5:3
Description Materials Unit Rate/Unit Description Materials Unit
Cement 4.50 Bag 380.00 1710.00 Cement 8.22 Bag
Sand 17.64 Cft. 120.00 2116.80 Sand 17.64 Cft.
M Sand 17.64 Cft. 0.00 0.00 M Sand 17.64 Cft.
10mm Bm 31.75 Cft. 40.00 1270.08 10mm Bm 31.75 Cft.
Labour 35.28 Cft. 15.00 529.20 Labour 35.28 Cft.
Total 5626.08 Total
Machineries 5% 281.30 Machineries
Profit 10% 590.74 Profit
6498.12
PCC M20 grade Rate/Cft 184.19 RCC M20 grade Rate/Cft
Rate/Unit
380.00 380.00
120.00 900.00
0.00 0.00
0.00 0.00
20.00 2151.68
3431.68
5% 171.58
10% 360.33
3963.59
36.84
4.5"-BRICK WORK CM 1:4
Description Materials Unit Rate/Unit
Cement 2.00 Bag 380.00 760.00
Sand 10.00 Cft. 120.00 1200.00
M Sand 10.00 Cft. 0.00 0.00
Bricks 575.00 Nos 7.00 4025.00
Labour 107.58 Sft 20.00 2151.68
Total 8136.68
Machineries 5% 406.83
Profit 10% 854.35
9397.87
BRICK WORK CM 1:4 87.35