This Checklist / Sheet applies to Supplier (AIAG) PPAP. Please refer to other worksheet for (VDA 2) PPA requirements as needed.
Date
JTEKT Part Number Revision Revision Date
Program: FSQM-080
Supplier: IMDS submission required to Site: 57229
Supplier JTEKT
Preliminary Preparations OK N/G N/A OK N/G References
Are All re-PPAP orders (Off Tool and/or Off Process) shipments accompanied by 100% inspection data on at
A least 3 pieces, and properly labelled with DELIVERY LABEL of SAMPLES form on the BOX? FORM # FSQM-013 SQAM 2.2.1, 2.2.2, 2.2.3, 2.3.1, 2.3.2
B Blue PPAP Binder prepared, with Labelled Dividers, per JTEKT SQAM. SQAM 2.2.3, FSQM-017
C Supplier Production Readiness complete? SQAM 2.1.2, FSQM-011, FSQM-012, FSQM-012 pg2
D Are Packaging and IMDS approvals obtained prior to PPAP submission? SQAM 1.8
E PPAP Production Run scheduled (minimum 300 pieces or 8 hours of production) SQAM 2.2, AIAG PPAP 4th ed.
2 Correct Part Name (from Print)? SQAM 2.2.3, AIAG PPAP 4th ed.
3 Correct JTEKT part number (not drawing number)? SQAM 2.2.3, AIAG PPAP 4th ed.
Is this a safety and/or government regulation, in other words, are there any Safety Characteristics on the print?
4 SQAM 2.2.3, AIAG PPAP 4th ed.
5 Correct part engineering drawing change level/date? SQAM 2.2.3, AIAG PPAP 4th ed.
6 Additional engineering changes noted and dated? SQAM 2.2.3, AIAG PPAP 4th ed.
8 Correct P.O. Number, Include copy of pg.1 of JTEKT PO in PPAP? SQAM 2.2.3, AIAG PPAP 4th ed.
9 Correct weight to 4 decimal places and referenced in kilograms? (0.0000kg) SQAM 2.2.3, AIAG PPAP 4th ed.
10 Was part weight calculated using ten randomly selected parts and based on a ten piece average? SQAM 2.2.3, AIAG PPAP 4th ed.
11 Are checking aids referenced? SQAM 2.2.3, AIAG PPAP 4th ed.
12 Correct checking aid engineering change level/dated? SQAM 2.2.3, AIAG PPAP 4th ed.
13 Has the supplier manufacturing information section been completed, including supplier code? SQAM 2.2.3, AIAG PPAP 4th ed.
14 Has the submission information section been completed? SQAM 2.2.3, AIAG PPAP 4th ed.
15 Proper reason for submission been entered correctly? SQAM 2.2.3, AIAG PPAP 4th ed.
16 Proper PPAP submission level entered correctly? SQAM 2.2.3, AIAG PPAP 4th ed.
17 Has the declaration completed and were parts produced per 8 Hr. shift? SQAM 2.2.3, AIAG PPAP 4th ed.
18 Have the submission results been submitted? SQAM 2.2.3, AIAG PPAP 4th ed.
19 Are the results from all mold/cavities/production process, etc.? SQAM 2.2.3, AIAG PPAP 4th ed.
20 Explanation completed (Include ECR, if applicable) SQAM 2.2.3, AIAG PPAP 4th ed.
21 Has the supplier signed the warrant? SQAM 2.2.3, AIAG PPAP 4th ed.
22 Are the approved PSW's from sub-suppliers included in the PPAP? SQAM 2.2.3, AIAG PPAP 4th ed.
29 Reason for change defined, using Engineering Change Request form? FSQM-003
30 Approval signed by JTEKT, with E.C.R. number assigned and noted on PSW? FSQM-003
32 Do all process steps noted in PFMEA, Control Plan, and Flow Chart match? AIAG PPAP 4th Ed.
Section 3B Control Plan (must use AIAG format) OK N/G N/A OK N/G
38 Have predictive maintenance procedures or predictive maintenance plan been included in PPAP? AIAG PPAP 4th Ed.
39 Do control plan steps follow the Flow chart, & FMEA? AIAG PPAP 4th Ed.
40 Special Characteristics match FMEA and Flow? AIAG PPAP 4th Ed.
41 Diamond C critical characteristics either Poke-Yoked or controlled via statistical methods? SQAM 1.5.1, AIAG PPAP 4th ed.
42 Safety critical characteristics either 100% inspected or Poke-Yoked? SQAM 1.5.1, AIAG PPAP 4th ed.
43 Heat / Lot Number of raw materials matching certification is verified? SQAM 1.4
44 Traceability and identification, including inspection results, are controlled from Raw Material to Finished goods SQAM 1.4, 3, 11.5
45 Is New Product Containment Control Plan / Safe Launch Identified for new products? SQAM 1.7.4
52 Has the supplier identified recommended actions for Severity rankings of 9 & 10? Are they also Safety Critical? AIAG FMEA 4th Ed.
