Вы находитесь на странице: 1из 302

UTE Dead Sea

DSWPP-GT1

Hydraulic calculation report

Title:

HVAC system. Hydraulic calculation report (IFP)

Client: UTE Dead Sea

Project: Dead Sea Works Power Station – Gas Turbine 1 (DSWPP-GT1)

Document Nº: 0331-CAL-ING-014-010-0001


Review: 0
Date: 10/09/2013

Drafted by:

Emilio Balado Leal – Mechanical & Process Engineer (Electronic Signature)

Reviewed by:

Francisco Sánchez Molada - Mechanical & Process Lead Engineer (Electronic Signature)

Rafael Muriel Muñoz – Mechanical Engineer (Electronic Signature)

Approved by:

Iván Fuertes Pérez – Technical Project Manager (Electronic Signature)

Cristina Chaza Chimeno- UDS Engineering Manager (Electronic Signature)

This document is the property of UTE Dead Sea. Total or partial reproduction thereof, by any means, as well as distribution to third parties, without
the express written consent of UTE Dead Sea is strictly forbidden
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 2 of 24

Review Control Sheet

Review Date Reason for the Review Drafted Reviewed Approved


0 10/09/2013 First issue (IFP) EBL FSM IFP
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 3 of 24

Index

1. Objective ................................................................................................................ 4
2. General description of the system and design parameters ................................ 5
2.1. HVAC system ...................................................................................................... 5
2.2. Pipe’s sizing ......................................................................................................... 6
2.3. Ambient Design temperature and pressure .......................................................... 6
2.4. Fluid characteristics of the system ........................................................................ 7
3. Equipment list and battery limits of the system ................................................. 8
4. Reference documents ............................................................................................ 9
5. Pipelines materials ............................................................................................... 10
6. Methodology of calculation ................................................................................ 11
6.1. Pressure gradient and friction factor in pipelines ................................................ 11
6.2. Miscellaneous pressure losses ............................................................................ 12
6.3. Height ............................................................................................................... 12
6.4. Net positive suction head (NPSH)........................................................................ 12
6.5. Hydraulic power ................................................................................................ 13
7. Hypothesis of calculation .................................................................................... 14
8. Results .................................................................................................................. 15
8.1. Scheme of the system ........................................................................................ 15
8.2. Operating conditions ......................................................................................... 15
8.3. Results of the pumps ......................................................................................... 16
9. Appendix .............................................................................................................. 17
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 4 of 24

1. Objective

This document is intended to cover the minimum requirements for the description and justification
of the calculations of the HVAC system, which will be installed in Power Plant for the Dead Sea
Works (DSW) at Sedom. The site is situated next to the Dead Sea in Israel at 385 m below sea level.

The system is shown in the document 88-36-01-102, “P&ID HVAC system”.


HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 5 of 24

2. General description of the system and design parameters

2.1. HVAC system


The function of HVAC system is to supply chilled water to the Electrical, Offices and Water
Treatment Plant (WTP) Buildings. The HVAC system shall be designed to fulfil the heat removal
requirements of each building mentioned.

The system is divided in two main water subsystems interconnected by means of two units of water
cooling chillers. One of these circuits is the HVAC condensation (or cooling) circuit and the other
one is the chilled water circuit, which at the same time consists of two circuits (primary and
secondary chilled water circuits).

The aim of the condensation circuit is to cause the condensation required by the refrigerant gas
inside the chillers. It is composed by three pumps with a configuration of 3x50% where each pump
is designed to provide an operating flow of 115.6 m3/h. These pumps collect the water cooled in
the DSW plate heat exchangers (TP-27a, pending to be confirmed by DSW) at 32ºC, carry it to the
Chillers Building (where an increase of temperature of 5ºC has been considered) and return it to
the DSW plate heat exchangers (TP-27b, pending to be confirmed by DSW) at 37 ºC.

On the other hand, the aim of the chilled water circuit is to obtain enough cold water able to
extract the thermal load produced both in Electrical Building and Office & WTP Buildings.

The primary circuit is composed of three pumps with a configuration of 3x50% where each pump
is designed to provide an operating and constant flow of 86.3 m3/h. These pumps collect the water
warmed through the buildings at 12ºC as well as the water flow rate that is not demanded by the
buildings, carry it to the Chillers (where a temperature drop of 5ºC has been considered) and
deliver it to the secondary circuit pumps.

The secondary circuit is composed by two pumps with a configuration of 2x100% dedicated to the
Electrical Building and designed to provide an operating flow of 137.7 m3/h and another two
pumps with a configuration of 2x100% dedicated to the Office and WTP Buildings and designed to
provide an operating flow of 34.7 m3/h. These four pumps are equipped with Variable Frequency
Drivers which permits to deliver a variable flow as a function of the required demand in the
buildings in every moment.

Primary and secondary circuits are connected in a common collector which permits to deliver the
excess in flow rate (depending on buildings demand) to the suction of the primary circuit pumps.

Chillers machines are composed by a refrigerant gas cycle with a compressor, an expansion valve
and two heat exchangers (evaporator and condenser) where the heat transfer between the two
mentioned circuits is carried out.
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 6 of 24

2.2. Pipe’s sizing

The objective of the fluid flow is to determine the minimum acceptable inside diameter of each
piping that will accommodate the design flow rate while maintaining the pressure drop and flow
velocity within reasonable limits. The diameter can be calculated with the equation (1).

4 ⋅ Q(m 3 / s)
D ( m) = (1)
π ⋅ v(m / s)

Where,

D: nominal diameter (m)


Q: volumetric flow (m3/s)
v: speed of the fluid (m/s)

The velocity criteria in the system are according to “0331-ESP-ING-000-010-0001- Mechanical


Design Criteria” is shown below:

ø <2'' 3''<ø <10'' ø >10''


Velocity rate Velocity rate Velocity rate
Fluid Description
(m/s) (m/s) (m/s)
Long pipe - 1.2 – 1.5 1.5 – 2.1 2.1 – 2.7
Short pipe - 0.6 – 0.9 0.9 – 1.2 1.2 – 1.5

The calculations have been done with the software “Pipe-Flo Professional”.

2.3. Ambient Design temperature and pressure

The environment conditions are the following:

Minimum temperature 5 °C
Maximum temperature 50 °C
Ambient pressure 1.060 bar(a)
Relative Humidity 55 %
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 7 of 24

2.4. Fluid characteristics of the system

Chemical characteristics of closed cooling water system, as minimum:

Specific Conductivity 0.1 µS/cm (25ºC) maximum or as required.

Total Silica 20 µg/kg maximum or as required.

Sodium 10 µg/kg maximum or as required.


HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 8 of 24

3. Equipment list and battery limits of the system

The system is composed by the following equipment:

- Pumps:

• HVAC Condensation Circuit Pumps.


• HVAC Primary Circuit Pumps
• HVAC Secondary Circuit Pumps

- Tanks:

• Buffer tank (condensation circuit side)


• Buffer tank (chilled water circuit side)

- Chillers

- Plate Heat Exchangers (pending to be confirmed by DSW)

Condensation and chilled water circuits are closed circuits which carry demineralized water (with
corrosion inhibitor) to the chillers and buildings by means of the pumps above described. The correct
operating pressure is ensured with the corresponding buffer tanks.

In this way, the system has the following battery limits:

• Electrical Building inlet/outlet (interconnection points at the west side of the building)
• Office Building inlet/outlet (interconnection points at the south-west side of the building)
• WTP Building inlet/outlet (interconnection points at the north-west side of the building)
• DSW plate heat exchangers (terminal points 27a-27b, pending to be confirmed by DSW)
• Demineralized water system
• Chemical dosing system
• Sampling system
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 9 of 24

4. Reference documents

Document Code
P&ID Demineralized water 88-35-01-177
Chemical injection system 88-30-01-106
Sample and Test system 88-30-01-111
Mechanical Design Criteria 0331-ESP-ING-000-010-0001
Chillers Datasheets 0331-HDD-ING-014-062-0003
Chillers Specification 0331-ESP-ING-014-062-0001
Parson B. Specification Vol.1 rev7, June 4 2012
Piping, valves and Accessories Technical Spec. 0331-ESP-ING-000-060-0001
Steam Turbine Rack South 88-30-04-106
Steam Turbine Rack North 88-30-04-107
HRSG Rack 88-30-04-109
WTP Rack 88-30-04-111
Plant Layout 88-30-01-130
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 10 of 24

5. Pipelines materials

Pipelines material has been selected according to the “0331-ESP-ING-000-060-0001 Piping, Valves
and Accessories Technical Specification” and “0331-ESP-ING-000-010-0001 Mechanical Design
Criteria”:

Specification Material
HVAC Closed Circuits
A112 A 106 GrB 150#
(condensation and chilled water)
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 11 of 24

6. Methodology of calculation

6.1. Pressure gradient and friction factor in pipelines

The calculations of pressure loss have been calculated with the software “Pipe-Flo”. It is based on
the following hypothesis.

The pressure loss in a pipe, due to friction, is a function of the fluid flow-rate, fluid density and
viscosity, pipe diameter, pipe surface roughness and the length of the pipe. To estimate the head
loss, Pipe-Flo Software uses Darcy-Weisbach calculation method whose expression is shown in the
equation (2).

f *W 2 * L (2)
∆h =
D * 2g

Where,
∆h : Pressure loss per linear meter of pipe due to the friction (m)
W : Speed of the fluid (m/s)
D : Interior Diameter of the pipe (m)
f : Darcy friction factor
L: Pipe length (m)

The friction factor is dependent on pipe roughness, average speed, pipe diameter and fluid viscosity.
There are different methods to determinate Darcy friction factor. It is usually determinate with
Moody graphic. However there are equations to calculate it according to Reynolds number. An
equation used to determine this factor is the relation of White-Colebrook which is shown in
equation (3).

0.25
f =
  (3)
 
[ log
1
+
5.74  ]2
 3.71 *  Di  Re 0.9 
  ε  
   

The coefficient of pressure loss depends on:

• Relative rugosity, ε
Di

• Reynolds number, Re
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 12 of 24

The Reynolds number, Re is given by equation (4):

Re = ρ v D /µ (4)

Where,
ρ: Density of the liquid (kg/m3)
D: Interior diameter of the pipe (m)
v: Speed of the fluid (m/s)
µ: Dynamic viscosity (cP)

6.2. Miscellaneous pressure losses

There will be a pressure drop due to the valves used to isolate equipment and control the fluid flow.
The pressure drop due to these miscellaneous losses can be estimated as the number of velocity
heads, K, lost at each fitting or valve. A velocity head is,

• u2/2g, metres of liquid


• u2/2ρ, (N/m2 = Pa)

The total number of velocity head loss is a characteristic of the particular fitting or type of valve used.

6.3. Height

Total Dynamic Head (TDH) is the total equivalent height that a fluid has to be pumped, taking into
account friction losses in the pipe.

(5)

Where,

Pd: Discharge pressure, (bara)


Ps: Suction pressure, (bara)
ρd: The density of the liquid at the pump discharge temperature, (kg/m3)
ρs: The density of the liquid at the pump suction temperature, (kg/m3)
g: acceleration due to gravity (m/s2)

6.4. Net positive suction head (NPSH)

NPSH available

The pressure at inlet to a pump must be high enough to prevent cavitation occurring in the
pump. Cavitation occurs when bubbles of vapour, or gas, form in the pump casing. Vapour
bubbles will form if the pressure falls below the vapour pressure of the liquid.
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 13 of 24

The Net Positive Suction Head available, NPSHavail, is the pressure at the pump suction, above
the vapour pressure of the liquid, expressed as head of liquid.

Psuc (bar ) − Pv (bar )


NPSHavailable(m ) = ⋅ 105 (6)
( ) (
ρ kg / m ⋅ g m / s
3 2
)

Where,

Pasp: The pressure in the suction of the pump, (bara)


Pv: The vapour pressure of the liquid, (bara)
ρ: The density of the liquid at the pump suction temperature, (kg/m3).
g: acceleration due to gravity (m/s2)

NPSH required

The Net Positive Suction Head required, NPSHr, is a function of the design parameters of the
pump, and will be specified by the pump manufacturer.

The inlet piping arrangement must be designed to ensure that NPSHa, exceeds NPSHr under all
operating conditions.

6.5. Hydraulic power

The hydraulic power required is calculated with the following equation:

Phidraulic = ρ ⋅ g ⋅ Q ⋅ TDH (7)

Where,

Phydraulic: Hydraulic power (kW)


ρ: Density of the liquid (kg/m3)
g: acceleration due to gravity (m/s2)
TDH: Total Dynamic Height (m)
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 14 of 24

7. Hypothesis of calculation

Some hypotheses have been considered for the calculations:

- Equivalent length: estimated length + 20%

- Overall oversizing of +10% in total pressure drop in the circuit, until piping isometrics are
developed.

- Distribution plant: estimation based on 88-30-01-130 Plant Layout and Steam Turbine, HRSG
and WTP Racks (Civil documents, see section 4. Reference Documents)

- Pumps elevation inlet/outlet = 0.5 meter (relative zero elevation = plant elevation)

- For the HVAC secondary circuit pumps, a typical limit of 25 m of TDH in 100% operation case
has been stated.

- Set pressure at buffer tank (chilled water side) = 3 barg and buffer tank (condensation water
side) = 1 barg (enough to ensure a proper NPSHa and reasonable working pressures).

- Pressure demand in all buildings ≈ 4 barg

- Pressure drops in equipment:

• Filter in pumps suction lines (chilled water side): 0.2 bar


• Filter in pumps suction lines (condensation water side): 0.25 bar
• DSW plate heat exchangers = 1 bar
• Chillers evaporator side (chilled water side) = 1 bar
• Chillers condenser side (condensation water side) = 0.75 bar

- Pressure drops in buildings have been estimated with a second order curve in each case in
order to obtain a pressure drop for each flow rate. Graphics are included in Appendixes. For
the three buildings, in operation case, pressure drops are around 2 bar.
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 15 of 24

8. Results

It is shown a scheme of the HVAC system, operating conditions with the main data of the system
and a summary table with the calculations of the pumps. An increasing of +10% in flow rate has
been stated to calculate the design conditions.

In addition, different operation cases have been also calculated for the secondary circuit pumps,
which have been equipped with variable frequency drives. Operation cases at 100%, 80%, 60%
and 40% of load have been calculated.

In order to regulate the necessary flow rate in WTP and Offices Buildings, a control valve has been
entered in the simulation. In the real pipe, this valve will be a manual globe valve, which will be
properly open until correct balancing of the circuit during start-up of the plant has been obtained.

8.1. Scheme of the system

The schemes of the subsystems Condesation Water Circuit and Chilled Water Circuit are included in
the Appendixes 1 to 4, for the diverse cases studied.

8.2. Operating conditions

Operation pressure (100%)


Section
(barg)
HVAC Condensation Pump suction 0.708
HVAC Condensation Pump discharge 3.44
HVAC Primary Pump suction 2.782
HVAC Primary Pump discharge 4.062
HVAC Secondary Pump suction (Electrical Building) 2.788
HVAC Secondary Pump discharge (Electrical Building) 4,683
HVAC Secondary Pump suction (Office & WTP Buildings) 2.797
HVAC Secondary Pump discharge (Office & WTP Buildings) 4.842
Chillers inlet (condensation water side) 3.371
Chillers outlet (condensation water side) 2.621
Chillers inlet (chilled water side) 4.018
Chillers outlet (chilled water side) 2.969
Electrical Building inlet 4.089
Electrical Building outlet 2.599
Office Building inlet 4.295
Office Building outlet 2.63
WTP Building inlet 4.811
WTP Building inlet 3.029
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 16 of 24

8.3. Results of the pumps

Hydraulic
Flow Flow TDH NPSHa Suction Discharge
Power
[kg/s] [m3/h] [m] [m] [barg] [barg]
[kW]
Condensation pumps (Design) 35.16 127.2 29.29 17.55 0.7 3.587 10.15
Condensation pumps (100%) 31.95 115.6 28 17.64 0.708 3.44 8.82
Primary circuit pumps (Design) 26.36 94.93 13.22 39.05 2.779 4.074 3.42
Primary circuit pumps (100%) 23.96 86.3 13.05 39.09 2.782 4.062 3.07
Secondary circuit pumps
42.04 151.4 22.95 39.12 2.785 5.035 9.47
(Electrical Building) (Design)
Secondary circuit pumps
38.23 137.7 19.34 39.15 2.788 4.683 7.26
(Electrical Building) (100%)
Secondary circuit pumps
30.57 110.1 13.13 39.2 2.793 4.079 3.94
(Electrical Building) (80%)
Secondary circuit pumps
22.94 82.6 8.306 39.24 2.797 3.611 1.87
(Electrical Building) (60%)
Secondary circuit pumps
15.30 55.1 4.831 39.29 2.801 3.275 0.73
(Electrical Building) (40%)
Secondary circuit pumps (Office
10.58 38.1 24.47 39.23 2.796 5.195 2.54
& WTP Buildings) (Design)
Secondary circuit pumps (Office
9.64 34.7 20.86 39.24 2.797 4.842 1.97
& WTP Buildings) (100%)
Secondary circuit pumps (Office
7.69 27.7 14.06 39.25 2.798 4.176 1.06
& WTP Buildings) (80%)
Secondary circuit pumps (Office
5.78 20.8 8.936 39.28 2.8 3.676 0.51
& WTP Buildings) (60%)
Secondary circuit pumps (Office
3.86 13.9 5.089 39.3 2.803 3.302 0.19
& WTP Buildings) (40%)
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 17 of 24

9. Appendix

List report, pipeline report and scheme of the system are enclosed, for every calculated case:

o Appendix 1: HVAC Condensation Water Circuit - Operation Case

o Appendix 2: HVAC Condensation Water Circuit - Design Case

o Appendix 3: HVAC Chilled Water Circuit - Operation Case (100%)

o Appendix 4: HVAC Chilled Water Circuit - Design Case

o Appendix 5: HVAC Chilled Water Circuit - Operation Case (80%)

o Appendix 6: HVAC Chilled Water Circuit - Operation Case (60%)

o Appendix 7: HVAC Chilled Water Circuit - Operation Case (40%)


HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 18 of 24

Appendix 1
HVAC Condensation Water Circuit - Operation Case
DS
W
dP HX
:1
ba (TP-
r 27
)

c
se
in m/
10 207
Ø: 1 .
l:
Ve

c
se
in m/
: 10 207
Ø 1.
l:
Ve
Ø: k
6i n
n c r ta
se ffe
in m/ Bu
: 10 207 in se
c
#1 Ø
l:
1 .
10 21dP m/extra
ter Ve Ø: .
in Fil l:
1 dP: 0.226 bar
Ø:
6 Ve
c Ø:
/hr se
m³ n m/ 6i
n
5.6 : 6 i 724 Ve
l:
11 Ø 1. 1.7
@ l: 24
Se
t Ve m/
se c
c in /se
#2 bar 10 21 m
ter Ø: 1 .
se
c Fil 0.25 Ve
l:
in n m/ dP
:
Ø:
6
: 6 i 724
Ø 1.
l:
Ve hr
m ³/
5.6
11
e t @ ) m 64 m #3 bar
Ø: S
: (2
8 .
17 r g ter
/se
c Fil 0.25
6 in TH Ha: a :
se
c S 8b 6i
n 4m d P c
n m/ NP 0.70 ar g Ø :
1.72 in /se
6 i 724 :
Ps 3.44
b l: 10 21 m
Ø: 1. : Ve Ø: 1 .
l: Pd l:
V e /hr Ve
r#
1 m³
ille c Ø: 5.6
Ch se 6i 11
Ø: 10 in in m/ Ve n t@ m m
: 10 207 l: Se (28) 7.64
Ø 1. 1.7
se
c : 1 g
l: 24 m/ TH Ha: ar
Ve m/ n
6 i 724 S 8 b
se
c Ø: . NP 0.70 ar g
1 : b
Ve
l: Ps 3.44
:
Pd
Ø: 10 in
2
r # bar
ille Ø: 10 in
Ch 0.75 Vel: 1.207 m/sec
:
dP

Ø: 10 in
Ø: Vel: 1.21 m/sec
10
Ve in
l:
1.2
1m
/se
c

Lineup: Operación Darcy-Weisbach PIPE-FLO 2009


System: HVAC Closed Cooling Circuit Flow: m³/hr
Date: 10/09/13 7:01 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Closed Cooling Circuit 10/09/13 7:00 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 34.99 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Cooling Water Water 32 3 995.1 0.7651 0.04757 / 220.6
Hot Water Water 37 3 993.4 0.6917 0.06279 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:00 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
CW101BR001 (n) WTP Rack Buffer tank 231.2 1.207 0.452 0.134
CW101BR001 (n){001} a.{001} WTP Rack (return) 231.6 1.21 (0.474) 0.134
CW101BR001(m){001} WTP Rack (return) dP extra 231.6 1.21 (0.214) 1.802
CW270 DSW HX (TP-27) WTP Rack 231.2 1.207 0.615 1.808
Pipe{001} dP extra DSW HX (TP-27) 231.6 1.21 0.002 0.022
Pipe{004} Buffer tank ~N{002} 231.2 1.207 0.007 0.073
Pipe{013} ~N{007} ~N{006} X Closed --- --- --- ---
Pipe{015} Cooling Pump #4 ~N{005} 115.6 1.724 0.037 0.382
Pipe{016} Cooling Pump #2 ~N{007} X Closed --- --- --- ---
Pipe{021} Chiller #1 N0001 X Closed --- --- --- ---
Pipe{027} N0001 a.{001} 231.6 1.21 0.004 0.043
Pipe{028} ~N{005} ~N{006} 115.6 1.724 0.003 0.033
Pipe{030} Cooling Pump #3 ~N{006} 115.6 1.724 0.041 0.415
Pipe{035} ~N{006} Chiller #2{002} 231.2 1.207 0.02 0.21
Pipe{038} Chiller #2 N0001 231.6 1.21 0.009 0.088
Pipe{039} Chiller #2{002} Chiller #2 231.2 1.207 0.009 0.088
Pipe{040} Chiller #2{002} Chiller #1 X Closed --- --- --- ---
Pipe{041} ~N{002} Filter #1 X Closed --- --- --- ---
Pipe{042} Filter #1 Cooling Pump #2 X Closed --- --- --- ---
Pipe{043} ~N{002} Filter #2 115.6 1.724 0.01 0.101
Pipe{044} Filter #2 Cooling Pump #3 115.6 1.724 0.025 0.253
Pipe{045} ~N{002} Filter #3 115.6 1.724 0.01 0.101
Pipe{046} Filter #3 Cooling Pump #4 115.6 1.724 0.025 0.253

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:00 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{002} 12 0.993 22.18
~N{005} 12 3.403 46.88
~N{006} 12 3.4 46.85
a.{001} 12 2.608 38.78
Chiller #2{002} 12 3.379 46.64
N0001 12 2.612 38.82
WTP Rack 7.5 1.452 22.38
WTP Rack (return) 7 3.082 38.65

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:00 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Cooling Pump #3 115.6 (28) (2.732) --- 17.64 0.708 3.44 12 12
Cooling Pump #4 115.6 (28) (2.732) --- 17.64 0.708 3.44 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 231.2 7.687 0.75 3.371 2.621 12 12
dP extra 231.6 2.324 0.226 3.296 3.07 3 3
DSW HX (TP-27) 231.6 10.27 1 3.068 2.068 3 3
Filter #2 115.6 2.562 0.25 0.983 0.733 12 12
Filter #3 115.6 2.562 0.25 0.983 0.733 12 12

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:00 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 1 0 12 0 1 22.25
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
CW101BR001 (n) @ 0 m 231.2 1 22.25
Pipe{004} @ 0 m 231.2 1 22.25

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:00 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001 (n) rev: 27/08/13 5:52 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 10 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 7.5 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
231.2 0.01557 1.207 0.452 0.009
5
0.4 10
0 0 0 0.439 0
38.53 0.0202 0.201 0.439 0 4
0.35 10
77.07 0.01793 0.402 0.441 0 3
0.3 10
115.6 0.0169 0.604 0.442 0.002
2
154.1 0.01629 0.805 0.445 0.004 0.25 10
192.7 0.01587 1.006 0.448 0.006
0.2
231.2 0.01557 1.207 0.452 0.009
269.7 0.01534 1.409 0.457 0.012 0.15
308.3 0.01515 1.61 0.462 0.015
0.1
346.8 0.015 1.811 0.468 0.02
385.3 0.01488 2.012 0.475 0.024 0.05
423.9 0.01477 2.214 0.482 0.029
462.4 0.01468 2.415 0.49 0.035 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 65 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001 (n){001} rev: 27/08/13 5:56 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 10 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 7 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
231.6 0.01542 1.21 -0.474 0.009
5
0.3 10
0 0 0 -0.487 0
38.6 0.01983 0.202 -0.487 0 4
0.2 10
77.2 0.01766 0.403 -0.485 0 3
0.1 10
115.8 0.01668 0.605 -0.484 0.002
2
154.4 0.01609 0.806 -0.481 0.004 0 10
193 0.0157 1.008 -0.478 0.006
-0.1
231.6 0.01542 1.21 -0.474 0.009
270.2 0.0152 1.411 -0.469 0.012 -0.2
308.8 0.01502 1.613 -0.464 0.016
-0.3
347.4 0.01488 1.814 -0.458 0.02
386 0.01477 2.016 -0.451 0.024 -0.4
424.6 0.01467 2.218 -0.444 0.029
463.2 0.01458 2.419 -0.436 0.035 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 65 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001(m){001} rev: 27/08/13 5:55 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 300 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 7 m out: 3 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
231.6 0.01542 1.21 -0.214 0.047
5
0.3 10
0 0 0 -0.39 0
38.6 0.01983 0.202 -0.384 0.001 4
0.2 10
77.2 0.01766 0.403 -0.368 0.005 3
0.1 10
115.8 0.01668 0.605 -0.343 0.012
2
154.4 0.01609 0.806 -0.309 0.021 0 10
193 0.0157 1.008 -0.266 0.032
-0.1
231.6 0.01542 1.21 -0.214 0.047
270.2 0.0152 1.411 -0.153 0.063 -0.2
308.8 0.01502 1.613 -0.083 0.083
-0.3
347.4 0.01488 1.814 -0.005 0.105
386 0.01477 2.016 0.083 0.13 -0.4
424.6 0.01467 2.218 0.179 0.157
463.2 0.01458 2.419 0.284 0.186 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
12 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 45° 0.2138 1 x Tee - Flow Thru Run 0.2673
1 x Tee - Flow Thru Run 0.2673 1 x Tee - Flow Thru Run 0.2673 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 6.429 Avg Percent of Total Loss: 26 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW270 rev: 27/08/13 5:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 300 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 3 m out: 7.5 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
1.8 10
231.2 0.01557 1.207 0.615 0.047
5
1.6 10
0 0 0 0.439 0
38.53 0.0202 0.201 0.445 0.001 4
1.4 10
77.07 0.01793 0.402 0.461 0.005 3
1.2 10
115.6 0.0169 0.604 0.486 0.012
2
154.1 0.01629 0.805 0.52 0.021 1 10
192.7 0.01587 1.006 0.563 0.032
0.8
231.2 0.01557 1.207 0.615 0.047
269.7 0.01534 1.409 0.677 0.063 0.6
308.3 0.01515 1.61 0.747 0.083
0.4
346.8 0.015 1.811 0.825 0.105
385.3 0.01488 2.012 0.913 0.129 0.2
423.9 0.01477 2.214 1.01 0.156
462.4 0.01468 2.415 1.115 0.186 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
12 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 45° 0.2138 1 x Tee - Flow Thru Run 0.2673
1 x Tee - Flow Thru Run 0.2673 1 x Tee - Flow Thru Run 0.2673 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 6.429 Avg Percent of Total Loss: 26 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{001} rev: 27/08/13 5:58 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 5 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 3 m out: 3 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
231.6 0.01542 1.21 0.002 0
5
0.008 10
0 0 0 0 0
38.6 0.01983 0.202 0 0 4
0.007 10
77.2 0.01766 0.403 0 0 3
0.006 10
115.8 0.01668 0.605 0 0
2
154.4 0.01609 0.806 0 0 0.005 10
193 0.0157 1.008 0.002 0
0.004
231.6 0.01542 1.21 0.002 0
270.2 0.0152 1.411 0.003 0 0.003
308.8 0.01502 1.613 0.004 0
0.002
347.4 0.01488 1.814 0.005 0
386 0.01477 2.016 0.006 0 0.001
424.6 0.01467 2.218 0.007 0
463.2 0.01458 2.419 0.008 0 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{004} rev: 27/08/13 5:52 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 3 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
231.2 0.01557 1.207 0.007 0.006
5
0.04 10
0 0 0 0 0
38.53 0.0202 0.201 0 0 4
0.035 10
77.07 0.01793 0.402 0 0 3
0.03 10
115.6 0.0169 0.604 0.002 0.001
2
154.1 0.01629 0.805 0.003 0.003 0.025 10
192.7 0.01587 1.006 0.005 0.004
0.02
231.2 0.01557 1.207 0.007 0.006
269.7 0.01534 1.409 0.01 0.008 0.015
308.3 0.01515 1.61 0.013 0.01
0.01
346.8 0.015 1.811 0.016 0.013
385.3 0.01488 2.012 0.02 0.016 0.005
423.9 0.01477 2.214 0.024 0.02
462.4 0.01468 2.415 0.028 0.023 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
115.6 0.01682 1.724 0.037 0.034
5
0.16 10
0 0 0 0 0
19.27 0.02134 0.287 0.001 0 4
0.14 10
38.53 0.01907 0.575 0.004 0.004 3
0.12 10
57.8 0.01807 0.862 0.009 0.009
2
77.07 0.01749 1.149 0.017 0.015 0.1 10
96.33 0.0171 1.437 0.026 0.024
0.08
115.6 0.01682 1.724 0.037 0.034
134.9 0.0166 2.012 0.051 0.046 0.06
154.1 0.01644 2.299 0.066 0.061
0.04
173.4 0.0163 2.586 0.084 0.077
192.7 0.01619 2.874 0.103 0.095 0.02
211.9 0.01609 3.161 0.125 0.115
231.2 0.01601 3.448 0.149 0.136 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
2 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 91 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 27/08/13 5:56 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 3 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
231.6 0.01542 1.21 0.004 0.003
5
0.016 10
0 0 0 0 0
38.6 0.01983 0.202 0 0 4
0.014 10
77.2 0.01766 0.403 0 0 3
0.012 10
115.8 0.01668 0.605 0.001 0
2
154.4 0.01609 0.806 0.002 0.001 0.01 10
193 0.0157 1.008 0.003 0.002
0.008
231.6 0.01542 1.21 0.004 0.003
270.2 0.0152 1.411 0.006 0.004 0.006
308.8 0.01502 1.613 0.007 0.005
0.004
347.4 0.01488 1.814 0.009 0.007
386 0.01477 2.016 0.012 0.008 0.002
424.6 0.01467 2.218 0.014 0.01
463.2 0.01458 2.419 0.017 0.012 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 63 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{028} rev: 06/06/13 9:09 am

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
115.6 0.01682 1.724 0.003 0
5
0.016 10
0 0 0 0 0
19.27 0.02134 0.287 0 0 4
0.014 10
38.53 0.01907 0.575 0 0 3
0.012 10
57.8 0.01807 0.862 0 0
2
77.07 0.01749 1.149 0.001 0 0.01 10
96.33 0.0171 1.437 0.002 0
0.008
115.6 0.01682 1.724 0.003 0
134.9 0.0166 2.012 0.004 0 0.006
154.1 0.01644 2.299 0.006 0
0.004
173.4 0.0163 2.586 0.007 0
192.7 0.01619 2.874 0.009 0 0.002
211.9 0.01609 3.161 0.01 0
231.2 0.01601 3.448 0.012 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{030} rev: 25/06/13 10:12 am

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 4 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
115.6 0.01682 1.724 0.041 0.034
5
0.16 10
0 0 0 0 0
19.27 0.02134 0.287 0.001 0 4
0.14 10
38.53 0.01907 0.575 0.005 0.004 3
0.12 10
57.8 0.01807 0.862 0.01 0.009
2
77.07 0.01749 1.149 0.018 0.015 0.1 10
96.33 0.0171 1.437 0.028 0.024
0.08
115.6 0.01682 1.724 0.041 0.034
134.9 0.0166 2.012 0.055 0.046 0.06
154.1 0.01644 2.299 0.072 0.061
0.04
173.4 0.0163 2.586 0.091 0.077
192.7 0.01619 2.874 0.112 0.095 0.02
211.9 0.01609 3.161 0.135 0.115
231.2 0.01601 3.448 0.161 0.136 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
2 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{035} rev: 13/06/13 2:53 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 7 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
231.2 0.01557 1.207 0.02 0.017
5
0.08 10
0 0 0 0 0
38.53 0.0202 0.201 0 0 4
0.07 10
77.07 0.01793 0.402 0.002 0.002 3
0.06 10
115.6 0.0169 0.604 0.005 0.004
2
154.1 0.01629 0.805 0.009 0.008 0.05 10
192.7 0.01587 1.006 0.014 0.012
0.04
231.2 0.01557 1.207 0.02 0.017
269.7 0.01534 1.409 0.028 0.024 0.03
308.3 0.01515 1.61 0.036 0.031
0.02
346.8 0.015 1.811 0.046 0.039
385.3 0.01488 2.012 0.056 0.048 0.01
423.9 0.01477 2.214 0.068 0.059
462.4 0.01468 2.415 0.081 0.07 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Tee - Flow Thru Branch 0.8019 1 x Tee - Flow Thru Branch 0.8019 1 x Tee - Flow Thru Branch 0.8019

