VALORIZACI

COSTO COSTO
ANTERIOR ACTUAL
ITEM DESCRIPCION DE LA PARTIDA UND METRADO UNITARIO PARCIAL
(S/.) (S/.) MONTO
METRADO % METRADO
S/.
OBRAS PROVICIONALES Y TRABAJOS
01 928.00 0.00 0.00%
PRELIMINARES
01.01 TRABAJOS PRELIMINARES 296.00 0.00 0.00%
01.01.01 LIMPIEZA DE TERRENO 296.00 0.00 0.00%

ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL


01.01.01.01 EXTRACCION m2 800.00 0.37 296.00 0.00 0.00% 800.00

01.01.02 TRAZO, NIVELES Y REPLANTEO 632.00 0.00 0.00%


01.01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 800.00 0.79 632.00 0.00 0.00% 800.00
02 ESTRUCTURAS 57,489.29 0.00 0.00%
02.01 MOVIMIENTO DE TIERRAS 4,174.73 0.00 0.00%
02.01.01 EXCAVACIONES 3,999.36 0.00 0.00%

02.01.01.01 ZAPATA IZQUIERDA m3 10.87 87.17 947.54 0.00 0.00% 10.87

02.01.01.02 ZAPATA DERECHA m3 10.87 87.17 947.54 0.00 0.00% 10.87


02.01.01.03 CAMARA DE ANCLAJE IZQUIERDO m3 10.63 87.17 926.62 0.00 0.00% 10.63
02.01.01.04 CAMARA DE ANCLAJE DERECHO m3 10.63 87.17 926.62 0.00 0.00% 10.63
02.01.01.05 COLUMNA DE PLATAFORMA m3 2.88 87.17 251.05 0.00 0.00% 2.88
02.01.02 RELLENOS 175.37 0.00 0.00%
02.01.02.01 RELLENO CON MATERIAL PROPIO m3 25.79 6.80 175.37 0.00 0.00%
02.02 OBRAS DE CONCRETO SIMPLE 7,197.08 0.00 0.00%
02.02.01 SOLADO 564.40 0.00 0.00%
SOLADO PARA ZAPATAS 4" MEZCLA 1:12 CEMENTO-
02.02.01.01 HORMIGON m2 13.84 40.78 564.40 0.00 0.00% 13.84
02.02.02 CAMARA DE ANCLAJE 6,632.68 0.00 0.00%
CONCRETO CICLOPEO f'c=140Kg/cm2 +30% P.G.
02.02.02.01 DOSIFICADO m3 19.57 332.42 6,505.46 0.00 0.00%

02.02.02.02 ENCOFRADO Y DESENCOFRADO m2 5.40 23.56 127.22 0.00 0.00%


02.03 OBRAS DE CONCRETO ARMADO 24,370.42 0.00 0.00%
02.03.01 ZAPATAS DE PLATAFORMA 5,614.57 0.00 0.00%

02.03.01.01 CONCRETO EN ZAPATAS f'c=210Kg/cm2 m3 10.11 436.69 4,414.94 0.00 0.00% 10.11

02.03.01.02 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 242.84 4.94 1,199.63 0.00 0.00% 242.84

02.03.02 COLUMNAS 12,437.90 0.00 0.00%

02.03.02.01 CONCRETO EN COLUMNAS f'c=175Kg/cm2 m3 7.10 401.62 2,851.50 0.00 0.00% 2.50

02.03.02.02 ENCOFRADO Y DESENCOFRADO m2 185.44 23.56 4,368.97 0.00 0.00% 85.34

02.03.02.03 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 1,056.16 4.94 5,217.43 0.00 0.00% 800.00

02.03.03 VIGAS 1,539.09 0.00 0.00%

02.03.03.01 CONCRETO EN VIGAS f'c=175Kg/cm2 m3 0.68 401.62 273.10 0.00 0.00% 0.34

02.03.03.02 ENCOFRADO Y DESENCOFRADO m2 8.35 23.56 196.73 0.00 0.00% 4.18

02.03.03.03 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 216.45 4.94 1,069.26 0.00 0.00% 110.00

