• Education
• NWTC (Northeast WI Technical College)
• Work History
• Wisconsin Public Service (WPS) – 24 years
• American Transmission Company (ATC) – 6 years
• Energis High Voltage Resources, Inc. – 10 years
No One Right Way
• Power Factor
• Ratio
• Insulation
• Winding Resistance
• SFRA (Sweep Frequency
Response Analysis)
• DGA and Oil Quality
Transformer Maintenance Frequency
• Verify oil level in main tank & LTC • Monthly
• Verify oil level in bushing • Monthly
• Verify insulator integrity
• Monthly
• Verify tank integrity and free of oil leak
• Monthly
• Inspect surge arrestors
• Verify paint is in good condition • Monthly
• Record winding/liquid temperatures (current & • Monthly
max)
• Monthly
• Record LTC position indicator & operation counter
(current & max raise/lower) • Monthly
• Verify correct operation of fans and free of bird • Monthly
nests
• Verify correct operation pumps (if applicable) • Monthly
• Verify nitrogen pressure (if applicable) • Monthly
• Verify transformer and pad are level • Monthly
• Verify control cabinet is free of moisture
• Monthly
• Verify cabinet heater operation
• Monthly
Transformer Maintenance Frequency
• Thermographic Imaging (Infrared) • Annual
• Transformer oil analysis (DGA) • Annual
• Power factor • Every 5 years
• Winding resistance test • Every 5 years
• Transformer turns ratio test • Every 5 years
• Insulation test • Every 5 years
• Calibrate temperature gauge • Every 5 years
• Verify alarms points • Every 5 years
• Verify Bucholtz relay operation • Every 5 years
• Verify rapid pressure rise relay operation • Every 5 years
• SFRA (sweep frequency response analysis) • New install & after fault operation
• Vibration & acoustic testing • Dependent on criticality of equipment
Industry Survey Results
Transformers
Circuit Breakers Testing
• Power Factor
• Speed
• Micro-ohm
• Ratio Bushing Current
Transformer
• SF6 Gas
• Installation Testing (e.g. Air
Mag)
Circuit Breaker Maintenance Frequency
• Verify breaker is level • Monthly
• Verify paint is in good condition • Monthly
• Verify insulator integrity • Monthly
• Verify SF6 gas pressure (check oil level in oil • Monthly
breaker)
• Record operation counter number • Monthly
• Verify control cabinet is free of moisture and • Monthly
cabinet is working
• Check control voltages & operation of breaker • Annual
• Thermographic Imaging (Infrared) • Annual
• Verify tank heaters (if applicable) • Annual
• Motion testing (speed test) • Every 5 years
• Micro-Ohm (ductor) contacts • Every 5 years
• Test SF6 gas for moisture, purity & SO2 content • Every 5 years
• Check alarm points in control house • Every 5 years
Battery & Charger Testing
• Specific Gravity
• Cell Strap Connection
Resistance
• Internal Cell Resistance
• Voltage Readings
Batteries & Charger Maintenance Frequency
• Visual inspection of electrolyte levels • Monthly
• Visual inspection of battery jars • Monthly
• Verify no battery grounds exist • Monthly
• Record battery voltage & current • Monthly
• Specific gravity • Annual
• Thermographic Imaging
(Infrared)
• Insulation Resistance Test
• Micro-ohm Contact Resistance
• Hi-pot Vacuum Bottles
Vacuum Breaker Maintenance Frequency
• Verify insulator integrity • Monthly
• Verify control cabinet is free of moisture • Monthly
• Verify cabinet heater operation • Monthly
• Record operation counter number • Monthly
• Thermographic Imaging (Infrared) • Every 5 years
• Micro-ohm
• Insulation Test
• Verify Mechanical Operation
• Verify Electrical Operation
Contact information:
Paul Schlies· pschlies@energisinc.com· 920.632.7929
Bill Gilbert· bgillbert@energisinc.com· 920.370.2062
Brad Beyer· bbeyer@energisinc.com· 920.655.1102
Questions