:- 2070/071
Item Labour (L) Materials (M) Total (L+M)
Rate Unit Rate, Rs. Cost, Rs. Total Cost, Rs. Norms
Cost Unit
SN Description Catagory m.d. Type Quantity IncludingVAT(for
per m.d. Including Excluding Including Excluding No.
UC)
Rs. Rs. VAT VAT VAT VAT in m in ft
1 Site clearance for1Sqm Unskill 0.23 580 133.40 Tools & Plant 3 % of labour cost 4.00 4.00 13.74 1.28 U/D A.(3)
1 Site clearance for1Sqm Unskill 0.04 580 23.20 Tools & Plant 3 % of labour cost 0.70 0.70 23.90 2.22 DoLIDAR 1-1.6
Land development works
per m3
dismentaling of old
bldg(mud mortar) Unskill 1.06 450 477.00 Tools & Plant 3 % of labour cost 14.31 14.31 m3 491.31
Skill 0.054 630 34.02 Tools & Plant 3 % of labour cost 1.02 1.02 35.04
roof dismentaling work Unskill 0.081 450 36.45 Tools & Plant 3 % of labour cost 1.09 1.09 m2 37.54
72.58
Stone Solling in foundation
4
& Leveling Unskill 1.25 580 725.00 Tools & Plant 3 % of labour cost 21.75 21.75
Blockstone 1.1000 1753.20 1753.20 1928.52 1928.52 DoLIDAR
Total 725.00 1950.27 2675.27 75.81 49)17-6
Formworks of Local wood
5
for Beam/Slab Skill 0.150 815 122.25 Local Wood 0.0070 52920.00 52920.00 370.44 370.44 m3 U/D+DoLIDAR
For 1 Sq.m. Unskill 0.200 580 116.00 Nails 0.2500 125.95 111.65 31.49 27.91 kg 39)9.a
Total 238.25 401.93 398.35 640.18 59.51
Quantity of wood required for 1 sqm formwork = 0.0526 cum.
Wood can be used 6 times for the formwork and after then 25% cost
of the wood is recovered. So the quantity of wood required for 1 sqm = 0.00658 cum.
9
Plain cement concrete work Skill 1.00 815 815.00 Cement 0.3200 17732.8 15882.4 5674.50 5082.37 MT
M15(P.C.C. 1:2:4) Unskill 4.00 580 2320.00 Agg.40mm 0.5200 3686.3 3686.3 1916.88 1916.88 cu.m U/D
and wall - For 1 m3 Agg.20mm 0.2200 3786.3 3786.3 832.99 832.99 cu.m D1 7-2d
For Foundation Agg.10mm 0.1100 3736.3 3736.3 410.99 410.99 cu.m
Sand 0.4450 3299.20 3299.20 1468.14 1468.14 cu.m
Total 3135.00 10303.50 9711.37 13438.50 380.83
Rate Unit Rate, Rs. Cost, Rs. Total Cost, Rs. Norms
Cost Unit
SN Description Catagory m.d. Type Quantity IncludingVAT(for
per m.d. Including Excluding Including Excluding No.
UC)
Sal wood work in Door Rs. Rs. VAT VAT VAT VAT in m in ft
&Window Frame For 1 m3
Holdfast 92.0000 31.71 28.46 2917.32 2618.32 no
Total 29682.0 166298.20 165967.9 195980.2 5553.8
20 Sal wood work in pannelled Skill 4.730 815 3854.95 wood 0.0397 148282.20 148282.2 5886.80 5886.80 m3 Urban Devemt
Door &Window Shutter For Unskill 0.473 580 274.34 Hinges 4" 2.8382 34.31 30.41 97.38 86.31 No G2 10-2
1 m2 (1.07*1.982=2.114)
Tower bolt 6" 0.4730 50.98 45.13 24.11 21.35 No
Tower bolt 10" 0.4730 67.97 60.17 32.15 28.46 No
Handle 6" 0.9461 28.49 25.24 26.95 23.88 No
L-drop 10"x12" 0.4730 226.20 200.20 106.99 94.69 no
Screw 14.1911 1.47 1.30 20.86 18.45 LS
Total 4129.29 6195.24 6159.94 10324.53 959.67
Total 2722.13 2911.69 2839.92 5633.82 523.67
CGI sheet Roofing for 1 Sq. 0.45 mm th Colour
27 Skill 0.110 815 89.65 CGI Sheet 0.0710 11373.26 10077.16 807.50 715.48 Bundle Urban Devemt
m
Unskill 0.125 580 72.50 Nut Bolt 8 mm 3.0000 28.25 25.00 84.75 75.00 No F3 9(1)
