Академический Документы
Профессиональный Документы
Культура Документы
Sl.N Name of the Category Basic VDA for 285 Total 20% Total Wage 30% Total 43%
o. Wage points Wage increase to be inincre Wage inincre
on CL.No. proposed ase on to be ase on
5 on 20% CL.No. propos CL.No.
5 ed on 5
30%
1 2 3 4 5 6 7 8 9 10
I SKILLED CATEGORIES
1 Works Inspector with B.E.Civil/ Mechanical/ Electrical 10377 3334.50 13712 2742.30 16453.80 4113.45 17825 5895.95
Qualifcations
2 Workers Inspector with LCE/LME/LEE Qualifications/ 7721 2479.50 10201 2040.10 12240.60 3060.15 13261 4386.22
Wireless Operator
3 Turner Grade-I/ Masion Class-I/ Carpenter/ Painter/ 7270 2337.00 9607 1921.40 11528.40 2882.1 12489 4131.01
Plumbefr/ Welder/ Fitter/Electrician/ Mechanic Rigger/
Syrang/ Wellsinher/ Senior Mixture including concrete
mixture operator/ Pump Operator/ Work Inspector with ITI
Qualification
4 Work Inspector with non-Technical Qualification 6830 2194.50 9025 1804.90 10829.40 2707.35 11732 3880.54
II SEMI SILLED CATEGORIES
1 Stone-Cutter/Ratoon Worker/ Blaster/ Vibrator/ 6830 2194.50 9025 1804.90 10829.40 2707.35 11732 3880.54
Compressor/ Operator Jack Hammer/ Driller/ Boxing
Maistry/ Mason/ Brick Layer/ Stone Cutter/ Carpenter/
Painter/ Plumber/ Blacksmith/ Welder/ Fitter/ Electrician of
all second class/ Caulter/ Bar Bender/ Tinker/ Sawyar/
Brick Moulder/ Pottile turner Brick and Lime Kilnman/
Galzzer/ Telephone Operator/ Stone Packer/ Jawali/ Hand
Driller/ Quarryman/ Thatcher Foreman/ Hammerman
5 Nava with Crew 7062 2265.75 9328 1865.55 11193.30 2798.33 12126 4010.93
6 Punt Thunda/ Punt Laskar 6168 1980.75 8149 1629.75 9778.50 2444.63 10593 3503.96
IV UN-SKILLED CATEGORIES
1 Mazdoor/ Casual Labour in Loading and Unloading 5891 1895.25 7786 1557.25 9343.50 2335.88 10122 3348.09
operations/ Helpers/ Office Boys.
Total 50% Total 55% Total
Wage to inincre Wage inincre Wage
be ase on to be ase on to be
proposed CL.No. propos CL.No. propos
on 43% 5 ed on 5 ed on
50% 55%
11
19607
6855.75 20567 7541.325 21253
14587
5100.25 15301 5610.275 15811
13738
11134
3893.125 11679 4282.438 12069
SCHEDULE
NAME OF THE SCHEDULE EMPLOYMENT:
CONSTRUCTION OF PROJECTS INCLUDING DAMS AND MULTIPURPOSE PROJECTS
Sl.N Name of the Category Basic VDA for 285 Total 55% Total Wage Cost of Living Actual
o. Wage points Wage increas to be Allowance to be Calculation
e on proposed paid per each
CL.No. on 55% point of increase
5 (in Rs.)
1 2 3 4 5 6 7 8 9
I SKILLED CATEGORIES
1 Works Inspector with B.E.Civil/ Mechanical/ Electrical 10377 3334.50 13712 7541.33 21253 18.16 18.18034645
Qualifcations
2 Workers Inspector with LCE/LME/LEE Qualifications/ 7721 2479.50 10201 5610.28 15811 13.5 13.5250427716
Wireless Operator
3 Turner Grade-I/ Masion Class-I/ Carpenter/ Painter/ 7270 2337.00 9607 5283.85 14891 12.71 12.7381094953
Plumbefr/ Welder/ Fitter/Electrician/ Mechanic Rigger/
Syrang/ Wellsinher/ Senior Mixture including concrete
mixture operator/ Pump Operator/ Work Inspector with ITI
Qualification
4 Work Inspector with non-Technical Qualification 6830 2194.50 9025 4963.48 13988 11.64 11.9657613345
II SEMI SILLED CATEGORIES .
1 Stone-Cutter/Ratoon Worker/ Blaster/ Vibrator/ 6830 2194.50 9025 4963.48 13988 11.94 11.9657613345
Compressor/ Operator Jack Hammer/ Driller/ Boxing
Maistry/ Mason/ Brick Layer/ Stone Cutter/ Carpenter/
Painter/ Plumber/ Blacksmith/ Welder/ Fitter/ Electrician of
all second class/ Caulter/ Bar Bender/ Tinker/ Sawyar/
Brick Moulder/ Pottile turner Brick and Lime Kilnman/
Galzzer/ Telephone Operator/ Stone Packer/ Jawali/ Hand
Driller/ Quarryman/ Thatcher Foreman/ Hammerman
6 Nava with Crew/Medium Vechicle Driver 7062 2265.75 9328 5130.26 14458 12.34 12.36784645
7 Light Vechicle Driver 8504 4677.2 13181 11.25 11.2756201882
8 Punt Thunda/ Punt Laskar 6168 1980.75 8149 4481.81 12631 10.78 10.8045872541
IV UN-SKILLED CATEGORIES
1 Mazdoor/ Casual Labour in Loading and Unloading 5891 1895.25 7786 4282.44 12069 10.3 10.3239414029
operations/ Helpers/ Office Boys.