02.03.04 TAPA DE CAMARA DE ANCLAJE 159.47 0.00 0.00%

02.03.04.01 CONCRETO EN LA CAMARA f'c=175Kg/cm2 m3 0.15 401.62 60.24 0.00 0.00%

02.03.04.02 ENCOFRADO Y DESENCOFRADO m2 2.40 23.56 56.54 0.00 0.00%

02.03.04.03 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 8.64 4.94 42.68 0.00 0.00%

02.03.05 LOSAS 2,186.48 0.00 0.00%

02.03.05.01 CONCRETO EN LOSAS f'c=175Kg/cm2 m3 2.30 367.40 845.02 0.00 0.00% 1.15
02.03.05.02 ENCOFRADO Y DESENCOFRADO m2 18.72 23.56 441.04 0.00 0.00% 9.36

02.03.05.03 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 182.27 4.94 900.41 0.00 0.00% 100.00

02.03.06 ESCALERAS 2,432.92 0.00 0.00%

02.03.06.01 CONCRETO EN ESCALERAS f'c=210Kg/cm2 m3 3.52 444.70 1,565.34 0.00 0.00%

02.03.06.02 ENCOFRADO Y DESENCOFRADO m2 23.65 23.56 557.19 0.00 0.00%

02.03.06.03 ACERO DE REFUERZO fy=4200Kg/cm2 GRADO 60 Kg 62.83 4.94 310.38 0.00 0.00%

02.04 ESTRUCTURAS METALICAS 16,247.06 0.00 0.00%


SUMINISTRO E INSTALACION DE CABLES DE ACERO
02.04.01 13,648.56 0.00 0.00%
CON ALMA DE ACERO DE 1"

02.04.01.01 CABLE GALVANIZADO D=1 1/4" INC. MONTAJE m 174.00 78.44 13,648.56 0.00 0.00%

SUMINISTRO Y COLOCACION DE GRAPAS DE


02.04.02 178.40 0.00 0.00%
SUJECCION DE CABLES DE 1"

02.04.02.01 SUMINISTRO Y COLOCACION DE GRAPAS DE SUJECCION und 8.00 22.30 178.40 0.00 0.00%

SUMINISTRO Y COLOCACION DE BARANDAS DE


02.04.03 1,600.00 0.00 0.00%
SEGURIDAD
SUMINISTRO Y COLOCACION DE BARANDAS DE
02.04.0301 SEGURIDAD
und 2.00 800.00 1,600.00 0.00 0.00%

SUMINISTRO Y COLOCACION DE CARROS DE


02.04.04 820.10 0.00 0.00%
DILATACION

02.04.04.01 SUMINISTRO Y COLOCACION DE CARROS DE DILATACION und 2.00 410.05 820.10 0.00 0.00%

02.05 ESTRUCTURAS DE MADERA 5,500.00 0.00 0.00%

02.05.01 JAULA DEL HUARO und 1.00 1,500.00 1,500.00 0.00 0.00%

TECHADO CON TIJERALES DE MADERA TORNILLO SEGÚN


02.05.02 DISEÑO
und 2.00 2,000.00 4,000.00 0.00 0.00%

COSTO DIRECTO (S/.) 58,417.29 0.00


GASTOS GENERALES 10.0% 5,841.73 0.00

SUB TOTAL 64,259.02 0.00

0.00 0.00

TOTAL PRESUPUESTO 64,259.02 0.00

PORCENTAJE 100.00% 0.00%


VALORIZACIONES
SALDO
ACTUAL ACUMULADO
MONTO MONTO MONTO
% METRADO % METRADO %
S/. S/. S/.