55 Is Severity, Occurrence, & Detection criteria to 4th Edition? AIAG FMEA 4th Ed.
Section 4B Process FMEA (Must use AIAG format) OK N/G N/A OK N/G
58 Is the DFMEA and Flow Chart available for developing the PFMEA? SQAM 2.2.3, AIAG FMEA 4th ed.
59 Have the DFMEA Special Characteristics and Severities been carried over to the PFMEA? SQAM 2.2.3, AIAG FMEA 4th ed.
Review and gain approval of Supplier's PFMEA with Subject Matter Experts - JTEKT Product Engineering,
Project/Process Engineering, and Quality Engineering - to ensure supplier controls are appropriate, Lessons
60 Learned Failures identified, with all controls in place both at the supplier and JTEKT. SQAM 2.2.3, AIAG FMEA 4th ed.
61 Has the supplier identified recommended actions for Severity rankings of 9 & 10 (if design responsible)? SQAM 2.2.3, AIAG FMEA 4th ed.
62 Has the supplier self identified Special Characteristics if the Severity = 5-8 AND Occurrence = 4-10? SQAM 2.2.3, AIAG FMEA 4th ed.
63 Has the supplier self identified KC's if the Severity = 5-8 AND Occurrence = 3 or less? SQAM 2.2.3, AIAG FMEA 4th ed.
64 Is "NONE" in recommended actions if no action? SQAM 2.2.3, AIAG FMEA 4th ed.
65 Recommended actions include responsible person/department & completion date present SQAM 2.2.3, AIAG FMEA 4th ed.
66 Recommended action follow up is not past due SQAM 2.2.3, AIAG FMEA 4th ed.
67 Process descriptions match flow and control plan steps SQAM 2.2.3, AIAG FMEA 4th ed.
68 All potential failure modes are present & appropriate SQAM 2.2.3, AIAG FMEA 4th ed.
69 S, O, D, RPNs calculated correctly SQAM 2.2.3, AIAG FMEA 4th ed.
70 Is PFMEA to 4th Edition? (Inc: Identification of Prevention/Detection Controls) SQAM 2.2.3, AIAG FMEA 4th ed.
71 Is engineering change addressed in PFMEA? SQAM 2.2.3, AIAG FMEA 4th ed.
This Checklist / Sheet applies to Supplier (AIAG) PPAP. Please refer to other worksheet for (VDA 2) PPA requirements as needed.
Date
JTEKT Part Number Revision Revision Date
Program: FSQM-080
Supplier: IMDS submission required to Site: 57229
72 Are detection and prevention addressed in PFMEA? (incl new 4th ed detection rankings) SQAM 2.2.3, AIAG FMEA 4th ed.
73 Is Severity, Occurrence, & Detection criteria to 4th Edition? SQAM 2.2.3, AIAG FMEA 4th ed.
74 Have capability studies been performed on all special characteristics listed on print? SQAM 1.5, SQAM 2.2.3, AIAG PPAP 4th ed, AIAG SPC 2nd ed.
75 PPK greater than 1.67 on a normal distribution (P > 0.05) for special characteristics? SQAM 1.5, SQAM 2.2.3, AIAG PPAP 4th ed, AIAG SPC 2nd ed.
Pp & Ppk results shall taken from a minimum of 30 pieces of data from each cavity of a multiple die or mold,
76 each process, and tooling? SQAM 1.5, SQAM 2.2.3, AIAG PPAP 4th ed, AIAG SPC 2nd ed.
77 Are all dimensions ballooned on print and all documented on layout? (include results of basic dimensions) SQAM 2.2.3, AIAG PPAP 4th ed
78 Is all information on layout report, including notes? SQAM 2.2.3, AIAG PPAP 4th ed
79 At least 3 parts measured AND submitted (delivered) with PPAP? SQAM 2.2.3, AIAG PPAP 4th ed
80 At least 1 part per cavity measured AND submitted (delivered) with PPAP? SQAM 2.2.3, AIAG PPAP 4th ed
Have out of tolerance dimensions been properly noted as out of tolerance on layout and PSW?
NOTE: Do Not submit PPAP if parts are out of tolerance, unless special arrangements and approvals have been
84 made with S.A.E. or S.Q.E. SQAM 2.2.3, AIAG PPAP 4th ed
85 Is the report marked Approved or Rejected? SQAM 2.2.3, AIAG PPAP 4th ed
86 Does the report have a approval signature? SQAM 2.2.3, AIAG PPAP 4th ed
87 Part name on layout? SQAM 2.2.3, AIAG PPAP 4th ed
88 Customer part number layout? SQAM 2.2.3, AIAG PPAP 4th ed
89 Date of layout? SQAM 2.2.3, AIAG PPAP 4th ed
Section 6B Performance Test Results OK N/G N/A OK N/G
Do all results come from suppliers internal lab with scope defined/submitted or external lab with ISO/IEC 17025
95 lab cert?
