NAME OF SITE
CONTENT
DESIGNED BY CHECKED BY
HARDIK S. POKIYA ANIL R. PANJWANI
CLIENT
GOVERNMENT OF MAHARASHTRA
PUBLIC WORKS DIVISION - CHIPLUN,
PUBLIC WORKS CIRCLE , RATNAGIRI
DESIGNED FOR
THIS DESIGN NOTE IS A PROPERTY OF M/s ACME STRUCTURAL CONSULTANTS. IT SHALL NOT BE
COPIED, USED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION.
ACME STRUCTURAL CONSULTANTS
ATHARVA FERYEZ PLAZA, OFFICE NO 406, OPP. SHANKAR
MAHARAJ MATH, PUNE - SATARA ROAD, DHANKAWADI,
PUNE- 411 043 PH. NO. (020) 4050 26 45
Loading Consideration :-
The following loads as per IRC-78 : 2000 & IRC-6 : 2000 have been considered as given below:
1 Dead Load ( Self weight of substructure, Superstructure, SIDL ) (G)
2 Live load ( Q )
3 Buoyancy
4 Wind Force
5 Horizontal force due to water current
6 Centrifugal force
7 Earth pressure
8 Longitudinal forces
9 Seismic Force
10 Loads due to tilt and shifts
PREAMBLE
ACME STRUCTURAL CONSULTANTS
ATHARVA FERYEZ PLAZA, OFFICE NO 406, OPP. SHANKAR
MAHARAJ MATH, PUNE - SATARA ROAD, DHANKAWADI,
PUNE- 411 043 PH. NO. (020) 4050 26 45
Rock Proposed
Abutment Level Rock Level Founding Design Bearing
No. Actual Design Level Validity level Capacity t/m2
A-L 78.825 78.825 78.675 78.50 140.0
A-R 80.28 80.28 80.130 78.50 140.0
Steining Thickness
Required In M
Height Of Well = 94.76 - 78.675 = 16.085 m 0.978
Height Of Well below well cap bottom
= 93.760 - 78.675 = 15.085 m
Height Of Well upto scour level
= 94.76 - 78.825 = 15.935 m
Grade of Concrete = M 30
Grade of Steel = Fe 500
Conditions of Exposure = Moderate 1
Density of Reinforced Concrete = 2.4 t/m3
( As per IRC:6-2000 )
d C.g. D
x x 1.70
0.30
0.15
T
Input Data :
Outer Dia ofDouble-D Well D= 6.25 m
Inner Dia of Double-D Well d= 4.05 m
B= 4.75 m
T= 1.10 m
t= 1.10 m
Kerb offset= Kb= 0.075 m
Kerb height= kh= 1.700 m
Thickness of Outer Kerb at Bottom = 0.15 m
Outer Dia Double d well at bottom = 6.40 m
Outer Dia Double d well at bottom in 11.15 m
traffic direction=
SHEET NO 6
ACME STRUCTURAL CONSULTANTS
ATHARVA FERYEZ PLAZA, OFFICE NO 406, OPP. SHANKAR
MAHARAJ MATH, PUNE - SATARA ROAD, DHANKAWADI,
PUNE- 411 043 PH. NO. (020) 4050 26 45
Quantity of Kerb :
SHEET NO 7
ACME STRUCTURAL CONSULTANTS
ATHARVA FERYEZ PLAZA, OFFICE NO 406, OPP. SHANKAR
MAHARAJ MATH, PUNE - SATARA ROAD, DHANKAWADI,
PUNE- 411 043 PH. NO. (020) 4050 26 45
0.30
1.10
SHEET NO 8
ACME STRUCTURAL CONSULTANTS
ATHARVA FERYEZ PLAZA, OFFICE NO 406, OPP. SHANKAR
MAHARAJ MATH, PUNE - SATARA ROAD, DHANKAWADI,
PUNE- 411 043 PH. NO. (020) 4050 26 45
DESIGN CALC
LWL
Sr. No Description
Well Cap
Dimension of well cap in current direction
Dimension Of well cap in traffic direction
Semicircular diameter of the well cap
Depth of well cap
Top Plug
Sectional Inner Area Of Well = 0.785 x 4.05 x 4.05
+ 4.05 x 3.65
`
Steining above scour upto bottom of well cap
Sectional Area Of well Steining above Curb
` = 0.785 x 6.25 x 6.25
= 6.25 x 4.75
Deduct For the Inner Portion = 0.785 x 4.05 x 4.05
= 4.05 x 3.65
Cross Sectional Area
Height Of Well steining Curb Level to bottom of well cap
DESIGN CALC
= 93.76 - 78.83 - 0.17
Well Curb
Bottom Plug
Sectional Area For the Inner Portion
top =
0.785 x 4.05 x 4.05
= 4.05 x 3.65
BUOYANCY
LWL
Buoyancy at LWL at
Fdn Lvl = 6.25 x 6.25 x 0.786 x ( 78.83 -
= 6.25 x 4.75 x 1.000 x ( 78.83 -
= 6.25 x 6.25 x 0.786 x ( 93.46 -
DESIGN CALC
+ 6.25 x 4.75 x 1.000 x ( 93.46 -
Buoyancy at LWL at
top of curb = 6.25 x 6.25 x 0.786 x ( 93.46 -
+ 6.25 x 4.75 x 1.000 x ( 93.46 -
HFL
Buoyancy at HFL at
Fdn Lvl = 6.25 x 6.25 x 0.786 x ( 94.8 -
= 6.25 x 4.8 x 1.000 x ( 94.8 -
= 6.25 x 6.25 x 0.786 x ( 78.8 -
= 6.25 x 4.8 x 1.000 x ( 78.8 -
= 6.25 x 2.60 x ( 96.7 -
Buoyancy at HFL at
top of curb = 6.25 x 6.3 x 0.786 x ( 94.8 -
= 6.25 x 4.8 x 1.000 x ( 94.8 -
= 6.25 x 2.60 x ( 96.7 -
HTL
Buoyancy at HTL at
Fdn Lvl = 6.3 x 6.3 x 0.786 x ( 94.76 -
= 6.3 x 4.75 x 1.000 x ( 94.76 -
= 6.3 x 6.3 x 0.786 x ( 78.8 -
= 6.3 x 4.8 x 1.000 x ( 78.8 -
= 6.25 x 2.60 x ( 95.7 -
Buoyancy at HTL at
top of curb = 6.25 x 6.3 x 0.786 x ( 94.76 -
= 6.3 x 4.8 x 1.000 x ( 94.76 -
= 4.75 x 1.00 x ( 95.7 -
LIVE LOADS
a VEHICULAR LIVE LOAD (As Per IRC 6 : 2000, )
Max. Reaction On A2
DESIGN CALC
32.8
Ra Rb
Abt. Pier
Ra = 77.82 t
Rb = 22.18 t
Total 100.00 t
Transverse eccentricity
Longitudinal Eccentricity
Case No : 2 CLASS A x 2
Max. Reaction On A2
32.8
Ra Rb
Abt. Pier
Ra = 85.93 t
Rb = 14.07 t
Total 100.00 t
Transverse eccentricity
Longitudinal Eccentricity
Case No : 3 CLASS A x1
Max. Reaction On A2
32.8
Ra Rb
DESIGN CALC
Abt. Pier
Ra = 42.97 t
Rb = 7.03 t
Total 50.00 t
Transverse eccentricity
Longitudinal Eccentricity
Max. Reaction On A2
32.8
Ra Rb
Abt. Pier
Ra = 67.04 t
Rb = 2.96 t
Total 70.00 t
Transverse eccentricity
Longitudinal Eccentricity
Moment in traffic direction Pxe = 67.04 x 1.500
Moment in current direction Pxe = 67.04 x 1.030
DESIGN CALC
Ka = Sin2(a1+f) cosd
2
sin a1 sin (a1-d)
2
1 + sin(f+d)sin(f-i)
sin(a1-d)sin(a1+i)
For abutment vertical below the cap top level For abutment back filling mat
a1 = 90.00 o
f = 30.00 o
d = 20.00 o
i = 0.00 o
and
Kah = 0.2794
Kav = 0.011
DESIGN CALC
For well
a1 = 90.00 o
f = 30.00 o
d = 20.00 o
i = 0.00 o
and
Kph = 5.74
a) LWL Condition
RTL 100.375
4 3
1 Well Cap Top 94.760
65 LWL 93.460
7
. 8 Top Of Curb 80.55
9
Founding Lvl 78.68
Fig Description
No.