928.00 100.00% 928.00 100.00% 0.00 0.00%

296.00 100.00% 296.00 100.00% 0.00 0.00%


296.00 100.00% 296.00 100.00% 0.00 0.00%

296.00 100.00% 800.00 296.00 100.00% 0.00 0.00 0.00%

632.00 100.00% 632.00 100.00% 0.00 0.00%


632.00 100.00% 800.00 632.00 100.00% 0.00 0.00 0.00%
19,060.33 33.15% 19,060.33 33.15% 38,428.96 66.85%
3,999.36 95.80% 3,999.36 95.80% 175.37 4.20%
3,999.36 100.00% 3,999.36 100.00% 0.00 0.00%

947.54 100.00% 10.87 947.54 100.00% 0.00 0.00 0.00%

947.54 100.00% 10.87 947.54 100.00% 0.00 0.00 0.00%


926.62 100.00% 10.63 926.62 100.00% 0.00 0.00 0.00%
926.62 100.00% 10.63 926.62 100.00% 0.00 0.00 0.00%
251.05 100.00% 2.88 251.05 100.00% 0.00 0.00 0.00%
0.00 0.00% 0.00 0.00 0.00% 25.79 175.37 100.00%
0.00 0.00% 0.00 0.00 0.00% 25.79 175.37 100.00%
564.40 7.84% 564.40 7.84% 6,632.68 92.16%
564.40 100.00% 564.40 100.00% 0.00 0.00%

564.40 100.00% 13.84 564.40 100.00% 0.00 0.00 0.00%


0.00 0.00% 0.00 0.00% 6,632.68 100.00%

0.00 0.00% 0.00 0.00 0.00% 19.57 6,505.46 100.00%

0.00 0.00% 0.00 0.00 0.00% 5.40 127.22 100.00%


14,496.57 59.48% 14,496.57 59.48% 9,873.85 40.52%
5,614.57 100.00% 5,614.57 100.00% 0.00 0.00%

