DOC. NO: QPE. ST.

-001
REV:R01
SITE PROTOCOL SHEET 1 / SHEET 2

AREA/UNIT TG-I , SCCL , STPP


SYSTEM LUBE OIL PIPING
ACTIVITY ERECTION OF LUBE OIL PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN LUBE OIL PIPING ERECTION AND WELDING COMPLETED.

REF. DRG.NO. :- 3-13121-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 HANGER - H1 1
2 HANGER - H2 1
3 HANGER - H3 1
4 HANGER - H4 3
5 HANGER - H5 1
6 HANGER - H6 2
7 HANGER - H7 1
8 HANGER - H8 2
9 HANGER - H9 1
10 HANGER - H10 1
11 HANGER - H11 1
12 HANGER - H12 1
13 HANGER - H13 1
14 HANGER - H14 1
15 HANGER - H15 2
16 HANGER - H16 20
17 SUPPORT - S1 1
18 SUPPORT - S2 2
19 SUPPORT - S3 1
20 SUPPORT - S4 2
21 SUPPORT - S5 1
22 SUPPORT - S6,S7 & S9 6
23 SUPPORT - S8 & S11 2
24 SUPPORT - S10 1
25 SUPPORT - S12,S13,S14 & S15 4
26 SUPPORT - S16 1
27 SUPPORT - S17 1
28 SUPPORT - S18 & S20 2
29 SUPPORT - S19 1
30 SUPPORT - S21 1
31 SUPPORT - S22 1
32 SUPPORT - S23 2
33 SUPPORT - S24 3
34 SUPPORT - S25 1
35 SUPPORT - S26 1
36 SUPPORT - S27 1

NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH
PROTOCOL SERIAL NO.SP:TG: PIPING (LUBE OIL PIPING SUPPORTS)

DOC. NO: QPE. ST.-001


REV:R01
SITE PROTOCOL SHEET 2 / SHEET 2

AREA/UNIT TG-I , SCCL , STPP


SYSTEM LUBE OIL PIPING
ACTIVITY ERECTION OF LUBE OIL COOLING WATER PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN LUBE OIL COOLING WATER PIPING ERECTION AND
WELDING COMPLETED.

REF. DRG.NO. :- 3-131262-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SUPPORT - S1 5

NAME SIGNATURE DATE


BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA
SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (LUBE OIL COOLING WATER PIPING SUPPORTS)
DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM SEAL OIL PIPING
ACTIVITY ERECTION OF SEAL OIL PIPING SUPPORT DATE :- 17.03.2016

REF. DRG.NO. :- 0-150-00-01632

ADEQNATE HANGERS AND SUPPORT ARE PROVIDED FOR


THE SEAL OIL SYSTEM PIPING.

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR

PROTOCOL SERIAL NO.SP:TG: PIPING (SEAL OIL PIPING SUPPORT )


DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM PRIMARY WATER PIPING
ACTIVITY ERECTION OF PRIMARY WATER PIPING SUPPORT DATE :- 17.03.2016

REF. DRG.NO. :- 0-150-00-01632

ADEQNATE HANGERS AND SUPPORT ARE PROVIDED FOR


THE PRIMARY WATER SYSTEM PIPING.

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR

PROTOCOL SERIAL NO.SP:TG: PIPING ( PRIMARY WATER PIPING SUPPORT )


DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM HYDROGEN COOLER PIPING
ERECTION OF HYDROGEN COOLER COOLING WATER
ACTIVITY DATE :- 17.03.2016
PIPING SUPPORT

REF. DRG.NO. :- 0-150-00-01633

ADEQNATE HANGERS AND SUPPORT ARE PROVIDED FOR


THE HYDROGEN COOLER COOLING WATER SYSTEM PIPING.

NAME SIGNATURE DATE


BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR

PROTOCOL SERIAL NO.SP:TG: PIPING (HYDROGEN COOLER COOLING WATER PIPING SUPPORTS)
DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM GAS PIPING
ACTIVITY ERECTION OF GENERATOR GAS PIPING SUPPORT DATE :- 17.03.2016

REF. DRG.NO. :- 3-13154-89000

ADEQNATE HANGERS AND SUPPORT ARE PROVIDED FOR


THE GENERATOR GAS SYSTEM PIPING.