FFT: 0.01337 Total K: 2.406 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 10/09/13 4:32 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 3 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
231.6 0.01542 1.21 0.009 0.007
5
0.04 10
0 0 0 0 0
38.6 0.01983 0.202 0 0 4
0.035 10
77.2 0.01766 0.403 0 0 3
0.03 10
115.8 0.01668 0.605 0.002 0.002
2
154.4 0.01609 0.806 0.004 0.003 0.025 10
193 0.0157 1.008 0.006 0.005
0.02
231.6 0.01542 1.21 0.009 0.007
270.2 0.0152 1.411 0.012 0.01 0.015
308.8 0.01502 1.613 0.015 0.013
0.01
347.4 0.01488 1.814 0.019 0.016
386 0.01477 2.016 0.024 0.02 0.005
424.6 0.01467 2.218 0.029 0.024
463.2 0.01458 2.419 0.034 0.029 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 83 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 10/09/13 4:32 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 3 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
231.2 0.01557 1.207 0.009 0.007
5
0.04 10
0 0 0 0 0
38.53 0.0202 0.201 0 0 4
0.035 10
77.07 0.01793 0.402 0 0 3
0.03 10
115.6 0.0169 0.604 0.002 0.002
2
154.1 0.01629 0.805 0.004 0.003 0.025 10
192.7 0.01587 1.006 0.006 0.005
0.02
231.2 0.01557 1.207 0.009 0.007
269.7 0.01534 1.409 0.012 0.01 0.015
308.3 0.01515 1.61 0.015 0.013
0.01
346.8 0.015 1.811 0.019 0.016
385.3 0.01488 2.012 0.024 0.02 0.005
423.9 0.01477 2.214 0.029 0.024
462.4 0.01468 2.415 0.034 0.029 50 100 150 200 250 300 350 400 450 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 83 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 06/06/13 4:23 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
115.6 0.01682 1.724 0.01 0.007
5
0.04 10
0 0 0 0 0
19.27 0.02134 0.287 0 0 4
0.035 10
38.53 0.01907 0.575 0.001 0 3
0.03 10
57.8 0.01807 0.862 0.003 0.002
2
77.07 0.01749 1.149 0.004 0.003 0.025 10
96.33 0.0171 1.437 0.007 0.005
0.02
115.6 0.01682 1.724 0.01 0.007
134.9 0.0166 2.012 0.013 0.009 0.015
154.1 0.01644 2.299 0.017 0.012
0.01
173.4 0.0163 2.586 0.022 0.015
192.7 0.01619 2.874 0.027 0.018 0.005
211.9 0.01609 3.161 0.033 0.022
231.2 0.01601 3.448 0.039 0.026 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 0.4468 Avg Percent of Total Loss: 67 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 1 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
115.6 0.01682 1.724 0.025 0.023
5
0.08 10
0 0 0 0 0
19.27 0.02134 0.287 0 0 4
0.07 10
38.53 0.01907 0.575 0.003 0.003 3
0.06 10
57.8 0.01807 0.862 0.006 0.006
2
77.07 0.01749 1.149 0.011 0.01 0.05 10
96.33 0.0171 1.437 0.017 0.016
0.04
115.6 0.01682 1.724 0.025 0.023
134.9 0.0166 2.012 0.034 0.031 0.03
154.1 0.01644 2.299 0.044 0.041
0.02
173.4 0.0163 2.586 0.055 0.052
192.7 0.01619 2.874 0.068 0.064 0.01
211.9 0.01609 3.161 0.083 0.078
231.2 0.01601 3.448 0.098 0.092 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 94 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 06/06/13 4:23 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
115.6 0.01682 1.724 0.01 0.007
5
0.04 10
0 0 0 0 0
19.27 0.02134 0.287 0 0 4
0.035 10
38.53 0.01907 0.575 0.001 0 3
0.03 10
57.8 0.01807 0.862 0.003 0.002
2
77.07 0.01749 1.149 0.004 0.003 0.025 10
96.33 0.0171 1.437 0.007 0.005
0.02
115.6 0.01682 1.724 0.01 0.007
134.9 0.0166 2.012 0.013 0.009 0.015
154.1 0.01644 2.299 0.017 0.012
0.01
173.4 0.0163 2.586 0.022 0.015
192.7 0.01619 2.874 0.027 0.018 0.005
211.9 0.01609 3.161 0.033 0.022
231.2 0.01601 3.448 0.039 0.026 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 0.4468 Avg Percent of Total Loss: 67 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:01 pm


Lineup: Operación
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 1 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
115.6 0.01682 1.724 0.025 0.023
5
0.08 10
0 0 0 0 0
19.27 0.02134 0.287 0 0 4
0.07 10
38.53 0.01907 0.575 0.003 0.003 3
0.06 10
57.8 0.01807 0.862 0.006 0.006
2
77.07 0.01749 1.149 0.011 0.01 0.05 10
96.33 0.0171 1.437 0.017 0.016
0.04
115.6 0.01682 1.724 0.025 0.023
134.9 0.0166 2.012 0.034 0.031 0.03
154.1 0.01644 2.299 0.044 0.041
0.02
173.4 0.0163 2.586 0.055 0.052
192.7 0.01619 2.874 0.068 0.064 0.01
211.9 0.01609 3.161 0.083 0.078
231.2 0.01601 3.448 0.098 0.092 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 94 %

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 19 of 24

Appendix 2
HVAC Condensation Water Circuit - Design Case
DS
W
dP HX
:1
ba (TP-
r 27
)

c
se
in m/
10 329
Ø: 1 .
l:
Ve

c
se
in m/
: 10 329
Ø 1.
l:
Ve
Ø: k
6i n
n c r ta
se ffe
in m/ Bu c
10 329 se
#1 Ø:
1 . in 1 m/
ter l: : 10 .33dP extra
in Fil Ve Ø : 1 dP: 0.249 bar
l
Ø:
6
c Ø: Ve
/hr se
m³ n m/ 6i
n
7.2 : 6 i 897 Ve
l:
12 Ø 1. 1.8
@ l: 97
Se
t Ve m/ c
se se
c in m/
#2 bar : 10 .331
ter Ø : 1
se
c Fil 0.25 l
in n m/ : Ve
Ø:
6
: 6 i 897 dP
Ø 1.
l:
Ve hr
m ³/
7.2
12 m
e t @ .29) 55 m #3 bar
Ø: S 9
: (2 a: 17
. ter
6 H g /se
c Fil 0.25
in T :
se
c SH ar g 6i
n 7m d P c
m/ NP 0 .7 b bar : 9 se
n Ø 1.8 in m/
6 i 897 :
Ps 3.55
7 l: 10 .331
Ø: 1. : Ve :
Ø : 1
e l: Pd l
V /hr Ve
r#
1 m³
ille c Ø: 7.2
Ch se 6i 12 ) m
Ø: 10 in in m/ Ve n t @ 29 m
: 10 329 l: Se (29. 7.55
Ø 1. 1.8
se
c : 1
l: 97 m/ TH Ha: g
Ve m/ n
6 i 897 S a r g
se
c Ø: . NP 0 .7 b bar
1 : 7
Ve
l: Ps 3.55
:
Pd
Ø: 10 in
2
r # bar
ille Ø: 10 in
Ch 0.75 Vel: 1.329 m/sec
:
dP

Ø: 10 in
Ø: Vel: 1.331 m/sec
1
Ve 0 in
l:
1.3
31
m/
se
c

Lineup: Diseño Darcy-Weisbach PIPE-FLO 2009


System: HVAC Closed Cooling Circuit Flow: m³/hr
Date: 10/09/13 7:03 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Closed Cooling Circuit 10/09/13 7:03 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 34.99 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Cooling Water Water 32 3 995.1 0.7651 0.04757 / 220.6
Hot Water Water 37 3 993.4 0.6917 0.06279 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:03 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
CW101BR001 (n) WTP Rack Buffer tank 254.4 1.329 0.455 0.161
CW101BR001 (n){001} a.{001} WTP Rack (return) 254.8 1.331 (0.471) 0.161
CW101BR001(m){001} WTP Rack (return) dP extra 254.8 1.331 (0.179) 2.167
CW270 DSW HX (TP-27) WTP Rack 254.4 1.329 0.651 2.174
Pipe{001} dP extra DSW HX (TP-27) 254.8 1.331 0.003 0.026
Pipe{004} Buffer tank ~N{002} 254.4 1.329 0.009 0.088
Pipe{013} ~N{007} ~N{006} X Closed --- --- --- ---
Pipe{015} Cooling Pump #4 ~N{005} 127.2 1.897 0.045 0.463
Pipe{016} Cooling Pump #2 ~N{007} X Closed --- --- --- ---
Pipe{021} Chiller #1 N0001 X Closed --- --- --- ---
Pipe{027} N0001 a.{001} 254.8 1.331 0.005 0.052
Pipe{028} ~N{005} ~N{006} 127.2 1.897 0.004 0.04
Pipe{030} Cooling Pump #3 ~N{006} 127.2 1.897 0.049 0.502
Pipe{035} ~N{006} Chiller #2{002} 254.4 1.329 0.025 0.253
Pipe{038} Chiller #2 N0001 254.8 1.331 0.01 0.106
Pipe{039} Chiller #2{002} Chiller #2 254.4 1.329 0.01 0.106
Pipe{040} Chiller #2{002} Chiller #1 X Closed --- --- --- ---
Pipe{041} ~N{002} Filter #1 X Closed --- --- --- ---
Pipe{042} Filter #1 Cooling Pump #2 X Closed --- --- --- ---
Pipe{043} ~N{002} Filter #2 127.2 1.897 0.012 0.122
Pipe{044} Filter #2 Cooling Pump #3 127.2 1.897 0.03 0.306
Pipe{045} ~N{002} Filter #3 127.2 1.897 0.012 0.122
Pipe{046} Filter #3 Cooling Pump #4 127.2 1.897 0.03 0.306

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:03 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{002} 12 0.991 22.16
~N{005} 12 3.512 48
~N{006} 12 3.508 47.96
a.{001} 12 2.708 39.8
Chiller #2{002} 12 3.484 47.71
N0001 12 2.713 39.86
WTP Rack 7.5 1.455 22.41
WTP Rack (return) 7 3.179 39.64

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:03 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Cooling Pump #3 127.2 (29.29) (2.858) --- 17.55 0.7 3.557 12 12
Cooling Pump #4 127.2 (29.29) (2.858) --- 17.55 0.7 3.557 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 254.4 7.687 0.75 3.473 2.723 12 12
dP extra 254.8 2.557 0.249 3.358 3.109 3 3
DSW HX (TP-27) 254.8 10.27 1 3.106 2.106 3 3
Filter #2 127.2 2.562 0.25 0.98 0.73 12 12
Filter #3 127.2 2.562 0.25 0.98 0.73 12 12

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:03 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 1 0 12 0 1 22.25
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
CW101BR001 (n) @ 0 m 254.4 1 22.25
Pipe{004} @ 0 m 254.4 1 22.25

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:03 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001 (n) rev: 27/08/13 5:52 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 10 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 7.5 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.9 10
254.4 0.01542 1.329 0.455 0.011
5
0.8 10
0 0 0 0.439 0
42.4 0.01984 0.221 0.44 0 4
0.7 10
84.8 0.01767 0.443 0.441 0.001 3
0.6 10
127.2 0.01669 0.664 0.443 0.003
2
169.6 0.0161 0.886 0.446 0.005 0.5 10
212 0.01571 1.107 0.45 0.007
0.4
254.4 0.01542 1.329 0.455 0.011
296.8 0.01521 1.55 0.46 0.014 0.3
339.2 0.01503 1.772 0.467 0.019
0.2
381.6 0.01489 1.993 0.474 0.024
424 0.01477 2.214 0.482 0.029 0.1
466.4 0.01467 2.436 0.491 0.035
508.8 0.01459 2.657 0.501 0.042 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001 (n){001} rev: 27/08/13 5:56 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 10 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 7 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
254.8 0.01528 1.331 -0.471 0.011
5
0.3 10
0 0 0 -0.487 0
42.47 0.01949 0.222 -0.486 0 4
0.2 10
84.93 0.01741 0.444 -0.485 0.001 3
0.1 10
127.4 0.01647 0.665 -0.483 0.003
2
169.9 0.01592 0.887 -0.48 0.005 0 10
212.3 0.01555 1.109 -0.476 0.007
-0.1
254.8 0.01528 1.331 -0.471 0.011
297.3 0.01507 1.553 -0.466 0.014 -0.2
339.7 0.01491 1.774 -0.459 0.019
-0.3
382.2 0.01478 1.996 -0.452 0.024
424.7 0.01467 2.218 -0.444 0.029 -0.4
467.1 0.01457 2.44 -0.435 0.035
509.6 0.01449 2.661 -0.425 0.042 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW101BR001(m){001} rev: 27/08/13 5:55 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 300 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 7 m out: 3 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
254.8 0.01528 1.331 -0.179 0.056
5
0.3 10
0 0 0 -0.39 0
42.47 0.01949 0.222 -0.383 0.002 4
0.2 10
84.93 0.01741 0.444 -0.364 0.006 3
0.1 10
127.4 0.01647 0.665 -0.334 0.014
2
169.9 0.01592 0.887 -0.293 0.025 0 10
212.3 0.01555 1.109 -0.241 0.039
-0.1
254.8 0.01528 1.331 -0.179 0.056
297.3 0.01507 1.553 -0.105 0.077 -0.2
339.7 0.01491 1.774 -0.021 0.1
-0.3
382.2 0.01478 1.996 0.074 0.127
424.7 0.01467 2.218 0.179 0.157 -0.4
467.1 0.01457 2.44 0.296 0.19
509.6 0.01449 2.661 0.423 0.226 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
12 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 45° 0.2138 1 x Tee - Flow Thru Run 0.2673
1 x Tee - Flow Thru Run 0.2673 1 x Tee - Flow Thru Run 0.2673 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 6.429 Avg Percent of Total Loss: 26 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

CW270 rev: 27/08/13 5:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 300 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 3 m out: 7.5 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
1.8 10
254.4 0.01542 1.329 0.651 0.056
5
1.6 10
0 0 0 0.439 0
42.4 0.01984 0.221 0.446 0.002 4
1.4 10
84.8 0.01767 0.443 0.465 0.006 3
1.2 10
127.2 0.01669 0.664 0.495 0.014
2
169.6 0.0161 0.886 0.536 0.025 1 10
212 0.01571 1.107 0.588 0.039
0.8
254.4 0.01542 1.329 0.651 0.056
296.8 0.01521 1.55 0.725 0.077 0.6
339.2 0.01503 1.772 0.809 0.1
0.4
381.6 0.01489 1.993 0.904 0.127
424 0.01477 2.214 1.01 0.157 0.2
466.4 0.01467 2.436 1.127 0.189
508.8 0.01459 2.657 1.254 0.225 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
12 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 45° 0.2138 1 x Tee - Flow Thru Run 0.2673
1 x Tee - Flow Thru Run 0.2673 1 x Tee - Flow Thru Run 0.2673 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 6.429 Avg Percent of Total Loss: 26 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{001} rev: 27/08/13 5:58 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 5 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 3 m out: 3 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
254.8 0.01528 1.331 0.003 0
5
0.008 10
0 0 0 0 0
42.47 0.01949 0.222 0 0 4
0.007 10
84.93 0.01741 0.444 0 0 3
0.006 10
127.4 0.01647 0.665 0 0
2
169.9 0.01592 0.887 0.001 0 0.005 10
212.3 0.01555 1.109 0.002 0
0.004
254.8 0.01528 1.331 0.003 0
297.3 0.01507 1.553 0.003 0 0.003
339.7 0.01491 1.774 0.004 0
0.002
382.2 0.01478 1.996 0.006 0
424.7 0.01467 2.218 0.007 0 0.001
467.1 0.01457 2.44 0.008 0
509.6 0.01449 2.661 0.01 0 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{004} rev: 27/08/13 5:52 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 3 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
254.4 0.01542 1.329 0.009 0.007
5
0.04 10
0 0 0 0 0
42.4 0.01984 0.221 0 0 4
0.035 10
84.8 0.01767 0.443 0 0 3
0.03 10
127.2 0.01669 0.664 0.002 0.002
2
169.6 0.0161 0.886 0.004 0.003 0.025 10
212 0.01571 1.107 0.006 0.005
0.02
254.4 0.01542 1.329 0.009 0.007
296.8 0.01521 1.55 0.012 0.01 0.015
339.2 0.01503 1.772 0.015 0.012
0.01
381.6 0.01489 1.993 0.019 0.016
424 0.01477 2.214 0.024 0.02 0.005
466.4 0.01467 2.436 0.029 0.024
508.8 0.01459 2.657 0.034 0.028 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 81 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
127.2 0.01668 1.897 0.045 0.041
5
0.16 10
0 0 0 0 0
21.2 0.02098 0.316 0.001 0.001 4
0.14 10
42.4 0.01882 0.632 0.005 0.005 3
0.12 10
63.6 0.01787 0.949 0.011 0.01
2
84.8 0.01731 1.265 0.02 0.018 0.1 10
106 0.01695 1.581 0.031 0.029
0.08
127.2 0.01668 1.897 0.045 0.041
148.4 0.01648 2.213 0.061 0.056 0.06
169.6 0.01633 2.53 0.08 0.073
0.04
190.8 0.0162 2.846 0.101 0.093
212 0.01609 3.162 0.125 0.115 0.02
233.2 0.01601 3.478 0.151 0.139
254.4 0.01593 3.794 0.18 0.165 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
2 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 92 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 27/08/13 5:56 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 3 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
254.8 0.01528 1.331 0.005 0.004
5
0.016 10
0 0 0 0 0
42.47 0.01949 0.222 0 0 4
0.014 10
84.93 0.01741 0.444 0 0 3
0.012 10
127.4 0.01647 0.665 0.001 0
2
169.9 0.01592 0.887 0.002 0.002 0.01 10
212.3 0.01555 1.109 0.004 0.002
0.008
254.8 0.01528 1.331 0.005 0.004
297.3 0.01507 1.553 0.007 0.005 0.006
339.7 0.01491 1.774 0.009 0.006
0.004
382.2 0.01478 1.996 0.011 0.008
424.7 0.01467 2.218 0.014 0.01 0.002
467.1 0.01457 2.44 0.017 0.012
509.6 0.01449 2.661 0.02 0.014 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 68 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{028} rev: 06/06/13 9:09 am

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
127.2 0.01668 1.897 0.004 0
5
0.016 10
0 0 0 0 0
21.2 0.02098 0.316 0 0 4
0.014 10
42.4 0.01882 0.632 0 0 3
0.012 10
63.6 0.01787 0.949 0.001 0
2
84.8 0.01731 1.265 0.002 0 0.01 10
106 0.01695 1.581 0.003 0
0.008
127.2 0.01668 1.897 0.004 0
148.4 0.01648 2.213 0.005 0 0.006
169.6 0.01633 2.53 0.007 0
0.004
190.8 0.0162 2.846 0.008 0
212 0.01609 3.162 0.01 0 0.002
233.2 0.01601 3.478 0.012 0
254.4 0.01593 3.794 0.015 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{030} rev: 25/06/13 10:12 am

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 4 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
127.2 0.01668 1.897 0.049 0.041
5
0.16 10
0 0 0 0 0
21.2 0.02098 0.316 0.001 0.001 4
0.14 10
42.4 0.01882 0.632 0.006 0.005 3
0.12 10
63.6 0.01787 0.949 0.012 0.01
2
84.8 0.01731 1.265 0.022 0.018 0.1 10
106 0.01695 1.581 0.034 0.029
0.08
127.2 0.01668 1.897 0.049 0.041
148.4 0.01648 2.213 0.067 0.056 0.06
169.6 0.01633 2.53 0.087 0.073
0.04
190.8 0.0162 2.846 0.11 0.093
212 0.01609 3.162 0.135 0.115 0.02
233.2 0.01601 3.478 0.164 0.139
254.4 0.01593 3.794 0.195 0.165 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
2 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{035} rev: 13/06/13 2:53 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 7 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
254.4 0.01542 1.329 0.025 0.021
5
0.08 10
0 0 0 0 0
42.4 0.01984 0.221 0 0 4
0.07 10
84.8 0.01767 0.443 0.003 0.002 3
0.06 10
127.2 0.01669 0.664 0.006 0.005
2
169.6 0.0161 0.886 0.011 0.009 0.05 10
212 0.01571 1.107 0.017 0.015
0.04
254.4 0.01542 1.329 0.025 0.021
296.8 0.01521 1.55 0.034 0.029 0.03
339.2 0.01503 1.772 0.044 0.037
0.02
381.6 0.01489 1.993 0.055 0.047
424 0.01477 2.214 0.068 0.059 0.01
466.4 0.01467 2.436 0.083 0.071
508.8 0.01459 2.657 0.098 0.084 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Tee - Flow Thru Branch 0.8019 1 x Tee - Flow Thru Branch 0.8019 1 x Tee - Flow Thru Branch 0.8019

FFT: 0.01337 Total K: 2.406 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 10/09/13 4:32 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 37 °C
Length: 3 m
den: 993.4 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.6917 cP Pv: 0.06279 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
254.8 0.01528 1.331 0.01 0.009
5
0.04 10
0 0 0 0 0
42.47 0.01949 0.222 0 0 4
0.035 10
84.93 0.01741 0.444 0.001 0 3
0.03 10
127.4 0.01647 0.665 0.003 0.002
2
169.9 0.01592 0.887 0.005 0.004 0.025 10
212.3 0.01555 1.109 0.007 0.006
0.02
254.8 0.01528 1.331 0.01 0.009
297.3 0.01507 1.553 0.014 0.012 0.015
339.7 0.01491 1.774 0.018 0.016
0.01
382.2 0.01478 1.996 0.023 0.02
424.7 0.01467 2.218 0.029 0.024 0.005
467.1 0.01457 2.44 0.035 0.03
509.6 0.01449 2.661 0.041 0.035 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 86 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 10/09/13 4:32 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 32 °C
Length: 3 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
254.4 0.01542 1.329 0.01 0.009
5
0.04 10
0 0 0 0 0
42.4 0.01984 0.221 0 0 4
0.035 10
84.8 0.01767 0.443 0.001 0 3
0.03 10
127.2 0.01669 0.664 0.003 0.002
2
169.6 0.0161 0.886 0.005 0.004 0.025 10
212 0.01571 1.107 0.007 0.006
0.02
254.4 0.01542 1.329 0.01 0.009
296.8 0.01521 1.55 0.014 0.012 0.015
339.2 0.01503 1.772 0.018 0.016
0.01
381.6 0.01489 1.993 0.023 0.02
424 0.01477 2.214 0.029 0.024 0.005
466.4 0.01467 2.436 0.035 0.03
508.8 0.01459 2.657 0.041 0.035 80 160 240 320 400 480 560 640 720 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 86 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 06/06/13 4:23 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
127.2 0.01668 1.897 0.012 0.008
5
0.04 10
0 0 0 0 0
21.2 0.02098 0.316 0 0 4
0.035 10
42.4 0.01882 0.632 0.001 0 3
0.03 10
63.6 0.01787 0.949 0.003 0.002
2
84.8 0.01731 1.265 0.005 0.004 0.025 10
106 0.01695 1.581 0.008 0.006
0.02
127.2 0.01668 1.897 0.012 0.008
148.4 0.01648 2.213 0.016 0.011 0.015
169.6 0.01633 2.53 0.021 0.014
0.01
190.8 0.0162 2.846 0.026 0.018
212 0.01609 3.162 0.033 0.022 0.005
233.2 0.01601 3.478 0.039 0.027
254.4 0.01593 3.794 0.047 0.032 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 0.4468 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 1 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
127.2 0.01668 1.897 0.03 0.028
5
0.16 10
0 0 0 0 0
21.2 0.02098 0.316 0 0 4
0.14 10
42.4 0.01882 0.632 0.003 0.003 3
0.12 10
63.6 0.01787 0.949 0.008 0.007
2
84.8 0.01731 1.265 0.013 0.012 0.1 10
106 0.01695 1.581 0.021 0.019
0.08
127.2 0.01668 1.897 0.03 0.028
148.4 0.01648 2.213 0.041 0.038 0.06
169.6 0.01633 2.53 0.053 0.05
0.04
190.8 0.0162 2.846 0.067 0.063
212 0.01609 3.162 0.083 0.078 0.02
233.2 0.01601 3.478 0.1 0.094
254.4 0.01593 3.794 0.119 0.112 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 06/06/13 4:23 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 2 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
127.2 0.01668 1.897 0.012 0.008
5
0.04 10
0 0 0 0 0
21.2 0.02098 0.316 0 0 4
0.035 10
42.4 0.01882 0.632 0.001 0 3
0.03 10
63.6 0.01787 0.949 0.003 0.002
2
84.8 0.01731 1.265 0.005 0.004 0.025 10
106 0.01695 1.581 0.008 0.006
0.02
127.2 0.01668 1.897 0.012 0.008
148.4 0.01648 2.213 0.016 0.011 0.015
169.6 0.01633 2.53 0.021 0.014
0.01
190.8 0.0162 2.846 0.026 0.018
212 0.01609 3.162 0.033 0.022 0.005
233.2 0.01601 3.478 0.039 0.027
254.4 0.01593 3.794 0.047 0.032 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 0.4468 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Closed Cooling Circuit 10/09/13 7:04 pm


Lineup: Diseño
Company:
rev: 10/09/13 4:49 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 18/06/13 3:30 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 32 °C
Length: 1 m
den: 995.1 kg/m³ pres: 3 bar g
Elevation in: 12 m out: 12 m vsc: 0.7651 cP Pv: 0.04757 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
127.2 0.01668 1.897 0.03 0.028
5
0.16 10
0 0 0 0 0
21.2 0.02098 0.316 0 0 4
0.14 10
42.4 0.01882 0.632 0.003 0.003 3
0.12 10
63.6 0.01787 0.949 0.008 0.007
2
84.8 0.01731 1.265 0.013 0.012 0.1 10
106 0.01695 1.581 0.021 0.019
0.08
127.2 0.01668 1.897 0.03 0.028
148.4 0.01648 2.213 0.041 0.038 0.06
169.6 0.01633 2.53 0.053 0.05
0.04
190.8 0.0162 2.846 0.067 0.063
212 0.01609 3.162 0.083 0.078 0.02
233.2 0.01601 3.478 0.1 0.094
254.4 0.01593 3.794 0.119 0.112 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 20 of 24

Appendix 3
HVAC Chilled Water Circuit - Operation Case (100%)
P: 3.013 bar g
Ø: 3 in

El: 12 m
Flow: 12.8 m³/hr
Vel: 0.746 m/sec

P: 2.623 bar g
Ø: 6 in P: 3.009 bar g Ø: 6 in

El: 16 m
Flow: 34.71 m³/hr El: 12 m Flow: 21.91 m³/hr
Vel: 0.518 m/sec Vel: 0.327 m/sec

P: 3.008 bar g
Ø: 10 in Ø: 6 in Ø: 6 in Ø: 8 in

El: 12 m
P: 3.004 bar g Flow: 172.5 m³/hr
Set @ 86.3 m³/hr Filter #a Vel: 1.433 m/sec

Flow: 172.5 m³/hr


Vel: 1.433 m/sec
Chiller #1 El: 12 m

P: 2.662 bar g
P: 2.813 bar g

Ø: 10 in

Ø: 6 in
Ø: 8 in

El: 16 m
Flow: 137.8 m³/hr
El: 14 m

Ø: 8 in
Vel: 1.145 m/sec

Ø: 10 in Ø: 6 in Ø: 6 in Ø: 6 in Ø: 10 in
Flow: 172.6 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
P: 3.834 bar g Vel: 1.287 m/sec Set @ 86.3 m³/hr
Flow: 86.3 m³/hr P: 2.999 barFlow:
g 172.6 m³/hr
Vel: 0.901 m/sec Filter #b Vel: 1.287 m/sec
Vel: 1.287 m/sec El: 12 m Vel: 0.901 m/secBuffer tank

Flow: 172.6 m³/hr

Flow: 137.8 m³/hr

Flow: 21.91 m³/hr


Vel: 0.901 m/sec

Vel: 1.287 m/sec

Vel: 1.145 m/sec

Vel: 0.327 m/sec

Vel: 0.747 m/sec


P: 3.828 bar g El: 14 m

Flow: 86.3 m³/hr

Flow: 12.8 m³/hr


TH: (13.05) m Flow: 86.3 m³/hr
El: 14 m NPSHa: 39.09 m dP: 0.2 bar
Ps: 2.782 bar g
Pd: 4.062 bar g

Ø: 10 in

Ø: 6 in

Ø: 8 in

Ø: 6 in

Ø: 3 in
Ø: 10 in Ø: 6 in Ø: 6 in
Flow: 172.5 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
Vel: 0.901 m/sec Chiller #2 Vel: 1.287 m/sec Set @ 86.3 m³/hr Vel: 1.287 m/secFilter #c
TH: (13.05) m Flow: 86.3 m³/hr
Flow: 172.6 m³/hr
NPSHa: 39.09 m dP: 0.2 bar
dP: 1 bar ELECTRIC Building OFFICE BUILDING WTP
Ps: 2.782 bar g
Pd: 4.062 bar g Flow: 137.7 m³/hr Flow: 21.9 m³/hr Flow: 12.8 m³/hr
dP: 1.49 bar dP: 1.666 bar dP: 1.782 bar

Ø: 10 in Ø: 10 in
Flow: 172.5 m³/hr Flow: 0.136 m³/hr
P: 3 bar g
Vel: 0.901 m/sec Vel: 0 m/sec
El: 12 m

Flow: 137.7 m³/hr


Vel: 1.144 m/sec
Flow: 172.4 m³/hr

Flow: 137.7 m³/hr


Vel: 0.9 m/sec

Ø: 8 in
Ø: 8 in

dP: 0.2 bar


Flow: 137.7 m³/hr

Ø: 10 in

Filter #1
Vel: 1.144 m/sec Set @ 137.7 m³/hr

g 137.7 m³/hr
El: 12 m Vel: 1.144 m/sec
TH: (19.34) m
NPSHa: 39.15 m
Ps: 2.788 bar g
Ø: 8 in Pd: 4.683 bar g

Ø: 8 in
Flow: 137.7 m³/hr

Flow:
Vel: 1.144 m/sec

P: 4.668 bar
P: 3 bar g

Vel: 0.327 m/sec


El: 12 m

Ø: 8 in Ø: 8 in

Flow: 21.9 m³/hr


Flow: 137.7 m³/hr
P: 2.998 bar g Flow: 137.7 m³/hr P: 4.226 bar g
Vel: 1.144 m/sec
El: 12 m Vel: 1.144 m/sec El: 16 m

Ø: 6 in

Vel: 0.746 m/sec


Ø: 8 in

Flow: 12.8 m³/hr


Ø: 8 in
Filter #2

Ø: 3 in
Ø: 8 in

Set @ 137.7 m³/hr


Vel: 0.181 m/sec
Flow: 34.7 m³/hr
Ø: 10 in

Flow: 34.7 m³/hr


dP: 0.2 bar

Ø: 6 in
Filter #3

Flow: 34.7 m³/hr

Vel: 0.518 m/sec


Vel: 0.518 m/sec Set @ 34.7 m³/hr

Flow: 34.7 m³/hr


Vel: 0.518 m/sec
Flow: 34.7 m³/hr

TH: (20.86) m
NPSHa: 39.24 m
Ps: 2.797 bar g
Pd: 4.842 bar g

Ø: 6 in
Ø: 6 in

P: 4.838 bar g
Ø: 6 in Ø: 6 in Ø: 6 in
P: 3 bar g

El: 12 m
El: 12 m

Flow: 34.7 m³/hr


P: 2.999 bar g Flow: 34.7 m³/hr P: 4.835 bar g Flow: 21.9 m³/hr
Vel: 0.518 m/sec Vel: 0.518 m/sec Vel: 0.327 m/sec FCV @ 21.9 m³/hr

Vel: 0.746 m/sec


El: 12 m El: 12 m dP: 0.131 bar

Flow: 12.8 m³/hr


Ø: 6 in

Ø: 3 in
Filter #4

Ø: 6 in Ø: 6 in Ø: 3 in
P: 4.828 bar g Flow: 12.8 m³/hr P: 4.824 bar g
Set @ 34.7 m³/hr Vel: 0.746 m/sec
El: 12 m El: 12 m

Lineup: Operación 100% Darcy-Weisbach PIPE-FLO 2009


System: HVAC Chilled water circuit Flow: m³/hr
Date: 10/09/13 7:05 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 19.46 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