4,414.94 100.00% 10.11 4,414.94 100.00% 0.00 0.00 0.00%

1,199.63 100.00% 242.84 1,199.63 100.00% 0.00 0.00 0.00%

6,966.66 56.01% 6,966.66 56.01% 5,471.24 43.99%

1,004.05 35.21% 2.50 1,004.05 35.21% 4.60 1,847.45 64.79%

2,010.61 46.02% 85.34 2,010.61 46.02% 100.10 2,358.36 53.98%

3,952.00 75.75% 800.00 3,952.00 75.75% 256.16 1,265.43 24.25%

778.31 50.57% 778.31 50.57% 760.78 49.43%

136.55 50.00% 0.34 136.55 50.00% 0.34 136.55 50.00%

98.36 50.00% 4.18 98.36 50.00% 4.18 98.36 50.00%

543.40 50.82% 110.00 543.40 50.82% 106.45 525.86 49.18%

0.00 0.00% 0.00 0.00% 159.47 100.00%

0.00 0.00% 0.00 0.00 0.00% 0.15 60.24 100.00%

0.00 0.00% 0.00 0.00 0.00% 2.40 56.54 100.00%

0.00 0.00% 0.00 0.00 0.00% 8.64 42.68 100.00%

1,137.03 52.00% 1,137.03 52.00% 1,049.45 48.00%

422.51 50.00% 1.15 422.51 50.00% 1.15 422.51 50.00%


220.52 50.00% 9.36 220.52 50.00% 9.36 220.52 50.00%

494.00 54.86% 100.00 494.00 54.86% 82.27 406.41 45.14%

0.00 0.00% 0.00 0.00% 2,432.92 100.00%

0.00 0.00% 0.00 0.00 0.00% 3.52 1,565.34 100.00%

0.00 0.00% 0.00 0.00 0.00% 23.65 557.19 100.00%

0.00 0.00% 0.00 0.00 0.00% 62.83 310.38 100.00%

0.00 0.00% 0.00 0.00% 16,247.06 100.00%

0.00 0.00% 0.00 0.00% 13,648.56 100.00%

0.00 0.00% 0.00 0.00 0.00% 174.00 13,648.56 100.00%

0.00 0.00% 0.00 0.00% 178.40 100.00%

0.00 0.00% 0.00 0.00 0.00% 8.00 178.40 100.00%

0.00 0.00% 0.00 0.00% 1,600.00 100.00%

0.00 0.00% 0.00 0.00 0.00% 2.00 1,600.00 100.00%

0.00 0.00% 0.00 0.00% 820.10 100.00%

0.00 0.00% 0.00 0.00 0.00% 2.00 820.10 100.00%

0.00 0.00% 0.00 0.00% 5,500.00 100.00%

0.00 0.00% 0.00 0.00 0.00% 1.00 1,500.00 100.00%

0.00 0.00% 0.00 0.00 0.00% 2.00 4,000.00 100.00%

19,988.33 19,988.33 38,428.96


1,998.83 1,998.83 3,842.90

21,987.16 21,987.16 42,271.86

0.00 0.00 0.00

21,987.16 21,987.16 42,271.86

34.22% 34.22% 65.78%


CRONOGRAMA DE AVANCE DE OBRA VALORIZADO REPROGRAMADO

PROYECTO : Err:509

ADMINISTRACIÓN
MODALIDAD DE EJECUCION : FECHA DE INICIO DE OBRA
DIRECTA

RESIDENTE DE OBRA : Err:509 PLAZO DE EJECUCION

SUPERVISOR DE OBRA : ING. HÉCTOR EVARISTO PRIMO SALIS FECHA DE TERMINO PROGRAMADO

MONTO TOTAL PRESUPUESTADO S/. : Err:509 FECHA DE TERMINO REPROGRAMADO

CORRESPONDIENTE AL MES DE : Err:509 FECHA DE PRESENTACION

PLAZOS DE EJECUCION

N° PARTIDAS PARCIAL S/. SETIEMBRE_2015 OCTUBRE_2015 NOVIEMBRE_2015 DICIEMBRE_

1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM

01.01.02TRAZO, NIVELES Y REPLANTEO Err:509


P 632.00 632.00
TRAZO, NIVELES Y REPLANTEO
01.01.02.0
PRELIMINAR E 743.11

P Err:509 Err:509
02.01.01.0 Err:509
E 7,883.04

02.01.01EXCAVACIONES 2,821.69

P 947.54 473.77 473.77


02.01.01.0 ZAPATA IZQUIERDA
02.01.01.0 ZAPATA IZQUIERDA
E 2,293.15 2,293.15

P 947.54 473.77 473.77


02.01.01.0 ZAPATA DERECHA
E 4,661.73 4,661.73

P 926.62 926.62
02.01.01.0 CAMARA DE ANCLAJE IZQUIERDO
E 3,882.40

02.01.02RELLENOS Err:509
P 175.37 66,526.11 49,936.50 22,647.43
02.01.02.0 RELLENO CON MATERIAL PROPIO
E 66,526.11 49,936.50 22,647.43

P Err:509 56,526.50 30,550.20 19,035.45


Err:509 Err:509
E 56,526.50 30,550.20 19,035.45

COSTO DIRECTO Err:509


MONTOS TOTALES PROGRAMADOS (S/.) Err:509 82,360.86 41,682.88
GASTOS GENERALES (6.5%) (S/.) Err:509 Err:509 5,353.46 2,709.39
SUB TOTAL (S/.) Err:509 Err:509 87,714.31 44,392.27

TOTAL MONTOS PROGRAMADOS (S/.) Err:509 Err:509 87,714.31 44,392.27

MONTOS TOTALES EJECUTADOS (S/.) 138,633.64 91,323.98 41,682.88


GASTOS GENERALES (6.5%) (S/.) 9,011.19 5,936.06 2,709.39
SUB TOTAL (S/.) 147,644.83 97,260.04 44,392.27
TOTAL MONTOS EJECUTADOS (S/.) 147,644.83 97,260.03 44,392.27
P = PROGRAMADO Err:509 Err:509 Err:509 E
AVANCE MENSUAL (%)
E = EJECUTADO Err:509 Err:509 Err:509
P = PROGRAMADO Err:509 Err:509 Err:509 E
AVANCE ACUMULADO (%)
E = EJECUTADO Err:509 Err:509 Err:509
VALORIZADO REPROGRAMADO