DESIGN CALC
1) Pressure due to Live load Surcharge = 0.279 x 1.8 x 1.2 =
2) Pressure due to soil upto bottom of
Abutment cap = 0.279 x 1.8 x 3.025 =
b) HFL Condition
RTL 100.375
4 HFL 96.700
3
65 1
Well Cap Top 94.760
8
Top Of Curb 80.55
10 9
Founding Lvl 78.68
Fig No.
DESIGN CALC
2) Pressure due to soil upto bottom of
Abutment cap = 0.279 x 1.8 x 3.025 =
c) HTL Condition
RTL 100.375
4 3
1 HTL 95.670
6
Well Cap Top 94.760
5
. 8 7
Top Of Curb 80.55
10
9 Founding Lvl 78.68
DESIGN CALC
3) Uniform Pressure due to soil below
Abutment cap = 0.279 x 1.8 x 3.025 =
DESIGN CALC
Uniform Pressure due to soil upto
3.0 below Abutment cap bottom lvl upto = 1.0 x 1.521 x 16.805 x
well cap top
Pressure due to soil below Abutment
4.0 cap upto HFL = 0.5 x 0.363 x 0.650 x
Summary Of Forces & Moments For Earth Pressure Upto Curb Top Level
LWL HFL
Force Lever Arm Moment Force Lever Arm Moment Force
1 74.792 9.915 741.57 74.79 9.92 741.57 74.79
2 14.381 18.08 259.93 14.38 18.08 259.93 14.38
3 159.778 8.40 1342.54 159.78 8.40 1342.54 159.78
4 10.542 15.30 161.32 0.74 16.43 12.12 2.46
5 115.718 7.11 822.46 36.67 8.08 296.22 44.37
6 2.951 13.46 39.72 3.29 15.03 49.39 0.72
DESIGN CALC
7 58.634 6.46 378.63 3.29 7.11 23.35 22.59
8 145.626 5.42 789.92 48.15 5.97 287.49 176.42
582.42 4536.10 341.086 3012.61 495.5
Summary Of Forces & Moments For Earth Pressure Upto Curb Top Level - Seismic Case
DESIGN CALC
Pressure due to soil below HFL upto
6.0 well cap top lvl = 0.5 x 0.542 x 1.940 x
Summary Of Forces & Moments For Earth Pressure Upto Founding Level
LWL HFL
Force Lever Arm Moment Force Lever Arm Moment Force
1 81.845 10.850 888.02 81.85 10.850 888.02 81.85
2 14.381 19.95 286.83 14.38 19.946 286.83 14.38
DESIGN CALC
3 177.558 9.34 1657.94 177.56 9.338 1657.94 177.56
4 10.542 17.17 181.04 0.74 18.298 13.50 2.46
5 152.025 8.04 1222.66 40.92 9.013 368.76 49.86
6 2.951 15.33 45.24 3.29 16.900 55.53 0.72
7 73.026 7.39 539.84 54.49 8.043 438.22 25.56
8 145.626 7.29 1062.24 176.42 7.840 1383.18 176.42
9 42.171 0.94 39.43 46.42 0.935 43.40 46.42
10 3.053 0.79 2.40 3.05 7.840 23.94 3.05
Summary Of Forces & Moments For Earth Pressure Upto Founding Level - In seismic Case
LWL HTL ( Seismic Condition)
Force Moment Force Moment
662.25 5481.63 537.35 4502.48
ah = 0.05
av = 0.025
a( for +av ) = 2.793 0
a( for -av ) = 2.936 0
For 1 + a v a = 33 a = 35
COS ( a - a - a ) = 0.889 0.889
COS ( a + a + a ) = 0.922 0.922
SIN ( a - i - a ) = 0.457 0.457
COS a = 0.9988 0.9988
COS a = 1.000 1.000
COS( a - i ) = 1.000 1.000
SIN( a + a ) = 0.766 0.766
DESIGN CALC
Coefficient of dynamic earth pressure Ca = 0.337 =
For 1 - a v
COS ( a - a - a ) = 0.890 0.890
COS ( a + a + a ) = 0.921 0.921
SIN ( a - i - a ) = 0.455 0.455
COS a = 0.999 0.999
COS a = 1.000 1.000
COS( a - i ) = 1.000 1.000
SIN( a + a ) = 0.766 0.766
Fig No.
b) HFL Condition
DESIGN CALC
Fig No.