A112_Sch80 A112 / 80 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Chilled water (cold) Water 7 5 999.9 1.371 0.01003 / 220.6
Chilled water (hot) Water 12 5 999.6 1.206 0.01403 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:06 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
By-Pass Line ~N{043} Buffer tank 0.136 0 0 0
Pipe{005} ~N{003} ~N{004} 172.6 0.901 0.006 0.065
Pipe{006} Primary Pumps #2 ~N{003} 86.3 1.287 0.227 0.32
Pipe{007} Primary Pumps #1 ~N{003} X Closed --- --- --- ---
Pipe{008} Primary Pumps #3 ~N{003} 86.3 1.287 0.227 0.32
Pipe{012} ~N{004} Chiller #2 172.6 0.901 (0.191) 0.055
Pipe{013} ~N{004} Chiller #1 X Closed --- --- --- ---
Pipe{014} Chiller #1 ~N{011} X Closed --- --- --- ---
Pipe{015} Chiller #2 ~N{011} 172.5 0.901 0.157 0.097
Pipe{020} ~N{015} ~N{013} 34.7 0.181 0 0
Pipe{022} Buffer tank ~N{009} 172.6 0.901 0 0.008
Pipe{023} ~N{013} ~N{016} 34.7 0.518 0 0.004
Pipe{024} ~N{015} ~N{017} 137.7 1.144 0.001 0.011
Pipe{027} ~N{017} Filter #1 137.7 1.144 0 0.006
Pipe{028} ~N{017} Filter #2 X Closed --- --- --- ---
Pipe{029} Electric Building Pumps #1 ~N{022} 137.7 1.144 0.015 0.156
Pipe{030} Electric Building Pumps #2 ~N{022} X Closed --- --- --- ---
Pipe{033} ~N{023} ~N{026} 34.7 0.518 0.003 0.034
Pipe{034} ~N{022} ~N{025} 137.7 1.144 0.442 0.51
Pipe{036} ~N{026} ~N{041} 12.8 0.746 0.007 0.072
Pipe{038} ~N{033} ~N{029} 21.91 0.327 (0.386) 0.056
Pipe{039} ~N{029} ~N{031} 34.71 0.518 0 0.009
Pipe{040} ~N{032} ~N{031} 137.8 1.145 (0.347) 0.463
Pipe{041} ~N{031} ~N{042} 172.5 1.433 0.004 0.043
Pipe{043} ~N{025} ELECTRIC Building 137.7 1.144 0.137 0.396
Pipe{044} ELECTRIC Building ~N{032} 137.8 1.145 (0.062) 0.364
Pipe{045} ~N{034} OFFICE BUILDING 21.9 0.327 0.009 0.096
Pipe{046} OFFICE BUILDING ~N{033} 21.91 0.327 0.007 0.072
Pipe{047} ~N{036} WTP 12.8 0.746 0.013 0.131
Pipe{048} WTP ~N{035} 12.8 0.747 0.015 0.158
Pipe{051} ~N{009} Filter #a X Closed --- --- --- ---
Pipe{052} Filter #a Primary Pumps #1 X Closed --- --- --- ---
Pipe{053} Filter #b Primary Pumps #2 86.3 1.287 0.015 0.152
Pipe{054} Filter #c Primary Pumps #3 86.3 1.287 0.015 0.152
Pipe{055} ~N{009} Filter #b 86.3 1.287 0.002 0.02
Pipe{056} ~N{009} Filter #c 86.3 1.287 0.002 0.02
Pipe{057} ~N{026} ~N{034} 21.9 0.327 0.399 0.067
Pipe{058} Filter #1 Electric Building Pumps #1 137.7 1.144 0.01 0.104
Pipe{059} Filter #2 Electric Building Pumps #2 X Closed --- --- --- ---
Pipe{062} Filter #3 Office & WTP Building Pu.. 34.7 0.518 0.002 0.023
Pipe{063} ~N{016} Filter #3 34.7 0.518 0 0.002
Pipe{064} Office & WTP Building Pu.. ~N{023} 34.7 0.518 0.003 0.035
Pipe{065} ~N{016} Filter #4 X Closed --- --- --- ---
Pipe{066} Filter #4 Office & WTP Building Pu.. X Closed --- --- --- ---
Pipe{067} Office & WTP Building Pu.. ~N{023} X Closed --- --- --- ---
Pipe{068} ~N{041} ~N{036} 12.8 0.746 0.004 0.043
Pipe{069} ~N{042} Buffer tank 172.5 1.433 0.004 0.043
Pipe{070} ~N{011} ~N{043} 172.5 0.901 (0.187) 0.091
Pipe{071} ~N{035} ~N{029} 12.8 0.746 0.004 0.043
Pipe70 ~N{043} ~N{015} 172.4 0.9 0 0.004

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:06 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{003} 14 3.834 53.13
~N{004} 14 3.828 53.06
~N{009} 12 2.999 42.59
~N{011} 14 2.813 42.69
~N{013} 12 3 42.6
~N{015} 12 3 42.6
~N{016} 12 2.999 42.59
~N{017} 12 2.998 42.59
~N{022} 12 4.668 59.62
~N{023} 12 4.838 61.35
~N{025} 16 4.226 59.11
~N{026} 12 4.835 61.32
~N{029} 12 3.009 42.71
~N{031} 12 3.008 42.7
~N{032} 16 2.662 43.16
~N{033} 16 2.623 42.76
~N{035} 12 3.013 42.75
~N{036} 12 4.824 61.21
~N{041} 12 4.828 61.25
~N{042} 12 3.004 42.66
~N{043} 12 3 42.6

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:06 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Electric Building Pumps #1 137.7 (19.34) (1.896) --- 39.15 2.788 4.683 12 12
Office & WTP Building Pumps #1 34.7 (20.86) (2.045) --- 39.24 2.797 4.842 12 12
Primary Pumps #2 86.3 (13.05) (1.279) --- 39.09 2.782 4.062 12 12
Primary Pumps #3 86.3 (13.05) (1.279) --- 39.09 2.782 4.062 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 172.6 10.2 1 4.018 2.969 12 12.5
ELECTRIC Building 137.7 15.2 1.49 4.089 2.599 17 17
Filter #1 137.7 2.04 0.2 2.998 2.798 12 12
Filter #3 34.7 2.04 0.2 2.999 2.799 12 12
Filter #b 86.3 2.04 0.2 2.997 2.797 12 12
Filter #c 86.3 2.04 0.2 2.997 2.797 12 12
OFFICE BUILDING 21.9 16.99 1.666 4.295 2.63 16 16
WTP 12.8 18.18 1.782 4.811 3.029 12 12

Controls
Control Set Value Elev Flow Status dP HL Inlet Outlet
m m³/hr bar m bar g bar g
~N{034} FCV: 21.9 16 21.9 0.131 1.341 4.436 4.305

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:06 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 3 0 12 0 3 42.61
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
By-Pass Line @ 0 m 0.136 3 42.6
Pipe{022} @ 0 m 172.6 3 42.6
Pipe{069} @ 0 m 172.5 3 42.61

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:06 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

By-Pass Line rev: 28/08/13 5:28 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 20 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
0.136 0.4745 0 0 0
5
0.008 10
0 0 0 0 0
0.023 2.847 0 0 0 4
0.007 10
0.045 1.424 0 0 0 3
0.006 10
0.068 0.9491 0 0 0
2
0.091 0.7118 0 0 0 0.005 10
0.113 0.5694 0 0 0
0.004
0.136 0.4745 0 0 0
0.159 0.4067 0 0 0 0.003
0.181 0.3559 0 0 0
0.002
0.204 0.3164 0.001 0 0
0.227 0.2847 0.001 0 0 0.001
0.249 0.2588 0.001 0 0
0.272 0.2373 0.001 0 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 0 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{005} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 18 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
172.6 0.01702 0.901 0.006 0.002
5
0.02 10
0 0 0 0 0
28.77 0.02349 0.15 0 0 4
0.0175 10
57.53 0.02039 0.3 0 0 3
0.015 10
86.3 0.01895 0.451 0.002 0
2
115.1 0.01807 0.601 0.003 0 0.0125 10
143.8 0.01747 0.751 0.005 0.001
0.01
172.6 0.01702 0.901 0.006 0.002
201.4 0.01667 1.052 0.009 0.002 0.0075
230.1 0.01639 1.202 0.011 0.003
0.005
258.9 0.01616 1.352 0.014 0.004
287.7 0.01596 1.502 0.017 0.005 0.0025
316.4 0.01579 1.653 0.02 0.005
345.2 0.01565 1.803 0.024 0.006 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 23 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{006} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{008} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{012} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.6 0.01702 0.901 -0.191 0.004
5
0.15 10
0 0 0 -0.196 0
28.77 0.02349 0.15 -0.196 0 4
0.1 10
57.53 0.02039 0.3 -0.195 0 3
0.05 10
86.3 0.01895 0.451 -0.195 0.001
2
115.1 0.01807 0.601 -0.194 0.002 0 10
143.8 0.01747 0.751 -0.192 0.003
-0.05
172.6 0.01702 0.901 -0.191 0.004
201.4 0.01667 1.052 -0.189 0.006 -0.1
230.1 0.01639 1.202 -0.187 0.007
-0.15
258.9 0.01616 1.352 -0.184 0.009
287.7 0.01596 1.502 -0.181 0.011 -0.2
316.4 0.01579 1.653 -0.178 0.014
345.2 0.01565 1.803 -0.175 0.016 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 74 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12.5 m out: 14 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
172.5 0.01733 0.901 0.157 0.008
5
0.16 10
0 0 0 0.147 0
28.75 0.02417 0.15 0.147 0 4
0.14 10
57.5 0.0209 0.3 0.148 0 3
0.12 10
86.25 0.01938 0.45 0.149 0.002
2
115 0.01845 0.601 0.151 0.004 0.1 10
143.8 0.01781 0.751 0.154 0.006
0.08
172.5 0.01733 0.901 0.157 0.008
201.3 0.01696 1.051 0.16 0.011 0.06
230 0.01666 1.201 0.164 0.015
0.04
258.8 0.01641 1.351 0.168 0.018
287.5 0.0162 1.502 0.173 0.023 0.02
316.3 0.01602 1.652 0.179 0.027
345 0.01587 1.802 0.185 0.033 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014 1 x Elbow - Standard 45° 0.2138

FFT: 0.01337 Total K: 2.018 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{020} rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 6 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.7 0.02319 0.181 0 0
5
0.008 10
0 0 0 0 0
5.783 0.03654 0.03 0 0 4
0.007 10
11.57 0.03015 0.06 0 0 3
0.006 10
17.35 0.02721 0.091 0 0
2
23.13 0.0254 0.121 0 0 0.005 10
28.92 0.02414 0.151 0 0
0.004
34.7 0.02319 0.181 0 0
40.48 0.02244 0.211 0 0 0.003
46.27 0.02183 0.242 0 0
0.002
52.05 0.02132 0.272 0 0
57.83 0.02088 0.302 0 0 0.001
63.62 0.0205 0.332 0 0
69.4 0.02016 0.362 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{022} rev: 06/06/13 5:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 3 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
172.6 0.01733 0.901 0 0
5
0.008 10
0 0 0 0 0
28.77 0.02417 0.15 0 0 4
0.007 10
57.53 0.0209 0.3 0 0 3
0.006 10
86.3 0.01938 0.451 0 0
2
115.1 0.01845 0.601 0 0 0.005 10
143.8 0.01781 0.751 0 0
0.004
172.6 0.01733 0.901 0 0
201.4 0.01696 1.052 0.001 0 0.003
230.1 0.01666 1.202 0.001 0
0.002
258.9 0.01641 1.352 0.002 0
287.7 0.0162 1.502 0.002 0 0.001
316.4 0.01602 1.653 0.003 0
345.2 0.01587 1.803 0.003 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{023} rev: 03/06/13 4:39 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.7 0.0213 0.518 0 0
5
0.008 10
0 0 0 0 0
5.783 0.03174 0.086 0 0 4
0.007 10
11.57 0.02672 0.173 0 0 3
0.006 10
17.35 0.02442 0.259 0 0
2
23.13 0.02301 0.345 0 0 0.005 10
28.92 0.02203 0.431 0 0
0.004
34.7 0.0213 0.518 0 0
40.48 0.02074 0.604 0 0 0.003
46.27 0.02027 0.69 0 0
0.002
52.05 0.01989 0.776 0 0
57.83 0.01957 0.863 0 0 0.001
63.62 0.01929 0.949 0.001 0
69.4 0.01905 1.035 0.001 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{024} rev: 11/06/13 2:26 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
137.7 0.01761 1.144 0.001 0
5
0.008 10
0 0 0 0 0
22.95 0.02427 0.191 0 0 4
0.007 10
45.9 0.02106 0.381 0 0 3
0.006 10
68.85 0.01958 0.572 0 0
2
91.8 0.01868 0.763 0 0 0.005 10
114.8 0.01807 0.954 0 0
0.004
137.7 0.01761 1.144 0.001 0
160.6 0.01726 1.335 0.001 0 0.003
183.6 0.01698 1.526 0.002 0
0.002
206.6 0.01675 1.717 0.002 0
229.5 0.01655 1.907 0.003 0 0.001
252.4 0.01639 2.098 0.003 0
275.4 0.01624 2.289 0.004 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
137.7 0.01761 1.144 0 0
5
0.008 10
0 0 0 0 0
22.95 0.02427 0.191 0 0 4
0.007 10
45.9 0.02106 0.381 0 0 3
0.006 10
68.85 0.01958 0.572 0 0
2
91.8 0.01868 0.763 0 0 0.005 10
114.8 0.01807 0.954 0 0
0.004
137.7 0.01761 1.144 0 0
160.6 0.01726 1.335 0 0 0.003
183.6 0.01698 1.526 0 0
0.002
206.6 0.01675 1.717 0.001 0
229.5 0.01655 1.907 0.001 0 0.001
252.4 0.01639 2.098 0.002 0
275.4 0.01624 2.289 0.002 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{029} rev: 11/06/13 2:35 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
137.7 0.01761 1.144 0.015 0.014
5
0.08 10
0 0 0 0 0
22.95 0.02427 0.191 0 0 4
0.07 10
45.9 0.02106 0.381 0.002 0.002 3
0.06 10
68.85 0.01958 0.572 0.004 0.004
2
91.8 0.01868 0.763 0.007 0.006 0.05 10
114.8 0.01807 0.954 0.011 0.01
0.04
137.7 0.01761 1.144 0.015 0.014
160.6 0.01726 1.335 0.021 0.019 0.03
183.6 0.01698 1.526 0.027 0.025
0.02
206.6 0.01675 1.717 0.034 0.032
229.5 0.01655 1.907 0.042 0.039 0.01
252.4 0.01639 2.098 0.051 0.048
275.4 0.01624 2.289 0.061 0.057 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6305 1 x Swing Check - Vertical 0.7006 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.172 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{033} rev: 06/06/13 6:57 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
34.7 0.0213 0.518 0.003 0.002
5
0.016 10
0 0 0 0 0
5.783 0.03174 0.086 0 0 4
0.014 10
11.57 0.02672 0.173 0 0 3
0.012 10
17.35 0.02442 0.259 0 0
2
23.13 0.02301 0.345 0.002 0.001 0.01 10
28.92 0.02203 0.431 0.002 0.002
0.008
34.7 0.0213 0.518 0.003 0.002
40.48 0.02074 0.604 0.004 0.003 0.006
46.27 0.02027 0.69 0.006 0.004
0.004
52.05 0.01989 0.776 0.007 0.005
57.83 0.01957 0.863 0.009 0.007 0.002
63.62 0.01929 0.949 0.011 0.008
69.4 0.01905 1.035 0.013 0.01 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{034} rev: 28/08/13 5:42 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.9 10
137.7 0.01761 1.144 0.442 0.011
5
0.8 10
0 0 0 0.392 0
22.95 0.02427 0.191 0.394 0 4
0.7 10
45.9 0.02106 0.381 0.399 0.001 3
0.6 10
68.85 0.01958 0.572 0.406 0.003
2
91.8 0.01868 0.763 0.415 0.005 0.5 10
114.8 0.01807 0.954 0.428 0.008
0.4
137.7 0.01761 1.144 0.442 0.011
160.6 0.01726 1.335 0.459 0.015 0.3
183.6 0.01698 1.526 0.479 0.02
0.2
206.6 0.01675 1.717 0.5 0.025
229.5 0.01655 1.907 0.525 0.031 0.1
252.4 0.01639 2.098 0.551 0.037
275.4 0.01624 2.289 0.58 0.044 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.681 Avg Percent of Total Loss: 21 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{036} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
12.8 0.02354 0.746 0.007 0.003
5
0.04 10
0 0 0 0 0
2.133 0.03501 0.124 0 0 4
0.035 10
4.267 0.0294 0.249 0 0 3
0.03 10
6.4 0.02687 0.373 0.002 0
2
8.533 0.02535 0.498 0.003 0.001 0.025 10
10.67 0.0243 0.622 0.005 0.002
0.02
12.8 0.02354 0.746 0.007 0.003
14.93 0.02294 0.871 0.009 0.004 0.015
17.07 0.02246 0.995 0.012 0.005
0.01
19.2 0.02207 1.119 0.015 0.006
21.33 0.02174 1.244 0.019 0.008 0.005
23.47 0.02145 1.368 0.023 0.01
25.6 0.02121 1.493 0.027 0.012 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 1.038 Avg Percent of Total Loss: 37 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
21.91 0.02268 0.327 -0.386 0
5
0.3 10
0 0 0 -0.392 0
3.652 0.03474 0.054 -0.392 0 4
0.2 10
7.303 0.02894 0.109 -0.391 0 3
0.1 10
10.96 0.02627 0.163 -0.39 0
2
14.61 0.02465 0.218 -0.389 0 0 10
18.26 0.02352 0.272 -0.388 0
-0.1
21.91 0.02268 0.327 -0.386 0
25.56 0.02201 0.381 -0.385 0 -0.2
29.21 0.02148 0.436 -0.383 0
-0.3
32.86 0.02103 0.49 -0.381 0
36.52 0.02065 0.545 -0.378 0 -0.4
40.17 0.02032 0.599 -0.375 0
43.82 0.02003 0.654 -0.373 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 06/06/13 6:55 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.71 0.02083 0.518 0 0
5
0.008 10
0 0 0 0 0
5.785 0.0307 0.086 0 0 4
0.007 10
11.57 0.02595 0.173 0 0 3
0.006 10
17.36 0.02377 0.259 0 0
2
23.14 0.02244 0.345 0 0 0.005 10
28.93 0.02151 0.431 0 0
0.004
34.71 0.02083 0.518 0 0
40.49 0.02029 0.604 0.001 0 0.003
46.28 0.01986 0.69 0.002 0
0.002
52.06 0.0195 0.777 0.002 0
57.85 0.0192 0.863 0.002 0 0.001
63.64 0.01894 0.949 0.003 0
69.42 0.01871 1.035 0.003 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{040} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
137.8 0.01732 1.145 -0.347 0.007
5
0.3 10
0 0 0 -0.392 0
22.97 0.0236 0.191 -0.39 0 4
0.2 10
45.93 0.02056 0.382 -0.386 0 3
0.1 10
68.9 0.01916 0.573 -0.38 0.002
2
91.87 0.01832 0.764 -0.371 0.003 0 10
114.8 0.01774 0.954 -0.36 0.005
-0.1
137.8 0.01732 1.145 -0.347 0.007
160.8 0.01699 1.336 -0.331 0.009 -0.2
183.7 0.01673 1.527 -0.314 0.012
-0.3
206.7 0.01651 1.718 -0.294 0.016
229.7 0.01633 1.909 -0.272 0.019 -0.4
252.6 0.01618 2.1 -0.248 0.023
275.6 0.01604 2.291 -0.222 0.028 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 45° 0.2242 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.065 Avg Percent of Total Loss: 15 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{041} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
172.5 0.01685 1.434 0.004 0
5
0.016 10
0 0 0 0 0
28.75 0.02251 0.239 0 0 4
0.014 10
57.5 0.01976 0.478 0 0 3
0.012 10
86.25 0.0185 0.717 0.001 0
2
115 0.01774 0.956 0.002 0 0.01 10
143.8 0.01723 1.195 0.003 0
0.008
172.5 0.01685 1.434 0.004 0
201.3 0.01656 1.673 0.006 0 0.006
230 0.01633 1.912 0.007 0
0.004
258.8 0.01614 2.151 0.009 0
287.5 0.01598 2.389 0.011 0 0.002
316.3 0.01584 2.628 0.013 0
345 0.01573 2.867 0.016 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 28/08/13 5:48 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 40 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 17 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.225 10
137.7 0.01761 1.144 0.137 0.016
5
0.2 10
0 0 0 0.098 0
22.95 0.02427 0.191 0.099 0 4
0.175 10
45.9 0.02106 0.381 0.103 0.002 3
0.15 10
68.85 0.01958 0.572 0.108 0.004
2
91.8 0.01868 0.763 0.116 0.007 0.125 10
114.8 0.01807 0.954 0.125 0.011
0.1
137.7 0.01761 1.144 0.137 0.016
160.6 0.01726 1.335 0.15 0.022 0.075
183.6 0.01698 1.526 0.166 0.029
0.05
206.6 0.01675 1.717 0.183 0.037
229.5 0.01655 1.907 0.202 0.046 0.025
252.4 0.01639 2.098 0.223 0.055
275.4 0.01624 2.289 0.246 0.066 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.522 Avg Percent of Total Loss: 42 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 28/08/13 5:49 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 40 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 17 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.08 10
137.8 0.01732 1.145 -0.062 0.014
5
0.06 10
0 0 0 -0.098 0
22.97 0.0236 0.191 -0.097 0 4
0.04 10
45.93 0.02056 0.382 -0.094 0.002 3
0.02 10
68.9 0.01916 0.573 -0.088 0.003
2
91.87 0.01832 0.764 -0.082 0.006 0 10
114.8 0.01774 0.954 -0.073 0.01
-0.02
137.8 0.01732 1.145 -0.062 0.014
160.8 0.01699 1.336 -0.05 0.019 -0.04
183.7 0.01673 1.527 -0.036 0.024
-0.06
206.7 0.01651 1.718 -0.02 0.031
229.7 0.01633 1.909 -0.002 0.038 -0.08
252.6 0.01618 2.1 0.017 0.046
275.6 0.01604 2.291 0.038 0.055 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
5 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.102 Avg Percent of Total Loss: 38 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 90 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
21.9 0.02326 0.327 0.009 0.002
5
0.04 10
0 0 0 0 0
3.65 0.03603 0.054 0 0 4
0.035 10
7.3 0.02988 0.109 0.001 0 3
0.03 10
10.95 0.02707 0.163 0.003 0
2
14.6 0.02535 0.218 0.004 0 0.025 10
18.25 0.02416 0.272 0.007 0.001
0.02
21.9 0.02326 0.327 0.009 0.002
25.55 0.02256 0.381 0.012 0.003 0.015
29.2 0.02199 0.436 0.016 0.004
0.01
32.85 0.02152 0.49 0.02 0.005
36.5 0.02111 0.544 0.024 0.006 0.005
40.15 0.02077 0.599 0.029 0.007
43.8 0.02046 0.653 0.034 0.009 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
9 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 4.021 Avg Percent of Total Loss: 21 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 90 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
21.91 0.02268 0.327 0.007 0
5
0.04 10
0 0 0 0 0
3.652 0.03474 0.054 0 0 4
0.035 10
7.303 0.02894 0.109 0.001 0 3
0.03 10
10.96 0.02627 0.163 0.002 0
2
14.61 0.02465 0.218 0.003 0 0.025 10
18.26 0.02352 0.272 0.005 0
0.02
21.91 0.02268 0.327 0.007 0
25.56 0.02201 0.381 0.009 0 0.015
29.21 0.02148 0.436 0.012 0
0.01
32.86 0.02103 0.49 0.015 0
36.52 0.02065 0.545 0.018 0 0.005
40.17 0.02032 0.599 0.021 0
43.82 0.02003 0.654 0.025 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{047} rev: 28/08/13 5:45 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
12.8 0.02354 0.746 0.013 0.009
5
0.08 10
0 0 0 0 0
2.133 0.03501 0.124 0 0 4
0.07 10
4.267 0.0294 0.249 0.002 0 3
0.06 10
6.4 0.02687 0.373 0.003 0.002
2
8.533 0.02535 0.498 0.006 0.004 0.05 10
10.67 0.0243 0.622 0.009 0.006
0.04
12.8 0.02354 0.746 0.013 0.009
14.93 0.02294 0.871 0.017 0.012 0.03
17.07 0.02246 0.995 0.023 0.015
0.02
19.2 0.02207 1.119 0.028 0.019
21.33 0.02174 1.244 0.035 0.024 0.01
23.47 0.02145 1.368 0.042 0.029
25.6 0.02121 1.493 0.05 0.035 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 3.115 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{048} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 12 °C
Length: 10 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
12.8 0.02304 0.746 0.015 0.007
5
0.08 10
0 0 0 0 0
2.133 0.03383 0.124 0 0 4
0.07 10
4.267 0.02855 0.249 0.002 0 3
0.06 10
6.4 0.02617 0.373 0.004 0.002
2
8.533 0.02474 0.498 0.007 0.003 0.05 10
10.67 0.02376 0.622 0.011 0.005
0.04
12.8 0.02304 0.746 0.015 0.007
14.93 0.02248 0.871 0.021 0.01 0.03
17.07 0.02203 0.995 0.027 0.013
0.02
19.2 0.02167 1.119 0.034 0.016
21.33 0.02136 1.244 0.041 0.02 0.01
23.47 0.0211 1.368 0.05 0.024
25.6 0.02087 1.493 0.059 0.029 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 2.596 Avg Percent of Total Loss: 46 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{053} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{054} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{055} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{056} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{057} rev: 28/08/13 5:43 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
21.9 0.02326 0.327 0.399 0
5
0.4 10
0 0 0 0.392 0
3.65 0.03603 0.054 0.392 0 4
0.35 10
7.3 0.02988 0.109 0.393 0 3
0.3 10
10.95 0.02707 0.163 0.394 0
2
14.6 0.02535 0.218 0.395 0 0.25 10
18.25 0.02416 0.272 0.397 0
0.2
21.9 0.02326 0.327 0.399 0
25.55 0.02256 0.381 0.401 0.001 0.15
29.2 0.02199 0.436 0.403 0.002
0.1
32.85 0.02152 0.49 0.406 0.002
36.5 0.02111 0.544 0.409 0.003 0.05
40.15 0.02077 0.599 0.412 0.003
43.8 0.02046 0.653 0.416 0.004 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 13 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{058} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
137.7 0.01761 1.144 0.01 0.01
5
0.04 10
0 0 0 0 0
22.95 0.02427 0.191 0 0 4
0.035 10
45.9 0.02106 0.381 0.001 0.001 3
0.03 10
68.85 0.01958 0.572 0.003 0.002
2
91.8 0.01868 0.763 0.005 0.004 0.025 10
114.8 0.01807 0.954 0.007 0.007
0.02
137.7 0.01761 1.144 0.01 0.01
160.6 0.01726 1.335 0.014 0.013 0.015
183.6 0.01698 1.526 0.018 0.017
0.01
206.6 0.01675 1.717 0.023 0.022
229.5 0.01655 1.907 0.028 0.027 0.005
252.4 0.01639 2.098 0.034 0.032
275.4 0.01624 2.289 0.041 0.038 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Butterfly 0.6305

FFT: 0.01401 Total K: 1.471 Avg Percent of Total Loss: 95 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{062} rev: 06/06/13 7:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.7 0.0213 0.518 0.002 0.002
5
0.008 10
0 0 0 0 0
5.783 0.03174 0.086 0 0 4
0.007 10
11.57 0.02672 0.173 0 0 3
0.006 10
17.35 0.02442 0.259 0 0
2
23.13 0.02301 0.345 0.001 0 0.005 10
28.92 0.02203 0.431 0.002 0.001
0.004
34.7 0.0213 0.518 0.002 0.002
40.48 0.02074 0.604 0.003 0.003 0.003
46.27 0.02027 0.69 0.004 0.004
0.002
52.05 0.01989 0.776 0.005 0.005
57.83 0.01957 0.863 0.006 0.006 0.001
63.62 0.01929 0.949 0.008 0.007
69.4 0.01905 1.035 0.009 0.008 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 82 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{063} rev: 03/06/13 4:40 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.7 0.0213 0.518 0 0
5
0.008 10
0 0 0 0 0
5.783 0.03174 0.086 0 0 4
0.007 10
11.57 0.02672 0.173 0 0 3
0.006 10
17.35 0.02442 0.259 0 0
2
23.13 0.02301 0.345 0 0 0.005 10
28.92 0.02203 0.431 0 0
0.004
34.7 0.0213 0.518 0 0
40.48 0.02074 0.604 0 0 0.003
46.27 0.02027 0.69 0 0
0.002
52.05 0.01989 0.776 0 0
57.83 0.01957 0.863 0 0 0.001
63.62 0.01929 0.949 0 0
69.4 0.01905 1.035 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{064} rev: 28/08/13 12:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
34.7 0.0213 0.518 0.003 0.003
5
0.016 10
0 0 0 0 0
5.783 0.03174 0.086 0 0 4
0.014 10
11.57 0.02672 0.173 0 0 3
0.012 10
17.35 0.02442 0.259 0 0
2
23.13 0.02301 0.345 0.002 0.001 0.01 10
28.92 0.02203 0.431 0.002 0.002
0.008
34.7 0.0213 0.518 0.003 0.003
40.48 0.02074 0.604 0.005 0.004 0.006
46.27 0.02027 0.69 0.006 0.005
0.004
52.05 0.01989 0.776 0.008 0.007
57.83 0.01957 0.863 0.01 0.009 0.002
63.62 0.01929 0.949 0.011 0.01
69.4 0.01905 1.035 0.014 0.012 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 81 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{068} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
12.8 0.02354 0.746 0.004 0
5
0.016 10
0 0 0 0 0
2.133 0.03501 0.124 0 0 4
0.014 10
4.267 0.0294 0.249 0 0 3
0.012 10
6.4 0.02687 0.373 0.001 0
2
8.533 0.02535 0.498 0.002 0 0.01 10
10.67 0.0243 0.622 0.003 0
0.008
12.8 0.02354 0.746 0.004 0
14.93 0.02294 0.871 0.006 0 0.006
17.07 0.02246 0.995 0.007 0
0.004
19.2 0.02207 1.119 0.009 0
21.33 0.02174 1.244 0.011 0 0.002
23.47 0.02145 1.368 0.013 0
25.6 0.02121 1.493 0.015 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{069} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
172.5 0.01685 1.434 0.004 0
5
0.016 10
0 0 0 0 0
28.75 0.02251 0.239 0 0 4
0.014 10
57.5 0.01976 0.478 0 0 3
0.012 10
86.25 0.0185 0.717 0.001 0
2
115 0.01774 0.956 0.002 0 0.01 10
143.8 0.01723 1.195 0.003 0
0.008
172.5 0.01685 1.434 0.004 0
201.3 0.01656 1.673 0.006 0 0.006
230 0.01633 1.912 0.007 0
0.004
258.8 0.01614 2.151 0.009 0
287.5 0.01598 2.389 0.011 0 0.002
316.3 0.01584 2.628 0.013 0
345 0.01573 2.867 0.016 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{070} rev: 10/09/13 4:39 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 15 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.5 0.01733 0.901 -0.187 0.005
5
0.15 10
0 0 0 -0.196 0
28.75 0.02417 0.15 -0.196 0 4
0.1 10
57.5 0.0209 0.3 -0.195 0 3
0.05 10
86.25 0.01938 0.45 -0.194 0.001
2
115 0.01845 0.601 -0.192 0.002 0 10
143.8 0.01781 0.751 -0.19 0.003
-0.05
172.5 0.01733 0.901 -0.187 0.005
201.3 0.01696 1.051 -0.184 0.007 -0.1
230 0.01666 1.201 -0.18 0.009
-0.15
258.8 0.01641 1.351 -0.176 0.011
287.5 0.0162 1.502 -0.172 0.014 -0.2
316.3 0.01602 1.652 -0.167 0.016
345 0.01587 1.802 -0.162 0.019 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 53 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{071} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
12.8 0.02354 0.746 0.004 0
5
0.016 10
0 0 0 0 0
2.133 0.03501 0.124 0 0 4
0.014 10
4.267 0.0294 0.249 0 0 3
0.012 10
6.4 0.02687 0.373 0.001 0
2
8.533 0.02535 0.498 0.002 0 0.01 10
10.67 0.0243 0.622 0.003 0
0.008
12.8 0.02354 0.746 0.004 0
14.93 0.02294 0.871 0.006 0 0.006
17.07 0.02246 0.995 0.007 0
0.004
19.2 0.02207 1.119 0.009 0
21.33 0.02174 1.244 0.011 0 0.002
23.47 0.02145 1.368 0.013 0
25.6 0.02121 1.493 0.015 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:06 pm


Lineup: Operación 100%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe70 rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 1.5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
172.4 0.01733 0.9 0 0
5
0.008 10
0 0 0 0 0
28.73 0.02418 0.15 0 0 4
0.007 10
57.47 0.0209 0.3 0 0 3
0.006 10
86.2 0.01938 0.45 0 0
2
114.9 0.01845 0.6 0 0 0.005 10
143.7 0.01781 0.75 0 0
0.004
172.4 0.01733 0.9 0 0
201.1 0.01696 1.05 0 0 0.003
229.9 0.01666 1.201 0 0
0.002
258.6 0.01641 1.351 0 0
287.3 0.0162 1.501 0.001 0 0.001
316.1 0.01602 1.651 0.001 0
344.8 0.01587 1.801 0.001 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 21 of 24

Appendix 4
HVAC Chilled Water Circuit - Design Case
P: 3.016 bar g
Ø: 3 in

El: 12 m
Flow: 14 m³/hr
Vel: 0.816 m/sec

P: 2.626 bar g
Ø: 6 in P: 3.011 bar g Ø: 6 in

El: 16 m
Flow: 38.11 m³/hr El: 12 m Flow: 24.11 m³/hr
Vel: 0.568 m/sec Vel: 0.36 m/sec

P: 3.01 bar g
Ø: 10 in Ø: 6 in Ø: 6 in Ø: 8 in

El: 12 m
P: 3.005 bar g Flow: 189.6 m³/hr
Set @ 94.93 m³/hr Filter #a Vel: 1.576 m/sec

Flow: 189.6 m³/hr


Vel: 1.576 m/sec
Chiller #1 El: 12 m

P: 2.672 bar g
P: 2.815 bar g

Ø: 10 in

Ø: 6 in
Ø: 8 in

El: 16 m
Flow: 151.5 m³/hr
El: 14 m

Ø: 8 in
Vel: 1.259 m/sec

Ø: 10 in Ø: 6 in Ø: 6 in Ø: 6 in Ø: 10 in
Flow: 189.9 m³/hr Flow: 94.93 m³/hr Flow: 94.93 m³/hr
P: 3.84 bar g Vel: 1.416 m/sec Set @ 94.93 m³/hr
Flow: 94.93 m³/hr P: 2.999 barFlow:
g 189.9 m³/hr
Vel: 0.992 m/sec Filter #b Vel: 1.416 m/sec
Vel: 1.416 m/sec El: 12 m Vel: 0.992 m/secBuffer tank

