Sub: Offer for Supply and Installation of Ball Jointed Space Frame - Reg.
Dear Sir,
This has reference to our discussion regarding your requirement for the Ball Jointed Space Frame.
Warm Regards,
Jayaraman
Regional Manager
9843264447
Project No : GSSPL/18-19/BEL-241
Date : 27-09-18
INDEX:
S.No. Contents Page
Index
2
1 Scope of supply
3
3 Applicable Codes
4
6 Approval drawings
5
7 Delivery period
5
8 Exclusions
5
10 Commercial Terms
6
11 Terms of payment-Supply
6
12 Certified Builders
6
Column Rc Column
5
Cladding Height NA
9
Roof slope 1 in 10
11
Gable NA
13
Crane NA
14
16 Sheet Accessories
a) Gutter NA
MAIN FRAME
B14
MAIN FRAME
ROOF SHEET
RC COLUMN
WALL
CROSS SECTION
PLAN & SECTION
MAIN FRAME
MAIN FRAME
ROOF PLAN
MAIN FRAME
B15
Only those items mentioned in this drawing comes
under GSSPL Scope.
MAIN FRAME
ROOF SHEET
RC COLUMN
MAIN FRAME
MAIN FRAME
ROOF PLAN
MAIN FRAME
B16
MAIN FRAME
ROOF SHEET
RC COLUMN
CROSS SECTION
MAIN FRAME
B17
ROOF SHEET
RC COLUMN
B18
ROOF SHEET
RC COLUMN
The buildings shall be designed in accordance with the specification of Indian Standards.
a) Fabrication tolerance in accordance with IS 7215 – 1974 and Metal Building
requirements of structural welding code IS 819 - 1979, IS 1024 - 1979 and IS 1261 - 1959.
b) Supply and application of one coat of synthetic enamel paint at site, GSSPL scope.
c) Only standard and straight colours like Smoke Grey - 692, Dark Grey - 632,
Oxford Blue - 105, Light Grey - 631 ( Asian Paint or equal make) shall only be used.
However, please note that GSSPL does not recommend use of mixing colours.
a) The below offered price is based on present ruling rates of raw materials and labour cost and should there
be any increase in raw material and labour cost during the tenure of job then we have every right to revise the
agreed price suitably.
b) Any change or revision to the above stated scope of supply may lead to a variation in the price and
delivery period. For any change on this, payment cannot be hold for work completed in the original contract.
6. Approval drawings
GSSPL will issue approval drawings within a minimum period of 10 working days from date of signing contract and
receipt of advance payment.
CLIENT must return the accepted approval drawings preferably within 1 week thereafter, otherwise, may result in
revision to delivery commitment.
7. Delivery period
GSSPLwill supply the material within 20 weeks from the latest date of receipt of the approval drawing from Client.
i) Installation of work will be completed within 12 weeks from the supply of materials.
iv) Leveling and Compacting of Floor / Ground shall be provided by Client Civil Contractor before start of Erection
v) Minimum 15 days curing time is to be given after Anchor Bolt Casting is done.
vi) Our offer excludes all civil work and necessary scaffolding
viii) Electricity 3 phase supply and water to be provided free of cost at site during the erection of structure.
xi) It is mandatory that Crane movement will be proposed inside building floor ( Plan Area ) while erecting the Primary
and Secondary Frames. (else variation in Installation Cost will be applicable)
xii) Periodic Supervision by Project Management Team and regular Updates of the Project Schedule Status will be
informed to Client by GSSPL PMC Department.
• PMC, which is our team of Project Management Consultant acts as a bridge between Project Departments and
Clients. The ERP software and the cutting edge technology makes our PMC work efficiently as a well- managed and
independent team.
• PMC provides approval to departments, immediately after client’s clearance of their process.
• The Main Aim of GSSPL PMC is to maintain Transparency with the Client by informing the Project Updates on a
Weekly Basis.
10. Commercial Terms
Amount(in Rs.)
S.No. Description of work Qty. in kg Rate/kg
1 AREA - B14
i SUPPLY
2 AREA - B15
i SUPPLY
3 AREA - B16
i SUPPLY
4 AREA - B17
i SUPPLY
i SUPPLY
11 TERMS OF PAYMENT
(I) Supply
20% Advance along with Work order / duly signed contract
50% against approval of drawing and design report or by Irrevocable Letter of Credit .
30% against our Proforma Invoice before dispatch of Materials or by Irrevocable Letter of
Credit .
INSTALLATION - B14
Installation of Ball Jointed Space Frame,
1 1unit Rs. 48,00,000.00
Sheet fixing & application of one coat of
Enamel paint.
INSTALLATION -B15
Installation of Ball Jointed Space Frame,
2 1unit Rs. 9,75,000.00
Sheet fixing & application of one coat of
Enamel paint.
INSTALLATION -B16
Installation of Ball Jointed Space Frame,
3 1unit Rs. 13,20,000.00
Sheet fixing & application of one coat of
Enamel paint.
