo) + (2*20d)
= 3500+3500+320
= 7640 cm = 7,64 m
kebutuhan 1 kolom = 7,64*16
= 122,24 m
berat D16 = 1,578 kg/m

Sengkang Kolom C1

Diameter Sengkang (d) = 10 mm


Dpen = 38,1 mm

L = 2*(92–Dpen–2d) + 2(32– Dpen–2d) + 3/2 πD + 2(6d)


= 1723,8+523,8+179,54+120
= 2547,14 mm = 2,547 m

1 kolom membutuhkan = 350/15


= 23,3 = 23 buah
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

kebutuhan panjang sengkang 1 kolom = 2,54*23


= 58,42 m

c. Tabel BBS Kolom


Bentuk d Banyak Panjang (mm)
Kode Berat (kg)
(mm) (n) Perbatang Total

C1
(Tulangan 16 384 7640 2933760 4629,4738
pokok)

K604
(Sengkang
Utama
10 552 2547,14 1406021,28 867,515
Kolom
K6b)

2. Balok Arah Memanjang


LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Denah Balok
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Gambar Detail Balok Arah Memanjang

Tabel Dimensi Balok Arah Memanjang

a. G2A5 ( bentang tumpuan Lo=480)

Tulangan dibagian tumpuan kiri


d = 19 mm
Dpen = 114,3 mm

15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+1200+170
= 1655 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1655- (76,15)
= 1578,85 mm
L = C+B+12d
= 1578,85+119,6+228
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

= 1926,45 mm

1 tumpuan kiri pada 1 balok = 1926,45*4 = 7705,8 mm

Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 4800/2
= 2400 mm
L = 2(20d)+(Lo/2)
= 760+2400
= 3160 mm
1 lapangan dalam satu tumpuan = 3160*2 = 6320 mm

Tulangan dibagian tumpuan kanan (bentang 500) dengan tumpuan kiri (bentang
600)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1200+200) + (285+1400+200)
= 3570 mm
= 3570*4 = 14280 mm

b. G2A5 ( bentang tumpuan Lo=560 cm)

Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 5600/2
= 2800 mm
L = 2(20d)+(Lo/2)
= 760+2800
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

= 3560 mm
1 lapangan dalam satu bentang = 3560*2 = 7120 mm

Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1400+200) + (285+1150+200)
= 3520 mm
= 3520*4 = 14080 mm
c. G2A5 ( bentang tumpuan Lo=460 cm)
Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 4600/2
= 2300 mm
L = 2(20d)+(Lo/2)
= 760+2300
= 3060 mm
1 lapangan dalam satu bentang = 3060*2 = 6120 mm

Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1150+200) + (285+1150+200)
= 3270 mm
= 3270*4 = 13080 mm

d. Tulangan sengkang untuk G2A5

Diameter Sengkang (d) = 10 mm


Dpen = 38,1 mm

L = 2*(170–Dpen–2d) + 2(420– Dpen–2d) +


3/2 πD + 2(6d)
= 223,8+723,8+179,54+120
= 1247,14 mm = 1,247 m

e. G34A ( bentang tumpuan Lo=480)

Tulangan dibagian tumpuan kiri


d = 19 mm
Dpen = 114,3 mm

15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+1200+170
= 1655 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1655- (76,15)
= 1578,85 mm
L = C+B+12d
= 1578,85+119,6+228
= 1926,45 mm

1 tumpuan kiri pada 1 balok = 1926,45*2 = 3852,9 mm

Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 4800/2
= 2400 mm
L = 2(20d)+(Lo/2)
= 760+2400
= 3160 mm
1 lapangan dalam satu tumpuan = 3160*2 = 6320 mm

Tulangan dibagian tumpuan kanan (bentang 500) dengan tumpuan kiri (bentang
600)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1200+200) + (285+1400+200)
= 3570 mm
= 3570*2 = 7140 mm

f. G34A ( bentang tumpuan Lo=560 cm)


LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 5600/2
= 2800 mm
L = 2(20d)+(Lo/2)
= 760+2800
= 3560 mm
1 lapangan dalam satu bentang = 3560*2 = 7120 mm

Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1400+200) + (285+1150+200)
= 3520 mm
= 3520*2 = 7040 mm
g. G34A ( bentang tumpuan Lo=460 cm)
Tulangan dibagian Lapangan

d = 19mm
20d = 380mm
Lo/2 = 4600/2
= 2300 mm
L = 2(20d)+(Lo/2)
= 760+2300
= 3060 mm
1 lapangan dalam satu bentang = 3060*2 = 6120 mm

Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+1150+200) + (285+1150+200)
= 3270 mm
= 3270*4 = 13080 mm

h. Tulangan sengkang untuk G34A

Diameter Sengkang (d) = 10 mm


Dpen = 38,1 mm

L = 2*(220–Dpen–2d) + 2(370– Dpen–2d) +


3/2 πD + 2(6d)
= 323,8+623,8+179,54+120
= 1247,14 mm = 1,247 m

3. Balok Arah Melintang

a. G36 bentang (Lo= 295)


Tulangan dibagian Tumpuan
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

d = 19 mm
Dpen = 114,3 mm

15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+737,5+220
= 1242,5 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1242,5- (76,15)
= 1166,35 mm
L = C+B+12d
= 1166,35+119,6+228
= 1783,05 mm

1 tumpuan kiri pada 1 balok = 1783,05*3 = 5349,15 mm

Tulangan dibagian Lapangan


d = 19mm
20d = 380mm
Lo/2 = 2950/2
= 1475 mm
L = 2(20d)+(Lo/2)
= 760+1475
= 2235 mm
1 lapangan dalam satu bentang = 2235*3 = 6705 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Tulangan dibagian tumpuan kanan (bentang 395) dengan tumpuan kiri (bentang
550)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+737,5+500) + (285+1100+500)
= 3407,5 mm
= 3407,5 *3 = 10222,5 mm

b. G36 bentang (Lo= 450)


Tulangan dibagian Lapangan
d = 19mm
20d = 380mm
Lo/2 = 4500/2
= 2250 mm
L = 2(20d)+(Lo/2)
= 760+2250
= 3010 mm
1 lapangan dalam satu bentang = 3010*3 = 9030 mm

Tulangan Sengkang

Diameter Sengkang (d) = 10 mm


Dpen = 38,1 mm

L = 2*(220–Dpen–2d) + 2(520– Dpen–2d) +


3/2 πD + 2(6d)
= 323,8+923,8+179,54+120
= 1547,14 mm = 1,547 m
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

c. G34A bentang (Lo= 295)


Tulangan dibagian Tumpuan

d = 19 mm
Dpen = 114,3 mm

15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+737,5+220
= 1242,5 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1242,5- (76,15)
= 1166,35 mm
L = C+B+12d
= 1166,35+119,6+228
= 1783,05 mm

1 tumpuan kiri pada 1 balok = 1783,05*2 = 3566,1 mm

Tulangan dibagian Lapangan


d = 19mm
20d = 380mm
Lo/2 = 2950/2
= 1475 mm
L = 2(20d)+(Lo/2)
= 760+1475
= 2235 mm
1 lapangan dalam satu bentang = 2235*2 = 4470 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Tulangan dibagian tumpuan kanan (bentang 395) dengan tumpuan kiri (bentang
550)

x = (15d+Lo/4+1/2b kolom) + (15d+Lo/4+1/2b kolom)


= (285+737,5+500) + (285+1100+500)
= 3407,5 mm
= 3407,5 *3 = 10222,5 mm

d. G36 bentang (Lo= 450)


Tulangan dibagian Lapangan
d = 19mm
20d = 380mm
Lo/2 = 4500/2
= 2250 mm
L = 2(20d)+(Lo/2)
= 760+2250
= 3010 mm
1 lapangan dalam satu bentang = 3010*3 = 9030 mm

4. Pelat ( A1 sampai I4 )
a. Denah Pelat Lt.1
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Denah Pelat Elevasi 0.00

b. Perhitungan Tulangan Pelat


Kode Gambar Perhitungan
(P01) Tulangan Pelat Bagian Atas Tipe a

Diameter = 10 mm
Tebal Pelat = 150 mm
Dpen = 38,1 mm

A = t selimut + dia. Tulangan sengkang + dia. Tulangan Utama


= 40 + 10 + 22
= 72 mm

B = ⅜. 𝜋.(Dpen + 2d)
= ⅜.(3,14).(38,1 + 20)
= 68,41 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

C = ¼.𝜋.(Dpen + 2d)
= ¼.(3,14).(38,1 + 20)
= 45,61 mm

D = 150 – (Dpen + 2d)


= 150 – (38,1 + 20)
= 91,9 mm

L = 6d + B + D + C +
A + 9575 + 350 +
1737,08
= 60 + 68,41 + 91,9
P01a
+ 45,61 + 72 +
9575 + 350 +
1737,08
= 12000 mm

