Вы находитесь на странице: 1из 1

BH5

CH4

TC42
TC43

TS 9

Operation Temp.: 982°C (max.)


Dry Out Temp.: 510°C
Dry Out Temp.: 465°C (min.)

Gasifier Overhead Transfer Line/


Quench Coke Standpipe
FCK-TL010

TC40 TC41

BR20
Burner20 and Fan 1 –3M: Level 13m
FAN 1

BR21
Burner 21 – 5N: Level 13m
TC39

BR22
Burner 22 – 1MA :30" – Level 17.6m

BR23
Burner 23 – 1MA :30" - Level 17.6m
TS 8

Operation Temp.: 982°C (max.) BR24


Burner 24 – 1MB :30" – Level 17.6m
Dry Out Temp.: 510°C
Dry Out Temp.: 465°C (min.)
BR25
Burner 25 – 1MB :30" – Level 17.6m

PS3
Pump set 3 – Level 0

TC36 TC37 TC38


EDB3
Electric Box 3 -Level 12.6m- 250 Amp

Internal Thermocouple

Possible location to insert TC in case of Internal


BR25 Thermocouple failure

2X BR24
6X15kW Shell Thermocouple
250Amp
BR23

EDB3
Oil Line :
BR22 Level +/- 17.6m
TC32 TC34
TC35
TC33
Compr.Air Line :
Grid Temp.: 260°C (max.)
TC31

TS 7
CC23 Pre Combustion Tube - 3M :36" Level 13m CH4 Chimney 4- M2:30" – Level 45m

CC4 Pre Combustion Tube – 5N Level 13m BH5 Bulkhead – Cutting off Gasifier Overhead Transferline

CC3

CC4
FAN 1

BR21 Gasifier FCK-R-103


BR20
Level +/- 13m

PS3

Вам также может понравиться