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR

PROTOCOL SERIAL NO.SP:TG: PIPING (GENERATOR GAS PIPING SUPPORTS)


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 1 / SHEET 2

AREA/UNIT TG-I , SCCL , STPP


SYSTEM SEAL STEAM PIPING
ACTIVITY ERECTION OF SEAL STEAM PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN SEAL STEAM PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13152-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SPRING HANGER - SH1 1
2 SPRING HANGER - SH2 1
3 SPRING HANGER - SH3 1
4 SPRING HANGER - SH4 1
5 SPRING HANGER - SH5 1
6 SPRING HANGER - SH6 1
7 SPRING HANGER - SH7 5
8 SPRING HANGER - SH8 2
9 SPRING HANGER - SH9 2
10 SPRING HANGER - SH10 1
11 SPRING HANGER - SH11 1
12 SPRING HANGER - SH12 1
13 SPRING HANGER - SH13 1
14 SPRING HANGER - SH14 1
15 SPRING HANGER - SH15 2
16 SPRING HANGER - SH16 1
17 SPRING HANGER - SH17 1
18 SPRING HANGER - SH18 1
19 SPRING HANGER - SH19 1
20 SPRING HANGER - SH20 1
21 SPRING HANGER - SH21 1
22 SPRING HANGER - SH22 1
23 SPRING HANGER - SH23 1
24 SPRING HANGER - SH24 1
25 SPRING HANGER - SH26 1
26 SPRING HANGER - SH29 2
27 SPRING HANGER - SH31 1
28 SPRING HANGER - SH32 1
29 SPRING HANGER - SH33 1

NAME SIGNATURE DATE


BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (SEAL STEAM PIPING SUPPORT )


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 2 / SHEET 2

AREA/UNIT TG-I , SCCL , STPP


SYSTEM SEAL STEAM PIPING
ACTIVITY ERECTION OF SEAL STEAM PIPING SUPPORT DATE :-

COMPLETED.

REF. DRG.NO. :- 3-13152-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SUPPORT - S1 2
2 SUPPORT - S2 3
3 SUPPORT - S3 1
4 SUPPORT - S4 1
5 SUPPORT - S5 1
6 SUPPORT - S6 1
7 SUPPORT - S10 1
8 SUPPORT - S11 1
9 SUPPORT - S12 1
10 SUPPORT - S14 1
11 SUPPORT - S15 2
12 SUPPORT - S16 2
13 SUPPORT - S17 2
14 SPRING SUPPORT - SS1 1
15 SPRING SUPPORT - SS2 1
16 SPRING SUPPORT - SS4 1
17 HANGER - H1 1
18 HANGER - H2 1
19 HANGER -H7 2
20 HANGER -H8 1
21 HANGER -H9 1
22 HANGER -H10 1
23 HANGER -H12 2
24 HANGER -H13 4
25 HANGER -H14 2
26 HANGER -H15 1
27 HANGER -H20 4

NAME SIGNATURE DATE


BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (SEAL STEAM PIPING SUPPORT )


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM TURBINE DRAINAGE PIPING
ACTIVITY ERECTION OF TURBINE DRAINAGE PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN TURBINE DRAINAGE PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13133-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SPRING SUPPORT - SS1 1
2 SPRING SUPPORT - SS2 1
3 SPRING SUPPORT - SS3 1
4 SPRING SUPPORT - SS4 1
5 SPRING SUPPORT - SS5 1
6 SPRING SUPPORT - SS6 2
7 SPRING SUPPORT - SS7 1
8 GUIDE G1 1
9 GUIDE G2 1
10 SPRING HANGER - SH1 2

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (TURBINE DRAINAGE PIPING SUPPORT)


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 3 / SHEET 5

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONTROL FLUID PIPING
ACTIVITY ERECTION OF CONTROL FLUID PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN CONTROL FLUID PIPING (NRVs) ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13158-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 HANGER - H1 3
2 HANGER - H2 1
3 HANGER - H3 2
4 SUPPORT - S1 2
5 SUPPORT - S2 2

NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (CONTROL FLUID PIPING SUPPORT)


