Extension of Southern Expressway Project Section 1

Talagahagoda Sub
MK 410 4+000 to 6+250 Section
T2 Prop. Standard Cost
DDLO Location Description Qty. Rate (Rs.) Stan. Cost (Rs.)
Removals
D3D5 33kV/HT Line 0.100 175,000.00 17,500.00
D3D5 LT Line (3ph) 0.150 150,000.00 22,500.00
D4D6 LT Line (3ph) 0.100 150,000.00 15,000.00
D5D7 LT Line (3ph) 0.180 150,000.00 27,000.00
D7D8 LT Line (3ph) 0.200 150,000.00 30,000.00
D7D9 LT Line (3ph) 0.150 150,000.00 22,500.00
D10D11 LT Line (3ph) 0.100 150,000.00 15,000.00

New Construction
T1T2 33kV/HT Racoon Line 1.500 2,991,000.00 *
TD (Using 3ph ABC) Separate feeder with 0.100 1,547,000.00 154,700.00
cutout box 1 10,000.00 10,000.00
D1D2 ABC 3ph 0.250 1,547,000.00 386,750.00
D3D5 ABC 3ph 0.150 1,547,000.00 232,050.00
D14D5 33kV/HT Racoon Line 0.100 2,991,000.00 299,100.00
D8 D5D6 ABC 3ph 0.100 1,547,000.00 154,700.00
D9 D7D8 ABC 3ph 0.200 1,547,000.00 309,400.00
D7
D7D9 ABC 3ph 0.150 1,547,000.00 232,050.00
CH

D10D11 ABC 3ph 0.100 1,547,000.00 154,700.00


CH
CH
5+000

D13 T2 33kV DDLO set 1 298,500.00 298,500.00


CH
CH

5+500
CH

5+450
CH

Other
5+200
5+150

**
5+100

D12D13 Lifting 33kV Pole line


5+100
5+250

5+050
5+200

5+000

by Electrical Towers.
D12
4+950
4+900

D5 Sub Total 2,381,450.00


D4
Contingencies 10% 238,145.00
D6 Grand Total 2,619,595.00
D14

CH
CT:
6+2
D3

08.0
CH
8
CH
CH

6+2
6+50

50
0
CH
Attudawa Sub

6+2
T1

00
6+25
CH

6+15
6+40
CH

0
0
MT 380

6+10
CH

0
6+0
6+30

0
CH

50
6+00
CH

0
Detail - `X`

6+20

5+95
CH

0
`X`

CH

5+90
0
CH

5+85
0
CH

5+80
0
CH

6+00
0

5+75
CH

0
5+95
D8 0

5+70
Catic Thudawa Sub
CH

0
5+65
CH

D9 0
5+60
CH

MT 378 D7
0
CH

5+55
5+750

0
CH

5+50
5+70

0
CH

5+45
CH

0
5+40
5+000

CH

D13
0
5+350
CH
CH

5+300
5+500
CH

5+450

5+250
CH

5+200
CH
TC: 4+710.6

5+100
CH

5+150
CH

5+100
CH

5+250

5+050
CH

D12
5+200
CH

5+000
CH

4+950
CH

TC: 4+902

4+900
CH

.90

4+850
CH

5+000

D5
4+800
CH

D4
4+750
CH
CH

4+700
CH

4+650
CH

4+600
CH

4+550
CH

4+500
4+500

D6
4+450
CH

D14
CH

4+400
4+350

D10
4+300
4+250
4+200

D11 D3 33kV
4+150
4+100

HT Li
4+050
4+000

ne
3+950
3+900

4+000

D2

Nilwala Gan

D1

T
D
Watagedara
Sub MT 375

Sketch No-02 Proposal


Chainage - From 4+000 to 6+250
Third Party
Note - CEYLON
Inv by: A.P.Samarasingha Drawn by: Kumara Check by:
1). Cost for wayleaves is not included.
ELECTRICITY

2). * Will be Constructed by CEB Funds. BOARD Recommended by Recommended for approval Approved by
SPE (SP) CE (P & D) D.G.M (SP)
System Planning Unit
3). ** Will be Estimated by PHM Branch. Southern Province Date: 2015 - 11 - 18

AREA/CSC Matara /