Steam Turbine Steam Washing of Turbine

Maintenance

Introduction own time of the turbine. Special measures


should be taken to accelerate cooling [3].
During operation, deposits occur on the
turbine blading to a greater or lesser degree For maximum success, steam washing
depending on the steam purity [1] and the should not be started until the casing
pressures and temperatures of the operating temperatures have dropped to < 100°C.
steam. These deposits cause a reduction of
When Steam Washing the turbine stages,
the turbine generator unit’s efficiency due to:
the initial saturated steam temperatures
 Changes in the flow profiles must be as low as possible. Steam washing
with a constant steam condition is not very
 Thicker boundary layers in the steam
effective. After a certain time the turbine
flow as a result of rough surfaces.
blading reaches the temperature of the
In extreme cases the flow area of turbine washing steam and the condensation that
may get reduced with consequent reduction brings about the effect is lost. To get
in the maximum possible steam flow through maximum success in the shortest possible
the turbine, and corresponding output. time, it is necessary to increase the steam
temperature in stages by increasing the
Choking of blade flow path can be detected
pressure. As the temperature is raised the
on the basis of internal efficiency (ηi) turbine speed will generally increase (take
measurements [2]. care to avoid critical speed ranges).
If deposit leads to an increase in stage Increased speed will also promote cleaning.
pressures, the maximum stage pressures The steam entering the condenser must be
shown in the Technical Data should not be condensed during the entire process i.e. one
exceeded. If necessary, the output must be circulating water pump must be in operation.
reduced. If possible, the turbine generator unit should
Complex, i.e. water-insoluble, silicate be started up and loaded after steam
deposits occur in a temperature range washing. Any dissolved salt residue
between 500°C and 350°C. Alkali silicates remaining on the blading will be blown out
and silicic acid are deposited between due to the high velocity of the steam under
350°C and 60°C. Salt deposits occur at load conditions.
temperatures ranging from 480°C to the Steam washing with saturated steam will
blading stages where condensation begins. only have the desired success if the steam
Salt deposits are water-soluble and can be has adequate moisture content upstream of
removed by steam washing with saturated the blading.
steam. Depending on their composition,
silicate deposits are either water-soluble The saturated steam is introduced into the
(e.g. alkali silicates) or occur as a hard HP turbine via the connection flanges
Water-insoluble coating. In latter case the provided between the stop and control
deposits can only be removed mechanically valves.
during overhauls. The steam is introduced into the IP turbine
between the control valves and the turbine.
General Instructions Appropriate blind flanges are provided.
The effort required for saturated steam The steam line must be blown-out before
washing is considerably lesser than that saturated steam washing commences.
required for opening the turbine. If efficiency
reduction occurs, saturated steam washing It may be ensured that no external
should be performed first. In that case, the condensate can enter the condenser during
major part of the turbine generator unit steam washing.
downtime is accounted for by the cooling

BHEL Haridwar 4-1200-01/1


3 3

6 2

HPT IPT LPT

3 3

10 9 8 7 1
11 12 CONDENSER

SATURATED STEAM
1 Flange for saturated steam line connections
2 Saturated steam line to IP turbine
3 Connections for introduction of saturated steam
4 Blind flange on condenser
5 Condensate discharge header
6 Saturated steam line to HP turbine 4 4
7 Drains
8 Drains
9 Drains 5
10 Drains
11 Drains
12 Drains

Fig. 1 : Flow diagram for saturated steam washing

Steam Washing of IP Turbine After the saturated steam line (Fig.1, item 2)
has been joined up at the connection points
All stop and control valves and all valves in
(3), the washing steam can be routed into
the extraction lines remain closed during
the IP turbine, from there via the cross-
steam washing of the IP turbine. Any
around lines to the IP turbine and then to the
isolating valves present upstream of the
condenser.
feedwater heaters must also be closed.
There are two possible ways of discharging
The drains from the IP turbine between the
the condensate condensing in the
reheat control valves and the IP outlet, the
condenser to the atmosphere. These are:
extraction valves or the swing check valves
in the extraction lines must be vented during  By opening the blind flanges (4) on the
steam washing only to the extent required to condenser. The condenser must be
allow the condensate arising to drain off under atmospheric pressure. With this
whilst preventing excessive loss of steam. method of steam washing samples for
All other drains from the turbine generator finding out the saIt content may also be
must be full open. taken at this point.

4-1200-01/2
 With the vacuum pump \ ejector Steam Washing of HP Turbine
switched on and the blind flange (4) The main control valves must be open
closed, i.e. with the condenser at sub during steam washing of the HP turbine.
atmospheric pressure, via the
All drains (7, 8) from the HP turbine situated
condensate discharge line of an
between the main stop valves and the HP
operation condensate pump. In this
outlet may be vented during steam washing
case, make sure that the condensate is
only to the extent required to allow the
discharged to the atmosphere
condensate arising to drain off while
downstream of the pump. Samples for
preventing excessive loss of steam.
finding out the salt content are also
taken at this point. All other drains particularly those in the cold
reheat line, must be fully open. Local
The first method of steam washing with the
drainage may also be provided so that no
condenser under atmospheric pressure
steam can enter the Reheater of the Boiler,
guarantees a slight overpressure at the
if at all possible.
drains so that it is possible to perform
additional sampling at these points. For this After the steam line (6) has been joined up
purpose, the appropriate drains may be cut at the connection points (3), the stream can
off at the sludge traps, or the steam inserts be routed into the HP turbine. The steam
of the drain valves may be removed. leaving the HP turbine is exhausted to the
condenser via the drains (9).
It is suggested to record the salt content at
the sampling point continuously throughout The condensate is discharged and samples
the washing Process. Also, water samples are taken to determine the salt content as
should be taken every half an hour for described in steam washing of IP turbine,
deposit analysis. the completion criteria remaining same.
Steam washing may be stopped when the
purity of steam entering the turbine (as Restoring the Turbine to Operating
determined by sampling) is approximately Condition
the same as that of the condensate or steam On completion of steam washing, all
extracted at the discharge sampling point. temporary fittings must be dismantled and
The steam washing may be stopped when the flanges closed off. Any drain lines cut off
the salt content in condensate remains must be rewelded. Controllers and control
constant at a very low level. valves must be returned to normal position.
The temporary lines are to be preserved for
future use.

Also refer to the following sections:


[1] 2-0300: Steam purity
[2] 4-1150: Measurement of internal efficiency
[3] 3-3160: Fast cooling down of the turbine