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 4 / SHEET 5

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONTROL FLUID PIPING
ACTIVITY ERECTION OF CONTROL FLUID PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN CONTROL FLUID PIPING (LPBV) ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13156-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1

NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA
SCCL RAMESH
PROTOCOL SERIAL NO.SP:TG: PIPING (CONTROL FLUID PIPING SUPPORT)

DOC. NO: QPE. ST.-001


REV:R01
SITE PROTOCOL SHEET 5 / SHEET 5

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONTROL FLUID PIPING
ACTIVITY ERECTION OF CONTROL FLUID PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN CONTROL FLUID COOLING WATER PIPING ERECTION AND
WELDING COMPLETED.

REF. DRG.NO. :- 3-13164-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SUPPORT - S1 5
2 SUPPORT - S2 4

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL RAMESH
PROTOCOL SERIAL NO.SP:TG: PIPING (CONTROL FLUID PIPING SUPPORT)

DOC. NO: QPE. ST.-001


REV:R01
SITE PROTOCOL SHEET 1 / SHEET 5

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONTROL FLUID PIPING
ACTIVITY ERECTION OF CONTROL FLUID PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN CONTROL FLUID PIPING ERECTION AND WELDING
COMPLETED.
REF. DRG.NO. :- 3-13142-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 HANGER - H1 2
2 HANGER - H2 3
3 HANGER - H3 1
4 HANGER - H4 1
5 HANGER - H5 1
6 HANGER - H9 1
7 HANGER - H10 1
8 HANGER - 11 2
9 HANGER - H12 4
HANGER - H17 1
10 SUPPORT - S1 1
11 SUPPORT - S2 1
12 SUPPORT - S3 1
13 HANGER - SH1 1
14 SUPPORT - SS1 1
15 SUPPORT - SS2 1
16 SUPPORT - S14 1
17 SUPPORT - S15 , FP 1
18 SUPPORT S16 1
19 SUPPORT - S17 1
20 SUPPORT - S18 1
21 SUPPORT - S19 1
22 SUPPORT - S20 2
23 SUPPORT - S21 1
24 SUPPORT - S22 1
25 SUPPORT - S23 1
26 SUPPORT - S24 2
27 SUPPORT - S25 1
28 SUPPORT - S26 1
29 HANGER - H14 1
30 HANGER - H15 2
31 SUPPORT - S51 2
32 SUPPORT - S52 , G10 2
33 SUPPORT - S54 1
34 SUPPORT - S55 3
35 FIXED POINT - FP1 1
36 SUPPORT - S57 , G12 1
37 SUPPORT - S58 , G13 2
38 FIXED POINT - FP2 1
39 FIXED POINT - FP3 1
NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH
PROTOCOL SERIAL NO.SP:TG: PIPING (CONTROL FLUID PIPING SUPPORT)

DOC. NO: QPE. ST.-001


REV:R01
SITE PROTOCOL SHEET 2 / SHEET 5

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONTROL FLUID PIPING
ACTIVITY ERECTION OF CONTROL FLUID PIPING SUPPORT DATE :-

FOLLOWING SUPPORT & HANGER IN CONTROL FLUID PIPING ERECTION AND WELDING
COMPLETED.
REF. DRG.NO. :- 3-13142-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SUPPORT - S59 4
2 SUPPORT - S60 1
3 SUPPORT - S61 1
4 SUPPORT - S62 1
5 HANGER - H53 1
6 HANGER - H51 1
7 HANGER - H52 2
8 SPRING HANGER - SH26 1
9 SPRING HANGER - SH27 1
10 SPRING HANGER - SH28 2
11 SUPPORT - S64 1
12 SUPPORT - S65 2
13 SUPPORT - S66 1
14 SUPPORT - S67 2
15 FIXED POINT - FP4 1
16 DAMPER - D1 & D2 1
17 DAMPER - D3 & D4 1
18 SUPPORT - S68 2
19 HANGER - H55 2
20 SUPPORT - S69 2
21 SUPPORT - S70 2
22 SPRING SUPPORT - SS3 , SS4 & SS9 3
23 SPRING SUPPORT - SS5 1
24 SPRING SUPPORT - SS6 1
25 SPRING SUPPORT - SS7 1
26 SPRING SUPPORT - SS8 1
27 SUPPORT - S71 2
28 SUPPORT - S72 2
29 SUPPORT - S73 5
30 SUPPORT - S74 1
31 SUPPORT - S75 2
NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL RAMESH
PROTOCOL SERIAL NO.SP:TG: PIPING (CONTROL FLUID PIPING SUPPORT)
SITE PROTOCOL

