BID

Place
Day/
Time

EPC
No. Name of Bidder Bid Letter Net Valicity
Y/N Days
Currency

USD

Consortium PT. Truba Jaya Engineering EUR


1 Y 150
- PT. Barata Indonesia and Operation JPY

Energy Group Indo PVT.LTD IDR

Consortium PT. Power Indonesia - USD

Sumec Complete Equipment and EUR


2 Y 150
Engineering Co.Ltd - PT. Shandong JPY

Lion Power Plant Technology IDR

Consortium PT. Rekadaya Elektrika - USD

China Energy Engineering Group EUR


3 Y 150
Guangdong Power Engineering Co.Ltd - JPY

PT. PJB Service IDR


BID OPENING RECORD STAGE-2 (PRICE PROPOSAL)
MALUKU CFSPP 2x15 MW (FORFEITURE)

EPC O&M Discount


%
Amount VAT Currency Amount VAT Currency

5,977,011,00 USD

326,528,043,537,00 EUR
Excluded IDR Excluded
JPY

634,006,531,142,00 IDR

29,276,706,00 USD

224,850,170,323,00 EUR
Excluded IDR Excluded
JPY

408,549,593,817,00 IDR

28,041,960,00 USD

460,579,924,659,00 EUR
Excluded IDR Excluded
JPY

345,853,065,874,00 IDR
Discount Memorandum Net Plant Heat Net Power
% Receipt (18,2) Rate - HHV Output (kW) Bidders Acknowlegment
Y/N (kCal/kwh) EPC
Amount
EPC

18.370
No Y 3,408,0
(1 Unit)

Witness : ALDY RACHMAN

32.910
No Y 3,316,0
(2 Unit)

Witness : REZA PRATAMA

20.000
No Y 3,395,0
(1 Unit)

Witness : DWI MEDICAWAN