Flow: 189.9 m³/hr

Flow: 94.93 m³/hr

Flow: 151.5 m³/hr

Flow: 24.11 m³/hr

Flow: 14.01 m³/hr


Vel: 0.992 m/sec

Vel: 1.416 m/sec

Vel: 1.259 m/sec

Vel: 0.817 m/sec


P: 3.833 bar g El: 14 m

Vel: 0.36 m/sec


TH: (13.22) m Flow: 94.93 m³/hr
El: 14 m NPSHa: 39.05 m dP: 0.2 bar
Ps: 2.779 bar g
Pd: 4.074 bar g

Ø: 10 in

Ø: 6 in

Ø: 8 in

Ø: 6 in

Ø: 3 in
Ø: 10 in Ø: 6 in Ø: 6 in
Flow: 189.8 m³/hr Flow: 94.93 m³/hr Flow: 94.93 m³/hr
Vel: 0.991 m/sec Chiller #2 Vel: 1.416 m/sec Set @ 94.93 m³/hr Vel: 1.416 m/sec
Filter #c
TH: (13.22) m Flow: 94.93 m³/hr
Flow: 189.9 m³/hr
NPSHa: 39.05 m dP: 0.2 bar
dP: 1 bar ELECTRIC Building OFFICE BUILDING WTP
Ps: 2.779 bar g
Pd: 4.074 bar g Flow: 151.4 m³/hr Flow: 24.1 m³/hr Flow: 14 m³/hr
dP: 1.803 bar dP: 2 bar dP: 2.124 bar

Ø: 10 in Ø: 10 in
Flow: 189.8 m³/hr Flow: 0.29 m³/hr
P: 3 bar g
Vel: 0.991 m/sec Vel: 0.002 m/sec
El: 12 m

Flow: 151.4 m³/hr


Vel: 1.258 m/sec
Flow: 189.5 m³/hr

Flow: 151.4 m³/hr


Vel: 0.99 m/sec

Ø: 8 in
Ø: 8 in

dP: 0.2 bar


Flow: 151.4 m³/hr

Ø: 10 in

Filter #1
Vel: 1.258 m/sec Set @ 151.4 m³/hr

g 151.4 m³/hr
El: 12 m Vel: 1.258 m/sec
TH: (22.95) m
NPSHa: 39.12 m
Ps: 2.785 bar g
Ø: 8 in Pd: 5.035 bar g

Ø: 8 in
Flow: 151.4 m³/hr

Flow:
Vel: 1.258 m/sec

P: 5.017 bar
P: 3 bar g

Vel: 0.359 m/sec


El: 12 m

Ø: 8 in Ø: 8 in

Flow: 24.1 m³/hr


Flow: 151.4 m³/hr
P: 2.998 bar g Flow: 151.4 m³/hr P: 4.565 bar g
Vel: 1.258 m/sec
El: 12 m Vel: 1.258 m/sec El: 16 m

Ø: 6 in

Vel: 0.816 m/sec


Ø: 8 in

Flow: 14 m³/hr
Ø: 8 in
Filter #2

Ø: 3 in
Ø: 8 in

Set @ 151.4 m³/hr


Vel: 0.199 m/sec
Flow: 38.1 m³/hr
Ø: 10 in

Flow: 38.1 m³/hr


dP: 0.2 bar

Ø: 6 in
Filter #3

Flow: 38.1 m³/hr

Vel: 0.568 m/sec


Vel: 0.568 m/sec Set @ 38.1 m³/hr

Flow: 38.1 m³/hr


Vel: 0.568 m/sec
Flow: 38.1 m³/hr

TH: (24.47) m
NPSHa: 39.23 m
Ps: 2.796 bar g
Pd: 5.195 bar g

Ø: 6 in
Ø: 6 in

P: 5.191 bar g
P: 2.999 bar g

Ø: 6 in Ø: 6 in Ø: 6 in

El: 12 m
Flow: 38.1 m³/hr
P: 2.999 bar g Flow: 38.1 m³/hr P: 5.187 bar g Flow: 24.1 m³/hr
FCV @ 24.1 m³/hr
El: 12 m

Vel: 0.568 m/sec Vel: 0.568 m/sec Vel: 0.359 m/sec

Vel: 0.816 m/sec


El: 12 m El: 12 m dP: 0.142 bar

Flow: 14 m³/hr
Ø: 6 in

Ø: 3 in
Filter #4

Ø: 6 in Ø: 6 in Ø: 3 in
P: 5.179 bar g Flow: 14 m³/hr P: 5.174 bar g
Set @ 38.1 m³/hr Vel: 0.816 m/sec
El: 12 m El: 12 m

Lineup: Diseño (110%) Darcy-Weisbach PIPE-FLO 2009


System: HVAC Chilled water circuit Flow: m³/hr
Date: 10/09/13 7:07 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Chilled water circuit 10/09/13 7:07 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 19.46 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

A112_Sch80 A112 / 80 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Chilled water (cold) Water 7 5 999.9 1.371 0.01003 / 220.6
Chilled water (hot) Water 12 5 999.6 1.206 0.01403 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:07 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
By-Pass Line ~N{043} Buffer tank 0.29 0.002 0 0
Pipe{005} ~N{003} ~N{004} 189.9 0.992 0.008 0.078
Pipe{006} Primary Pumps #2 ~N{003} 94.93 1.416 0.234 0.386
Pipe{007} Primary Pumps #1 ~N{003} X Closed --- --- --- ---
Pipe{008} Primary Pumps #3 ~N{003} 94.93 1.416 0.234 0.386
Pipe{012} ~N{004} Chiller #2 189.9 0.992 (0.189) 0.066
Pipe{013} ~N{004} Chiller #1 X Closed --- --- --- ---
Pipe{014} Chiller #1 ~N{011} X Closed --- --- --- ---
Pipe{015} Chiller #2 ~N{011} 189.8 0.991 0.159 0.117
Pipe{020} ~N{015} ~N{013} 38.1 0.199 0 0.001
Pipe{022} Buffer tank ~N{009} 189.9 0.992 0 0.01
Pipe{023} ~N{013} ~N{016} 38.1 0.568 0 0.004
Pipe{024} ~N{015} ~N{017} 151.4 1.258 0.001 0.014
Pipe{027} ~N{017} Filter #1 151.4 1.258 0 0.007
Pipe{028} ~N{017} Filter #2 X Closed --- --- --- ---
Pipe{029} Electric Building Pumps #1 ~N{022} 151.4 1.258 0.018 0.189
Pipe{030} Electric Building Pumps #2 ~N{022} X Closed --- --- --- ---
Pipe{033} ~N{023} ~N{026} 38.1 0.568 0.004 0.041
Pipe{034} ~N{022} ~N{025} 151.4 1.258 0.452 0.611
Pipe{036} ~N{026} ~N{041} 14 0.816 0.008 0.086
Pipe{038} ~N{033} ~N{029} 24.11 0.36 (0.385) 0.067
Pipe{039} ~N{029} ~N{031} 38.11 0.568 0.001 0.011
Pipe{040} ~N{032} ~N{031} 151.5 1.259 (0.338) 0.554
Pipe{041} ~N{031} ~N{042} 189.6 1.576 0.005 0.051
Pipe{043} ~N{025} ELECTRIC Building 151.4 1.258 0.145 0.475
Pipe{044} ELECTRIC Building ~N{032} 151.5 1.259 (0.055) 0.437
Pipe{045} ~N{034} OFFICE BUILDING 24.1 0.359 0.011 0.114
Pipe{046} OFFICE BUILDING ~N{033} 24.11 0.36 0.008 0.086
Pipe{047} ~N{036} WTP 14 0.816 0.015 0.156
Pipe{048} WTP ~N{035} 14.01 0.817 0.018 0.187
Pipe{051} ~N{009} Filter #a X Closed --- --- --- ---
Pipe{052} Filter #a Primary Pumps #1 X Closed --- --- --- ---
Pipe{053} Filter #b Primary Pumps #2 94.93 1.416 0.018 0.184
Pipe{054} Filter #c Primary Pumps #3 94.93 1.416 0.018 0.184
Pipe{055} ~N{009} Filter #b 94.93 1.416 0.002 0.024
Pipe{056} ~N{009} Filter #c 94.93 1.416 0.002 0.024
Pipe{057} ~N{026} ~N{034} 24.1 0.359 0.4 0.08
Pipe{058} Filter #1 Electric Building Pumps #1 151.4 1.258 0.012 0.125
Pipe{059} Filter #2 Electric Building Pumps #2 X Closed --- --- --- ---
Pipe{062} Filter #3 Office & WTP Building Pu.. 38.1 0.568 0.003 0.028
Pipe{063} ~N{016} Filter #3 38.1 0.568 0 0.002
Pipe{064} Office & WTP Building Pu.. ~N{023} 38.1 0.568 0.004 0.042
Pipe{065} ~N{016} Filter #4 X Closed --- --- --- ---
Pipe{066} Filter #4 Office & WTP Building Pu.. X Closed --- --- --- ---
Pipe{067} Office & WTP Building Pu.. ~N{023} X Closed --- --- --- ---
Pipe{068} ~N{041} ~N{036} 14 0.816 0.005 0.05
Pipe{069} ~N{042} Buffer tank 189.6 1.576 0.005 0.051
Pipe{070} ~N{011} ~N{043} 189.8 0.991 (0.185) 0.109
Pipe{071} ~N{035} ~N{029} 14 0.816 0.005 0.05
Pipe70 ~N{043} ~N{015} 189.5 0.99 0 0.005

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:07 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{003} 14 3.84 53.19
~N{004} 14 3.833 53.11
~N{009} 12 2.999 42.59
~N{011} 14 2.815 42.71
~N{013} 12 2.999 42.6
~N{015} 12 3 42.6
~N{016} 12 2.999 42.59
~N{017} 12 2.998 42.58
~N{022} 12 5.017 63.18
~N{023} 12 5.191 64.95
~N{025} 16 4.565 62.57
~N{026} 12 5.187 64.91
~N{029} 12 3.011 42.72
~N{031} 12 3.01 42.72
~N{032} 16 2.672 43.27
~N{033} 16 2.626 42.79
~N{035} 12 3.016 42.77
~N{036} 12 5.174 64.78
~N{041} 12 5.179 64.83
~N{042} 12 3.005 42.66
~N{043} 12 3 42.6

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:07 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Electric Building Pumps #1 151.4 (22.95) (2.25) --- 39.12 2.785 5.035 12 12
Office & WTP Building Pumps #1 38.1 (24.47) (2.399) --- 39.23 2.796 5.195 12 12
Primary Pumps #2 94.93 (13.22) (1.296) --- 39.05 2.779 4.074 12 12
Primary Pumps #3 94.93 (13.22) (1.296) --- 39.05 2.779 4.074 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 189.9 10.2 1 4.022 2.973 12 12.5
ELECTRIC Building 151.4 18.39 1.803 4.42 2.617 17 17
Filter #1 151.4 2.04 0.2 2.998 2.798 12 12
Filter #3 38.1 2.04 0.2 2.999 2.799 12 12
Filter #b 94.93 2.04 0.2 2.997 2.797 12 12
Filter #c 94.93 2.04 0.2 2.997 2.797 12 12
OFFICE BUILDING 24.1 20.4 2 4.634 2.634 16 16
WTP 14 21.67 2.124 5.158 3.034 12 12

Controls
Control Set Value Elev Flow Status dP HL Inlet Outlet
m m³/hr bar m bar g bar g
~N{034} FCV: 24.1 16 24.1 0.142 1.447 4.787 4.645

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:07 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 3 0 12 0 3 42.61
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
By-Pass Line @ 0 m 0.29 3 42.6
Pipe{022} @ 0 m 189.9 3 42.6
Pipe{069} @ 0 m 189.6 3 42.61

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:07 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

By-Pass Line rev: 28/08/13 5:28 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 20 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
0.29 0.2225 0.002 0 0
5
0.008 10
0 0 0 0 0
0.048 1.335 0 0 0 4
0.007 10
0.097 0.6676 0 0 0 3
0.006 10
0.145 0.4451 0 0 0
2
0.193 0.3338 0.001 0 0 0.005 10
0.242 0.267 0.001 0 0
0.004
0.29 0.2225 0.002 0 0
0.338 0.1907 0.002 0 0 0.003
0.387 0.1669 0.002 0 0
0.002
0.435 0.1484 0.002 0 0
0.483 0.1335 0.003 0 0 0.001
0.532 0.1214 0.003 0 0
0.58 0.1113 0.003 0 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 0 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{005} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 18 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
189.9 0.0168 0.992 0.008 0.002
5
0.04 10
0 0 0 0 0
31.65 0.02301 0.165 0 0 4
0.035 10
63.3 0.02003 0.331 0 0 3
0.03 10
94.95 0.01865 0.496 0.002 0
2
126.6 0.01781 0.661 0.004 0 0.025 10
158.3 0.01723 0.826 0.005 0.001
0.02
189.9 0.0168 0.992 0.008 0.002
221.5 0.01647 1.157 0.01 0.003 0.015
253.2 0.0162 1.322 0.013 0.003
0.01
284.9 0.01598 1.488 0.017 0.004
316.5 0.01579 1.653 0.02 0.005 0.005
348.2 0.01564 1.818 0.024 0.007
379.8 0.0155 1.984 0.029 0.008 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 23 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{006} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
94.93 0.01797 1.416 0.234 0.032
5
0.4 10
0 0 0 0.196 0
15.82 0.02423 0.236 0.197 0 4
0.35 10
31.64 0.02117 0.472 0.2 0.004 3
0.3 10
47.47 0.01978 0.708 0.206 0.008
2
63.29 0.01895 0.944 0.213 0.014 0.25 10
79.11 0.01839 1.18 0.222 0.022
0.2
94.93 0.01797 1.416 0.234 0.032
110.8 0.01766 1.652 0.247 0.044 0.15
126.6 0.0174 1.888 0.263 0.057
0.1
142.4 0.0172 2.124 0.281 0.072
158.2 0.01703 2.36 0.3 0.089 0.05
174 0.01688 2.596 0.322 0.108
189.9 0.01675 2.832 0.346 0.128 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{008} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
94.93 0.01797 1.416 0.234 0.032
5
0.4 10
0 0 0 0.196 0
15.82 0.02423 0.236 0.197 0 4
0.35 10
31.64 0.02117 0.472 0.2 0.004 3
0.3 10
47.47 0.01978 0.708 0.206 0.008
2
63.29 0.01895 0.944 0.213 0.014 0.25 10
79.11 0.01839 1.18 0.222 0.022
0.2
94.93 0.01797 1.416 0.234 0.032
110.8 0.01766 1.652 0.247 0.044 0.15
126.6 0.0174 1.888 0.263 0.057
0.1
142.4 0.0172 2.124 0.281 0.072
158.2 0.01703 2.36 0.3 0.089 0.05
174 0.01688 2.596 0.322 0.108
189.9 0.01675 2.832 0.346 0.128 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{012} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
189.9 0.0168 0.992 -0.189 0.005
5
0.15 10
0 0 0 -0.196 0
31.65 0.02301 0.165 -0.196 0 4
0.1 10
63.3 0.02003 0.331 -0.195 0 3
0.05 10
94.95 0.01865 0.496 -0.194 0.001
2
126.6 0.01781 0.661 -0.193 0.002 0 10
158.3 0.01723 0.826 -0.191 0.003
-0.05
189.9 0.0168 0.992 -0.189 0.005
221.5 0.01647 1.157 -0.187 0.007 -0.1
253.2 0.0162 1.322 -0.185 0.009
-0.15
284.9 0.01598 1.488 -0.182 0.011
316.5 0.01579 1.653 -0.178 0.014 -0.2
348.2 0.01564 1.818 -0.175 0.017
379.8 0.0155 1.984 -0.17 0.02 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 74 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12.5 m out: 14 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
189.8 0.0171 0.991 0.159 0.01
5
0.16 10
0 0 0 0.147 0
31.63 0.02366 0.165 0.147 0 4
0.14 10
63.27 0.02052 0.33 0.148 0.001 3
0.12 10
94.9 0.01906 0.496 0.15 0.002
2
126.5 0.01817 0.661 0.152 0.004 0.1 10
158.2 0.01755 0.826 0.155 0.007
0.08
189.8 0.0171 0.991 0.159 0.01
221.4 0.01674 1.156 0.163 0.013 0.06
253.1 0.01646 1.322 0.167 0.018
0.04
284.7 0.01622 1.487 0.173 0.022
316.3 0.01602 1.652 0.179 0.027 0.02
348 0.01585 1.817 0.185 0.033
379.6 0.0157 1.983 0.193 0.04 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014 1 x Elbow - Standard 45° 0.2138

FFT: 0.01337 Total K: 2.018 Avg Percent of Total Loss: 87 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{020} rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 6 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
38.1 0.02273 0.199 0 0
5
0.008 10
0 0 0 0 0
6.35 0.03556 0.033 0 0 4
0.007 10
12.7 0.02943 0.066 0 0 3
0.006 10
19.05 0.0266 0.099 0 0
2
25.4 0.02486 0.133 0 0 0.005 10
31.75 0.02365 0.166 0 0
0.004
38.1 0.02273 0.199 0 0
44.45 0.02201 0.232 0 0 0.003
50.8 0.02142 0.265 0 0
0.002
57.15 0.02093 0.298 0 0
63.5 0.0205 0.332 0 0 0.001
69.85 0.02014 0.365 0 0
76.2 0.01982 0.398 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{022} rev: 06/06/13 5:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 3 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
189.9 0.01709 0.992 0 0
5
0.008 10
0 0 0 0 0
31.65 0.02366 0.165 0 0 4
0.007 10
63.3 0.02052 0.331 0 0 3
0.006 10
94.95 0.01906 0.496 0 0
2
126.6 0.01817 0.661 0 0 0.005 10
158.3 0.01755 0.826 0 0
0.004
189.9 0.01709 0.992 0 0
221.5 0.01674 1.157 0.001 0 0.003
253.2 0.01645 1.322 0.002 0
0.002
284.9 0.01622 1.488 0.002 0
316.5 0.01602 1.653 0.003 0 0.001
348.2 0.01585 1.818 0.003 0
379.8 0.0157 1.984 0.004 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{023} rev: 03/06/13 4:39 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
38.1 0.02095 0.568 0 0
5
0.008 10
0 0 0 0 0
6.35 0.03097 0.095 0 0 4
0.007 10
12.7 0.02616 0.189 0 0 3
0.006 10
19.05 0.02394 0.284 0 0
2
25.4 0.02259 0.379 0 0 0.005 10
31.75 0.02165 0.474 0 0
0.004
38.1 0.02095 0.568 0 0
44.45 0.02041 0.663 0 0 0.003
50.8 0.01997 0.758 0 0
0.002
57.15 0.0196 0.852 0 0
63.5 0.0193 0.947 0.001 0 0.001
69.85 0.01903 1.042 0.001 0
76.2 0.0188 1.137 0.002 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{024} rev: 11/06/13 2:26 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
151.4 0.01739 1.258 0.001 0
5
0.008 10
0 0 0 0 0
25.23 0.02377 0.21 0 0 4
0.007 10
50.47 0.02069 0.419 0 0 3
0.006 10
75.7 0.01927 0.629 0 0
2
100.9 0.01841 0.839 0 0 0.005 10
126.2 0.01783 1.049 0 0
0.004
151.4 0.01739 1.258 0.001 0
176.6 0.01706 1.468 0.002 0 0.003
201.9 0.01679 1.678 0.002 0
0.002
227.1 0.01657 1.887 0.003 0
252.3 0.01639 2.097 0.003 0 0.001
277.6 0.01623 2.307 0.004 0
302.8 0.01609 2.517 0.005 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
151.4 0.01739 1.258 0 0
5
0.008 10
0 0 0 0 0
25.23 0.02377 0.21 0 0 4
0.007 10
50.47 0.02069 0.419 0 0 3
0.006 10
75.7 0.01927 0.629 0 0
2
100.9 0.01841 0.839 0 0 0.005 10
126.2 0.01783 1.049 0 0
0.004
151.4 0.01739 1.258 0 0
176.6 0.01706 1.468 0 0 0.003
201.9 0.01679 1.678 0.001 0
0.002
227.1 0.01657 1.887 0.001 0
252.3 0.01639 2.097 0.002 0 0.001
277.6 0.01623 2.307 0.002 0
302.8 0.01609 2.517 0.002 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{029} rev: 11/06/13 2:35 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
151.4 0.01739 1.258 0.018 0.017
5
0.08 10
0 0 0 0 0
25.23 0.02377 0.21 0 0 4
0.07 10
50.47 0.02069 0.419 0.002 0.002 3
0.06 10
75.7 0.01927 0.629 0.005 0.004
2
100.9 0.01841 0.839 0.008 0.008 0.05 10
126.2 0.01783 1.049 0.013 0.012
0.04
151.4 0.01739 1.258 0.018 0.017
176.6 0.01706 1.468 0.025 0.023 0.03
201.9 0.01679 1.678 0.033 0.031
0.02
227.1 0.01657 1.887 0.041 0.039
252.3 0.01639 2.097 0.051 0.048 0.01
277.6 0.01623 2.307 0.062 0.058
302.8 0.01609 2.517 0.074 0.069 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6305 1 x Swing Check - Vertical 0.7006 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.172 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{033} rev: 06/06/13 6:57 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
38.1 0.02095 0.568 0.004 0.003
5
0.016 10
0 0 0 0 0
6.35 0.03097 0.095 0 0 4
0.014 10
12.7 0.02616 0.189 0 0 3
0.012 10
19.05 0.02394 0.284 0.001 0
2
25.4 0.02259 0.379 0.002 0.001 0.01 10
31.75 0.02165 0.474 0.003 0.002
0.008
38.1 0.02095 0.568 0.004 0.003
44.45 0.02041 0.663 0.005 0.004 0.006
50.8 0.01997 0.758 0.007 0.005
0.004
57.15 0.0196 0.852 0.009 0.006
63.5 0.0193 0.947 0.011 0.008 0.002
69.85 0.01903 1.042 0.013 0.01
76.2 0.0188 1.137 0.015 0.012 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 65 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{034} rev: 28/08/13 5:42 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.9 10
151.4 0.01739 1.258 0.452 0.013
5
0.8 10
0 0 0 0.392 0
25.23 0.02377 0.21 0.394 0 4
0.7 10
50.47 0.02069 0.419 0.4 0.001 3
0.6 10
75.7 0.01927 0.629 0.408 0.003
2
100.9 0.01841 0.839 0.42 0.006 0.5 10
126.2 0.01783 1.049 0.435 0.009
0.4
151.4 0.01739 1.258 0.452 0.013
176.6 0.01706 1.468 0.472 0.018 0.3
201.9 0.01679 1.678 0.496 0.024
0.2
227.1 0.01657 1.887 0.522 0.03
252.3 0.01639 2.097 0.551 0.037 0.1
277.6 0.01623 2.307 0.583 0.045
302.8 0.01609 2.517 0.618 0.053 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.681 Avg Percent of Total Loss: 22 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{036} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
14 0.02318 0.816 0.008 0.003
5
0.04 10
0 0 0 0 0
2.333 0.03417 0.136 0 0 4
0.035 10
4.667 0.0288 0.272 0.001 0 3
0.03 10
7 0.02637 0.408 0.002 0
2
9.333 0.02491 0.544 0.004 0.002 0.025 10
11.67 0.02392 0.68 0.006 0.002
0.02
14 0.02318 0.816 0.008 0.003
16.33 0.02262 0.952 0.011 0.005 0.015
18.67 0.02216 1.088 0.015 0.006
0.01
21 0.02178 1.224 0.018 0.008
23.33 0.02147 1.36 0.022 0.01 0.005
25.67 0.0212 1.497 0.027 0.012
28 0.02097 1.633 0.032 0.014 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 1.038 Avg Percent of Total Loss: 38 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
24.11 0.02226 0.36 -0.385 0
5
0.3 10
0 0 0 -0.392 0
4.018 0.03383 0.06 -0.392 0 4
0.2 10
8.037 0.02827 0.12 -0.391 0 3
0.1 10
12.05 0.02571 0.18 -0.39 0
2
16.07 0.02415 0.24 -0.389 0 0 10
20.09 0.02307 0.3 -0.387 0
-0.1
24.11 0.02226 0.36 -0.385 0
28.13 0.02162 0.42 -0.383 0 -0.2
32.15 0.02111 0.479 -0.381 0
-0.3
36.17 0.02068 0.539 -0.378 0
40.18 0.02032 0.599 -0.375 0 -0.4
44.2 0.02001 0.659 -0.372 0
48.22 0.01973 0.719 -0.369 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 06/06/13 6:55 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
38.11 0.0205 0.568 0.001 0
5
0.008 10
0 0 0 0 0
6.352 0.02997 0.095 0 0 4
0.007 10
12.7 0.02541 0.189 0 0 3
0.006 10
19.06 0.02332 0.284 0 0
2
25.41 0.02204 0.379 0 0 0.005 10
31.76 0.02116 0.474 0 0
0.004
38.11 0.0205 0.568 0.001 0
44.46 0.01999 0.663 0.001 0 0.003
50.81 0.01957 0.758 0.002 0
0.002
57.16 0.01923 0.853 0.002 0
63.52 0.01894 0.947 0.003 0 0.001
69.87 0.01869 1.042 0.003 0
76.22 0.01848 1.137 0.004 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{040} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
151.5 0.01711 1.259 -0.338 0.008
5
0.3 10
0 0 0 -0.392 0
25.25 0.02313 0.21 -0.39 0 4
0.2 10
50.5 0.02021 0.42 -0.385 0 3
0.1 10
75.75 0.01887 0.63 -0.377 0.002
2
101 0.01807 0.839 -0.367 0.004 0 10
126.2 0.01752 1.049 -0.354 0.006
-0.1
151.5 0.01711 1.259 -0.338 0.008
176.8 0.0168 1.469 -0.319 0.011 -0.2
202 0.01655 1.679 -0.298 0.015
-0.3
227.3 0.01635 1.889 -0.274 0.019
252.5 0.01618 2.099 -0.248 0.023 -0.4
277.8 0.01603 2.308 -0.219 0.028
303 0.0159 2.518 -0.188 0.034 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 45° 0.2242 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.065 Avg Percent of Total Loss: 15 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{041} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
189.6 0.01667 1.576 0.005 0
5
0.016 10
0 0 0 0 0
31.6 0.02209 0.263 0 0 4
0.014 10
63.2 0.01944 0.525 0 0 3
0.012 10
94.8 0.01824 0.788 0.001 0
2
126.4 0.01752 1.051 0.002 0 0.01 10
158 0.01703 1.313 0.004 0
0.008
189.6 0.01667 1.576 0.005 0
221.2 0.01639 1.838 0.007 0 0.006
252.8 0.01617 2.101 0.009 0
0.004
284.4 0.016 2.364 0.011 0
316 0.01585 2.626 0.013 0 0.002
347.6 0.01572 2.889 0.016 0
379.2 0.01561 3.152 0.019 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 28/08/13 5:48 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 40 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 17 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
151.4 0.01739 1.258 0.145 0.02
5
0.4 10
0 0 0 0.098 0
25.23 0.02377 0.21 0.1 0 4
0.35 10
50.47 0.02069 0.419 0.104 0.002 3
0.3 10
75.7 0.01927 0.629 0.11 0.005
2
100.9 0.01841 0.839 0.119 0.009 0.25 10
126.2 0.01783 1.049 0.131 0.014
0.2
151.4 0.01739 1.258 0.145 0.02
176.6 0.01706 1.468 0.161 0.027 0.15
201.9 0.01679 1.678 0.179 0.035
0.1
227.1 0.01657 1.887 0.2 0.045
252.3 0.01639 2.097 0.223 0.055 0.05
277.6 0.01623 2.307 0.249 0.067
302.8 0.01609 2.517 0.276 0.08 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.522 Avg Percent of Total Loss: 42 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 28/08/13 5:49 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 40 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 17 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.08 10
151.5 0.01711 1.259 -0.055 0.017
5
0.06 10
0 0 0 -0.098 0
25.25 0.02313 0.21 -0.097 0 4
0.04 10
50.5 0.02021 0.42 -0.093 0.002 3
0.02 10
75.75 0.01887 0.63 -0.087 0.004
2
101 0.01807 0.839 -0.078 0.007 0 10
126.2 0.01752 1.049 -0.068 0.012
-0.02
151.5 0.01711 1.259 -0.055 0.017
176.8 0.0168 1.469 -0.04 0.023 -0.04
202 0.01655 1.679 -0.023 0.03
-0.06
227.3 0.01635 1.889 -0.004 0.037
252.5 0.01618 2.099 0.017 0.046 -0.08
277.8 0.01603 2.308 0.04 0.056
303 0.0159 2.518 0.066 0.066 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
5 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.102 Avg Percent of Total Loss: 38 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 90 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
24.1 0.02282 0.359 0.011 0.003
5
0.04 10
0 0 0 0 0
4.017 0.03506 0.06 0 0 4
0.035 10
8.033 0.02917 0.12 0.002 0 3
0.03 10
12.05 0.02647 0.18 0.003 0
2
16.07 0.02482 0.24 0.005 0.001 0.025 10
20.08 0.02368 0.3 0.008 0.002
0.02
24.1 0.02282 0.359 0.011 0.003
28.12 0.02215 0.419 0.015 0.004 0.015
32.13 0.0216 0.479 0.019 0.005
0.01
36.15 0.02115 0.539 0.024 0.006
40.17 0.02076 0.599 0.029 0.007 0.005
44.18 0.02043 0.659 0.035 0.009
48.2 0.02014 0.719 0.041 0.01 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
9 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 4.021 Avg Percent of Total Loss: 21 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 90 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
24.11 0.02226 0.36 0.008 0
5
0.04 10
0 0 0 0 0
4.018 0.03383 0.06 0 0 4
0.035 10
8.037 0.02827 0.12 0.001 0 3
0.03 10
12.05 0.02571 0.18 0.002 0
2
16.07 0.02415 0.24 0.004 0 0.025 10
20.09 0.02307 0.3 0.006 0
0.02
24.11 0.02226 0.36 0.008 0
28.13 0.02162 0.42 0.011 0 0.015
32.15 0.02111 0.479 0.014 0
0.01
36.17 0.02068 0.539 0.018 0
40.18 0.02032 0.599 0.021 0 0.005
44.2 0.02001 0.659 0.025 0
48.22 0.01973 0.719 0.03 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{047} rev: 28/08/13 5:45 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
14 0.02318 0.816 0.015 0.01
5
0.08 10
0 0 0 0 0
2.333 0.03417 0.136 0 0 4
0.07 10
4.667 0.0288 0.272 0.002 0.001 3
0.06 10
7 0.02637 0.408 0.004 0.003
2
9.333 0.02491 0.544 0.007 0.005 0.05 10
11.67 0.02392 0.68 0.011 0.007
0.04
14 0.02318 0.816 0.015 0.01
16.33 0.02262 0.952 0.021 0.014 0.03
18.67 0.02216 1.088 0.027 0.018
0.02
21 0.02178 1.224 0.034 0.023
23.33 0.02147 1.36 0.041 0.029 0.01
25.67 0.0212 1.497 0.05 0.035
28 0.02097 1.633 0.059 0.041 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 3.115 Avg Percent of Total Loss: 67 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{048} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 12 °C
Length: 10 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
14.01 0.02271 0.817 0.018 0.009
5
0.08 10
0 0 0 0 0
2.335 0.03304 0.136 0 0 4
0.07 10
4.67 0.02798 0.272 0.002 0 3
0.06 10
7.005 0.02569 0.408 0.005 0.002
2
9.34 0.02433 0.545 0.008 0.004 0.05 10
11.67 0.02339 0.681 0.013 0.006
0.04
14.01 0.02271 0.817 0.018 0.009
16.34 0.02218 0.953 0.025 0.012 0.03
18.68 0.02175 1.089 0.032 0.015
0.02
21.02 0.0214 1.225 0.04 0.019
23.35 0.02111 1.361 0.049 0.024 0.01
25.68 0.02086 1.498 0.059 0.029
28.02 0.02064 1.634 0.07 0.035 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 2.596 Avg Percent of Total Loss: 46 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{053} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
94.93 0.01826 1.416 0.018 0.016
5
0.08 10
0 0 0 0 0
15.82 0.02491 0.236 0 0 4
0.07 10
31.64 0.02166 0.472 0.002 0.002 3
0.06 10
47.47 0.02019 0.708 0.005 0.004
2
63.29 0.0193 0.944 0.008 0.007 0.05 10
79.11 0.0187 1.18 0.013 0.011
0.04
94.93 0.01826 1.416 0.018 0.016
110.8 0.01792 1.652 0.024 0.021 0.03
126.6 0.01765 1.888 0.032 0.028
0.02
142.4 0.01742 2.124 0.04 0.035
158.2 0.01724 2.36 0.05 0.043 0.01
174 0.01708 2.596 0.06 0.053
189.9 0.01694 2.832 0.071 0.063 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 86 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{054} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
94.93 0.01826 1.416 0.018 0.016
5
0.08 10
0 0 0 0 0
15.82 0.02491 0.236 0 0 4
0.07 10
31.64 0.02166 0.472 0.002 0.002 3
0.06 10
47.47 0.02019 0.708 0.005 0.004
2
63.29 0.0193 0.944 0.008 0.007 0.05 10
79.11 0.0187 1.18 0.013 0.011
0.04
94.93 0.01826 1.416 0.018 0.016
110.8 0.01792 1.652 0.024 0.021 0.03
126.6 0.01765 1.888 0.032 0.028
0.02
142.4 0.01742 2.124 0.04 0.035
158.2 0.01724 2.36 0.05 0.043 0.01
174 0.01708 2.596 0.06 0.053
189.9 0.01694 2.832 0.071 0.063 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 86 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{055} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
94.93 0.01826 1.416 0.002 0
5
0.008 10
0 0 0 0 0
15.82 0.02491 0.236 0 0 4
0.007 10
31.64 0.02166 0.472 0 0 3
0.006 10
47.47 0.02019 0.708 0 0
2
63.29 0.0193 0.944 0.001 0 0.005 10
79.11 0.0187 1.18 0.002 0
0.004
94.93 0.01826 1.416 0.002 0
110.8 0.01792 1.652 0.003 0 0.003
126.6 0.01765 1.888 0.004 0
0.002
142.4 0.01742 2.124 0.005 0
158.2 0.01724 2.36 0.006 0 0.001
174 0.01708 2.596 0.007 0
189.9 0.01694 2.832 0.009 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{056} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
94.93 0.01826 1.416 0.002 0
5
0.008 10
0 0 0 0 0
15.82 0.02491 0.236 0 0 4
0.007 10
31.64 0.02166 0.472 0 0 3
0.006 10
47.47 0.02019 0.708 0 0
2
63.29 0.0193 0.944 0.001 0 0.005 10
79.11 0.0187 1.18 0.002 0
0.004
94.93 0.01826 1.416 0.002 0
110.8 0.01792 1.652 0.003 0 0.003
126.6 0.01765 1.888 0.004 0
0.002
142.4 0.01742 2.124 0.005 0
158.2 0.01724 2.36 0.006 0 0.001
174 0.01708 2.596 0.007 0
189.9 0.01694 2.832 0.009 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{057} rev: 28/08/13 5:43 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
24.1 0.02282 0.359 0.4 0.001
5
0.4 10
0 0 0 0.392 0
4.017 0.03506 0.06 0.392 0 4
0.35 10
8.033 0.02917 0.12 0.393 0 3
0.3 10
12.05 0.02647 0.18 0.394 0
2
16.07 0.02482 0.24 0.396 0 0.25 10
20.08 0.02368 0.3 0.398 0
0.2
24.1 0.02282 0.359 0.4 0.001
28.12 0.02215 0.419 0.403 0.002 0.15
32.13 0.0216 0.479 0.405 0.002
0.1
36.15 0.02115 0.539 0.409 0.003
40.17 0.02076 0.599 0.412 0.003 0.05
44.18 0.02043 0.659 0.416 0.004
48.2 0.02014 0.719 0.42 0.005 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 13 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{058} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
151.4 0.01739 1.258 0.012 0.012
5
0.04 10
0 0 0 0 0
25.23 0.02377 0.21 0 0 4
0.035 10
50.47 0.02069 0.419 0.001 0.001 3
0.03 10
75.7 0.01927 0.629 0.003 0.003
2
100.9 0.01841 0.839 0.005 0.005 0.025 10
126.2 0.01783 1.049 0.009 0.008
0.02
151.4 0.01739 1.258 0.012 0.012
176.6 0.01706 1.468 0.017 0.016 0.015
201.9 0.01679 1.678 0.022 0.021
0.01
227.1 0.01657 1.887 0.028 0.026
252.3 0.01639 2.097 0.034 0.032 0.005
277.6 0.01623 2.307 0.041 0.039
302.8 0.01609 2.517 0.049 0.046 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Butterfly 0.6305