INSTALLATION -B17
Installation of Ball Jointed Space Frame,
4 1unit Rs. 6,00,000.00
Sheet fixing & application of one coat of
Enamel paint.
INSTALLATION-B18
Installation of Ball Jointed Space Frame,
5 1unit Rs. 18,00,000.00
Sheet fixing & application of one coat of
Enamel paint.
ii Scope Included:
• Unloading of Materials
• Installation of Structure
• Sheet Fixing
Note: The Contractor Should get the Final Site Completion Certificate from the Client before Project
Hand over.
15% Against Completion of Roof Sheet and Commencement of the Side Cladding.
5% Against Signing of Final Site Completion Certificate and Site Hand Over.
STANDARD PRODUCT SPECIFICATIONS Scope As per
A Standard System is Made Up of Primary Members, Secondary Yes No DWG
Members, Connections, Roof Sheeting, Wall Sheeting, Sheeting
13 Fasteners, Sealer, Closures, Ridge caps, Flashings and Trim, Gutters
and downspouts.
A PRIMARY MEMBERS
Primary Structural framing shall include Top Chord , Bottom Chord ,
Diagonal Members & Connecting rod.
B SECONDARY MEMBERS
Secondary Structural Framing shall include the Purlins, Girts eave
struts, Wind bracing, Flange bracing, Cleats and other
miscellaneous structural parts.
C PAINT OF STRUCTURAL MEMBERS
All structural members shall be cleaned to remove dirt, grease, oil
and loose mill scale and given one shop coat of primer.
D CONNECTIONS
All field connections shall be bolted (Unless otherwise noted).
Primary bolted connections shall be furnished with high strength
bolts confirming to the physical specifications of ASTM A325 (or
equivalent).
Secondary bolted connections shall be furnished with machine bolts
confirm to the physical specifications of ASTM A307 (or equivalent).
K ANCHOR BOLTS
These are normally supplied prior to the delivery of structural
materials.
Delivery will be made after receipt of GSSPL's anchor bolts setting
plans (marked - For Construction) from our Engineering Department
L SKY LIGHT
2 MM tk Compact Polycarbonate sheet
STANDARD BUILDING ACCESSORIES
1 Sky Lights NA
3 Turbo Ventilator NA
4 Insulation NA
6 Canopy NA
7 Cantilevering Extension NA
4. FORCE MAJEURE:
GSSPL shall not be liable for any loss or damage to CUSTOMER for delay in delivery or cancellation of any
Purchaser's Orders by GSSPL due to circumstances beyond GSSPL's control, such as, but not limited to, war, riots, civil
commotion, revolution, government regulations, orders, or acts of any government authority directly or indirectly
interfering with or rendering more burdensome the production or delivery of the products, floods, fires, delays due to
transporter's strike and any other circumstance or event beyond GSSPL's control.
5 PERMITS:
GSSPL shall not be responsible or liable for the obtaining of permits to erect or install any product.
6.CANCELLATIONS:
BUYER CANNOT cancels orders without first reaching an Agreement in writing with SELLER covering all damages.
If cancellations is agreed by SELLER, BUYER agrees to pay all engineering and other expenses, Incurred by SELLER and
in any case not less than 5% of the agreement price ( Supply Value ) in case of cancellations.
7. OTHER EXCLUSIONS:
GSSPL SUPPLY Does not include any material or labour in connection with foundations, concrete, setting of
anchorbolts, grouting under columns or in recess around bottom of wall sheets, electrical installations, plumbing, Civil
finished painting, heating, masonry, interior finishing, partitions, glass and glazing or any item not shown in GSSPL
ApprovalDrawings, unless specifically mentioned in this Agreement.
8. WARRANTY:
GSSPL's products are warranted against failure due to defective material or workmanship for a period of TEN YEARS
after shipment.
9. EXCESS MATERIAL AT SITE:
Material supplied by GSSPL to site in excess of building requirements shall be the property of GSSPL and GSSPL
reserves the right to ship the same back to its works.
10. GOVERING LAWS:
This agreement shall be construed and enforced in accordance with and under the laws of the Government
ofIndia. Both parties agree that in case of any difference or dispute arising between the SELLER and the CUSTOMER
willbe resolved by mutual discussions and agreement. However, unresolved issues. If any, will be settled by arbitration
as per the Indian Arbitration and Conciliation Act, and the venue of the arbitration will be Coimbatore, Tamil Nadu.
16. SUPPLY CONTRACT AGREEMENT
Represented by Mr. _________________________, duly authorized to enter into this supply contract.
And
Contract Scope: The supply of materials by GSSPL areas described in the supply contract documents.
Contract documents: The following documents constitute this supply contract documents:
For Geometrics Space Structures Pvt Ltd For M/s. ………………………. (Customer)
(BUILDER)
Name Name
Designation Designation
Signature Signature
Date Date