1) Pressure due to Live load Surcharge
50% = 0.058 x 1.8 x 0.6 =
c) HTL Condition
DESIGN CALC
1.0 Due To Live Load Surcharge upto
well cap top lvl = 1.0 x 0.062 x 19.830 x
DESIGN CALC
Pressure due to soil below Abutment
4.0 cap upto well cap top lvl = 0.5 x 0.174 x 1.680 x
Summary Of Dynamic Forces & Moments For Earth Pressure Upto Curb Top Level
LWL HFL
Force Lever Arm Moment Force Lever Arm Moment Force
1 7.71 13.09 100.92 7.71 #REF! #REF! 7.71
2 2.97 18.32 54.32 2.97 #REF! #REF! 2.97
3 32.95 11.09 365.42 32.95 #REF! #REF! 32.95
4 2.17 27.17 59.05 0.15 #REF! #REF! 0.91
5 23.86 9.38 223.86 7.56 #REF! #REF! 16.47
6 0.55 13.57 7.43 0.68 #REF! #REF! 0.27
7 10.88 8.52 92.75 9.93 #REF! #REF! 8.38
8 30.03 6.46 193.91 36.38 #REF! #REF! 36.38
DESIGN CALC
Summary Of Forces & Moments For Earth Pressure Upto Founding Level
In Seismic case
Longitudinal force on abutment
i) = 15 - ( 6.71 + 1.17 ) = 7.128 t
DESIGN CALC
Since the Bearing rigidity force is critical we have considered the same in the calculations
Since the bridge is free to expand and contract there will be no force due to temperature effects
DESIGN CALC
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 85.93 x= 0.150
= 605.82 t
Buoyant Weight of well = 1332.23 t tilt
Y
M t&s = 285.71 t-m
= Y / 80
3 With the maximum live load & Seismic HFL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 85.93 x= 0.150
= 605.82 t
Buoyant Weight of well = 1363.75 t tilt
Y
M t&s = 288.88 t-m
= Y / 80
4 With no live load & LWL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = 1442.24 t tilt
Y
M t&s = 275.24 t-m
= Y / 80
5 With no live load & AHFL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = 1332.23 t tilt
Y
M t&s = 264.18 t-m
= Y / 80
DESIGN CALC
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = 1363.75 t tilt
Y
M t&s = 267.35 t-m
= Y / 80
7 With no live load and no superstructure & LWL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1442.24 t tilt
Y
M t&s = 219.24 t-m
= Y / 80
8 With no live load and no superstructure & AHFL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1332.23 t tilt
Y
M t&s = 208.19 t-m
= Y / 80
9 With no live load and no superstructure & Seismic HFL (FL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1363.75 t tilt
Y
M t&s = 211.36 t-m
= Y / 80
10 With no live load and no superstructure in HFL ( Scour All Round Case)
DESIGN CALC
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 147.92 + 0.00 x= 0.150
= 147.92 t
Buoyant Weight of well = 1002.59 t tilt
Y
M t&s = 137.85 t-m
= Y / 80
11 With no live load in HFL ( Scour All Round Case)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 147.92 + 0.00 x= 0.150
= 371.42 t
Buoyant Weight of well = 1002.59 t tilt
Y
M t&s = 193.84 t-m
= Y / 80
At Scour Level
DESIGN CALC
= Y / 80
3 With the maximum live load & Seismic HFL (SL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 85.93 x= 0.150
= 605.82 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
4 With no live load & LWL (SL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
5 With no live load & AHFL (SL)
DESIGN CALC
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
7 With no live load and no superstructure & LWL (SL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
8 With no live load and no superstructure & AHFL (SL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
9 With no live load and no superstructure & Seismic HFL (SL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
10 With no live load and no superstructure in HFL ( Scour All Round Case)
Vertical load at well cap level
= Sup + Sub + LL(max)
DESIGN CALC
= 0.00 + 147.92 + 0.00 x= 0.150
= 147.92 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
11 With no live load in HFL ( Scour All Round Case)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 147.92 + 0.00 x= 0.150
= 371.42 t
Buoyant Weight of well = #REF! t tilt
Y
M t&s = #REF! t-m
= Y / 80
At Curb Top Level
DESIGN CALC
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 85.93 x= 0.150
= 605.82 t
Buoyant Weight of well = 1244.26 t tilt
Y
M t&s = 243.68 t-m
= Y / 80
4 With no live load & LWL (CTL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = 1322.74 t tilt
Y
M t&s = 230.17 t-m
= Y / 80
5 With no live load & AHFL (CTL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 223.50 + 296.39 + 0.00 x= 0.150
= 519.89 t
Buoyant Weight of well = 1212.73 t tilt
Y
M t&s = 221.09 t-m
= Y / 80
DESIGN CALC
= 519.89 t
Buoyant Weight of well = 1244.26 t tilt
Y
M t&s = 223.69 t-m
= Y / 80
7 With no live load and no superstructure & LWL (CTL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1322.74 t tilt
Y
M t&s = 178.19 t-m
= Y / 80
8 With no live load and no superstructure & AHFL (CTL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1212.73 t tilt
Y
M t&s = 169.10 t-m
= Y / 80
9 With no live load and no superstructure & Seismic HFL (CTL)
Vertical load at well cap level
= Sup + Sub + LL(max)
= 0.00 + 296.39 + 0.00 x= 0.150
= 296.39 t
Buoyant Weight of well = 1244.26 t tilt
Y
M t&s = 171.71 t-m
= Y / 80
10 With no live load and no superstructure in HFL ( Scour All Round Case)
Vertical load at well cap level
= Sup + Sub + LL(max)
DESIGN CALC
= 0.00 + 147.92 + 0.00 x= 0.150
= 147.92 t