FFT: 0.01401 Total K: 1.471 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{062} rev: 06/06/13 7:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
38.1 0.02095 0.568 0.003 0.003
5
0.016 10
0 0 0 0 0
6.35 0.03097 0.095 0 0 4
0.014 10
12.7 0.02616 0.189 0 0 3
0.012 10
19.05 0.02394 0.284 0 0
2
25.4 0.02259 0.379 0.001 0.001 0.01 10
31.75 0.02165 0.474 0.002 0.002
0.008
38.1 0.02095 0.568 0.003 0.003
44.45 0.02041 0.663 0.004 0.003 0.006
50.8 0.01997 0.758 0.005 0.004
0.004
57.15 0.0196 0.852 0.006 0.006
63.5 0.0193 0.947 0.008 0.007 0.002
69.85 0.01903 1.042 0.009 0.008
76.2 0.0188 1.137 0.011 0.01 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{063} rev: 03/06/13 4:40 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
38.1 0.02095 0.568 0 0
5
0.008 10
0 0 0 0 0
6.35 0.03097 0.095 0 0 4
0.007 10
12.7 0.02616 0.189 0 0 3
0.006 10
19.05 0.02394 0.284 0 0
2
25.4 0.02259 0.379 0 0 0.005 10
31.75 0.02165 0.474 0 0
0.004
38.1 0.02095 0.568 0 0
44.45 0.02041 0.663 0 0 0.003
50.8 0.01997 0.758 0 0
0.002
57.15 0.0196 0.852 0 0
63.5 0.0193 0.947 0 0 0.001
69.85 0.01903 1.042 0 0
76.2 0.0188 1.137 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{064} rev: 28/08/13 12:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
38.1 0.02095 0.568 0.004 0.004
5
0.016 10
0 0 0 0 0
6.35 0.03097 0.095 0 0 4
0.014 10
12.7 0.02616 0.189 0 0 3
0.012 10
19.05 0.02394 0.284 0.001 0
2
25.4 0.02259 0.379 0.002 0.002 0.01 10
31.75 0.02165 0.474 0.003 0.003
0.008
38.1 0.02095 0.568 0.004 0.004
44.45 0.02041 0.663 0.006 0.005 0.006
50.8 0.01997 0.758 0.007 0.007
0.004
57.15 0.0196 0.852 0.009 0.008
63.5 0.0193 0.947 0.011 0.01 0.002
69.85 0.01903 1.042 0.014 0.013
76.2 0.0188 1.137 0.016 0.015 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 89 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{068} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
14 0.02318 0.816 0.005 0
5
0.016 10
0 0 0 0 0
2.333 0.03417 0.136 0 0 4
0.014 10
4.667 0.0288 0.272 0 0 3
0.012 10
7 0.02637 0.408 0.001 0
2
9.333 0.02491 0.544 0.002 0 0.01 10
11.67 0.02392 0.68 0.004 0
0.008
14 0.02318 0.816 0.005 0
16.33 0.02262 0.952 0.007 0 0.006
18.67 0.02216 1.088 0.008 0
0.004
21 0.02178 1.224 0.01 0
23.33 0.02147 1.36 0.013 0 0.002
25.67 0.0212 1.497 0.015 0
28 0.02097 1.633 0.018 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{069} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
189.6 0.01667 1.576 0.005 0
5
0.016 10
0 0 0 0 0
31.6 0.02209 0.263 0 0 4
0.014 10
63.2 0.01944 0.525 0 0 3
0.012 10
94.8 0.01824 0.788 0.001 0
2
126.4 0.01752 1.051 0.002 0 0.01 10
158 0.01703 1.313 0.004 0
0.008
189.6 0.01667 1.576 0.005 0
221.2 0.01639 1.838 0.007 0 0.006
252.8 0.01617 2.101 0.009 0
0.004
284.4 0.016 2.364 0.011 0
316 0.01585 2.626 0.013 0 0.002
347.6 0.01572 2.889 0.016 0
379.2 0.01561 3.152 0.019 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{070} rev: 10/09/13 4:39 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 15 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
189.8 0.0171 0.991 -0.185 0.006
5
0.15 10
0 0 0 -0.196 0
31.63 0.02366 0.165 -0.196 0 4
0.1 10
63.27 0.02052 0.33 -0.195 0 3
0.05 10
94.9 0.01906 0.496 -0.193 0.001
2
126.5 0.01817 0.661 -0.191 0.003 0 10
158.2 0.01755 0.826 -0.189 0.004
-0.05
189.8 0.0171 0.991 -0.185 0.006
221.4 0.01674 1.156 -0.182 0.008 -0.1
253.1 0.01646 1.322 -0.177 0.01
-0.15
284.7 0.01622 1.487 -0.172 0.013
316.3 0.01602 1.652 -0.167 0.016 -0.2
348 0.01585 1.817 -0.161 0.02
379.6 0.0157 1.983 -0.155 0.024 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 55 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{071} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
14 0.02318 0.816 0.005 0
5
0.016 10
0 0 0 0 0
2.333 0.03417 0.136 0 0 4
0.014 10
4.667 0.0288 0.272 0 0 3
0.012 10
7 0.02637 0.408 0.001 0
2
9.333 0.02491 0.544 0.002 0 0.01 10
11.67 0.02392 0.68 0.004 0
0.008
14 0.02318 0.816 0.005 0
16.33 0.02262 0.952 0.007 0 0.006
18.67 0.02216 1.088 0.008 0
0.004
21 0.02178 1.224 0.01 0
23.33 0.02147 1.36 0.013 0 0.002
25.67 0.0212 1.497 0.015 0
28 0.02097 1.633 0.018 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:08 pm


Lineup: Diseño (110%)
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe70 rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 1.5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
189.5 0.0171 0.99 0 0
5
0.008 10
0 0 0 0 0
31.58 0.02367 0.165 0 0 4
0.007 10
63.17 0.02052 0.33 0 0 3
0.006 10
94.75 0.01906 0.495 0 0
2
126.3 0.01817 0.66 0 0 0.005 10
157.9 0.01756 0.825 0 0
0.004
189.5 0.0171 0.99 0 0
221.1 0.01674 1.155 0 0 0.003
252.7 0.01646 1.32 0 0
0.002
284.3 0.01622 1.485 0.001 0
315.8 0.01602 1.649 0.001 0 0.001
347.4 0.01585 1.814 0.002 0
379 0.01571 1.979 0.002 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 22 of 24

Appendix 5
HVAC Chilled Water Circuit - Operation Case (80%)
P: 3.009 bar g
Ø: 3 in

El: 12 m
Flow: 10.2 m³/hr
Vel: 0.595 m/sec

P: 2.618 bar g
Ø: 6 in P: 3.006 bar g Ø: 6 in

El: 16 m
Flow: 27.71 m³/hr El: 12 m Flow: 17.51 m³/hr
Vel: 0.413 m/sec Vel: 0.261 m/sec

P: 3.005 bar g
Ø: 10 in Ø: 6 in Ø: 6 in Ø: 8 in

El: 12 m
P: 3.003 bar g Flow: 137.9 m³/hr
Set @ 86.3 m³/hr Filter #a Vel: 1.146 m/sec

Flow: 137.9 m³/hr


Vel: 1.146 m/sec
Chiller #1 El: 12 m

P: 2.643 bar g
P: 2.813 bar g

Ø: 10 in

Ø: 6 in
Ø: 8 in

El: 16 m
Flow: 110.1 m³/hr
El: 14 m

Ø: 8 in
Vel: 0.915 m/sec

Ø: 10 in Ø: 6 in Ø: 6 in Ø: 6 in Ø: 10 in
Flow: 172.6 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
P: 3.835 bar g Vel: 1.287 m/sec Set @ 86.3 m³/hr
Flow: 86.3 m³/hr P: 2.999 barFlow:
g 172.6 m³/hr
Vel: 0.901 m/sec Filter #b Vel: 1.287 m/sec
Vel: 1.287 m/sec El: 12 m Vel: 0.901 m/secBuffer tank

Flow: 172.6 m³/hr

Flow: 110.1 m³/hr

Flow: 17.51 m³/hr


Vel: 0.901 m/sec

Vel: 1.287 m/sec

Vel: 0.915 m/sec

Vel: 0.261 m/sec

Vel: 0.595 m/sec


P: 3.828 bar g El: 14 m

Flow: 86.3 m³/hr

Flow: 10.2 m³/hr


TH: (13.05) m Flow: 86.3 m³/hr
El: 14 m NPSHa: 39.09 m dP: 0.2 bar
Ps: 2.782 bar g
Pd: 4.062 bar g

Ø: 10 in

Ø: 6 in

Ø: 8 in

Ø: 6 in

Ø: 3 in
Ø: 10 in Ø: 6 in Ø: 6 in
Flow: 172.5 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
Vel: 0.901 m/sec Chiller #2 Vel: 1.287 m/sec Set @ 86.3 m³/hr Vel: 1.287 m/secFilter #c
TH: (13.05) m Flow: 86.3 m³/hr
Flow: 172.6 m³/hr
NPSHa: 39.09 m dP: 0.2 bar
dP: 1 bar ELECTRIC Building OFFICE BUILDING WTP
Ps: 2.782 bar g
Pd: 4.062 bar g Flow: 110.1 m³/hr Flow: 17.5 m³/hr Flow: 10.2 m³/hr
dP: 0.953 bar dP: 1.067 bar dP: 1.138 bar

Ø: 10 in Ø: 10 in
Flow: 172.5 m³/hr Flow: 34.74 m³/hr
P: 3 bar g
Vel: 0.901 m/sec Vel: 0.181 m/sec
El: 12 m

Flow: 110.1 m³/hr


Vel: 0.915 m/sec
Flow: 137.8 m³/hr

Flow: 110.1 m³/hr


Vel: 0.72 m/sec

Ø: 8 in
Ø: 8 in

dP: 0.2 bar


Flow: 110.1 m³/hr

Ø: 10 in

Filter #1
Vel: 0.915 m/sec Set @ 110.1 m³/hr

g 110.1 m³/hr
El: 12 m Vel: 0.915 m/sec
TH: (13.13) m
NPSHa: 39.2 m
Ps: 2.793 bar g
Ø: 8 in Pd: 4.079 bar g

Ø: 8 in
Flow: 110.1 m³/hr

Flow:
Vel: 0.915 m/sec

P: 4.07 bar
P: 3 bar g

Vel: 0.261 m/sec


El: 12 m

Ø: 8 in Ø: 8 in

Flow: 17.5 m³/hr


Flow: 110.1 m³/hr
P: 2.999 bar g Flow: 110.1 m³/hr P: 3.645 bar g
Vel: 0.915 m/sec
El: 12 m Vel: 0.915 m/sec El: 16 m

Ø: 6 in

Vel: 0.595 m/sec


Ø: 8 in

Flow: 10.2 m³/hr


Ø: 8 in
Filter #2

Ø: 3 in
Ø: 8 in

Set @ 110.1 m³/hr


Vel: 0.145 m/sec
Flow: 27.7 m³/hr
Ø: 10 in

Flow: 27.7 m³/hr


dP: 0.2 bar

Ø: 6 in
Filter #3

Flow: 27.7 m³/hr

Vel: 0.413 m/sec


Vel: 0.413 m/sec Set @ 27.7 m³/hr

Flow: 27.7 m³/hr


Vel: 0.413 m/sec
Flow: 27.7 m³/hr

TH: (14.06) m
NPSHa: 39.25 m
Ps: 2.798 bar g
Pd: 4.176 bar g

Ø: 6 in
Ø: 6 in

P: 4.174 bar g
Ø: 6 in Ø: 6 in Ø: 6 in
P: 3 bar g

El: 12 m
El: 12 m

Flow: 27.7 m³/hr P: 3 bar g Flow: 27.7 m³/hr P: 4.172 bar g Flow: 17.5 m³/hr
Vel: 0.413 m/secEl: 12 m Vel: 0.413 m/sec Vel: 0.261 m/sec FCV @ 17.5 m³/hr

Vel: 0.595 m/sec


El: 12 m dP: 0.08 bar

Flow: 10.2 m³/hr


Ø: 6 in

Ø: 3 in
Filter #4

Ø: 6 in Ø: 6 in Ø: 3 in
P: 4.167 bar g Flow: 10.2 m³/hr P: 4.165 bar g
Set @ 27.7 m³/hr Vel: 0.595 m/sec
El: 12 m El: 12 m

Lineup: Operación 80% Darcy-Weisbach PIPE-FLO 2009


System: HVAC Chilled water circuit Flow: m³/hr
Date: 10/09/13 7:10 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Chilled water circuit 10/09/13 7:10 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 19.46 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

A112_Sch80 A112 / 80 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Chilled water (cold) Water 7 5 999.9 1.371 0.01003 / 220.6
Chilled water (hot) Water 12 5 999.6 1.206 0.01403 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:10 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
By-Pass Line ~N{043} Buffer tank 34.74 0.181 0 0.004
Pipe{005} ~N{003} ~N{004} 172.6 0.901 0.006 0.065
Pipe{006} Primary Pumps #2 ~N{003} 86.3 1.287 0.227 0.32
Pipe{007} Primary Pumps #1 ~N{003} X Closed --- --- --- ---
Pipe{008} Primary Pumps #3 ~N{003} 86.3 1.287 0.227 0.32
Pipe{012} ~N{004} Chiller #2 172.6 0.901 (0.191) 0.055
Pipe{013} ~N{004} Chiller #1 X Closed --- --- --- ---
Pipe{014} Chiller #1 ~N{011} X Closed --- --- --- ---
Pipe{015} Chiller #2 ~N{011} 172.5 0.901 0.157 0.097
Pipe{020} ~N{015} ~N{013} 27.7 0.145 0 0
Pipe{022} Buffer tank ~N{009} 172.6 0.901 0 0.008
Pipe{023} ~N{013} ~N{016} 27.7 0.413 0 0.003
Pipe{024} ~N{015} ~N{017} 110.1 0.915 0 0.008
Pipe{027} ~N{017} Filter #1 110.1 0.915 0 0.004
Pipe{028} ~N{017} Filter #2 X Closed --- --- --- ---
Pipe{029} Electric Building Pumps #1 ~N{022} 110.1 0.915 0.01 0.1
Pipe{030} Electric Building Pumps #2 ~N{022} X Closed --- --- --- ---
Pipe{033} ~N{023} ~N{026} 27.7 0.413 0.002 0.022
Pipe{034} ~N{022} ~N{025} 110.1 0.915 0.425 0.334
Pipe{036} ~N{026} ~N{041} 10.2 0.595 0.005 0.047
Pipe{038} ~N{033} ~N{029} 17.51 0.261 (0.388) 0.037
Pipe{039} ~N{029} ~N{031} 27.71 0.413 0 0.006
Pipe{040} ~N{032} ~N{031} 110.1 0.915 (0.362) 0.304
Pipe{041} ~N{031} ~N{042} 137.9 1.146 0.003 0.028
Pipe{043} ~N{025} ELECTRIC Building 110.1 0.915 0.123 0.258
Pipe{044} ELECTRIC Building ~N{032} 110.1 0.915 (0.075) 0.237
Pipe{045} ~N{034} OFFICE BUILDING 17.5 0.261 0.006 0.063
Pipe{046} OFFICE BUILDING ~N{033} 17.51 0.261 0.005 0.048
Pipe{047} ~N{036} WTP 10.2 0.595 0.008 0.084
Pipe{048} WTP ~N{035} 10.2 0.595 0.01 0.102
Pipe{051} ~N{009} Filter #a X Closed --- --- --- ---
Pipe{052} Filter #a Primary Pumps #1 X Closed --- --- --- ---
Pipe{053} Filter #b Primary Pumps #2 86.3 1.287 0.015 0.152
Pipe{054} Filter #c Primary Pumps #3 86.3 1.287 0.015 0.152
Pipe{055} ~N{009} Filter #b 86.3 1.287 0.002 0.02
Pipe{056} ~N{009} Filter #c 86.3 1.287 0.002 0.02
Pipe{057} ~N{026} ~N{034} 17.5 0.261 0.397 0.045
Pipe{058} Filter #1 Electric Building Pumps #1 110.1 0.915 0.007 0.066
Pipe{059} Filter #2 Electric Building Pumps #2 X Closed --- --- --- ---
Pipe{062} Filter #3 Office & WTP Building Pu.. 27.7 0.413 0.001 0.015
Pipe{063} ~N{016} Filter #3 27.7 0.413 0 0.001
Pipe{064} Office & WTP Building Pu.. ~N{023} 27.7 0.413 0.002 0.023
Pipe{065} ~N{016} Filter #4 X Closed --- --- --- ---
Pipe{066} Filter #4 Office & WTP Building Pu.. X Closed --- --- --- ---
Pipe{067} Office & WTP Building Pu.. ~N{023} X Closed --- --- --- ---
Pipe{068} ~N{041} ~N{036} 10.2 0.595 0.003 0.028
Pipe{069} ~N{042} Buffer tank 137.9 1.146 0.003 0.028
Pipe{070} ~N{011} ~N{043} 172.5 0.901 (0.187) 0.091
Pipe{071} ~N{035} ~N{029} 10.2 0.595 0.003 0.028
Pipe70 ~N{043} ~N{015} 137.8 0.72 0 0.003

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:10 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{003} 14 3.835 53.13
~N{004} 14 3.828 53.07
~N{009} 12 2.999 42.59
~N{011} 14 2.813 42.7
~N{013} 12 3 42.6
~N{015} 12 3 42.6
~N{016} 12 3 42.6
~N{017} 12 2.999 42.6
~N{022} 12 4.07 53.51
~N{023} 12 4.174 54.58
~N{025} 16 3.645 53.18
~N{026} 12 4.172 54.56
~N{029} 12 3.006 42.67
~N{031} 12 3.005 42.67
~N{032} 16 2.643 42.97
~N{033} 16 2.618 42.71
~N{035} 12 3.009 42.7
~N{036} 12 4.165 54.48
~N{041} 12 4.167 54.51
~N{042} 12 3.003 42.64
~N{043} 12 3 42.61

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:10 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Electric Building Pumps #1 110.1 (13.13) (1.287) --- 39.2 2.793 4.079 12 12
Office & WTP Building Pumps #1 27.7 (14.06) (1.378) --- 39.25 2.798 4.176 12 12
Primary Pumps #2 86.3 (13.05) (1.28) --- 39.09 2.782 4.062 12 12
Primary Pumps #3 86.3 (13.05) (1.28) --- 39.09 2.782 4.062 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 172.6 10.2 1 4.019 2.97 12 12.5
ELECTRIC Building 110.1 9.72 0.953 3.521 2.569 17 17
Filter #1 110.1 2.04 0.2 2.999 2.799 12 12
Filter #3 27.7 2.04 0.2 3 2.8 12 12
Filter #b 86.3 2.04 0.2 2.997 2.797 12 12
Filter #c 86.3 2.04 0.2 2.997 2.797 12 12
OFFICE BUILDING 17.5 10.89 1.067 3.69 2.622 16 16
WTP 10.2 11.6 1.138 4.156 3.019 12 12

Controls
Control Set Value Elev Flow Status dP HL Inlet Outlet
m m³/hr bar m bar g bar g
~N{034} FCV: 17.5 16 17.5 0.08 0.812 3.776 3.696

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:10 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 3 0 12 -0.013 3 42.61
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
By-Pass Line @ 0 m 34.74 3 42.6
Pipe{022} @ 0 m 172.6 3 42.6
Pipe{069} @ 0 m 137.9 3 42.61

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:10 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

By-Pass Line rev: 28/08/13 5:28 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 20 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
34.74 0.02319 0.181 0 0
5
0.008 10
0 0 0 0 0
5.79 0.03653 0.03 0 0 4
0.007 10
11.58 0.03015 0.06 0 0 3
0.006 10
17.37 0.0272 0.091 0 0
2
23.16 0.0254 0.121 0 0 0.005 10
28.95 0.02414 0.151 0 0
0.004
34.74 0.02319 0.181 0 0
40.53 0.02244 0.212 0 0 0.003
46.32 0.02182 0.242 0 0
0.002
52.11 0.02131 0.272 0 0
57.9 0.02087 0.302 0.001 0 0.001
63.69 0.02049 0.333 0.001 0
69.48 0.02016 0.363 0.002 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 19 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{005} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 18 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
172.6 0.01702 0.901 0.006 0.002
5
0.02 10
0 0 0 0 0
28.77 0.02349 0.15 0 0 4
0.0175 10
57.53 0.02039 0.3 0 0 3
0.015 10
86.3 0.01895 0.451 0.002 0
2
115.1 0.01807 0.601 0.003 0 0.0125 10
143.8 0.01747 0.751 0.005 0.001
0.01
172.6 0.01702 0.901 0.006 0.002
201.4 0.01667 1.052 0.009 0.002 0.0075
230.1 0.01639 1.202 0.011 0.003
0.005
258.9 0.01616 1.352 0.014 0.004
287.7 0.01596 1.502 0.017 0.005 0.0025
316.4 0.01579 1.653 0.02 0.005
345.2 0.01565 1.803 0.024 0.006 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 23 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{006} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{008} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{012} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.6 0.01702 0.901 -0.191 0.004
5
0.15 10
0 0 0 -0.196 0
28.77 0.02349 0.15 -0.196 0 4
0.1 10
57.53 0.02039 0.3 -0.195 0 3
0.05 10
86.3 0.01895 0.451 -0.195 0.001
2
115.1 0.01807 0.601 -0.194 0.002 0 10
143.8 0.01747 0.751 -0.192 0.003
-0.05
172.6 0.01702 0.901 -0.191 0.004
201.4 0.01667 1.052 -0.189 0.006 -0.1
230.1 0.01639 1.202 -0.187 0.007
-0.15
258.9 0.01616 1.352 -0.184 0.009
287.7 0.01596 1.502 -0.181 0.011 -0.2
316.4 0.01579 1.653 -0.178 0.014
345.2 0.01565 1.803 -0.175 0.016 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 74 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12.5 m out: 14 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
172.5 0.01733 0.901 0.157 0.008
5
0.16 10
0 0 0 0.147 0
28.75 0.02417 0.15 0.147 0 4
0.14 10
57.5 0.0209 0.3 0.148 0 3
0.12 10
86.25 0.01938 0.45 0.149 0.002
2
115 0.01845 0.601 0.151 0.004 0.1 10
143.8 0.01781 0.751 0.154 0.006
0.08
172.5 0.01733 0.901 0.157 0.008
201.3 0.01696 1.051 0.16 0.011 0.06
230 0.01666 1.201 0.164 0.015
0.04
258.8 0.01641 1.351 0.168 0.018
287.5 0.0162 1.502 0.173 0.023 0.02
316.3 0.01602 1.652 0.179 0.027
345 0.01587 1.802 0.185 0.033 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014 1 x Elbow - Standard 45° 0.2138

