SATURATED STEAM
1 Flange for saturated steam line connections
2 Saturated steam line to IP turbine
3 Connections for introduction of saturated steam
4 Blind flange on condenser
5 Condensate discharge header
6 Saturated steam line to HP turbine 4 4
7 Drains
8 Drains
9 Drains 5
10 Drains
11 Drains
12 Drains
Steam Washing of IP Turbine After the saturated steam line (Fig.1, item 2)
has been joined up at the connection points
All stop and control valves and all valves in
(3), the washing steam can be routed into
the extraction lines remain closed during
the IP turbine, from there via the cross-
steam washing of the IP turbine. Any
around lines to the IP turbine and then to the
isolating valves present upstream of the
condenser.
feedwater heaters must also be closed.
There are two possible ways of discharging
The drains from the IP turbine between the
the condensate condensing in the
reheat control valves and the IP outlet, the
condenser to the atmosphere. These are:
extraction valves or the swing check valves
in the extraction lines must be vented during By opening the blind flanges (4) on the
steam washing only to the extent required to condenser. The condenser must be
allow the condensate arising to drain off under atmospheric pressure. With this
whilst preventing excessive loss of steam. method of steam washing samples for
All other drains from the turbine generator finding out the saIt content may also be
must be full open. taken at this point.
4-1200-01/2
With the vacuum pump \ ejector Steam Washing of HP Turbine
switched on and the blind flange (4) The main control valves must be open
closed, i.e. with the condenser at sub during steam washing of the HP turbine.
atmospheric pressure, via the
All drains (7, 8) from the HP turbine situated
condensate discharge line of an
between the main stop valves and the HP
operation condensate pump. In this
outlet may be vented during steam washing
case, make sure that the condensate is
only to the extent required to allow the
discharged to the atmosphere
condensate arising to drain off while
downstream of the pump. Samples for
preventing excessive loss of steam.
finding out the salt content are also
taken at this point. All other drains particularly those in the cold
reheat line, must be fully open. Local
The first method of steam washing with the
drainage may also be provided so that no
condenser under atmospheric pressure
steam can enter the Reheater of the Boiler,
guarantees a slight overpressure at the
if at all possible.
drains so that it is possible to perform
additional sampling at these points. For this After the steam line (6) has been joined up
purpose, the appropriate drains may be cut at the connection points (3), the stream can
off at the sludge traps, or the steam inserts be routed into the HP turbine. The steam
of the drain valves may be removed. leaving the HP turbine is exhausted to the
condenser via the drains (9).
It is suggested to record the salt content at
the sampling point continuously throughout The condensate is discharged and samples
the washing Process. Also, water samples are taken to determine the salt content as
should be taken every half an hour for described in steam washing of IP turbine,
deposit analysis. the completion criteria remaining same.
Steam washing may be stopped when the
purity of steam entering the turbine (as Restoring the Turbine to Operating
determined by sampling) is approximately Condition
the same as that of the condensate or steam On completion of steam washing, all
extracted at the discharge sampling point. temporary fittings must be dismantled and
The steam washing may be stopped when the flanges closed off. Any drain lines cut off
the salt content in condensate remains must be rewelded. Controllers and control
constant at a very low level. valves must be returned to normal position.
The temporary lines are to be preserved for
future use.
4-1200-01/3