Buoyant Weight of well = 889.70 t tilt
Y
M t&s = 107.89 t-m
= Y / 80
HFL Case
HFL = 96.7 Vm x 20.5 3.34 579.24 579.24
DESIGN CALC
K = Shape constant ( Rectangular shape of Pier Cap & Superstructure) =
U = Velocity of current at the point where pressure intensity is worked out
U2 = 2(Vm)2xX/H
X = Height at any point From Scour Level
= 96.70 - 78.83
H = Height at HFL From Scour Level
= 17.88
U2 = 11.1392 x 17.88 / 17.88
U =
2
11.14 m /s2 2
5 s 4 m
U = 3.34 m/s
P = 52 x k x U2
= 52.0 K U2 Kg/m2
Pressure intensity at the HFL = 579 K kg/m2
Depth
S.No From Velo. In Force =
Max Mean Water Current Velocity = 2.360 m/s Scour m/s Max Vel. 52*K*V^2
1 Designed H.F.L = 96.700 m 17.875 2.360 3.338 0.58 K
2 Well Cap Top Level = 94.760 m 15.935 2.104 2.975 0.46 K
3 Low Water Level = 93.460 m 14.635 1.932 2.733 0.39 K
4 Well Cap Bottom Level = 93.760 m 14.935 1.972 2.789 0.40 K
5 Top Plug Bottom Level = 93.460 m 14.635 1.932 2.733 0.39 K
6 River Bed Level = 94.327 m 15.502 2.047 2.894 0.44 K
7 Scour Level = 78.825 m 0.000 0.000 0.000 0.00 K
8 Curb Top Level = 80.545 m
9 Founding Level = 78.68 m
Total 60.890
T m T-m
1 Return wall 3.5 16.9 58.88
Return wall 0.4 16.6 7.46
DESIGN CALC
2 Well Cap 6.7 15.4 102.98
Well Cap 0.5 15.6 7.20
3 Well 49.8 10.0 496.08
Total 60.9 672.60
T m T-m
1 Return wall 3.5 15.2 52.89
Return wall 0.4 14.9 6.69
2 Well Cap 6.7 13.7 91.51
Well Cap 0.5 13.9 6.41
3 Well 49.8 8.2 410.38
Total 60.9 567.87
DESIGN CALC
Sr.No Particulars Current Force Lever Arm Moment In
Transverse
Direction MT
T m T-m
1 Return wall 3.1 15.2 46.70
Return wall 0.4 14.9 5.90
2 Well Cap 5.9 13.7 80.80
Well Cap 0.4 13.9 5.66
3 Well 44.0 8.2 362.37
Total 53.8 501.44
DESIGN CALC
1 Return wall 0.98 16.9 16.56
Return wall 0.13 16.6 2.10
2 Well Cap 0.78 15.4 12.05
Well Cap 0.05 15.6 0.84
3 Well 11.66 10.0 116.06
Total 13.6 147.60
a On Superstructure
DESIGN CALC
Force per m = 4.400 x 0.10
Total Force on abutment = 0.440 x 62.50 x
Acting RL =
b On Moving Load
Ht of LL = 3 m
Total force on LL = 3 x 0.100 x 62.5 x
Acting RL =
c On Abutment Body
Exposed Area of Return Wall = 5.615 x 2.60
Acting RL
T m T-m T-m
1 SuperStructure 13.8 21.6 296.66 192.83
2 On Moving Vehicles 9.4 23.4 218.91 142.29
3 On Abutment Body 1.5 18.7 27.36 17.79
Total 24.6 542.92 352.90
DESIGN CALC
Seismic Loads
Horizontal seismic force as per IRC 6 - 2000 cl no.222 ( Modified Clauses for The Interim Measures for seism
Seismic Zone As per the NIT = III
Feq = A h x ( Dead Load + Appropriate Live Load)
Where
Feq = Seismic Force to be resisted
Ah = Horizontal Seismic Coefficient
( Z / 2 ) x ( Sa / g )
=
(R/I)
Calculation of T
F = 1 KN Width =
Length =
L1 = 2.89 m
E1 = 27386.13 N/mm2 = 2.74E+07
I1 = 18.6 m4
L2 = 16.09 m
E2 = 25000 N/mm2 = 2.50E+07
I2 = 322.86 m4
= 1.096092560779E-07 m
= 0.0001096093 mm
Force F = 9123.317 KN
DESIGN CALC
T = 2 x Sqrt (D/1000F)
= 0.042 sec
Calculation of T
F = 1 KN Width =
Length =
L1 = 2.89 m
E1 = 27386.13 N/mm2 = 2.74E+07
I1 = 67.03695 m4
L2 = 16.09 m
E2 = 25000 N/mm2 = 2.50E+07
I2 = 138.13 m
4
= 2.2372835136922E-07 m
= 0.000224 mm
Force F = 4469.706 KN
DESIGN CALC
T = 2 x Sqrt (D/1000F)
= 0.059 sec
T T m
1 SuperStructure 223.5 17.9 99.29
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
6 Abutment Triangular wall 25.2 2.0 97.57
7 Weight of earth fill behind 148.5 11.9 96.06
abutment beyond Dirt wall
8 Weight of return wall 24.5 2.0 96.06
Total 519.89 41.591
T T m
1 SuperStructure 223.5 17.9 99.29
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
DESIGN CALC
6 Abutment Triangular wall 25.2 2.0 97.57
7 Weight of earth fill behind 148.5 11.9 96.06
abutment beyond Dirt wall
8 Weight of return wall 24.5 2.0 96.06
Total 519.89 41.6
T T m
1 SuperStructure 223.5 17.9 99.29
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
6 Abutment Triangular wall 25.2 2.0 97.57
7 Weight of earth fill behind 148.5 11.9 96.06
abutment beyond Dirt wall
8 Weight of return wall 24.5 2.0 96.06
Total 519.89 41.6
T T m
1 SuperStructure 447.0 35.8 98.20
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
6 Abutment Triangular wall 25.2 2.0 97.57
DESIGN CALC
7 Weight of earth fill behind 148.5 11.9 96.06
abutment beyond Dirt wall
8 Weight of return wall 24.5 2.0 96.06
Total 743.39 59.5
T T m
1 SuperStructure 447.0 35.8 98.20
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
6 Abutment Triangular wall 25.2 2.0 97.57
7 Weight of earth fill behind 148.5 11.9 96.06
abutment beyond Dirt wall
8 Weight of return wall 24.5 2.0 96.06
Total 743.39 59.5
T T m
1 SuperStructure 447.0 35.8 98.20
2 Dirt wall 9.8 0.8 98.74
3 Pedestals 1.7 0.1 97.88
4 Abutment cap 9.0 0.7 97.50
5 Abutment Rectangular wall 77.7 6.2 96.06
6 Abutment Triangular wall 25.2 2.0 97.57
DESIGN CALC
7 Weight of earth fill behind 148.5 11.9 96.06
LOAD COMBINATIONS
a LWL Condition
4 1 + with wind
5 2 + with wind
6 3 + with wind
190 t
34 t
223.5 t
2.4 = 9.788 t
2.4 = 1.750 t
2.4 = 9.000 t
2.4 = 77.70 t
2.4 = 25.16 t
= 148.47 t
= 24.53 t
= 296.39 t
= 1.50 m
= 1.50 m
= 2.750 m
= 1.50 m
= 1.90 m
= 1.90 m
= -0.53 m
= 4.200 m
= 4.200 m
= 6.25 m
= 11.00 m
= 6.25 m
= 1.00 m
= 49.22 m2
0.5 = 15.33 m2
64.55
= 154.92 t
= 12.88 m2
= 14.78 m2
27.66 m2
= 19.91 t
= 14.64 m
= 769.09 t
= 30.66 m2
= 29.69 m2
= -(12.88) m2