Err:509

: Err:509

: Err:509

: Err:509

: Err:509

: Err:509

PLAZOS DE EJECUCION

DICIEMBRE_2015 ENERO_2016

3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM


0.00 0.00
0.00 0.00

0.00 0.00 Err:509

0.00 0.00
0.00 0.00
0.00 0.00
Err:509 Err:509

Err:509 Err:509
HOJA DE RESUMEN DE METRADOS EJECUTADOS

PROYECTO : Err:509

CORRESPONDIENTE AL MES DE
FECHA DE PRESENTACION

ITEM DESCRIPCION DE LA PARTIDA

01.01.02 TRAZO, NIVELES Y REPLANTEO

01.01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR

Err:509 Err:509

02.01.01 EXCAVACIONES

02.01.01.01 ZAPATA IZQUIERDA

02.01.01.02 ZAPATA DERECHA

02.01.01.03 CAMARA DE ANCLAJE IZQUIERDO

02.01.02 RELLENOS

02.01.02.01 RELLENO CON MATERIAL PROPIO

Err:509 Err:509
EJECUTADOS N° 03

: Err:509
: Err:509

UND METRADO AVANCE %

m2 800.00 100.00%

Err:509 Err:509 Err:509

m3 10.87 100.00%

m3 10.87 100.00%

m3 10.63 100.00%

m3 0.00 0.00%

Err:509 Err:509 Err:509


CURVA "S" N° 03
PROYECTO : Err:509

CORRESPONDIENTE AL MES DE : Err:509

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALOR


COSTO DIRECTO DIAS DIAS PORCENTAJES COSTO DIRECTO
VALORIZ.
MESES PARCIAL ACUMUL. POR PARCIAL ACUMUL. PARCIAL ACUMUL.
N° ACUMUL.
S/. S/. MES % % S/. S/.
0 0 0.00 0.00

SETIEMBRE_2015 01 Err:509 Err:509 30 30 51.04 51.04 138,633.64 138,633.64

OCTUBRE_2015 02 82,360.86 Err:509 30 60 33.62 84.66 91,323.98 91,323.98

OCTUBRE_2016 03 41,682.88 Err:509 30 90 15.34 100.00 19,988.33 19,988.33

TOTAL Err:509
M E N S U A L A C U M U L A D O (% )

GRAFICO COMPARATIVO
AVANCE M E NS U
GRAFICO COMPARATIVO
PROGRAMADO VS EJECUTADO

10000%

9000% 8466.00%

8000% 8466.00%

7000%

6000%
5104.00%
5000%
5104.00%

4000%

3000%

2000%

1000%
0.00%
0%
0.00%
0 10 20 30 40 50 60

PLAZO EJECUCION DIAS CALENDARIO


PROGRAMADO EJECUTADO
ONTOS VALORIZADOS EJECUTADOS
ESTADO DE LA OBRA
DIAS DIAS PORCENTAJES
POR PARCIAL ACUMUL. ATRASADO ADELANTO
ACUMUL.
MES % % % %
0 0 0.00 0.00

30 30 51.04 51.04 0.00

30 60 33.62 84.66 0.00

30 90 15.34 100.00 0.00


10000.00%

10000.00%

8466.00%

8466.00%

60 70 80 90
AMORTIZACION DEL ADELANTO DIRECTO

DONDE:
AD = AMORTIZACION DEL ADELANTO DIRECTO
A = MONTO DEL ADELANTO DIRECTO
C = MONTO DEL PRESUPUESTO OFERTADO
V = MONTO DE LA VALORIZACION DEL MES

FORMULA GENERAL: = AD = A/C X V

DATOS: = ADELANTO DIRECTO S/.

