1. General
A. One air cycle machine (ACM) is provided for each cooling pack.
Since the left and right ACM installations are alike, the
following procedure will apply to either ( Ref. Fig. 401 ).
2. Prepare ACM for Removal
A. Open 3351 left, 3451 right, ACM access door.
B. Drain oil from ACM.
3. Remove ACM
A. Remove compressor and turbine inlet and outlet flexible
couplings (Ref 21-55-31 , R/I).
B. If installed, remove and discard O-ring gasket on turbine
outlet assembly. Gasket is obsolete and should not be replaced.
C. Open overheat circuit breaker on panel P6.
D. Remove electrical connector from compressor discharge overheat
switch then unscrew switch from ACM compressor scroll.
E. Support ACM and remove three mounting bolts.
F. Remove ACM.
4. Install ACM
A. Check that flexible coupling sleeve and ring are in place on
ACM connecting ducts.
NOTE : Procedure for installation of flexible couplings depends
on whether a new coupling or old coupling is being used
to connect ducts to ACM. Refer to 21-55-31 , R/I, for
recommended installation procedure.
B. Lift ACM into place and secure with three mounting bolts
( Ref. Fig. 401 ).
C. Move compressor inlet and turbine outlet ducts into place.