= -(14.78) m2
ectional Area = 32.69 m2
2.4 = 1158.51 t
= 32.15 m2
= 31.36 m2
= -(12.88) m2
= -(14.78) m2
ectional Area = 35.86 m2
2.4 = 25.82 t
2.4 = 60.24 t
= 12.88 m2
= 14.78 m2
27.66 m2
= 32.15
= 14.78 m2
46.94 m2
2.4 = 19.91 t
3 = 123.90 t
4.05 = 33.65 m
= 2.52 t
= 2334.82 t
= 2102.43 t
78.7 ) = 4.60 t
78.7 ) = 4.45 t
78.8 ) = 449.05 t
80.5 ) = 396.28 t
80.5 ) = 383.41 t
779.69 t
78.8 ) = 488.94 t
78.8 ) = 473.07 t
78.7 ) = 4.60
78.7 ) = 4.45
94.8 ) = 31.53 t
1002.59 t
80.5 ) = 436.17 t
80.5 ) = 422.01 t
94.8 ) = 31.53 t
889.70 t
78.8 ) = 488.94 t
78.8 ) = 473.07 t
78.7 ) = 4.60 t
78.7 ) = 4.45 t
94.8 ) = 14.79 t
971.07 t
80.5 ) = 436.17 t
80.5 ) = 422.01 t
94.8 ) = 4.32 t
858.18 t
e = 0.965 m
e = 1.500 m
= 116.72 tm
= 75.09 tm
e = 0.100 m
e = 1.500 m
= 128.90 tm
= 8.59 tm
e = 1.450 m
e = 1.500 m
= 64.45 tm
= 62.30 tm
e = 1.030 m
e = 1.500 m
= 100.56 tm
= 69.05 tm
MT CURRENT ML TRAFFIC
75.09 116.72
8.59 128.90
62.30 64.45
69.05 100.56
Kah = 0.2794
Kav = 0.011
0.02017 tm
1.521 t/m2
1.521 t/m2
1.302 t/m2
1.302 t/m2
0.726 t/m2
0.726 t/m2
3.608 t/m2
3.608 t/m2
0.522 t/m3
0.603 t/m2
1.521 t/m2
1.521 t/m2
0.363 t/m2
0.363 t/m2
0.542 t/m2
0.542 t/m2
3.971 t/m2
3.971 t/m2
0.522 t/m2
0.603 t/m2
1.521 t/m2
1.521 t/m2
0.469 t/m2
0.469 t/m2
0.254 t/m2
0.254 t/m2
3.971 t/m2
3.971 t/m2
0.522 t/m2
6.250 = 74.792 t
6.250 = 14.381 t
6.250 = 159.778 t
6.250 = 10.542 t
6.250 = 115.718 t
6.25 = 2.951 t
6.25 = 58.634 t
6.25 = 145.626 t
582.42 t
6.250 = 74.792 t
6.250 = 14.381 t
6.25 = 159.778 t
6.250 = 0.738 t
6.250 = 36.672 t
6.250 = 3.286 t
6.250 = 48.154 t
6.250 = 176.419 t
514.22 t
6.250 = 74.792 t
6.250 = 14.381 t
6.250 = 159.778 t
6.250 = 2.464 t
6.250 = 44.370 t
6.250 = 0.723 t
6.250 = 22.588 t
6.250 = 176.419 t
495.51 t
HTL
Lever Arm Moment
9.92 741.57
18.08 259.93
8.40 1342.54
15.831 39.01
7.56 335.55
14.60 10.55
6.250 = 81.845 t
6.250 = 14.381 t
6.250 = 177.558 t
6.250 = 10.542 t
6.250 = 152.025 t
6.25 = 2.951 t
6.25 = 73.026 t
6.25 = 145.626 t
6.25 = 42.171 t
6.25 = 3.053 t
606.95 t
6.250 = 81.845 t
6.250 = 14.381 t
6.25 = 177.558 t
6.250 = 0.738 t
6.250 = 40.917 t
6.250 = 3.286 t
6.250 = 54.488 t
6.250 = 176.419 t
6.250 = 46.416 t
6.250 = 3.053 t
549.63 t
6.250 = 81.845 t
6.250 = 14.381 t
6.250 = 177.558 t
6.250 = 2.464 t
6.250 = 49.855 t
6.250 = 0.723 t
6.250 = 25.559 t
6.250 = 176.419 t
6.250 = 46.416 t
6.250 = 3.053 t
578.27 t
HTL
Lever Arm Moment
10.85 888.02
19.95 286.83
4946.49
0.322
0.058
0.058
0.062 t/m2
0.314 t/m2
0.314 t/m2
0.269 t/m2
0.269 t/m2
0.135 t/m2
0.135 t/m2
0.744 t/m2
0.062 t/m2
0.314 t/m2
0.314 t/m2
0.075 t/m2
0.075 t/m2
0.112 t/m2
0.112 t/m2
0.819 t/m2
0.062 t/m2
0.31 t/m2
0.314 t/m2
0.17 t/m2
0.174 t/m2
0.094 t/m2
0.094 t/m2
0.819 t/m2
6.25 = 7.711 t
6.25 = 2.965 t
6.25 = 32.947 t
6.25 = 2.174 t
6.25 = 23.861 t
6.25 = 0.548 t
6.25 = 10.881 t
6.25 = 30.028 t
111.12 t
6.250 = 7.711 t
6.250 = 2.965 t
6.25 = 32.947 t
6.250 = 0.152 t
6.250 = 7.562 t
6.250 = 0.678 t
6.250 = 9.929 t
6.250 = 36.378 t
98.32 t
6.250 = 7.711 t
6.25 = 2.965 t
6.25 = 32.947 t
6.25 = 0.915 t
6.25 = 16.468 t
6.25 = 0.268 t
6.25 = 8.384 t
6.25 = 36.378 t
106.04 t
HTL
Lever Arm Moment
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
SEISMIC HFL
Lever Arm Moment
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
= 30.00 t
= 16.62 t
= 16.62 t
= 14.00 t
dity
78.675
Moment at Well
Foundation
585.75
409.25
78.675
Moment at Well
Foundation
292.875
139.17
Effect
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 16
= 0.101
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0.0
= 0.000
1 : 80
= 0
= 0.000
1 : 80
= 13.22
= 0.083
1 : 80
= 13.22
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
1 : 80
= 13.2
= 0.083
579.24 Kg/m
orce Diagram
0.66
20 m/s
Force =
52*K*V^2
0.58 K
0.46 K
0.39 K
0.40 K
0.39 K
0.44 K
0.00 K
RL 78.825
Acting RL Lever Arm Moment T-M
95.730 16.905 58.878
95.407 16.582 7.459
58.878
94.260 15.435 102.983
94.427 15.602 7.203
110.186
88.782 9.957 496.077
665.141
RL = 78.825
RL = 80.545
RL = 78.675
0.883 U2
RL = 78.825
RL = 80.545
RL = 78.675
RL 78.825
Acting RL Lever Arm Moment T-M
95.730 16.905 141.533
95.407 16.582 17.930
159.463
94.260 15.435 102.983
94.427 15.602 7.203
110.186
88.782 9.957 992.153
992.153
0.117 U2
RL = 78.825
RL = 80.545
RL = 78.675
V = 39 m/s
= 912.600 N/m2
say = 0.100 t/m2
= 4.400 m
0.5 = 9.375 t
102.175 m
= 14.60 m2
= 1.46 t
= 97.568 m
RL = 78.825
Moment In Moment In Longitudinal
Transverse Direction 35 %
Direction MT 65%
T-m T-m
192.83 103.83
142.29 76.62
17.79 9.58
352.90 190.02
RL = 80.545
Moment In Moment In Longitudinal
Transverse Direction
Direction MT
T-m T-m
177.45 95.55
131.81 70.97
16.15 8.70
325.42 175.22
RL = 78.675
Moment In Moment In Longitudinal
Transverse Direction
Direction MT
T-m T-m
194.17 104.55
143.20 77.11
17.93 9.65
355.30 191.31
= 0.16
= 1
= 2.5
< 0.4
T < 4
3.295 m
6.25 m
2.74E+07 KN/m2
2.50E+07 KN/m2
9123.317 ))
= 0.16
= 1
= 2.5
= 2.50
= 0.080
= 0.080
3.295 m
6.25 m
2.74E+07 KN/m2
2.50E+07 KN/m2
4469.706 ))
= 0.16
= 1
= 2.5
= 2.50
= 0.080
= 0.080
irection
RL = 78.825
Lever Arm Moments at Scour
level
m T-m
20.46 365.87
19.91 15.59
19.05 2.67
18.68 13.45
17.23 107.10
18.74 37.72
17.23 204.65
17.23 33.81
780.85
15.435 191.30
7.468 1163.44
22.75 78.20
