Академический Документы
Профессиональный Документы
Культура Документы
RISK ASSESSMENT
Risk
compliance
Job steps/
Conseque
/Potential
identified
Remarks
might be
Residual
Activities
Hazards
Control
Hazard
Risks /
Rating/
Harm/
Sl no
Legal
nces
E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R
Serious injury due Proper Training for Stacking, handling &
to the accidental Transportation works.
Improper manual Tool box talk on proper manual handling
1 Stacking contact with 3 2 L
handling, lack of proper No 3 5 H R Adequate house keeping
training machinery/Materi Proper Supervision
al Workers are capable for doing job &
adequate Working platform area
Proper training for rigging works &
procedures.
Death, Serious
Tool box talk on proper manual handling,
Improper manual body injury,
Delivery using handling, lack of proper Using of vehicles/ Equipment’s
Serious injury due
boom loader & training and skills for Always secure blocks while on delivery on
2 to accidental 4 2 M
cranes: standard rigging Yes 4 4 H R upper levels using cranes & provide nylon net
procedures. Accidental contact with
secured & fix to avoid collapse of blocks
contact with the delivery machinery
Maintain always good housekeeping
trailer & cranes, collapse Proper supervision
Adequate signal man with approved by 3rd
party certificate for vehicle and operator
GENERAL CONTRACTING CO.L.L.C
RISK ASSESSMENT
Risk
compliance
Job steps/
Conseque
/Potential
identified
Remarks
might be
Residual
Activities
Hazards
Control
Hazard
Risks /
Rating/
Harm/
Sl no
Legal
nces
E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R
All vehicles / equipment’s must be equipped
with all safety materials (reverse alarm,
warning light, license, vehicle certificate &
Approved 3rd party certificates….)
Proper training and supervision
Falling from the
Adequate supervision must be provided
height,
Platform must be erected as per standard
Collapse of
Ladders should be provided on the scaffolding
working platform
for easy access.
Working at height Short-term and
Workers should not carry loads while using
Unsafe platform long term health
the ladders.
Inadequate supervision problems ,
Materials should not be stored in front of any
Block installation Unsafe manual handling Unsafe manual
2 No 3 3 M R&I access. 2 2 L
work Excess material loading handling cause
MSDS should be followed for the chemical.
on platform injury, dropping
Appropriate PPE should be worn during the
falling materials of material from
work.
top,
Housekeeping to be carried out regularly.
Falling material
Materials should be handled ergonomically.
can harm people
Blocks must be handled with proper PPE’s.
/property at
Avoid direct contact with unprotected hands,
underneath
knees and wet concrete
GENERAL CONTRACTING CO.L.L.C
RISK ASSESSMENT
Risk
compliance
Job steps/
Conseque
/Potential
identified
Remarks
might be
Residual
Activities
Hazards
Control
Hazard
Risks /
Rating/
Harm/
Sl no
Legal
nces
E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R
RISK ASSESSMENT
Health and Safety
1. In case of Near Miss, Accidents or Emergencies call – (HSE Incharge--__________)
2. This Standard Risk Assessment may be revised to suit the site condition.
3. All persons will familiarize themselves and conform to project HSE rules and requirements and wear Basic PPE (Hard Hat, High-Viz Vest and Steel Toe Safety Shoes) at all
times – use additional PPE required by the job.
4. Only trained and certified operators shall operate vehicles and mobile construction machinery. Proof of competence will be available with the operator at all times for site
verification
5. Use of mobile phones during working hours is prohibited, except for emergency reporting only.
6. No eating, smoking and sleeping at the construction worksite. Use the facilities provided on site
7. Do not use defective PPE, tools, machinery, or equipment – get them replaced before you start your work
8. Report all near misses and accidents immediately to HSE Incharge and your work leader
9. Work leaders are accountable for the behavior of their operatives
10. Conduct a Tool Box Talk, Risk Assessment Review or issue safety instructions before the start of the day’s work.
11. Copy of this Risk Assessment available on site
Environmental
1. All waste materials will removed daily from the work area and transferred to the designated waste skip
2. All Hazardous waste shall be immediately removed as per UAE regulation and dispatched slip maintained.
Control
Likely
Risk