L = 40d + 4141,5085
P01b
= 4181,5085 mm

(P02) Tulangan Pelat Bagian Bawah Tipe a

Diameter = 10 mm
Tebal Pelat = 150 mm
Dpen = 38,1 mm

A = t selimut + dia. Tulangan sengkang + dia. Tulangan Utama


= 40 + 10 + 22
= 72 mm

B = ⅜. 𝜋.(Dpen + 2d)
= ⅜.(3,14).(38,1 + 20)
= 68,41 mm

C = ¼.𝜋.(Dpen + 2d)
= ¼.(3,14).(38,1 + 20)
= 45,61 mm

D = 150 – (Dpen + 2d)


= 150 – (38,1 + 20)
= 91,9 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

L = 6d + B + A +
5239
P02a = 60 + 68,41 + 72 +
5239
= 5439,41 mm

L = 40d + 4336 + 350


+ 7274
P02b = 40 + 4336 + 350
+ 7274
= 12000 mm
(P03) Tulangan Pelat Bagian Atas Tipe b

Diameter = 10 mm
L = 6d + B + D + C +
A + 4500 + 500 +
6662,08
= 60 + 68,41 + 91,9
P03a
+ 45,61 + 72 +
4500 + 500 +
6662,08
= 12000 mm
L = 40d + 2837,92 +
500 + 8262,08
P03b = 400 + 2837,92 +
500 + 8262,08
= 12000 mm

L = 40d + 1237,92 +
500 + 4500 + A +
C + D + B + 6d
= 400 +1237,92 +
P03c
500 + 4500 + 72
+ 45,61 + 91,9 +
68,41 + 60
= 6975,84 mm

(P04) Tulangan Pelat Bagian Bawah Tipe b


LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Diameter 10 mm
L = 6d + B + A +
4500 + 500 +
6799,59
P04a = 60 + 68,41 + 72 +
4500 + 500 +
6799,59
= 12000 mm
L = 40d + 2700,41 +
500 + 8399,59
P04b = 400 + 2700,41 +
500 + 8399,59
= 12000 mm
L = 40d + 1237,92 +
500 + 4500 + A +
B + 6d
P04c = 400 + 1237,92 +
500 + 4500 + 72
+ 68,41 + 60
= 6975,84 mm
(P05) Tulangan Pelat Bagian Atas Tipe c

Diameter 10 mm
L = 6d + B + D + C +
A + 4500 + 500 +
6662,08
= 60 + 68,41 + 91,9
P05a
+ 45,61 + 72 +
4500 + 500 +
6662,08
= 12000 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

L = 40d + 2837,92 +
A+C+D+B
+6d
P05b = 400 + 2837,92 +
72 + 45,61 + 91,9
+ 68,41 + 60
= 3575,84 mm

(P06) Tulangan Pelat Bagian Bawah Tipe c

Diameter 10 mm
L = 6d + B + A +
4500 + 500 +
6799,59
P06a = 60 + 68,41 + 72 +
4500 + 500 +
6799,59
= 12000 mm
L = 40d + 2700,41 +
A + B + 6d
P06b = 400 + 2700,41 +
72 + 68,41 + 60
= 3300,82 mm
(P07) Tulangan Pelat Bagian Atas Tipe d

Diameter 10 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

L = 6d + B + D + C +
A + 4750 + 500 +
6412,08
= 60 + 68,41 + 91,9
P07a
+ 45,61 + 72 +
4750 + 500 +
6412,08
= 12000 mm

L = 40d + 3087,92
P07b = 400 + 3087,92
= 3487,92 mm

(P08) Tulangan Pelat Bagian Bawah Tipe d

Diameter 10 mm
L = 6d + B + A +
4750 + 500 +
6549,59
P08a = 60 + 68,41 + 72 +
4750 + 500 +
6549,59
= 12000 mm

L = 40d + 2950,41
P08b = 400 + 2950,41
= 3350,41 mm

c. Tabel BBS Pelat Lantai


d Banyak Panjang (mm)
Kode Berat (kg) Bentuk
(mm) (n) Perbatang Total
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