RL = 80.545
Lever Arm Moments at Curb
Top level
m T-m
18.74 335.12
18.19 14.24
17.33 2.43
16.96 12.21
15.51 96.41
15.51 30.43
709.32
13.715 169.98
6.608 1029.45
21.030 72.29
1981.04
RL = 78.675
Lever Arm Moments at
founding level
m T-m
20.61 368.55
20.06 15.71
19.20 2.69
18.83 13.55
17.38 108.03
18.89 38.02
17.38 206.44
17.38 34.10
787.09
15.585 193.16
7.543 1175.13
22.900 78.72
direction
RL = 78.825
Lever Arm Moments at Scour
level
m T-m
19.38 692.85
19.91 15.59
19.05 2.67
18.68 13.45
17.23 107.10
18.74 37.72
17.23 33.81
1107.83
15.435 191.30
7.468 1163.44
RL = 80.55
Lever Arm Moments at Curb
Top level
m T-m
17.66 631.34
18.19 14.24
17.33 2.43
16.96 12.21
15.51 96.41
17.02 34.26
15.51 184.22
15.51 30.43
1005.54
13.715 169.98
6.608 1029.45
RL = 78.675
Moments at Curb
Lever Arm
Top level
m T-m
19.53 698.21
20.06 15.71
19.20 2.69
18.83 13.55
17.38 108.03
18.89 38.02
17.38 34.10
1116.75
15.585 193.16
7.543 1175.13
13156.79
5 LC 2 + Wind
Sum Load Case 2 Err:509 507.630 - #REF! -
6 LC 3 + Wind
Sum Load Case 3 Err:509 603.38 - #REF! 75.09
Wind Load - - 24.58 190.02 352.90
8 LC 2 + Transverse Seim
Superstructure 223.500 - - -335.25 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well Err:509 - - - -
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Seismic Transverse 209.79 2135.59
Sum = Err:509 Err:509 209.79 Err:509 2135.59
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well Err:509 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity / Braking - 7.13 138.1
Seismic Transverse. - - 213.22 - 2213.79
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Sum = Err:509 Err:509 213.22 #REF! 2251.34
11 LC 2 + Long. Seim
Superstructure 223.500 - - -335.25 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well Err:509 - - - -
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Dynamic Earth Pressure 103.40 996.74
Seismic Longitudinal - 227.666 - 2462.58 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.738 -
Earth Pressure - Err:509 - Err:509 -
Well Err:509 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity - 7.13 138.1
Dynamic Earth Pressure 111.12 1097.66
Seismic Longitudinal - 227.67 - 2462.6 -
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Sum = Err:509 Err:509 0.00 #REF! 37.55
5 LC 2 + Wind
Sum Load Case 2 2041.61 Err:509 - Err:509 -
Wind Load - - 15.21 104.25 193.61
6 LC 3 + Wind
Sum Load Case 3 2119.42 Err:508 - Err:509 75.09
Wind Load - - 24.58 175.22 325.42
T T T TM TM
7 LC 1 + Transverse Seim
Sub Structure 495.36 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well 2102.43 - - - -
Buoyancy -779.69 - - - -
M t&s - - - 178.19 -
Seismic Transverse. - - 191.91 - 1573.64
8 LC 2 + Transverse Seim
Superstructure 223.500 -335.250
Sub Structure 495.364 - - -1242.738 -
Earth Pressure - Err:509 - Err:509 -
Well 2102.434 - - - -
Buoyancy -779.693 - - - -
M t&s - - - 230.173 -
Seismic Transverse. - - 209.79 - 1908.75
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure Seismic - Err:509 - Err:509 -
Well 2102.434 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 125.8
Seismic Transverse. - - 213.22 - 1981.04
Buoyancy -779.69 - - - -
M t&s - - - 250.16 -
Sum = 2080.51 Err:509 213.22 Err:509 2018.59
11 LC 2 + Long. Seim
Superstructure 223.500 -335.250
Sub Structure 495.36 - - -1242.74 -
Earth Pressure Seismic Err:509 Err:509
Well 2102.43 - - - -
Buoyancy -779.69 - - - -
M t&s - - - 230.17 -
Dynamic Earth Pressure Err:509 Err:509
Seismic Longitudinal - 227.666 - 2204.98 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.738 -
Earth Pressure Seismic - Err:509 - Err:509 -
Well 2102.434 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 125.8
Dynamic Earth Pressure Err:509 Err:509
Seismic Longitudinal - 227.67 - 2205.0 -
Buoyancy -779.69 - - - -
M t&s - - - 250.16 -
Sum = 2080.51 Err:509 0.00 Err:509 37.55
5 LC 2 + Wind
Sum Load Case 2 2161.10 621.332 - 3734.869 -
Wind Load - - 15.21 114.20 212.09
6 LC 3 + Wind
Sum Load Case 3 2238.92 724.14 - 4936.95 75.09
Wind Load - - 24.58 191.31 355.30
7 LC 1 + Transverse Seim
Sub Structure 495.36 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well 2334.82 - - - -
Buoyancy -892.59 - - - -
M t&s - - - 219.24 -
Seismic Transverse. - - 191.91 - 1786.83
8 LC 2 + Transverse Seim
Superstructure 223.500 -335.250
Sub Structure 495.36 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well 2334.82 - - - -
Buoyancy -892.59 - - - -
M t&s - - - 219.24 -
Seismic Transverse. - - 209.79 - 2155.38
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure Seismic - 662.25 - 5481.63 -
Well 2334.823 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 139.2
Seismic Transverse. - - 213.22 - 2234.09
Buoyancy -892.59 - - - -
M t&s - - - 296.77 -
Sum = 2200.01 669.38 213.22 4281.22 2271.64
11 LC 2 + Long. Seim
Superstructure 223.500 -335.250
Sub Structure 495.36 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well 2334.82 - - - -
Buoyancy -892.59 - - - -
M t&s - - - 219.24 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.25 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure Seismic - 662.25 - 5481.63 -
Well 2334.823 - - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity / Braking - 7.13 - 139.2 -
Dynamic Earth Pressure #REF! #REF!