FFT: 0.01337 Total K: 2.018 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{020} rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 6 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02438 0.145 0 0
5
0.008 10
0 0 0 0 0
4.617 0.03908 0.024 0 0 4
0.007 10
9.233 0.03202 0.048 0 0 3
0.006 10
13.85 0.02879 0.072 0 0
2
18.47 0.0268 0.096 0 0 0.005 10
23.08 0.02542 0.121 0 0
0.004
27.7 0.02438 0.145 0 0
32.32 0.02355 0.169 0 0 0.003
36.93 0.02288 0.193 0 0
0.002
41.55 0.02232 0.217 0 0
46.17 0.02184 0.241 0 0 0.001
50.78 0.02142 0.265 0 0
55.4 0.02105 0.289 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{022} rev: 06/06/13 5:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 3 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
172.6 0.01733 0.901 0 0
5
0.008 10
0 0 0 0 0
28.77 0.02417 0.15 0 0 4
0.007 10
57.53 0.0209 0.3 0 0 3
0.006 10
86.3 0.01938 0.451 0 0
2
115.1 0.01845 0.601 0 0 0.005 10
143.8 0.01781 0.751 0 0
0.004
172.6 0.01733 0.901 0 0
201.4 0.01696 1.052 0.001 0 0.003
230.1 0.01666 1.202 0.001 0
0.002
258.9 0.01641 1.352 0.002 0
287.7 0.0162 1.502 0.002 0 0.001
316.4 0.01602 1.653 0.003 0
345.2 0.01587 1.803 0.003 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{023} rev: 03/06/13 4:39 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02221 0.413 0 0
5
0.008 10
0 0 0 0 0
4.617 0.03373 0.069 0 0 4
0.007 10
9.233 0.02819 0.138 0 0 3
0.006 10
13.85 0.02565 0.207 0 0
2
18.47 0.0241 0.275 0 0 0.005 10
23.08 0.02302 0.344 0 0
0.004
27.7 0.02221 0.413 0 0
32.32 0.02158 0.482 0 0 0.003
36.93 0.02107 0.551 0 0
0.002
41.55 0.02064 0.62 0 0
46.17 0.02028 0.689 0 0 0.001
50.78 0.01997 0.757 0 0
55.4 0.0197 0.826 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{024} rev: 11/06/13 2:26 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
110.1 0.01818 0.915 0 0
5
0.008 10
0 0 0 0 0
18.35 0.02552 0.153 0 0 4
0.007 10
36.7 0.02199 0.305 0 0 3
0.006 10
55.05 0.02036 0.458 0 0
2
73.4 0.01937 0.61 0 0 0.005 10
91.75 0.01869 0.763 0 0
0.004
110.1 0.01818 0.915 0 0
128.4 0.01778 1.068 0 0 0.003
146.8 0.01746 1.22 0.001 0
0.002
165.1 0.0172 1.373 0.002 0
183.5 0.01698 1.525 0.002 0 0.001
201.8 0.01679 1.678 0.002 0
220.2 0.01663 1.83 0.003 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
110.1 0.01818 0.915 0 0
5
0.008 10
0 0 0 0 0
18.35 0.02552 0.153 0 0 4
0.007 10
36.7 0.02199 0.305 0 0 3
0.006 10
55.05 0.02036 0.458 0 0
2
73.4 0.01937 0.61 0 0 0.005 10
91.75 0.01869 0.763 0 0
0.004
110.1 0.01818 0.915 0 0
128.4 0.01778 1.068 0 0 0.003
146.8 0.01746 1.22 0 0
0.002
165.1 0.0172 1.373 0 0
183.5 0.01698 1.525 0 0 0.001
201.8 0.01679 1.678 0.001 0
220.2 0.01663 1.83 0.001 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{029} rev: 11/06/13 2:35 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
110.1 0.01818 0.915 0.01 0.009
5
0.04 10
0 0 0 0 0
18.35 0.02552 0.153 0 0 4
0.035 10
36.7 0.02199 0.305 0.001 0.001 3
0.03 10
55.05 0.02036 0.458 0.002 0.002
2
73.4 0.01937 0.61 0.004 0.004 0.025 10
91.75 0.01869 0.763 0.007 0.006
0.02
110.1 0.01818 0.915 0.01 0.009
128.4 0.01778 1.068 0.013 0.012 0.015
146.8 0.01746 1.22 0.017 0.016
0.01
165.1 0.0172 1.373 0.022 0.02
183.5 0.01698 1.525 0.027 0.025 0.005
201.8 0.01679 1.678 0.033 0.03
220.2 0.01663 1.83 0.039 0.036 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6305 1 x Swing Check - Vertical 0.7006 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.172 Avg Percent of Total Loss: 93 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{033} rev: 06/06/13 6:57 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02221 0.413 0.002 0.002
5
0.008 10
0 0 0 0 0
4.617 0.03373 0.069 0 0 4
0.007 10
9.233 0.02819 0.138 0 0 3
0.006 10
13.85 0.02565 0.207 0 0
2
18.47 0.0241 0.275 0 0 0.005 10
23.08 0.02302 0.344 0.001 0.001
0.004
27.7 0.02221 0.413 0.002 0.002
32.32 0.02158 0.482 0.003 0.002 0.003
36.93 0.02107 0.551 0.004 0.003
0.002
41.55 0.02064 0.62 0.005 0.003
46.17 0.02028 0.689 0.006 0.004 0.001
50.78 0.01997 0.757 0.007 0.005
55.4 0.0197 0.826 0.008 0.006 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{034} rev: 28/08/13 5:42 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.9 10
110.1 0.01818 0.915 0.425 0.007
5
0.8 10
0 0 0 0.392 0
18.35 0.02552 0.153 0.393 0 4
0.7 10
36.7 0.02199 0.305 0.396 0 3
0.6 10
55.05 0.02036 0.458 0.401 0.002
2
73.4 0.01937 0.61 0.407 0.003 0.5 10
91.75 0.01869 0.763 0.415 0.005
0.4
110.1 0.01818 0.915 0.425 0.007
128.4 0.01778 1.068 0.436 0.01 0.3
146.8 0.01746 1.22 0.449 0.012
0.2
165.1 0.0172 1.373 0.463 0.016
183.5 0.01698 1.525 0.478 0.02 0.1
201.8 0.01679 1.678 0.496 0.024
220.2 0.01663 1.83 0.514 0.028 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.681 Avg Percent of Total Loss: 21 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{036} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
10.2 0.0245 0.595 0.005 0.002
5
0.016 10
0 0 0 0 0
1.7 0.03728 0.099 0 0 4
0.014 10
3.4 0.03104 0.198 0 0 3
0.012 10
5.1 0.02822 0.297 0.001 0
2
6.8 0.02653 0.396 0.002 0 0.01 10
8.5 0.02537 0.496 0.003 0.001
0.008
10.2 0.0245 0.595 0.005 0.002
11.9 0.02383 0.694 0.006 0.002 0.006
13.6 0.0233 0.793 0.008 0.003
0.004
15.3 0.02285 0.892 0.01 0.004
17 0.02248 0.991 0.012 0.005 0.002
18.7 0.02215 1.09 0.015 0.006
20.4 0.02187 1.189 0.017 0.007 2.5 5 7.5 10 12.5 15 17.5 20 22.5 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 1.038 Avg Percent of Total Loss: 36 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
17.51 0.02372 0.261 -0.388 0
5
0.3 10
0 0 0 -0.392 0
2.918 0.03704 0.044 -0.392 0 4
0.2 10
5.837 0.03062 0.087 -0.391 0 3
0.1 10
8.755 0.02769 0.131 -0.391 0
2
11.67 0.0259 0.174 -0.39 0 0 10
14.59 0.02465 0.218 -0.389 0
-0.1
17.51 0.02372 0.261 -0.388 0
20.43 0.02299 0.305 -0.387 0 -0.2
23.35 0.0224 0.348 -0.386 0
-0.3
26.27 0.0219 0.392 -0.384 0
29.18 0.02148 0.435 -0.383 0 -0.4
32.1 0.02112 0.479 -0.381 0
35.02 0.0208 0.522 -0.379 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 06/06/13 6:55 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.71 0.02168 0.413 0 0
5
0.008 10
0 0 0 0 0
4.618 0.03257 0.069 0 0 4
0.007 10
9.237 0.02734 0.138 0 0 3
0.006 10
13.85 0.02493 0.207 0 0
2
18.47 0.02346 0.276 0 0 0.005 10
23.09 0.02244 0.344 0 0
0.004
27.71 0.02168 0.413 0 0
32.33 0.02109 0.482 0 0 0.003
36.95 0.02061 0.551 0.001 0
0.002
41.57 0.02021 0.62 0.001 0
46.18 0.01987 0.689 0.002 0 0.001
50.8 0.01957 0.758 0.002 0
55.42 0.01932 0.827 0.002 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{040} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
110.1 0.01785 0.915 -0.362 0.004
5
0.3 10
0 0 0 -0.392 0
18.35 0.02479 0.153 -0.391 0 4
0.2 10
36.7 0.02145 0.305 -0.388 0 3
0.1 10
55.05 0.0199 0.458 -0.384 0.001
2
73.4 0.01897 0.61 -0.378 0.002 0 10
91.75 0.01832 0.763 -0.371 0.003
-0.1
110.1 0.01785 0.915 -0.362 0.004
128.4 0.01748 1.068 -0.352 0.006 -0.2
146.8 0.01718 1.22 -0.341 0.008
-0.3
165.2 0.01694 1.373 -0.328 0.01
183.5 0.01673 1.525 -0.314 0.012 -0.4
201.8 0.01655 1.678 -0.298 0.015
220.2 0.0164 1.83 -0.281 0.018 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 45° 0.2242 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.065 Avg Percent of Total Loss: 14 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{041} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
137.9 0.01732 1.146 0.003 0
5
0.008 10
0 0 0 0 0
22.98 0.0236 0.191 0 0 4
0.007 10
45.97 0.02056 0.382 0 0 3
0.006 10
68.95 0.01916 0.573 0 0
2
91.93 0.01832 0.764 0.001 0 0.005 10
114.9 0.01774 0.955 0.002 0
0.004
137.9 0.01732 1.146 0.003 0
160.9 0.01699 1.337 0.004 0 0.003
183.9 0.01673 1.528 0.005 0
0.002
206.9 0.01651 1.719 0.006 0
229.8 0.01633 1.91 0.007 0 0.001
252.8 0.01617 2.101 0.009 0
275.8 0.01604 2.292 0.01 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 28/08/13 5:48 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 40 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 17 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
110.1 0.01818 0.915 0.123 0.011
5
0.16 10
0 0 0 0.098 0
18.35 0.02552 0.153 0.099 0 4
0.14 10
36.7 0.02199 0.305 0.101 0.001 3
0.12 10
55.05 0.02036 0.458 0.105 0.003
2
73.4 0.01937 0.61 0.11 0.005 0.1 10
91.75 0.01869 0.763 0.116 0.007
0.08
110.1 0.01818 0.915 0.123 0.011
128.4 0.01778 1.068 0.132 0.014 0.06
146.8 0.01746 1.22 0.142 0.019
0.04
165.1 0.0172 1.373 0.153 0.024
183.5 0.01698 1.525 0.165 0.029 0.02
201.8 0.01679 1.678 0.179 0.035
220.2 0.01663 1.83 0.194 0.042 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.522 Avg Percent of Total Loss: 41 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 28/08/13 5:49 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 40 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 17 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.08 10
110.1 0.01785 0.915 -0.075 0.009
5
0.06 10
0 0 0 -0.098 0
18.35 0.02479 0.153 -0.097 0 4
0.04 10
36.7 0.02145 0.305 -0.095 0 3
0.02 10
55.05 0.0199 0.458 -0.092 0.002
2
73.4 0.01897 0.61 -0.087 0.004 0 10
91.75 0.01832 0.763 -0.082 0.006
-0.02
110.1 0.01785 0.915 -0.075 0.009
128.4 0.01748 1.068 -0.067 0.012 -0.04
146.8 0.01718 1.22 -0.058 0.016
-0.06
165.2 0.01694 1.373 -0.047 0.02
183.5 0.01673 1.525 -0.036 0.024 -0.08
201.8 0.01655 1.678 -0.023 0.03
220.2 0.0164 1.83 -0.01 0.035 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
5 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.102 Avg Percent of Total Loss: 37 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 90 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
17.5 0.02437 0.261 0.006 0.001
5
0.02 10
0 0 0 0 0
2.917 0.03847 0.044 0 0 4
0.0175 10
5.833 0.03167 0.087 0 0 3
0.015 10
8.75 0.02856 0.131 0.002 0
2
11.67 0.02667 0.174 0.003 0 0.0125 10
14.58 0.02536 0.218 0.004 0
0.01
17.5 0.02437 0.261 0.006 0.001
20.42 0.0236 0.305 0.008 0.002 0.0075
23.33 0.02297 0.348 0.011 0.002
0.005
26.25 0.02244 0.392 0.013 0.003
29.17 0.022 0.435 0.016 0.004 0.0025
32.08 0.02161 0.479 0.019 0.005
35 0.02127 0.522 0.022 0.005 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
9 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 4.021 Avg Percent of Total Loss: 20 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 90 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
17.51 0.02372 0.261 0.005 0
5
0.016 10
0 0 0 0 0
2.918 0.03704 0.044 0 0 4
0.014 10
5.837 0.03062 0.087 0 0 3
0.012 10
8.755 0.02769 0.131 0.001 0
2
11.67 0.0259 0.174 0.002 0 0.01 10
14.59 0.02465 0.218 0.003 0
0.008
17.51 0.02372 0.261 0.005 0
20.43 0.02299 0.305 0.006 0 0.006
23.35 0.0224 0.348 0.008 0
0.004
26.27 0.0219 0.392 0.01 0
29.18 0.02148 0.435 0.012 0 0.002
32.1 0.02112 0.479 0.014 0
35.02 0.0208 0.522 0.017 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{047} rev: 28/08/13 5:45 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
10.2 0.0245 0.595 0.008 0.005
5
0.04 10
0 0 0 0 0
1.7 0.03728 0.099 0 0 4
0.035 10
3.4 0.03104 0.198 0.001 0 3
0.03 10
5.1 0.02822 0.297 0.002 0.001
2
6.8 0.02653 0.396 0.004 0.002 0.025 10
8.5 0.02537 0.496 0.006 0.004
0.02
10.2 0.0245 0.595 0.008 0.005
11.9 0.02383 0.694 0.011 0.007 0.015
13.6 0.0233 0.793 0.014 0.01
0.01
15.3 0.02285 0.892 0.018 0.012
17 0.02248 0.991 0.022 0.015 0.005
18.7 0.02215 1.09 0.027 0.018
20.4 0.02187 1.189 0.032 0.022 2.5 5 7.5 10 12.5 15 17.5 20 22.5 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 3.115 Avg Percent of Total Loss: 66 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{048} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 12 °C
Length: 10 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
10.2 0.02395 0.595 0.01 0.005
5
0.04 10
0 0 0 0 0
1.7 0.03597 0.099 0 0 4
0.035 10
3.4 0.03009 0.198 0.001 0 3
0.03 10
5.1 0.02744 0.297 0.003 0.001
2
6.8 0.02585 0.396 0.005 0.002 0.025 10
8.5 0.02475 0.496 0.007 0.003
0.02
10.2 0.02395 0.595 0.01 0.005
11.9 0.02332 0.694 0.013 0.006 0.015
13.6 0.02281 0.793 0.017 0.008
0.01
15.3 0.0224 0.892 0.022 0.01
17 0.02205 0.991 0.027 0.013 0.005
18.7 0.02175 1.09 0.032 0.015
20.4 0.02149 1.189 0.038 0.018 2.5 5 7.5 10 12.5 15 17.5 20 22.5 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 2.596 Avg Percent of Total Loss: 44 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{053} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{054} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{055} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{056} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{057} rev: 28/08/13 5:43 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
17.5 0.02437 0.261 0.397 0
5
0.4 10
0 0 0 0.392 0
2.917 0.03847 0.044 0.392 0 4
0.35 10
5.833 0.03167 0.087 0.393 0 3
0.3 10
8.75 0.02856 0.131 0.393 0
2
11.67 0.02667 0.174 0.394 0 0.25 10
14.58 0.02536 0.218 0.395 0
0.2
17.5 0.02437 0.261 0.397 0
20.42 0.0236 0.305 0.398 0 0.15
23.33 0.02297 0.348 0.4 0.001
0.1
26.25 0.02244 0.392 0.401 0.001
29.17 0.022 0.435 0.403 0.002 0.05
32.08 0.02161 0.479 0.405 0.002
35 0.02127 0.522 0.408 0.002 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 12 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{058} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.045 10
110.1 0.01818 0.915 0.007 0.006
5
0.04 10
0 0 0 0 0
18.35 0.02552 0.153 0 0 4
0.035 10
36.7 0.02199 0.305 0 0 3
0.03 10
55.05 0.02036 0.458 0.002 0.002
2
73.4 0.01937 0.61 0.003 0.003 0.025 10
91.75 0.01869 0.763 0.005 0.004
0.02
110.1 0.01818 0.915 0.007 0.006
128.4 0.01778 1.068 0.009 0.008 0.015
146.8 0.01746 1.22 0.012 0.011
0.01
165.1 0.0172 1.373 0.015 0.014
183.5 0.01698 1.525 0.018 0.017 0.005
201.8 0.01679 1.678 0.022 0.021
220.2 0.01663 1.83 0.026 0.025 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Butterfly 0.6305

FFT: 0.01401 Total K: 1.471 Avg Percent of Total Loss: 96 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{062} rev: 06/06/13 7:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02221 0.413 0.001 0.001
5
0.008 10
0 0 0 0 0
4.617 0.03373 0.069 0 0 4
0.007 10
9.233 0.02819 0.138 0 0 3
0.006 10
13.85 0.02565 0.207 0 0
2
18.47 0.0241 0.275 0 0 0.005 10
23.08 0.02302 0.344 0.001 0
0.004
27.7 0.02221 0.413 0.001 0.001
32.32 0.02158 0.482 0.002 0.002 0.003
36.93 0.02107 0.551 0.003 0.002
0.002
41.55 0.02064 0.62 0.003 0.003
46.17 0.02028 0.689 0.004 0.004 0.001
50.78 0.01997 0.757 0.005 0.004
55.4 0.0197 0.826 0.006 0.005 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 83 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{063} rev: 03/06/13 4:40 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02221 0.413 0 0
5
0.008 10
0 0 0 0 0
4.617 0.03373 0.069 0 0 4
0.007 10
9.233 0.02819 0.138 0 0 3
0.006 10
13.85 0.02565 0.207 0 0
2
18.47 0.0241 0.275 0 0 0.005 10
23.08 0.02302 0.344 0 0
0.004
27.7 0.02221 0.413 0 0
32.32 0.02158 0.482 0 0 0.003
36.93 0.02107 0.551 0 0
0.002
41.55 0.02064 0.62 0 0
46.17 0.02028 0.689 0 0 0.001
50.78 0.01997 0.757 0 0
55.4 0.0197 0.826 0 0 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{064} rev: 28/08/13 12:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
27.7 0.02221 0.413 0.002 0.002
5
0.008 10
0 0 0 0 0
4.617 0.03373 0.069 0 0 4
0.007 10
9.233 0.02819 0.138 0 0 3
0.006 10
13.85 0.02565 0.207 0 0
2
18.47 0.0241 0.275 0 0 0.005 10
23.08 0.02302 0.344 0.002 0.001
0.004
27.7 0.02221 0.413 0.002 0.002
32.32 0.02158 0.482 0.003 0.003 0.003
36.93 0.02107 0.551 0.004 0.003
0.002
41.55 0.02064 0.62 0.005 0.004
46.17 0.02028 0.689 0.006 0.005 0.001
50.78 0.01997 0.757 0.007 0.007
55.4 0.0197 0.826 0.009 0.008 10 20 30 40 50 60 70 80 90 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 79 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{068} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
10.2 0.0245 0.595 0.003 0
5
0.008 10
0 0 0 0 0
1.7 0.03728 0.099 0 0 4
0.007 10
3.4 0.03104 0.198 0 0 3
0.006 10
5.1 0.02822 0.297 0 0
2
6.8 0.02653 0.396 0.001 0 0.005 10
8.5 0.02537 0.496 0.002 0
0.004
10.2 0.0245 0.595 0.003 0
11.9 0.02383 0.694 0.004 0 0.003
13.6 0.0233 0.793 0.005 0
0.002
15.3 0.02285 0.892 0.006 0
17 0.02248 0.991 0.007 0 0.001
18.7 0.02215 1.09 0.008 0
20.4 0.02187 1.189 0.01 0 2.5 5 7.5 10 12.5 15 17.5 20 22.5 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{069} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
137.9 0.01732 1.146 0.003 0
5
0.008 10
0 0 0 0 0
22.98 0.0236 0.191 0 0 4
0.007 10
45.97 0.02056 0.382 0 0 3
0.006 10
68.95 0.01916 0.573 0 0
2
91.93 0.01832 0.764 0.001 0 0.005 10
114.9 0.01774 0.955 0.002 0
0.004
137.9 0.01732 1.146 0.003 0
160.9 0.01699 1.337 0.004 0 0.003
183.9 0.01673 1.528 0.005 0
0.002
206.9 0.01651 1.719 0.006 0
229.8 0.01633 1.91 0.007 0 0.001
252.8 0.01617 2.101 0.009 0
275.8 0.01604 2.292 0.01 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{070} rev: 10/09/13 4:39 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 15 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.5 0.01733 0.901 -0.187 0.005
5
0.15 10
0 0 0 -0.196 0
28.75 0.02417 0.15 -0.196 0 4
0.1 10
57.5 0.0209 0.3 -0.195 0 3
0.05 10
86.25 0.01938 0.45 -0.194 0.001
2
115 0.01845 0.601 -0.192 0.002 0 10
143.8 0.01781 0.751 -0.19 0.003
-0.05
172.5 0.01733 0.901 -0.187 0.005
201.3 0.01696 1.051 -0.184 0.007 -0.1
230 0.01666 1.201 -0.18 0.009
-0.15
258.8 0.01641 1.351 -0.176 0.011
287.5 0.0162 1.502 -0.172 0.014 -0.2
316.3 0.01602 1.652 -0.167 0.016
345 0.01587 1.802 -0.162 0.019 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 53 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{071} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
10.2 0.0245 0.595 0.003 0
5
0.008 10
0 0 0 0 0
1.7 0.03728 0.099 0 0 4
0.007 10
3.4 0.03104 0.198 0 0 3
0.006 10
5.1 0.02822 0.297 0 0
2
6.8 0.02653 0.396 0.001 0 0.005 10
8.5 0.02537 0.496 0.002 0
0.004
10.2 0.0245 0.595 0.003 0
11.9 0.02383 0.694 0.004 0 0.003
13.6 0.0233 0.793 0.005 0
0.002
15.3 0.02285 0.892 0.006 0
17 0.02248 0.991 0.007 0 0.001
18.7 0.02215 1.09 0.008 0
20.4 0.02187 1.189 0.01 0 2.5 5 7.5 10 12.5 15 17.5 20 22.5 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:11 pm


Lineup: Operación 80%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe70 rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 1.5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
137.8 0.01792 0.72 0 0
5
0.008 10
0 0 0 0 0
22.97 0.02545 0.12 0 0 4
0.007 10
45.93 0.02186 0.24 0 0 3
0.006 10
68.9 0.02019 0.36 0 0
2
91.87 0.01916 0.48 0 0 0.005 10
114.8 0.01845 0.6 0 0
0.004
137.8 0.01792 0.72 0 0
160.8 0.01751 0.84 0 0 0.003
183.7 0.01717 0.96 0 0
0.002
206.7 0.0169 1.08 0 0
229.7 0.01666 1.199 0 0 0.001
252.6 0.01646 1.319 0 0
275.6 0.01628 1.439 0 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 23 of 24

Appendix 6
HVAC Chilled Water Circuit - Operation Case (60%)
P: 3.005 bar g
Ø: 3 in

El: 12 m
Flow: 7.7 m³/hr
Vel: 0.449 m/sec

P: 2.614 bar g
Ø: 6 in P: 3.004 bar g Ø: 6 in

El: 16 m
Flow: 20.81 m³/hr El: 12 m Flow: 13.1 m³/hr
Vel: 0.31 m/sec Vel: 0.195 m/sec

P: 3.003 bar g
Ø: 10 in Ø: 6 in Ø: 6 in Ø: 8 in

El: 12 m
P: 3.002 bar g Flow: 103.4 m³/hr
Set @ 86.3 m³/hr Filter #a Vel: 0.86 m/sec

Flow: 103.4 m³/hr


Chiller #1 El: 12 m

Vel: 0.86 m/sec

P: 2.629 bar g
P: 2.814 bar g

Ø: 10 in

Ø: 6 in
Ø: 8 in

El: 16 m
Flow: 82.63 m³/hr
El: 14 m

Ø: 8 in
Vel: 0.687 m/sec

Ø: 10 in Ø: 6 in Ø: 6 in Ø: 6 in Ø: 10 in
Flow: 172.6 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
P: 3.836 bar g Vel: 1.287 m/sec Set @ 86.3 m³/hr
Flow: 86.3 m³/hr P: 2.999 barFlow:
g 172.6 m³/hr
Vel: 0.901 m/sec Filter #b Vel: 1.287 m/sec
Vel: 1.287 m/sec El: 12 m Vel: 0.901 m/secBuffer tank

Flow: 172.6 m³/hr

Flow: 82.63 m³/hr

Flow: 7.703 m³/hr


Vel: 0.901 m/sec

Vel: 1.287 m/sec

Vel: 0.687 m/sec

Vel: 0.195 m/sec

Vel: 0.449 m/sec


P: 3.829 bar g El: 14 m

Flow: 86.3 m³/hr

Flow: 13.1 m³/hr


TH: (13.06) m Flow: 86.3 m³/hr
El: 14 m NPSHa: 39.09 m dP: 0.2 bar
Ps: 2.782 bar g
Pd: 4.063 bar g

Ø: 10 in

Ø: 6 in

Ø: 8 in

Ø: 6 in

Ø: 3 in
Ø: 10 in Ø: 6 in Ø: 6 in
Flow: 172.5 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
Vel: 0.901 m/sec Chiller #2 Vel: 1.287 m/sec Set @ 86.3 m³/hr Vel: 1.287 m/secFilter #c
TH: (13.06) m Flow: 86.3 m³/hr
Flow: 172.6 m³/hr
NPSHa: 39.09 m dP: 0.2 bar
dP: 1 bar ELECTRIC Building OFFICE BUILDING WTP
Ps: 2.782 bar g
Pd: 4.063 bar g Flow: 82.6 m³/hr Flow: 13.1 m³/hr Flow: 7.7 m³/hr
dP: 0.538 bar dP: 0.602 bar dP: 0.654 bar

Ø: 10 in Ø: 10 in
Flow: 172.5 m³/hr Flow: 69.14 m³/hr
P: 3.002 bar g
Vel: 0.901 m/sec Vel: 0.361 m/sec
El: 12 m

Vel: 0.687 m/sec


Flow: 82.6 m³/hr
Flow: 103.4 m³/hr

Flow: 82.6 m³/hr


Vel: 0.54 m/sec

Ø: 8 in
dP: 0.2 bar
Ø: 8 in

Filter #1
Flow: 82.6 m³/hr

Ø: 10 in
Vel: 0.687 m/sec Set @ 82.6 m³/hr

El: 12 m Vel: 0.687 m/sec


g 82.6 m³/hr
TH: (8.306) m
NPSHa: 39.24 m
Ps: 2.797 bar g
Ø: 8 in Pd: 3.611 bar g

Ø: 8 in
Flow: 82.6 m³/hr

Flow:
Vel: 0.687 m/sec
P: 3.001 bar g

P: 3.606 bar

Vel: 0.195 m/sec


Ø: 8 in Ø: 8 in

Flow: 13.1 m³/hr


El: 12 m

Flow: 82.6 m³/hr


P: 3.001 bar g Flow: 82.6 m³/hr P: 3.195 bar g
Vel: 0.687 m/sec
El: 12 m Vel: 0.687 m/sec El: 16 m

Ø: 6 in

Vel: 0.449 m/sec


Ø: 8 in

Flow: 7.7 m³/hr


Ø: 8 in
Filter #2

Ø: 3 in
Ø: 8 in

Set @ 82.6 m³/hr


Vel: 0.109 m/sec
Flow: 20.8 m³/hr
Ø: 10 in

Flow: 20.8 m³/hr


dP: 0.2 bar

Ø: 6 in
Filter #3

Flow: 20.8 m³/hr


Set @ 20.8 m³/hr

Flow: 20.8 m³/hr


Vel: 0.31 m/sec
Vel: 0.31 m/sec
Flow: 20.8 m³/hr
Vel: 0.31 m/sec

TH: (8.936) m
NPSHa: 39.28 m
Ps: 2.8 bar g

Ø: 6 in
Pd: 3.676 bar g
Ø: 6 in

P: 3.675 bar g
P: 3.001 bar g

Ø: 6 in Ø: 6 in Ø: 6 in

El: 12 m
Flow: 20.8 m³/hr
P: 3.001 bar g Flow: 20.8 m³/hr P: 3.674 bar g Flow: 13.1 m³/hr
FCV @ 13.1 m³/hr
El: 12 m

Vel: 0.31 m/sec Vel: 0.31 m/sec Vel: 0.195 m/sec

Vel: 0.449 m/sec


El: 12 m El: 12 m dP: 0.057 bar

Flow: 7.7 m³/hr


Ø: 6 in

Ø: 3 in
Filter #4

Ø: 6 in Ø: 6 in Ø: 3 in
P: 3.671 bar g Flow: 7.7 m³/hr P: 3.669 bar g
Set @ 20.8 m³/hr Vel: 0.449 m/sec
El: 12 m El: 12 m

Lineup: Operación 60% Darcy-Weisbach PIPE-FLO 2009


System: HVAC Chilled water circuit Flow: m³/hr
Date: 10/09/13 7:12 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 19.46 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

A112_Sch80 A112 / 80 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Chilled water (cold) Water 7 5 999.9 1.371 0.01003 / 220.6
Chilled water (hot) Water 12 5 999.6 1.206 0.01403 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:13 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
By-Pass Line ~N{043} Buffer tank 69.14 0.361 0.002 0.016
Pipe{005} ~N{003} ~N{004} 172.6 0.901 0.006 0.065
Pipe{006} Primary Pumps #2 ~N{003} 86.3 1.287 0.227 0.32
Pipe{007} Primary Pumps #1 ~N{003} X Closed --- --- --- ---
Pipe{008} Primary Pumps #3 ~N{003} 86.3 1.287 0.227 0.32
Pipe{012} ~N{004} Chiller #2 172.6 0.901 (0.191) 0.055
Pipe{013} ~N{004} Chiller #1 X Closed --- --- --- ---
Pipe{014} Chiller #1 ~N{011} X Closed --- --- --- ---
Pipe{015} Chiller #2 ~N{011} 172.5 0.901 0.157 0.097
Pipe{020} ~N{015} ~N{013} 20.8 0.109 0 0
Pipe{022} Buffer tank ~N{009} 172.6 0.901 0 0.008
Pipe{023} ~N{013} ~N{016} 20.8 0.31 0 0.001
Pipe{024} ~N{015} ~N{017} 82.6 0.687 0 0.004
Pipe{027} ~N{017} Filter #1 82.6 0.687 0 0.002
Pipe{028} ~N{017} Filter #2 X Closed --- --- --- ---
Pipe{029} Electric Building Pumps #1 ~N{022} 82.6 0.687 0.006 0.057
Pipe{030} Electric Building Pumps #2 ~N{022} X Closed --- --- --- ---
Pipe{033} ~N{023} ~N{026} 20.8 0.31 0.001 0.012
Pipe{034} ~N{022} ~N{025} 82.6 0.687 0.411 0.195
Pipe{036} ~N{026} ~N{041} 7.7 0.449 0.003 0.028
Pipe{038} ~N{033} ~N{029} 13.1 0.195 (0.39) 0.022
Pipe{039} ~N{029} ~N{031} 20.81 0.31 0 0.004
Pipe{040} ~N{032} ~N{031} 82.63 0.687 (0.375) 0.177
Pipe{041} ~N{031} ~N{042} 103.4 0.86 0.002 0.016
Pipe{043} ~N{025} ELECTRIC Building 82.6 0.687 0.113 0.149
Pipe{044} ELECTRIC Building ~N{032} 82.63 0.687 (0.085) 0.137
Pipe{045} ~N{034} OFFICE BUILDING 13.1 0.195 0.004 0.037
Pipe{046} OFFICE BUILDING ~N{033} 13.1 0.195 0.003 0.029
Pipe{047} ~N{036} WTP 7.7 0.449 0.005 0.049
Pipe{048} WTP ~N{035} 7.703 0.449 0.006 0.06
Pipe{051} ~N{009} Filter #a X Closed --- --- --- ---
Pipe{052} Filter #a Primary Pumps #1 X Closed --- --- --- ---
Pipe{053} Filter #b Primary Pumps #2 86.3 1.287 0.015 0.152
Pipe{054} Filter #c Primary Pumps #3 86.3 1.287 0.015 0.152
Pipe{055} ~N{009} Filter #b 86.3 1.287 0.002 0.02
Pipe{056} ~N{009} Filter #c 86.3 1.287 0.002 0.02
Pipe{057} ~N{026} ~N{034} 13.1 0.195 0.395 0.026
Pipe{058} Filter #1 Electric Building Pumps #1 82.6 0.687 0.004 0.037
Pipe{059} Filter #2 Electric Building Pumps #2 X Closed --- --- --- ---
Pipe{062} Filter #3 Office & WTP Building Pu.. 20.8 0.31 0 0.008
Pipe{063} ~N{016} Filter #3 20.8 0.31 0 0
Pipe{064} Office & WTP Building Pu.. ~N{023} 20.8 0.31 0.001 0.013
Pipe{065} ~N{016} Filter #4 X Closed --- --- --- ---
Pipe{066} Filter #4 Office & WTP Building Pu.. X Closed --- --- --- ---
Pipe{067} Office & WTP Building Pu.. ~N{023} X Closed --- --- --- ---
Pipe{068} ~N{041} ~N{036} 7.7 0.449 0.002 0.017
Pipe{069} ~N{042} Buffer tank 103.4 0.86 0.002 0.016
Pipe{070} ~N{011} ~N{043} 172.5 0.901 (0.187) 0.091
Pipe{071} ~N{035} ~N{029} 7.7 0.449 0.002 0.017
Pipe70 ~N{043} ~N{015} 103.4 0.54 0 0.002

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:13 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{003} 14 3.836 53.14
~N{004} 14 3.829 53.08
~N{009} 12 2.999 42.59
~N{011} 14 2.814 42.71
~N{013} 12 3.001 42.62
~N{015} 12 3.001 42.62
~N{016} 12 3.001 42.61
~N{017} 12 3.001 42.61
~N{022} 12 3.606 48.78
~N{023} 12 3.675 49.49
~N{025} 16 3.195 48.59
~N{026} 12 3.674 49.48
~N{029} 12 3.004 42.65
~N{031} 12 3.003 42.65
~N{032} 16 2.629 42.82
~N{033} 16 2.614 42.67
~N{035} 12 3.005 42.66
~N{036} 12 3.669 49.43
~N{041} 12 3.671 49.45
~N{042} 12 3.002 42.63
~N{043} 12 3.002 42.62

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:13 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Electric Building Pumps #1 82.6 (8.306) (0.814) --- 39.24 2.797 3.611 12 12
Office & WTP Building Pumps #1 20.8 (8.936) (0.876) --- 39.28 2.8 3.676 12 12
Primary Pumps #2 86.3 (13.06) (1.281) --- 39.09 2.782 4.063 12 12
Primary Pumps #3 86.3 (13.06) (1.281) --- 39.09 2.782 4.063 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 172.6 10.2 1 4.02 2.971 12 12.5
ELECTRIC Building 82.6 5.487 0.538 3.082 2.544 17 17
Filter #1 82.6 2.04 0.2 3.001 2.801 12 12
Filter #3 20.8 2.04 0.2 3.001 2.801 12 12
Filter #b 86.3 2.04 0.2 2.997 2.797 12 12
Filter #c 86.3 2.04 0.2 2.997 2.797 12 12
OFFICE BUILDING 13.1 6.137 0.602 3.218 2.617 16 16
WTP 7.7 6.666 0.654 3.665 3.011 12 12

Controls
Control Set Value Elev Flow Status dP HL Inlet Outlet
m m³/hr bar m bar g bar g
~N{034} FCV: 13.1 16 13.1 0.057 0.584 3.279 3.222

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:13 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 3 0 12 -0.026 3 42.61
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
By-Pass Line @ 0 m 69.14 3 42.6
Pipe{022} @ 0 m 172.6 3 42.6
Pipe{069} @ 0 m 103.4 3 42.61

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:13 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

By-Pass Line rev: 28/08/13 5:28 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 20 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
69.14 0.02018 0.361 0.002 0
5
0.008 10
0 0 0 0 0
11.52 0.03018 0.06 0 0 4
0.007 10
23.05 0.02543 0.12 0 0 3
0.006 10
34.57 0.02321 0.181 0 0
2
46.09 0.02185 0.241 0 0 0.005 10
57.62 0.02089 0.301 0.001 0
0.004
69.14 0.02018 0.361 0.002 0
80.66 0.01961 0.421 0.002 0 0.003
92.19 0.01915 0.481 0.003 0
0.002
103.7 0.01877 0.542 0.003 0.001
115.2 0.01844 0.602 0.004 0.001 0.001
126.8 0.01816 0.662 0.005 0.002
138.3 0.01791 0.722 0.006 0.002 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 28 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{005} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 18 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
172.6 0.01702 0.901 0.006 0.002
5
0.02 10
0 0 0 0 0
28.77 0.02349 0.15 0 0 4
0.0175 10
57.53 0.02039 0.3 0 0 3
0.015 10
86.3 0.01895 0.451 0.002 0
2
115.1 0.01807 0.601 0.003 0 0.0125 10
143.8 0.01747 0.751 0.005 0.001
0.01
172.6 0.01702 0.901 0.006 0.002
201.4 0.01667 1.052 0.009 0.002 0.0075
230.1 0.01639 1.202 0.011 0.003
0.005
258.9 0.01616 1.352 0.014 0.004
287.7 0.01596 1.502 0.017 0.005 0.0025
316.4 0.01579 1.653 0.02 0.005
345.2 0.01565 1.803 0.024 0.006 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 23 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{006} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{008} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{012} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.6 0.01702 0.901 -0.191 0.004
5
0.15 10
0 0 0 -0.196 0
28.77 0.02349 0.15 -0.196 0 4
0.1 10
57.53 0.02039 0.3 -0.195 0 3
0.05 10
86.3 0.01895 0.451 -0.195 0.001
2
115.1 0.01807 0.601 -0.194 0.002 0 10
143.8 0.01747 0.751 -0.192 0.003
-0.05
172.6 0.01702 0.901 -0.191 0.004
201.4 0.01667 1.052 -0.189 0.006 -0.1
230.1 0.01639 1.202 -0.187 0.007
-0.15
258.9 0.01616 1.352 -0.184 0.009
287.7 0.01596 1.502 -0.181 0.011 -0.2
316.4 0.01579 1.653 -0.178 0.014
345.2 0.01565 1.803 -0.175 0.016 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 74 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12.5 m out: 14 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
172.5 0.01733 0.901 0.157 0.008
5
0.16 10
0 0 0 0.147 0
28.75 0.02417 0.15 0.147 0 4
0.14 10
57.5 0.0209 0.3 0.148 0 3
0.12 10
86.25 0.01938 0.45 0.149 0.002
2
115 0.01845 0.601 0.151 0.004 0.1 10
143.8 0.01781 0.751 0.154 0.006
0.08
172.5 0.01733 0.901 0.157 0.008
201.3 0.01696 1.051 0.16 0.011 0.06
230 0.01666 1.201 0.164 0.015
0.04
258.8 0.01641 1.351 0.168 0.018
287.5 0.0162 1.502 0.173 0.023 0.02
316.3 0.01602 1.652 0.179 0.027
345 0.01587 1.802 0.185 0.033 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014 1 x Elbow - Standard 45° 0.2138