MONTO DEL CONTRATO S/.

ADELANTO MONTO
VALORIZACION AMORTIZACION
DIRECTO VALORIZADO
FECHA
(A) N° PERIODO (V) (AD)

0.00

1 NOVIEMBRE _ 2013 21,987.16 Err:509

2 DICIEMRE _ 2013 Err:509

3 ENERO _ 2014

4 FEBRERO _ 2014

5 MARZO_2014

6 ABRIL_2014

7 MAYO_2014

TOTAL S/. 21,987.16 Err:509

AMORTIZACION DEL ADELANTO DIRECTO EN EL MES DE NOVIEMBRE


DEL 2013
Err:509
CTO

0.00

Err:509 20% Err:509

SALDO POR
AMORTIZAR

Err:509

Err:509
AMORTIZACION DEL ADELANTO DIRECTO EN EL MES DE NOVIEMBRE DEL 2013
0
AMORTIZACION DE ADELANTO PARA ADQUISICION DE MATERIAL

DONDE:
AM = AMORTIZACION DEL ADELANTO PARA MATERIALES CON IGV
A = MONTO DEL ADELANTO PARA MATERIALES CON IGV
C = MONTO DEL PRESUPUESTO OFERTADO Y/O CONTRATO CON IGV
V = MONTO DE LA VALORIZACION DEL MES CON IGV

FORMULA GENERAL: = AM = A/C X V

DATOS: = ADELANTO DIRECTO PARA MATERIALES

MONTO DEL CONTRATO

ADELANTO
MONTO
DIRECTO VALORIZACION
VALORIZADO
MATERIALES FECHA
(A) N° PERIODO (V)

0.00

1 NOVIEMBRE _ 2013 21,987.16

2 DICIEMRE _ 2013

3 ENERO _ 2014

4 FEBRERO _ 2014

5 MARZO_2014

6 ABRIL_2014

7 MAYO_2014

TOTAL S/. 21,987.16

AMORTIZACION DEL ADELANTO PARA MATERIALES EN EL MES DE NOVIEMBRE DEL


2013

RESUMEN DEL PAGO AL CONTRATISTA


Amorizacion x
Monto Bruto Amortización x
Valorización Adelanto para
Valorizado Adelanto Directo
Materiales
N° A B C
01 21,987.16 Err:509 0.00

TOTAL MONTO A PAGAR AL CONTRATISTA EN EL PRESENTE MES


QUISICION DE MATERIALES

PARA MATERIALES CON IGV


ATERIALES CON IGV
ERTADO Y/O CONTRATO CON IGV
EL MES CON IGV

S/. 0.00

S/. Err:509 40% Err:509

AMORTIZACION
SALDO POR
AMORTIZAR
(AM)

0.00 0.00

Err:509

Err:509 0.00

0.00

Monto Neto a
Cancelar

D =A- B - C
Err:509

Err:509
RESUMEN DE PAGOS AL CONTRATISTA POR LA OBRA PRINCIPAL

ENTIDAD : Err:509

OBRA : Err:509

CONTRATISTA : Err:509
SUPERVISION : ING. HÉCTOR EVARISTO PRIMO SALIS
MONTO DEL CONTRATO : Err:509
PLAZO DE EJECUCION : Err:509
FECHA DE INICIO : Err:509
FECHA DE TERMINO : Err:509

RESUMEN DE VALORIZACION DEL CONTRATISTA N° 01 (DICIEMBRE - 2013)