J-Hook 6" 2.5000 29.38 26.00 73.45 65.00 No
Bitumin Washer 5.5000 1.13 1.00 6.22 5.50 No
Total 162.15 971.92 860.98 1134.07 105.41
Plain sheet Roofing for 1 m 0.45 mm th Plain
28 Skill 0.200 815 163.00 sheet 1.2000 193.75 171.65 232.50 205.98 Rm Urban Devemt
Unskill 0.300 580 174.00 Nut Bolt 8 mm 1.0000 28.25 25.00 28.25 25.00 No F2 9(2)
Total
Two coat Enamel Painting 337.00 260.75 230.98 597.75 182.24
29 with one coat Primer in Skill 0.120 815 97.80 Primer 0.0810 408.45 361.65 33.08 29.29 Ltr Urban Devemt
doors & winndows for 1 sq
m Unskill 0.080 580 46.40 Enamel 0.1600 510.15 451.65 81.62 72.26 Ltr J5 13(5)a,b,c
Total 144.20 114.70 101.55 m2 258.90 24.06
30 Two Coat waterproof Skill 0.050 815 40.75 Snowcem 0.4850 71.71 63.65 34.78 30.87 Kg Urban Devemt
cement (Snowceme) Paint on
Plastered Surface for 1 Sq m Unskill 0.050 580 29.00 J4 13(4)b
Total 69.75 34.78 30.87 m2 104.53 9.72
33 Skill 0.1400 815 114.10 Cement 0.0081 17732.84 15882.44 143.64 128.65 MT Urban Devemt
20 mm Thick 1:4 Cement
sand Plaster work excluding
ceiling for 1Sq. M Unskill 0.1900 580 110.20 Sand 0.0220 3299.20 3299.20 72.58 72.58 cu.m I4) 12(4)b
Total 224.30 216.22 201.23 440.52 40.95
Total 123.20 26.11 24.07 m2 149.31 13.88
COST ESTIMATE
F./Y.:- 2070/071
Government of Nepal
Ministry of Local Development
Office of District Development Committee
District Technical Office
Gorkha
Rate of Materials
FY : 2072/73
Rate/kg/km
By Tractor By Poters
General Rate for Analysis Rate for Analysis Weight Load /
SN Particular VAT 13% Unit
Rate ( VAT+Trans.) (WithTrans.) per unit Unload
Tractor Porter
Dist(KM) Amount Dist(KM) Amount
Disel 90 lt
Item: Earthwork excavation in foundation, Swerage & Pipeline including 10m lead &1.5m lift
BMS
Norms No: 2(14) Nirman Tatha Yatayat Unit :m3
Item : Backfilling in foundation trenches with excavated materials including compaction in layers of 150mm
Norms No: B2) 2(25)a Unit :m3
Item: plain cement concrete works in foundation including material collection & 30m lead
A.1:3:6
Norms No: D1 7-2c Unit : 1 Cu.m.
Item: plain cement concrete works in superstructure including material collection &30m lead
B. 1:1.5:3 mix
Norms No: D2 7 b Unit :1 Cu.m.
A) Stone Masonry works including material collection,preparation of mortar with 5m lift and 10m lead
A. Random rubble Masonary 1:4
Norms No : C6 6(a)1-2 Unit : 1Cu.m.
A) Stone Masonry works including material collection,with 5m lift and 10m lead
A. Dry Random rubble Masonary
Norms No : C6 6-2-1 Unit : 1Cu.m.
Item: 38mmx75mm Sal wood frame &4mm glazed Shutter work in Door &Window
Norms No: G3 10(4) Unit : 2.23 m2
Item: 12.5 mm Thick 1:4 Cement sand Plaster work excluding ceiling
Norms No: I1) 12-1c Unit :100 m2
Item: Flush Rule Pointing on Stone Masonry Wall in 1:3 Cement sand mortar
Norms No: I10) 14(2)c Unit :100 m2
Item: Making and fixing 3*20 mm Iron Grill including aluminium paint
Norms No: M1 24-1a Unit :10 m2
Item: 3"(75mm) thick cement concrete floor (1:2:4) with Cement Punning
Norms No: H1 11-1d Unit :10 Sqm.