FFT: 0.01337 Total K: 2.018 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{020} rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 6 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02605 0.109 0 0
5
0.008 10
0 0 0 0 0
3.467 0.04273 0.018 0 0 4
0.007 10
6.933 0.03468 0.036 0 0 3
0.006 10
10.4 0.03101 0.054 0 0
2
13.87 0.02878 0.072 0 0 0.005 10
17.33 0.02722 0.091 0 0
0.004
20.8 0.02605 0.109 0 0
24.27 0.02512 0.127 0 0 0.003
27.73 0.02437 0.145 0 0
0.002
31.2 0.02374 0.163 0 0
34.67 0.0232 0.181 0 0 0.001
38.13 0.02273 0.199 0 0
41.6 0.02231 0.217 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{022} rev: 06/06/13 5:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 3 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
172.6 0.01733 0.901 0 0
5
0.008 10
0 0 0 0 0
28.77 0.02417 0.15 0 0 4
0.007 10
57.53 0.0209 0.3 0 0 3
0.006 10
86.3 0.01938 0.451 0 0
2
115.1 0.01845 0.601 0 0 0.005 10
143.8 0.01781 0.751 0 0
0.004
172.6 0.01733 0.901 0 0
201.4 0.01696 1.052 0.001 0 0.003
230.1 0.01666 1.202 0.001 0
0.002
258.9 0.01641 1.352 0.002 0
287.7 0.0162 1.502 0.002 0 0.001
316.4 0.01602 1.653 0.003 0
345.2 0.01587 1.803 0.003 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{023} rev: 03/06/13 4:39 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02351 0.31 0 0
5
0.008 10
0 0 0 0 0
3.467 0.03657 0.052 0 0 4
0.007 10
6.933 0.03028 0.103 0 0 3
0.006 10
10.4 0.0274 0.155 0 0
2
13.87 0.02564 0.207 0 0 0.005 10
17.33 0.02442 0.259 0 0
0.004
20.8 0.02351 0.31 0 0
24.27 0.02279 0.362 0 0 0.003
27.73 0.02221 0.414 0 0
0.002
31.2 0.02172 0.465 0 0
34.67 0.02131 0.517 0 0 0.001
38.13 0.02095 0.569 0 0
41.6 0.02064 0.62 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{024} rev: 11/06/13 2:26 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
82.6 0.019 0.687 0 0
5
0.008 10
0 0 0 0 0
13.77 0.02731 0.114 0 0 4
0.007 10
27.53 0.02333 0.229 0 0 3
0.006 10
41.3 0.02149 0.343 0 0
2
55.07 0.02036 0.458 0 0 0.005 10
68.83 0.01958 0.572 0 0
0.004
82.6 0.019 0.687 0 0
96.37 0.01854 0.801 0 0 0.003
110.1 0.01818 0.915 0 0
0.002
123.9 0.01787 1.03 0 0
137.7 0.01762 1.144 0.001 0 0.001
151.4 0.01739 1.259 0.001 0
165.2 0.0172 1.373 0.002 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
82.6 0.019 0.687 0 0
5
0.008 10
0 0 0 0 0
13.77 0.02731 0.114 0 0 4
0.007 10
27.53 0.02333 0.229 0 0 3
0.006 10
41.3 0.02149 0.343 0 0
2
55.07 0.02036 0.458 0 0 0.005 10
68.83 0.01958 0.572 0 0
0.004
82.6 0.019 0.687 0 0
96.37 0.01854 0.801 0 0 0.003
110.1 0.01818 0.915 0 0
0.002
123.9 0.01787 1.03 0 0
137.7 0.01762 1.144 0 0 0.001
151.4 0.01739 1.259 0 0
165.2 0.0172 1.373 0 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{029} rev: 11/06/13 2:35 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
82.6 0.019 0.687 0.006 0.005
5
0.02 10
0 0 0 0 0
13.77 0.02731 0.114 0 0 4
0.0175 10
27.53 0.02333 0.229 0 0 3
0.015 10
41.3 0.02149 0.343 0.001 0.001
2
55.07 0.02036 0.458 0.002 0.002 0.0125 10
68.83 0.01958 0.572 0.004 0.004
0.01
82.6 0.019 0.687 0.006 0.005
96.37 0.01854 0.801 0.008 0.007 0.0075
110.1 0.01818 0.915 0.01 0.009
0.005
123.9 0.01787 1.03 0.012 0.011
137.7 0.01762 1.144 0.015 0.014 0.0025
151.4 0.01739 1.259 0.018 0.017
165.2 0.0172 1.373 0.022 0.02 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6305 1 x Swing Check - Vertical 0.7006 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.172 Avg Percent of Total Loss: 90 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{033} rev: 06/06/13 6:57 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02351 0.31 0.001 0
5
0.008 10
0 0 0 0 0
3.467 0.03657 0.052 0 0 4
0.007 10
6.933 0.03028 0.103 0 0 3
0.006 10
10.4 0.0274 0.155 0 0
2
13.87 0.02564 0.207 0 0 0.005 10
17.33 0.02442 0.259 0 0
0.004
20.8 0.02351 0.31 0.001 0
24.27 0.02279 0.362 0.002 0.001 0.003
27.73 0.02221 0.414 0.002 0.002
0.002
31.2 0.02172 0.465 0.003 0.002
34.67 0.02131 0.517 0.003 0.002 0.001
38.13 0.02095 0.569 0.004 0.003
41.6 0.02064 0.62 0.005 0.003 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 59 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{034} rev: 28/08/13 5:42 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
82.6 0.019 0.687 0.411 0.004
5
0.4 10
0 0 0 0.392 0
13.77 0.02731 0.114 0.393 0 4
0.35 10
27.53 0.02333 0.229 0.395 0 3
0.3 10
41.3 0.02149 0.343 0.397 0
2
55.07 0.02036 0.458 0.401 0.002 0.25 10
68.83 0.01958 0.572 0.406 0.003
0.2
82.6 0.019 0.687 0.411 0.004
96.37 0.01854 0.801 0.418 0.005 0.15
110.1 0.01818 0.915 0.425 0.007
0.1
123.9 0.01787 1.03 0.433 0.009
137.7 0.01762 1.144 0.442 0.011 0.05
151.4 0.01739 1.259 0.452 0.013
165.2 0.0172 1.373 0.463 0.016 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.681 Avg Percent of Total Loss: 20 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{036} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
7.7 0.02587 0.449 0.003 0.001
5
0.008 10
0 0 0 0 0
1.283 0.04046 0.075 0 0 4
0.007 10
2.567 0.03333 0.15 0 0 3
0.006 10
3.85 0.03012 0.224 0 0
2
5.133 0.02818 0.299 0.001 0 0.005 10
6.417 0.02685 0.374 0.002 0
0.004
7.7 0.02587 0.449 0.003 0.001
8.983 0.0251 0.524 0.004 0.001 0.003
10.27 0.02448 0.599 0.005 0.002
0.002
11.55 0.02396 0.673 0.006 0.002
12.83 0.02353 0.748 0.007 0.003 0.001
14.12 0.02315 0.823 0.009 0.004
15.4 0.02283 0.898 0.01 0.004 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 1.038 Avg Percent of Total Loss: 35 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
13.1 0.02524 0.195 -0.39 0
5
0.3 10
0 0 0 -0.392 0
2.183 0.0404 0.033 -0.392 0 4
0.2 10
4.367 0.03307 0.065 -0.392 0 3
0.1 10
6.55 0.02974 0.098 -0.391 0
2
8.733 0.02771 0.13 -0.391 0 0 10
10.92 0.0263 0.163 -0.39 0
-0.1
13.1 0.02524 0.195 -0.39 0
15.28 0.02441 0.228 -0.389 0 -0.2
17.47 0.02373 0.261 -0.388 0
-0.3
19.65 0.02317 0.293 -0.387 0
21.83 0.02269 0.326 -0.387 0 -0.4
24.02 0.02228 0.358 -0.386 0
26.2 0.02191 0.391 -0.384 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 06/06/13 6:55 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.81 0.02291 0.31 0 0
5
0.008 10
0 0 0 0 0
3.468 0.03525 0.052 0 0 4
0.007 10
6.937 0.02931 0.103 0 0 3
0.006 10
10.4 0.02659 0.155 0 0
2
13.87 0.02492 0.207 0 0 0.005 10
17.34 0.02377 0.259 0 0
0.004
20.81 0.02291 0.31 0 0
24.28 0.02223 0.362 0 0 0.003
27.75 0.02168 0.414 0 0
0.002
31.22 0.02122 0.466 0 0
34.68 0.02083 0.517 0 0 0.001
38.15 0.0205 0.569 0.001 0
41.62 0.0202 0.621 0.001 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{040} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
82.63 0.01862 0.687 -0.375 0.003
5
0.3 10
0 0 0 -0.392 0
13.77 0.02648 0.114 -0.391 0 4
0.2 10
27.54 0.02271 0.229 -0.39 0 3
0.1 10
41.31 0.02097 0.343 -0.387 0
2
55.09 0.0199 0.458 -0.384 0.001 0 10
68.86 0.01917 0.572 -0.38 0.002
-0.1
82.63 0.01862 0.687 -0.375 0.003
96.4 0.01819 0.801 -0.369 0.003 -0.2
110.2 0.01785 0.916 -0.362 0.004
-0.3
123.9 0.01756 1.03 -0.355 0.006
137.7 0.01732 1.145 -0.347 0.007 -0.4
151.5 0.01711 1.259 -0.338 0.008
165.3 0.01693 1.374 -0.328 0.01 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 45° 0.2242 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.065 Avg Percent of Total Loss: 13 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{041} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
103.4 0.01801 0.859 0.002 0
5
0.008 10
0 0 0 0 0
17.23 0.02514 0.143 0 0 4
0.007 10
34.47 0.02171 0.286 0 0 3
0.006 10
51.7 0.02013 0.43 0 0
2
68.93 0.01916 0.573 0 0 0.005 10
86.17 0.0185 0.716 0.001 0
0.004
103.4 0.01801 0.859 0.002 0
120.6 0.01763 1.003 0.002 0 0.003
137.9 0.01732 1.146 0.003 0
0.002
155.1 0.01706 1.289 0.003 0
172.3 0.01685 1.432 0.004 0 0.001
189.6 0.01667 1.576 0.005 0
206.8 0.01651 1.719 0.006 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 28/08/13 5:48 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 40 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 17 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
82.6 0.019 0.687 0.113 0.006
5
0.16 10
0 0 0 0.098 0
13.77 0.02731 0.114 0.099 0 4
0.14 10
27.53 0.02333 0.229 0.1 0 3
0.12 10
41.3 0.02149 0.343 0.102 0.001
2
55.07 0.02036 0.458 0.105 0.003 0.1 10
68.83 0.01958 0.572 0.108 0.004
0.08
82.6 0.019 0.687 0.113 0.006
96.37 0.01854 0.801 0.118 0.008 0.06
110.1 0.01818 0.915 0.123 0.011
0.04
123.9 0.01787 1.03 0.13 0.013
137.7 0.01762 1.144 0.137 0.016 0.02
151.4 0.01739 1.259 0.145 0.02
165.2 0.0172 1.373 0.153 0.024 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.522 Avg Percent of Total Loss: 41 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 28/08/13 5:49 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 40 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 17 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.08 10
82.63 0.01862 0.687 -0.085 0.005
5
0.06 10
0 0 0 -0.098 0
13.77 0.02648 0.114 -0.098 0 4
0.04 10
27.54 0.02271 0.229 -0.096 0 3
0.02 10
41.31 0.02097 0.343 -0.094 0.001
2
55.09 0.0199 0.458 -0.092 0.002 0 10
68.86 0.01917 0.572 -0.088 0.003
-0.02
82.63 0.01862 0.687 -0.085 0.005
96.4 0.01819 0.801 -0.08 0.007 -0.04
110.2 0.01785 0.916 -0.075 0.009
-0.06
123.9 0.01756 1.03 -0.069 0.011
137.7 0.01732 1.145 -0.062 0.014 -0.08
151.5 0.01711 1.259 -0.055 0.017
165.3 0.01693 1.374 -0.047 0.02 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
5 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.102 Avg Percent of Total Loss: 36 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 90 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
13.1 0.02597 0.195 0.004 0
5
0.016 10
0 0 0 0 0
2.183 0.04203 0.033 0 0 4
0.014 10
4.367 0.03425 0.065 0 0 3
0.012 10
6.55 0.03072 0.098 0.001 0
2
8.733 0.02858 0.13 0.002 0 0.01 10
10.92 0.02709 0.163 0.003 0
0.008
13.1 0.02597 0.195 0.004 0
15.28 0.02509 0.228 0.005 0.001 0.006
17.47 0.02438 0.261 0.006 0.001
0.004
19.65 0.02378 0.293 0.008 0.002
21.83 0.02328 0.326 0.009 0.002 0.002
24.02 0.02284 0.358 0.011 0.003
26.2 0.02245 0.391 0.013 0.003 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
9 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 4.021 Avg Percent of Total Loss: 18 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 90 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.1 0.02524 0.195 0.003 0
5
0.008 10
0 0 0 0 0
2.183 0.0404 0.033 0 0 4
0.007 10
4.367 0.03307 0.065 0 0 3
0.006 10
6.55 0.02974 0.098 0 0
2
8.733 0.02771 0.13 0.001 0 0.005 10
10.92 0.0263 0.163 0.002 0
0.004
13.1 0.02524 0.195 0.003 0
15.28 0.02441 0.228 0.004 0 0.003
17.47 0.02373 0.261 0.005 0
0.002
19.65 0.02317 0.293 0.006 0
21.83 0.02269 0.326 0.007 0 0.001
24.02 0.02228 0.358 0.008 0
26.2 0.02191 0.391 0.01 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{047} rev: 28/08/13 5:45 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
7.7 0.02587 0.449 0.005 0.003
5
0.016 10
0 0 0 0 0
1.283 0.04046 0.075 0 0 4
0.014 10
2.567 0.03333 0.15 0 0 3
0.012 10
3.85 0.03012 0.224 0.001 0
2
5.133 0.02818 0.299 0.002 0.001 0.01 10
6.417 0.02685 0.374 0.003 0.002
0.008
7.7 0.02587 0.449 0.005 0.003
8.983 0.0251 0.524 0.006 0.004 0.006
10.27 0.02448 0.599 0.008 0.006
0.004
11.55 0.02396 0.673 0.011 0.007
12.83 0.02353 0.748 0.013 0.009 0.002
14.12 0.02315 0.823 0.016 0.011
15.4 0.02283 0.898 0.018 0.013 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 3.115 Avg Percent of Total Loss: 60 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{048} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 12 °C
Length: 10 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
7.703 0.02522 0.449 0.006 0.003
5
0.02 10
0 0 0 0 0
1.284 0.03896 0.075 0 0 4
0.0175 10
2.568 0.03225 0.15 0 0 3
0.015 10
3.851 0.02922 0.225 0.002 0
2
5.135 0.0274 0.299 0.003 0.001 0.0125 10
6.419 0.02615 0.374 0.004 0.002
0.01
7.703 0.02522 0.449 0.006 0.003
8.987 0.0245 0.524 0.008 0.004 0.0075
10.27 0.02392 0.599 0.01 0.005
0.005
11.55 0.02343 0.674 0.013 0.006
12.84 0.02303 0.749 0.016 0.007 0.0025
14.12 0.02268 0.823 0.019 0.009
15.41 0.02237 0.898 0.022 0.01 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 2.596 Avg Percent of Total Loss: 41 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{053} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{054} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{055} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{056} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{057} rev: 28/08/13 5:43 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
13.1 0.02597 0.195 0.395 0
5
0.4 10
0 0 0 0.392 0
2.183 0.04203 0.033 0.392 0 4
0.35 10
4.367 0.03425 0.065 0.392 0 3
0.3 10
6.55 0.03072 0.098 0.393 0
2
8.733 0.02858 0.13 0.393 0 0.25 10
10.92 0.02709 0.163 0.394 0
0.2
13.1 0.02597 0.195 0.395 0
15.28 0.02509 0.228 0.396 0 0.15
17.47 0.02438 0.261 0.396 0
0.1
19.65 0.02378 0.293 0.398 0
21.83 0.02328 0.326 0.399 0 0.05
24.02 0.02284 0.358 0.4 0.001
26.2 0.02245 0.391 0.401 0.001 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 10 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{058} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
82.6 0.019 0.687 0.004 0.003
5
0.016 10
0 0 0 0 0
13.77 0.02731 0.114 0 0 4
0.014 10
27.53 0.02333 0.229 0 0 3
0.012 10
41.3 0.02149 0.343 0 0
2
55.07 0.02036 0.458 0.002 0.002 0.01 10
68.83 0.01958 0.572 0.003 0.002
0.008
82.6 0.019 0.687 0.004 0.003
96.37 0.01854 0.801 0.005 0.005 0.006
110.1 0.01818 0.915 0.007 0.006
0.004
123.9 0.01787 1.03 0.008 0.008
137.7 0.01762 1.144 0.01 0.01 0.002
151.4 0.01739 1.259 0.012 0.012
165.2 0.0172 1.373 0.015 0.014 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Butterfly 0.6305

FFT: 0.01401 Total K: 1.471 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{062} rev: 06/06/13 7:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02351 0.31 0 0
5
0.008 10
0 0 0 0 0
3.467 0.03657 0.052 0 0 4
0.007 10
6.933 0.03028 0.103 0 0 3
0.006 10
10.4 0.0274 0.155 0 0
2
13.87 0.02564 0.207 0 0 0.005 10
17.33 0.02442 0.259 0 0
0.004
20.8 0.02351 0.31 0 0
24.27 0.02279 0.362 0.001 0.001 0.003
27.73 0.02221 0.414 0.001 0.001
0.002
31.2 0.02172 0.465 0.002 0.002
34.67 0.02131 0.517 0.002 0.002 0.001
38.13 0.02095 0.569 0.003 0.003
41.6 0.02064 0.62 0.003 0.003 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 76 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{063} rev: 03/06/13 4:40 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02351 0.31 0 0
5
0.008 10
0 0 0 0 0
3.467 0.03657 0.052 0 0 4
0.007 10
6.933 0.03028 0.103 0 0 3
0.006 10
10.4 0.0274 0.155 0 0
2
13.87 0.02564 0.207 0 0 0.005 10
17.33 0.02442 0.259 0 0
0.004
20.8 0.02351 0.31 0 0
24.27 0.02279 0.362 0 0 0.003
27.73 0.02221 0.414 0 0
0.002
31.2 0.02172 0.465 0 0
34.67 0.02131 0.517 0 0 0.001
38.13 0.02095 0.569 0 0
41.6 0.02064 0.62 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{064} rev: 28/08/13 12:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
20.8 0.02351 0.31 0.001 0.001
5
0.008 10
0 0 0 0 0
3.467 0.03657 0.052 0 0 4
0.007 10
6.933 0.03028 0.103 0 0 3
0.006 10
10.4 0.0274 0.155 0 0
2
13.87 0.02564 0.207 0 0 0.005 10
17.33 0.02442 0.259 0 0
0.004
20.8 0.02351 0.31 0.001 0.001
24.27 0.02279 0.362 0.002 0.002 0.003
27.73 0.02221 0.414 0.002 0.002
0.002
31.2 0.02172 0.465 0.003 0.002
34.67 0.02131 0.517 0.003 0.003 0.001
38.13 0.02095 0.569 0.004 0.004
41.6 0.02064 0.62 0.005 0.004 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 82 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{068} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
7.7 0.02587 0.449 0.002 0
5
0.008 10
0 0 0 0 0
1.283 0.04046 0.075 0 0 4
0.007 10
2.567 0.03333 0.15 0 0 3
0.006 10
3.85 0.03012 0.224 0 0
2
5.133 0.02818 0.299 0 0 0.005 10
6.417 0.02685 0.374 0.001 0
0.004
7.7 0.02587 0.449 0.002 0
8.983 0.0251 0.524 0.002 0 0.003
10.27 0.02448 0.599 0.003 0
0.002
11.55 0.02396 0.673 0.003 0
12.83 0.02353 0.748 0.004 0 0.001
14.12 0.02315 0.823 0.005 0
15.4 0.02283 0.898 0.006 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{069} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
103.4 0.01801 0.859 0.002 0
5
0.008 10
0 0 0 0 0
17.23 0.02514 0.143 0 0 4
0.007 10
34.47 0.02171 0.286 0 0 3
0.006 10
51.7 0.02013 0.43 0 0
2
68.93 0.01916 0.573 0 0 0.005 10
86.17 0.0185 0.716 0.001 0
0.004
103.4 0.01801 0.859 0.002 0
120.6 0.01763 1.003 0.002 0 0.003
137.9 0.01732 1.146 0.003 0
0.002
155.1 0.01706 1.289 0.003 0
172.3 0.01685 1.432 0.004 0 0.001
189.6 0.01667 1.576 0.005 0
206.8 0.01651 1.719 0.006 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{070} rev: 10/09/13 4:39 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 15 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.5 0.01733 0.901 -0.187 0.005
5
0.15 10
0 0 0 -0.196 0
28.75 0.02417 0.15 -0.196 0 4
0.1 10
57.5 0.0209 0.3 -0.195 0 3
0.05 10
86.25 0.01938 0.45 -0.194 0.001
2
115 0.01845 0.601 -0.192 0.002 0 10
143.8 0.01781 0.751 -0.19 0.003
-0.05
172.5 0.01733 0.901 -0.187 0.005
201.3 0.01696 1.051 -0.184 0.007 -0.1
230 0.01666 1.201 -0.18 0.009
-0.15
258.8 0.01641 1.351 -0.176 0.011
287.5 0.0162 1.502 -0.172 0.014 -0.2
316.3 0.01602 1.652 -0.167 0.016
345 0.01587 1.802 -0.162 0.019 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 53 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{071} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
7.7 0.02587 0.449 0.002 0
5
0.008 10
0 0 0 0 0
1.283 0.04046 0.075 0 0 4
0.007 10
2.567 0.03333 0.15 0 0 3
0.006 10
3.85 0.03012 0.224 0 0
2
5.133 0.02818 0.299 0 0 0.005 10
6.417 0.02685 0.374 0.001 0
0.004
7.7 0.02587 0.449 0.002 0
8.983 0.0251 0.524 0.002 0 0.003
10.27 0.02448 0.599 0.003 0
0.002
11.55 0.02396 0.673 0.003 0
12.83 0.02353 0.748 0.004 0 0.001
14.12 0.02315 0.823 0.005 0
15.4 0.02283 0.898 0.006 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:13 pm


Lineup: Operación 60%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe70 rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 1.5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
103.4 0.01878 0.54 0 0
5
0.008 10
0 0 0 0 0
17.23 0.02726 0.09 0 0 4
0.007 10
34.47 0.02323 0.18 0 0 3
0.006 10
51.7 0.02134 0.27 0 0
2
68.93 0.02019 0.36 0 0 0.005 10
86.17 0.01938 0.45 0 0
0.004
103.4 0.01878 0.54 0 0
120.6 0.01831 0.63 0 0 0.003
137.9 0.01792 0.72 0 0
0.002
155.1 0.0176 0.81 0 0
172.3 0.01733 0.9 0 0 0.001
189.6 0.0171 0.99 0 0
206.8 0.0169 1.08 0 0 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
HVAC system. Hydraulic calculation report (IFP)
Document:
0331-CAL-ING-014-010-0001
UTE Dead Sea Review: 0 Date: 10/09/2013
DSWPP-GT1
Page: 24 of 24

Appendix 7
HVAC Chilled Water Circuit - Operation Case (40%)
P: 3.002 bar g
Ø: 3 in

El: 12 m
Flow: 5.1 m³/hr
Vel: 0.297 m/sec

P: 2.611 bar g
Ø: 6 in P: 3.002 bar g Ø: 6 in

El: 16 m
Flow: 13.91 m³/hr El: 12 m Flow: 8.803 m³/hr
Vel: 0.207 m/sec Vel: 0.131 m/sec

P: 3.002 bar g
Ø: 10 in Ø: 6 in Ø: 6 in Ø: 8 in

El: 12 m
P: 3.001 bar g Flow: 69.03 m³/hr
Set @ 86.3 m³/hr Filter #a Vel: 0.574 m/sec

Flow: 69.03 m³/hr


Vel: 0.574 m/sec
Chiller #1 El: 12 m

P: 2.618 bar g
P: 2.816 bar g

Ø: 10 in

Ø: 6 in
Ø: 8 in

El: 16 m
Flow: 55.12 m³/hr
El: 14 m

Ø: 8 in
Vel: 0.458 m/sec

Ø: 10 in Ø: 6 in Ø: 6 in Ø: 6 in Ø: 10 in
Flow: 172.6 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
P: 3.837 bar g Vel: 1.287 m/sec Set @ 86.3 m³/hr
Flow: 86.3 m³/hr P: 2.999 barFlow:
g 172.6 m³/hr
Vel: 0.901 m/sec Filter #b Vel: 1.287 m/sec
Vel: 1.287 m/sec El: 12 m Vel: 0.901 m/secBuffer tank

Flow: 172.6 m³/hr

Flow: 55.12 m³/hr

Flow: 8.803 m³/hr

Flow: 5.102 m³/hr


Vel: 0.901 m/sec

Vel: 1.287 m/sec

Vel: 0.458 m/sec

Vel: 0.131 m/sec

Vel: 0.297 m/sec


P: 3.831 bar g El: 14 m

Flow: 86.3 m³/hr


TH: (13.08) m Flow: 86.3 m³/hr
El: 14 m NPSHa: 39.09 m dP: 0.2 bar
Ps: 2.782 bar g
Pd: 4.065 bar g

Ø: 10 in

Ø: 6 in

Ø: 8 in

Ø: 6 in

Ø: 3 in
Ø: 10 in Ø: 6 in Ø: 6 in
Flow: 172.5 m³/hr Flow: 86.3 m³/hr Flow: 86.3 m³/hr
Vel: 0.901 m/sec Chiller #2 Vel: 1.287 m/sec Set @ 86.3 m³/hr Vel: 1.287 m/secFilter #c
TH: (13.08) m Flow: 86.3 m³/hr
Flow: 172.6 m³/hr
NPSHa: 39.09 m dP: 0.2 bar
dP: 1 bar ELECTRIC Building OFFICE BUILDING WTP
Ps: 2.782 bar g
Pd: 4.065 bar g Flow: 55.1 m³/hr Flow: 8.8 m³/hr Flow: 5.1 m³/hr
dP: 0.24 bar dP: 0.275 bar dP: 0.291 bar

Ø: 10 in Ø: 10 in
Flow: 172.5 m³/hr Flow: 103.5 m³/hr
P: 3.003 bar g
Vel: 0.901 m/sec Vel: 0.541 m/sec
El: 12 m

Vel: 0.458 m/sec


Flow: 55.1 m³/hr
Vel: 0.36 m/sec

Flow: 55.1 m³/hr


Flow: 69 m³/hr

Ø: 8 in
dP: 0.2 bar
Ø: 8 in

Ø: 10 in

Filter #1
Flow: 55.1 m³/hr
Vel: 0.458 m/sec Set @ 55.1 m³/hr

El: 12 m Vel: 0.458 m/sec


g 55.1 m³/hr
TH: (4.831) m
NPSHa: 39.29 m
Ps: 2.801 bar g
Ø: 8 in Pd: 3.275 bar g

Ø: 8 in
Flow: 55.1 m³/hr

Flow:
Vel: 0.458 m/sec
P: 3.003 bar g

P: 3.272 bar

Vel: 0.131 m/sec


Ø: 8 in Ø: 8 in

Flow: 8.8 m³/hr


El: 12 m

Flow: 55.1 m³/hr


P: 3.003 bar g Flow: 55.1 m³/hr P: 2.871 bar g
Vel: 0.458 m/sec
El: 12 m Vel: 0.458 m/sec El: 16 m

Ø: 6 in

Vel: 0.297 m/sec


Ø: 8 in

Flow: 5.1 m³/hr


Ø: 8 in
Filter #2

Ø: 3 in
Ø: 8 in

Set @ 55.1 m³/hr


Vel: 0.073 m/sec
Flow: 13.9 m³/hr
Ø: 10 in

Flow: 13.9 m³/hr


dP: 0.2 bar

Ø: 6 in
Filter #3

Flow: 13.9 m³/hr

Vel: 0.207 m/sec


Vel: 0.207 m/sec Set @ 13.9 m³/hr

Flow: 13.9 m³/hr


Vel: 0.207 m/sec
Flow: 13.9 m³/hr

TH: (5.089) m
NPSHa: 39.3 m
Ps: 2.803 bar g
Pd: 3.302 bar g

Ø: 6 in
Ø: 6 in

P: 3.301 bar g
P: 3.003 bar g

Ø: 6 in Ø: 6 in Ø: 6 in

El: 12 m
Flow: 13.9 m³/hr
P: 3.003 bar g Flow: 13.9 m³/hr P: 3.3 bar g Flow: 8.8 m³/hr
FCV @ 8.8 m³/hr
El: 12 m

Vel: 0.207 m/sec Vel: 0.207 m/sec Vel: 0.131 m/sec

Vel: 0.297 m/sec


El: 12 m El: 12 m dP: 0.018 bar

Flow: 5.1 m³/hr


Ø: 6 in

Ø: 3 in
Filter #4

Ø: 6 in Ø: 6 in Ø: 3 in
P: 3.299 bar g Flow: 5.1 m³/hr P: 3.298 bar g
Set @ 13.9 m³/hr Vel: 0.297 m/sec
El: 12 m El: 12 m

Lineup: Operación 40% Darcy-Weisbach PIPE-FLO 2009


System: HVAC Chilled water circuit Flow: m³/hr
Date: 10/09/13 7:14 pm Pressure: bar g
Company: Size: in
Project: Elevation: m
by: Velocity: m/sec
Length: m
Volume: m³
List Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Total System Volume: 19.46 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
A112_Sch20 A112 / 20 0.0018 in not specified ---
Valves: standard C: 140 ---

A112_Sch40 A112 / 40 0.0018 in not specified ---


Valves: standard C: 140 ---

A112_Sch80 A112 / 80 0.0018 in not specified ---


Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C bar g kg/m³ cP bar a
Chilled water (cold) Water 7 5 999.9 1.371 0.01003 / 220.6
Chilled water (hot) Water 12 5 999.6 1.206 0.01403 / 220.6

PIPE-FLO 2009 pg 1
List Report 10/09/13 7:14 pm

Pipelines
Pipeline From To Status Flow Velocity dP HL
m³/hr m/sec bar m
By-Pass Line ~N{043} Buffer tank 103.5 0.541 0.003 0.033
Pipe{005} ~N{003} ~N{004} 172.6 0.901 0.006 0.065
Pipe{006} Primary Pumps #2 ~N{003} 86.3 1.287 0.227 0.32
Pipe{007} Primary Pumps #1 ~N{003} X Closed --- --- --- ---
Pipe{008} Primary Pumps #3 ~N{003} 86.3 1.287 0.227 0.32
Pipe{012} ~N{004} Chiller #2 172.6 0.901 (0.191) 0.055
Pipe{013} ~N{004} Chiller #1 X Closed --- --- --- ---
Pipe{014} Chiller #1 ~N{011} X Closed --- --- --- ---
Pipe{015} Chiller #2 ~N{011} 172.5 0.901 0.157 0.097
Pipe{020} ~N{015} ~N{013} 13.9 0.073 0 0
Pipe{022} Buffer tank ~N{009} 172.6 0.901 0 0.008
Pipe{023} ~N{013} ~N{016} 13.9 0.207 0 0
Pipe{024} ~N{015} ~N{017} 55.1 0.458 0 0.002
Pipe{027} ~N{017} Filter #1 55.1 0.458 0 0.001
Pipe{028} ~N{017} Filter #2 X Closed --- --- --- ---
Pipe{029} Electric Building Pumps #1 ~N{022} 55.1 0.458 0.002 0.025
Pipe{030} Electric Building Pumps #2 ~N{022} X Closed --- --- --- ---
Pipe{033} ~N{023} ~N{026} 13.9 0.207 0 0.006
Pipe{034} ~N{022} ~N{025} 55.1 0.458 0.401 0.092
Pipe{036} ~N{026} ~N{041} 5.1 0.297 0.001 0.013
Pipe{038} ~N{033} ~N{029} 8.803 0.131 (0.391) 0.011
Pipe{039} ~N{029} ~N{031} 13.91 0.207 0 0.002
Pipe{040} ~N{032} ~N{031} 55.12 0.458 (0.384) 0.083
Pipe{041} ~N{031} ~N{042} 69.03 0.574 0 0.008
Pipe{043} ~N{025} ELECTRIC Building 55.1 0.458 0.105 0.069
Pipe{044} ELECTRIC Building ~N{032} 55.12 0.458 (0.092) 0.064
Pipe{045} ~N{034} OFFICE BUILDING 8.8 0.131 0.002 0.018
Pipe{046} OFFICE BUILDING ~N{033} 8.803 0.131 0.001 0.014
Pipe{047} ~N{036} WTP 5.1 0.297 0.002 0.022
Pipe{048} WTP ~N{035} 5.102 0.297 0.003 0.028
Pipe{051} ~N{009} Filter #a X Closed --- --- --- ---
Pipe{052} Filter #a Primary Pumps #1 X Closed --- --- --- ---
Pipe{053} Filter #b Primary Pumps #2 86.3 1.287 0.015 0.152
Pipe{054} Filter #c Primary Pumps #3 86.3 1.287 0.015 0.152
Pipe{055} ~N{009} Filter #b 86.3 1.287 0.002 0.02
Pipe{056} ~N{009} Filter #c 86.3 1.287 0.002 0.02
Pipe{057} ~N{026} ~N{034} 8.8 0.131 0.393 0.013
Pipe{058} Filter #1 Electric Building Pumps #1 55.1 0.458 0.002 0.017
Pipe{059} Filter #2 Electric Building Pumps #2 X Closed --- --- --- ---
Pipe{062} Filter #3 Office & WTP Building Pu.. 13.9 0.207 0 0.004
Pipe{063} ~N{016} Filter #3 13.9 0.207 0 0
Pipe{064} Office & WTP Building Pu.. ~N{023} 13.9 0.207 0 0.006
Pipe{065} ~N{016} Filter #4 X Closed --- --- --- ---
Pipe{066} Filter #4 Office & WTP Building Pu.. X Closed --- --- --- ---
Pipe{067} Office & WTP Building Pu.. ~N{023} X Closed --- --- --- ---
Pipe{068} ~N{041} ~N{036} 5.1 0.297 0 0.008
Pipe{069} ~N{042} Buffer tank 69.03 0.574 0 0.008
Pipe{070} ~N{011} ~N{043} 172.5 0.901 (0.187) 0.091
Pipe{071} ~N{035} ~N{029} 5.1 0.297 0 0.008
Pipe70 ~N{043} ~N{015} 69 0.36 0 0

PIPE-FLO 2009 pg 2
List Report 10/09/13 7:14 pm

Nodes
Node Elev Status Pressure Grade
m bar g m
~N{003} 14 3.837 53.16
~N{004} 14 3.831 53.09
~N{009} 12 2.999 42.59
~N{011} 14 2.816 42.73
~N{013} 12 3.003 42.63
~N{015} 12 3.003 42.63
~N{016} 12 3.003 42.63
~N{017} 12 3.003 42.63
~N{022} 12 3.272 45.38
~N{023} 12 3.301 45.67
~N{025} 16 2.871 45.29
~N{026} 12 3.3 45.67
~N{029} 12 3.002 42.63
~N{031} 12 3.002 42.63
~N{032} 16 2.618 42.71
~N{033} 16 2.611 42.64
~N{035} 12 3.002 42.63
~N{036} 12 3.298 45.65
~N{041} 12 3.299 45.65
~N{042} 12 3.001 42.62
~N{043} 12 3.003 42.64