CONCEPTO PROG. PAGADAS

(A) VALORIZACION BRUTA : Err:509 0.00


Valorización Nº 01 (DICIEMBRE - 2013) Sin IGV
Reajuste de la Valorización Nº 01
(Seran considerados en la proxima valorización)
Valorización Nº 02 (ENERO - 2014) Sin IGV
Reajuste de la Valorización Nº 02
(Seran considerados en la proxima valorización)
Valorización Nº 03 (FEBRERO - 2014) Sin IGV
Reajuste de la Valorización Nº 03
(Seran considerados en la proxima valorización)
Valorización Nº 04 (MARZO- 2014) Sin IGV
Reajuste de la Valorización Nº 04
(Seran considerados en la proxima valorización)
Valorización Nº 05 (ABRIL - 2014) Sin IGV
Reajuste de la Valorización Nº 05
(Seran considerados en la proxima valorización)
Valorización Nº 06 (MAYO- 2014) Sin IGV
Reajuste de la Valorización Nº 06
(Seran considerados en la proxima valorización)
Valorización Nº 07 (JUNIO- 2014) Sin IGV
Reajuste de la Valorización Nº 07
(Seran considerados en la proxima valorización)
Valorización Nº 08 (JULIO- 2014) Sin IGV
Reajuste de la Valorización Nº 08
(Seran considerados en la proxima valorización)
Valorización Nº 09 (AGOSTO- 2014) Sin IGV
Reajuste de la Valorización Nº 09
(Seran considerados en la proxima valorización)
(B) AMORTIZACION DEL ADELANTO EN EFECTIVO 0.00 0.00
Si hubo adelanto en Efectivo (S/.579,942.19) 0.00 0.00
Se presento Carta de Garantia x Adelanto Directo
(C) Deducción del Reajuste por Adelanto en Efectivo 0.00 0.00
No corresponde 0.00 0.00
(D) AMORTIZACION DEL ADELANTO PORA MATERIALES 0.00 0.00
Si hubo adelanto para adquisición de materiales (S/.1'159,884.38) 0.00 0.00
Se presento Carta de Garantia x Adelanto de Materiales 0.00
(E) Deducción del Reajuste por Adelanto de Materiales 0.00 0.00
No corresponde 0.00 0.00
VALORIZACION NETA (A-B-C-D-E) Err:509 0.00

RETENCION POR FONDO DE GARANTIA (10%) 0.00 0.00


Monto Retenido por Fondo de Garantia (10%) - No hubo 0.00
(REMYPE) se presento carta de garantia x fiel cumplimiento 0.00 0.00
MONTO FACTURABLE (Sin IGV) Err:509 0.00
IMPUESTO GENERAL A LAS VENTAS (IGV) 18% Err:509 0.00
COSTO TOTAL Err:509 0.00

MONTO A CANCELAR EN LA PRESENTE VALORIZACION (S/.) :


R LA OBRA PRINCIPAL

N° 01 (DICIEMBRE - 2013)

NO PAGADAS POR PAGAR

0.00 21,987.16
21,987.16

0.00 Err:509
0.00 Err:509
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 Err:509

0.00 0.00

0.00 0.00
0.00 Err:509
0.00 Err:509
0.00 Err:509

Err:509
Monto del Contrato S/. Err:509 Err:509

Monto Monto Cobrado Saldo por Cobrar


Item Detalle
Cobrado S/. Acumulado S/. S/.
1 1° Adelanto en Efectivo (No hubo) 0.00 0.00

2 1° Adelanto para Materiales 0.00 0.00 Err:509

3 Valorización N° 01

4 Valorización N° 02

5 Valorización N° 03

6 Valorización N° 04

7 Valorización N° 05

8 Valorización N° 06

9 Valorización N° 07
TOTALES
MONTO DEL FIEL CUMPLIMIENTO ADELANTO ADELANTO PARA
CONTRATO DEL COMNTRATO DIRECTO MATERIALES

10% 20% 40%

2,899,710.97 289,971.10 579,942.19 1,159,884.39


1,739,826.58 1,159,884.39
CORRESPONDIENTE AL AVANCE DEL MONTO VALORIZADO MONTO MONTO TOTAL A
MES DE MES DEL MES AMORTIZADO CANCELAR

NOVIEMBRE_2013 6.61% 147,644.83 Err:509 Err:509