48,215.34
VDC contribution 40000
Estimated Amount 48215.34
User's Committee contribution 8215.34
@) ld=ld 3.84 m3
Knf:6/ ug]
5 { sfo{ !M$
lelq e'O{ efudf 1 8 4 32
lelq nfdf] kvf{ndf 2 8 4 64
lelq ;fgf] kvf{ndf 2 8 4 64
k]l6 jfndf 1 12 0.6 4 7.2
aflx/L nfdf] kvf{n 2 7 4 56
aflx/L ;fgf] kvf{n 2 7 4 56
36fpg' kg]{
emofn 4 0.6 0.75 -1.80
9f]sf 2 0.68 1 -1.36
276.0 m2
6 klgª sfo{
{ lelq e'O{ efudf 1 4 2.2 8.8
8.80 m2
7 /ª/f]ug ug]{ sfd
lelq nfdf] kvf{ndf 2 4 4 32
lelq ;fgf] kvf{ndf 2 3 4 24
aflx/L nfdf] kvf{n 2 3 4 24
aflx/L ;fgf] kvf{n 2 3 4 24
36fpg' kg]{
emofn 4 1 0.75 -3.00
9f]sf 2 1 1.56 -3.12
97.88 m2
8 9f]sfsf] kNnf / 1 0.68 2 1.36 m2
3 ld=
$=@ ld sf] 5fgf]
a/08f efusf] 5fgf] 3 ld=
6 klgª sfo{
{ lelq e'O{ efudf
ufpFkflnsfsf] sfo{no
uf]/vf
cfof]hgfsf] gfd M hnsGof vfg]kfgL of]hgf
7]ufgf M ;lxb nvg ufpFkflnsf uf]/vf
l;=g ljj/0f g= nDafOrf}8f prfO{kl/df0fo'lg6b/ /sd ?
1 Site clearance works 1 510 0.5 255.00 m2 13.74 3503.70
2 earth work excavation 1 510 0.2 0.3 30.60 m3 549.61 16818.07
3 32 mm HDPE Pipe 1 510 510.00 m 80.16 40881.60
4 40mm HDPE Pipe 1 5 5.00 m 123.36 616.80
5 Earth work backfilling 1 510 0.2 0.3 30.600 m3 333.50 10205.10
72,025.27
VDC contribution 60000
Estimated Amount 72025.27
User's Committee contribution 12025.27
g]kfn ;/sf/
;+l3o dfldnf tyf :yfgLo ljsf; dGqfno
ufpFkflnsfsf] sfo{no
uf]/vf
cfof]hgfsf] gfd M 5fkaf/L l;9L lg[df0f
7]ufgf M ;lxb nvg ufpFkflnsf uf]/vf
l;=g ljj/0f g= nDafOrf}8f prfO{kl/df0fo'lg6b/ /sd ?
1 Site clearance works 1 110 2.35 258.50 m2 13.74 3551.79
2 earth work excavation 1 110 1.35 0.12 17.82 m3 549.61 9794.05
3 dry stone steeping work 314 1.35 0.5 0.15 15.90 m3 2,294.27 36478.89
49,824.73
VDC contribution 40000
Estimated Amount 49824.73
User's Committee contribution 9824.73
g]kfn ;/sf/
;+l3o dfldnf tyf :yfgLo ljsf; dGqfno
ufpFkflnsfsf] sfo{no
uf]/vf
cfof]hgfsf] gfd M /fd]Zj/L b]lv 5la;] ;Dd l;9L lg[df0f
7]ufgf M ;lxb nvg ufpFkflnsf uf]/vf
l;=g ljj/0f g= nDafOrf}8f prfO{kl/df0fo'lg6b/ /sd ?
1 Site clearance works 1 212 2.35 498.20 m2 13.74 6845.27
2 earth work excavation 1 212 1.35 0.12 34.34 m3 549.61 18873.61
3 dry stone steeping work 606 1.35 0.5 0.15 30.68 m3 2,294.27 70388.20
96,107.08
VDC contribution 80000
Estimated Amount 96107.08
User's Committee contribution 16107.08
ufpFkflnsfsf] sfo{no
uf]/vf
cfof]hgfsf] gfd M k}/] vf]nf b]lv lkKn] ;Dd l;9L lgd{f0f
7]ufgf M ;lxb nvg ufpFkflnsf uf]/vf
l;= ljj/0f g= nDafOrf}8fOprfO{ kl/df0fo'lg6 b/ /sd ?
Site clearance
m2
1 works 1 250 2.35 587.50 13.74 8072.25
earth work
m3
2 excavation 1 265 1.35 0.12 42.93 549.61 23594.76
dry stone m3
3 steeping work 606 1.35 0.5 0.15 30.68 2,294.27 70388.20
102,055.21
VDC contribution 85000
Estimated Amount 102055.21
User's Committee contribution 17055.21
g]kfn ;/sf/
;+l3o dfldnf tyf :yfgLo ljsf; dGqfno
ufpFkflnsfsf] sfo{no
jf8 g * uf]/vf
cfof]hgfsf] gfd M nvg yfkfu'kmf l;l8 lgd{f0f
7]ufgf M ;lxb nvg ufpFkflnsf uf]/vf
l;= ljj/0f g=nDafOrf}8fOprfO{kl/df0fo'lg6 b/ /sd ?
Site clearance
m2
1 works 1 140 2.35 329.00 13.74 4520.46
earth work
m3
2 excavation 1 140 1.35 0.1 18.90 549.61 10387.63
dry stone m3
3 steeping work 400 1.35 0.5 0.15 20.25 2,294.27 46458.97
61,367.06
VDC contribution 50000
Estimated Amount 61367.06
User's Committee contribution 11367.06