PIPE-FLO 2009 pg 3
List Report 10/09/13 7:14 pm

Pumps
Pump Flow Status Total head dP Speed NPSHa Suction Discharge Suction Discharge
m³/hr m bar rpm m bar g bar g m m
Electric Building Pumps #1 55.1 (4.831) (0.474) --- 39.29 2.801 3.275 12 12
Office & WTP Building Pumps #1 13.9 (5.089) (0.499) --- 39.3 2.803 3.302 12 12
Primary Pumps #2 86.3 (13.08) (1.283) --- 39.09 2.782 4.065 12 12
Primary Pumps #3 86.3 (13.08) (1.283) --- 39.09 2.782 4.065 12 12

Components
Component Flow Status Head Loss dP Inlet Outlet Inlet Outlet
m³/hr m bar bar g bar g m m
Chiller #2 172.6 10.2 1 4.022 2.973 12 12.5
ELECTRIC Building 55.1 2.453 0.24 2.766 2.526 17 17
Filter #1 55.1 2.04 0.2 3.003 2.803 12 12
Filter #3 13.9 2.04 0.2 3.003 2.803 12 12
Filter #b 86.3 2.04 0.2 2.997 2.797 12 12
Filter #c 86.3 2.04 0.2 2.997 2.797 12 12
OFFICE BUILDING 8.8 2.806 0.275 2.887 2.612 16 16
WTP 5.1 2.968 0.291 3.296 3.005 12 12

Controls
Control Set Value Elev Flow Status dP HL Inlet Outlet
m m³/hr bar m bar g bar g
~N{034} FCV: 8.8 16 8.8 0.018 0.184 2.907 2.889

PIPE-FLO 2009 pg 4
List Report 10/09/13 7:14 pm

Tanks
Tank Surface Pressure Level Bottom Elevation Status Flow Pressure Grade
bar g m m m³/hr bar g m
Buffer tank 3 0 12 -0.038 3 42.6
Connecting pipelines Flow (m³/hr) Pressure (bar g) Grade (m)
By-Pass Line @ 0 m 103.5 3 42.6
Pipe{022} @ 0 m 172.6 3 42.6
Pipe{069} @ 0 m 69.03 3 42.61

PIPE-FLO 2009 pg 5
List Report 10/09/13 7:14 pm

Notes

PIPE-FLO 2009 pg 6
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

By-Pass Line rev: 28/08/13 5:28 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 20 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.018 10
103.5 0.01878 0.541 0.003 0.001
5
0.016 10
0 0 0 0 0
17.25 0.02725 0.09 0 0 4
0.014 10
34.5 0.02322 0.18 0 0 3
0.012 10
51.75 0.02134 0.27 0 0
2
69 0.02018 0.36 0.002 0 0.01 10
86.25 0.01938 0.45 0.002 0
0.008
103.5 0.01878 0.541 0.003 0.001
120.8 0.0183 0.631 0.004 0.002 0.006
138 0.01792 0.721 0.006 0.002
0.004
155.3 0.0176 0.811 0.007 0.003
172.5 0.01733 0.901 0.009 0.003 0.002
189.7 0.0171 0.991 0.01 0.004
207 0.01689 1.081 0.012 0.005 25 50 75 100 125 150 175 200 225 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.8019 Avg Percent of Total Loss: 32 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{005} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 18 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.0225 10
172.6 0.01702 0.901 0.006 0.002
5
0.02 10
0 0 0 0 0
28.77 0.02349 0.15 0 0 4
0.0175 10
57.53 0.02039 0.3 0 0 3
0.015 10
86.3 0.01895 0.451 0.002 0
2
115.1 0.01807 0.601 0.003 0 0.0125 10
143.8 0.01747 0.751 0.005 0.001
0.01
172.6 0.01702 0.901 0.006 0.002
201.4 0.01667 1.052 0.009 0.002 0.0075
230.1 0.01639 1.202 0.011 0.003
0.005
258.9 0.01616 1.352 0.014 0.004
287.7 0.01596 1.502 0.017 0.005 0.0025
316.4 0.01579 1.653 0.02 0.005
345.2 0.01565 1.803 0.024 0.006 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 0.401 Avg Percent of Total Loss: 23 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{006} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{008} rev: 28/08/13 4:48 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 14 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
86.3 0.01818 1.287 0.227 0.026
5
0.4 10
0 0 0 0.196 0
14.38 0.02473 0.215 0.197 0 4
0.35 10
28.77 0.02154 0.429 0.2 0.003 3
0.3 10
43.15 0.02008 0.644 0.204 0.007
2
57.53 0.01921 0.858 0.21 0.012 0.25 10
71.92 0.01862 1.073 0.218 0.018
0.2
86.3 0.01818 1.287 0.227 0.026
100.7 0.01785 1.502 0.239 0.036 0.15
115.1 0.01758 1.716 0.251 0.047
0.1
129.4 0.01736 1.931 0.266 0.06
143.8 0.01718 2.145 0.282 0.073 0.05
158.2 0.01703 2.36 0.3 0.089
172.6 0.01689 2.574 0.32 0.106 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
4 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447

FFT: 0.01489 Total K: 3.202 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{012} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.6 0.01702 0.901 -0.191 0.004
5
0.15 10
0 0 0 -0.196 0
28.77 0.02349 0.15 -0.196 0 4
0.1 10
57.53 0.02039 0.3 -0.195 0 3
0.05 10
86.3 0.01895 0.451 -0.195 0.001
2
115.1 0.01807 0.601 -0.194 0.002 0 10
143.8 0.01747 0.751 -0.192 0.003
-0.05
172.6 0.01702 0.901 -0.191 0.004
201.4 0.01667 1.052 -0.189 0.006 -0.1
230.1 0.01639 1.202 -0.187 0.007
-0.15
258.9 0.01616 1.352 -0.184 0.009
287.7 0.01596 1.502 -0.181 0.011 -0.2
316.4 0.01579 1.653 -0.178 0.014
345.2 0.01565 1.803 -0.175 0.016 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014

FFT: 0.01337 Total K: 1.002 Avg Percent of Total Loss: 74 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{015} rev: 10/09/13 4:40 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12.5 m out: 14 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
172.5 0.01733 0.901 0.157 0.008
5
0.16 10
0 0 0 0.147 0
28.75 0.02417 0.15 0.147 0 4
0.14 10
57.5 0.0209 0.3 0.148 0 3
0.12 10
86.25 0.01938 0.45 0.149 0.002
2
115 0.01845 0.601 0.151 0.004 0.1 10
143.8 0.01781 0.751 0.154 0.006
0.08
172.5 0.01733 0.901 0.157 0.008
201.3 0.01696 1.051 0.16 0.011 0.06
230 0.01666 1.201 0.164 0.015
0.04
258.8 0.01641 1.351 0.168 0.018
287.5 0.0162 1.502 0.173 0.023 0.02
316.3 0.01602 1.652 0.179 0.027
345 0.01587 1.802 0.185 0.033 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401 1 x Butterfly 0.6014 1 x Elbow - Standard 45° 0.2138

FFT: 0.01337 Total K: 2.018 Avg Percent of Total Loss: 84 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{020} rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 6 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02876 0.073 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04882 0.012 0 0 4
0.007 10
4.633 0.03904 0.024 0 0 3
0.006 10
6.95 0.03465 0.036 0 0
2
9.267 0.03199 0.048 0 0 0.005 10
11.58 0.03014 0.06 0 0
0.004
13.9 0.02876 0.073 0 0
16.22 0.02767 0.085 0 0 0.003
18.53 0.02678 0.097 0 0
0.002
20.85 0.02603 0.109 0 0
23.17 0.0254 0.121 0 0 0.001
25.48 0.02484 0.133 0 0
27.8 0.02436 0.145 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{022} rev: 06/06/13 5:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 3 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
172.6 0.01733 0.901 0 0
5
0.008 10
0 0 0 0 0
28.77 0.02417 0.15 0 0 4
0.007 10
57.53 0.0209 0.3 0 0 3
0.006 10
86.3 0.01938 0.451 0 0
2
115.1 0.01845 0.601 0 0 0.005 10
143.8 0.01781 0.751 0 0
0.004
172.6 0.01733 0.901 0 0
201.4 0.01696 1.052 0.001 0 0.003
230.1 0.01666 1.202 0.001 0
0.002
258.9 0.01641 1.352 0.002 0
287.7 0.0162 1.502 0.002 0 0.001
316.4 0.01602 1.653 0.003 0
345.2 0.01587 1.803 0.003 0 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{023} rev: 03/06/13 4:39 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02563 0.207 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04126 0.035 0 0 4
0.007 10
4.633 0.0337 0.069 0 0 3
0.006 10
6.95 0.03026 0.104 0 0
2
9.267 0.02817 0.138 0 0 0.005 10
11.58 0.02671 0.173 0 0
0.004
13.9 0.02563 0.207 0 0
16.22 0.02477 0.242 0 0 0.003
18.53 0.02408 0.276 0 0
0.002
20.85 0.0235 0.311 0 0
23.17 0.023 0.346 0 0 0.001
25.48 0.02257 0.38 0 0
27.8 0.0222 0.415 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{024} rev: 11/06/13 2:26 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
55.1 0.02036 0.458 0 0
5
0.008 10
0 0 0 0 0
9.183 0.03023 0.076 0 0 4
0.007 10
18.37 0.02551 0.153 0 0 3
0.006 10
27.55 0.02333 0.229 0 0
2
36.73 0.02199 0.305 0 0 0.005 10
45.92 0.02106 0.382 0 0
0.004
55.1 0.02036 0.458 0 0
64.28 0.01981 0.534 0 0 0.003
73.47 0.01937 0.611 0 0
0.002
82.65 0.019 0.687 0 0
91.83 0.01868 0.763 0 0 0.001
101 0.01841 0.84 0 0
110.2 0.01818 0.916 0 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{027} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
55.1 0.02036 0.458 0 0
5
0.008 10
0 0 0 0 0
9.183 0.03023 0.076 0 0 4
0.007 10
18.37 0.02551 0.153 0 0 3
0.006 10
27.55 0.02333 0.229 0 0
2
36.73 0.02199 0.305 0 0 0.005 10
45.92 0.02106 0.382 0 0
0.004
55.1 0.02036 0.458 0 0
64.28 0.01981 0.534 0 0 0.003
73.47 0.01937 0.611 0 0
0.002
82.65 0.019 0.687 0 0
91.83 0.01868 0.763 0 0 0.001
101 0.01841 0.84 0 0
110.2 0.01818 0.916 0 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{029} rev: 11/06/13 2:35 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
55.1 0.02036 0.458 0.002 0.002
5
0.008 10
0 0 0 0 0
9.183 0.03023 0.076 0 0 4
0.007 10
18.37 0.02551 0.153 0 0 3
0.006 10
27.55 0.02333 0.229 0 0
2
36.73 0.02199 0.305 0.001 0.001 0.005 10
45.92 0.02106 0.382 0.002 0.002
0.004
55.1 0.02036 0.458 0.002 0.002
64.28 0.01981 0.534 0.003 0.003 0.003
73.47 0.01937 0.611 0.004 0.004
0.002
82.65 0.019 0.687 0.006 0.005
91.83 0.01868 0.763 0.007 0.006 0.001
101 0.01841 0.84 0.008 0.008
110.2 0.01818 0.916 0.01 0.009 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6305 1 x Swing Check - Vertical 0.7006 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.172 Avg Percent of Total Loss: 85 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{033} rev: 06/06/13 6:57 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02563 0.207 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04126 0.035 0 0 4
0.007 10
4.633 0.0337 0.069 0 0 3
0.006 10
6.95 0.03026 0.104 0 0
2
9.267 0.02817 0.138 0 0 0.005 10
11.58 0.02671 0.173 0 0
0.004
13.9 0.02563 0.207 0 0
16.22 0.02477 0.242 0 0 0.003
18.53 0.02408 0.276 0 0
0.002
20.85 0.0235 0.311 0.001 0
23.17 0.023 0.346 0.002 0.001 0.001
25.48 0.02257 0.38 0.002 0.001
27.8 0.0222 0.415 0.002 0.002 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 52 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{034} rev: 28/08/13 5:42 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
55.1 0.02036 0.458 0.401 0.002
5
0.4 10
0 0 0 0.392 0
9.183 0.03023 0.076 0.392 0 4
0.35 10
18.37 0.02551 0.153 0.393 0 3
0.3 10
27.55 0.02333 0.229 0.395 0
2
36.73 0.02199 0.305 0.396 0 0.25 10
45.92 0.02106 0.382 0.399 0.001
0.2
55.1 0.02036 0.458 0.401 0.002
64.28 0.01981 0.534 0.404 0.002 0.15
73.47 0.01937 0.611 0.407 0.003
0.1
82.65 0.019 0.687 0.411 0.004
91.83 0.01868 0.763 0.415 0.005 0.05
101 0.01841 0.84 0.42 0.006
110.2 0.01818 0.916 0.425 0.007 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203
1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.681 Avg Percent of Total Loss: 18 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{036} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
5.1 0.02822 0.297 0.001 0
5
0.008 10
0 0 0 0 0
0.85 0.046 0.05 0 0 4
0.007 10
1.7 0.03728 0.099 0 0 3
0.006 10
2.55 0.03338 0.149 0 0
2
3.4 0.03104 0.198 0 0 0.005 10
4.25 0.02942 0.248 0 0
0.004
5.1 0.02822 0.297 0.001 0
5.95 0.02729 0.347 0.002 0 0.003
6.8 0.02653 0.396 0.002 0
0.002
7.65 0.0259 0.446 0.003 0.001
8.5 0.02537 0.496 0.003 0.001 0.001
9.35 0.02491 0.545 0.004 0.002
10.2 0.0245 0.595 0.005 0.002 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 1.038 Avg Percent of Total Loss: 30 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{038} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
8.803 0.02765 0.131 -0.391 0
5
0.3 10
0 0 0 -0.392 0
1.467 0.04583 0.022 -0.392 0 4
0.2 10
2.934 0.03698 0.044 -0.392 0 3
0.1 10
4.402 0.033 0.066 -0.392 0
2
5.869 0.03058 0.088 -0.391 0 0 10
7.336 0.02891 0.109 -0.391 0
-0.1
8.803 0.02765 0.131 -0.391 0
10.27 0.02667 0.153 -0.391 0 -0.2
11.74 0.02587 0.175 -0.39 0
-0.3
13.2 0.0252 0.197 -0.39 0
14.67 0.02462 0.219 -0.389 0 -0.4
16.14 0.02413 0.241 -0.389 0
17.61 0.0237 0.263 -0.388 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{039} rev: 06/06/13 6:55 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.91 0.02491 0.207 0 0
5
0.008 10
0 0 0 0 0
2.318 0.03966 0.035 0 0 4
0.007 10
4.637 0.03254 0.069 0 0 3
0.006 10
6.955 0.02929 0.104 0 0
2
9.273 0.02731 0.138 0 0 0.005 10
11.59 0.02594 0.173 0 0
0.004
13.91 0.02491 0.207 0 0
16.23 0.0241 0.242 0 0 0.003
18.55 0.02344 0.277 0 0
0.002
20.86 0.02289 0.311 0 0
23.18 0.02243 0.346 0 0 0.001
25.5 0.02202 0.38 0 0
27.82 0.02167 0.415 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{040} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 70 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.4 10
55.12 0.0199 0.458 -0.384 0.001
5
0.3 10
0 0 0 -0.392 0
9.187 0.02925 0.076 -0.392 0 4
0.2 10
18.37 0.02478 0.153 -0.391 0 3
0.1 10
27.56 0.02271 0.229 -0.39 0
2
36.75 0.02144 0.305 -0.388 0 0 10
45.93 0.02056 0.382 -0.386 0
-0.1
55.12 0.0199 0.458 -0.384 0.001
64.31 0.01938 0.534 -0.381 0.002 -0.2
73.49 0.01896 0.611 -0.378 0.002
-0.3
82.68 0.01862 0.687 -0.375 0.003
91.87 0.01832 0.764 -0.371 0.003 -0.4
101.1 0.01807 0.84 -0.367 0.004
110.2 0.01784 0.916 -0.362 0.004 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 45° 0.2242 1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 1.065 Avg Percent of Total Loss: 12 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{041} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
69.03 0.01916 0.574 0 0
5
0.008 10
0 0 0 0 0
11.51 0.02765 0.096 0 0 4
0.007 10
23.01 0.02359 0.191 0 0 3
0.006 10
34.52 0.02171 0.287 0 0
2
46.02 0.02055 0.382 0 0 0.005 10
57.52 0.01975 0.478 0 0
0.004
69.03 0.01916 0.574 0 0
80.54 0.01869 0.669 0.001 0 0.003
92.04 0.01832 0.765 0.001 0
0.002
103.5 0.018 0.861 0.002 0
115.1 0.01774 0.956 0.002 0 0.001
126.6 0.01751 1.052 0.002 0
138.1 0.01731 1.147 0.003 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{043} rev: 28/08/13 5:48 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 40 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 17 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.18 10
55.1 0.02036 0.458 0.105 0.003
5
0.16 10
0 0 0 0.098 0
9.183 0.03023 0.076 0.098 0 4
0.14 10
18.37 0.02551 0.153 0.099 0 3
0.12 10
27.55 0.02333 0.229 0.1 0
2
36.73 0.02199 0.305 0.101 0.001 0.1 10
45.92 0.02106 0.382 0.103 0.002
0.08
55.1 0.02036 0.458 0.105 0.003
64.28 0.01981 0.534 0.107 0.004 0.06
73.47 0.01937 0.611 0.11 0.005
0.04
82.65 0.019 0.687 0.113 0.006
91.83 0.01868 0.763 0.116 0.007 0.02
101 0.01841 0.84 0.119 0.009
110.2 0.01818 0.916 0.123 0.011 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.522 Avg Percent of Total Loss: 36 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{044} rev: 28/08/13 5:49 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 40 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 17 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.08 10
55.12 0.0199 0.458 -0.092 0.002
5
0.06 10
0 0 0 -0.098 0
9.187 0.02925 0.076 -0.098 0 4
0.04 10
18.37 0.02478 0.153 -0.097 0 3
0.02 10
27.56 0.02271 0.229 -0.096 0
2
36.75 0.02144 0.305 -0.095 0 0 10
45.93 0.02056 0.382 -0.094 0.002
-0.02
55.12 0.0199 0.458 -0.092 0.002
64.31 0.01938 0.534 -0.09 0.003 -0.04
73.49 0.01896 0.611 -0.087 0.004
-0.06
82.68 0.01862 0.687 -0.085 0.005
91.87 0.01832 0.764 -0.082 0.006 -0.08
101.1 0.01807 0.84 -0.078 0.007
110.2 0.01784 0.916 -0.075 0.009 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
5 x Elbow - Standard 90° 0.4203

FFT: 0.01401 Total K: 2.102 Avg Percent of Total Loss: 32 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{045} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 90 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
8.8 0.02852 0.131 0.002 0
5
0.008 10
0 0 0 0 0
1.467 0.04783 0.022 0 0 4
0.007 10
2.933 0.0384 0.044 0 0 3
0.006 10
4.4 0.03418 0.066 0 0
2
5.867 0.03162 0.088 0 0 0.005 10
7.333 0.02985 0.109 0.001 0
0.004
8.8 0.02852 0.131 0.002 0
10.27 0.02748 0.153 0.002 0 0.003
11.73 0.02664 0.175 0.003 0
0.002
13.2 0.02593 0.197 0.004 0
14.67 0.02532 0.219 0.004 0 0.001
16.13 0.0248 0.241 0.005 0.001
17.6 0.02434 0.263 0.006 0.001 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
9 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 4.021 Avg Percent of Total Loss: 16 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{046} rev: 28/08/13 5:50 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 12 °C
Length: 90 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 16 m out: 16 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
8.803 0.02765 0.131 0.001 0
5
0.008 10
0 0 0 0 0
1.467 0.04583 0.022 0 0 4
0.007 10
2.934 0.03698 0.044 0 0 3
0.006 10
4.402 0.033 0.066 0 0
2
5.869 0.03058 0.088 0 0 0.005 10
7.336 0.02891 0.109 0.001 0
0.004
8.803 0.02765 0.131 0.001 0
10.27 0.02667 0.153 0.002 0 0.003
11.74 0.02587 0.175 0.002 0
0.002
13.2 0.0252 0.197 0.003 0
14.67 0.02462 0.219 0.003 0 0.001
16.14 0.02413 0.241 0.004 0
17.61 0.0237 0.263 0.005 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{047} rev: 28/08/13 5:45 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
5.1 0.02822 0.297 0.002 0.001
5
0.008 10
0 0 0 0 0
0.85 0.046 0.05 0 0 4
0.007 10
1.7 0.03728 0.099 0 0 3
0.006 10
2.55 0.03338 0.149 0 0
2
3.4 0.03104 0.198 0.001 0 0.005 10
4.25 0.02942 0.248 0.002 0
0.004
5.1 0.02822 0.297 0.002 0.001
5.95 0.02729 0.347 0.003 0.002 0.003
6.8 0.02653 0.396 0.004 0.002
0.002
7.65 0.0259 0.446 0.005 0.003
8.5 0.02537 0.496 0.006 0.004 0.001
9.35 0.02491 0.545 0.007 0.005
10.2 0.0245 0.595 0.008 0.005 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
6 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 3.115 Avg Percent of Total Loss: 59 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{048} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 12 °C
Length: 10 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
5.102 0.02744 0.297 0.003 0.001
5
0.008 10
0 0 0 0 0
0.85 0.04415 0.05 0 0 4
0.007 10
1.701 0.03597 0.099 0 0 3
0.006 10
2.551 0.0323 0.149 0 0
2
3.401 0.03009 0.198 0.001 0 0.005 10
4.252 0.02857 0.248 0.002 0
0.004
5.102 0.02744 0.297 0.003 0.001
5.952 0.02656 0.347 0.004 0.002 0.003
6.803 0.02585 0.397 0.005 0.002
0.002
7.653 0.02525 0.446 0.006 0.003
8.503 0.02475 0.496 0.007 0.003 0.001
9.354 0.02432 0.545 0.008 0.004
10.2 0.02394 0.595 0.01 0.005 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191
1 x Elbow - Standard 90° 0.5191 1 x Elbow - Standard 90° 0.5191

FFT: 0.0173 Total K: 2.596 Avg Percent of Total Loss: 38 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{053} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{054} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.09 10
86.3 0.01849 1.287 0.015 0.013
5
0.08 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.07 10
28.77 0.02205 0.429 0.002 0.001 3
0.06 10
43.15 0.02051 0.644 0.004 0.003
2
57.53 0.01958 0.858 0.007 0.006 0.05 10
71.92 0.01895 1.073 0.01 0.009
0.04
86.3 0.01849 1.287 0.015 0.013
100.7 0.01813 1.502 0.02 0.018 0.03
115.1 0.01784 1.716 0.026 0.023
0.02
129.4 0.0176 1.931 0.033 0.029
143.8 0.0174 2.145 0.041 0.036 0.01
158.2 0.01724 2.36 0.05 0.043
172.6 0.01709 2.574 0.059 0.052 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 88 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{055} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{056} rev: 06/06/13 5:16 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
86.3 0.01849 1.287 0.002 0
5
0.008 10
0 0 0 0 0
14.38 0.02543 0.215 0 0 4
0.007 10
28.77 0.02205 0.429 0 0 3
0.006 10
43.15 0.02051 0.644 0 0
2
57.53 0.01958 0.858 0 0 0.005 10
71.92 0.01895 1.073 0.001 0
0.004
86.3 0.01849 1.287 0.002 0
100.7 0.01813 1.502 0.003 0 0.003
115.1 0.01784 1.716 0.003 0
0.002
129.4 0.0176 1.931 0.004 0
143.8 0.0174 2.145 0.005 0 0.001
158.2 0.01724 2.36 0.006 0
172.6 0.01709 2.574 0.007 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{057} rev: 28/08/13 5:43 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 70 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 16 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.45 10
8.8 0.02852 0.131 0.393 0
5
0.4 10
0 0 0 0.392 0
1.467 0.04783 0.022 0.392 0 4
0.35 10
2.933 0.0384 0.044 0.392 0 3
0.3 10
4.4 0.03418 0.066 0.393 0
2
5.867 0.03162 0.088 0.393 0 0.25 10
7.333 0.02985 0.109 0.393 0
0.2
8.8 0.02852 0.131 0.393 0
10.27 0.02748 0.153 0.394 0 0.15
11.73 0.02664 0.175 0.394 0
0.1
13.2 0.02593 0.197 0.395 0
14.67 0.02532 0.219 0.395 0 0.05
16.13 0.0248 0.241 0.396 0
17.6 0.02434 0.263 0.397 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 1.787 Avg Percent of Total Loss: 9 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{058} rev: 11/06/13 2:30 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
55.1 0.02036 0.458 0.002 0.002
5
0.008 10
0 0 0 0 0
9.183 0.03023 0.076 0 0 4
0.007 10
18.37 0.02551 0.153 0 0 3
0.006 10
27.55 0.02333 0.229 0 0
2
36.73 0.02199 0.305 0 0 0.005 10
45.92 0.02106 0.382 0.001 0.001
0.004
55.1 0.02036 0.458 0.002 0.002
64.28 0.01981 0.534 0.002 0.002 0.003
73.47 0.01937 0.611 0.003 0.003
0.002
82.65 0.019 0.687 0.004 0.003
91.83 0.01868 0.763 0.005 0.004 0.001
101 0.01841 0.84 0.005 0.005
110.2 0.01818 0.916 0.007 0.006 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4203 1 x Elbow - Standard 90° 0.4203 1 x Butterfly 0.6305

FFT: 0.01401 Total K: 1.471 Avg Percent of Total Loss: 87 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{062} rev: 06/06/13 7:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02563 0.207 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04126 0.035 0 0 4
0.007 10
4.633 0.0337 0.069 0 0 3
0.006 10
6.95 0.03026 0.104 0 0
2
9.267 0.02817 0.138 0 0 0.005 10
11.58 0.02671 0.173 0 0
0.004
13.9 0.02563 0.207 0 0
16.22 0.02477 0.242 0 0 0.003
18.53 0.02408 0.276 0 0
0.002
20.85 0.0235 0.311 0 0
23.17 0.023 0.346 0.001 0 0.001
25.48 0.02257 0.38 0.001 0.001
27.8 0.0222 0.415 0.001 0.001 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Elbow - Standard 90° 0.4468 1 x Elbow - Standard 90° 0.4468 1 x Butterfly 0.6702

FFT: 0.01489 Total K: 1.564 Avg Percent of Total Loss: 67 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{063} rev: 03/06/13 4:40 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 1 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02563 0.207 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04126 0.035 0 0 4
0.007 10
4.633 0.0337 0.069 0 0 3
0.006 10
6.95 0.03026 0.104 0 0
2
9.267 0.02817 0.138 0 0 0.005 10
11.58 0.02671 0.173 0 0
0.004
13.9 0.02563 0.207 0 0
16.22 0.02477 0.242 0 0 0.003
18.53 0.02408 0.276 0 0
0.002
20.85 0.0235 0.311 0 0
23.17 0.023 0.346 0 0 0.001
25.48 0.02257 0.38 0 0
27.8 0.0222 0.415 0 0 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{064} rev: 28/08/13 12:02 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 6 in (ID: 6.0654 in)
Fluid: Water temp: 7 °C
Length: 2 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
13.9 0.02563 0.207 0 0
5
0.008 10
0 0 0 0 0
2.317 0.04126 0.035 0 0 4
0.007 10
4.633 0.0337 0.069 0 0 3
0.006 10
6.95 0.03026 0.104 0 0
2
9.267 0.02817 0.138 0 0 0.005 10
11.58 0.02671 0.173 0 0
0.004
13.9 0.02563 0.207 0 0
16.22 0.02477 0.242 0 0 0.003
18.53 0.02408 0.276 0 0
0.002
20.85 0.0235 0.311 0.001 0.001
23.17 0.023 0.346 0.002 0.001 0.001
25.48 0.02257 0.38 0.002 0.002
27.8 0.0222 0.415 0.002 0.002 5 10 15 20 25 30 35 40 45 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
1 x Butterfly 0.6702 1 x Swing Check - Vertical 0.7447 1 x Elbow - Standard 90° 0.4468
1 x Elbow - Standard 90° 0.4468

FFT: 0.01489 Total K: 2.309 Avg Percent of Total Loss: 73 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{068} rev: 28/08/13 5:44 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
5.1 0.02822 0.297 0 0
5
0.008 10
0 0 0 0 0
0.85 0.046 0.05 0 0 4
0.007 10
1.7 0.03728 0.099 0 0 3
0.006 10
2.55 0.03338 0.149 0 0
2
3.4 0.03104 0.198 0 0 0.005 10
4.25 0.02942 0.248 0 0
0.004
5.1 0.02822 0.297 0 0
5.95 0.02729 0.347 0.001 0 0.003
6.8 0.02653 0.396 0.001 0
0.002
7.65 0.0259 0.446 0.002 0
8.5 0.02537 0.496 0.002 0 0.001
9.35 0.02491 0.545 0.002 0
10.2 0.0245 0.595 0.003 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{069} rev: 03/06/13 4:47 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 8 in (ID: 8.1252 in)
Fluid: Water temp: 12 °C
Length: 5 m
den: 999.6 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.206 cP Pv: 0.01403 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
69.03 0.01916 0.574 0 0
5
0.008 10
0 0 0 0 0
11.51 0.02765 0.096 0 0 4
0.007 10
23.01 0.02359 0.191 0 0 3
0.006 10
34.52 0.02171 0.287 0 0
2
46.02 0.02055 0.382 0 0 0.005 10
57.52 0.01975 0.478 0 0
0.004
69.03 0.01916 0.574 0 0
80.54 0.01869 0.669 0.001 0 0.003
92.04 0.01832 0.765 0.001 0
0.002
103.5 0.018 0.861 0.002 0
115.1 0.01774 0.956 0.002 0 0.001
126.6 0.01751 1.052 0.002 0
138.1 0.01731 1.147 0.003 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{070} rev: 10/09/13 4:39 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 15 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 14 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.2 10
172.5 0.01733 0.901 -0.187 0.005
5
0.15 10
0 0 0 -0.196 0
28.75 0.02417 0.15 -0.196 0 4
0.1 10
57.5 0.0209 0.3 -0.195 0 3
0.05 10
86.25 0.01938 0.45 -0.194 0.001
2
115 0.01845 0.601 -0.192 0.002 0 10
143.8 0.01781 0.751 -0.19 0.003
-0.05
172.5 0.01733 0.901 -0.187 0.005
201.3 0.01696 1.051 -0.184 0.007 -0.1
230 0.01666 1.201 -0.18 0.009
-0.15
258.8 0.01641 1.351 -0.176 0.011
287.5 0.0162 1.502 -0.172 0.014 -0.2
316.3 0.01602 1.652 -0.167 0.016
345 0.01587 1.802 -0.162 0.019 40 80 120 160 200 240 280 320 360 m³/hr
Valves and Fittings
Valve / Fitting K Valve / Fitting K Valve / Fitting K
3 x Elbow - Standard 90° 0.401

FFT: 0.01337 Total K: 1.203 Avg Percent of Total Loss: 53 %

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe{071} rev: 28/08/13 5:51 pm

Piping Material: A112 Specification: A112_Sch40


Schedule: 40
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 3 in (ID: 3.0677 in)
Fluid: Water temp: 7 °C
Length: 5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
5.1 0.02822 0.297 0 0
5
0.008 10
0 0 0 0 0
0.85 0.046 0.05 0 0 4
0.007 10
1.7 0.03728 0.099 0 0 3
0.006 10
2.55 0.03338 0.149 0 0
2
3.4 0.03104 0.198 0 0 0.005 10
4.25 0.02942 0.248 0 0
0.004
5.1 0.02822 0.297 0 0
5.95 0.02729 0.347 0.001 0 0.003
6.8 0.02653 0.396 0.001 0
0.002
7.65 0.0259 0.446 0.002 0
8.5 0.02537 0.496 0.002 0 0.001
9.35 0.02491 0.545 0.002 0
10.2 0.0245 0.595 0.003 0 2 4 6 8 10 12 14 16 18 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009
Pipeline Report

System: HVAC Chilled water circuit 10/09/13 7:14 pm


Lineup: Operación 40%
Company:
rev: 10/09/13 7:05 pm
Project:
Atm pressure: 1.06 bar a

Pipe70 rev: 28/08/13 12:10 pm

Piping Material: A112 Specification: A112_Sch20


Schedule: 20
Sizing Criteria: not specified
abs roughness: 0.0018 in
C: 140 Limits Velocity: ---
Pressure: ---
Pipe Size: 10 in (ID: 10.25 in)
Fluid: Water temp: 7 °C
Length: 1.5 m
den: 999.9 kg/m³ pres: 5 bar g
Elevation in: 12 m out: 12 m vsc: 1.371 cP Pv: 0.01003 bar a

Pipeline Resistance Curve - Darcy-Weisbach method


Flow ffp Vel dP mL bar Re
m³/hr m/sec bar bar 6
0.009 10
69 0.02018 0.36 0 0
5
0.008 10
0 0 0 0 0
11.5 0.0302 0.06 0 0 4
0.007 10
23 0.02544 0.12 0 0 3
0.006 10
34.5 0.02322 0.18 0 0
2
46 0.02185 0.24 0 0 0.005 10
57.5 0.0209 0.3 0 0
0.004
69 0.02018 0.36 0 0
80.5 0.01962 0.42 0 0 0.003
92 0.01916 0.48 0 0
0.002
103.5 0.01878 0.541 0 0
115 0.01845 0.601 0 0 0.001
126.5 0.01817 0.661 0 0
138 0.01792 0.721 0 0 20 40 60 80 100 120 140 160 180 m³/hr
Valves and Fittings
No valves/fittings are installed in this pipeline.

PIPE-FLO 2009