Seismic Longitudinal - 227.67 - 2485.0 -
Buoyancy -892.59 - - - -
M t&s - - - 296.77 -
Sum = 2200.01 #REF! 0.00 #REF! 37.55
AT SCOUR LVL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
AT FOUNDING LEVEL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
CHECK FOR AREA UNDER TENSION & REDISTRIBUTED BASE PRESSURE ON BT PROGRAM
For Calculation of Area Under Tension BT program has been used. The result for critical cases has been tabulated below
STABILITY CALCULATIONS
78.825 m
MR
TM
-
-
-
-
#REF!
-
-
-
-
-
-
#REF!
-
-
#REF!
MR
TM
-
-
#REF!
#REF!
-
-
#REF!
MR
TM
-
-
-
-
#REF!
-
-
-
-
-
-
Err:509
-
-
-
-
-
#REF!
MR
TM
-
-
-
-
#REF!
-
-
-
-
-
-
Err:509
-
-
-
-
-
#REF!
80.545 m
MR
TM
-
-
-
Err:509
-
-
-
-
Err:509
-
-
Err:509
MR
TM
-
-
Err:509
-
-
Err:509
-
-
Err:509
MR
TM
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
-
-
-
Err:509
MR
TM
-
-
Err:509
-
-
Err:509
-
-
-
-
-
Err:509
78.675 m
MR
TM
-
-
-
-
4014.13
-
-
-
-
3734.87
-
-
4937.52
MR
TM
-
-
4023.82
-
-
3854.91
-
-
5146.29
MR
TM
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
-
-
-
4846.56
MR
TM
-
-
-
-
#REF!
-
-
-
-
Err:509
-
-
-
-
-
-
-
-
-
#REF!
78.83
Mr
TM
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Err:509
#REF!
#REF!
Err:509
#REF!
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
4014.13
3734.87
4937.52
4023.82
3854.91
5146.29
Err:509
Err:509
4846.56
#REF!
Err:509
#REF!
P/A - MT/ZT -
ML/ZL
T/m2
IV
-11.377
-4.859
-17.587
-11.787
-9.710
-25.714
Err:509
Err:509
-49.057
#REF!
Err:509
#REF!
PROGRAM
bulated below
Redistri
buted
Remark Base
Pressur
e
OK 54.12
OK 55.54
OK 63.20
OK 54.59
OK 59.68
OK 70.03
OK 86.13
OK 92.04
OK 98.75
OK 85.96
OK 90.86
OK 97.64
Remarks
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
Err:509
Err:509
OK
#REF!
#REF!
#REF!
5 LC 2 + Wind
Sum Load Case 2 Err:509 266.294 - #REF! -
6 LC 3 + Wind
Sum Load Case 3 Err:509 371.09 - #REF! 75.09
Wind Load - - 24.58 190.02 352.90
T T T TM TM
4 LC 1 + Wind
Sum Load Case 2 1708.10 Err:509 - Err:509 -
Wind Load - - 1.46 8.70 16.15
5 LC 2 + Wind
Sum Load Case 2 1931.60 Err:509 - Err:509 -
Wind Load - - 15.21 104.25 193.61
5 LC 2 + Wind
Sum Load Case 2 2051.09 517.255 - 2957.489 -
Wind Load - - 15.21 114.20 212.09
6 LC 3 + Wind
Sum Load Case 3 2128.91 629.10 - 4336.07 75.09
Wind Load - - 24.58 191.31 355.30
AT SCOUR LVL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
Case I Err:509 266.29 0.00 #REF! 0.00
Case II Err:509 266.29 0.00 #REF! 0.00
Case III Err:509 371.09 0.00 #REF! 75.09
AT FOUNDING LEVEL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
Case I 1827.59 517.25 0.00 3236.74 0.00
Case II 2051.09 517.25 0.00 2957.49 0.00
Case III 2128.91 629.10 0.00 4336.07 75.09
STABILITY CALCULATIONS
78.825 m
MR
TM
-
-
-
-
#REF!
-
-
-
-
#REF!
-
-
#REF!
MR
TM
-
-
#REF!
#REF!
-
-
#REF!
80.545 m
MR
TM
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
Err:509
MR
TM
-
-
Err:509
-
-
Err:509
-
-
Err:509
78.675 m
MR
TM
-
-
-
-
3236.74
-
-
-
-
2957.49
-
-
4336.72
MR
TM
-
-
3246.45
-
-
3079.01
-
-
4547.79
78.83
Mr
TM
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
3236.74
2957.49
4336.72
3246.45
3079.01
4547.79
P/A - MT/ZT +
ML/ZL
T/m2
II
63.35
63.98
78.47
63.15
61.54
74.38
Remarks
OK
OK
OK
OK
OK
OK
5 LC 2 + Wind
Sum Load Case 2 Err:509 420.722 - #REF! -
Wind Load - - 15.21 113.41 210.61
6 LC 3 + Wind
Sum Load Case 3 Err:509 268.72 - #REF! 75.09
Wind Load - - 24.58 190.02 352.90
8 LC 2 + Transverse Seim
Sum Load Case 2 Err:509 420.72 - #REF! -
Seismic Transverse. - - 209.79 - 2135.59
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - 247.76 - 3942.96 -
Well Err:509 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity / Braking - 7.13 138.1
Seismic Transverse. - - 213.22 - 2213.79
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Sum = Err:509 254.88 213.22 #REF! 2251.34
11 LC 2 + Long. Seim
Sum Load Case 2 Err:509 420.72 - #REF! -
Dynamic Earth Pressure 106.04 - #REF! -
Seismic Longitudinal - 227.666 - 2462.58 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.738 -
Earth Pressure - 247.76 - 3942.959 -
Well Err:509 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity - 7.13 138.1
Dynamic Earth Pressure 106.04 #REF!