Section 7A Measurement System Analysis R & R OK N/G N/A OK N/G
96 New R&R for any changes to gage? SQAM 1.5, SQAM 2.2.3, AIAG PPAP 4th ed, AIAG MSA 2nd ed.
97 R&R / MSA present for ALL gauges shown on control plan? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
98 R&R / MSA performed on product/parts being PPAP'd rather than surrogate product/parts? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
99 3 Appraisers, 3 Trials, 10 parts for variable gauges on parts that represent the maximum variation seen? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
3 Appraisers, 3 Trials, 50 parts for attribute gauges on parts/product being PPAP'd that represent the maximum
100 variation seen? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
101 Action plan REQUIRED for R&R ³ 10% and £30% AIAG PPAP 4th ed, AIAG MSA 2nd ed.
102 Is percent study variation and ndc (discrimination) included? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
103 Corrective action issued for failed gage R&R? AIAG PPAP 4th ed, AIAG MSA 2nd ed.
106 Test Results Signed and Dated? AIAG PPAP 4th ed.
107 Are copies of specifications included in PPAP? SQAM 2.1, AIAG PPAP 4th ed.
108 All documentation complete to match all specifications? SQAM 2.1, AIAG PPAP 4th ed.
109 All material Certs. for all sub components/materials, with results? SQAM 2.1, AIAG PPAP 4th ed.
110 Materials purchased from OEM approved sources, with approval evidence included in PPAP? Customer Specific Requirements
111 Do all material Certifications contain specification as noted per drawing? SQAM 2.1, AIAG PPAP 4th ed.
Do all results come from suppliers internal lab with scope defined/submitted or external lab with ISO/IEC 17025
112 lab cert? SQAM 2.2.3
Has complete restricted substance and IMDS information been included in PPAP, showing proof of submission to
113 the correct facility? SQAM 2.2.3
Have Norms and References (for raw materials) been included in the IMDS submission, using existing materials
114 in IMDS whenever possible? SQAM 2.2.3
Section 8 Tooling OK N/G N/A OK N/G
Has supplier submitted tooling record (FSQM-005) to purchasing for each item or assembly classified as
115 Customer and/or JTEKT owned tooling? SQAM 2.2.3
Sample Product OK N/G N/A OK N/G
116 Has a minimum of 3 PPAP sample pieces, 100% dimensionally inspected (see section 6) been provided? SQAM 2.2.1
Have PPAP samples been properly labelled/tagged with DELIVERY LABEL of SAMPLES on the BOX? FORM #
117 FSQM-013 SQAM 2.2.2. 2.3.1
118 Does the same container of samples also contain the required Blue PPAP Binder? SQAM 2.2.3
119 Are these 3 (minimum) samples the same samples that were used for the dimensional analysis? AIAG PPAP 4th ed.
1120 Were these samples randomly collected from the same 300 pieces (minimum) PPAP production run? AIAG PPAP 4th ed.
Master Sample OK N/G N/A OK N/G
121 Has a master PPAP sample (per cavity/process) been measured, evaluated, and retained at the Supplier? AIAG PPAP 4th ed.
122 Does this master sample have the same measurements (range) as the submitted samples? AIAG PPAP 4th ed.
ACCEPTED REJECTED
Reviewed By Date
Date
Part Number Revision
Part Name APQP Contact:
Program:
Supplier: IMDS submission required to Site:
Additional Section 1
(VDA 2 ref Section 8) Software Test Report
1 Has the Software Validation been documented using the VDA-2 Appendix 6 "So
2 Has the ASPICE level been validated on site by a qualified JTEKT ASPICE assess
3 Has the Software Test Report Form been reviewed and approved by JTEKT's So
Additional Section 2
Tooling List
(VDA 2 ref Section 16)
4 Has the tooling concept been reviewed and approved by JTEKT Process Engine
5 Is a tooling list / final concept included in the PPAP/PPA?
6 Does the Tooling list include the quantity of tools and number of cavities intend
7 Is the tooling design included in the PPAP/PPA submission?
Additional Section 3 Capacity Confirmation
(VDA 2 ref Section 17)
12 Has the Production Maturity been evaluated in concert with the Capacity Confir
13 Has the Production Maturity been documented using the 2 page, Appendix 7, P
14 Is the Production Matrix complete, reviewed, and signed by the supplier?
Additional Section 5 Confirmation of Suitability of the product carrying units, including storage.
(VDA 2 ref Section 20)
15 See PPAP AIAG Checklist deliverable Control Plan item for Packaging.
Additional Section 6 PPA status of the supply chain (purchased parts, directed parts, and in-hou
(VDA 2 ref Section 21)
16 Are sub-tier supplier PPA's available and submitted within the supplier's PPA?
ACCEPTED
Reviewed By
(AIAG) PPAP / (VDA) PPA Book Checklist
REVISION: #VALUE!
REVISION DATE: #VALUE!
Revision Date
on required to Site:
Supplier
Packaging.
REJECTED
Date
Revision History
DATE REV #
3-May-16 1
ion History
REVISION
Initial Draft
Rev By
M. Filley