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CROSS AROUND PIPING
ACTIVITY ERECTION OF CROSS AROUND PIPING SUPPORT

REF. DRG.NO. :- 0-10713-19000

ALL SUPPORTS & HANGERS ARE ERECTED AND


WELDING COMPLETED.

NAME SIGNATURE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR


PROTOCOL SERIAL NO.SP:TG: PIPING (CONDENSATE SPRAY SUPPORTS)
DOC. NO: QPE. ST.-001
REV:R01
SHEET 1 / SHEET 1

DATE :- 23.02.2016

RE ERECTED AND
TED.

DATE
UPPORTS)
DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM COT AND DOT
ACTIVITY ERECTION OF COT AND DOT PIPING SUPPORT DATE :- 14.03.2016

FOLLOWING SUPPORT & HANGER IN COT AND DOT PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13154-89000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1
2
3
4
5
6
7

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (CROSS AROUND PIPING SUPPORTS)


DOC. NO: QPE. ST.-001
REV:R01
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM CONDENSATE SPRAY PIPING
ACTIVITY ERECTION OF CONDENSATE SPRAY PIPING SUPPORT DATE :- 17.03.2016

FOLLOWING SUPPORT & HANGER IN CONDENSATE SPRAY PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13154-R9000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1 SUPPORT - S1 10 8.5 Mtr.
2 SUPPORT - S2 2 8.5 Mtr.
3 HANGER - H1 2 8.5 Mtr.
4 HANGER - SH1 1 8.5 Mtr.
5 HANGER - SH2 3 8.5 Mtr.

NAME SIGNATURE DATE

BHEL V.S.RAJPUT

NTPC A.SATYANARAYANA

SCCL CHANDRA SHEKHAR


PROTOCOL SERIAL NO.SP:TG: PIPING (CONDENSATE SPRAY PIPING SUPPORTS)
DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM TDBFP-A
ACTIVITY ERECTION OF TDBFP - A OIL PIPING SUPPORT DATE :- 14.03.2016

FOLLOWING SUPPORT & HANGER IN TDBFP - A OIL PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13154-89000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1
2
3
4
5
6
7

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (TDBFP - A OIL PIPING SUPPORT)


DOC. NO: QPE. ST.-001
REV:R00
SITE PROTOCOL SHEET 1 / SHEET 1

AREA/UNIT TG-I , SCCL , STPP


SYSTEM TDBFP - B
ACTIVITY ERECTION OF TDBFP- B OIL PIPING SUPPORT DATE :- 14.03.2016

FOLLOWING SUPPORT & HANGER IN TDBFP - B OIL PIPING ERECTION AND WELDING
COMPLETED.

REF. DRG.NO. :- 3-13154-89000

SL. NO. SUPPORT NAME / NO. QTY. LOCATION


1
2
3
4
5
6
7

NAME SIGNATURE DATE

BHEL V.S.RAJPUT
NTPC A.SATYANARAYANA

SCCL RAMESH

PROTOCOL SERIAL NO.SP:TG: PIPING (TDBFP- B OIL PIPING SUPPORT )


TO WHOM SO EVER IT MAY CONCERN

This is to certify that Mr. AJAY KUMAR KUMBHAKAR S/o A. KUMBHAKAR

has worked in our organization as a EOT crane operator in unit -9,TG NTPC (500 MW)

VINDHYACHAL SITE,VINDHYNAGAR from 07.06.2005 to 28.12.2006 and our

other site unit- v TG NTPC (500 MW) SIPAT, BILASPUR (C.G.) from 04.05.2007 to

22.10.2008 During his tenure . We found him sincere and hard working .

We wish him for bright future & all the success in life.

SITE INCHARGE

S.BAKSHI
( DGM
BHEL)