Seismic Longitudinal - 227.67 - 2462.6 -
Buoyancy Err:509 - - - -
M t&s - - - #REF! -
Sum = Err:509 588.59 0.00 #REF! 37.55
Buoyancy -858.18 - - - -
M t&s - - - 243.68 -
Sum = 2040.94 Err:509 0.00 Err:509 75.09
5 LC 2 + Wind
Sum Load Case 2 1963.12 Err:509 - Err:509 -
Wind Load - - 15.21 104.25 193.61
6 LC 3 + Wind
Sum Load Case 3 2040.94 Err:509 - Err:509 75.09
Wind Load - - 24.58 175.22 325.42
8 LC 2 + Transverse Seim
Sum Load Case 2 1963.12 Err:509 - Err:509 -
Seismic Transverse. - - 209.79 - 1908.75
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - Err:509 - Err:509 -
Well 2102.434 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 125.8
Seismic Transverse. - - 213.22 - 1981.04
Buoyancy -858.18 - - - -
M t&s - - - 243.68 -
Sum = 2002.03 Err:509 213.22 Err:509 2018.59
11 LC 2 + Long. Seim
Sum Load Case 2 1963.12 Err:509 - Err:509 -
Dynamic Earth Pressure Err:509 Err:509
Seismic Longitudinal - 227.666 - 2204.98 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.738 -
Earth Pressure - Err:509 - Err:509 -
Well 2102.434 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 125.8
Dynamic Earth Pressure Err:509 Err:509
Seismic Longitudinal - 227.67 - 2205.0 -
Buoyancy -858.18 - - - -
M t&s - - - 243.68 -
Sum = 2002.03 Err:509 0.00 Err:509 37.55
Well 2334.82 - - - -
Buoyancy -971.07 - - - -
M t&s - - - 267.35 -
Sum = 2082.62 496.43 0.00 2747.83 0.00
5 LC 2 + Wind
Sum Load Case 2 2082.62 496.428 - 2747.831 -
Wind Load - - 15.21 114.20 212.09
6 LC 3 + Wind
Sum Load Case 3 2160.43 310.10 - 3949.91 75.09
Wind Load - - 24.58 191.31 355.30
8 LC 2 + Transverse Seim
9 LC 3 + Transverse Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.74 -
Earth Pressure - 289.14 - 4946.49 -
Well 2334.823 - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity/ Braking - 7.13 139.2
Seismic Transverse. - - 213.22 - 2234.09
Buoyancy -971.07 - - - -
M t&s - - - 288.88 -
Sum = 2121.53 296.26 213.22 3738.19 2271.64
11 LC 2 + Long. Seim
Sum Load Case 2 2082.62 496.43 - 2747.83 -
Dynamic Earth Pressure #REF! #REF!
Seismic Longitudinal - 227.666 - 2485.04 -
12 LC 3 + Long. Seim
Superstructure 223.500 - - -335.250 -
Sub Structure 495.364 - - -1242.738 -
Earth Pressure - 496.43 - 4946.494 -
Well 2334.823 - - - -
Max Live Load 38.908 - - -58.36 37.55
Bearing Rigidity / Braking - 7.13 - 139.2 -
Dynamic Earth Pressure #REF! #REF!
Seismic Longitudinal - 227.67 - 2485.0 -
Buoyancy -971.07 - - - -
M t&s - - - 288.88 -
Sum = 2121.53 #REF! 0.00 #REF! 37.55
AT SCOUR LVL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
Case I Err:509 420.72 0.00 #REF! 0.00
Case II Err:509 420.72 0.00 #REF! 0.00
Case III Err:509 268.72 0.00 #REF! 75.09
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
Case I 1739.62 Err:509 0.00 Err:509 0.00
Case II 1963.12 Err:509 0.00 Err:509 0.00
Case III 2040.94 Err:509 0.00 Err:509 75.09
AT FOUNDING LEVEL
Load Fl Ft Ml Mt
T T T TM TM
Normal Load Combination 1
Case I 1859.12 496.43 0.00 3027.09 0.00
Case II 2082.62 496.43 0.00 2747.83 0.00
Case III 2160.43 310.10 0.00 3949.91 75.09
CHECK FOR AREA UNDER TENSION & REDISTRIBUTED BASE PRESSURE ON BT PROGRAM
For Calculation of Area Under Tension BT program has been used. The result for critical cases has been tabulated below
Area under Area under Permissible
Percentage
CASE NO. Total Area compression Tension percentage
of At
(Ac) (At) of At
STABILITY CALCULATIONS
78.825 m
MR
TM
-
-
-
-
#REF!
-
-
-
-
#REF!
-
-
#REF!
MR
TM
-
-
#REF!
-
-
#REF!
-
-
#REF!
MR
TM
-
-
#REF!
-
-
#REF!
-
-
-
-
-
#REF!
MR
TM
#REF!
-
-
-
#REF!
-
-
-
-
-
#REF!
80.545 m
MR
TM
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
Err:509
MR
TM
-
-
Err:509
-
-
Err:509
-
-
Err:509
MR
TM
-
-
Err:509
-
-
Err:509
-
-
-
-
-
Err:509
MR
TM
Err:509
Err:509
-
-
-
-
-
Err:509
78.675 m
MR
TM
-
-
-
-
3027.09
-
-
-
-
2747.83
-
-
3950.63
MR
TM
-
-
3036.79
-
-
2869.88
-
-
4163.53
MR
TM
-
-
3515.11
-
-
3492.31
-
-
-
-
-
4374.29
MR
TM
#REF!
#REF!
-
-
-
-
-
-
-
-
-
#REF!
78.83
Mr
TM
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
P/A - MT/ZT -
ML/ZL
T/m2
IV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mr
TM
3027.09
2747.83
3950.63
3036.79
2869.88
4163.53
3515.11
3492.31
4374.29
#REF!
#REF!
#REF!
T PROGRAM
tabulated below
Redistributed
Remark
Base Pressure
OK 54.12
OK 55.54
OK 63.20
OK 54.59
OK 59.68
OK 70.03
OK 86.13
OK 92.04
OK 98.75
OK 85.96
OK 90.86
OK 97.64
#REF! #REF!
Remarks
OK
OK
OK
OK
OK
OK
OK
OK
OK
#REF!
#REF!
#REF!
TOTAL LOADS, FORCES AND MOMENTS AT CURB TOP LVL @ R.L. 80.55 m
Load Fl Ft Ml Mt Mr
T T T TM TM TM
Normal Load Combination 1
AT FOUNDING LEVEL
Load Fl Ft Ml Mt Mr
T T T TM TM TM
Normal Load Combination 1
STABILITY CALCULATIONS
DESIGN OF STEINING
As per the IRC 78 : 2000 Cl 708.3.4 the min vertical reinf shall be 0.12% of Gross cross sectional area.
Above Scour Level
Gross cross sectional Area =
Hoop Steel
As per the IRC 78 : 2000 Cl 708.3.4 the min hoop reinf shall be 0.04% of Volume of steining per unit length .
DESIGN OF CURB
As per the IRC 78 : 2000 Cl 708.7.3 the min reinforcement shall be 72 Kg/Cum. Of curb.
As per the IRC 78 : 2000 Cl 708.6, the mild steel cutting edge shall not be less than 40kg/m.
sectional area.
Err:509 m2
Err:509 cm2
mm2/ m
mm2/ m
DESIGN OF CURB
As per the IRC 78 : 2000 Cl 708.7.3 the min reinforcement shall be 72 Kg/Cum. Of curb.
As per the IRC 78 : 2000 Cl 708.6, the mild steel cutting edge shall not be less than 40kg/m.
0.0118
S FOR ABUTMENT WELL A-L
8500 174.6
8500 174.6
6250
0
0
0
6732
6276
6476
6778
6980
7180
7382
8500 174.6
8500 174.6
6250
0
0
0
6732
6276