P01a 10 100 12000 1200000 740400

4181,50
P01b 10 100 418150,85 257999
85

P02a 10 100 5439,41 543941 335612

P02b 10 100 12000 1200000 740400

P03a 10 52 12000 624000 385008

P03b 10 52 12000 624000 385008

P03c 10 52 6975,84 362743,68 223813

P04a 10 52 12000 624000 385008

P04b 10 52 12000 624000 385008

P04c 10 52 6975,84 362743,68 223813


LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

P05a 10 24 12000 288000 177696

P05b 10 24 3575,84 85820,16 52951

P06a 10 24 12000 288000 177696

P06b 10 24 3300,82 79219,68 48878,5

P07a 10 58 12000 696000 429432

P07b 10 58 3487,92 202299,36 124819

P08a 10 58 12000 696000 429432

P08b 10 58 3350,41 194323,78 119898


LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

BAB II
PERHITUNGAN KEBUTUHAN JUMLAH BATANG TULANGAN

Diketahui : 1 lente = 12 m

Tulangan Diameter 16 mm
1. C1 (Tulangan Utama Kolom)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
Jumlah lente
Total sisa
Tulangan Diameter 19 mm
1. G2A5 (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
Jumlah lente
Total sisa
2. G34A (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
sisa 1 lente
Total sisa
3. G36 (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
sisa 1 lente
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Total sisa
4. P01a
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 100 lente
Total sisa =-

5. P01b
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 4181,5085 mm
Sisa tulangan = 3636,98
Jumlah lente = 50 lente
Total sisa = 181849,15 mm

6. P02a
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 5439,41 mm
Sisa tulangan = 1121,18 mm
Jumlah lente = 50 lente
Total sisa = 56059 mm

7. P02b
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 100 lente
Total sisa =-

8. P03a
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Jumlah Tulangan = 52 tulangan


Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-

9. P03b
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-

10. P03c
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 6975,84 mm
Sisa tulangan = 5024,16 mm
Jumlah lente = 52 lente
Total sisa = 261256,32 mm

11. P04a
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-

12. P04b
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Jumlah Tulangan = 52 tulangan


Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-

13. P04c
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 6975,84 mm
Sisa tulangan = 5024,16 mm
Jumlah lente = 52 lente
Total sisa = 261256,32 mm

14. P05a
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 24 lente
Total sisa =-

15. P05b
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 3575,84 mm
Sisa tulangan = 1272,48 mm
Jumlah lente = 6 lente
Total sisa = 7634,88 mm

16. P06a
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 24 lente
Total sisa =-
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

17. P06b
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 3300,82 mm
Sisa tulangan = 2097,54 mm
Jumlah lente = 6 lente
Total sisa = 12585,24 mm

18. P07a
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 58 lente
Total sisa =-

19. P07b
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 3487,92 mm
Sisa tulangan = 1536,24 mm
Jumlah lente = 20 lente
Total sisa = 30724,8 mm

20. P08a
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 58 lente
Total sisa =-

21. P08b
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

Jumlah Tulangan = 58 tulangan


Panjang Tulangan = 3350,41 mm
Sisa tulangan = 1948,77 mm
Jumlah lente = 20 lente
Total sisa = 38975,4 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

BAB III
PERHITUNGAN SISA TULANGAN

Panjang Sisa
Jumlah Jumlah Total Sisa Sisa Akhir
No. Kode Tulangan tulangan Keterangan
Tulangan lente (mm) (mm)
(mm) (mm)
Diameter 22
1 K401 11,382.545 420 617.455 420 259,331.100 259,331.100
2 K501 9,247.090 140 2,752.911 140 385,407.470 644,738.570
3 K601 9,247.090 60 2,752.911 60 165,174.630 809,913.200
4 K603 7,347.090 20 4,652.911 20 93,058.210 902,971.410
Dipakai
5 B01a 6780 15 5220 15 - -
untuk B02a
6 B01b 120 15 1800 15
7 B01c 10880 15 16800 15
Memakai
8 B02a 5220 10 - 10 - -
sisa B01a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Diameter 16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Diameter 10
Sisa
1 K402 8,905.595 60 3,094.405 60 terpakai - 902,971.410
untuk K403
2 K403 2,961.251 69 133.154 60 7,989.240
154.996 2 309.992
9,038.749 1 9,038.749 920,309.391
3 K404 2,209.251 35 953.745 7 6,676.215 926,985.606
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

4 K502 1,761.251 69 1,432.494 11 15,757.434


Sisa
6,716.247 1 terpakai 942,743.040
untuk K602
Sisa
5 K602 104.151 20 4,633.227 1 terpakai 4,633.227 947,376.267
untuk K604
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung

BAB IV
KESIMPULAN

Вам также может понравиться